FINAL Southern Nuclear E, I, Hatch Nuclear Plant Operations Training JPM CRISIM 1 ALL (Alternate Path)

TITLE WITHDRAW CONTROL RODS (ROD UNCOUPLES)

AUTHOR MEDIA NUMBER TIME Anthony Ball 2012-301 SIM-l 12 Minutes RECOMMENDED BY APPROVED BY DATE NA C. M. EDMUND 06/07/20 12 SOUTHERN COMPANY A

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code: OPERATIONS TRAINING Media Number: 2012-301 SIM-1 Rev. No. Date Reason for Revision Authors] Supvs Initials I Initials 00 06/07/12 Revision for use on 2012-30 1 NRC Exam. After NRC ARB CME Exam, Media Number will be changed to LR-JP 01.10.

2012-301 SIIvI-1 Page 1 of 9 UNIT 1 0 UNIT 2 (X)

TASK TITLE: WITHDRAW CONTROL RODS (ROD UNCOUPLES)

JPM NUMBER: 2012-301 SIM-1 TASK STANDARD: The task shall be completed when the uncoupled control rod has been re-coupled lAW 34AR-603-248-2, Rod Over travel.

TASK NUMBER: 001.010 OBJECTIVE NUMBER: 001.010.A PLANT HATCH JTA IMPORTANCE RATING:

RO 2.8 SRO 2.8 K/A CATALOG NUMBER: 201003 A2.02, K/A CATALOG JTA IMPORTANCE RATING:

RO 3.7 SRO 3.8 OPERATOR APPLICABILITY: Reactor Operator (RO)

GENERAL

REFERENCES:

Unit 2 34AR-603-248-2 34G0-OPS-065-0 34G0-OPS-00 1-2 REQUIRED MATERIALS: Unit 2 34AR-603-248-2 34G0-OPS-065-0 APPROXIMATE COMPLETION TIME: 12 Minutes SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

2012-301 SIM-1 Page 2 of 9 SIMULATOR SETUP Simulator Initial Conditions:

1. RESET the Simulator to IC #109 or Snap 611 and leave in FREEZE.
2. INSERT the following MALFUNCTIONS:

MALF # TITLE FINAL RAMP ACT.

VALUE RATE TIME mfC 1 2_23 Control rod 10-47 uncoupled 0000

3. INSERT the following SIMULATOR VALUE OVERRIDES (SVO):

SVO # DESCRIPTION FINALJ RAMP ACT.

VALUE RATE TIME none

4. INSERT the following REMOTE FUNCTIONS:

REM # DESCRIPTION STATUS none

5. INSERT the following ORS OVERRIDES:

TAG # P/L DESCRIPTION STATUS none

6. Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:

A. Give the student the marked up copy of 34G0-OPS-001-2.

7. PLACE the Simulator in FREEZE until the INITIATING CUE is given.
8. PLACE DANGER TAGS on the following equipment:
9. ESTIMATED Simulator SETUP TIME:
10. Once the operator begins inserting the control rod to re-couple, REMOVE the malfunction.

2

EVALUATOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONIMTIONS:

1. A Reactor Startup is in progress. 34G0-OPS-OO1-2 is in progress.
2. Control rods are being withdrawn to increase power per 34G0-OPS-065-O. The current control rod step is 31 with a withdraw limit of position 48.
3. The Control Rod Movement Pre-job Brief and associated checklist have been completed.
4. Continuous Rod Movement is desired for these rod movements
5. No one will be performing peer checks but proceed with the task.
6. No FAST Control rods have been identified.

INITIATING CUES:

Continue Control Rod withdrawal in Rod Step 31.

2012-301 SIM-1 Page 4 of 9 I STEP PERFORMANCE STEP STANDARD For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN IJ Human performance tools, safety, PPE met (1), AND Mark the JPM as a PASS IJ For initial trg all steps completed correctly OR PASS i For continuing trg, critical steps (if used) completed correctly FAIL Above standards not met Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01-0685 Section 6.5.3 provides examples)

START TIME:________

1. Operator identifies the procedure Operator has identified the correct needed to perform the task, procedure as 34GO-OPS-065-0.
2. Operator verifies the status of the On 2H1 1-P603, the operator currently latched rod group. selects each control rod in the currently latched group, observing their position on the four rod display AND comparing to the pull sheet.
3. The operator selects the first rod to be On 2H11-P603, the operator withdrawn 38-39. selects the first rod in the currently latched group.

NOTE: With regard to withdrawing the rod, IF the applicant notches the rod out one or two notches and then transitions to continuous withdrawal is acceptable.

(** Indicates critical step)

2012-301 SIM-1 Page 5 of 9 19 PERFORMANCE STEP STANDARD I (COMMENTS) 1

    • 4 The operator withdraws the selected The operator positions both the rod to position 48. Rod Movement Control switch and the RONOR switch to the withdraw position and holds them until the rod moves to position 48.

NOTE: 34G0-OPS-065-0 instructions for performing a coupling check only addresses using the rod movement switch. It is acceptable if the student uses the RONOR switch along with the rod movement switch in withdrawing the rod for the coupling check.

    • 5. The operator performs a coupling The operator positions the Rod check on the selected control rod by Movement Control switch to the providing a separate (second) withdraw position observing for:

withdraw signal.

. The red withdraw light illuminates

. Momentary loss of the 48 position indication

. The rod does NOT move beyond position 48.

. Annunciator rod overtravel does NOT illuminate.

. Documents the check on the movement form.

6. The operator selects the next rod to be On 2H1 1-P603, the operator withdrawn 14-15. depresses the pushbutton on the select panel for the next rod in the currently latched group.
    • 7 The operator withdraws the selected On 2H1 l-P603, the operator rod to position 48. positions both the Rod Movement Control switch and the RONOR switch to the withdraw position and holds them until the rod moves to position 48.

(*

  • Indicates critical step)

2012-301 SIM-1 Page 6 of 9 9 I PERFORMANCE STEP STANDARD I (COMMENTS) 1 The operator performs a coupling The operator positions the Rod check on the selected control rod by Movement Control switch to the providing a separate (second) withdraw position observing for:

withdraw signal.

  • The red withdraw light illuminates
  • Loss of the 48 position indication
  • The rod MOVES beyond position 48.
9. Operator identifies the procedure The operator reviews ARP 34AR-needed to perform the task 603-248-2, Rod Over travel.
10. Notifies the Shift Supervisor. The operator reports the status of the control rod which experienced over travel.
    • 11. Attempts to re-couple the rod by On panel 2H1 1-P603, the notching the rod in. operator inserts the rod from one to three notches, notching the rod in using the Rod Movement Switch.

NOTE: The operator may choose to use continuous withdrawal or notch withdrawal to return the control rod to position 48.

PROMPT: Simulator Operator, once the rod is inserted past 48, THEN remove the uncouple rod malfunction mfCl2_23 for rod 14-15.

    • 12. Withdraw the rod to position 48 On 2H1 1-P603, the operator positions the Rod Movement Control switch and possibly the RONOR switch to the withdraw position and holds them until the rod moves to position 48.

(** Indicates critical step)

2012-301 STM-1 Page 7 of 9 ESTEP PERFORMANCE STEP STANDARD I (COMMENTS) 1 NOTE: 34G0-OPS-065-0 instructions for performing a coupling check only addresses using the rod movement switch. It is acceptable if the student uses the RONOR switch along with the rod movement switch in withdrawing the rod for the coupling check.

    • 13. The operator performs a coupling The operator positions the Rod check on the selected control rod. Movement Control switch to the withdraw position observing for:

. The red withdraw light illuminates

. Momentary loss of the 48 position indication

. The rod does NOT move beyond position 48.

. Annunciator rod overtravel does NOT illuminate.

14. The operator documents the coupling The operator documents the check. coupling check on the movement form.
15. Informs supervision of the re-coupling The operator reports to the SS attempt. that the coupling check was successful.

PROMPT: When the operator selects the third control rod inform the operator that another operator will assume control rod movement duties and the JPM will be stopped here.

EN])

TIME:________

NOTE: The terminating cue shall be given to the operator when:

After JPM step #15 is complete.

With no reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

EVALUATOR PICK UP the Initiating Cue sheet.

(** Indicates critical step)

Page 8 of 9 UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. A Reactor Startup is in progress. 34G0-OPS-OOl-2 is in progress.
2. Control rods are being withdrawn to increase power per 34G0-OPS-065-O. The current control rod step is 31 with a withdraw limit of position 48.
3. The Control Rod Movement Pre-job Brief and associated checklist have been completed.
4. Continuous Rod Movement is desired for these rod movements
5. No one will be performing peer checks but proceed with the task.
6. No FAST Control rods have been identified.

INITIATING CUES:

Continue Control Rod withdrawal in Rod Step 31.

Page 9 of 9 ep1ace this page with

1. The marked up pull sheet for control rod withdrawal up to Rod step 31, rod 38-39.

FINAL Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM CR/SIM 2 ALL TITLE STARTUP A REACTOR FEED PUMP TURBINE (NORMAL METHOD)

AUTHOR MEDIA NUMBER TIME Anthony Ball 2012-301 SIM-2 20.0 Minutes RECOMMENDED BY APPROVED BY DATE N/R C. M. EDMUND 06/07/2012 SOUTHERN COMPANY A

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code: OPERATIONS TRAINING Media Number: 2012-301 SIM-2 Rev. No. Date Reason for Revision Authors Supvs Imtials Imtaals 00 06/07/12 Revision for use on 2012-30 1 NRC Exam. After NRC ARB CME Exam, Media Number will be changed to LR-JP 02.04-19.

2012-301 SIM-2 Page 1 of 4 UNIT 1 (X) UNIT 2 (X)

TASK TITLE: STARTUP A REACTOR FEED PUMP TURBINE (NORMAL METHOD)

JPM NUMBER: 2012-301 SIM-2 TASK STANDARD: The task shall be completed when the second Reactor Feed Pump is supplying water to the Reactor and is being controlled in automatic by the FW Lvi Control Turb, per 34S0-N21-007.

TASK NUMBER: 002.004 OBJECTIVE NUMBER: 002.004.C PLANT HATCH JTA IMPORTANCE RATING:

RO 2.79 SRO 3.15 K/A CATALOG NUMBER: 259001A4.02 K/A CATALOG JTA IMPORTANCE RATING:

RO 3.90 SRO 3.70 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)

GENERAL

REFERENCES:

Unit 1 Unit 2 34G0-OPS-00 1-1 34G0-OPS-00 1-2 (current version) (current version) 34S0-N2 1-007-1 34S0-N2 1-007-2 (current version) (current version)

REQUIRED MATERIALS: Unit 1 Unit 2 34S0-N21 -007-1 34S0-N21 -007-2 (current version) (current version)

APPROXIMATE COMPLETION TIME: 20.0 Minutes SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

2012-301 SIM-2 Page 2 of 4 SIMULATOR SETUP Simulator Initial Conditions:

1. RESET the Simulator to IC #110 and leave in FREEZE.
2. ENSURE 21(1 Condensate and CBP are running.
3. ENSURE 2A RFPT is operating at 2100 rpm with MJA Station Permissive 2A (White) light ILLUMINATED.
4. ESTIMATED Simulator SETUP TIME: 10 Minutes

EVALUATOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. RFPT 2A is operating at -2100 rpms per step 7.1.11.2.9 of 34S0-N21-007-2.
2. RFPT 2B is in operation and the Feedwater Level Control System is in 3 Element Control.
3. 34GO.OPS-OO1-2 is in progress.

INITIATING CUES:

Place RFPT 2A in service per 34S0-N21-007-2 starting at step 7.1.11.2.9.

2012-301 SIM-2 Page 4 of 7 STEP PERFORMANCE STEP STANDARD I (COMMENTSJ For INITIAL Operator Programs:

For OJTIOJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN Human performance tools, safety, PPE met (1), AND Mark the JPM as a PASS IJ For initial trg all steps completed correctly OR PASS I For continuing trg, critical steps (if used) completed correctly FAIL J Above standards not met IJ Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-O1-0685 Section 6.5.3 provides examples)

START TIME:

1. Operator reviews the procedures Operator has reviewed the precautions and limitations, precautions and limitations.
2. Confirm the WA Station Permissive At panel 2H1 1-P650, the operator 2A white light is illuminated. CONFIRMS the WA STATION PERMISSIVE 2A white light is illuminated.
3. Confirm that the WA Station output At panel 2H1 1-P603, the operator signal is tracking 2A RFPT speed. CONFIRMS the WA STATION, output signal is tracking actual RFPT 2A speed.
    • 4 Place the RFPT 2A TMR Mode At panel 2H1 1-P650, the operator switch to WA. PLACES the RFPT 2A TMR MODE switch to WA, the M/A STATION green light illuminates.
5. Slowly increase RFPT 2A speed until At panel 2H1 1-P603, RFPT 2A incoming and running RFPT flows M/A STATION has been match. ADJUSTED until the RFP being started and the running RFP flow MATCH

(** Indicates critical step)

2012-301 SIM-2 Page 5 of 7 STEP PERFORMANCE STEP STANDARD I (COMMENTS) 1 NOTE: For the purpose of this JPM, accept feed flows within +/-10% of meter scale as being matched on feed flows.

6. Adjust the manual output lever on At panel 2H1 1-P603, RFPT 2A RFPT 2A WA Station until the M/A STATION manual output INPUT and OUTPUT signals are lever is ADJUSTED until the matched. INPUT signal (PF lamp extinguished) and OUTPUT signal (PF lamp illuminated) are MATCHED.

NOTE: To match the INPUT and OUTPUT signals, the PF key must be toggled (PF key depressed to switch off, PF lamp extinguished, then depressing the PF key again to switch on, PF lamp illuminated) to compare the signals. For the purpose of this JPM, consider the signals matched if within +/-2%.

    • 7* Place RFPT 2A WA Station in At panel 2H1 1-P603, RFPT 2A automatic. M/A STATION is placed in AUTOMATIC, the (A) AUTO green light is illuminated.

(** Indicates critical step)

2012-301 SIM-2 Page 6 of 7 STEP I

  1. 1 PERFORMANCE STEP STANDARD I SAT/UNSAT (COMMENTS) 1
8. Adjust RFPT 2A Speed Control Bias At panel 2H1 1-P603, if required:

setting to maintain RFPT 2A and The Speed Control Bias for M/A RFPT 2B speeds within 100 rpm.

