RS-12-156, Day Response to NRC Bulletin 2012-01, Design Vulnerability in Electric Power System

From kanterella
(Redirected from ML12300A106)
Jump to navigation Jump to search
Day Response to NRC Bulletin 2012-01, Design Vulnerability in Electric Power System
ML12300A106
Person / Time
Site: Dresden, Peach Bottom, Oyster Creek, Byron, Three Mile Island, Braidwood, Limerick, Clinton, Quad Cities, LaSalle
Issue date: 10/25/2012
From: Jury K
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RS-12-156
Download: ML12300A106 (154)


Text

RS-12-156 10 CFR 50.54(f)

October 25, 2012 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-37 4 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289

U. S. Nuclear Regulatory Commission October 25, 2012 Page 2

Subject:

Exelon Generation Company, LLC 90-Day Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System"

Reference:

NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System," dated July 27, 2012 On July 27, 2012, the referenced NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System," was issued to all holders of operating licenses and combined licenses for nuclear power reactors, except those who have permanently ceased operation and have certified that fuel has been removed from the reactor vessel. The Bulletin requested that all addresses submit a written response within 90 days in accordance with 10 CFR 50.54, "Conditions of licenses," paragraph (f). The Bulletin requested information to determine compliance with 10 CFR 50.55a(h)(2), "Protection systems," 10 CFR 50.55a(h)(3), "Safety systems," and Appendix A to 10 CFR Part 50, GDC 17, "Electric power systems," or equivalent principal design criteria as specified in licensee's Updated Final Safety Analysis Report.

Attachments 1 through 10 to this letter provide Exelon Generation Company, LLC's (EGG's) 90-day response to the requested information for each EGC nuclear operating station with the exception of the evaluation of high impedance grounds. An evaluation of vulnerabilities to high impedance grounds for the EGC nuclear operating fleet is contained in Attachment 11.

There are no regulatory commitments contained in this letter. Should you have any questions concerning this letter, please contact Mr. Mitchel Mathews at (630) 657-2819.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 25th day of October 2012.

Respectfully, Keith R. Jury ; ( -~

Vice President - Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments:

1. Braidwood Station, Units 1 and 2, 90-Day Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System"
2. Byron Station, Units 1 and 2, 90-Day Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System"
3. Clinton Power Station, Unit 1, 90-Day Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System"

U. S. Nuclear Regulatory Commission October 25, 2012 Page 3

4. Dresden Nuclear Power Station, Units 2 and 3, 90-Day Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System"
5. LaSalle County Station, Units 1 and 2, 90-Day Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System"
6. Limerick Generating Station, Units 1 and 2, 90-Day Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System"
7. Oyster Creek Nuclear Generating Station, Unit 1, 90-Day Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System"
8. Peach Bottom Atomic Power Station, Units 2 and 3, 90-Day Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System"
9. Quad Cities Nuclear Power Station, Units 1 and 2, 90-Day Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System"
10. Three Mile Island Nuclear Station, Unit 1, 90-Day Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System"
11. Exelon Generation Company, LLC's Evaluation of the Effects of High Impedance Ground Faults

ATTACHMENT 1 Braidwood Station, Units 1 and 2, 90-Day Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System"

ATTACHMENT 1 Braidwood Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" High Impedance Grounds:

On January 30, 2012, a porcelain insulator broke in the Byron Station switchyard resulting in parting of the C phase conductor of the offsite source. The insulator was on the offsite source side of the Unit 2 System Auxiliary Transformers (SATs), and the connection parted in such a way as to leave an electrically open end on the source side. The parted connection remained electrically connected on the transformer side, and the loose bus bar conductor end fell to the ground. This ground was a direct result of the broken insulator and not an independent event.

The connected loose bus bar provided a path to ground for the transformer high voltage terminal, but did not result in a ground fault (i.e., neither solid nor impedance) as seen from the source. Since the switchyard (i.e., source side) relaying was electrically isolated from the fault, it did not detect a fault; therefore, did not operate.

The significant event was the opening of a single phase connection; the ground on the high voltage side of the SAT is of lesser significance. Regardless of phase discontinuity, if the ground impedance is low on the source side, and currents are high, the source side protective relaying will operate and open all circuit phases. If the ground impedance is high, and currents low, the relaying may not operate depending on the magnitude of ground impedance; the circuit will continue to supply power.

A qualitative analysis has been performed to assess the impact of single phase high impedance ground faults. The primary objective of the analysis was to determine if a high impedance ground fault could result in an unbalanced voltage condition sufficient to adversely affect energized ESF equipment. The cases analyzed include a single phase high impedance ground fault with all three phases intact and a single phase high impedance ground fault concurrent with the loss of the same phase. These cases have been analyzed for both the high and low voltage sides of the SATs analyzed. 1 provides a summary report of the qualitative analysis; therefore, all information discussed in this response attachment is limited to single-phase open circuit conditions.

System Description

NRC Requests 2, 1.d, 2.a, and 2.c request system information and will be addressed in this section.

NRC Request No. 2: Briefly describe the operating configuration of the ESF buses (Class 1E for current operating plants or non-Class 1E for passive plants) at power (normal operating condition).

Exelon Generation Company, LLC (EGC) Response to NRC Request No. 2 Braidwood Generating Station has two electrically and physically independent Class 1E engineered safety features (ESF) distribution divisions per unit (i.e., Divisions 11 and 12 for Unit 1, and Divisions 21 and 22 for Unit 2). Two physically separate and electrically Page 1 of 13

ATTACHMENT 1 Braidwood Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" independent offsite power circuits are provided for each unit, one via the units assigned system auxiliary transformers (SATs) and the other from the opposite units SATs.

The ESF buses are normally powered directly from offsite power via the two SATs (i.e., 345-6.9/4.16-kV). Each transformer is normally energized providing power to an ESF 4160-volt bus of the unit. Each transformer also serves as a second source of offsite power for the corresponding ESF bus of the other unit. In addition, an emergency diesel generator (EDG) is provided as an emergency power source for each 4160 V ESF bus of the unit.

A simplified one-line diagram of the Braidwood Station, Unit 2 Auxiliary Power System, and similar for Unit 1 is shown in Figure 1 below.

Figure 1: Simplified One-Line Diagram of a Braidwood Station Auxiliary Power System For normal operating conditions at-power, the ESF buses are powered by offsite sources. The ESF buses are normally powered directly from offsite power via two SATs (i.e., 345-6.9/4.16-kV). Each transformer is normally energized providing power to an ESF 4160-volt bus of the unit. Each transformer also serves as a second source of offsite power for the corresponding ESF bus of the other unit.

Page 2 of 13

ATTACHMENT 1 Braidwood Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" NRC Request 1.d: Describe the offsite power transformer (e.g., start-up, reserve, station auxiliary) winding and grounding configurations.

EGC Response to NRC Request 1.d:

The Braidwood Station offsite power transformer winding and grounding configurations are shown in Table 1 below.

Table 1: Braidwood Station Offsite Power Transformer Winding and Grounding Configurations MVA Size Voltage Rating Winding @ 55 °C Grounding Transformer (Primary/

Configuration Cooling Type Configuration Secondary)

(OA/FA/FA)

Station Auxiliary Wye-Wye-Transformer 36/48/60 345-6.9/4.16-kV Neutral Grounded Wye (3 Leg)

(SAT) 142-1 Station Auxiliary Wye-Wye-Transformer 36/48/60 345-6.9/4.16-kV Neutral Grounded Wye (3 Leg)

(SAT) 142-2 Station Auxiliary Wye-Wye-Transformer 36/48/60 345-6.9/4.16-kV Neutral Grounded Wye (3 Leg)

(SAT) 242-1 Station Auxiliary Wye-Wye-Transformer 36/48/60 345-6.9/4.16-kV Neutral Grounded Wye (3 Leg)

(SAT) 242-2 NRC Request 2.a: Are the ESF buses powered by offsite power sources?

If so, explain what major loads are connected to the buses including their ratings.

EGC Response to NRC Request 2.a:

Yes, for at power (i.e., normal operating condition) configurations, ESF buses are powered by offsite sources.

Page 3 of 13

ATTACHMENT 1 Braidwood Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" The Braidwood Station ESF bus power sources are shown in Tables 2 and 3 below.

Table 2: ESF Buses Continuously Powered From Offsite Power Source(s)

Original 4.16 kV ESF Bus Name licensing basis Description of ESF Bus Power Source (normal operating configuration condition)

(Y/N)

System Auxiliary Transformer (SAT)142-1 141 Y System Auxiliary Transformer (SAT) 142-2 142 Y System Auxiliary Transformer (SAT) 242-1 241 Y System Auxiliary Transformer (SAT) 242-2 242 Y Table 3: ESF Buses That Are Not Continuously Powered From Offsite Power Source(s)

Description of ESF Bus ESF Bus Name (normal Original licensing basis Power Source operating condition) configuration (Y/N)

N/A N/A N/A The ESF buses and their associated major loads that are energized during normal power operations, including ratings, are shown in Table 4 below.

Table 4: ESF Bus Major Loads Connected During Normal Power Operations 4kV Voltage Normally ESF Load Rating (hp)

Level (V) Energized Bus 141 Auxiliary Feedwater Pump 1A 4160 1250 N 141 Essential Service Water Pump 1A 4160 1250 Y 141 Containment Spray Pump 1A 4160 600 N 141 Centrifugal Charging Pump 1A 4160 600 Y 141 Auxiliary Building Exhaust Fan 0A 4160 500 Y 141 Control Room Refrig. Unit 0A 4160 461 Y 141 Component Cooling Water Pump 1A 4160 450 Y 141 Safety Injection Pump 1A 4160 400 N 141 RHR Pump 1A 4160 400 N 141 Auxiliary Building Supply Fan 0A 4160 350 Y 141 Transformer 131X Feed 4160 1000kVA Y 142 Essential Service Water Pump 1B 4160 1250 Y 142 Containment Spray Pump 1B 4160 600 N Page 4 of 13

ATTACHMENT 1 Braidwood Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" 4kV Voltage Normally ESF Load Rating (hp)

Level (V) Energized Bus 142 Centrifugal Charging Pump 1B 4160 600 Y 142 Auxiliary Building Exhaust Fan 0B 4160 500 Y 142 Component Cooling Water Pump 1B 4160 450 Y 142 Control Room Refrig. Unit 0B 4160 461 Y 142 Safety Injection Pump 1B 4160 400 N 142 RHR Pump 1B 4160 400 N 142 Auxiliary Building Supply Fan 0B 4160 350 Y 142 Transformer 132X Feed 4160 1333kVA Y 241 Auxiliary Feedwater Pump 2A 4160 1250 N 241 Essential Service Water Pump 2A 4160 1250 Y 241 Containment Spray Pump 2A 4160 600 N 241 Centrifugal Charging Pump 2A 4160 600 Y 241 Auxiliary Building Exhaust Fan 0C 4160 500 Y 241 Component Cooling Water Pump 2A 4160 450 Y 241 Component Cooling Water Pump 0 4160 450 Y 241 Safety Injection Pump 2A 4160 400 N 241 RHR Pump 2A 4160 400 N 241 Auxiliary Building Supply Fan 0C 4160 350 Y 241 Transformer 231X Feed 4160 1000kVA Y 242 Essential Service Water Pump 2B 4160 1250 Y 242 Containment Spray Pump 2B 4160 600 N 242 Centrifugal Charging Pump 2B 4160 600 Y 242 Auxiliary Building Exhaust Fan 0D 4160 500 Y 242 Component Cooling Water Pump 2B 4160 450 Y 242 Component Cooling Water Pump 0 4160 450 Y 242 Safety Injection Pump 2B 4160 400 N 242 RHR Pump 2B 4160 400 N 242 Auxiliary Building Supply Fan 0D 4160 350 Y 242 Transformer 232X Feed 4160 1000kVA Y Page 5 of 13

ATTACHMENT 1 Braidwood Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" NRC Request 2.c: Confirm that the operating configuration of the ESF buses is consistent with the current licensing basis.

Describe any changes in offsite power source alignment to the ESF buses from the original plant licensing.

EGC Response to NRC Request 2.c:

The following at power (i.e., normal operating condition) configurations, have been confirmed to be consistent with the current licensing basis (CLB).

Each 4160-volt ESF bus has the following power sources:

(1) A normal source from the SAT, (2) A second (i.e., reserve) source from the other unit's SAT, and (3) An emergency source from its respective diesel generator The unit Class 1E a-c power system is divided into two divisions (i.e., Divisions 11 and 12 for Unit 1, and Divisions 21 and 22 for Unit 2), each of which is supplied from a 4160-volt bus (i.e., Buses 141 and 142, for Unit 1, and Buses 241 and 242 for Unit 2). Each ESF group of each unit is supplied standby power from an individual diesel-generator unit. With this arrangement, alternate or redundant components of all ESF systems are supplied from separate switch groups so that no single failure can jeopardize the proper functioning of redundant ESF loads. The division of the ESF loads among the system buses is such that the total loss of one of the two electrical divisions cannot prevent the safe shutdown of the reactor under any normal or abnormal design condition.

There have been no changes in the offsite power source alignment to the ESF buses from the original plant licensing. Each units set of SATs has sufficient capacity to accommodate the auxiliary power requirements of the unit when operating at full load. Furthermore, each units set of SATs is capable of supplying the design basis accident (DBA) loads of both divisions of one unit and the safe shutdown loads of both divisions of the other unit simultaneously.

Page 6 of 13

ATTACHMENT 1 Braidwood Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" System Protection NRC Requests 1, 1.a, 2.b, and 2.d request information regarding electrical system protection, and will be addressed in this section.

NRC Request 1: Given the requirements above, describe how the protection scheme for ESF buses (Class 1E for current operating plants or non-Class 1E for passive plants) is designed to detect and automatically respond to a single-phase open circuit condition or high impedance ground fault condition on a credited off-site power circuit or another power sources. Also, include the following information:

EGC Response to NRC Request 1:

Consistent with the CLB and 10 CFR 50, Appendix A, "General Design Criteria for Nuclear Power Plants," Criterion (GDC) 17, "Electric power systems," existing protective circuitry will separate the ESF buses from a connected failed offsite source due to a loss of voltage or a sustained, balanced degraded grid voltage concurrent with certain DBAs. The relay systems were not specifically designed to detect an open single phase of a three phase system.

Detection of a single-open phase condition is beyond the approved design and licensing basis of the plant.

NRC Request 1.a: The sensitivity of protective devices to detect abnormal operating conditions and the basis for the protective device setpoint(s).

EGC Response to NRC Request 1.a:

Consistent with the CLB and GDC 17, existing electrical protective devices are sufficiently sensitive to detect design basis conditions like a loss of voltage or a degraded voltage, but were not designed to detect a single phase open circuit condition. The undervoltage protective devices and the basis for the device setpoint(s) are show in Table 5 below.

Table 5: Protective Devices Protective UV Setpoint Protection Zone Basis for Setpoint Device Logic (Nominal)

Loss of To detect a complete loss of ESF 4 kV ESF Bus 2 of 2 2870 V Voltage Relay Bus voltage condition Degraded To detect degraded voltage on an 4 kV ESF Bus 2 of 2 3987 V Voltage Relay ESF Bus.

Page 7 of 13

ATTACHMENT 1 Braidwood Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Protective UV Setpoint Protection Zone Basis for Setpoint Device Logic (Nominal)

Tap: 1A CT Turns Ratio Normal Feed to Ground To provide time overcurrent 240:1 ESF Bus Overcurrent protection for ground faults Set: 240A TD: 3.5 Tap: 12A Phase CT Turns Ratio To provide time overcurrent Normal Feed to Overcurrent 240:1 protection for phase to ground or ESF Bus (A, C) Set: 2880A phase to phase faults.

TD: 4 To provide time delayed overcurrent protection for the ESF bus from overloads while cross-tied to the corresponding ESF bus Tap: 5A Phase on the opposite unit. The Normal Feed to CT Turns Ratio Overcurrent overcurrent relay is an ESF Bus 240:1 (B) instantaneous overcurrent relay.

Set: 1200A This relay is used in conjunction an external time delay relay which alarms after 10 sec and trips a cross-tie breaker after 5 minutes.

Tap: 0.5A CT Turns Ratio Reserve Feed to Ground To provide time overcurrent 240:1 ESF Bus Overcurrent protection for ground faults.

Set: 120A TD: 1.5 Tap: 6A Phase CT Turns Ratio To provide time overcurrent Reserve Feed to Overcurrent 240:1 protection for phase to ground or ESF Bus (A, C) Set: 1440A phase to phase faults..

TD: 3 Tap: 7A CT Turns Ratio To provide time overcurrent Emergency Feed Phase 240:1 protection for phase to ground or to ESF Bus Overcurrent Set: 1680A phase to phase faults.

TD: 5 Protects the ESF bus from a Emergency Feed Differential 0.14A Min Trip faulted Emergency Diesel to ESF Bus Generator.

Page 8 of 13

ATTACHMENT 1 Braidwood Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Protective UV Setpoint Protection Zone Basis for Setpoint Device Logic (Nominal)

CT Turns Ratios: 1) 345 kV Winding =

40:1;

2) 6.9 kV Winding =

1000:1;

3) 4.16 kV SATs and 6.9 kV Winding = To protect the ESF and non-ESF

/ 4.16 kV Non-Differential N/A 1600:1; buses from a faulted SAT or Non-Segregated Bus Sensitivity = Segregated Bus Duct Ducts 30%;

Tap Settings:

1) 345 kV Side

= 4.2 A;

2) 6.9 kV Side

= 8.7 A;

3) 4.16 kV Side

= 8.7 A CT Turns Ratios:

1) SAT 4.16 kV Neutral = 120:1; Aux CT = 5:1;
2) 4.16 kV ESF 4.16 kV Non- To protect the ESF and non-ESF Ground Bus = 240:1; Segregated Bus N/A buses from a ground fault on the Differential Aux CT = 2.5:1 Ducts Non-Segregated Bus Ducts
3) 4.16 kV Non-ESF Bus =

600:1; Aux CT = 1:1 Tap: 0.5 A; TD: 3 CT Turns Ratios:

1) SAT 6.9 kV Neutral = 120:1; 6.9 kV Non- Aux CT = To protect the ESF and non-ESF Ground Segregated Bus N/A 3.33:1; buses from a ground fault on the Differential Ducts 2) 6.9 kV Bus = Non-Segregated Bus Ducts 400:1; Aux CT = 1:1 Tap: 0.5 A; TD: 3 Page 9 of 13

ATTACHMENT 1 Braidwood Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Protective UV Setpoint Protection Zone Basis for Setpoint Device Logic (Nominal)

Tap: 3.5A SATs and 4.16 Phase CT Turns Ratio To provide time overcurrent kV / 6.9 kV Non- Overcurrent 40:1 protection for phase to ground or N/A Segregated Bus Set: 140A phase to phase faults on the SATs Ducts (Primary Amps) or the Non-Segregated Bus Ducts TD: 3 Tap: 2.5A SATs and 4.16 CT Turns Ratio To provide time overcurrent kV Non- Ground 120:1 protection for ground faults on the N/A Segregated Bus Overcurrent Set: 300A SAT 4.16 kV winding or Non-Ducts (Primary Amps) Segregated Bus ducts.

TD: 5 Tap: 2A CT Turns Ratio To provide time overcurrent SATs and 6.9 kV Ground 120:1 protection for ground faults on the Non-Segregated N/A Overcurrent Set: 240A SAT 6.9 kV windings or Non-Bus Ducts (Primary Amps) Segregated Bus ducts.

