MONTHYEARML12118A1392012-04-20020 April 2012 Units 2 & 3 Components, Portions Outside of Scope Project stage: Request ML12285A2672012-10-0101 October 2012 Attachment 4: SG Tube Wear Analysis for Unit-2/3 Project stage: Request ML12285A2652012-10-0101 October 2012 Attachment 4 - MHI Document L5-04GA564 - Tube Wear of Unit-3 RSG, Technical Evaluation Report Project stage: Request ML12285A2662012-10-0101 October 2012 Attachment 4: Appendix-2 Attachment-1, Tube-to-TSP Wear Depth Diagram for Unit-2/3 Project stage: Request ML12285A2642012-10-0101 October 2012 Attachment 3 - Areva Document 51-9180143-001 - SONGS Unit 3 February 2012 Leaker Outage Steam Generator Condition Monitoring Report Project stage: Request ML12285A2682012-10-0202 October 2012 Attachment 6 - Appendix B: SONGS U2C17 - Steam Generator Operational Assessment for Tube-to-Tube Wear Project stage: Request ML12285A2692012-10-0202 October 2012 Attachment 6: Appendix a: Estimates of FEI-Induced Ttw Rates Project stage: Request ML12285A2632012-10-0303 October 2012 Confirmatory Action Letter - Actions to Address Steam Generator Tube Degradation Project stage: Request ML12335A2972012-11-28028 November 2012 LTR-12-0728 - Ltr. Ricardo Nicol Concerns Restart of San Onofre Nuclear Generating Station Project stage: Request ML12338A1102012-11-30030 November 2012 Email, Request for Additional Information Southern California Edisons Response to NRCs Confirmatory Action Letter (CAL) 4-12-001 Dated March 27, 2012 Project stage: RAI ML12341A1122012-12-0707 December 2012 Notice of Meeting with Southern California Edison to Discuss Its Response to NRCs Confirmatory Action Letter and Return to Service Report for San Onofre Nuclear Generating Station, Unit 2 Project stage: Meeting ML12347A0662012-12-0707 December 2012 Revised Notice of 12/18/12 Meeting with Southern California Edison to Discuss Its Response to NRCs Confirmatory Action Letter and Return to Service Report for San Onofre Nuclear Generating Station, Unit 2 Project stage: Meeting ML12345A4272012-12-10010 December 2012 Revised Email, Request for Additional Information Review of Southern California Edisons Response to NRCs 3/27/2012 Confirmatory Action Letter (CAL) 4-12-001 and Return to Service Report Project stage: RAI ML12353A0972012-12-13013 December 2012 LTR-12-0795 - E-mail Don Leichtling Concerns Media Alert - Nuclear News - NRR Forthcoming Meeting with Southern California Edison Company Project stage: Meeting ML12352A3852012-12-18018 December 2012 Licensee Slides for 12/18/12 Public Meeting Project stage: Meeting ML12352A4112012-12-18018 December 2012 NRC Slides for 12/18/12 Meeting with Southern California Edison Project stage: Meeting ML12356A1982012-12-20020 December 2012 Email, Request for Additional Information, Round 3, Review of Southern California Edisons Response to NRCs 3/27/2012 Confirmatory Action Letter (CAL) 4-12-001 and Return to Service Report Project stage: RAI ML12361A0652012-12-26026 December 2012 Request for Additional Information Regarding Response to Confirmatory Action Letter Project stage: RAI ML13009A3492013-01-0808 January 2013 Response to Request for Additional Information Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13014A2492013-01-0909 January 2013 Response to Request for Additional Information (RAI 15) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13014A2512013-01-0909 January 2013 Response to Request for Additional Information (RAI 30) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13015A0042013-01-10010 January 2013 Response to Request for Additional Information (RAI 16), Regarding Confirmatory Action Letter Response (TAC No. Me 9727) Project stage: Response to RAI ML13022A0882013-01-16016 January 2013 Response to Request for Additional Information (RAI 19) Regarding Confirmatory Action Letter Response (TAC No. Me 9727) Project stage: Response to RAI ML13022A4132013-01-17017 January 2013 Response to Request for Additional Information (RAIs 10 and 17) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13022A4812013-01-18018 January 2013 Response to Request for Additional Information (RAI 13), Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13022A4082013-01-18018 January 2013 Response to Request for Additional Information (RAI 12), Regarding Confirmatory Action Letter Response (TAC No. Me 9727) Project stage: Response to RAI ML13018A4452013-01-18018 January 2013 Natural Resources Defense Councils Amicus Response in Support of Friends of the Earth Opening Brief Project stage: Request ML13022A4052013-01-21021 January 2013 Response to Request for Additional Information (RAI 28), Regarding Confirmatory Action Letter Response (TAC No. Me 9727) Project stage: Response to RAI ML13022A4112013-01-21021 January 2013 Response to Request for Additional Information (RAI 11) Regarding Confirmatory Action Letter Response (TAC Me 9727) Project stage: Response to RAI ML13028A0982013-01-24024 January 2013 Response to Request for Additional Information (RAI 18) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13028A4742013-01-25025 January 2013 Response to Request for Additional Information (RAIs 5, 7, and 9) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13028A4752013-01-25025 January 2013 Response to Request for Additional Information (RAI 27) Regarding Confirmatory Action Letter Project stage: Response to RAI ML13032A0092013-01-29029 January 2013 Response to Request for Additional Information (RAI 14) Regarding Confirmatory Action Letter Response (TAC No. Me 9727) Project stage: Response to RAI ML13037A1122013-01-31031 January 2013 Response to Request for Additional Information (RAI 29) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13053A3672013-02-0101 February 2013 E-mail, Draft Request for Additional Information Southern California Edisons Response to NRCs Confirmatory Action Letter Project stage: Draft RAI ML13038A0102013-02-0404 February 2013 Response to Request for Additional Information (RAI 8) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13038A0092013-02-0404 February 2013 Response to Request for Additional Information (RAI 6) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13039A2782013-02-0606 February 2013 Response to Request for Additional Information (RAIs 20, 21, 22, 23, 24, 26 & 31), Confirmatory Action Letter Project stage: Response to RAI ML13039A3172013-02-0707 February 2013 Response to Request for Additional Information (RAI 25) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13050A1892013-02-14014 February 2013 Supplemental Document Submittal Regarding Confirmatory Action Letter Response, Concerning Steam Generator Tubes Project stage: Supplement ML13051A1992013-02-15015 February 2013 Enclosure 6, LTR-SGDA-12-36, Rev. 3, Flow-Induced Vibration and Tube Wear Analysis of the San Onofre Nuclear Generating Station Unit 2 Replacement Steam Generators Supporting Restart. Page 228 of 415 Through End Project stage: Other ML13046A1232013-02-15015 February 2013 2/27/2013 Notice of Forthcoming Meeting with Southern California Edison Company to Discuss Confirmation Action Letter Project stage: Meeting ML13051A1972013-02-15015 February 2013 Enclosure 6, LTR-SGDA-12-36, Rev. 3, Flow-Induced Vibration and Tube Wear Analysis of the San Onofre Nuclear Generating Station Unit 2 Replacement Steam Generators Supporting Restart. Cover Through Page 227 of 415 Project stage: Other ML13051A1902013-02-18018 February 2013 Supplemental Document Submittal Regarding Confirmatory Action Letter Response to Address Steam Generator Tube Degradation Project stage: Supplement ML13051A1922013-02-18018 February 2013 Enclosure 4, L5-04GA567, Rev. 6, Evaluation of Stability Ratio for Return to Service Project stage: Other ML13051A1932013-02-18018 February 2013 Enclosure 5, L5-04GA585, Rev. 2, Analytical Evaluations for Operational Assessment Project stage: Other ML13056A0922013-02-20020 February 2013 Email, Draft Request for Additional Information Nos. 38-52, Southern California Edisons Response to NRCs Confirmatory Action Letter Project stage: Draft RAI ML13053A1842013-02-21021 February 2013 Draft Request for Additional Information, Nos. 53-67, Southern California Edisons Response to NRCs Confirmatory Action Letter Project stage: Draft RAI ML13053A1732013-02-21021 February 2013 Email, Draft Request for Additional Information, Nos. 53-67, Southern California Edisons Response to NRCs Confirmatory Action Letter Project stage: Draft RAI ML13056A6012013-02-25025 February 2013 Response to Request for Additional Information (RAI 32) Regarding Confirmatory Action Letter Response Project stage: Response to RAI 2013-01-21
[Table View] |
Text
J j SOUTHERN CALIFORNIA A
EDISONA An EDISON INTERNATIONAL Company Richard J. St. Onge Director, Nuclear Regulatory Affairs and Emergency Planning February 4, 2013 10 CFR 50.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Docket No. 50-361 Response to Request for Additional Information (RAI 8)
Regarding Confirmatory Action Letter Response (TAC No. ME 9727)
San Onofre Nuclear Generating Station, Unit 2
References:
- 1. Letter from Mr. Elmo E. Collins (USNRC) to Mr. Peter T. Dietrich (SCE), dated March 27, 2012, Confirmatory Action Letter 4-12-001, San Onofre Nuclear Generating Station, Units 2 and 3, Commitments to Address Steam Generator Tube Degradation
- 2. Letter from Mr. Peter T. Dietrich (SCE) to Mr. Elmo E. Collins (USNRC), dated October 3, 2012, Confirmatory Action Letter - Actions to Address Steam Generator Tube Degradation, San Onofre Nuclear Generating Station, Unit 2
- 3. Letter from Mr. James R. Hall (USNRC) to Mr. Peter T. Dietrich (SCE), dated December 26, 2012, Request for Additional Information Regarding Response to Confirmatory Action Letter, San Onofre Nuclear Generating Station, Unit 2
Dear Sir or Madam,
On March 27, 2012, the Nuclear Regulatory Commission (NRC) issued a Confirmatory Action Letter (CAL) (Reference 1) to Southern California Edison (SCE) describing actions that the NRC and SCE agreed would be completed to address issues identified in the steam generator tubes of San Onofre Nuclear Generating Station (SONGS) Units 2 and 3. In a letter to the NRC dated October 3, 2012 (Reference 2), SCE reported completion of the Unit 2 CAL actions and included a Return to Service Report (RTSR) that provided details of their completion.