STATION R6O1A or R6O1B has been ADJUSTED using the INCREASE/DECREASE set pushbuttons.

RFPT 2A and RFPT 2B speeds are within 100 rpm of each other on panel 2H1 1-P650.

END TIME:________

NOTE: The terminating cue shall be given to the operator when:

After JPM step #8 is complete.

With no reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

EVALUATOR PICK UP the Initiating Cue sheet.

(*

  • Indicates critical step)

2012-301 SIM-2 Page 7 of 7 UNIT 2 READ TO TIlE OPERATOR INITIAL CONDITIONS:

1. RFPT 2A is operating at -21OO rpms per step 7.1.11.9 of 34S0-N2 1-007-2.
2. RFPT 2B is in operation and the Feedwater Level Control System is in 3 Element Control.
3. 34G0-OPS-001-2 is in progress.

INITIATING CUES:

Place RFPT 2A in service per 34S0-N21-007-2 starting at step 7.1.11.9.

FINAL Southern Nuclear 0 I. Hatch Nuclear Plant E

Operations Training JPM CR/SIM 3 ALL TITLE OVERRIDE THE MS1VS IN AN EMERGENCY AUTHOR MEDIA NUMBER TIME ANTHONY BALL 20 12-301 SIM-3 18.0 Minutes RECOMMENDED BY APPROVED BY DATE N/R C. M. EDMUND 06/07/20 12 SOUTHERN COMPANY A

SOUThERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code: OPERATIONS TRAINING Media Number: 2012-301 SIM-3 Rev. No. Date Reason for Revision Authors] Supvs Initials j Initials 01 08/24/92 General revision and format change WMM SCB 02 08/16/93 General revision, word processor change RAB RSG 03 08/19/94 Modify simulator setup, adjust format RAB SMC 04 03/28/96 Format change RAB DHG 05 04/10/97 Revised based on feedback from the 1996 Requal SCB RSG annual exam.

06 02/07/00 Format modification, change time allowance based on RAB DHG running average, upgrade to the new simulator operating_system 07 11/02/00 Include objective number RAB DHG 08 03/1 1/02 Include initial operator statement RAB RAB 09 03/17/05 Deleted S from procedure numbers, changed ARB DHG Revision and Rev, numbers to Current Version.

Changed to Nuclear Plant Operator. Updated Simulator_IC#_and_MSIV_position.

10 06/13/05 Revised Initial License statement for successful RAB RAB completion 11 04/18/06 Remove Response Cues RAB RAB 12 11/06/06 Correct MPLs and Switch labels on Unit 1 BKW RAB 13 06/07/12 Revision for use on 2012-301 CR-SIM 3 and updated ARB CME procedure changes. After NRC Exam, Media Number will be changed to LR-JP-14.14-13.

2012-301 SllvI-3 Page 1 of 9 UNIT 1 (X) UMT 2 (X)

TASK TITLE: OVERRIDE THE MSIVS IN AN EMERGENCY JPM NUMBER: 2012-301 SIM-3 TASK STANDARD: The task shall be completed when the MSIVs have been opened per 31E0-EOP-1 11-1/2.

TASK NUMBER: 014.014 OBJECTIVE NUMBER: 014.014.A PLANT HATCH JTA IMPORTANCE RATING:

RO 3.85 SRO 3.16 K/A CATALOG NUMBER: 239001A401 K/A CATALOG JTA IMPORTANCE RATING:

RO 4.20 SRO 4.00 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)

GENERAL

REFERENCES:

Unit 1 Unit 2 31E0-EOP-111-1 31E0-EOP-111-2 3 1EO-EOP-01 1-1 3 1EO-EOP-01 1-2 (current versions) (current versions)

REQUIRED MATERIALS: Unit 1 Unit 2 31E0-EOP-1 11-1 3 1EO-EOP-1 11-2 (current version) (current version)

APPROXIMATE COMPLETION TIME: 18.0 Minutes SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

2012-301 SIM-3 Page 2 of 9 SIMULATOR SETUP Simulator Initial Conditions:

1. RESET the Simulator to IC #127 or Snap 613 and leave in FREEZE.
2. INSERT the following MALFUNCTIONS:

MALF # TITLE FINAL RAMP ACT.

VALUE RATE TIME mfCl 1_21 1 Scram Discharge Volume ATWS (Var) 60 100 00000 mfE4l_235A HPCI Fails to Auto Start on Low Level 00000 mfE4l_235B HPCI Fails to Auto Start on Hi Drywell Press 00000 mf60321383 Spur Ann LOW CONDENSER VACUUM 00000 A BYPASS mf60321384 Spur Ann LOW CONDENSER VACUUM B 00000 BYPASS

3. INSERT the following SIMULATOR VALUE OVERRIDES (SVO):

SVO # DESCRIPTION FINAL RAMP ACT.

VALUE, RATE TIME svoB2lOO5 LT-NO81A Group 1111 Isolation -110 100 00000 svoB2lOO6 LT-NO81B Group 1111 Isolation -110 100 00000

4. INSERT the following REMOTE FUNCTIONS:

REM # DESCRIPTION STATUS rfNl 1045 SJAE A Steam CLOSE rfB21148 Grp 1 Low Rx Water Level Bypass ORIDE rfC7 1279 Group 1 Isolation Oride Jumpers ORIDE

5. Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:

A. Take simulator out of FREEZE and perform RC- 1, RC-2 and TC- 1.

B. Place 2N1 1-FOO4A & FOO4B control switches in CLOSED & ENSURE they are CLOSED.

C. Place the MSIV control switches in CLOSED.

D. Enter Remote Functions WHEN Torus temperature reaches 109°F or greater.

E. Inhibit ADS and inject SBLC.

F. Acknowledge annunciators.

6. PLACE the Simulator in FREEZE until the INITIATING CUE is given.
7. ESTIMATED Simulator SETUP TIME: 15 Minutes

EVALUATOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. The Condenser Low Vacuum and Low RWL isolations have been bypassed.
2. Main Condenser is in operation with Circ Water and Condensate Systems in operation.
3. An ATWS condition exists and 31E0-EOP-O1 1-2 (RCA) is in progress.
4. EHC is in operation.

INITIATING CUES:

Open the MSIVs to re-establish Main Condenser as the heat sink using 31E0-EOP-1 11-2.

2012-301 SllvI-3 Page 4 of 9 I STEP f PERFORMANCE STEP STANDARD f

For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN L1 Human performance tools, safety, PPE met (1), AND J Mark the JPM as a PASS J For initial trg all steps completed correctly OR PASS L For continuing trg, critical steps (if used) completed correctly FAIL U Above standards not met U Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)

START TIME:_______

1. Place MSIV Control Switches to At panel 2H1 1-P601, the CLOSED. following OUTBOARD MSIV switches are in CLOSED:

MS1V 2B21-F028A MSIV 2B21-F028B MSIV 2B21-F028C MSIV 2B21-F028D At panel 2H1 1-P602, the following INBOARD MSIV switches are in CLOSED:

MSIV 2B21-F022A MSIV 2B21-F022B MSIV 2B21-F022C MSIV 2B21-F022D

2. Confirm A & B RFPTs are tripped. At panel 2H1 1-P650, Operator has determined BOTH RFPTs are TRIPPED by:

Checking annunciators(650-325

& 326) are ILLUMINATED

(** Indicates critical step)

2012-301 SIM-3 Page 5 of 9 I STEP PERFORMANCE STEP STANDARD I (COMMENTSJ PROMPT: IF the operator addresses isolation bypasses, as the Shift Supervisor, INFORM the operator that the Condenser Low Vacuum and Low Water Level isolations are bypassed.

    • 3 Reset Group I Isolation. The GR ISOL RESET switch has been taken to GR I RESET position at panels 2H1 1-P601 and 2H1 1-P602.
4. Bypass the High Flow isolation on Operator has determined it is 2P70-F004 and F005, if necessary. NOT necessary to bypass the High Flow Isolation by:

Checking annunciators OR Checking INBD INLET ISOL 2P70-F004 and F005 red lights illuminated on panel 2H1 1-P700.

NOTE: It is acceptable for operator to have the High Flow Isolation bypassed. IF operator decides to bypass the High Flow Isolation, as the Shift Support Supervisor, INFORM the operator that it has been bypassed.

5. Confirm closed Inboard MSIVs. At panel 2H1 1-P602, the following INBOARD MSIVs are CLOSED, green light illuminated:

MSIV 2B21-F022A MSIV 2B21-F022B MSIV 2B21-F022C MSIV 2B21-F022D.

    • 6. Open Outboard MSIVs. At panel 2H1 1-P601, the following switches are in OPEN SLO TEST, red light illuminated:

MSIV 2B2l-F028A MSIV 2B21-F028B MSIV 2B21-F028C MSIV 2B21-F028D.

(*

  • Indicates critical step)

2012-301 SIM-3 Page 6 of 9 STEP PERFORMANCE STEP I SAT/UNSAT

  1. STANDARD L_(COMMENTS)
7. Check differential pressure across Operator has determined Inboard MSIVs. differential pressure is greater than 200 psid using:

REACTOR PRESSURE indicator A(B,C) 2C32-R605A(B,C) on panel 2H11-P603 AND MAIN STEAM PRESS A(B) 2N32-R654A(B) indicator on Turbine EHC Panel or recorder PRESS TO STOP VLVS 1 & 4 2N 11 -R60 1 OR

NOTE: Any valid indication of Reactor Pressure and Steam Line Pressure can be used for Step 7.

8. Confirm/Close valves The operator has ADDRESSED 2N1 1-FOO1A & B. contacting a SO to verify/close SJAE 2A(2B) MAIN STEAM ISOL VALVE at panel 2H21-P216.

PROMPT: WHEN the operator addresses valves 2N11-FOO1A and B, as the SO, INFORM the operator that the valves 2N1 1-FOO1A & B are closed.

9. Confirm the following valves are At panel 2H1 1-P650, the closed: following valves are CLOSED, 2N1 l-FOO4A green light illuminated:

2Nl 1 FOO4B 2ND STG A & B MSR RHTR STM SPLY VLV 2N1 1-FOO4A 2N33-F003 2ND STG C & D MSR RHTR STM SPLY VLV 2N1 1-FOO4B MAIN STM FEED VLV 2N33-F003.

(** Indicates critical step)

2012-301 SllvI-3 Page 7 of 9 STEP I SAT!UNSAT 1

  1. i PERFORMANCE STEP STANT)ARI)

I (COMMENTS) I

    • 1O. Open the following valves: The following valves are OPEN, 2B21-F016 red lights illuminated:

2B21-F019 MSL DRAIN VLV, 2B21-F0l6, at panel 2H1 1-P602 2B21-F020 MSL DRAIN VLV, 2B21-F019, at panel 2H1 1-P601 DRAIN VLV, 2B21-F020, at panel 2H1 1-P602

11. Verify differential pressure across Operator has determined MSIVs is less than 200 psid. differential pressure is less than 200 psid using:

REACTOR PRESSURE indicator A(B,C) 2C32-R605A(B,C) on panel 2H11-P603 AND MAIN STEAM PRESS T A(B

)

2N32-R654A(B) indicator on Turbine EHC Panel or recorder PRESS TO STOP VLVS 1 & 4 2N1 lR601 OR

NOTE: Any valid indication of Reactor Pressure and Steam Line Pressure can be used for Step 11.

    • 12. Open Inboard MSIVs. At panel 2H1 1-P602, the following switches are in OPEN SLO TEST, red light illuminated:

MSIV 2B2l-F022A MSIV 2B2l-F022B MSIV 2B21-F022C MSIV 2B21-F022D.

NOTE: It is acceptable if the operator uses the Open Fast Test switch position.

(*

  • Indicates critical step)

2012-301 SIM-3 Page 8 of 9 I STEP PERFORMANCE STEP STANDARD I (COMMENTS) 1 PROMPT: WHEN the operator addresses the Main Condenser Vacuum System, as the Shift Supervisor, INFORM the operator that another operator will place it in service and monitor vacuum.

PROMPT: IF the operator addresses system restoration, as the Shift Supervisor, INFORM the operator that restoration is not required at this time.

END TIME:________

NOTE: The terminating cue shall be given to the operator when any one of the following is met:

After JPM step #12 is complete.

With no reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

EVALUATOR PICK UP the Initiating Cue sheet.

(*

  • Indicates critical step)

Page 9 of 9 UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. The Condenser Low Vacuum and Low RWL isolations have been bypassed.
2. Main Condenser is in operation with Circ Water and Condensate Systems in operation.
3. An ATWS condition exists and 31E0-EOP-Ol 1-2 (RCA) is in progress.
4. El-IC is in operation.

INITIATING CUES:

Open the MSIVs to re-establish Main Condenser as the heat sink using 31 EO-EOP- 111-2.

FINAL Southern Nuclear E. I Hatch Nuclear Plant Operations Training JPM CRISIM 4 ALL (Alternate Path)

TITLE REACTOR PRESSURE CONTROL WITH EHC FAILURE AUTHOR MEDIA NUMBER TiME Anthony Ball 2012-301 SIM-4 20 Minutes RECOMMENDED BY APPROVED BY DATE N/R C. M. EDMUND 06/07/2012 SOUTHERN COMPANY A

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code: OPERATIONS TRAINING Media Number: 2012-301 SIM-4 Rev. No. I Date

[ Reason for Revision f Authors Initials Supvs Initials 00 06/07/12 Initial development for use on 2012-301 NRC Exam. ARB CME

2012-301 SIM-4 Page 1 of 8 UNIT1 () UNIT2 (X)

TASK TITLE: REACTOR PRESSURE CONTROL WITH EHC FAILURE JPM NUMBER: 2012-301 SIM-4 TASK STANDARD: The task will be completed when the operator has either opened a SRV or identified any other available alternate reactor pressure control system listed in 3 1EO-EOP-107-2.