TD: 3.5 Existing electrical protective devices are also sufficiently sensitive to detect a ground fault.

Table 5 lists electrical protective devices on the ESF buses and the basis for the device setpoint(s).

Page 10 of 13

ATTACHMENT 1 Braidwood Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" NRC Request 2.b. If the ESF buses are not powered by offsite power sources, explain how the surveillance tests are performed to verify that a single-phase open circuit condition or high impedance ground fault condition on an off-site power circuit is detected.

EGC Response to NRC Request 2.b:

Not Applicable - the ESF buses at Braidwood Station are powered from offsite power sources.

NRC Request 2.d: Do the plant operating procedures, including off-normal operating procedures, specifically call for verification of the voltages on all three phases of the ESF buses?

EGC Response to NRC Request 2.d:

Yes, the current plant operating procedures including annunciator response procedures specifically call for verification of the voltages on all three phases of the ESF buses. The off-normal operating procedures were not revised since annunciator response procedures contain sufficient guidance to address a loss of a single phase condition in a timely manner.

Page 11 of 13

ATTACHMENT 1 Braidwood Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Consequences NRC Requests 1.b, 1.c, and 2.e request information regarding the electrical consequences of an event, and will be addressed in this section.

NRC Request 1.b: The differences (if any) of the consequences of a loaded (i.e., ESF bus normally aligned to offsite power transformer) or unloaded (e.g., ESF buses normally aligned to unit auxiliary transformer) power source.

EGC Response to NRC Request 1.b:

Installed relays were not designed to detect single phase open circuit conditions. Existing loss of voltage and degraded voltage relays may respond depending on load and possible grounds.

In general, there will be no plant response for an unloaded (e.g., non- ESF buses normally aligned to unit auxiliary transformers and ESF buses aligned to the reserve feed) power source in the event of a single-phase open circuit on a credited off-site power circuit because there is insufficient current to provide for detection of a single-phase open circuit for this configuration.

The plant response for a loaded power source will vary based upon the amount of loading and the specific loads involved. In most cases the loading will not be sufficient to decrease bus voltage enough during a single-phase open circuit event to trip the degraded voltage relays.

NRC Request 1.c: If the design does not detect and automatically respond to a single-phase open circuit condition or high impedance ground fault condition on a credited offsite power circuit or another power sources, describe the consequences of such an event and the plant response.

EGC Response to NRC Request 1.c:

Braidwood Station did not credit in the CLB that the Class 1E protection scheme for the ESF buses was designed to detect and automatically respond to a single-phase open circuit condition on the credited off-site power source as described in the Updated Final Safety Analysis Report (UFSAR) and Technical Specifications (TS).

The offsite power circuits at Braidwood Station from the switchyard to the ESF 4.16kV buses consist of two physically separate and electrically independent circuits for each unit. One circuit is via the units assigned SATs and the other from the opposite units SATs.

Since Braidwood Station did not credit the ESF bus protection scheme as being capable of detecting and automatically responding to a single phase open circuit condition, an open phase fault was not included in the design criteria for either the loss of voltage, the degraded voltage relay scheme or secondary level undervoltage protection system design criteria. Since open Page 12 of 13

ATTACHMENT 1 Braidwood Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" phase detection was not credited in the Braidwood Station design or licensing basis, no design basis calculations or design documents exist that previously considered this condition.

The station currently has in place an operability evaluation compensatory action that requires a designated operator to monitor bus voltage and to open the offsite feed breakers to the ESF buses within 30 seconds of identifying a single-open phase condition. After this action is completed, the ESF bus undervoltage relays will automatically start the EDGs and reenergize the ESF buses. This manual action can be completed in a timely manner following the occurrence of a single-phase open circuit to ensure that safe shutdown is achieved and maintained.

Note that a single-phase open circuit condition concurrent with a DBA is considered to be beyond the design basis of the station. However, if a single-phase open circuit condition were to occur concurrent with a DBA, plant systems would be available after the EDGs reenergize the ESF buses.

NRC Request 2.e: If a common or single offsite circuit is used to supply redundant ESF buses, explain why a failure, such as a single-phase open circuit or high impedance ground fault condition, would not adversely affect redundant ESF buses.

EGC Response to NRC Request 2.e:

Consistent with the CLB and GDC 17, protective circuitry will separate the ESF buses from a failed offsite source due to a loss of voltage or a sustained balanced degraded grid voltage concurrent with certain DBAs. The relay systems were not specifically designed to detect an open single phase of a three phase system. Detection of a single-open phase circuit is beyond the approved design and licensing basis of the plant. Calculations that model various loss of single phase conditions are currently being developed.

Braidwood Station has implemented several interim compensatory measures to minimize the impact should the open phase event occur. These measures include:

Modification of the SAT 4 kV undervoltage alarm from a two-out-of-two to a one-out-of-two configuration to enhance annunciatiation for a loss of single phase event Alignment of plant voltmeters to ensure all phases are monitored Implementation of a designated operator to isolate the safety buses from the grid in a timely fashion Completion of required reading packages for operators to enhance operator awareness Enhancement of alarm / annunciator response procedures Creation of operator aids and placards to enhance operator response These compensatory actions now provide effective controls to promptly diagnose and mitigate a loss of singe-phase event.

Page 13 of 13

ATTACHMENT 2 Byron Station, Units 1 and 2, 90-Day Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System"

ATTACHMENT 2 Byron Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" High Impedance Grounds:

On January 30, 2012, a porcelain insulator broke in the Byron Station switchyard resulting in parting of the C phase conductor of the offsite source. The insulator was on the offsite source side of the Unit 2 System Auxiliary Transformers (SATs), and the connection parted in such a way as to leave an electrically open end on the source side. The parted connection remained electrically connected on the transformer side, and the loose bus bar conductor end fell to the ground. This ground was a direct result of the broken insulator and not an independent event.

The connected loose bus bar provided a path to ground for the transformer high voltage terminal, but did not result in a ground fault (i.e., neither solid nor impedance) as seen from the source. Since the switchyard (i.e., source side) relaying was electrically isolated from the fault, it did not detect a fault; therefore, did not operate.

The significant event was the opening of a single phase connection; the ground on the high voltage side of the SAT is of lesser significance. Regardless of phase discontinuity, if the ground impedance is low on the source side, and currents are high, the source side protective relaying will operate and open all circuit phases. If the ground impedance is high, and currents low, the relaying may not operate depending on the magnitude of ground impedance; the circuit will continue to supply power.

A qualitative analysis has been performed to assess the impact of single phase high impedance ground faults. The primary objective of the analysis was to determine if a high impedance ground fault could result in an unbalanced voltage condition sufficient to adversely affect energized ESF equipment. The cases analyzed include a single phase high impedance ground fault with all three phases intact and a single phase high impedance ground fault concurrent with the loss of the same phase. These cases have been analyzed for both the high and low voltage sides of the SATs analyzed. 1 provides a summary report of the qualitative analysis; therefore, all information discussed in this response attachment is limited to single-phase open circuit conditions.

System Description

NRC Requests 2, 1.d, 2.a, and 2.c request system information, and will be addressed in this section.

NRC Request No. 2: Briefly describe the operating configuration of the ESF buses (Class 1E for current operating plants or non-Class 1E for passive plants) at power (normal operating condition).

Exelon Generation Company, LLC (EGC) Response to NRC Request No. 2 Byron Station, Units 1 and 2 have two electrically and physically independent Class 1E engineered safety features (ESF) electrical distribution divisions per unit (i.e., Divisions 11 and 12 for Unit 1, and Divisions 21 and 22 for Unit 2). Two physically separate and electrically independent offsite power circuits are provided for each unit, one via the units assigned system auxiliary transformers and the other from the opposite units system auxiliary transformers.

Page 1 of 14

ATTACHMENT 2 Byron Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" The ESF buses are normally powered directly from offsite power via the two system auxiliary transformers (345-6.9/4.16-kV). Each transformer is normally energized providing power to an ESF 4160-volt bus of the unit. Each transformer also serves as a second source of offsite power for the corresponding ESF bus of the other unit. In addition, an emergency diesel generator (EDG) is provided as an emergency power source for each 4160 V ESF bus of the unit.

A simplified one-line diagram of the Byron Station, Unit 2 Auxiliary Power System, and similar for Unit 1 is shown in Figure 1 below.

Figure 1: Byron Station Simplified One-Line Diagram For normal operating conditions at-power, the ESF buses are powered by offsite sources. The ESF buses are normally powered directly from offsite power via two SATs (i.e., 345 6.9/4.16 kV). Each transformer is normally energized providing power to an ESF 4160-volt bus of the unit. Each transformer also serves as a second source of offsite power for the corresponding ESF bus of the other unit.

Page 2 of 14

ATTACHMENT 2 Byron Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" NRC Request 1.d: Describe the offsite power transformer (e.g., start-up, reserve, station auxiliary) winding and grounding configurations.

EGC Response to NRC Request 1.d:

Offsite power transformer winding and grounding configurations are shown in Table 1 below.

Table 1: Offsite Power Transformer Winding and Grounding Configurations MVA Size Voltage Rating Winding Grounding Transformer @ 55 °C (Primary/

Configuration Configuration (AO/FA/FA) Secondary)

System Wye-Wye-Wye 36/48/60 345-6.9/4.16-kV 1. Neutral - Solidly Auxiliary (3 Leg) MVA Grounded (345kV Transformer (OA/FA/FA) Winding)

(SAT) 142-1 2. Neutral - Resistance Grounded (6.9 & 4.16 kV Windings)

System Wye-Wye-Wye 36/48/60 345-6.9/4.16-kV 1. Neutral - Solidly Auxiliary (3 Leg) MVA Grounded (345kV Transformer (OA/FA/FA) Winding)

(SAT) 142-2 2. Neutral - Resistance Grounded (6.9 & 4.16 kV Windings)

System Wye-Wye-Wye 36/48/60 345-6.9/4.16-kV 1. Neutral - Solidly Auxiliary (3 Leg) MVA Grounded (345kV Transformer (OA/FA/FA) Winding)

(SAT) 242-1 2. Neutral - Resistance Grounded (6.9 & 4.16 kV Windings)

System Wye-Wye-Wye 36/48/60 345-6.9/4.16-kV 1. Neutral - Solidly Auxiliary (3 Leg) MVA Grounded (345kV Transformer (OA/FA/FA) Winding)

(SAT) 242-2 2. Neutral - Resistance Grounded (6.9 & 4.16 kV Windings)

Page 3 of 14

ATTACHMENT 2 Byron Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" NRC Request 2.a: Are the ESF buses powered by offsite power sources? If so, explain what major loads are connected to the buses including their ratings.

EGC Response to NRC Request 2.a:

Yes, for at power (normal operating condition) configurations, ESF buses are powered by offsite sources. The Byron Station ESF bus power sources during normal operation are shown Tables 2 and 3 below.

Table 2 : Byron Station ESF Buses That Are Normally Powered from Offsite Sources Original 4.16kV ESF Bus Name licensing Description of ESF Bus Power Source (normal operating basis condition) configura tion (Y/N)

System Auxiliary Transformer (SAT) 142-1 141 Y System Auxiliary Transformer (SAT) 142-2 142 Y System Auxiliary Transformer (SAT) 242-1 241 Y System Auxiliary Transformer (SAT) 242-2 242 Y Table 3: ESF Buses Not Continuously Powered From Offsite Power Source(s)

Description of ESF Bus Name Original licensing ESF Bus Power (normal operating condition) basis configuration Source (Y/N)

N/A N/A N/A N/A N/A N/A N/A N/A N/A ESF bus major loads that are energized during normal power operations, including ratings are shown in Table 4 below.

Table 4: Major ESF Loads Including Ratings and Status during Normal Power Operations 4kV Voltage Rating Normally ESF Load Level (hp) Energized Bus (V) 141 Auxiliary Feedwater Pump 1A 4160 1250 N 141 Essential Service Water Pump 1A 4160 1250 Y 141 Containment Spray Pump 1A 4160 600 N 141 Centrifugal Charging Pump 1A 4160 600 Y 141 Auxiliary Building Exhaust Fan 0A 4160 500 Y Page 4 of 14

ATTACHMENT 2 Byron Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" 4kV Voltage Rating Normally ESF Load Level (hp) Energized Bus (V) 141 Control Room Refrigeration Unit 0A 4160 461 Y 141 Component Cooling Water Pump 1A 4160 450 Y 141 Component Cooling Water Pump 0 4160 450 Y 141 Safety Injection Pump 1A 4160 400 N 141 Residual Heat Removal (RHR) Pump 1A 4160 400 N 141 Auxiliary Building Supply Fan 0A 4160 350 Y 141 Transformer 131X Feed 4160 1000kVA Y 141 Transformer 131Z Feed 4160 750kVA Y 142 Essential Service Water Pump 1B 4160 1250 Y 142 Containment Spray Pump 1B 4160 600 N 142 Centrifugal Charging Pump 1B 4160 600 Y 142 Auxiliary Building Exhaust Fan 0B 4160 500 Y 142 Component Cooling Water Pump 1B 4160 450 Y 142 Component Cooling Water Pump 0 4160 450 Y 142 Control Room Refrigeration Unit 0B 4160 461 Y 142 Safety Injection Pump 1B 4160 400 N 142 RHR Pump 1B 4160 400 N 142 Auxiliary Building Supply Fan 0B 4160 350 Y 142 Transformer 132X Feed 4160 1333kVA Y 142 Transformer 132Z Feed 4160 750kVA Y 241 Auxiliary Feedwater Pump 2A 4160 1250 N 241 Essential Service Water Pump 2A 4160 1250 Y 241 Containment Spray Pump 2A 4160 600 N 241 Centrifugal Charging Pump 2A 4160 600 Y 241 Auxiliary Building Exhaust Fan 0C 4160 500 Y 241 Component Cooling Water Pump 2A 4160 450 Y 241 Component Cooling Water Pump 0 4160 450 Y 241 Safety Injection Pump 2A 4160 400 N 241 RHR Pump 2A 4160 400 N Page 5 of 14

ATTACHMENT 2 Byron Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" 4kV Voltage Rating Normally ESF Load Level (hp) Energized Bus (V) 241 Auxiliary Building Supply Fan 0C 4160 350 Y 241 Transformer 231X Feed 4160 1000kVA Y 241 Transformer 231Z Feed 4160 750kVA Y 242 Essential Service Water Pump 2B 4160 1250 Y 242 Containment Spray Pump 2B 4160 600 N 242 Centrifugal Charging Pump 2B 4160 600 Y 242 Auxiliary Building Exhaust Fan 0D 4160 500 Y 242 Component Cooling Water Pump 2B 4160 450 Y 242 Component Cooling Water Pump 0 4160 450 Y 242 Safety Injection Pump 2B 4160 400 N 242 RHR Pump 2B 4160 400 N 242 Auxiliary Building Supply Fan 0D 4160 350 Y 242 Transformer 232X Feed 4160 1000kVA Y 242 Transformer 232Z Feed 4160 750kVA Y NRC Request 2.c: Confirm that the operating configuration of the ESF buses is consistent with the current licensing basis. Describe any changes in offsite power source alignment to the ESF buses from the original plant licensing.

EGC Response to NRC Request 2.c:

The following at power (normal operating condition) configurations, have been confirmed to be consistent with the current licensing basis (CLB).

Each 4160-volt ESF bus has the following:

(1) A normal feed from the system auxiliary transformer, (2) A second (reserve) feed from the other unit's SAT, and (3) An emergency feed from its respective diesel generator The unit Class 1E a-c power system is divided into two divisions (i.e., Divisions 11 and 12 for Unit 1, and Divisions 21 and 22 for Unit 2), each of which is supplied from a 4160-volt bus (i.e.,

Buses 141 and 142, for Unit 1, and Buses 241 and 242 for Unit 2). Each ESF group of each unit is supplied standby power from an individual diesel-generator unit. With this arrangement, alternate or redundant components of all ESF systems are supplied from separate switch Page 6 of 14

ATTACHMENT 2 Byron Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" groups so that no single failure can jeopardize the proper functioning of redundant ESF loads.

The division of the ESF loads among the system buses is such that the total loss of one of the two electrical divisions cannot prevent the safe shutdown of the reactor under any normal or abnormal design condition.

There have been no changes in the offsite power source alignment to the ESF buses from the original plant licensing. Each units set of SATs has sufficient capacity to accommodate the auxiliary power requirements of the unit when operating at full load. Furthermore, each units set of SATs is capable of supplying the design basis accident (DBA) loads of both divisions of one unit and the safe shutdown loads of both divisions of the other unit simultaneously.

Page 7 of 14

ATTACHMENT 2 Byron Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" System Protection NRC Requests 1, 1.a, 2.b, and 2.d request information regarding electrical system protection, and will be addressed in this section.

NRC Request 1: Given the requirements above, describe how the protection scheme for ESF buses (Class 1E for current operating plants or non-Class 1E for passive plants) is designed to detect and automatically respond to a single-phase open circuit condition or high impedance ground fault condition on a credited off-site power circuit or another power sources. Also, include the following information:

EGC Response to NRC Request 1:

Consistent with the CLB and 10 CFR 50, Appendix A, "General Design Criteria for Nuclear Power Plants," Criterion (GDC) 17, "Electric power systems," existing protective circuitry will separate the ESF buses from a connected failed offsite source due to a loss of voltage or a sustained, balanced degraded grid voltage concurrent with certain DBAs. The relay systems were not specifically designed to detect an open single phase of a three phase system.

Detection of a single-open phase condition is beyond the approved design and licensing basis of the plant.

NRC Request 1.a: The sensitivity of protective devices to detect abnormal operating conditions and the basis for the protective device setpoint(s).

EGC Response to NRC Request 1.a:

Consistent with the CLB and GDC 17, existing electrical protective devices are sufficiently sensitive to detect design basis conditions like a loss of voltage or a degraded voltage, but were not designed to detect a single phase open circuit condition. The Byron Station undervoltage protective devices and the basis for the device setpoint(s) are shown in Table 5 below.

Table 5: Protective Devices Protection Protective Setpoint UV Logic Basis for Setpoint Zone Device (Nominal)

Loss of To detect a complete loss of 4 kV ESF Bus 2 of 2 2870 V Voltage ESF Bus voltage condition Degraded To detect degraded voltage 4 kV ESF Bus 2 of 2 3847 V Voltage on an ESF Bus.

Page 8 of 14

ATTACHMENT 2 Byron Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Protection Protective Setpoint UV Logic Basis for Setpoint Zone Device (Nominal)

Tap: 1A CT Ratio 240:1 Normal Feed to Ground Set: 240A To provide time overcurrent N/A ESF Bus Overcurrent (Primary protection for ground faults.

Amps)

Time Dial (TD): 3.5 Tap: 12A To provide time overcurrent Phase CT Ratio Normal Feed to protection for phase to Overcurrent N/A 240:1 ESF Bus ground or phase to phase (A, C) Set: 2880A faults.

TD: 4 To provide time delayed overcurrent protection for the ESF bus from overloads while cross-tied to the corresponding ESF bus on Tap: 5A the opposite unit. The Phase Normal Feed to CT Ratio overcurrent relay is an Overcurrent N/A ESF Bus 240:1 instantaneous overcurrent (B)

Set: 1200A relay. This relay is used in conjunction an external time delay relay which alarms after 10 sec and trips a cross-tie breaker after 5 minutes.