By letter dated December 26, 2012 (Reference 3), the NRC issued Requests for Additional Information (RAIs) regarding the CAL response. Enclosure 1 of this letter provides the response to RAI 8.
P.O. Box 128 San Clemente, CA 92672 6 -ýý
ýKk
Document Control Desk February 4, 2013 There are no new regulatory commitments contained in this letter. If you have any questions or require additional information, please call me at (949) 368-6240.
Sincerely,
Enclosure:
- 1) Response to RAI 8 cc:
E. E. Collins, Regional Administrator, NRC Region IV J. R. Hall, NRC Project Manager, SONGS Units 2 and 3 G. G. Warnick, NRC Senior Resident Inspector, SONGS Units 2 and 3 R. E. Lantz, Branch Chief, Division of Reactor Projects, NRC Region IV
ENCLOSURE 1 SOUTHERN CALIFORNIA EDISON RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REGARDING RESPONSE TO CONFIRMATORY ACTION LETTER DOCKET NO. 50-361 TAC NO. ME 9727 Response to RAI 8 Page 1 of 2
RAI 8
It is stated in Reference 4, page 4-6, second paragraph that, "It has been observed that the number of AVB supports that develop wear in the second cycle of operation can increase dependent on the number of worn AVB indications at the beginning of the second cycle. These data were used in the OA to add AVB locations at the start of Cycle 17 from a statistical representation of this data." Provide a more complete description of the model used to add AVB locations that will develop wear during the second cycle. Confirm that this model applies to both the 560 tubes with existing tube support wear and the 1350 NDD tubes.
RESPONSE
Note: RAI Reference 4 is the "Operational Assessment for SONGS Unit 2 SG for Upper Bundle Tube-to-Tube Wear Degradation at End of Cycle 16," prepared by Intertek APTECH for Areva, Report No. AES 12068150-2Q-1, Revision 0, September 2012.
The inspection results from a similar replacement steam generator (RSG) unit were used to establish the probability of having new wear locations in a tube with prior anti-vibration bar (AVB) wear after completing the second (full) cycle of operation subsequent to generator replacement. The algorithm for SONGS Unit 2 conservatively assumes any new wear locations initiate at the start of the next cycle of operation, although in reality, new wear locations may develop at various times during the cycle.
New tube to AVB wear locations are assigned using a statistical model. The data for the model came from a similar RSG two-loop design of comparable size with more than two operating cycles. Because of the similar U-bend support structure, the data were considered applicable to SONGS. A difference between the two units is the number of AVB supports (eight versus 12 bars for SONGS steam generators). Most support of the U-bend for SONGS comes from the inner eight AVBs. Little to no tube to AVB wear is observed in the outer support locations prior to TTW. Since the two units are similar in the number of active supports, normalization between the two designs was not required for assigning new wear locations.
The data defining the increase in the number of tube to AVB contact locations are well represented by Poisson distribution functions. The parameters for the Poisson distribution were developed by standard regression analysis. The Poisson distribution was selected because it is a single parameter function and is a good representation for distributions of integer variables such as the number of AVBs.
Cumulative distribution functions (CDF) were developed from the fitted Poisson distributions.
Each CDF is dependent on the number of wear locations that exist in a given tube at the end of the first cycle of operation. These CDFs were sampled at the start of the next cycle of operation for each trial in the Monte Carlo simulation and new locations were added to each tube accordingly. The CDFs representing new wear sites are based on 100% power for the similar RSG over the full 2nd cycle of operation. No credit was taken for operation at 70%
power for the five month operating interval when assigning new wear sites, making this approach conservative.
This method was implemented for the 560 tubes with existing tube support wear. The group of 1350 tubes with no detected wear used a different method for assigning wear locations at the start of the next operating cycle as described in the response to RAIs 5 and 7.
Page 2 of 2