TASK NUMBER: 200.034 OBJECTIVE NUMBER: 200.034.C PLANT HATCH JTA IMPORTANCE RATING:

RO SRO K/A CATALOG NUMBER: 206000A4.01 K/A CATALOG JTA IMPORTANCE RATING:

RO 3.80 SRO 3.70 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)

  • GENERAL

REFERENCES:

Unit 2 34S0-N30-001-2 (current version) 34S0-E41-001-2 (current version)

REQUIRED MATERIALS: Unit 2 34S0-N30-001-2 (current version) 34S0-E41-001-2 (current version)

APPROXIMATE COMPLETION TIME: 20 Minutes SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

2012-301 SIM-4 Page 2 of 8 SIMULATOR SETUP Simulator Initial Conditions:

1. RESET the Simulator to IC #113 or Snap 614 and leave in FREEZE.
2. INSERT the following MALFUNCTIONS and EVENT TRIGGERS:

KEY MALF # DESCRIPTION FINAL RAMP DELAY ST-O mfN2l_87A Feedwater Pump A Trip 0000 ST-O mfB2l_226A Low-Low Set A Fails mop 0000 ST-O mfB2l_226B Low-Low Set B Fails mop 0000 ST-O svoB2lO53 PT-N127A SRV Electrical open 1000 1000 0000 ST-O svoB2lO54 PT-N127B SRV Electrical open 1000 1000 0000 ST-O svoB2lO55 PT-N127C SRV Electrical open 1000 1000 0000 ST-O svoB2lO56 PT-N127D SRV Electrical open 1000 1000 0000 ST-O mf60131129 Leak Det Diff Temp Hi 0000 ST-O mf60131135 Leak Ambient Temp Hi 0000 RB-i mfN37j34 ALL Bypass Valves Fail CLOSED 9999 RB-2 diN32-COO1A EHC Pump 2A Switch Trip 9999 RB-2 diN32-COO1B EHC Pump 2B Switch Trip 9999 ACTIVATE THE FOLLOWING EVENT TRIGGERS:

3. Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS OR RUN SCENARIO FILE and EVENT TRIGGER (current rev) JPM CR-SIM 4 2012-301:

A. Perform RC-1 and RC-2 actions such that the 2N2 1-Fl 10 is closed and the SULCV is in auto and set at +20.

B. Perform TC-1; ensuring 2N11-FOO4A and B are closed.

C. Lower Pressure Set to 825 psig.

D. Ensure Reactor pressure stabilizes at 825 psig.

E. Ensure Bypass Valve screen and Speed screen is called up.

F. Place Pressure in the P603 plasma display.

4. PLACE the Simulator in FREEZE until the INITIATING CUE is given.
5. ESTIMATED Simulator SETUP TIME: 15 minutes 2

EVALUATOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. Unit 2 Reactor has been scrammed.
2. Other operators are performing scram actions.
3. A Reactor pressure reduction is required due to an unisolable steam leak in the Reactor Building.
4. You are assigned Reactor Pressure control.

INITIATING CUES:

LOWER AND THEN MAINTAIN Reactor pressure between 700 and 800 psig using the Bypass Valves.

2012-301 SIM-4 Page 4 of 8 I STEP PERFORMANCE STEP I STANDARD I I

SATIUNSAT (COMMENTS)

For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN ci Human performance tools, safety, PPE met (1), AND ci Mark the JPM as a PASS ci For initial trg all steps completed correctly OR PASS ci For continuing trg, critical steps (if used) completed correctly FAIL ci Above standards not met ci Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)

START TIME:_______

1. Operator identifies the procedure Operator has obtained procedure needed to perform the task. 34GO-OPS-013-2, step 7.5.5 or uses Placard at Turbine Panel.

NOTE: For Steps 2 through 8 all indication will be on panel 2H1 l-P650 using HMI Screens 2N32-K4001A or B.

I

2. Selects *Control* / I*psi..load*I The operator has SELECTED the screen *Icontrol* screen and also has SELECTED the I*psi4oad*I button on 2N32-K4001A or B.
3. Selects *Ramp Rate*I button The operator has SELECTED the

(*

  • Indicates critical step)

2012-301 SIM-4 Page 5 of 8 STEP I I SAT!UNSAT

  1. 1 PERFORMANCE STEP STANDARD I (COMMENTS) 1 NOTE: An acceptable Ramp Rate results in a cooldown rate NOT exceeding 100°F/hr OR RWL exceeding 100 inches.
    • 4 Enters a ramp rate The operator has ENTERED a ramp rate >0 and <100 displayed on 2N32-K4001A or B.
    • 5* Selects I*Pressure*I button The operator has SELECTED the
    • 6. Enters desired target pressure The operator has ENTERED a target pressure between 700 and 800 psig on 2N32-K4001A or B.
    • 7 Adjusts *Ramp Rate*I AND/OR the The operator has VARIED the L*Pressure* setpoints to maintain ramp rate/pressure to maintain a pressure/cooldown rate. cooldown rate 100° F/Hr OR RWL exceeding 100 inches change on 2N32-K4001A or B.

NOTE: ALTERNATE PATH starts here.

NOTE: SIMULATOR OPERATOR, WhEN the operator has successfully opened Bypass Valves (BPVs) and reactor pressure is being reduced AND with the Chief Examiners approval, ENTER RB-2 malfunction which TRIPS BOTH EHC Pumps.

8. The failure of EHC pump is Operator identifies all EHC recognized. pumps on 2H11-P650 are off as indicated by Zero amps on 2C32-R613 & R614.

PROMPT: IF the operator addresses the failure of EHC Pumps, INFORM the operator that you will get Maintenance to investigate, and to continue to control Reactor pressure in the band.

(*

  • Indicates critical step)

2012-301 SIM-4 Page 6 of 8 STEP PERFORMANCE STEP STANDARD I (COMMENTS)

PROMPT: IF the operator request which system to use, INFORM the operator to continue to control Reactor pressure in the band using available systems.

NOTE: The operator may reference 31E0-EOP-107-2, Alternate RPV Pressure Control, for guidance on which systems to use.

NOTE: The operator is required to select ONLY one of the CRITICAL steps below to achieve a SAT for JPM steps 9 15 or 17 19.

Opening a SRV or IDENTIFYING any other alternate reactor pressure control system listed in JPM steps 10-15 or 17 19, will satisfy the intent and complete this JPM.

    • 9 The operator evaluates available On 2H1 1-P602, the operator has pressure control systems. SELECTED SRVs to control reactor pressure and OPENS any SRV to start reducing reactor pressure.
    • JØ The operator evaluates available On 2H1 1-P601, the operator has pressure control systems. SELECTED HPCI in Pressure Control Mode to control reactor pressure.
    • 11. The operator evaluates available On 2H1 1-P601, the operator has pressure control systems. SELECTED HPCI Drains to control reactor pressure.
    • 12. The operator evaluates available On 2H1 1-P602, the operator has pressure control systems. SELECTED RCIC in Pressure Control Mode to control reactor pressure.
    • 13. The operator evaluates available On 2H1 1-P602, the operator has pressure control systems. SELECTED RCIC Drains to control reactor pressure.
    • 14. The operator evaluates available On 2H1 1-P650, the operator has pressure control systems. SELECTED Reactor Feed Pump Turbines to control reactor pressure.
    • 15. The operator evaluates available On 2H1 l-P601, the operator has pressure control systems. SELECTED Reactor Main Steam Line Drains to control reactor pressure.

(** Indicates critical step)

2012-301 SIM-4 Page 7 of 8 STEP PERFORMANCE STEP STANDARD I (COMMENTS) ]

NOTE: Main Turbine Chest Warming is NOT available lAW 31E0-EOP-l07-2, Alternate RPV Pressure Control, due to NO EHC pumps available.

16. The operator evaluates available On 2H 11 -P650, the operator has pressure control systems. SELECTED Main Turbine Chest Warming to control reactor pressure.
    • 17. The operator evaluates available On 2H1 1-P602, the operator has pressure control systems. SELECTED RWCU in Recirculation Mode to control reactor pressure.
    • 18. The operator evaluates available On 2H1 l-P602, the operator has pressure control systems. SELECTED RWCU in Blowdown Mode to control reactor pressure.
  • 99* The operator evaluates available On 2H1 l-P650, the operator has pressure control systems. SELECTED Steam Jet Air Ejectors to control reactor pressure.

PROMPT AFTER the operator has opened a SRV or has selected another system to control Reactor pressure, INFORM the operator that another operator will control Reactor pressure in band.

END TIME:________

NOTE: The terminating cue shall be given to the operator when any one of the following is met:

After the operator has opened a SRV or has selected another system to control Reactor pressure.

With no reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

EVALUATOR PICK UP the Initiating Cue sheet.

(* 9< Indicates critical step)

Page 8 of 8 UNIT 2 READ TO THE OPERATOR IMTIAL CONDITIONS:

1. Unit 2 Reactor has been scrammed.
2. Other operators are performing scram actions.
3. A Reactor pressure reduction is required due to an unisolable steam leak in the Reactor Building.
4. You are assigned Reactor Pressure control.

INITIATING CUES:

LOWER AND THEN MAINTAIN Reactor pressure between 700 and 800 psig using the Bypass Valves.

FINAL Southern Nuclear 0 I. Hatch Nuclear Plant E

Operations Training JPM CR/SIM 5 ALL (Alternate Path)

TITLE PERFORM A MANUAL INITIATION OF DRYWELL SPRAY (VALVE FAILURE)

AUTHOR MEDIA NUMBER TIME Anthony Ball 2O123O1 Sllvl-5 5 Minutes RECOMMENDED BY APPROVED BY DATE N/R C. M. EDMUND 06/07/2012 SOUTHERN COMPANY

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code: OPERATIONS TRAINING Media Number: 2012-301 SllVI-5 Rev. No. Date Reason for Revision F Authors Supvs Initials Initials 00 11/15/99 Initial development RAB DHG 01 05/19/00 Correct simulator setup to incorporate instructor RAB DHG comments 02 11/06/00 Include objective number RAB DHG 03 03/25/02 Include initial operator statement RAB RAB 04 02/04/03 Reference S000gpm limit as referenced in SAG/EOP. DNM DHG Add placing RHR in SP cooling as initial condition.

05 05/27/05 Revised Initial License statement for successful RAB RAB completion 06 06/30/06 Remove Response Cues RAB RAB 07 05/19/07 Correct the value for maximum drywell spray flow, DHG RAB 12500 gpm.

08 06/01/07 Revised to have both ioops of torus cooling in service DHG BKW 09 06/07/12 Revision for use on 2012-301 CR-SIM 5 and updated ARB CME procedure changes. After NRC Exam, Media Number will be changed to LR-JP-25033-10.

2012-301 SIM-5 Page 1 of 8 UNIT 1 ( ) UNIT2 (X)

TASK TITLE: PERFORM A MANUAL INITIATION OF DRYWELL SPRAY (VALVE FAILURE)

JPM NUMBER: 2012-301 S1M-5 TASK STANDARD: The task shall be completed when the RHR System has been initiated in the Drywell Spray Mode, per 34S0-E1 1-010-2.

TASK NUMBER: 007.00 1 OBJECTIVE NTJMBER: 007.00 1.0 Type ALTERNATE PATH PLANT HATCH JTA IMPORTANCE RATING:

RO 4.71 SRO 4.05 K/A CATALOG NUMBER: 226001A4.03, 226001A2.1 1 K/A CATALOG JTA IMPORTANCE RATING:

RO 3.50,3.0 SRO 3.40, 3.0 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)

  • GENERAL

REFERENCES:

Unit 2 34S0-E1 1-010-2 (current version) 31E0-EOP-012-2 (current version REQUIRED MATERIALS: Unit 2 34S0-El 1-010-2 (current version)

Key for 2E11-F016 A(B)

APPROXIMATE COMPLETION TIME: 10 SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

2012-301 SllvI-5 Page 2 of 8 SIMULATOR SETUP Simulator Initial Conditions:

1. RESET the Simulator to IC #113 or Snap 615 and leave in FREEZE.
2. INSERT the following MALFUNCTIONS:

MALF # TITLE FINAL RAMP ACT.

VALUE RATE TIME mfE5 1_i 10 RCIC Turbine Trip 00000 mfB2l_229B FW Line B Break Inside Containment (Var) 50 1000 00000 mfB2l_48A Steam Line A Break (After Restrictor) (Var) .5 1000 0

3. INSERT the following REMOTE FUNCTIONS:

REM # DESCRIPTION STATUS mfEl 1_167 2E1 1-FO17A & B Override 5 Mm Timer ORIDE

4. INSERT the following ORS OVERRIDES:

TAG # PJL DESCRIPTION STATUS diEl 1-FOI6A P Contmt Spray Outboard Drywell CLOSE 00000 diEl 1-FO16B P Contmt Spray Outboard Drywell CLOSE 0000 ACTIVATE THE FOLLOWING EVENT TRIGGERS:

Trigger # DESCRIPTION CONDITIONS Expert Command E11-4 Deletes diEll-FO16B & CET E1l-5 when 2E11-FO16A open E11-5 Deletes diEll-FO16A & CET E1l-4 when 2E11-FO16B open

5. Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:

A. Take the simulator out of FREEZE.

B. Close 2N21-FOO6B. Allow the valve to go FULL CLOSE.

C. Place the A and B Loops of RHR in Torus spray.

D. Place Recirc pumps switches in the TRIP position and all Drywell Cooling Fans to off.

6. PLACE the Simulator in FREEZE until the crew assumes the shift.
7. ESTIMATED Simulator SETUP TIME: 20 Minutes

Page 3 of 8 INSTRUCTOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. Torus pressure is greater than 11 psig.
2. Drywell pressure and temperature are within the SAFE region of the Drywell Spray Initiation Limit Curve. (GRAPH 8)
3. Both Recirc pumps are tripped.
4. Both Loops of RHR have been placed in Torus sprays with operation to continue in Both Loops.
5. All Drywell Cooling fans are tripped.
6. Torus level is <215 inches.
7. 31E0-EOP-012-2, PC-i Primary Containment Control is in progress.
8. The links to override the 5 minute LOCA OPEN interlock for RHR OUTBD INJ VLVs has been OPENED.

INITIATING CUES:

Initiate one loop of RHR in Drywell sprays per 34S0-El 1-010-2, Residual Heat Removal System to lower drywell pressure to 1.0 psig.

2012-301 SIM-5 Page 4 of 8 STEP f PERFORMANCE STEP STANDARD I (COMMENTS)

For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRiTICAL STEPS must be completed for Satisfactory Performance.