Tap: 0.5A CT Ratio Reserve Feed Ground To provide time overcurrent N/A 240:1 to ESF Bus Overcurrent protection for ground faults.

Set: 120A TD: 1.5 Tap: 6A To provide time overcurrent Phase CT Ratio Reserve Feed protection for phase to Overcurrent N/A 240:1 to ESF Bus ground or phase to phase (A, C) Set: 1440A faults.

TD: 3 Tap: 7A To provide time overcurrent Emergency CT Ratio Phase protection for phase to Feed to ESF N/A 240:1 Overcurrent ground or phase to phase Bus Set: 1680A faults.

TD: 5 Page 9 of 14

ATTACHMENT 2 Byron Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Protection Protective Setpoint UV Logic Basis for Setpoint Zone Device (Nominal)

CT Ratio Emergency Protects the ESF bus from a 240:1 Feed to ESF Differential N/A faulted Emergency Diesel 0.14A Min Bus Generator.

Trip CT Turns Ratios: 1) 345 kV Winding =

60:1;

2) 6.9 kV Winding =

1000:1; SATs and 6.9

3) 4.16 kV To protect the ESF and non-kV / 4.16 kV Winding = ESF buses from a faulted Non- Differential N/A 1600:1; SAT or Non-Segregated Bus Segregated Bus Sensitivity = Duct Ducts 30%;

Tap Settings:

1) 345 kV Side = 2.9 A;
2) 6.9 kV Side = 8.7 A;
3) 4.16 kV Side = 8.7 A CT Turns Ratios:
1) SAT 4.16 kV Neutral =

120:1; Aux CT = 5:1;

2) 4.16 kV To protect the ESF and non-4.16 kV Non-Ground ESF Bus = ESF buses from a ground Segregated Bus N/A Differential 240:1; Aux fault on the Non-Segregated Ducts CT = 2.5:1 Bus Ducts
3) 4.16 kV Non-ESF Bus

= 600:1; Aux CT = 1:1 Tap: 0.5 A; TD: 3 Page 10 of 14

ATTACHMENT 2 Byron Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Protection Protective Setpoint UV Logic Basis for Setpoint Zone Device (Nominal)

CT Turns Ratios:

1) SAT 6.9 kV Neutral =

To protect the ESF and non-6.9 kV Non- 120:1; Aux Ground ESF buses from a ground Segregated Bus N/A CT = 3.33:1; Differential fault on the Non-Segregated Ducts 2) 6.9 kV Bus Bus Ducts

= 400:1; Aux CT = 1:1 Tap: 0.5 A; TD: 3

1) CT Turns SATs and 4.16 Ratio = 40:1 To provide time overcurrent kV / 6.9 kV 2) Tap: 3.5A protection for phase to Phase Non- N/A 3) Set: 140A ground or phase to phase Overcurrent Segregated Bus (Primary faults on the SATs or the Ducts Amps) Non-Segregated Bus Ducts
4) TD: 3
1) CT Turns Ratio 120:1 To provide time overcurrent SATs and 4.16
2) Tap: 2.5A protection for ground faults kV Non- Ground N/A 3) Set: 300A on the SAT 4.16 kV winding Segregated Bus Overcurrent (Primary or Non-Segregated Bus Ducts Amps) ducts.
4) TD: 5
1) CT Turns Ratio 120:1 To provide time overcurrent SATs and 6.9
2) Tap: 2A protection for ground faults kV Non- Ground N/A 3) Set: 240A on the SAT 6.9 kV windings Segregated Bus Overcurrent (Primary or Non-Segregated Bus Ducts Amps) ducts.
4) TD: 3.5 Existing electrical protective devices are also sufficiently sensitive to detect a ground fault.

Table 5 lists electrical protective devices on the ESF buses and the basis for the device setpoint(s).

Page 11 of 14

ATTACHMENT 2 Byron Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" NRC Request 2.b: If the ESF buses are not powered by offsite power sources, explain how the surveillance tests are performed to verify that a single-phase open circuit condition or high impedance ground fault condition on an off-site power circuit is detected.

EGC Response to NRC Request 2.b:

Not Applicable - the ESF buses at Byron Generation Station are powered from offsite power sources.

NRC Request 2.d: Do the plant operating procedures, including off-normal operating procedures, specifically call for verification of the voltages on all three phases of the ESF buses?

EGC Response to NRC Request 2.d:

Yes, the current plant operating procedures including annunciator response procedures specifically call for verification of the voltages on all three phases of the ESF buses. The off-normal operating procedures were not revised since annunciator response procedures contain sufficient guidance to address a loss of a single phase condition in a timely manner.

Page 12 of 14

ATTACHMENT 2 Byron Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Consequences NRC Requests 1.b, 1.c, and 2.e request information regarding the electrical consequences of an event, and will be addressed in this section.

NRC Request 1.b: The differences (if any) of the consequences of a loaded (i.e., ESF bus normally aligned to offsite power transformer) or unloaded (e.g.,

ESF buses normally aligned to unit auxiliary transformer) power source.

EGC Response to NRC Request 1.b:

Installed relays were not designed to detect single-open phase circuit conditions. Existing loss of voltage and degraded voltage relays may respond depending on load and possible grounds.

In general, there will be no plant response for an unloaded (e.g., non- ESF buses normally aligned to unit auxiliary transformers and ESF buses aligned to the reserve feed) power source in the event of a single-phase open circuit on a credited off-site power circuit because there is insufficient current to provide for detection of a single-phase open circuit for this configuration.

Note that the normal offsite power source is usually loaded. An unloaded normal offsite power source would only occur during SAT shutdown or start-up.

The plant response for a loaded power source will vary based upon the amount of loading and the specific loads involved. In most cases the loading will not be sufficient to decrease bus voltage enough during a single-phase open circuit event to trip the degraded voltage relays.

NRC Request 1.c: If the design does not detect and automatically respond to a single-phase open circuit condition or high impedance ground fault condition on a credited offsite power circuit or another power sources, describe the consequences of such an event and the plant response.

EGC Response to NRC Request 1.c:

Byron Station did not credit in the CLB that the Class 1E protection scheme for the ESF buses was designed to detect and automatically respond to a single-phase open circuit condition on the credited off-site power source as described in the Updated Final Safety Analysis Report (UFSAR) and Technical Specifications (TS).

The offsite power circuits at Byron Station consist of two physically separate and electrically independent offsite power circuits, from the switchyard to the ESF 4.16kV buses for each unit.

One circuit is via the units assigned SATs and the other from the opposite units SATs.

Since Byron Station did not credit the ESF bus protection scheme as being capable of detecting and automatically responding to a single phase open circuit condition, an open phase fault was not included in the design criteria for either the loss of voltage, the degraded voltage relay scheme or secondary level undervoltage protection system design criteria. Since open phase Page 13 of 14

ATTACHMENT 2 Byron Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" detection was not credited in the Byron Station design or licensing basis, no design basis calculations or design documents exist that previously considered this condition.

The station currently has in place an Operability Evaluation compensatory action that requires a designated operator to monitor bus voltage and to open the offsite feed breakers to the ESF buses within 30 seconds of identifying a single-open phase condition. After this action is completed, the ESF bus undervoltage relays will automatically start the EDGs and reenergize the ESF buses. This manual action can be completed in a timely manner following the occurrence of a single-phase open circuit to ensure that safe shutdown is achieved and maintained.

Note that a single-phase open circuit condition concurrent with a DBA is considered to be beyond the design basis of the station. However, if a single-phase open circuit condition were to occur concurrent with a DBA, plant systems would be available after the EDGs reenergize the ESF buses.

NRC Request 2.e: If a common or single offsite circuit is used to supply redundant ESF buses, explain why a failure, such as a single-phase open circuit or high impedance ground fault condition, would not adversely affect redundant ESF buses.

EGC Response to NRC Request 2.e:

Consistent with the CLB and GDC 17, protective circuitry will separate the ESF buses from a failed offsite source due to a loss of voltage or a sustained balanced degraded grid voltage concurrent with certain DBAs. The relay systems were not specifically designed to detect an open single phase of a three phase system. Detection of a single-open phase circuit is beyond the approved design and licensing basis of the plant. Calculations that model various loss of single phase conditions are currently being developed.

Byron Station has implemented several interim compensatory measures to minimize the impact should the open phase event occur. These measures include.

Modification of the SAT 4 kV undervoltage alarm from a two-out-of-two to a one-out-of-two configuration to enhance annunciatiation for a loss of single phase event Alignment of plant voltmeters to ensure all phases are monitored Implementation of a designated operator to isolate the safety buses from the grid in a timely fashion Completion of required reading packages for operators to enhance operator awareness Enhancement of alarm / annunciator response procedures Creation of operator aids and placards to enhance operator response These compensatory actions now provide effective controls to promptly diagnose and mitigate a singe-phase event.

Page 14 of 14

ATTACHMENT 3 Clinton Power Station, Unit 1, 90-Day Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System"

ATTACHMENT 3 Clinton Power Station, Unit 1 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" High Impedance Grounds:

On January 30, 2012, a porcelain insulator broke in the Byron Station switchyard resulting in parting of the C phase conductor of the offsite source. The insulator was on the offsite source side of the Unit 2 System Auxiliary Transformers (SATs), and the connection parted in such a way as to leave an electrically open end on the source side. The parted connection remained electrically connected on the transformer side, and the loose bus bar conductor end fell to the ground. This ground was a direct result of the broken insulator and not an independent event.

The connected loose bus bar provided a path to ground for the transformer high voltage terminal, but did not result in a ground fault (i.e., neither solid nor impedance) as seen from the source. Since the switchyard (i.e., source side) relaying was electrically isolated from the fault, it did not detect a fault; therefore, did not operate.

The significant event was the opening of a single phase connection; the ground on the high voltage side of the SAT is of lesser significance. Regardless of phase discontinuity, if the ground impedance is low on the source side, and currents are high, the source side protective relaying will operate and open all circuit phases. If the ground impedance is high, and currents low, the relaying may not operate depending on the magnitude of ground impedance; the circuit will continue to supply power.

A qualitative analysis has been performed to assess the impact of single phase high impedance ground faults. The primary objective of the analysis was to determine if a high impedance ground fault could result in an unbalanced voltage condition sufficient to adversely affect energized ESF equipment. The cases analyzed include a single phase high impedance ground fault with all three phases intact and a single phase high impedance ground fault concurrent with the loss of the same phase. These cases have been analyzed for both the high and low voltage sides of the SATs analyzed. 1 provides a summary report of the qualitative analysis; therefore, all information discussed in this response attachment is limited to single-phase open circuit conditions.

System Description

NRC Requests 2, 1.d, 2.a, and 2.c request system information, and will be addressed in this section.

NRC Request No. 2: Briefly describe the operating configuration of the ESF buses (Class 1E for current operating plants or non-Class 1E for passive plants) at power (normal operating condition).

Exelon Generation Company, LLC (EGC) Response to NRC Request No. 2 Clinton Power Station, Unit 1 (CPS) has three electrically and physically independent Class 1E engineered safety features (ESF) ac buses (i.e., Divisions 1, 2, and 3). The 4kV ESF buses are 1A1, 1B1, and 1C1 in show in Figure 1 below. Two physically independent offsite power Page 1 of 13

ATTACHMENT 3 Clinton Power Station, Unit 1 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" systems provide electrical power to these ESF buses; the 138kV system, and the 345kV system.

Figure 1: One-Line Diagram of CPS Electrical Distribution System The 138kV system provides power to the station by one, two-terminal transmission line connected to the bulk electric system (BES). The line terminates through a circuit switcher to the Emergency Reserve Auxiliary Transformer (ERAT), which transforms the system voltage to 4.16kV feeding bus 1ET4. Bus 1ET4 provides normal power to Division 1 (i.e., Bus 1A1).

The 345kV system provides power to the station through three transmission lines connected to the BES. All three lines terminate at the station switchyard ring bus which feeds Reserve Auxiliary Transformers (RATs) A, B, and C. RAT B transforms the system voltage to 4.16kV feeding bus 1RT4. Bus 1RT4 provides normal power to Division 2 (i.e., Bus 1B1) and Division 3 (i.e., Bus 1C1).

Page 2 of 13

ATTACHMENT 3 Clinton Power Station, Unit 1 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" NRC Request 1.d: Describe the offsite power transformer (e.g., start-up, reserve, station auxiliary) winding and grounding configurations.

EGC Response to NRC Request 1.d:

The offsite power transformer winding and grounding configurations are shown in Table 1 below.

Table 1: CPS Offsite Power Transformer and Grounding Configurations Winding MVA Size Voltage Rating Grounding Transformer Configuration (Cooling Mode) (Primary/Secondary) Configuration High Side Reserve Grounded Wye-Wye 20/26.6/33.34 Auxiliary 345,000/4160V Low Side (3 Leg) (ONAN/ONAF/ONAF)

Transformer B Resistance Grounded High Side Grounded Emergency Low Side Wye-Wye-Reserve 18/24/30MVA Resistance Buried 137,950/4160V Auxiliary (OA/FA/FA) Grounded Tertiary Delta Transformer Tertiary Delta Grounded (A Phase)

NRC Request 2.a: Are the ESF buses powered by offsite power sources?

If so, explain what major loads are connected to the buses including their ratings.

EGC Response to NRC Request 2.a:

For at-power (i.e., normal operating condition) configurations, the CPS ESF buses are powered by offsite sources. The offsite sources do not carry non-safety loads during normal operations.

The CPS ESF bus power sources are shown in Tables 2 and 3 below.

Table 2: CPS ESF Buses Continuously Powered from Offsite Power Source(s)

Description of ESF ESF Bus Name Original licensing Bus Power Source (normal operating condition) basis configuration (Y/N)

ERAT 1A1 (i.e., Division 1) Y RAT B 1B1 (i.e., Division 2) Y RAT B 1C1 (i.e., Division 3) Y Page 3 of 13

ATTACHMENT 3 Clinton Power Station, Unit 1 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Table 3: ESF Buses Not Continuously Powered From Offsite Power Source(s)

Description of ESF ESF Bus Name Original licensing Bus Power Source (normal operating condition) basis configuration (Y/N)

Not Applicable to CPS Not Applicable to CPS Not Applicable to CPS The major ESF bus loads that are energized during normal power operations, including their ratings, are shown below in Tables 4, 5, and 6 for ESF Buses 1A1, 1B1, and 1C1, respectively.

Table 4: ESF Bus 1A1 Normally-Energized Major Loads Voltage Rating Load Level Note (hp/kVA)

(VAC) 480V Unit Sub 1A 4160 750kVA 480V Unit Sub A1 4160 750kVA Drywell Chiller 1A 4000 533kW 1 Fuel Pool Cooling Pump 1A 4000 400hp 1 Shutdown Service Water Pump 1A 4000 1500hp 2 LPCS Pump 1 4000 1250hp 2 RHR Pump 1A 4000 700HP 2 Table 5: ESF Bus 1B1 Normally-Energized Major Loads Voltage Rating Load Level Note (hp/kVA)

(VAC) 480V Unit Sub 1B 4160 750kVA 480V Unit Sub B1 4160 750kVA Drywell Chiller 1B 4000 533kW 1 Fuel Pool Cooling Pump 1B 4000 400hp 1 Shutdown Service Water Pump 1B 4000 1500hp 2 RHR Pump 1B 4000 700hp 2 RHR Pump 1C 4000 700hp 2 Table 6: ESF Bus 1C1 Normally-Energized Major Loads Voltage Rating Load Level Note (hp/kVA)

(VAC) 480V Unit Sub 1C 4160 225kVA HPCS Pump 1 4000 2500hp 2 Tables 4, 5, and 6 Notes:

1) Normally energized on either bus 1A1 or bus 1B1, but not both.
2) Connected, but not energized under normal conditions.

Page 4 of 13

ATTACHMENT 3 Clinton Power Station, Unit 1 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" NRC Request 2.c: Confirm that the operating configuration of the ESF buses is consistent with the current licensing basis.

Describe any changes in offsite power source alignment to the ESF buses from the original plant licensing.

EGC Response to NRC Request 2.c:

The Class 1E AC distribution system supplies electrical power to three divisional load groups, with each division powered by an independent Class 1E 4.16 kV ESF bus. Each ESF bus has two separate and independent offsite sources of power. Each ESF bus has a dedicated onsite diesel generator (DG). The ESF systems of any two of the three divisions provide for the minimum safety functions necessary to shut down the unit and maintain it in a safe shutdown condition.

The following at power (i.e., normal operating conditions) configurations have been confirmed to be consistent with the current licensing basis (CLB):

1. Power to ESF bus 1A1 via 138kV system and ERAT.
2. Power to ESF bus 1B1 via 345kV system and RAT B.
3. Power to ESF bus 1C1 via 345kV system and RAT B.

There have been no changes in the offsite power source alignment to the ESF buses from the original plant licensing. RAT B and the ERAT are fully capable of supplying power to all three ESF buses and the plant licensing basis does not specify a particular ESF bus alignment. In response to the Byron Station event, CPS changed the normal bus alignment from all three ESF buses powered by RAT B to a split configuration where Bus 1A1 is powered by one source while Buses 1B1 and 1C1 are maintained on the other source.

Page 5 of 13

ATTACHMENT 3 Clinton Power Station, Unit 1 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" System Protection NRC Requests 1, 1.a, 2.b, and 2.d request information regarding electrical system protection, and will be addressed in this section.

NRC Request 1: Given the requirements above, describe how the protection scheme for ESF buses (Class 1E for current operating plants or non-Class 1E for passive plants) is designed to detect and automatically respond to a single-phase open circuit condition or high impedance ground fault condition on a credited off-site power circuit or another power sources. Also, include the following information:

EGC Response to NRC Request 1:

Consistent with the CLB and 10 CFR 50, Appendix A, "General Design Criteria for Nuclear Power Plants," Criterion (GDC) 17, "Electric power systems," existing protective circuitry will separate the ESF buses from a connected failed offsite source due to a loss of voltage or a sustained, balanced degraded grid voltage concurrent with certain design basis accidents (DBAs). The relay systems were not specifically designed to detect a single open phase of a three phase system. Detection of a single-open phase condition is beyond the approved design and licensing basis of the plant.

CPS utilizes two static VAR compensators (SVCs); one on the secondary side of each offsite source transformer. The SVCs have redundant voltage unbalance relays that have at least some capability of detecting an open single phase. Operating experience at CPS has shown that the relays will actuate with a depressed single phase. The SVC is automatically separated from the secondary side of the respective transformer when a voltage unbalance is detected.

The purpose of the relays is to protect the SVC, not the ESF buses; therefore, there is no automatic action taken to separate the offsite source. The extent to which the relays are effective would involve extensive analysis, including the development of detailed plant specific models.

During normal plant operation, ESF bus 1A1 is fed from the ERAT while ESF buses 1B1 and 1C1 are fed from RAT B. An open single-phase on either offsite source would result in the trip of the SVC associated with that source as well as a MCR alarm. Upon receipt of the alarm, Operators verify bus voltages and take appropriate actions to align the affected bus to the other, unaffected, offsite source.

Buses 1A1 and 1B1 have redundant, but non-coincidental loads that are energized during normal operation. Maintenance activities and surveillances determine which bus will be carrying the normally energized loads. If a single open-phase condition were to occur on the offsite source powering the energized loads, it is expected that the protection scheme for the associated load will actuate. The actuation of the protective circuits (e.g., motor overloads, etc.)

will provide additional indication to the MCR. With buses 1A1 and 1B1 powered by separate offsite sources, the redundant, non-coincidental loads can be powered by the unaffected offsite source.

Page 6 of 13

ATTACHMENT 3 Clinton Power Station, Unit 1 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" NRC Request 1.a: The sensitivity of protective devices to detect abnormal operating conditions and the basis for the protective device setpoint(s).

EGC Response to NRC Request 1.a:

Consistent with the CLB and GDC 17, existing electrical protective devices are sufficiently sensitive to detect design basis conditions like a loss of voltage or a degraded voltage, but were not designed to detect a single phase open circuit condition. Undervoltage protective devices and the basis for the device setpoint(s) are shown in Table 7 below.

Table 7: Protective Devices Protection Protective UV Setpoint Basis for Setpoint Zone Device Logic (Nominal) 4.16kV 2870V To detect complete loss of Loss of ESF Bus 2 of 2 (69% of 4160V) voltage on bus 1A1 (1B1), bus Voltage Relay 1A1 (1B1) 2.2s at 0V 1RT4, and bus 1ET4.

4.16kV 4078V Degraded To detect degraded voltage on ESF Bus 2 of 2 (98% of 4160V)

Voltage Relay bus 1A1 (1B1).

1A1 (1B1) 14.9s Delay 12A Tap 4.16kV Bus Phase 800:5 To provide time overcurrent ESF Bus Overcurrent TD 10 protection for bus 1A1 (1B1).

1A1 (1B1) 1.3s 0.5A Tap 4.16kV Bus Neutral 800:5 To provide ground fault ESF Bus Overcurrent TD 10 protection for bus 1A1 (1B1).

1A1 (1B1) 0.75s 2520V 4.16kV 1 of 2 To detect complete loss of Loss of (60.6% of ESF Bus Taken voltage on bus 1C1, bus Voltage Relay 4160V) 1C1 Twice 1RT4, and bus 1ET4.

2.5s at 0V 4.16kV 4078V Degraded To detect degraded voltage on ESF Bus 2 of 2 (98% of 4160V)

Voltage Relay bus 1C1.

1C1 14.9s Delay 12A Tap 4.16kV Bus Phase 1200:5 To provide time overcurrent ESF Bus Overcurrent TD 3.5 protection for bus 1C1.

1C1 1.4s Page 7 of 13

ATTACHMENT 3 Clinton Power Station, Unit 1 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Protection Protective UV Setpoint Basis for Setpoint Zone Device Logic (Nominal) 0.5A Tap 4.16kV Bus Neutral 1200:5 To provide ground fault ESF Bus Overcurrent TD 1.5 protection for bus 1C1.

1C1 0.6s 4.16kV 195V Differential To provide fault detection for 3A Bus 1RT4 Current bus 1RT4.

5000:5 CT 4.16kV 75V Differential To provide fault detection for 3A Bus 1ET4 Current bus 1ET4.

4000:5 CT 1V Tap 10s Trips SVC and alarms in MCR.

Voltage RAT SVC Dropout=95% Does not provide protection for Unbalance of PU = 0.95V the offsite source.

(4200-120 PT) 1V Tap 10s Trips SVC and alarms in MCR.

ERAT Voltage Dropout=95% Does not provide protection for SVC Unbalance of PU = 0.95V the offsite source.

(4200-120 PT)

To provide ground fault 1.5A Tap 4.16kV detection for the transformer (360A)

RAT B Winding secondary winding and 4kV TD 2.0 Ground Fault system that may overload the (1200:5) transformer.

To provide ground fault 1A Tap 345kV detection for the transformer (40A)

RAT B Winding primary winding and 138kV TD 1.0 Ground Fault system that may overload the (200:5) transformer.

345kV 2.5A Tap Instantaneous (100A, 175%) To provide transformer RAT B and Time TD 2.75 overload and fault protection.

Overcurrent 22A (880A) 2.9A Tap To provide fault detection Differential (200:5 primary between the load side of circuit RAT B Current 5000:5 switcher 4538 and buses secondary) 1RT4 and 1ET4.

Page 8 of 13

ATTACHMENT 3 Clinton Power Station, Unit 1 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Protection Protective UV Setpoint Basis for Setpoint Zone Device Logic (Nominal)

To provide fault detection 345kV Differential 200V between RAT B primary North Bus Current 14A winding and breakers 4502 and 4522.

To provide ground fault 0.8A Tap 4.16kV detection for the transformer (192A, 16%)

ERAT Winding secondary winding and 4kV TD 3.2 Ground Fault system that may overload the (1200:5) transformer.

To provide ground fault 1.5A Tap 138kV detection for the transformer (180A, 243%)

ERAT Winding primary winding and 138kV TD 4.0 Ground Fault system that may overload the (600:5) transformer.

5A Tap 138kV To provide transformer (200A, 159%)

Instantaneous winding fault detection and ERAT TD 3.8 and Time backup protection for Inst. = 1640A Overcurrent secondary side faults.

(200:5) 4.2A Tap To provide fault detection Differential (250:5 primary ERAT between the load side of circuit Current 4000:5 switcher B018 and bus 1ET4.

secondary)

Existing electrical protective devices are also sufficiently sensitive to detect a ground fault.

Ground protection on the ESF buses and the basis for the device setpoint(s) are also shown in Table 7.

NRC Request 2.b. If the ESF buses are not powered by offsite power sources, explain how the surveillance tests are performed to verify that a single-phase open circuit condition or high impedance ground fault condition on an off-site power circuit is detected.

EGC Response to NRC Request 2.b:

Not Applicable - the ESF buses at CPS are powered by offsite power sources.

Page 9 of 13

ATTACHMENT 3 Clinton Power Station, Unit 1 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" NRC Request 2.d: Do the plant operating procedures, including off-normal operating procedures, specifically call for verification of the voltages on all three phases of the ESF buses?

EGC Response to NRC Request 2.d:

The current plant operating procedures, including operating procedures for off-normal alignments, call for verification of the voltages on all three phases of the ESF buses.

Page 10 of 13

ATTACHMENT 3 Clinton Power Station, Unit 1 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Consequences NRC Requests 1.b, 1.c, and 2.e request information regarding the electrical consequences of an event, and will be addressed in this section.

NRC Request 1.b: The differences (if any) of the consequences of a loaded (i.e., ESF bus normally aligned to offsite power transformer) or unloaded (e.g., ESF buses normally aligned to unit auxiliary transformer) power source.

EGC Response to NRC Request 1.b:

Installed relays were not designed to detect single phase open circuit conditions. Existing loss of voltage and degraded voltage relays may respond depending on load and possible grounds.

The SVCs are designed to provide a reactive load to RAT B and ERAT. This loading enhances the ability of the voltage unbalance relays to detect a single open phase and may provide sufficient current for ground detection.

The plant response for a loaded power source cannot be calculated without specifying the amount of loading and the specific loads involved. Extensive modeling and analysis would have to be performed to determine the impact that SVC loading has on detecting a single open phase.

NRC Request 1.c: If the design does not detect and automatically respond to a single-phase open circuit condition or high impedance ground fault condition on a credited offsite power circuit or another power sources, describe the consequences of such an event and the plant response.

EGC Response to NRC Request 1.c:

1. CPS did not credit in the CLB that the Class 1E protection scheme ESF buses was designed to detect and automatically respond to a single-phase open circuit condition on the credited offsite power source as described in the Updated Safety Analysis Report (USAR) and Technical Specifications (TS).

The offsite power circuits at CPS consist of two independent circuits. As discussed in the CPS TS Bases B 3.8.1, "AC Sources - Operating," each offsite circuit consists of incoming breakers and disconnects to the respective RAT or ERAT and the respective circuit path including feeder breakers to each of the 4.16kV ESF buses. The first source originates at 345kV Circuit Switcher 4538 and ends at a feeder breaker at each ESF bus. The second source originates at 138kV Circuit Switcher B018 and ends at a feeder breaker at each ESF bus.

Page 11 of 13

ATTACHMENT 3 Clinton Power Station, Unit 1 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" The SVC voltage unbalance relays have the capability of detecting a single open phase.

The SVCs are automatically separated from the secondary side of their respective transformer when a voltage unbalance is detected, but no automatic action is taken to separate the offsite source. When the SVC trips off-line, an alarm is received in the Main Control Room (MCR). Upon receipt of the alarm, the ESF bus voltages are verified and appropriate actions are taken based on those voltages.

2. Since CPS did not credit the ESF bus protection scheme as being capable of detecting and automatically responding to a single phase open circuit condition, an open phase fault was not included in the design criteria for either the loss of voltage, the degraded voltage relay scheme or secondary level undervoltage protection system design criteria. Since open phase detection was not credited in the CPS design or licensing basis, no design basis calculations or design documents exist that previously considered this condition.
3. Without formalized engineering calculations or engineering evaluations, the electrical consequences of such an open phase event, including the plant response, can only be evaluated to the extent of what has already been published by the Electric Power Research Institute (EPRI) and Basler; which is a generic overview. The difficulty in applying these documents to the CPS specific response is that these are generic assessments and cannot be formally credited as a basis for an accurate response. The primary reason is that detailed plant specific models would need to be developed (e.g., transformer magnetic circuit models, electric distribution models, motor models; including positive, negative, and zero sequence impedances, voltage, and currents), and the models would need to be compiled and analyzed for the CPS specific Class 1E electric distribution system.
4. The SVCs provide reactive load to the associated 4.16kV bus. Neither offsite source is operated unloaded during normal conditions. This loading enhances the ability of the SVC voltage unbalance relay to detect a single open-phase condition.
5. The degraded voltage scheme at CPS utilizes an open delta configuration on the potential transformers with 2 out of 2 coincidence logic. The "B" phase is common to both relays. An open phase on Phase "A" or Phase "C" may not be detected by the existing degraded voltage relay scheme.
6. An open single-phase on RAT B would affect both Division 2 and 3. Division 1 is redundant to Division 2. Division 1 would be unaffected and could accomplish the intended DBA safety function. An open single-phase on the ERAT would only affect Division 1, leaving both Divisions 2 and 3 unaffected and available to respond to a DBA.
7. The following interim compensatory actions were taken to promptly diagnose and respond to degraded offsite power sources due to single-phase open circuit conditions:
a. Prepared required reading packages for all Licensed Operators
b. Aligned plant voltmeters to ensure all phases are monitored
c. Created Operator aids and placards
d. Enhanced alarm and annunciator response procedures
e. Implemented a designated operator to isolate the safety buses from the grid in a timely fashion Page 12 of 13

ATTACHMENT 3 Clinton Power Station, Unit 1 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System"

f. Aligned normal configuration of ESF bus 1A1 on one offsite source with bus 1B1 on the other offsite source
g. Aligned non-safety loads on UAT to enhance protection for BOP loads
8. CPS is currently developing a plant modification to provide automatic protection from single open-phase circuit conditions for offsite power sources supplying Class 1E ESF buses.

NRC Request 2.e: If a common or single offsite circuit is used to supply redundant ESF buses, explain why a failure, such as a single-phase open circuit or high impedance ground fault condition, would not adversely affect redundant ESF buses.

EGC Response to NRC Request 2.e:

Division 1 and 2 are redundant divisions. To minimize the affect of a single open phase on an offsite source, buses 1A1 and 1B1 are maintained on separate sources. However, as discussed in the CPS TS Bases, Division 3 is considered redundant to both Division 1 and 2 with respect to emergency core cooling systems. Therefore, a common offsite source is used to supply redundant ESF buses.

Consistent with the CLB and GDC 17, protective circuitry will separate the ESF buses from a failed offsite source due to a loss of voltage or a sustained balanced degraded grid voltage concurrent with certain DBAs. The relay systems were not specifically designed to detect an single open phase of a three phase system. Detection of a single-open phase circuit is beyond the approved design and licensing basis of CPS. No calculations for this scenario have been done.

Consistent with the current station design, protective circuitry will protect from a ground fault condition with all three phases intact.

CPS Procedure 3501.01, "High Voltage Auxiliary Power System," was revised as a compensatory measure to provide operator additional guidance for quickly identifying and responding to an open single-phase condition. Additional compensatory measures taken include:

a. Prepared required reading packages for all Licensed Operators
b. Aligned plant voltmeters to ensure all phases are monitored
c. Created Operator aids and placards
d. Enhanced alarm and annunciator response procedures
e. Implemented a designated operator to isolate the safety buses from the grid in a timely fashion
f. Aligned normal configuration of ESF bus 1A1 on one offsite source with bus 1B1 on the other offsite source
g. Aligned non-safety loads on UAT to enhance protection for BOP loads Page 13 of 13

ATTACHMENT 4 Dresden Nuclear Power Station, Units 2 and 3, 90-Day Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System"

ATTACHMENT 4 Dresden Nuclear Power Station, Units 2 and 3 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" High Impedance Grounds:

On January 30, 2012, a porcelain insulator broke in the Byron Station switchyard resulting in parting of the C phase conductor of the offsite source. The insulator was on the offsite source side of the Unit 2 System Auxiliary Transformers (SATs), and the connection parted in such a way as to leave an electrically open end on the source side. The parted connection remained electrically connected on the transformer side, and the loose bus bar conductor end fell to the ground. This ground was a direct result of the broken insulator and not an independent event.

The connected loose bus bar provided a path to ground for the transformer high voltage terminal, but did not result in a ground fault (i.e., neither solid nor impedance) as seen from the source. Since the switchyard (i.e., source side) relaying was electrically isolated from the fault, it did not detect a fault; therefore, did not operate.

The significant event was the opening of a single phase connection; the ground on the high voltage side of the SAT is of lesser significance. Regardless of phase discontinuity, if the ground impedance is low on the source side, and currents are high, the source side protective relaying will operate and open all circuit phases. If the ground impedance is high, and currents low, the relaying may not operate depending on the magnitude of ground impedance; the circuit will continue to supply power.

A qualitative analysis has been performed to assess the impact of single phase high impedance ground faults. The primary objective of the analysis was to determine if a high impedance ground fault could result in an unbalanced voltage condition sufficient to adversely affect energized ESF equipment. The cases analyzed include a single phase high impedance ground fault with all three phases intact and a single phase high impedance ground fault concurrent with the loss of the same phase. These cases have been analyzed for both the high and low voltage sides of the SATs analyzed. 1 provides a summary report of the qualitative analysis; therefore, all information discussed in this response attachment is limited to single-phase open circuit conditions.

System Description

NRC Requests 2, 1.d, 2.a, and 2.c request system information, and will be addressed in this section.

NRC Request No. 2: Briefly describe the operating configuration of the ESF buses (Class 1E for current operating plants or non-Class 1E for passive plants) at power (normal operating condition).

Exelon Generation Company, LLC (EGC) Response to NRC Request No. 2 The Dresden Nuclear Power Station (DNPS), Units 2 and 3 engineered safety features (ESF) buses are powered either from the main generator or from offsite power (i.e., capable of being transferred to and/or from the main generator). A simplified one-line diagram is shown in Figure 1 below. Normally the electrical auxiliary distribution system is operated in a split bus Page 1 of 15

ATTACHMENT 4 Dresden Nuclear Power Station, Units 2 and 3 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" configuration where the Division I ESF bus is supplied from the main generator via the unit auxiliary transformer (UAT) and the Division II bus is supplied from the 345kV system via the reserve auxiliary transformer (RAT).

The 345kV system provides continuously connected offsite power to two three winding RATs (i.e., RAT TR22 and RAT TR32) for DNPS, Unit 2 and Unit 3, respectively. A 345/138kV 2 winding auto transformer (i.e., TR86) is installed between the 345kV system and RAT TR22.

During normal split bus operation, the RAT TR22 X-winding provides power to ESF 4kV Buses 24/24-1 and the RAT TR32 X-winding provides power to ESF Buses 34/34-1. The transformer Y-windings provide power to the non-ESF 4kV Buses 22 and 32.

Figure 1: Simplified One-Line Diagram Page 2 of 15

ATTACHMENT 4 Dresden Nuclear Power Station, Units 2 and 3 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" NRC Request 1.d: Describe the offsite power transformer (e.g., start-up, reserve, station auxiliary) winding and grounding configurations.

EGC Response to NRC Request 1.d:

The DNPS offsite power transformer winding and grounding configurations are shown in Table 1 below.

Table 1: Offsite Power Transformer Winding and Grounding Configurations Winding MVA Grounding Unit Transformer Configuration (Cooling Type) Configuration Solid Neutral 27.6/36.8/46 Grounded 138/4.16kV Wye-Wye-Wye (OA/FA/FA) 55°C Primary Reserve Auxiliary (3 Leg) 30.9/41.2/51.5 Resistive Neutral Transformer TR22 (OA/FA/FA) 65°C Grounded Secondary 2

100/133/167 (ONAN/ONAF/ONAF) 345/138kV Wye-Wye 55°C Solid Neutral Autotransformer (Auto) 112/149/187 Grounded TR86 (ONAN/ONAF/ONAF) 65°C Solid Neutral Grounded 345/4.28kV 37.5/50/62.5 Wye-Wye-Wye Primary 3 Reserve Auxiliary (ONAN/ONAF/ONAF)

(3 Leg) Resistive Neutral Transformer TR32 65°C Grounded Secondary NRC Request 2.a: Are the ESF buses powered by offsite power sources?

If so, explain what major loads are connected to the buses including their ratings.

EGC Response to NRC Request 2.a:

For at power (i.e., normal operating conditions) configurations, ESF Division II buses are powered by offsite sources.

The DNPS ESF bus power sources are shown in Tables 2 and 3 below.

Page 3 of 15

ATTACHMENT 4 Dresden Nuclear Power Station, Units 2 and 3 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Table 2: DNPS 4kV ESF Buses That Are Continuously Powered from Offsite Power Source(s)

Description of ESF Bus ESF Bus Name (normal Original licensing basis Power Source operating condition). configuration (Y/N)

Unit 2 Circuit #1-Unit 2 345kV Switchyard (Blue System) to 4.16kV Buses 24/24-1 N 345kV-138kV TR86 to 138- (Division II) (See Note) 4.16kV RAT TR22 Note: Unit 2 Original Licensing basis - 138kV Switchyard to 138kV-4.16kV RAT TR22 to 4.16kV ESF Buses 24/24-1 (Division II)

Unit 3 Circuit #1 -345kV 4.16kV Buses 34/34-Switchyard (Red System) to Y 1(Division II) 345kV-4.16kV RAT TR32 Table 3: DNPS ESF Buses That Are Not Continuously Powered From Offsite Power Source(s)

Original Description of ESF Bus Power ESF Bus Name licensing basis Source (normal operating condition). configuration (Y/N)

Unit 2 - Main Generator to UAT TR21 4.16kV Buses 23/23-1 (Division I) Y Unit 3 - Main Generator to UAT TR31 4.16kV Buses 33/33-1 (Division I) Y The DNPS ESF bus major loads that are connected to offsite power during normal power operations, including their ratings are shown in Table 4 below.