IF THEN Human performance tools, safety, PPE met (1), AND tJ Mark the JPM as a PASS c For initial trg all steps completed correctly OR PASS l For continuing trg, critical steps (if used) completed correctly FAIL U Above standards not met U Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)

START TIME:________

NOTE: If the operator starts with the A Loop of RHR, then ONLY the B Loop steps designated are CRITICAL (Steps 11, 12, & 14).

If the operator starts with the B Loop of RHR, then ONLY the A Loop steps designated are CRITICAL (Steps 6, 7, & 14).

1. Identifies the procedure for the task. Operator EITHER utilizes 34S0-El 1-010-2 Attachment 5 OR section 7.4.6.

NOTE: It is acceptable for the operator to place the 2/3 core height switch to override even though not renuired.

2. IF reactor water level is < 2/3 core Operator observes current RPV height, (-193 inches indicated on water level is above 193 inches 2B21-R623A or B, Rx Level, at indicated on 2B21-R623A or B, 2H11-P601), PLACE 2E11-S18A(B), Rx Level, at 2H11-P601 and that Cnmt Spray Vlv Cntl 2/3 Core Ht overriding the 2/3 interlock is not Permis switch, in the MANUAL required.

OVERRD position.

2012-301 SIM-5 Page 5 of 8 STEP PERFORMANCE STEP STANDARD I (COMMENTS) 1

3. Place the Containment Spray Valve At panel 2H1 1-P601, the operator control switch 2E1 1-S 17A to the CONFIRMS the Manual position. CONTAINMENT SPRAY VALVE CONTROL switch to MANUAL, white light illuminated. This switch will already be in manual due to having Torus sprays in service.

NOTE: The operator may throttle or close 2E1 1-FO17A/B even though the RHR System is NOT injecting into the Reactor.

NOTE: The first 2E1 l-F016 A or B switch selected is failed.

Event Triggers E11-4 OR E11-5 will remove the other 2E1 1-F016 A or B switch failure.

4. Confirm or start RHR pumps in At panel 2H1 1-P601, the operator selected Loop. CONFIRMS the RHR pumps are running in the selected loop, red lights illuminated.
5. Addresses Torus sprays The operator recognizes Torus sprays have already been placed in service.
    • 7 If this is the second ioop attempted, At panel 2H1 l-P601, the slowly opens the Containment Spray Operator has ThROTTLED Outboard Vlv. 2E1 1-FO16A to start 2E1 1-FO16A OPEN, red light flow. ILLUMINATED.
8. If this is the first ioop attempted, At panel 2H1 l-P601, the attempts to throttle open the Operator has RECOGNIZED that Containment Spray Outboard Vlv. 2E1 l-FO16A failed to OPEN, 2E1 1-FO16A. green light ILLUMINATED.

NOTE: Do not order B loop to be placed in Torus spray since this is an Alternate Path JPM, the operators must determine this is the correct action on their own.

2012-301 SIM-5 Page 6 of 8 STEP PERFORMANCE STEP STANDARD I (COMMENTS) 1 PROMPT: WhEN the Operator reports that 2E1 l-FO16A will NOT open ACKNOWLEDGE the failure and INFORM the operator that conditions are still met to spray the Drywell, ORDER the Operator to Spray the DrywelL

9. Place the Containment Spray Valve At panel 2H1 l-P601, the operator control switch 2E1 1-517B to the CONFIRMS the Manual position. CONTAINMENT SPRAY VALVE CONTROL to MANUAL, white light illuminated.

NOTE: The operator may throttle or close 2E1 l-FO17B even though the RHR System is NOT injecting into the Reactor. The operator may close 2E1 l-F027B, Torus Spray valve, but this is NOT required because only one loop will be in drywell sprays.

10. Confirm or start RHR pumps in At panel 2H1 l-P601, the operator selected loop. CONFIRMS the RHR pumps are RUNNING, red lights illuminated.
    • 12. If this is the second ioop attempted, At panel 2H1 1-P601, the operator slowly opens the Containment Spray THROTTLES the CNMT Outboard Vlv. 2E1 1-FO16B to start SPRAY OUTBD VLV, flow. 2E11-FO16B, to OPEN, red light illuminated.
13. If this is the first loop attempted, At panel 2H1 1-P601, the attempts to throttle open the Operator has RECOGNIZED that Containment Spray Outboard Vlv. 2E1 l-FO16B failed to OPEN, 2E1 1-FO16B. green light ILLUMINATED.

NOTE: Drywell Spray flow rate must be at least 5000 GPM to ensure an effective drywell pressure reduction (reference EOP/SAG Appendix C calculations).

2012-301 SIM-5 Page 7 of 8 STEP I

  1. 1 PERFORMANCE STEP STANDARD I SAT/UNSAT (COMMENTS)
    • 14. RHR flow rate established within At panel 2H1 l-P601, the operator limits. VERIFIES that RHR Flow is less than or equal to 17,000 gpm, but greater than 5,000 gpm, on RHR FLOW 2E1 1-R6O3AIB.

NOTE: This JPM may be stopped once drywell pressure is decreasing.

END TIME:________

NOTE: The terminating cue shall be given to the operator when any one of the following is met:

After JPM step #14 is complete.

With no reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

EVALUATOR PICK UP the Initiating Cue sheet.

Page 8 of 8 UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. Torus pressure is greater than 11 psig.
2. Drywell pressure and temperature are within the SAFE region of the Drywell Spray Initiation Limit Curve. (GRAPH 8)
3. Both Recirc pumps are tripped.
4. Both loops of RHR have been placed in torus sprays.
5. All Drywell Cooling fans are tripped.
6. Torus level is <215 inches.
7. 31E0-EOP-012-2, PC Primary Containment Control, is in progress.
8. The links to override the 5 minute LOCA OPEN interlock for RHR OUTBD INJ VLVs has been OPENED.

INITIATING CUES:

Initiate one ioop of RHR in Drywell sprays per 34S0-El 1-010-2, Residual Heat Removal System to lower drywell pressure to 1.0 psig.

FINAL Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM CRISIM 6 RO ONLY TITLE TRANSFER AN EMERGENCY 4160 VAC BUS FROM NORMAL TO ALTERNATE SUPPLY AUTHOR MEDIA NUMBER TIME Anthony Ball 2012-301 SIM-6 5.0 Minutes RECOMMENDED BY APPROVED BY DATE N/R C. M. EDMUND 06/07/2012 SOUTH ERN COMPANY

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code: OPERATIONS TRAINING Media Number: 2012-301 SIM-6 Rev. Date Reason for Revision Authors Supvs No. 1 Initials Initials 01 06/09/89 General revision and format change JEM RSG 02 08/09/89 Procedure revision & add LR lesson plans JEM DHG 03 05/11/90 Procedure, format, and question revision JEM DHG 04 08/18/92 General revision and format change WMM SCB 05 09/23/93 General revision, word processor change RAB RSG 06 07/05/96 Format change RAB SMC 07 02/11/00 Format modification, update K/As, change time allowance based on RAB DHG running average 08 11/02/00 Include objective number RAB DHG 09 03/11/02 Include initial operator statement RAB RAB 10 03/08/05 Documentum revision DNM RAB 11 06/13/05 Revised Initial License statement for successful completion RAB RAB 12 04/18/06 Remove Response Cues RAB RAE 13 10/19/09 Added RU steps. CLN/ADY ALD 13.1 10/17/11 Reviewed JPM against current procedure. Added MMG ALS Fundamental question to Attachment 1. Changed step 1 from identify correct procedure to obtain correct procedure.

13.2 06/07/12 Revision for use on 2012-301 CR-SIM 6. Removed prompt ARB CME for DIG. After NRC Exam, Media Number will be changed to LR-JP-27.10.

2012-301 SIM-6 Page 1 of 4 UNIT1 () UNIT2 (X)

TASK TITLE: TRANSFER AN EMERGENCY 4160 VAC BUS FROM NORMAL TO ALTERNATE SUPPLY JPM NUMBER: 2012-301 SIM-6 TASK STANDARD: The task shall be completed when the operator has transferred one of the Emergency 4160 VAC Buses power supply from the D Startup Transformer to the C Startup Transformer per 34S0-R22-001.

TASK NUMBER: 027.0 10 OBJECTIVE NUMBER: 027.010.O PLANT HATCH JTA IMPORTANCE RATING:

RO 3.00 SRO 3.11 K/A CATALOG NUMBER: 262001A4.01 K/A CATALOG JTA IMPORTANCE RATING:

RO 3.4 SRO 3.7 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)

GENERAL

REFERENCES:

Unit 1 Unit 2 N/A 34S0-R22-001-2 (current version)

REQUIRED MATERIALS: Unit 1 Unit 2 N/A 34S0-R22-001-2 (current version)

APPROXIMATE COMPLETION TIME: 5.0 Minutes SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

2012-301 SIM-6 Page 2 of 4 SIMULATOR SETUP Simulator Initial Conditions:

1. RESET the Simulator to 100% Power and leave in FREEZE.\
2. PLACE the Sync Switch for the Emergency Buses to either 2E or 2G 416OVAC Buses
3. ESTIMATED Simulator SETUP TIME: 5 Minutes

EVALUATOR COPY UNIT 2 READ TO THE OPERATOR IMTIAL CONDITIONS:

1. The plant is at 100% power. All plant systems are in their normal power lineup.
2. All offsite power sources are available.

INITIATING CUES:

Transfer the 4160 VAC Bus 2F to the Alternate Supply per 34S O-R22-00 1-2.

2012-301 SIM-6 Page 4 of 7 STEP I PERFORMANCE STEP I SAT/UNSAT 1 STANDARD

  1. I (COMMENTS) I For INITIAL Operator Programs:

For OJTIOJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN Human performance tools, safety, PPE met (1), AND Li Mark the JPM as a PASS Li For initial trg all steps completed correctly OR PASS LI For continuing trg, critical steps (if used) completed correctly FAIL LI Above standards not met Li Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)

START TIME:________

NOTE: This JPM was written for 4160 VAC Bus 2F. Other Emergency Buses may be chosen. The performance step sequence will be identical, but the switch names will be different.

1. Operator identifies the procedure Operator has obtained the correct needed to perform the task. procedure as 34S0-R22-001-2.
2. Operator reviews the procedures Operator has reviewed the precautions and limitations, precautions and limitations.
3. Confirm power is available from At panel 2H1 1-P651, the operator SAT 2C. has VERIFIED that VOLT SELECT STARTUP AUX XFMR 2C, 211-S004, potential lights are illuminated.

(** Indicates critical step)

2012-301 S1M-6 Page 5 of 7 STEP PERFORMANCE STEP STANDARD I (1) 1 NOTE: JPM Step 4 is not required to be performed based on the Initial Conditions which has all electrical buses on their Normal Supply. The applicant may or may not perform JPM Step 4. Marking N/A is acceptable.

4. Confirm 4160 VAC Buses 2A and 2B At panel 2H1 1-P651, the operator are powered from UAT 2B. has VERIFIED that:

NORMAL SUPPLY ACB 135434 is CLOSED, red light illuminated.

ALTERNATE SUPPLY ACB 135454 is OPEN, green light illuminated.

NORMAL SUPPLY ACB 135444 is CLOSED, red light illuminated.

ALTERNATE SUPPLY ACB 135464 is OPEN, green light illuminated.

    • 5 Place Sync Switch in ON position for At panel 2H1 1-P652, SSW ACB 135564. ACB 135564 Switch is in ON.
    • 6. Close Alternate supply breaker, At panel 2H1 1-P652, ACB 135564. ALTERNATE SUPPLY ACB 135564 is CLOSED, red light illuminated.
7. Verify the Normal supply breaker, At panel 2H1 1-P652, verifies ACB 135574, trips. NORMAL SUPPLY ACB 135574 TRIPS, green and amber lights illuminated.
8. Take Normal Supply Breaker control At panel 2H1 1-P652, NORMAL switch to TRIP. SUPPLY ACB 135574 control switch has been taken to TRIP, green light illuminated and amber light extinguished.
9. Place Sync Switch in OFF position for At panel 2H1 1-P652, SSW ACB ACB 135564. 135544 Switch is in OFF.

(** Indicates critical step)

2012-301 SIM-6 Page 6 of 7 STEP PERFORMANCE STEP STANDARD I (COMMENTS)

10. Notify SS the Emergency bus is on Notifies SS the Emergency bus is Alternate Supply AND should on Alternate Supply AND should consider placing 4160V Buses 2C consider placing 4160V Buses 2C AND 2D on alternate supply. AND 2D on alternate supply.

END TIME:________

NOTE: The terminating cue shall be given to the operator when any one of the following is met:

After JPM step #10 is complete.

With no reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

EVALUATOR PICK UP the Initiating Cue sheet.

  • Indicates critical step)

Page 7 of 7 UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. The plant is at 100% power. All plant systems are in their normal power lineup.
2. All offsite power sources are available.

INITIATING CUES:

Transfer the 4160 VAC Bus 2F to the Alternate Supply per 34S0-R22-001 -2.

FINAL Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM CR/SIM 7 ALL TITLE CROSSTIE RHR SERVICE WATER AUTHOR MEDIA NUMBER TIME Anthony Ball 2012-301 SIM-7 15.0 Minutes RECOMMENDED BY APPROVED BY DATE N/R C. M. EDMUND 06/07/2012 SOUTHERN COMPANY A

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code: OPERATIONS TRAINING Media Number: 2012-301 SIM-7 Rev. Authors Supvs Date Reason for Revision No. Initials Initials Format modification, change time allowance based on running average, 07 02/25/00 RAB DHG correct simulator setup TLB comment, procedure change on Unit 2 that reorder Step 2-5 08 03/22/00 RAB DHG 09 11/02/00 Include objective number, correct simulator setup RAB DHG 10 12/27/01 Incorporate procedure changes DNM DHG 11 03/12/02 Include initial Operator statement RAB RAB Revised Initial License statement for successful completion 12 06/ 14105 RAB RAB 13 04/21/06 Remove Response Cues RAB RAB Changed the Initial Conditions for Unit 2 to include a lead from PC 14 09/18/08 JwP RAB Primary Containment Control to allow 2 pump operations.