Table 4: Major ESF Loads Including Ratings and Status during Normal Power Operations Voltage Normally ESF Rating Safety Load Level Energized Bus (hp) Class (kV) (Y/N) 24 Circulating Water Pump 2C 4 1750 NS Y 24 Service Water Pump 2B 4 1000 NS Y 24 Service Water Pump 2/3 4 1000 NS Y*

1000 24 480V Switchgear (SWGR) 20 4 NS Y (KVA) 1500 24 480V SWGR 26 4 NS Y (KVA) 1500 24 480V SWGR 27 4 NS Y (KVA) 24 Condensate & Booster Pump 2C 4 1750 NS Y 24 Condensate & Booster Pump 2D 4 1750 NS Y Page 4 of 15

ATTACHMENT 4 Dresden Nuclear Power Station, Units 2 and 3 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Voltage Normally ESF Rating Safety Load Level Energized Bus (hp) Class (kV) (Y/N) 24 Control Rod Drive Feed Pump 2B 4 250 NS Y 24 Containment Cooling Service Water Pump 2C 4 500 SR N 24 Containment Cooling Service Water Pump 2D 4 500 SR N 24-1 Reactor (Rx) Bldg Cooling Water Pump 2B 4 300 NS Y 24-1 Rx Bldg Cooling Water Pump 2/3 4 300 NS Y*

24-1 Rx Shut-down Cooling Pump 2B 4 500 NS N 24-1 Rx Clean-up Recirculation Pump 2B 4 600 NS Y 1500 24-1 480 SWGR 29 4 SR Y (KVA) 24-1 Core Spray Pump 2B 4 800 SR N 24-1 Low Pressure Coolant Injection Pump 2C 4 700 SR N 24-1 Low Pressure Coolant Injection Pump 2D 4 700 SR N 34 Circ Water Pump 3C 4 1750 NS Y 34 Service Water Pump 3B 4 1000 NS Y 34 Service Water Pump 2/3 4 1000 NS Y*

1000 34 480V SWGR 30 4 NS Y (KVA) 1500 34 480V SWGR 36 4 NS Y (KVA) 1500 34 480V SWGR 37 4 NS Y (KVA) 34 Condensate & Booster Pump 3C 4 1750 NS Y 34 Condensate & Booster Pump 3D 4 1750 NS Y 34 Control Rod Drive Feed Pump 3B 4 250 NS Y 34 Containment Cooling Service Water Pump 3C 4 500 SR N 34 Containment Cooling Service Water Pump 3D 4 500 SR N 34-1 Rx Bldg Cooling Water Pump 3B 4 300 NS Y 34-1 Rx Bldg Cooling Water Pump 2/3 4 300 NS Y*

34-1 RX Shut-down Cooling Pump 3B 4 500 NS N 34-1 RX Shut-down Cooling Pump 3C 4 500 NS N Page 5 of 15

ATTACHMENT 4 Dresden Nuclear Power Station, Units 2 and 3 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Voltage Normally ESF Rating Safety Load Level Energized Bus (hp) Class (kV) (Y/N) 34-1 Rx Clean-up Recirculation Pump 3B 4 600 NS Y 1500 34-1 480 SWGR 39 4 SR Y (KVA) 34-1 Core Spray Pump 3B 4 800 SR N 34-1 Low Pressure Coolant Injection Pump 3C 4 700 SR N 34-1 Low Pressure Coolant Injection Pump 3D 4 700 SR N

  • Swing load - may not be energized depending on swing source alignment.

NS - Non Safety-Related SR - Safety Related Page 6 of 15

ATTACHMENT 4 Dresden Nuclear Power Station, Units 2 and 3 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" NRC Request 2.c: Confirm that the operating configuration of the ESF buses is consistent with the current licensing basis.

Describe any changes in offsite power source alignment to the ESF buses from the original plant licensing.

EGC Response to NRC Request 2.c:

The following at power (i.e., normal operating conditions) configurations have been confirmed to be consistent with the current licensing basis (CLB):

1. Unit 2 Offsite Power Circuit #1- Power to ESF buses via 345kV switchyard (TR86 and RAT TR22)
2. Unit 3 Offsite Power Circuit #1 - Power to ESF buses via 345kV (i.e., RAT TR32)

See Table 2 for any changes in the offsite power source alignment to the ESF buses during normal operation from the original plant licensing.

Additionally, the following offsite power configurations, although not normally operating, are available:

1. Unit 2 Offsite Power Circuit #2 - Power to ESF buses via 345kV switchyard (i.e., RAT TR32) and the unit 4kV bus cross-ties.
2. Unit 3 Offsite Power Circuit #2 - Power to ESF buses via 345kV switchyard (i.e., TR86 and RAT TR22) and the unit 4kV bus cross-ties.
3. An additional source of off-site power for Units 2 and 3 is available when the main generator is off-line by back feeding through the main power/unit auxiliary transformers.

The backfeed operation must be manually performed and involves removal of flexible link connections between the main generator and main power transformer (MPT)/UAT.

Page 7 of 15

ATTACHMENT 4 Dresden Nuclear Power Station, Units 2 and 3 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" System Protection NRC Requests 1, 1.a, 2.b, and 2.d request information regarding electrical system protection, and will be addressed in this section.

NRC Request 1: Given the requirements above, describe how the protection scheme for ESF buses (Class 1E for current operating plants or non-Class 1E for passive plants) is designed to detect and automatically respond to a single-phase open circuit condition or high impedance ground fault condition on a credited off-site power circuit or another power sources. Also, include the following information:

EGC Response to NRC Request 1:

Consistent with the CLB and 10 CFR 50, Appendix A, "General Design Criteria for Nuclear Power Plants," Criterion (GDC) 17, "Electric power systems," existing protective circuitry will separate the ESF buses from a connected failed source due to a loss of voltage, or a sustained, balanced degraded grid voltage concurrent with certain design basis accidents. The failure of a single-phase circuit to an open condition is beyond the approved design and licensing basis of the plant and therefore constitutes a beyond design basis event.

Normal Plant Operation Considerations:

During normal plant operation (i.e., Modes 1, 2, and 3) the Division I emergency buses (i.e., ESF buses) are powered from the UAT. An open phase on the MPT 345kV side would have no effect on the ESF bus voltage. Since the UAT is tied directly to the generator terminals, it will continue to receive three phase voltage on its primary side for as long as the generator remains online. If the generator trips on negative sequence due to the open MPT phase, the ESF Division I bus on the UAT X-winding and the balance of plant (BOP) bus on the UAT Y-winding will automatically transfer to their alternate source (i.e., the RAT). Therefore, an open phase on the MPT high side while the plant is in normal operation is not of concern.

An open phase on the UAT primary side while the isophase, generator and MPT connections remain intact is not credible due to the isophase bus connection arrangement, which makes it highly unlikely that a phase would open without also shorting to ground and tripping the generator.

During normal plant operation (i.e., Modes 1, 2, or 3) the loss of voltage and degraded voltage relaying scheme is capable of responding to degraded grid conditions as described in applicable NRC and industry guidelines. However, the protection scheme at DNPS is not designed to detect and automatically respond to unbalanced system conditions as a result of single phase open circuit condition or high impedance ground fault condition on a credited off-site power circuit.

The insulator failure at Byron Station resulted in unbalanced system voltage at the ESF buses, and the buses did not automatically separate and realign to the EDGs to restore bus voltage.

The Byron Station event was caused by a passive failure of a switchyard component. Detection Page 8 of 15

ATTACHMENT 4 Dresden Nuclear Power Station, Units 2 and 3 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" down to the level of this type of failure is beyond the requirements of NRC documents such as GDC 17 or NRC Branch Technical Position (BTP) PSB-1, "Adequacy of Station Electric Distribution System Voltages," and was not considered as part of original plant design.

GDC 17 did not define degraded voltage as an unbalanced system. As such, the industry failure mode effects analysis (FMEA), implied or otherwise, did not address a single open phase as design criteria for a degraded voltage relay (DVR) scheme. Therefore, open phase detection was not credited in the original plant's design or licensing basis.

DNPS has reviewed the vulnerability for impact on plant operability using the Operability Evaluation process. DNPS has revised several procedures, such as annunciator response and operating procedures as needed in response to the Byron Station event. These procedures now provide effective controls to promptly diagnose and mitigate a single phase event.

Operators have been trained to check voltages, currents, and other control room alarms in order to diagnose and respond to a single-phase event.

NRC Request 1.a: The sensitivity of protective devices to detect abnormal operating conditions and the basis for the protective device setpoint(s).

EGC Response to NRC Request 1.a:

Consistent with the CLB and GDC 17, existing electrical protective devices are sufficiently sensitive to detect design basis conditions like a loss of voltage or a degraded voltage, but were not designed to detect a single phase open circuit condition. Existing electrical protective devices are also sufficiently sensitive to detect a ground fault.

The undervoltage protective devices and the basis for the device setpoints for DNPS, Units 2 and 3 are shown in Tables 5 and 6 below, respectively. Tables 5 and 6 also list the other protective devices for the offsite circuit and the ESF buses and the basis for the device setpoints.

Table 5: Unit 2 Protective Devices Protection Protective Trip Setpoint Basis for Setpoint Zone Device Logic (Nominal) 4.16kV ESF 2929.5V To actuate upon complete Loss of Buses 2 of 2 (70.42% of loss of ESF Bus voltage Voltage Relay 24 and 24-1 4160V) condition 4.16kV ESF 3867.5V To actuate upon degraded Bus Degraded 2 of 2 (92.97% of ESF Bus voltage condition Grid 24-1 4160V) (Alarm only on 1 of 2 logic) 4.16kV ESF Bus 24 Phase To actuate upon ESF Bus 1 of 1 4800A @TL 4.0 Feed from Overcurrent overcurrent condition RAT Page 9 of 15

ATTACHMENT 4 Dresden Nuclear Power Station, Units 2 and 3 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Protection Protective Trip Setpoint Basis for Setpoint Zone Device Logic (Nominal) 4.16kV ESF Bus 24-1 Phase To actuate upon ESF Bus 1 of 1 1920A @TL 4.0 Feed from Overcurrent overcurrent condition Bus 24 4.16kV ESF Bus 24 Ground To actuate upon ESF Bus 1 of 1 240A @ TL 4.0 Feed from Overcurrent ground fault condition RAT 4.16kV ESF Bus 24-1 Ground To actuate upon ESF Bus 1 of 1 144A @TL 3.2 Feed from Overcurrent ground fault condition Bus 24 252A at 138kV To actuate upon a RAT RAT Differential 1 of 1 8700A at 4160V H,X,Y-winding protection 25% Slope zone fault Phase To actuate upon RAT RAT 1 of 1 277A @TL 5.0 Overcurrent overcurrent condition X-Winding To actuate upon RAT X-RAT Neutral 1 of 1 360A @TL 4.5 winding neutral ground fault Overcurrent condition X-Winding To actuate upon RAT X-RAT Ground 1 of 1 480A @TL 3.0 winding low level ground Differential fault condition 135.68A at Differential 345kV To actuate upon a TR86 TR86 Sys 1 1 of 1 339.2A at protection zone fault (SEL-387) 138kV 30% Slope 134.4A at Differential 345kV To actuate upon a TR86 TR86 Sys 2 1 of 1 339.2A at protection zone fault (SEL-387) 138kV 30% Slope Phase Overcurrent To actuate upon transformer TR86 1 of 1 256A @TL2.0 Sys 1 or line overcurrent condition (SEL-321)

Page 10 of 15

ATTACHMENT 4 Dresden Nuclear Power Station, Units 2 and 3 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Protection Protective Trip Setpoint Basis for Setpoint Zone Device Logic (Nominal)

Phase Overcurrent To actuate upon transformer TR86 1 of 1 800A @TL 3.0 Sys 2 or line overcurrent condition (SEL-321) 600A 30%

138 kV Line Slope To actuate upon a 138 kV TR86 Relay Primary 1 of 1 4012A 150% Line fault (P544)

Slope 138 kV Line 800A Phase Relay Differential To actuate upon a 138 kV TR86 1 of 1 Secondary 600A Neg-Seq Line fault (SEL-311L) Differential Table 6: Unit 3 Protective Devices Protection Protective Trip Setpoint Basis for Setpoint Zone Device Logic (Nominal) 4.16kV ESF 2929.5V To actuate upon complete Loss of Buses 2 of 2 (70.42% of loss of ESF Bus voltage Voltage Relay 34 and 34-1 4160V) condition 4.16kV ESF 3867.5V To actuate upon degraded Degraded Bus 2 of 2 (92.97% of ESF Bus voltage condition Grid 34-1 4160V) (Alarm only on 1 of 2 logic) 4.16kV ESF Bus 34 Phase To actuate upon ESF Bus 1 of 1 4800A @TL 4.0 Feed from Overcurrent overcurrent condition RAT 4.16kV ESF Bus 34-1 Phase To actuate upon ESF Bus 1 of 1 1920A @TL 4.0 Feed from Overcurrent overcurrent condition Bus 34 4.16kV ESF Bus 34 Ground To actuate upon ESF Bus 1 of 1 240A @ TL 4.0 Feed from Overcurrent ground fault condition RAT 4.16kV ESF Bus 34-1 Ground To actuate upon ESF Bus 1 of 1 144A @TL 3.2 Feed from Overcurrent ground fault condition Bus 34 Page 11 of 15

ATTACHMENT 4 Dresden Nuclear Power Station, Units 2 and 3 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Protection Protective Trip Setpoint Basis for Setpoint Zone Device Logic (Nominal) 105A at 345kV To actuate upon a RAT RAT Differential 1 of 1 8700A at 4160V H,X,Y-winding protection 25% Slope zone fault Phase 121.2A @TL To actuate upon RAT RAT 1 of 1 Overcurrent 4.0 overcurrent condition X-Winding To actuate upon RAT X-RAT Neutral 1 of 1 360A @TL 4.5 winding neutral ground fault Overcurrent condition X-Winding To actuate upon RAT X-RAT Ground 1 of1 480A @TL 3.0 winding low level ground Differential fault condition NRC Request 2.b. If the ESF buses are not powered by offsite power sources, explain how the surveillance tests are performed to verify that a single-phase open circuit condition or high impedance ground fault condition on an off-site power circuit is detected.

EGC Response to NRC Request 2.b:

The DNPS Division II ESF buses are powered by offsite power sources. The DNPS Division I ESF buses are not powered by offsite power sources. The DNPS review of the Byron Station event has also identified potential design vulnerability in the DNPS ESF 4kV bus protection scheme, related to the automatic detection capability of a specific degraded voltage condition (i.e., loss of a single phase) and the subsequent Operator response.

Specific measures implemented at DNPS as interim compensatory measures include the following:

Modification of plant voltage alarms to annunciate the event Alignment of plant voltmeters to ensure all phases are monitored Completion of required reading packages for operators Enhancement of alarm and annunicator response procedures Creation of operator aids and placards for enhanced operator awareness Performance of switchyard walkdowns and verification that no Ohio Brass insulators are installed.

Page 12 of 15

ATTACHMENT 4 Dresden Nuclear Power Station, Units 2 and 3 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" NRC Request 2.d: Do the plant operating procedures, including off-normal operating procedures, specifically call for verification of the voltages on all three phases of the ESF buses?

EGC Response to NRC Request 2.d:

The current plant operating procedures call for verification of the voltages on all three phases of the ESF buses.

Consequences NRC Requests 1.b, 1.c, and 2.e request information regarding the electrical consequences of an event, and will be addressed in this section.

NRC Request 1.b: The differences (if any) of the consequences of a loaded (i.e., ESF bus normally aligned to offsite power transformer) or unloaded (e.g., ESF buses normally aligned to unit auxiliary transformer) power source.

EGC Response to NRC Request 1.b:

Installed relays were not designed to detect single phase open circuit conditions. Existing loss of voltage and degraded voltage relays may respond depending on load and possible grounds.

In general, there will be no plant response for an unloaded (e.g., ESF buses normally aligned to UAT) power source in the event of a single-phase open circuit on a credited off-site power circuit because there is insufficient current to provide for detection of a single-phase open circuit for this configuration. The DNPS ESF buses normally operate in a split bus configuration with Division I powered from the UAT and Division II from the RAT (i.e., the offsite source).

However, the plant response for a loaded power source cannot be determined without specifying the amount of loading and the specific loads involved.

NRC Request 1.c: If the design does not detect and automatically respond to a single-phase open circuit condition or high impedance ground fault condition on a credited offsite power circuit or another power sources, describe the consequences of such an event and the plant response.

EGC Response to NRC Request 1.c:

1. DNPS did not credit in the CLB that the Class 1E protection scheme for the ESF buses was designed to detect and automatically respond to a single-phase open circuit condition on the credited off-site power source as described in the Updated Final Safety Analysis Report (UFSAR) and Technical Specifications (TS).

Page 13 of 15

ATTACHMENT 4 Dresden Nuclear Power Station, Units 2 and 3 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" As described in UFSAR Section 8.2.1.3, "Switchyards," and TS Bases B 3.8.1, "AC Sources - Operating," DNPS, Units 2 and 3 each have two independent sources of offsite power available. The normal source of offsite power for DNPS, Unit 3 is supplied by the 345-kV switchyard through RAT 32. The alternate source of offsite power for DNPS, Unit 3 is supplied through the 4-kV crosstie between Safety Buses 34-1 and 24-1 or Safety Buses 23-1 and 33-1. The normal source of offsite power for DNPS, Unit 2 is supplied by the 345-kV switchyard through Transformer 86 and RAT 22. The alternate source of offsite power for DNPS, Unit 2 is supplied through the 4kV crosstie between Safety Buses 24-1 and 34-1 or Safety Buses 23-1 and 33-1.

As stated in TS Bases B3.8, an offsite circuit to each unit consists of the incoming breakers and disconnects to the respective 22 and 32 RATs, RATs 22 and 32, and the respective circuit path including feeder breakers to 4160 V ESF buses. The other qualified offsite circuit for each unit is provided by a bus tie between the corresponding ESF buses of the two units. The breakers connecting the buses must be capable of closure.

2. Since DNPS did not credit the ESF bus protection scheme as being capable of detecting and automatically responding to a single phase open circuit condition, an open phase fault was not included in the design criteria for either the loss of voltage, or the degraded voltage relay design criteria. Since open phase detection was not credited in the DNPS design or licensing basis, no design basis calculations or design documents exist that previously considered this condition.
3. Without formalized engineering calculations or engineering evaluations, the electrical consequences of such an open phase event, including plant response, can only be evaluated to the extent of what has already been published by the Electric Power Research Institute (EPRI) and Basler; which is a generic overview. The difficulty in applying these documents to the DNPS-specific response is that these are generic assessments and cannot be formally credited as a basis for an accurate response. The primary reason is that detailed plant specific models would need to be developed (e.g., transformer magnetic circuit models, electric distribution models, motor models; including positive, negative, and zero sequence impedances, voltage, and currents), and the models would need to be compiled and analyzed for the DNPS-specific Class 1E electric distribution system.

NRC Request 2.e: If a common or single offsite circuit is used to supply redundant ESF buses, explain why a failure, such as a single-phase open circuit or high impedance ground fault condition, would not adversely affect redundant ESF buses.

EGC Response to NRC Request 2.e:

Consistent with the DNPS CLB and GDC 17, protective circuitry will separate the ESF buses from a failed source due to a loss of voltage or a sustained balanced degraded grid voltage Page 14 of 15

ATTACHMENT 4 Dresden Nuclear Power Station, Units 2 and 3 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" concurrent with certain design basis accidents. The failure of a single-phase open circuit is beyond the approved design and licensing basis of the plant.