15 10/17/08 Added prompt before step 2 to address concern about flume level JwP RAB control, Added another prompt before step 2 to address the need to sample before using B Heat Exchanger. Added Red Light and annunciator to Standard on step 6 to reflect procedure.

16 06/07/12 Revision for use on 20 12-301 CR-SIM 7 and updated ARB CME procedure changes. Removed Ui info for NRC Exam.

After NRC Exam, Media Number will be changed to LR-JP 34.08-16.

2012-301 SllvI-7 Page 1 of 8 UNIT1 () UNIT2 (X)

TASK TITLE: CROSSTIE RHR SERVICE WATER JPM NUMBER: 2012-301 SIM-7 TASK STANDARD: The task will be completed when the operator has crosstied the A loop of RHR Service Water to the B ioop of RHR Service Water and placed RHR Service Water in service through the B RHR Heat Exchanger per 34S0-E1 1-0 10.

TASK NUMBER: 034.008 OBJECTIVE NUMBER: 034.008.O PLANT HATCH JTA IMPORTANCE RATING:

RO 3.29 SRO Not Available KJA CATALOG NUMBER: 219000A2.15 K/A CATALOG JTA IMPORTANCE RATING:

RO 3.30 SRO 3.40 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)

GENERAL

REFERENCES:

Unit 1 Unit 2 N/A 34S0-E1 1-010-2 (current version)

REQUIRED MATERIALS: Unit 1 Unit 2 N/A 34S0-E11-010-2 (current version)

APPROXIMATE COMPLETION TIME: 15.0 Minutes SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

2012.-301 SIM-7 Page 2 of 8 SIMULATOR SETUP Simulator Initial Conditions:

1. RESET the Simulator to IC #111 or Snap 617 and leave in FREEZE.
2. INSERT the following MALFUNCTIONS:

MALF # TITLE FINAL RAMP ACT.

VALUE RATE TI1VIE mfEl l_120B RHRSW 2B Pump Trip 00000 mfEl lj2OD RHRSW 2D Pump Trip 00000

3. INSERT the following ORS OVERRIDES:

TAG # PIL DESCRIPTION STATUS El l-COO1B_A RHR Service Water Pmp lB OFF 00000 El l-COO1B_B RHR Service Water Pmp lB OFF 00000 El l-COO1D.A RHR Service Water Pmp 1D OFF 00000 El l-COO1D_B RHR Service Water Pmp 1D OFF 00000 El l-FO28ADI P RHR A Torus Spray/Test Vlv CLOSE 00000 El lF028A_A L RHR A Torus Spray/Test Vlv OFF 00000 El l-F028A_B L RHR A Torus Spray/Test Vlv OFF 00000

4. PLACE DANGER TAGS on the following equipment:

MPL # COMPONENT TAGGED POSITION 2E1 l-F028A Torus Spray Or Test Vlv 2E1 l-F028A CLOSE 2E1 l-COO1B Service Water Pump 2E1 l-COO1B OFF 2El 1-COO1D Service Water Pump 2E1 1-COO1D OFF

5. OPEN SRV(s) and allow Torus temperature to exceed 102°F, THEN close and reset amber light/alarms.
6. ESTIMATED Simulator SETUP TIME: 10 Minutes

INSTRUCTOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. Unit 2 is at 75% power and Torus Cooling is desired.
2. RHR Service Water Pumps 2B and 2D have been tagged out of service.
3. 2E1 l-F028A is tagged closed for corrective maintenance.
4. Torus Water Temperature is 102°F.

INITIATING CUES:

Crosstie the A loop of RHR Service Water to the B loop of RHR Service Water and place RHR Service Water in service through the B RHR Heat Exchanger.

2012-301 SIM-7 Page 4 of 8 STEP PERFORMANCE STEP STANDARD I (COMMENTS) 1 For INITIAL Operator Programs:

For OJTIOJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN I Human performance tools, safety, PPE met (1), AND ci Mark the JPM as a PASS ci For initial trg all steps completed correctly OR PASS ci For continuing trg, critical steps (if used) completed correctly FAIL ci Above standards not met ci Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action wouLd not have resulted in significant actual or potential consequences. (AG-TRN-O1-0685 Section 6.5.3 provides examples)

START TIME:________

NOTE: The remaining steps were written using 34S0-E1 1-010-2 Attachment 10.

1. Operator identifies the procedure Operator EITHER utilizes 34S0-needed to perform the task. El 1-010-2 Attachment 10 OR section 7.2.6.

PROMPT: IF the Operator addresses the Caution concerning Flume level control, INFORM the Operator that Flume level control will be monitored and maintained by another Operator NOTE: It will NOT be necessary to override the RHRSW pump LOCA signal in this condition, but to do so will NOT prevent system operation.

2. Depress the RHR Service Water Lube At panel 2H1 1-P601, Operator Valves push-button on 2H1 1-P601. has depressed the RHR SERVICE WATER LUBE VALVES push button.

PROMPT: IF the Operator addresses waiting for one minute, INFORM the Operator that one minute has elapsed.

(** Indicates critical step)

2012-301 SIM-7 Page 5 of 8 I STEP PERFORMANCE STEP STANDARD I (1) 1 PROMPT: IF the Operator addresses obtaining Shift Supervisors permission to crosstie RHRSW loops, INFORM the Operator that the Shift Supervisor has given permission to crosstie RHRSW loops.

    • 3* Open 2E1 1-Fl 19A. At panel 2H1 1-P601, Operator opens SERV WTR CROSSTIE VLV 2E11-F119A, red light illuminated.
    • 4* Open 2E1 1-Fl 19B. At panel 2H1 1-P601, Operator opens SERV WTR CROSSTIE VLV 2E1 1-Fl 19B, red light illuminated.
    • 5* Operator places the Interlock Override At panel 2H1 l-P601, Operator valve 2E1 l-F068B Keylock Switch in PLACES the Interlock Override the Override position. Valve 2E1 I -F068B Keylock Switch in the OVERRIDE position.

NOTE: Using the Override Switch for 2E1 l-F068A is not required, but if performed, should be noted. Overriding 2E1 l-F068A will not affect the performance of the JPM.

6. Set the Heat Exchanger B Differential At panel 2H1 l-P601, Operator Pressure Control Valve Controller, sets HX B DIFF PRESS 2E1 l-R600B to 45% OPEN. CONTROL VLV F068B controller, 2E1 1-R600B to 45%

OPEN.

The Operator confirms 2E1 1-F068B, red light illuminated.

The Operator confirms RHR HX A (B) DIFF PRESS LOW annunciator illuminates.

NOTE: RHRSW Pump A or C may be started first. Therefore Steps 7 and 11 may be interchanged.

    • 7, Start RHRSW Pump 2A. At panel 2H1 l-P601, Operator starts SERVICE WATER PUMP 2E1 1-COO1A, red light illuminated.

(** Indicates critical step)

2012-301 SIM-7 Page 6 of 8 1 STEP PERFORMANCE STEP STANDARD I

8. Operator places the Interlock Override At panel 2H1 1-P601, Operator valve 2E1 1-F068B Keylock Switch in PLACES the INTERLOCK the Normal position. OVERRIDE VLV 2E1 1-F068B Keylock Switch in the NORMAL position.
9. THROTTLE 2E1 1-F068B, Hx B At panel 2H1 1-P601, Operator Disch Vlv to obtain the desired has adjusted HX B DIFF PRESS 2E1 1-R602B RHR Service Water CONTROL VLV F068B flow (4400 GPM maximum), WHILE controller, 2E1 1-R600B, to obtain maintaining RHRSW System pressure desired flow rate of about less than 450 PSIG 4400gpm.

Pressure limit for RHR Service Water is less than 450 psi.

PROMPT: WhEN the Operator addresses starting the second RHRSW pump, INFORM the Operator that it is desired to start the second RHRSW pump.

10. Adjust Duff Press Control Vlv At panel 2H1 1-P601, Operator 2E1 1-F068B to obtain desired has adjusted HX B DIFF PRESS RHRSW flow rate, THEN open CONTROL VLV F068B 2E1 1-F068B an additional 5%. controller, 2E1 1-R600B, to obtain desired flow rate, and THEN an additional 5% is added.

Flow rate limit, PRIOR to adding 5%, is 4400 gpm (+0, -200 gpm).

Pressure limit for RHR Service Water is less than 450 psi.

NOTE: Flow rate will be monitored on PUMP TEST FLOW indicator SERV WATER FLOW indicator 2E1 1-R602A. Pump discharge pressure will be monitored on DIV I PRESSURE indicator 2E1 1-R650A or R650B.

NOTE: If step 7 is performed successfully, Step 12 is NOT critical.

PROMPT: IF the Operator addresses exceeding 7600 gpm, INFORM the Operator to NOT exceed 7600 gpm.

11. Depress the RHR Service Water Lube At panel 2H1 1-P601, Operator Valves push-button on 2H1 1-P601. has depressed the RHR SERVICE WATER LUBE VALVES push button.

(*

  • Indicates critical step)

2012-301 SIM-7 Page 7 of 8 I STEP PERFORMANCE STEP STANDARD I (COMMENTS)

    • 12. Adjust Diff Press Control Vlv At panel 2H1 l-P601, Operator 2E1 l-F068B to obtain desired has adjusted HX B DIFF PRESS RHRSW flow rate. CONTROL VLV F068B controller, 2E1 1-R600B, to obtain desired flow rate.

Flow rate limit is 4400 gpm for one pump or 8800 gpm for two pumps.

Pressure limit for RHR Service Water is less than 450 psi.

PROMPT: WHEN the Operator addresses starting RHR, INFORM the Operator that another Operator will start that system.

PROMPT: IF the Operator addresses the in-service RHR Service Water strainer differential pressure, INFORM the Operator that another Operator is monitoring this differential pressure and it is below 6 psid.

END TIME:

NOTE: The terminating cue shall be given to the Operator when:

After JPM step #12 is complete.

With no reasonable progress, the Operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

EVALUATOR PICK UP the Initiating Cue sheet.

(** Indicates critical step)

Page 8 of 8 UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. Unit 2 is at 75% power and Torus Cooling is desired.
2. RHR Service Water Pumps 2B and 2D have been tagged out of service.
3. 2E1 l-F028A is tagged closed for corrective maintenance.
4. Torus Water Temperature is 102°F.

INITIATING CUES:

Crosstie the A loop of RHR Service Water to the B loop of RHR Service Water and place RHR Service Water in service through the B RHR Heat Exchanger.

FINAL Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM CRISIM 8 ALL (Alternate Path)

TITLE USING THE OVERRIDE SWITCHES, VENT THE DRYWELL WITH THE CAD SYSTEM WITH VALVE FAILURE AUTHOR MEDIA NUMBER TIME Anthony Ball 20 12-301 SIM-8 7.0 Minutes RECOMMENDED BY APPROVED BY DATE NIR C. M. EDMUND 06/07/2012 COMPANY

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code: OPERATIONS TRAINING Media Number: 2012-301 SIM-8 Rev. No. Date Reason for Revision Authors Supvs Initials Initials 00 06/07/12 Initial development for NRC Exam 2012-30 1 SIM 8 ARB CME from JPM_01364-8.1.

2012-301 SIM-8 Page 1 of 5 UNIT1 () UNIT2 (X)

TASK TITLE: USING THE OVERRIDE SWITCHES, VENT THE DRYWELL WITH THE CAD SYSTEM WITH VALVE FAILURE JPM NUMBER: 2012-301 SIM-8 TASK STANDARD: The task shall be completed when the Drywell is being vented via the CAD System, per 31E0-EOP-l01.

TASK NUMBER: 013.064 OBJECTIVE NUMBER: 013.064.A PLANT HATCH JTA IMPORTANCE RATING:

RO 3.43 SRO 3.16 K/A CATALOG NUMBER: 223001A2.07 K/A CATALOG JTA IMPORTANCE RATING:

RO 4.20 SRO 4.30 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)

[ GENERAL

REFERENCES:

Unit 1 N/A Unit 2 31EO-EOP-101-2 (current version)

REQUIRED MATERIALS: Unit 1 Unit 2 N/A 31E0-EOP-101.-2 (current version)

APPROXIMATE COMPLETION TIME: 7.0 Minutes SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

2012-301 SIM-8 Page 2 of 5 SIMULATOR SETUP Simulator Initial Conditions:

1. RESET the Simulator to 100% RTP or Snap 618 and leave in FREEZE.
2. INSERT the following MALFUNCTIONS:

MALF # TITLE FINAL RAMP ACT.

VALUE RATE TIME mfP64_193A Drywell Chiller Compressor A Failure 00000 mfP64_193B Drywell Chiller Compressor B Failure 00000 mfB2l_123A Steam Line A Break (Before Restrictor) (Var) 7.5 100 00000 diT48-F334A Drywell Vent Exh 2 Inch Isolation Valve CLOSE 100 0000

3. Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:

A. RC-1,2,&3 B. Start SBGT System 2A with suction from the Reactor Building.

C. Allow the simulator to run until the plant is in the UNSAFE Region of the DWS1L Curve.

D. Maintain RWL around 0 inches with Condensate.

E. Turn OFF ALL ECCS Pumps.

4. PLACE the Simulator in FREEZE until the INITIATING CUE is given.
5. ESTIMATED Simulator SETUP TIME: 15 Minutes

EVALUATOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. A steam line broke in the Drywell.
2. All attempts to control Drywell pressure have been unsuccessful.
3. Standby Gas Treatment is in operation.
4. Primary Containment Hydrogen concentration is less than 1%.
5. Offsite radioactivity release rate is <0.057 mR/hr and is expected to remain at its present level.
6. Normal AC Power is available.
7. A Group II isolation has occurred.

INITIATING CUES:

Defeating isolation interlocks, vent the Drywell with the 2A loop of CAD valves, per 31E0-EOP-10l-2.