DNPS has reviewed the vulnerability for impact on plant operability using the Operability Evaluation process. DNPS has implemented several interim compensatory measures including several procedure revisions, such as annunciator response and surveillance procedures as needed in response to the Byron Station event. These procedures now provide effective controls to promptly diagnose and mitigate a singe-phase event. Operators have been trained to check voltages, currents, and other control room alarms in order to diagnose and respond to a single-phase event.

Specific measures implemented at DNPS as interim compensatory measures include the following:

Modification of plant voltage alarms to annunciate the event Alignment of plant voltmeters to ensure all phases are monitored Completion of required reading packages for operators Enhancement of alarm and annunicator response procedures Creation of operator aids and placards for enhanced operator awareness Performance of switchyard walkdowns and verification that no Ohio Brass insulators are installed.

These actions have been implemented and will be active until permanent solutions can be implemented.

Page 15 of 15

ATTACHMENT 5 LaSalle County Station, Units 1 and 2, 90-Day Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System"

ATTACHMENT 5 LaSalle County Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" High Impedance Grounds:

On January 30, 2012, a porcelain insulator broke in the Byron Station switchyard resulting in parting of the C phase conductor of the offsite source. The insulator was on the offsite source side of the Unit 2 System Auxiliary Transformers (SATs), and the connection parted in such a way as to leave an electrically open end on the source side. The parted connection remained electrically connected on the transformer side, and the loose bus bar conductor end fell to the ground. This ground was a direct result of the broken insulator and not an independent event.

The connected loose bus bar provided a path to ground for the transformer high voltage terminal, but did not result in a ground fault (i.e., neither solid nor impedance) as seen from the source. Since the switchyard (i.e., source side) relaying was electrically isolated from the fault, it did not detect a fault; therefore, did not operate.

The significant event was the opening of a single phase connection; the ground on the high voltage side of the SAT is of lesser significance. Regardless of phase discontinuity, if the ground impedance is low on the source side, and currents are high, the source side protective relaying will operate and open all circuit phases. If the ground impedance is high, and currents low, the relaying may not operate depending on the magnitude of ground impedance; the circuit will continue to supply power.

A qualitative analysis has been performed to assess the impact of single phase high impedance ground faults. The primary objective of the analysis was to determine if a high impedance ground fault could result in an unbalanced voltage condition sufficient to adversely affect energized ESF equipment. The cases analyzed include a single phase high impedance ground fault with all three phases intact and a single phase high impedance ground fault concurrent with the loss of the same phase. These cases have been analyzed for both the high and low voltage sides of the SATs analyzed. 1 provides a summary report of the qualitative analysis; therefore, all information discussed in this response attachment is limited to single-phase open circuit conditions.

System Description

NRC Requests 2, 1.d, 2.a, and 2.c request system information and will be addressed in this section:

NRC Request No. 2: Briefly describe the operating configuration of the ESF buses (Class 1E for current operating plants or non-Class 1E for passive plants) at power (normal operating condition).

Exelon Generation Company, LLC (EGC) Response to NRC Request No. 2 A simplified one-line diagram of the LaSalle County Station (LSCS), Units 1 and 2 Auxiliary Power Distribution System is shown in Figure 1 below.

Page 1 of 15

ATTACHMENT 5 LaSalle County Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Figure 1: Simplified One-Line Diagram of LSCS, Units 1 an 2 Auxiliary Power System The 345kV system provides continuously connected offsite power to two (2) three-winding System Auxiliary Transformers (SATs) (i.e., SAT 142 and SAT 242). The 345kV system is comprised of a double ring bus with four incoming lines; two for each unit. The station auxiliaries are connected to secondary side of SATs through two 6.9kV and five 4.16kV buses.

The engineered safety features (ESF) loads are fed from three of the 4.16kV buses (i.e., Buses 141Y, 142Y, and 143 for LSCS Unit 1, and Buses 241Y, 242Y, and 243 for Unit 2). The normal source of power for the LSCS ESF buses is the 345kV system offsite through the SAT. When no offsite power is available through the SAT, the preferred configuration is for the ESF buses (i.e., 141Y, 142Y, 241Y, and 242Y) to be fed from the unit (i.e., onsite power) through the unit auxiliary transformer (UAT) and ESF Buses 143 and 243 which are fed from Diesel Generator 1B and 2B for Units 1 and 2, respectively.

Page 2 of 15

ATTACHMENT 5 LaSalle County Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" NRC Request 1.d: Describe the offsite power transformer (e.g., start-up, reserve, station auxiliary) winding and grounding configurations.

EGC Response to NRC Request 1.d:

The LSCS offsite power transformer winding and grounding configurations.

Table 1: LSCS, Off-Site Power Transformer Configurations Transformer Winding Grounding Configuration Configuration System Aux. Wye-Wye-Wye HV ---Neutral Grounding Transformer (3 Leg) LV--- Resistance SAT142 Grounding System Aux. Wye-Wye-Wye HV ---Neutral Grounding Transformer (3 Leg) LV--- Resistance SAT242 Grounding NRC Request 2.a: Are the ESF buses powered by offsite power sources?

If so, explain what major loads are connected to the buses including their ratings.

EGC Response to NRC Request 2.a:

Yes, ESF buses are normally powered by offsite sources.

The normal power sources for the LSCS ESF buses are shown in Tables 2 and 3 below.

Table 2: LSCS ESF Buses That Are Normally Powered From Offsite Sources Original licensing basis Description of ESF Bus ESF Bus Name configuration Power Source (normal operating condition)

(Y/N)

SAT-142 141Y Y SAT-142 142Y Y SAT-142 143 Y SAT-242 241Y Y SAT-242 242Y Y SAT-242 243 Y Page 3 of 15

ATTACHMENT 5 LaSalle County Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Table 3: LSCS ESF Buses That Are Not Normally Powered From Offsite Sources Original licensing Description of ESF Bus ESF Bus Name basis configuration Power Source (normal operating condition)

(Y/N)

N/A N/A N/A N/A N/A N/A N/A N/A N/A The LSCS major ESF bus loads that are energized during normal power operations, including their ratings, are shown in Table 4 below.

Table 4: LSCS Major ESF Bus Loads Including Ratings and Status during Normal Power Operations ESF Voltage Rating Load Bus (kV) (hp/kVA) 141Y Unit 1 Low Pressure Core Spray (LPCS) Pump 4.16 1500 hp 141Y Suppression Pool Cleanup & Transfer Pump 1B 4.16 450 hp 141Y Residual Heat Removal (RHR) Pump 1A 4.16 800 hp 141Y Control Rod Drive (CRD) Feed Pump 1A 4.16 300 hp*

141Y Primary Containment Water Chiller 1A 4.16 804 hp*

141Y Recirculation Motor Generator (MG) set Drive Motor 1A 4.16 400 hp 141Y Transformer for 480V Switchgear (SWGR) 135X & 135Y 4.16 2000 kVA*

141Y Transformer for 480V SWGR. 133 4.16 1000 kVA*

142Y RHR Pump 1B 4.16 800 hp 142Y Suppression Pool Cleanup & Transfer Pump 1A 4.16 450 hp 142Y RHR Pump 1C 4.16 800 hp 142Y CRD Feed Pump 1B 4.16 300 hp 142Y Primary Containment water Chiller 1B 4.16 804 hp 142Y Transformer for 480V SWGR. 136X & 136Y 4.16 2000 kVA*

142Y Transformer for 480V SWGR. 134X & 134Y 4.16 2000 kVA*

142Y Recirculation MG set Drive Motor 1B 4.16 400 hp 143 Unit 1 High Pressure Core Spray (HPCS) Pump 4.16 3000 hp 143 Transformer to Feed MCC143-1 4.16 225 kVA*

241Y Unit 2 LPCS Pump 4.16 1500 hp 241Y Suppression Pool Cleanup & Transfer Pump 2B 4.16 450 hp 241Y RHR Pump 2A 4.16 800 hp 241Y CRD Feed Pump 2A 4.16 300 hp*

Page 4 of 15

ATTACHMENT 5 LaSalle County Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" ESF Voltage Rating Load Bus (kV) (hp/kVA) 241Y Primary Containment water Chiller 2A 4.16 804 hp*

241Y Recirculation MG set Drive Motor 2A 4.16 400 hp 241Y Transformer for 480V SWGR. 235X & 235Y 4.16 2000 kVA*

241Y Transformer for 480V SWGR. 233 4.16 1000 kVA*

242Y RHR Pump 2C 4.16 800 hp 242Y Suppression Pool Cleanup & Transfer Pump 2A 4.16 450 hp*

242Y RHR Pump 2B 4.16 800 hp 242Y CRD Feed Pump 2B 4.16 300 hp 242Y Transformer for 480V SWGR. 236X & 236Y 4.16 2000 kVA*

242Y Transformer for 480V SWGR. 234X & 234Y 4.16 2000 kVA*

242Y Primary Containment water Chiller 2B 4.16 804 hp 242Y Recirculation MG set Drive Motor 2B 4.16 400 hp 243 Unit 2 HPCS Pump 4.16 3000 hp 243 Transformer to feed MCC243-1 4.16 225 kVA*

NRC Request 2.c: Confirm that the operating configuration of the ESF buses is consistent with the current licensing basis.

Describe any changes in offsite power source alignment to the ESF buses from the original plant licensing.

EGC Response to NRC Request 2.c:

ESF bus configurations have been confirmed to be consistent with the current licensing basis (CLB). There are no changes in offsite power source alignment to the ESF buses from the original plant licensing.

Page 5 of 15

ATTACHMENT 5 LaSalle County Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" System Protection NRC Requests 1, 1.a, 2.b, and 2.d request information regarding electrical system protection and will be addressed in this section:

NRC Request 1: Given the requirements above, describe how the protection scheme for ESF buses (Class 1E for current operating plants or non-Class 1E for passive plants) is designed to detect and automatically respond to a single-phase open circuit condition or high impedance ground fault condition on a credited off-site power circuit or another power sources. Also, include the following information:

EGC Response to NRC Request 1:

The loss of voltage and degraded voltage relaying scheme is capable of responding to degraded grid conditions as described in applicable NRC industry guidelines. However, protection scheme at LSCS is not designated to detect and automatically respond to unbalanced system condition as a result of single phase open circuit condition or high impedance ground fault condition on a credited off-site power circuit.

Consistent with the CLB and 10 CFR 50, Appendix A, "General Design Criteria for Nuclear Power Plants," Criterion (GDC) 17, "Electric power systems," existing protective circuitry will separate the ESF buses from a connected field source due to loss of voltage or a sustained, balanced degraded grid voltage concurrent with certain design basis accidents. The failure of a single phase circuit to an open condition is beyond the approved design and licensing basis of the plant; therefore, constitutes a beyond design basis event. The high impedance ground fault in off-site circuits is beyond the approved design and licensing basis.

NRC Request 1.a: The sensitivity of protective devices to detect abnormal operating conditions and the basis for the protective device setpoint(s).

EGC Response to NRC Request 1.a:

Consistent with the CLB and GDC 17, existing electrical protective devices are sufficiently sensitive to detect design basis conditions like a loss of voltage or a degraded voltage, but were not designed to detect a single phase open circuit condition. The LSCS ground protection and alarms on the ESF buses and the basis for the device setpoint(s) are show in Table 5 below.

Page 6 of 15

ATTACHMENT 5 LaSalle County Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Table 5: Protective Devices and Alarms Protection UV Setpoint Protective Device Basis for Setpoint Zone Logic (Nominal) 1887AP001A/B/C H Tap = 3.5A Multiphase and phase to SAT142 Percentage N/A X Tap = 8.7A ground protection in HV Differential Y Tap = 8.7A winding.

1851- AP022A/B/C 5A Tap Back up protection for SAT142 HV winding Time N/A (150A primary) transformer internal overcurrent (O/C) T.D. 3.5 faults Back up protection for 1.5A Tap 1551- AP003 6.9kV phase to ground faults in SAT142 N/A (360A primary)

Time O/C X-winding (6.9kV)

T.D. 2.0 winding.

Back up protection for 2.0A Tap 1451- AP004 phase to ground faults in SAT142 N/A (480A primary) 4.16kV Time O/C Y-winding (4.16kV)

T.D. 2.5 winding.

1587- AP033 0.5A Tap Phase to ground fault SAT142 X-Winding Gnd. N/A (300A primary) protection within Differential T.D. 1 X-winding (6.9kV) 1487AP044 0.5A Tap (480A Phase to ground fault SAT142 Y-Winding Gnd. N/A primary) protection within Differential T.D. 1 Y-winding (4.16kV) 8A Tap Back-up protection for 1451-AP024A/B Bus 141Y N/A (4800A primary) multiphase faults on 4.16kV Bus O/C T.D. 3.5 4.16kV Bus Division 1 1451-AP025 0.6A Tap Back-up protection for Bus 141Y 4.16kV Bus Ground N/A (360A primary) ground faults on 4.16kV O/C T.D. 3.0 Bus Division 1 Primary protection for Min. Operating multiphase faults on 1487-AP020A/B/C Bus current 0.5A Slope interconnection between 141Y-241Y Tie N/A 141Y/241Y Characteristics 141Y and 142Y.

Differential 25% Note: Protective devices located on bus 141Y.

7A Tap Phase over current 1451-AP026 A/B Bus 141Y N/A (4200A primary) protection for bus tie to 4.16KV Bus O/C T.D. 1.5 Switchgear 141X 0.5A Tap Ground fault protection 1451-AP027 Bus 141Y N/A (300A primary) for bus tie to Switchgear 4.16KV Bus O/C T.D. 1.25 141X Page 7 of 15

ATTACHMENT 5 LaSalle County Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Protection UV Setpoint Protective Device Basis for Setpoint Zone Logic (Nominal)

Unit-1 ESF Bus 3027.15V undervoltage. To actuate Bus 141Y 1427-AP037A/B 2 of 2 ( 72.7% of 4160V) upon complete loss of ESF Bus voltage condition.

3870V Unit-1 ESF Bus Bus 141Y 1427-AP270A/B 2 0f 2 (93% of 4160V) Degraded voltage 3500V (84% of 4160V) SAT 142-Y Winding Bus 141Y 1427-AP251 1 0f 1 undervoltage alarm 8A Tap Secondary protection for 1451-AP030A/B Bus 142Y N/A (4800Aprimary) multiphase faults on 4.16KV Bus O/C T.D. 3.5 4.16kV Bus Division 2 1451-AP031 0.6A Tap Secondary protection for Bus 142Y 4.16kV Bus Ground N/A (360A primary) ground faults on 4.16kV O/C T.D. 3.0 Bus Division 2 Primary protection for Min. Operating multiphase faults and 1487-AP021 Bus current 0.5A Slope ground faults on 142Y-142Y-242Y Tie N/A 142Y/242Y Characteristics 242Y interconnect.

Differential 25% Note: protective devices located on bus 142Y 7A Tap Phase over current for Bus 142Y 1451-AP032A/B N/A (4200A primary) bus tie to Switchgear T.D. 1.5 142X 0.5A Tap Ground fault protection Bus 142Y 1452-AP033 N/A (300A primary) for bus tie to 142X T.D. 1.25 3500V SAT 142 Y-winding LUV Bus 142Y 1427-AP039 1 of 1 (84% of 4160V) alarm Unit-1 ESF Bus undervoltage. To actuate 3027.15V Bus 142Y 1427-AP040A/B 2 of 2 upon complete loss of (72.7% of 4160V)

ESF Bus voltage condition.

3870V (93% of Unit-1 ESF Bus Bus 142Y 1427-AP271A/B 2 0f 2 4160V) Degraded voltage Page 8 of 15

ATTACHMENT 5 LaSalle County Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Protection UV Setpoint Protective Device Basis for Setpoint Zone Logic (Nominal) 16A Tap Secondary protection for 1451-AP034A/B Bus 143 N/A (3840 A primary) multiphase faults on 4.16kV Bus O/C T.D. 5.0 4.16kV Bus Division 3 1451-AP035 1.0A Tap Secondary protection for Bus 143 4.16kV Bus Ground N/A (240A primary) ground faults on 4.16kV O/C T.D. 2.0 Bus Division 3 Unit-1 ESF Bus undervoltage. To 2870V Bus 143 1427-AP041A/B 2 of 2 actuate upon complete (68.9% of 4160V) loss of ESF Bus voltage condition 3870V Unit-1 ESF Bus Bus 143 1427-AP272A/B 2 0f 2 (93% of 4160V) degraded voltage 3255V SAT 142 Y winding LUV Bus 143 1427-AP245A/B 2 0f 2 (78% of 4160V) alarm 2887-001A/B/C H tap = 3.5A Multiphase and phase to SAT242 Percentage N/A X Tap = 8.7A ground protection in HV Differential Y Tap = 8.7A winding.

2851- AP022A/B/C 5A Tap Back up protection for SAT242 HV winding Time N/A (150A primary) transformer internal O/C T.D. 3.5 faults Back up protection for 1.5A Tap 2551-AP003 phase to ground faults in SAT242 N/A (360A primary) 6.9kV Time O/C X-winding (6.9kV)

T.D. 2.0 winding.

Back up protection for 2.0A Tap 2451-AP004 phase to ground faults in SAT242 N/A (480A primary) 4.16kV Time O/C Y-winding (4.16kV)

T.D. 2.5 winding.

2587AP033 Phase to ground fault 0.5A Tap (300A SAT242 X-Winding Ground N/A protection within primary) T.D. 1 Differential X-winding (6.9kV) 2487AP044 Phase to ground fault 0.5A Tap (480A SAT242 Y-Winding Ground N/A protection within primary/ T.D. 1 Differential Y-winding (4.16kV) 8A Tap (4800A Back-up protection for 2451-AP024A/B Bus 241Y N/A primary) multiphase faults on 4.16kV Bus O/C T.D. 3.5 4.16kV Bus Division 1 Page 9 of 15

ATTACHMENT 5 LaSalle County Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Protection UV Setpoint Protective Device Basis for Setpoint Zone Logic (Nominal) 2451-AP025 0.6A Tap Back-up protection for Bus 241Y 4.16kV Bus Ground N/A (360A primary) ground faults on 4.16kV O/C T.D. 3.0 bus Division 1 8A Tap Phase over current for Bus 241Y 2451-AP257A/B N/A (1920A primary) 141Y-241Y unit-tie T.D. 4.0 interconnection Unit-2 ESF Bus undervoltage. To actuate 3027.15V Bus 241Y 2427-AP037A/B 2 of 2 upon complete loss of

( 72.7% of 4160V)

ESF bus voltage condition.

1A Tap Ground fault protection Bus 241Y 2451-AP261 N/A (240A primary) for 141Y-241Y unit tie.

T.D. 1.5 7A Tap Phase over current Bus 241Y 2451-AP026A/B N/A (4200A primary) protection for bus tie to T.D. 1.5 Switchgear 241X 0.5A Tap (300A Ground fault protection Bus 241Y 2451-AP027 N/A primary) for bus tie to Switchgear T.D. 1.25 241X 3870V Unit-2 ESF bus Bus 241Y 2427-AP270A/B 2 0f 2 (93% of 4160V) degraded voltage 3500V SAT 242-Y winding Bus 241Y 2427-AP251 1 0f 1 (84% of 4160V) undervoltage alarm 8A Tap Secondary protection for 2451-AP030A/B Bus 242Y N/A (4800Aprimary) multiphase faults on 4.16KV Bus O/C T.D. 3.5 4.16kV Bus Div. 2 2451-AP031 0.6A Tap Secondary protection for Bus 242Y 4.16KV Bus Ground N/A (360A primary) ground faults on 4.16kV O/C T.D. 3.0 Bus Div. 2 Unit-2 ESF bus undervoltage. To actuate 3027.15V Bus 242Y 2427-AP040A/B 2 of 2 upon complete loss of

( 72.7% of 4160V)

ESF bus voltage condition.