2012-301 SIM-8 Page 4 of 8 I STEP SATIUNSAT PERFORMANCE STEP STANDARD

  1. (COMMENTS)

For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN U Human performance tools, safety, PPE met (1), AND U Mark the JPM as a PASS U For initial trg all steps completed correctly OR PASS U For continuing trg, critical steps (if used) completed correctly FAIL U Above standards not met U Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)

START TIME:_______

1. Operator identifies the materials that Operator identifies the required are required. materials and where to obtain them.
2. Defeat the High Drywell Pressure At panel 2H1 1-P657, the operator Isolation signal. PLACES the keylock PCIS Override Switches to OVERRIDE for:

High Drywell Press, 2T48-F334A High Drywell Press, 2T48-F335A

3. Defeat the Low RPV Level Isolation At panel 2H1 1-P657, the operator signal. PLACES the keylock PCIS Override Switches to OVERRIDE for:

Low RPV Level, 2T48-F334A Low RPV Level, 2T48-F335A

(** Indicates critical step)

2012-301 STM-8 Page 5 of 8 I STEP PERFORMANCE STEP STANDARD I (COMMENTS) 1

4. Defeat the Reactor Building High At panel 2H1 1-P657, the operator Radiation Isolation signal. PLACES the keylock PCIS Override Switches to OVERRIDE for:

Rx Bldg High Radn, 2T48-F334A Rx Bldg High Radn, 2T48-F335A

5. Defeat the Refuel Floor High At panel 2H1 1-P657, the operator Radiation Isolation signal. PLACES the keylock PCIS Override Switches to OVERRIDE for:

Refuel Fir High Radn, 2T48-F334A Refuel Fir High Radn, 2T48-F335A

6. Open Drywell 2 Vent valve, At panel 2H1 1-P657, the 2T48-F334A. Operator has RECOGNIZED that 2T48-F334A failed to OPEN, green light ILLUMINATED.

PROMPT: WHEN the Operator reports that 2T48-F334A will NOT open ACKNOWLEDGE the failure and INFORM the operator that conditions are still met to vent the Drywell, CONTINUE to take actions to vent the Drywell.

    • 7 Defeat the High Drywell Pressure At panel 2H1 1-P654, the operator Isolation signal. PLACES the keylock PCIS Override Switches to OVERRIDE for:

High Drywell Press, 2T48-F334B High Drywell Press, 2T48-F335B

    • 8. Defeat the Low RPV Level Isolation At panel 2Hl l-P654, the operator signal. PLACES the keylock PCIS Override Switches to OVERRIDE for:

Low RPV Level, 2T48-F334B Low RPV Level, 2T48-F335B

(** Indicates critical step)

2012-301 SIM-8 Page 6 of 8 STEP PERFORMANCE STEP STANDARD I (COMMENTS) 1

    • 9 Defeat the Reactor Building High At panel 2H1 1-P654, the operator Radiation Isolation signal. PLACES the keylock PCIS Override Switches to OVERRIDE for:

Rx Bldg High Radn, 2T48-F334B Rx Bldg High Radn, 2T48-F335B

    • 1O. Defeat the Refuel Floor High At panel 2H1 1-P654, the operator Radiation Isolation signal. PLACES the keylock PCIS Override Switches to OVERRIDE for:

Refuel Fir High Radn, 2T48-F334B Refuel Fir High Radn, 2T48-F335B

    • 11. Open Drywell 2 Vent valve, At panel 2H1 1-P654, DRYWELL 2T48-F334B. VENT ISOL VLV, 2T48-F334B is OPEN, red light illuminated.
    • 12. Open Drywell 2 Vent valve, At panel 2H1 1-P654, DRYWELL 2T48-F335B. VENT ISOL VLV, 2T48-F335B is OPEN, red light illuminated.
    • 13, Using Drywell Flow Controller, At panel 2H1 1-P654, the operator 2T48-R615B, Open Torus Vent Flow Operates 2T48-R615B, Drywell Control Valve, 2T48-F336B. Vent Flow Cntl Vlv 2T48-F336B, as required to maintain Suppression Chamber pressure below 56 psig.

(*

  • Indicates critical step)

2012-301 SIM-8 Page 7 of 8 I STEP PERFORMANCE STEP STANDARD I (COMMENTS)

14. Monitor Drywell pressure indication On any of the following instruments, Drywell pressure is monitored by the operator:

2T48-R63 1B, 2T48-R60 1 B, 2T48-R631A, 2T48-R60 1 A, SPDS Panel Any other D/W pressure indication on scale PROMPT: AFTER the operator identifies one of the on scale Drywell pressure indicators below, INFORM for the operator that Drywell pressure is slowly decreasing:

2T48-R631B, Mid Range DIW Press, Panel 2H1 1-P654 2T48-R6O1B, D/W PressIRADNfWide Range, Panel 2H1 1-P650 2T48-R631A, Mid Range D/W Press, Panel 2H1 1-P657 2T48-R6O1A, DIW PressIRADN/Wide Range, Panel 2H1 1-P657 SPDS Panel Any other D/W pressure indication on scale PROMPT: INFORM the operator, as Shift Supervisor, that Drywell venting is to continue and another operator will complete the process.

END TIME:________

NOTE: The terminating cue shall be given to the operator when any one of the following is met:

After JPM step #14 is complete.

With no reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

EVALUATOR PICK UP the Initiating Cue sheet.

(** Indicates critical step)

Page 8 of 8 UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. A steam line broke in the Drywell.
2. All attempts to control Drywell pressure have been unsuccessful.
3. Standby Gas Treatment is in operation.
4. Primary Containment Hydrogen concentration is less than 1%.
5. Offsite radioactivity release rate is <0.057 mR/hr and is expected to remain at its present level.
6. Normal AC Power is available.
7. A Group II isolation has occurred.

INITIATING CUES:

Defeating isolation interlocks, vent the Drywell with the 2A loop of CAD valves, per 31E0-EOP-l0l-2.

FINAL Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM PLANT 1 ALL (Alternate Path)

TITLE From Outside the MCR, Inject Boron using the SBLC System with 1st Pump Failure AUTHOR MEDIA NUMBER TIME ANTHONY BALL 2012-301 PLANT-i 21.0 Minutes RECOMMENDED BY APPROVED BY DATE NIR C. M. EDMUND 06/07/2012 SOUTH ERN COMPANY

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code: OPERATIONS TRAINING Media Number: 2012-301 PLANT-I Rev. No. Date Reason for Revision Authors Initials

{ Supvs Initials 00 06/07/12 Modified JPM 1 1.12-16.1 (From Outside MCR Inject ARB CME SBLC) to make a NEW Alternate Path JPM where the A SBLC pump fails to run but B SBLC will start.

After NRC Exam, Media Number will be changed to LR-JP-1 1.12-01.

2012-301 PLANT-i Page 1 of 6 UNIT 1 (X) UNIT 2 (X)

TASK TITLE: From Outside the MCR, Inject Boron using the SBLC System with 1st Pump Failure JPM NUMBER: 2012-301 PLANT-i TASK STANDARD: The task shall be completed when one Standby Liquid Control Squib Valve has been fired and one System pump has been started locally and the Standby Liquid Control System is injecting to the Reactor, per 34S0-C41-003.

TASK NUMBER: 011.012 OBJECTIVE NUMBER: 0i1.012.B PLANT HATCH JTA IMPORTANCE RATING:

RO 4.20 SRO 4.20 K/A CATALOG NUMBER: 2110002130 K/A CATALOG JTA IMPORTANCE RATING:

RO 3.90 SRO 3.40 OPERATOR APPLICABILITY: System Operator (SO)

GENERAL RE1ERENCES: Unit 1 Unit 2 31EO-EOP-011-1 31E0-EOP-Oll-2 34S0-C4 1-003-i 34S0-C41 -003-2 (Current Versions) (Current Versions)

REQUIRED MATERIALS: Unit 1 Unit 2 34S0-C41-003-1 34S0-C4 1-003-2 (current version) (current version)

Four (4) SBLC Squib Valve Four (4) SBLC Squib Valve jumper wires, from EOP file jumper wires, from EOP file next to Remote Shutdown next to Remote Shutdown Panel 1H21-P173 Panel 2C82-P001 Flathead screwdriver Flathead screwdriver APPROXIMATE COMPLETION TIME: 21.0 Minutes SIMULATOR SETUP: N/A 1

EVALUATOR COPY UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:

1. The Reactor has failed to Scram either manually or automatically, and the Torus temperature is approaching the BuT curve.
2. 31E0-EOP-Oll-1 (RCA) is in progress.
3. SBLC has failed to initiate from the Control Room.
4. RWCU is isolated.

INITIATING CUES:

Manually initiate SBLC locally per 34S0-C41-003-1.

2012-301 PLANT-i Page 3 of 9 I STEP PERFORMANCE STEP STANDARD SAT[UNSAT

  1. (COMMENTS)

For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN I Human performance tools, safety, PPE met (1), AND l Mark the JPM as a PASS L1 For initial trg all steps completed correctly OR PASS For continuing trg, critical steps (if used) completed correctly FAIL L Above standards not met I Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-O1-0685 Section 6.5.3 provides examples)

START TIME:_______

1. Operator identifies the materials that Operator has identified the are required. required materials and where to obtain them.
2. Operator reviews the procedure s

t Operator has reviewed the precautions and limitations, precautions and limitations.

(** Indicates critical step)

2012-301 PLANT-i Page 4 of 9 I STEP PERFORMANCE STEP STANDARD I (COMMENTS) 1 Detonate Squib Valve 1C41-FOO4A. At Squib Valve Junction Box and AND Panel 1H21-P0i 1, the following jumpers are INSTALLED to fire Detonate Squib Valve 1C41-FOO4B. 1C41-FOO4A:

Junction Box terminal Cl (white wire) and terminal C (green wire) to Terminal point BB-l.

Junction Box terminal C2 (black wire) and terminal C3 (red wire) to Terminal point BB-4.

At Squib Valve Junction Box and Panel 1 H2 1-POll, the following jumpers are INSTALLED to fire 1C41-FOO4B:

Junction Box terminal Cl (white wire) and terminal C (green wire) to Terminal point BB-8.

Junction Box terminal C2 (black wire) and terminal C3 (red wire) to Terminal point BB-1 1.

PROMPT: WHEN the operator locates the Squib Valve Junction Boxes, PROVIDE Figure 1, inside of the box.

PROMPT: WHEN the operator locates Panel 1H21-P0i 1, PROVIDE Figure 2, inside of the panel.

PROMPT: WHEN all terminals for a Squib Valve are correctly installed (Squib Valve will fire when the last connection is made, preferably at 11121-POll panel), INDICATE an explosive noise from the vicinity of that Squib Valve.

NOTE: Detonation of one Squib Valve will satisfactorily meet the standard.

NOTE: The jumpers used to fire the Squib Valves are a jumper with 3 connections to connect all three terminal points.

PROMPT: IF the operator addresses isolation of RWCU, as the Control Room operator REPORT that RWCU is isolated.

(*

  • Indicates critical step)

2012-301 PLANT-i Page 5 of 9 STEP PERFORMANCE STEP STANDARD I (COMMENTS)

4. Start SBLC Pump 1C41-COO1A. At panel 1H21-P011, SBLC PUMP, 1C41-COO1A, control switch is in RUN.

PROMPT: WHEN the operator addresses indications for pump start, INDICATE there is NO noise from the pump and the green light is ILLUMINATED and the red light is EXTINGUISHED.

5. RETURN the control switch to the At panel 1H21-P01i, SBLC STOP position. STOP position PUMP, 1C41-COO1A, control switch is in STOP.

PROMPT: WHEN the operator addresses indications for pump start, INDICATE there IS noise from the pump and the green light is EXTINGUISHED and the red light is ilLUMINATED.

(** Indicates critical step)

2012-301 PLANT-i Page 6 of 9 STEP I I

  1. I PERFORMANCE STEP STANDARD I

SATIUNSAT (COMMENTS) 1

7. Verify the SBLC solution is being The operator has VERIFIED injected into the Reactor. SBLC Tank level is DECREASING as indicated by SBLC STORAGE TANK LEVEL INDICATOR, 1C41-R001.

PROMPT: WHEN the operator addresses SBLC tank level, INDICATE for the operator that level is decreasing slowly, but is greater than 1300 gallons.

NOTE: It will take between 30 and 70 minutes to completely empty the SBLC Storage Tank.

END TIME:

NOTE: The terminating cue shall be given to the operator when any one of the following is met:

After JPM step #7 is complete.

With no reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

EVALUATOR PICK UP the Initiating Cue sheet.

(*

  • Indicates critical step)

1j CD LJ

fl n 1j I

CD c

A 4J Lii

Page 9 of 9 UNIT 1 READ TO TIlE OPERATOR INITIAL CONDITIONS:

1. The Reactor has failed to Scram either manually or automatically, and the Torus temperature is approaching the BITT curve.
2. 31E0-EOP-Ol1-1 (RCA) is in progress.
3. SBLC has failed to initiate from the Control Room.
4. RWCU is isolated.

INITIATING CUES:

Manually initiate SBLC locally per 34S0-C41-003-1.

FINAL Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM PLANT 2 ALL (Alternate Path)

TITLE FROM OUTSIDE THE CONTROL ROOM, ENERGIZE AN EMERGENCY BUS AUTHOR MEDIA NUMBER TIME ANTHONY BALL 2012-301 PLANT-2 19.0 Minutes RECOMMENDED BY APPROVED BY DATE N/R C. M. EDMUND 06/07/20 12 SOUTHERN COMPANY

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code: OPERATIONS TRAINING Media Number: 2012-301 PLANT-Rev. No. Date Reason for Revision i Authors Initials Supvs Initials 00 06/07/12 Initial development of new Alternate path JPM. ARB CME

2012-301 PLANT-2 Page 1 ofl7 UNIT 1 (X) UNIT 2 (X)

TASK TITLE: FROM OUTSIDE THE CONTROL ROOM, ENERGIZE AN EMERGENCY BUS JPM NUMBER: 2012-301 PLANT-2 TASK STANDARD: The task shall be completed when the operator has successfully manually caused 1C Diesel Generator voltage of 4,160 VAC to be established and has forced the closure of the 1C Emergency Diesel Generator ouput breaker per 34AB-R43-001.