3870V Unit-2 ESF Bus Bus 242Y 2427-AP271A/B 2 0f 2 (93% of 4160V) degraded voltage 3500V SAT242 Y winding Bus 242Y 2427-AP039 1 0f 1 (84% OF 4160v) undervoltage Page 10 of 15

ATTACHMENT 5 LaSalle County Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Protection UV Setpoint Protective Device Basis for Setpoint Zone Logic (Nominal) 8A Tap 2451-AP258A/B Phase overcurrent for Bus 242Y N/A (1920Aprimary) 4.16KV Unit tie O/C unit tie buses 241Y-242Y T.D. 4.0 2451-AP262 1A Tap Ground fault for unit tie Bus 242Y 4.16KV unit tie N/A (240Aprimary) buses 142Y-242Y Ground fault T.D. 1.5 7A Tap 2451-AP032A/B Phase overcurrent for Bus 242Y N/A (4200Aprimary) 4.16KV Bus tie O/C bus tie to 242X T.D. 1.5 2451-AP033 0.5A Tap Ground fault for bus tie Bus 242Y 4.16KV bus tie N/A (300Aprimary) to 242X Ground fault T.D. 1.25 16A Tap Secondary protection for 2451-AP034A/B Bus 243 N/A (3840Aprimary) multiphase faults on 4.16KV Bus O/C T.D. 5.0 4.16kV bus Division 3 2451-AP035 1.0A Tap Secondary protection for Bus 243 4.16KV Bus Ground N/A (240A primary) ground faults on 4.16kV O/C T.D. 2.0 bus Division 3 Unit-2 ESF Bus u/v. To 2870V actuate upon complete Bus 243 2427-AP041A/B 2 of 2 (68.9% of 4160V) loss of ESF bus voltage condition 3870V Unit-2 ESF Bus Bus 243 2427-AP272A/B 2 0f 2 (93% of 4160V) degraded voltage 3255V SAT242 Y-winding Bus 243 2427-AP245A/B 2 0f 2 (78% of 4160V) undervoltage NRC Request 2.b. If the ESF buses are not powered by offsite power sources, explain how the surveillance tests are performed to verify that a single-phase open circuit condition or high impedance ground fault condition on an off-site power circuit is detected.

EGC Response to NRC Request 2.b:

Not Applicable - the ESF buses at LSCS are powered by offsite power sources.

Page 11 of 15

ATTACHMENT 5 LaSalle County Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" NRC Request 2.d: Do the plant operating procedures, including off-normal operating procedures, specifically call for verification of the voltages on all three phases of the ESF buses?

EGC Response to NRC Request 2.d:

The current plant operating procedures, including off-normal operating procedures, specifically call for verification of the voltages on all three phases of the ESF buses.

For the Division I and II ESF buses (i.e., Buses 141Y and 241Y, and 142Y and 242Y for Divisions I and II on Unit 1 and 2, respectively), verification for all three phases is done using voltmeter selector switch in the Main Control Room (MCR). Verification of all three phases of Division III buses (i.e., Buses 143Y and 243Y for Unit 1 and 2, respectively), verification of voltage on all three phases is performed using the voltmeter selector switch on the associated switchgear.

Page 12 of 15

ATTACHMENT 5 LaSalle County Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Consequences NRC Requests 1.b, 1.c, and 2.e request information regarding the electrical consequences of an event, and will be addressed in this section.

NRC Request 1.b: The differences (if any) of the consequences of a loaded (i.e., ESF bus normally aligned to offsite power transformer) or unloaded (e.g., ESF buses normally aligned to unit auxiliary transformer) power source.

EGC Response to NRC Request 1.b:

There is no difference in the response of the present protective relaying scheme. Installed relays were not designed to detect single phase open circuit conditions. Existing loss of voltage and degraded voltage relays may respond depending on load and possible grounds.

NRC Request 1.c: If the design does not detect and automatically respond to a single-phase open circuit condition or high impedance ground fault condition on a credited offsite power circuit or another power sources, describe the consequences of such an event and the plant response.

EGC Response to NRC Request 1.c:

1. LaSalle did not credit in the CLB that the Class 1E protection scheme (i.e., for the ESF buses) was designed to detect and automatically respond to a single-phase open circuit condition on the credited off-site power source as described in the Updated Final Safety Analysis Report (UFSAR) and Technical Specifications (TS).
2. The offsite power at LSCS is supplied from 345kV system connected to two (2) three winding SATs (i.e., SAT 142 and SAT 242). The 345kV system is comprised of a double ring bus with four incoming lines two for each unit. The station auxiliaries are connected to secondary side of SATs through two 6.9kV and five 4.16kV buses for each unit. The ESF loads are fed from three electrically and physically independent divisions (i.e., Divisions 1, 2, and 3) through the 4.16kV buses (i.e., Bus 141Y, 142Y, and 143 for Unit 1, and Bus 241Y, 242Y, and 243 for Unit 2). The normal source of power for ESF buses is the 345kV system offsite through the SAT. When no offsite power is available through SAT, the preferred configuration is ESF buses 141Y and 241Y and 142Y and 241Y, fed from onsite power through the UATs and ESF Bus 143 and 243 fed from diesel generator 1B and 2B for Unit 1 and 2, respectively.

Page 13 of 15

ATTACHMENT 5 LaSalle County Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System"

3. For each unit ESF Division 1 and 2, the 4160V bus (i.e., 141Y(241Y) and 142Y(242Y)), is provided with four independent sources of a-c power as follow:
a. A normal (#1 offsite) source which is provided from the 345kV system through the SAT.
b. A reserve (#1 onsite) source available during unit operation which is provided from the unit through the UAT.
c. A standby (#2 onsite) source which is provided from the onsite diesel generators.
d. An emergency (#2 offsite) source from 345kV system through the SAT of the opposite unit.

For each unit ESF Division 3, the 4160V bus is provided with the two independent sources of a-c power are as follows:

A normal (i.e, offsite) source which is provided from 345kV system through the SAT.

A standby (i.e, on-site) source which is provided from the onsite diesel generator.

4. Each ESF 4160V bus (i.e., Divisions 1, 2 & 3), is provided with two levels of under voltage protection: 1) loss of voltage, and 2) degraded bus voltage. The function of these relays is to initiate load shedding and transfer the ESF loads to the onsite diesel generators in case offsite power is lost or degraded. Each 4160V ESF bus has its own independent loss of voltage and degraded voltage instrumentation and associated trip logic.
5. The EDG start signal on each 4160V ESF bus can be initiated by two loss of voltage relays (i.e., two out of two logic) or two degraded voltage relays (i.e., two out of two logic). These relays sense voltage levels at the bus between Phases A-B and Phases B-C. The logic is part of the original plant design and was evaluated and approved in the original plant safety evaluation report (SER). The relays are combined in this logic in accordance with BTP PSB-1, , "Adequacy of Station Electric Distribution System Voltages," which requires, in part, The under voltage protection shall include coincidence logic on a per bus basis to preclude spurious trips of the offsite power source.
6. Since LSCS did not credit the ESF bus protection scheme as being capable of detecting and automatically responding to a single phase open circuit condition, an open phase fault was not included in the design criteria for either the loss of voltage, the degraded voltage relay scheme or secondary level undervoltage protection system design criteria. Since open phase detection was not credited in the LSCS design or licensing basis, no design basis calculations or design documents exist that considered this condition.
7. Without formalized engineering calculations or engineering evaluations, the electrical consequences of such an open phase event can only be evaluated to the extent of what has already been published by the Electric Power Research Institute (EPRI) and Basler; which is a generic overview. The difficulty in applying these documents to the LSCS-specific response is that these are generic assessments and cannot be formally credited as a basis for an accurate response. The primary reason is that detailed plant specific models would need to be developed (e.g., transformer magnetic circuit models, electric distribution models, motor models; including positive, negative, and zero sequence impedances, voltages, and currents), and the models would need to be compiled and analyzed for the LSCS-specific Class 1E electric distribution system.

Page 14 of 15

ATTACHMENT 5 LaSalle County Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" LSCS has implemented several interim compensatory measures to minimize the impact should the open phase event occur. These measures include:

Modification of plant voltage alarms to annunciate the event Alignment of plant voltmeters to ensure all phases are monitored Implementation of a designated operator to isolate the safety buses from the grid in a timely fashion Completion of required reading packages by operators Enhancement of alarm and annunciator response procedures Creation of operator aids and placards for enhance operator response NRC Request 2.e: If a common or single offsite circuit is used to supply redundant ESF buses, explain why a failure, such as a single-phase open circuit or high impedance ground fault condition, would not adversely affect redundant ESF buses.

EGC Response to NRC Request 2.e:

Not applicable since LaSalle plant does not use a common or single offsite circuit to supply redundant ESF buses.

Page 15 of 15

ATTACHMENT 6 Limerick Generating Station, Units 1 and 2, 90-Day Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System"

ATTACHMENT 6 Limerick Generating Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" High Impedance Grounds:

On January 30, 2012, a porcelain insulator broke in the Byron Station switchyard resulting in parting of the C phase conductor of the offsite source. The insulator was on the offsite source side of the Unit 2 System Auxiliary Transformers (SATs), and the connection parted in such a way as to leave an electrically open end on the source side. The parted connection remained electrically connected on the transformer side, and the loose bus bar conductor end fell to the ground. This ground was a direct result of the broken insulator and not an independent event.

The connected loose bus bar provided a path to ground for the transformer high voltage terminal, but did not result in a ground fault (i.e., neither solid nor impedance) as seen from the source. Since the switchyard (i.e., source side) relaying was electrically isolated from the fault, it did not detect a fault; therefore, did not operate.

The significant event was the opening of a single phase connection; the ground on the high voltage side of the SAT is of lesser significance. Regardless of phase discontinuity, if the ground impedance is low on the source side, and currents are high, the source side protective relaying will operate and open all circuit phases. If the ground impedance is high, and currents low, the relaying may not operate depending on the magnitude of ground impedance; the circuit will continue to supply power.

A qualitative analysis has been performed to assess the impact of single phase high impedance ground faults. The primary objective of the analysis was to determine if a high impedance ground fault could result in an unbalanced voltage condition sufficient to adversely affect energized ESF equipment. The cases analyzed include a single phase high impedance ground fault with all three phases intact and a single phase high impedance ground fault concurrent with the loss of the same phase. These cases have been analyzed for both the high and low voltage sides of the SATs analyzed. 1 provides a summary report of the qualitative analysis; therefore, all information discussed in this response attachment is limited to single-phase open circuit conditions.

System Description

NRC Requests 2, 1.d, 2.a, and 2.c request system information, and will be addressed in this section.

NRC Request No. 2: Briefly describe the operating configuration of the ESF buses (Class 1E for current operating plants or non-Class 1E for passive plants) at power (normal operating condition).

Exelon Generation Company, LLC (EGC) Response to NRC Request No. 2 A simplified one-line diagram of the Limerick Generating Station (LGS), Units 1 and 2 Auxiliary Power System is shown in Figure 1 below.

Page 1 of 16

ATTACHMENT 6 Limerick Generating Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Figure 1: Limerick Generating Station Simplified One-Line Diagram The LGS 220 kV substation supplies offsite power at 13.2 kV via the No. 10 220-13 kV transformer connected to the Station Auxiliary Bus 10A103. The LGS 500 kV substation supplies offsite power at 13.2 kV to Station Auxiliary Bus 20A103 from the tertiary winding of one of the 4A or 4B bus tie autotransformers through the No. 20 13-13 kV regulating transformer. Each offsite source supplies an emergency auxiliary (i.e., safeguard) transformer that steps down the 13.2 kV to 4.16 kV and connects through interlocked circuit breakers to every 4 kV Class 1E bus. Both offsite sources are continuously available to the Class 1E buses.

In addition to the two offsite sources described above, an alternate independent, but not connected, offsite source is available from the 66-13 kV transformer connected to the 6680, 66 kV Cromby - Moser tie line.

The Class 1E ac power system for each unit is divided into Divisions A, B, C, and D. The 4 kV bus of each Class 1E load division is provided with connection to the two offsite power sources, designated as preferred and alternate power supplies. For each load division, one 4 kV feeder circuit breaker is provided for the normal incoming preferred power source, and another 4 kV feeder circuit breaker is provided for the alternate power source. Safeguard Bus 101 Transformer is the preferred power source for Channels A (i.e., Division A) and C (i.e., Division C) for Unit 1 and Channels B (i.e., Division B) and D (i.e., Division D) for Unit 2.

Safeguard Bus 101 Transformer is the alternate power source for Channels B (i.e., Division B) and D (i.e., Division D) for Unit 1 and Channels A (i.e., Division A) and C (i.e., Division C) for Unit 2. Safeguard Bus 201 Transformer is the preferred power source for Channels B (i.e., Division B) and D (i.e., Division D) for Unit 1 and Channels A (i.e., Division A) and C Page 2 of 16

ATTACHMENT 6 Limerick Generating Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" (i.e., Division C) for Unit 2. Safeguard Bus 201 Transformer is the alternate source for Channels A (i.e., Division A) and C (i.e., Division C) for Unit 1 and Channels B (i.e., Division B) and D (i.e., Division D) for Unit 2.

NRC Request 1.d: Describe the offsite power transformer (e.g., start-up, reserve, station auxiliary) winding and grounding configurations.

EGC Response to NRC Request 1.d:

The LGS offsite power transformer winding and grounding configurations are shown in Table 1 below.

Table 1: LGS Offsite Power Transformer Winding and Grounding Configurations MVA Size Voltage Rating Winding Grounding Transformer (Cooling (Primary/

Configuration Configuration Mode) Secondary)

No. 10 Station 36.96/49.28/61. Wye Resistor Auxiliary 230-14.18 Delta Wye 6 230/14.18 kV (4 ohms, 2000 a) kV Transformer (OA/FOA/FOA) Grounded No. 4A Station Auxiliary 515-230/

132.8-13.8 kV 252/336/420 515/230/132.8-Wye Wye Delta Neutral Grounded Transformer (OA/FOA/FOA) 13.8 kV (Autotransformer)

(Preferred Source)

No. 4B Station Auxiliary 515-230/

132.8-13.8 kV 252/336/420 515/230/132.8-Transformer Wye Wye Delta Neutral Grounded (OA/FOA/FOA) 13.8 kV (Autotransformer)

(Alternate Source)

Wye Resistor No. 20 Regulating Wye Wye with 35/46.667/58.3 (4 ohms 2000 a, 13.8-13.8 kV Delta stabilizing 33 13.8/13.8 kV 8000 V)

Transformer winding (OA/FA/FA)

Grounded Wye Resistor No.101 Safeguard 11.2/14 (1.2 ohms, 13.2-4.16 kV Delta Wye 13.2/4.16 kV (OA/FA) 2000 a, 2400 V)

Transformer Grounded Page 3 of 16

ATTACHMENT 6 Limerick Generating Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" MVA Size Voltage Rating Winding Grounding Transformer (Cooling (Primary/

Configuration Configuration Mode) Secondary)

Wye Resistor No.201 Safeguard 11.2/14 (1.2 ohms, 13.2-4.16 kV Delta Wye 13.2/4.16 kV (OA/FA) 2000 a, 2400 V)

Transformer Grounded NRC Request 2.a: Are the ESF buses powered by offsite power sources?

If so, explain what major loads are connected to the buses including their ratings.

EGC Response to NRC Request 2.a:

For at power (i.e., normal operating condition) configurations, engineered safety features (ESF) buses are powered by offsite sources.

The normal power sources for the LGS ESF Buses are shown in Tables 2 and 3 below.

Page 4 of 16

ATTACHMENT 6 Limerick Generating Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Table 2: LGS ESF Buses That Are Normally Powered From Offsite Sources Original ESF Bus Name Licensing Description of ESF Bus Power Source (Normal Operating Basis Condition) Configuration (Y/N)

No. 10 Station Auxiliary 230-14.18 kV Transformer through 101 Safeguard 10A115 (Division A) Y 13.2-4.16 kV Transformer No. 10 Station Auxiliary 230-14.18 kV Transformer through 101 Safeguard 10A117 (Division C) Y 13.2-4.16 kV Transformer No. 10 Station Auxiliary 230-14.18 kV Transformer through 101 Safeguard 20A116 (Division B) Y 13.2-4.16 kV Transformer No. 10 Station Auxiliary 230-14.18 kV Transformer through 101 Safeguard 20A118 (Division D) Y 13.2-4.16 kV Transformer No. 4A Station Auxiliary 515/230/132.8-13.8 kV Transformer through No. 20 Regulating 13.8-13.8 kV Transformer 10A116 (Division B) Y and 201 Safeguard 13.2-4.16 kV Transformer No. 4A Station Auxiliary 515/230/132.8-13.8 kV Transformer Through No. 20 10A118 (Division D) Y Regulating 13.8-13.8 kV Transformer and 201 Safeguard 13.2-4.16 kV Transformer No. 4A Station Auxiliary 515/230/132.8-13.8 kV Transformer Through No. 20 20A115 (Division A) Y Regulating 13.8-13.8 kV Transformer and 201 Safeguard 13.2-4.16 kV Transformer No. 4A Station Auxiliary 515/230/132.8-13.8 kV Transformer Through No. 20 20A117 (Division C) Y Regulating 13.8-13.8 kV Transformer and 201 Safeguard 13.2-4.16 kV Transformer Table 3: LGS ESF Buses That Are Not Normally Powered From Offsite Sources Description of ESF Bus ESF Bus Name (normal operating Original licensing Power Source condition) basis configuration (Y/N)

N/A N/A N/A Page 5 of 16

ATTACHMENT 6 Limerick Generating Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" The major LGS ESF bus loads that are energized during normal power operations, including their ratings, are shown in Table 4 below.

Table 4: Major LGS ESF Loads Including Ratings and Status during Normal Power Operations ESF Bus Load Voltage Level (V) Rating (hp)

Load Center 10A115 4160-480 1000 kVA Transformer (10X201)

T-B Equip Compt Exhaust Fan 4000 250 (1AV106)

Control Rod Drive 10A117 Water Pump 4000 250 (1AP158)

Load Center 4160-480 1000 kVA Transformer (10X203)

Drywell Chiller 4000 1303 kW (1AK111)

Control Room Chiller 4000 329 kW (0AK112)

Load Center 10A116 4160-480 1000 kVA Transformer (10X202)

T-B Equip Compt Exhaust Fan 4000 250 (1BV106)

Control Rod Drive 10A118 Water Pump 4000 250 (1BP158)

Load Center 4160-480 1000 kVA Transformer (10X204)

Drywell Chiller 4000 1303 kW (1BK111)

Control Room Chiller 4000 329 kW (0BK112)

Page 6 of 16

ATTACHMENT 6 Limerick Generating Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" ESF Bus Load Voltage Level (V) Rating (hp)

T-B Equip Compt 20A115 Exhaust Fan 4000 250 (2AV106)

Load Center 4160-480 1000 kVA Transformer (20X201)

Drywell Chiller 4000 500 (2AK111)

Control Rod Drive 20A117 Water Pump 4000 250 (2AP158)

Load Center 4160-480 1000 kVA Transformer (20X203)

Load Center 20A116 4160-480 1000 kVA Transformer (20X202)

T-B Equip Compt Exhaust Fan 4000 250 (2BV106)

Drywell Chiller 4000 500 (2BK111)

Control Rod Drive 20A118 Water Pump 4000 250 (2BP158)

Load Center 4160-480 1000 kVA Transformer (20X204)

NRC Request 2.c: Confirm that the operating configuration of the ESF buses is consistent with the current licensing basis.