TASK NUMBER: 028.026 OBJECTIVE NUMBER: 028.026.O PLANT HATCH JTA IMPORTANCE RATING:

RO 3.64 SRO Not Available K/A CATALOG NUMBER: 2640002130 K/A CATALOG JTA IMPORTANCE RATING:

RO 3.90 SRO 3.40 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO), Systems Operator (SO)

GENERAL

REFERENCES:

Unit 1 Unit 2 34AB-R43-00 1-1 34AB-R43-00 1-2 3 1RS-OPS-002- 1 3 1RS-OPS-002-2 (current versions) (current versions)

REQUIRED MATERIALS: Unit 1 Unit 2 34AB-R43-00 1-1 34AB-R43-00 1-2 (current version) i (current version)

APPROXIMATE COMPLETION TIME: 19.0 Minutes SIMULATOR SETUP: N/A

EVALUATOR COPY UNIT 1 READ TO THE APPLICANT INITIAL CONDITIONS:

1. The Main Control Room has been evacuated.
2. The 1G 4160VAC Emergency Bus is DE-ENERGIZED.
3. ALL 1G 4160 VAC Bus Supply Breakers are OPEN.
4. Another operator has manually started the 1 C Diesel Generator (DG).
5. 1C DG is operating at 900 RPM.
6. The 1C DG Output Breaker is OPEN.
7. The 1C DG Control Switch is in the AT ENGINE position
8. 1D PSW Pump is operating.
9. All station DC power is available.
10. A fire was NOT the cause of the Control Room evacuation.

INITIATING CUES:

JAW 34AB-R43-001-1, starting at step 4.6, ENERGIZE the 1G 416OVAC Emergency Bus.

2012-301 PLANT-2 Page 3 of 17 I STEP PERFORMANCE STEP STANDARD I (COMMENTS)

For INITIAL Operator Programs:

For OJTIOJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN Human performance tools, safety, PPE met (1), AND Mark the JPM as a PASS For initial trg all steps completed correctly OR PASS For continuing trg, critical steps (if used) completed correctly FAIL L3 Above standards not met J Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (Reference NMP-TR-1 11, On-The-Job Training and Task Performance Evaluation)

NOTE: IF any Diesel Generator (DG) surveillance is in progress, DOUBLE hearing protection will be REQUIRED to be worn while performing this JPM.

NOTE: If it is desired to have the applicant open local panel 1R43-POO1C to demonstrate knowledge of the location of the speed control switch, then a key (Key 1 R43- 1) is required to perform this JPM. If the applicant will not be required to open the panel, a picture of the switch may be used to simulate this part of the task and the key will NOT be required.

NOTE: This 1PM is written to be performed on the 1C DG. If 1C DG is out of service for plant maintenance, then substitute the letter A for the letter C throughout this JPM and complete on the 1A DG.

START TIME:________

1. Applicant reviews the procedure. Applicant has reviewed step 4.6 of 34AB-R43-00 1-1.

PROMPT: IF the applicant addresses operation of other 4160VAC Buses, as the Shift Supervisor, INFORM the applicant that ANOTHER operator will address any remaining buses.

(*

  • Indicates critical step)

2012-301 PLANT-2 Page4of 17 I STEP PERFORMANCE STEP STANDARD I (COMMENTS) 1 NOTE: The status of the 1D PSW pump is OPERATING (provided to the applicant on the Initial Conditions sheet of this JPM). The power supply to 1B PSW Pump is 1G 4KV bus, which is currently de-energized.

2. The applicant addresses step The applicant has evaluated step 4.6.1 Confirm generator voltage 4.6.1 and continues to the step comes up to rated voltage (4160V), 4.6.1.1 in order to verify as indicated on local panel 1R43- generator voltage has come up to POO1C, IF NOT, establish voltage by rated.

performing the following:

NOTE: The applicant may not address the steps which correspond to the 1A and 1 B diesel generators. It is acceptable for the operator to jump to step 4.6.1.4 to address establishing voltage for the 1C diesel generator.

3. The applicant addresses step The applicant has determined that 4.6.1.1 IF 1A EDG is operating, the 1A EDG is running and the confirm either the 1A or 1C, Plant 1A PSW pump is in operation.

Service Water Pump, is in operation.

PROMPT: IF the applicant asks the status of the 1A EDG INFORM the applicant that 1A EDG is running and tied to its respective bus.

PROMPT: IF the applicant asks the status of the 1A and lC PSW pumps INFORM the applicant that 1A PSW pump is running.

4. The applicant addresses step The applicant has determined that 4.6.1.2 IF lB EDG is operating and the 1B EDG is is operating and iF 4160 is de-energized (cant be iF Bus is energized.

restored), restore cooling water to EDG lB by performing the following:

PROMPT: IF the applicant asks the status of the 1B EDG INFORM the applicant that 1B EDG is running and tied to its respective Unit 1 4160 VAC bus.

(** Indicates critical step)

2012-301 PLANT-2 Page 5 of 17 I STEP PERFORMANCE STEP STANDARD I (COMMENTS) 1 NOTE: 4.6.1.2.1, 4.6.1.2.2 and 4.6.1.2.3 are ALL N/A because the 1B EDG is running and the iF bus is energized.

5. The applicant addresses steps The applicant has determined that 4.6.1.2.1, 4.6.1.2.2 and 4.6.1.2.3: steps 4.6.1.2.1, 4.6.1.2.2 and 4.6.1.2.3 are ALL N/A.

4.6.1.2.1 At panel 1H11-P652, OPEN Unit 1 supply to 1R24-S026 (11-S009).

4.6.1.2.2 At panel 2H1 1-P652, confirm CLOSED/CLOSE Unit 2 supply to 1R24-S026 (2S1 1-S009).

4.6.1.2.3 Confirm 2P41-C002, standby PSW pump, is running.

6. The applicant addresses step The applicant has determined that 4.6.1.3 IF 1C EDG is operating, 1C EDG is operating and that confirm either the lB or 1D, Plant 1D PSW pump is operating.

Service Water Pump, is in operation.

PROMPT: WhEN the applicant asks the status of the 1B and 1D PSW pumps INFORM the applicant to refer to the Initial Conditions sheet.

7. The applicant performs step The applicant has determined that 4.6.1.4 iF generator output voltage generator output voltage has NOT has NOT developed, perform the developed (meter located at following: 1R43-POO1C) and has continued to step 4.6.1.4.1 PROMPT: WHEN the applicant has located the generator output voltage meter (local panel, 1R43-POO1C) INDICATE using a pointing device that the indicator is reading 0 VAC.

(** Indicates critical step)

2012-301 PLANT-2 Page 6 of 17 I STEP PERFORMANCE STEP STANDARD I (COMMENTSJj

    • 8. The applicant performs step The applicant has placed the 4.6. 1.4.1 Place Diesel Generator Diesel Generator control switch, control switch on Diesel Generator located on 1R43-POO3C, Diesel Control Panel to the REMOTE Generator Control Panel, to the position. REMOTE position PROMPT: AFTER the applicant has placed the Diesel Generator control switch, located on lR43-POO3C, Diesel Generator Control Panel, to the REMOTE position AND has located the generator output voltage meter (local panel, lR43-POO1C) INDICATE using a pointing device that the indicator is reading 4,160 VAC.
    • 9 The applicant performs step The applicant has placed the 4.6. 1.4.2 WHEN voltage develops, Diesel Generator control switch, Place the control switch back to the located on lR43-POO3C, Diesel AT ENGINE position. Generator Control Panel, to the AT ENGINE position
10. The applicant addresses step The applicant has confirmed that 4.6.2 IF diesel generator output diesel generator output voltage is voltage is 4l60V. 4160V using generator output voltage meter (local panel, 1R43-POO1C).

PROMPT: WHEN the applicant has located the generator output voltage meter (local panel, 1R43-POO1C) INDICATE, using a pointing device, that the indicator is reading 4,160 VAC.

11. The applicant addresses step The applicant has confirmed that 4.6.2 IF diesel generator output diesel generator frequency is frequency is between 60 and 60.5 Hz. between 60 hertz using generator frequency meter (local panel, lR43-POO1C).

PROMPT: WHEN the applicant has located the generator frequency meter (local panel, lR43-POO1C) INDICATE using a pointing device that the indicator is reading 60 hertz.

(** Indicates critical step)

2012-301 PLANT-2 Page7of 17 I STEP PERFORMANCE STEP STANDARD I (COMMENTS) 1

12. The applicant performs step The applicant has confirmed that 4.6.2 VERIFY the Diesel Generator the Diesel Generator output output breaker is CLOSED. breaker is NOT closed by observing the output breaker GREEN light indication located on 1 E 4,160 VAC switchgear, Frame 5.

PROMPT: WHEN the applicant has located the diesel generator output breaker open/closed light indications (1R22-5005 4160V STA SERV SWGR 1E DIESEL BUILDING (lB SWGR ROOM) Frame 5)) INFORM the applicant that the GREEN light is ILLUMINATED.

NOTE: At this point the applicant will go to section 4.7 to force the output breaker to close by lowering and then raising 1C DG speed/frequency.

13. The applicant addresses step The applicant has continued to 4.6.2 IF the output breaker is still step 4.7 open, continue to section 4.7.
14. The applicant addresses step The applicant has determined that 4.7.1 IF required Diesel Generators 1A EDG is operating and tied to are operating, AND their respective its respective bus.

4160V bus is NOT energized, THEN attempt to close the Diesel Generator output breaker(s) as follows:

PROMPT: IF the applicant asks the status of the 1A EDG INFORM the applicant that 1A EDG is running and tied to its respective bus.

15. The applicant addresses step The applicant has determined that 4.7.1 IF required Diesel Generators lB EDG is operating and tied to are operating, AND their respective its respective bus.

4160V bus is NOT energized, THEN attempt to close the Diesel Generator output breaker(s) as follows:

PROMPT: IF the applicant asks the status of the 1B EDG INFORM TIlE APPLICANT that 1B EDG is running and tied to its respective bus.

  • Indicates critical step)

2012-301 PLANT-2 Page 8 of 17 EsTEP PERFORMANCE STEP STANDARD I (COMMENTS)

NOTE: The applicant will have sufficient knowledge to determine the status of the 1C EDG without the need for prompting in the next step.

16. The applicant addresses step The applicant has determined that 4.7.1 IF required Diesel Generators lC EDG is operating but NOT are operating, AND their respective tied to its respective bus.

4l60V bus is NOT energized, THEN attempt to close the Diesel Generator output breaker(s) as follows:

17. The applicant addresses step The applicant has continued to 4.7.1.1 Confirm normal AND the assess step 4.7.1.1. bulleted alternate supply breakers to 4160V list.

Bus 1E (lG, iF, 2F) are OPEN:

NOTE: If the applicant addresses the Normal and Alternate Supply Breakers for 4160 VAC buses lE, iF and/or 2F, inform the applicant that another operator is addressing these buses.

NOTE: The 1st Bullet is N/A since the lA EDG is running and tied to its 4,160 VAC emergency bus.

18. The applicant addresses step 4.7.1.1 The applicant has determined that Confirm 4l60V Bus 1E NORMAL this bullet is N/A.

SUPPLY ACB 135712 is open St 1

(

Bullet)

NOTE: The 2 bullet is N/A since the 1 A EDG is running and tied to its 4,160 VAC emergency bus.

19. The applicant addresses step 4.7.1.1 The applicant has determined that Confirm 4160V BUS 1E this bullet is N/A.

ALTERNATE SUPPLY ACB -

135711 is open ( fld 2

Bullet)

20. The applicant addresses step 4.7.1.1 The applicant has determined that Confirm 4160V Bus 1G NORMAL the 4160V Bus IG NORMAL SUPPLY ACB 135716 is open ( rd 3

SUPPLY ACB 135716 is OPEN.

Bullet).

PROMPT: IF the applicant asks the status of the 4160V Bus 1G NORMAL SUPPLY breaker INFORM the applicant to review the Initial Conditions sheet.

(** Indicates critical step)

2012-301 PLANT-2 Page 9 of 17 I STEP PERFORMANCE STEP STANDARD I (COMMENTS) 1

21. The applicant addresses step The applicant has determined that 4.7.1.1 Confirm 4160V BUS 1G the 4160V Bus 1G ALTERNATE ALTERNATE SUPPLY ACB 135715 SUPPLY ACB 135715 is OPEN is open (th 4

Bullet)

PROMPT: IF the applicant asks the status of the 4160V Bus 1G ALTERNATE SUPPLY breaker INFORM the applicant to review the Initial Conditions sheet.

NOTE: The 5 th Bullet is N/A since the lB EDG is running and tied to its Unit 1 4,160 VAC emergency bus.

22. The applicant addresses step The applicant has determined that 4.7.1.1 Confirm 4160V Bus iF this bullet is N/A.

NORMAL SUPPLY ACB 135714 is open (th 5

Bullet)

NOTE: The 6 th Bullet is N/A since the 1 B EDG is running and tied to its Unit 1 4,160 VAC emergency bus.

23. The applicant addresses step 4.7.1.1 The applicant has determined that Confirm 4160V BUS iF this bullet is N/A.

ALTERNATE SUPPLY ACB 135713 is open (

th 6

Bullet)

NOTE: The 7 th Bullet is N/A since the lB EDG is running and tied to its Unit 1 4,160 VAC emergency bus.

24. The applicant addresses step 4.7.1.1 The applicant has determined that Confirm 4160V Bus 2F NORMAL this bullet is N/A.

SUPPLY ACB 135574 is open ( th 7

Bullet)

PROMPT: IF the applicant interprets that the 4160V Bus 2F NORMAL SUPPLY breaker must be verified open, then INFORM the applicant that another operator has confirmed that the 4160V Bus 2F NORMAL SUPPLY breaker is OPEN.

(** Indicates critical step)

2012-301 PLANT-2 Page 10 of 17 I STEP PERFORMANCE STEP 8

t h STANDARD I (COMMENTS) 1 NOTE: The Bullet is N/A since the lB EDG is running and tied to its Unit 1 4,160 VAC emergency bus.

25. The applicant addresses step 4.7.1.1 The applicant has determined that Confirm 4160V BUS 2F this bullet is N/A.

ALTERNATE SUPPLY ACB 135564 is open (th 8

Bullet)

PROMPT: IF the applicant interprets that the 4160V Bus 2F ALTERNATE SUPPLY breaker must be verified open, then INFORM the applicant that another operator has confirmed that the 4160V Bus 2F ALTERNATE SUPPLY breaker is OPEN.

NOTE: Step 4.7.1.2 is N/A since the lB EDG is already running and tied to its Unit 1 emergency bus.

26. The applicant addresses step The applicant has determined that 4.7.1.2 IF connecting lB Diesel this bullet is N/A.

Generator to Unit 1, panel 2H1 1-P652, confirm ACB 135570 is OPEN.

NOTE: Step 4.7.1.3 is N/A since the lB EDG is already running and tied to its Unit 1 emergency bus.

27. The applicant addresses step The applicant has determined that 4.7.1.3 IF connecting lB Diesel this bullet is N/A.

Generator to Unit 2, panel 1H1 1-652, confirm ACB 135912 is OPEN.

NOTE: In evaluating step 4.7.2 the applicant will proceed to step 4.7.4 due to the Main Control Room evacuation.

28. The applicant performs step The applicant has evaluated step 4.7.2 IF the Main Control room is 4.7.2 and has proceeded to step ACCESSIBLE perform step 4.7.3, 4.7.4.

OR IF the Main Control room is NOT ACCESSIBLE perform 4.7.4

(*

  • Indicates critical step)

2012-301 PLANT-2 Page 11 of 17 STEP I PERFORMANCE STEP I SATIUNSAT

  1. 1 STANDARD I (COMMENTS) j
29. The applicant addresses step The applicant has evaluated step 4.7.4 IF the Main Control Room is 4.7.4 and has proceeded to step NOT ACCESSIBLE, AND the Diesel 4.7.4.1.

Generator start is successful, perform the following:

30. The applicant addresses step The applicant has determined that 4.7.4.1 CONFIRM Diesel Generator generator output voltage is output voltage is at 4160 VAC at 4,160 VAC using voltage meter panel 1R43-POO1C. on 1R43-POO1C.

PROMPT: WHEN the applicant has located the generator output voltage meter (local panel, 1R43-POO1C) INDICATE, using a pointing device, that the indicator is reading 4,160 VAC.

NOTE: JPM steps 31, 32 and 33 are N/A due to diesel generator output voltage being at normal voltage of 4,160 VAC. The applicant has previously confirmed this voltage reading.

31. The applicant performs step The applicant has determined that 4.7.4.2 IF the generator output voltage step 4.7.4.2 is N/A since has NOT developed, THEN generator voltage is at momentarily PLACE Diesel 4,160 VAC.

Generator local switch to the REMOTE position.

32. The applicant performs step The applicant has determined that 4.7.4.2.1 WHEN voltage develops, step 4.7.4.2.1 is N/A.

PLACE the local switch back to the LOCAL position.

33. The applicant addresses step The applicant has determined that 4.7.4.3 IF necessary, ADJUST diesel step 4.7.4.3 is N/A.

output voltage > 4160V AC using Auto Voltage Adjust switch inside panel 1R43-POO1C. (Key 1R43-1).

(*

  • Indicates critical step)

2012-301 PLANT-2 Page 12 of 17 I STEP PERFORMANCE STEP STANDARD I (COMMENTS)l NOTE: The applicant can adjust the Diesel Generator 1C speed from EITHER 1R43-POO1C, using the SPEED CONTROL switch OR from Diesel Generator 1C Governor Speed Setting knob (Top Right Knob on the Governor).

NOTE: If the Applicant uses the Speed Setting Switch then steps 35,36 and 37 are CRITICAL, and 39,40 and 41 become N/A.

If the Applicant uses the Speed Setting Knob on the diesel generator governor then steps 39,40 and 41 will be CRITICAL and 35,36 and 37 become N/A.

34. The applicant addresses step 4.7.4.4 The applicant has selected to use perform either 4.7.4.4.1 or 4.7.4.4.2: either step 4.7.4.4.1 or step 4.7.4.4.2 NOTE: If the applicant performs 4.7.4.4.1, then provide Figure 1 & 2 of the Speed Adjust switch (located inside 1R43-POO1C, bottom left door).
    • 35 The applicant addresses step The applicant has placed Diesel 4.7.4.4.1 Using Diesel Gen lC Diesel Gen 1C Diesel Generator Speed Generator Speed Setting Switch, Setting Switch, (located inside (located inside 1R43-POOIC, bottom 1R43-POO1C, bottom left door) in left door) LOWER generator the LOWER position and lowers frequency to 57 HERTZ. generator frequency to (Key 1R43-1) <=57 HERTZ.

PROMPT: WHEN the applicant has located 1R43-R766C, GEN FREQ METER (1R43-POO1C) indication meter (local panel, 1R43-POO1C) INDICATE using a pointing device that the indicator is reading 57 hertz.

    • 36. The applicant performs step The applicant has has placed the 4.7.4.4.1.1 Then INCREASE generator speed control switch in frequency to 60 and 60.5 Hertz, to the RAISE position and increased force automatic breaker closure, AND generator frequency (range of verify the diesel generator output 60 60.5 hz is acceptable).

breaker CLOSES.

PROMPT: WHEN the applicant has located 1R43-R766C, GEN FREQ METER (1R43-POO1C) indication meter (local panel, 1R43-POO1C) INDICATE, using a pointing device, that the indicator is reading 60 hertz.

(** Indicates critical step)

2012-301 PLANT-2 Page 13 of 17 I STEP PERFORMANCE STEP STANDARD f (IS) 1

    • 37 The applicant performs step The applicant has verified that the 4.7.4.4. 1.1 Then INCREASE diesel generator output breaker is frequency to 60 and 60.5 Hertz, to CLOSED by observing breaker force automatic breaker closure, AND RED light indications on 1 E verify the diesel generator output 4,160 VAC switchgear, Frame 5.

breaker CLOSES.

PROMPT: WHEN the applicant has located the output breaker open/closed light indications (1R22-S005 4160V STA SERV SWGR lB DIESEL BUILDING (1E SWGR ROOM) Frame 5)) INFORM the applicant that the RED light is ILLUMINATED.

38. The applicant addresses step The applicant has determined step 4.7.4.4.1.2 IF the diesel generator 4.7.4.4.1.2 is N/A since the diesel output breaker does NOT close, generator output breaker is continue to section 4.7. closed.
    • 39 The applicant performs step The applicant has rotated the 4.7.4.4.2 Using Diesel Gen 1C Diesel Diesel Gen 1C Diesel Generator Generator Governor Speed Setting Governor Speed Setting knob, in knob, LOWER generator frequency to the LOWER direction and lowers 57 HERTZ (located on Governor), generator frequency to

<= 57 hertz.

PROMPT: WHEN the applicant has located 1R43-R766C, GEN FREQ METER (1R43-POO1C) indication meter (local panel, 1R43-POO1C) INDICATE, using a pointing device, that the indicator is reading 57 hertz.

    • 40. The applicant performs step The applicant has has rotated the 4.7.4.4.2.1 Then INCREASE generator Speed Setting knob, in frequency to 60 and 60.5 Hertz, to the RAISE direction and force automatic breaker closure, AND increased generator frequency verify the diesel generator output (range of 60 60.5 hz is breaker CLOSES. acceptable).

PROMPT: WHEN the applicant has located 1R43-R766C, GEN FREQ METER (1R43-POO1C) indication meter (local panel, 1R43-POO1C) INDICATE using a pointing device that the indicator is reading 60 hertz.

(** Indicates critical step)

2012-301 PLANT-2 Page 14 of 17 F STEP PERFORMANCE STEP STANDARD I (COMMENTS)

    • 41. The applicant performs step The applicant has verified that the 4.7.4.4.2.1 Then INCREASE diesel generator output breaker is frequency to 60 and 60.5 Hertz, to CLOSED by observing breaker force automatic breaker closure, AND RED light indications on 1 E verify the diesel generator output 4,160 VAC switchgear, Frame 5.

breaker CLOSES.

PROMPT: WHEN the applicant located the output breaker openlclosed light indications (lR22-S005 4160V STA SERV SWGR 1E DIESEL BUILDING (1E SWGR ROOM) Frame 5)) INFORM the applicant that the RED light is ILLUMINAThD.

42. The applicant addresses step The applicant has determined step 4.7.4.4.2.2 IF the diesel generator 4.7.4.4.2.2 is N/A since the diesel output breaker does NOT close, generator output breaker is continue to section 4.7. CLOSED.

PROMPT: IF the applicant addresses restoration of 4160 VAC Emergency Bus loads, as the Shift Supervisor, INFORM the applicant that this will be performed by another applicant.

END TIME:________

NOTE: The terminating cue shall be given to the applicant when any one of the following is met:

After JPM step #42 is complete.

With no reasonable progress, the applicant exceeds double the allotted time.

Applicant states the task is complete.

TERMINATING CUE: We will stop here.

EVALUATOR PICK UP the Initiating Cue sheet and the picture of the Speed Control switch (if used).

(** Indicates critical step)

WnIL_*

I

(** Indicates critical step)

n n

  • l

S-.

Page 17 of 17 UNIT 1 READ TO THE APPLICANT INITIAL CONDITIONS:

1. The Main Control Room has been evacuated.
2. The 1G 416OVAC Emergency Bus is DR-ENERGIZED.
3. ALL 1G 4160 VAC Bus Supply Breakers are OPEN.
4. Another applicant has manually started the 1 C Diesel Generator (DG).
5. 1C DG is operating at 900 RPM.
6. The 1C DG Output Breaker is OPEN.
7. The 1C DG Control Switch is in the AT ENGINE position
8. 1D PSW Pump is operating.
9. All station DC power is available.
10. A fire was NOT the cause of the Control Room evacuation.

INITIATING CUES:

lAW 34AB-R43-001-1, starting at step 4.6, ENERGIZE the 1G 416OVAC Emergency Bus.

FINAL Southern Nuclear E. I Hatch Nuclear Plant Operations Training JPM PLANT 3 ALL TITLE DURING A LOSS OF AIR, ISOLATE THE FIRE PROTECTION SPRINKLERS AUTHOR MEDIA NUMBER TIME Anthony Ball 20 12-301 PLANT-3 13.0 Minutes RECOMMENDED BY APPROVED BY DATE N/R C. M. EDMUND 06/07/2012 SOUTHERN COMPANY A

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code: OPERATIONS TRAINING Media Number: 2012-301 PLANT-3 Rev. No. Date Reason for Revision Authors 1 Supvs Imtials j Initials 01 09/04/92 General revision and format change WMM SMC 02 07/22/93 General revision, word processor change RAB RSG 03 08/19/94 Procedure change, adjust format, change initiating cue RAB SMC to_a_direct_command 04 08/01/96 Format change, modify time allowance RAB DHG 05 02/25/00 Format modification, change time allowance based on RAB DHG running_average,_update_K/As -.

06 11/02/00 Include objective number, change operator RAB DHG applicability_to_Systems_Operator 07 03/12/02 Include initial operator statement RAB RAB 08 06/16/05 Revised Initial License statement for successful RAB RAB completion 09 04/21/06 Remove Response Cues RAB RAB 10 06/07/12 General revision for use on HLT-7 NRC Exam. After ARB CME NRC Exam, Media Number will be changed to LR JP-36. 13-10.

2012-301 PLANT-3 Page 1 of 5 UMT 1 (X) UNIT 2 (X)

TASK TITLE: DURING A LOSS OF AIR, ISOLATE THE FIRE PROTECTION SPRINKLERS JPM NUMBER: 2012-301 PLANT-3 TASK STANDARD: The task shall be completed when the Fire Protection Sprinklers have been isolated during a loss of air per 34AB-P51-001.

TASK NUMBER: 036.013 OBJECTIVE NUMBER: 036.013.O PLANT HATCH JTA IMPORTANCE RATING:

RO 3.57 SRO 3.70 K/A CATALOG NUMBER: 2860002130 K/A CATALOG JTA IMPORTANCE RATING:

RO 3.90 SRO 3.40 OPERATOR APPLICABILITY: Systems Operator (SO)

GENERAL

REFERENCES:

Unit 1 Unit 2

. N/A 34AB-P51-001-2 (current version)

REQUIRED MATERIALS: Unit 1 Unit 2 N/A 34AB-P5 1-001-2 (current version)

APPROXIMATE COMPLETION TIME: 13.0 Minutes SIMULATOR SETUP: N/A

EVALUATOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. A scram has occurred on Unit 2.
2. Unit 2 has had a loss of control air pressure and header pressure is below 45 psig and NOT increasing.
3. No fires exist in the plant.
4. Another operator is isolating Fire Protection Sprinklers to the Startup Transformers.
5. 34AB-P51-OO1-2, Loss of Instrument and Service Air System, is in progress.

INITIATING CUES:

Isolate the Fire Protection Sprinklers inside the Power Block per Attachment 1 of 34AB-P51-OO1-2.

2012-301 PLANT-3 Page 3 of 5 STEP j PERFORMANCE STEP STANDARI)

I (COMMENTS) 1 For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN l Human performance tools, safety, PPE met (1), AND 1J Mark the JPM as a PASS U For initial trg all steps completed correctly OR PASS U For continuing trg, critical steps (if used) completed correctly FAIL U Above standards not met U Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)

START TIME:

NOTE: The steps of this JPM may be performed in any order.

NOTE: This valve isolates the Reactor Feed Pump and Oil Conditioner area.

NOTE: This valve isolates the Hydrogen Seal Oil System, W End Cond A & B (Below 130) and W End Cond A & B (Above 130) areas.

NOTE: This valve isolates the Main Turbine Lube Oil Reservoir area.

PROMPT: IF the operator addresses stationing a fire watch, as the Shift Supervisor, INFORM the operator that a fire watch is being posted with back-up suppression equipment.

(** Indicates critical step)

2012-301 PLANT-3 Page 4 of 5 ESThP PERFORMANCE STEP SAT!UNSAT STANDARD (COMMENTS

RESPONSE CUE: N/A NOTE: This valve isolates the RFP Oil Conditioner area.

END TIME:________

NOTE: The terminating cue shall be given to the operator when any one of the following is met:

After JPM step #4 is complete.

With no reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

EVALUATOR PICK UP the Initiating Cue sheet.

(** Indicates critical step)

Page 5 of 5 UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. A scram has occurred on Unit 2.
2. Unit 2 has had a loss of control air pressure and header pressure is below 45 psig and NOT increasing.
3. No fires exist in the plant.
4. Another operator is isolating Fire Protection Sprinklers to the Startup Transformers.
5. 34AB-P51-OO1-2, Loss of Instrument and Service Air System, is in progress.

INITIATING CUES:

Isolate the Fire Protection Sprinklers inside the Power Block per Attachment 1 of 34AB-P51-OO1-2.