Describe any changes in offsite power source alignment to the ESF buses from the original plant licensing.

EGC Response to NRC Request 2.c:

The LGS 220 kV substation supplies offsite power at 13.2 kV via the No. 10 220-13 kV transformer connected to the Station Auxiliary Bus 10A103. The LGS 500 kV substation supplies offsite power at 13.2 kV to Station Auxiliary Bus 20A103 from the tertiary winding of Page 7 of 16

ATTACHMENT 6 Limerick Generating Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" one of the 4A or 4B bus tie autotransformers through the No. 20 13-13 kV regulating transformer. Each offsite source supplies an emergency auxiliary (i.e., safeguard) transformer with a nominal capacity of 14 MVA that steps down the 13.2 kV to 4.16 kV and connects through interlocked circuit breakers to every 4 kV Class 1E bus. Both offsite sources are available continuously to the Class 1E buses.

The Class 1E ac power system for each unit is divided into Divisions A, B, C, and D. The 4 kV bus of each Class 1E load division is provided with connection to the two offsite power sources, designated as preferred and alternate power supplies For each load division, one 4 kV feeder circuit breaker is provided for the normal incoming preferred power source, and another 4 kV feeder circuit breaker is provided for the alternate power source Safeguard Bus 101 Transformer is the preferred power source for Channels A (i.e., Division A) and C (i.e. Division C) for Unit 1 and Channels B (i.e., Division B) and D (i.e., Division D) for Unit 2.

Safeguard Bus 201 Transformer is the preferred power source for Channels B (i.e., Division B) and D (i.e., Division D) for Unit 1 and Channels A (i.e., Division A) and C (i.e., Division C) for Unit 2.

The following at power (i.e., normal operating condition) configurations have been confirmed to be consistent with the current licensing basis:

1. Unit 1 Preferred Source - Power to ESF Division A and C Buses via the 220 kV substation through the No.10 Station Transformer and the 101 Safeguard Transformer.
2. Unit 1 Preferred Source - Power to ESF Division B and D Buses via the 500 kV substation through the No.4A Station Transformer, No. 20 Regulating Transformer and the 201 Safeguard Transformer.
3. Unit 1 Alternate Source - Power to ESF Division B and D Buses via the 220 kV substation through the No.10 Station Transformer and the 101 Safeguard Transformer.
4. Unit 1 Alternate Source - Power to ESF Division A and C Buses via the 500 kV substation through the No.4A Station Transformer, No. 20 Regulating Transformer and the 201 Safeguard Transformer.
5. Unit 2 Preferred Source - Power to ESF Division B and D Buses via the 220 kV substation through the No.10 Station Transformer and the 101 Safeguard Transformer.
6. Unit 2 Preferred Source - Power to ESF Division A and C Buses via the 500 kV substation through the No.4A Station Transformer, No. 20 Regulating Transformer and the 201 Safeguard Transformer.
7. Unit 2 Alternate Source - Power to ESF Division A and C Buses via the 220 kV substation through the No.10 Station Transformer and the 101 Safeguard Transformer.
8. Unit 2 Alternate Source - Power to ESF Division B and D Buses via the 500 kV substation through the No.4A Station Transformer, No. 20 Regulating Transformer and the 201 Safeguard Transformer.

Page 8 of 16

ATTACHMENT 6 Limerick Generating Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" The operating configuration of the offsite source alignment is consistent with the current licensing basis (CLB), and the original Safety Evaluation Report (SER) issued for LGS.

System Protection NRC Requests 1, 1.a, 2.b, and 2.d request information regarding electrical system protection, and will be addressed in this section.

NRC Request 1: Given the requirements above, describe how the protection scheme for ESF buses (Class 1E for current operating plants or non-Class 1E for passive plants) is designed to detect and automatically respond to a single-phase open circuit condition or high impedance ground fault condition on a credited off-site power circuit or another power sources. Also, include the following information:

EGC Response to NRC Request 1:

Consistent with the current licensing basis and 10 CFR 50, Appendix A, "General Design Criteria for Nuclear Power Plants," Criterion (GDC) 17, "Electric power systems," existing protective circuitry will separate the ESF buses from a connected failed offsite source due to a loss of voltage or a sustained, balanced degraded grid voltage concurrent with certain design basis accidents. The relay systems were not specifically designed to detect an open single phase of a three phase system. Detection of a single-open phase condition is beyond the approved design and licensing basis of the plant.

The LGS degraded voltage relaying schemes are capable of responding to degraded grid conditions as described in the LGS Updated Final Safety Analysis Report (UFSAR) Section 8.1.6.3.6, "NRC Branch Technical Position (BTP) PSB-1, 'Adequacy of Station Electric Distribution System Voltages.'" The LGS degraded grid and dead bus relaying schemes monitor the A and B phases. This design assumes that grid changes occur symmetrically across all phases. The C phase is unmonitored by the degraded grid relays, the dead bus relays or the Main Control Room (MCR) panel board meters.

The 4 kV distribution system design at LGS is different from that of Byron Station because LGS has two independent offsite sources which provide power to the appropriate 4 kV ESF buses through the 101 and 201 Safeguard Transformers. The 101 Transformer is fed from one offsite source and the 201 Transformer is fed from the second offsite source. The normal LGS configuration for each unit is to have two safeguard buses aligned to the 101 source and two safeguard buses aligned to the 201 source; whereas Byron Station aligns both of their 4 kV ESF buses to one offsite source. Also, the LGS 4 kV safeguard bus configuration consists of four divisions to prevent a total loss of any specific 4 kV safeguard load.

In a normal plant alignment, a loss of phase on one offsite source would affect two of four safeguard buses per unit. The 4 kV degraded voltage (i.e., degraded grid) protective relay Page 9 of 16

ATTACHMENT 6 Limerick Generating Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" schemes at LGS are a one-out-of-one logic for each 4 kV safeguard bus which uses potential transformers across the A to B phases to monitor for degraded bus conditions. A loss of the A or B phase at the 4 kV bus feeder or on the 13 kV side of the safeguard transformer would cause the degraded grid relays to trip the 4 kV bus and transfer to the other offsite source.

Thus, only a C phase open is undetected. This is different from the Byron Station's design of two-out-of-two logic with two independent relays monitoring the A to B phases and B to C phases. The existing Byron Station scheme requires both relays to actuate to trip on degraded grid.

NRC Request 1.a: The sensitivity of protective devices to detect abnormal operating conditions and the basis for the protective device setpoint(s).

EGC Response to NRC Request 1.a:

Consistent with the current licensing basis and GDC 17, existing electrical protective devices are sufficiently sensitive to detect design basis conditions like a loss of voltage or a degraded voltage, but were not designed to detect a single phase open circuit condition. The LGS undervoltage protective devices and the basis for their setpoint(s) are shown in Table 5 below.

Table 5: LGS Protective Devices, Setpoints, and Basis Protection Protective UV Logic Setpoint (Nominal) Basis for Setpoint Zone Device Loss of 1664 V To actuate upon 4 kV ESF Bus Voltage 1 of 1 complete loss of ESF (Note 1) (40% of 4160 V)

Relay Bus voltage condition Voltage Unit Pickup-113 V 4 kV ESF Bus Min Trip Amp Differential To actuate for faults on D11, D12, 1 of 3 Relays 87 primary amps (p.a.). ESF Bus D21, and D22 Current Unit Inst 800 p.a.

Voltage Unit Pickup-113 V 4 kV ESF Bus Min Trip Amp Differential To actuate for faults on D13, D14, 1 of 3 Relays 96 primary amps (p.a.). ESF Bus D23, and D24 Current Unit Inst 800 p.a.

To actuate upon degraded voltage condition on the feed to Loss of 4 kV ESF Bus 3910 V the ESF Bus after a 61 Voltage 1 of 1 (Note 2) (94% of 4160 V) second time delay Relay (normal), (10 seconds on loss of coolant accident (LOCA))

Page 10 of 16

ATTACHMENT 6 Limerick Generating Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Protection Protective UV Logic Setpoint (Nominal) Basis for Setpoint Zone Device To actuate upon Loss of degraded voltage 4 kV ESF Bus 3640 V Voltage 1 of 1 condition on the feed to (Note 2) (87.5% of 4160 V)

Relay the ESF Bus after a 52 second time delay To actuate upon loss of Loss of voltage condition on the 4 kV ESF Bus 2905 V Voltage 1 of 1 feed to the ESF Bus (Note 2) (70% of 4160 V)

Relay after a 0.9 second time delay Current Transformer (CT)

Phase 4 kV ESF Bus 200/1 (4160 V) To actuate for faults on Overcurrent 1 of 3 (Note 2) Time-1600 p.a. 60 cycles ESF Bus Relays

@ 400%

Ground CT 200/1 (4160 V) 4 kV ESF Bus To actuate for faults on Overcurrent 1 of 1 Time-100 p.a 51 cycles @

(Note 2) ESF Bus Relay 400%

Phase No. 10 Unit CT 50/1 Differential To actuate upon No. 10 Auxiliary 230- Pickup Relays 1 of 3 Unit Auxiliary 230-13.8 13.8 kV DHR-1.14a (at 220 kV kV Transformer fault Transformer DOC-30.4a Substation)

Phase No. 10 Unit CT 50/1 (230 kV)

Overcurrent To actuate upon No. 10 Auxiliary 230- Inst-1450 p.a Relays 1 of 3 Unit Auxiliary 230-13.8 13.8 kV Time-300 p.a 120 cycles @

(at 220 kV kV Transformer fault Transformer 400%

Substation)

Ground No. 10 Unit Overcurrent CT 50/1 (230 kv) To actuate upon No. 10 Auxiliary 230-Relay 1 of 1 Time-75 p.a 15 cycles @ Unit Auxiliary 230-13.8 13.8 kV (at 220 kV 400% kV Transformer fault Transformer Substation)

Overall No. 10 Unit NeutralOver CT 120/1 (13 kv)} To actuate upon No. 10 Auxiliary 230- current 1 of 1 Time-480 p.a. 85 cycles @ Unit Auxiliary 230-13.8 13.8 kV Relay 400% kV Transformer fault Transformer (at 220 kV Substation)

Page 11 of 16

ATTACHMENT 6 Limerick Generating Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Protection Protective UV Logic Setpoint (Nominal) Basis for Setpoint Zone Device No.10 Station Phase Auxiliary Bus To actuate upon No.10 Overcurrent CT 400/1 (13 kv) and the Station Auxiliary Bus or Relays 1 of 3 Time-4000 p.a 125 cycles connection to the connection to the (at 220 kV @ 400%

the 220 kV 220 kV substation fault Substation)

Substation No.10 Station Ground Auxiliary Bus To actuate upon No.10 Overcurrent CT 400/1 (13 kv) and the Station Auxiliary Bus or Relay 1 of 1 Time-400 p.a 70 cycles @

connection to the connection to the (at 220 kV 400%

the 220 kV 220 kV substation fault Substation)

Substation No.10 Station Differential Voltage Unit Pickup-Auxiliary Bus To actuate upon No.10 Voltage 159 V and the Station Auxiliary Bus or Relays 1 of 3 Min Trip Amp 71 p.a.

connection to the connection to the Current Unit the 220 kV 220 kV substation fault Inst 1200 p.a.

Substation No.101 CT 200/1(13.2 kV)

Phase To actuate upon No.

Safeguard Pickup Differential 1 of 3 101 Safeguard 13.2-13.2-4.16 kV DHR-1.14a Relays 4.16 kV transformer fault Trans DOC-30.4a No.101 CT 200/1 (13.2 kV)

Phase To actuate upon No.

Safeguard Inst-15000 p.a.

Overcurrent 1 of 3 101 Safeguard 13.2-13.2-4.16 kV Time-1000 p.a 132 cycles Relays 4.16 kV transformer fault Trans @ 400%

No.101 Ground To actuate upon No.

Safeguard CT 10/1 (13.2 kV)

Overcurrent 1 of 1 101 Safeguard 13.2-13.2-4.16 kV Inst-17 p.a.

Relays 4.16 kV transformer fault Trans Overall No.101 NeutralOver CT 120/1 (4160 V) To actuate upon No.

Safeguard current 1 of 1 Time-120 p.a 96 cycles @ 101 Safeguard 13.2-13.2-4.16 kV Relay 400% 4.16 kV transformer fault Trans No. 20 Differential Relays CT 600/1.73 Pickup To actuate upon No. 20 Regulating 1 of 3 DHR-2.61a Regulating 13.8-13.8 kV 13.8-13.8 kV (At 500 kV DOC-69.6a transformer fault Transformer Substation)

Page 12 of 16

ATTACHMENT 6 Limerick Generating Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Protection Protective UV Logic Setpoint (Nominal) Basis for Setpoint Zone Device Current No. 20 Balance Relays To actuate upon No. 20 Regulating 3.0 amp 1 of 3 Regulating 13.8-13.8 kV 13.8-13.8 kV (At 500 kV (relay current) transformer fault Transformer Substation)

Phase No. 20 Overcurrent CT 600/1 To actuate upon No. 20 Regulating Relays Inst-25800 p.a.

1 of 3 Regulating 13.8-13.8 kV 13.8-13.8 kV Time-4200 p.a 120 cycles (At 500 kV transformer fault Transformer @ 400%

Substation)

Ground No. 20 Overcurrent CT 600/1 To actuate upon No. 20 Regulating Relay 1 of 1 Time-360 p.a 70 cycles @ Regulating 13.8-13.8 kV 13.8-13.8 kV (at 500 kV 400% transformer fault Transformer Substation)

No. 20 Ground Regulating Overcurrent CT 600/1 To actuate upon No. 20 13.8-13.8 kV Relay 1 of 1 Time-480 p.a 85 cycles @ Regulating 13.8-13.8 kV Transformer (at 500 kV 400% transformer fault Neutral Resistor Substation)

No. 20 Regulating Pilot Wire To actuate upon No. 20 Overcurrent 1 of 3 CT 600/1 13.8-13.8 kV Regulating 13.8-13.8 kV Relays elements Phase Transformer Transformer or No.20 (single Inst 3600 p.a.

and No.20 (at 500 kV Station Auxiliary Bus relay) Ground Inst 1200 p.a.

Station Substation) fault Auxiliary Bus No. 20 Regulating Pilot Wire To actuate upon No. 20 1 of 3 CT 600/1 13.8-13.8 kV Overcurrent Regulating 13.8-13.8 kV elements Phase Transformer Relays Transformer or No.20 (single Inst 3600 p.a.

and No.20 Station Auxiliary Bus relay) Ground Inst 1200 p.a.

Station fault Auxiliary Bus No.201 CT 200/1(13.2 kV)

Phase To actuate upon NO.

Safeguard Pickup Differential 1 of 3 201 Safeguard 13.2-13.2-4.16 kV DHR-1.14a Relays 4.16 kV transformer fault Transformer DOC-30.4a Page 13 of 16

ATTACHMENT 6 Limerick Generating Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Protection Protective UV Logic Setpoint (Nominal) Basis for Setpoint Zone Device No.201 CT 200/1 (13.2 kV)

Phase To actuate upon No.

Safeguard Inst-15000 p.a Overcurrent 1 of 3 201 Safeguard 13.2-13.2-4.16 kV Time-1000 p.a 132 cycles Relays 4.16 kV transformer fault Transformer @ 400%

No.201 Ground To actuate upon No.

Safeguard CT 10/1 (13.2 kV)

Overcurrent 1 of 1 201 Safeguard 13.2-13.2-4.16 kV Inst-17 p.a.

Relays 4.16 kV transformer fault Transformer Overall No.201 Neutral CT 120/1 (4160 V) To actuate upon No.

Safeguard Overcurrent 1 of 1 Time-120 p.a 96 cycles @ 201 Safeguard 13.2-13.2-4.16 kV Relay 400% 4.16 kV transformer fault Transformer Note 1: Separate relay for each ESF Bus Note 2: Separate relays for each preferred and alternate feeder to each ESF Bus Existing electrical protective devices are also sufficiently sensitive to detect a ground fault.

Additionally, Table 5 lists ground protection on the ESF buses and the basis for the device setpoint(s).

NRC Request 2.b. If the ESF buses are not powered by offsite power sources, explain how the surveillance tests are performed to verify that a single-phase open circuit condition or high impedance ground fault condition on an off-site power circuit is detected.

EGC Response to NRC Request 2.b:

Not Applicable - the ESF buses at LGS, Units 1 and 2 are powered by offsite power sources.

NRC Request 2.d: Do the plant operating procedures, including off-normal operating procedures, specifically call for verification of the voltages on all three phases of the ESF buses?

EGC Response to NRC Request 2.d:

LGS Special Event Procedure SE-17, "Loss of Single Phase from Offsite Source," requires checking all three phase to phase voltages at the station auxiliary buses when a single open phase is suspected.

Page 14 of 16

ATTACHMENT 6 Limerick Generating Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Consequences NRC Requests 1.b, 1.c, and 2.e request information regarding the electrical consequences of an event, and will be addressed in this section.

NRC Request 1.b: The differences (if any) of the consequences of a loaded (i.e., ESF bus normally aligned to offsite power transformer) or unloaded (e.g., ESF buses normally aligned to unit auxiliary transformer) power source.

EGC Response to NRC Request 1.b:

Installed relays were not designed to detect single phase open circuit conditions. Existing loss of voltage and degraded voltage relays may respond depending on load and possible grounds.

In general, there will be no plant response for an unloaded power source in the event of a single-phase open circuit on a credited off-site power circuit because there is insufficient current to detect a single-phase open circuit for this configuration.

NRC Request 1.c: If the design does not detect and automatically respond to a single-phase open circuit condition or high impedance ground fault condition on a credited offsite power circuit or another power sources, describe the consequences of such an event and the plant response.

EGC Response to NRC Request 1.c:

1. Limerick Generating Station (LGS) did not credit in the CLB that the Class 1E protection scheme (i.e., for the emergency safeguard feature (ESF) buses) was designed to detect and automatically respond to a single-phase open circuit condition on the credited off-site power source as described in the UFSAR and Technical Specifications (TS).

The offsite power circuits at the LGS consists of two independent circuits one source from the 220-13 kV Startup Transformer in the 220 kV substation, the second source from the 13 kV tertiary winding of the 220-500 kV Bus Tie Autotransformer in the 500 kV substation. Each offsite source is connected as the preferred or alternate source to every 4 kV ESF bus in Unit 1 and Unit 2.

2. Since LGS did not credit the ESF bus protection scheme as being capable of detecting and automatically responding to a single phase open circuit condition, an open phase fault was not included in the design criteria for either the loss of voltage, the degraded voltage relay scheme or secondary level undervoltage protection system design criteria.

Since open phase detection was not credited in the design or licensing basis, no design basis calculations or design documents exist that previously considered this condition.

Page 15 of 16

ATTACHMENT 6 Limerick Generating Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System"

3. Without formalized engineering calculations or engineering evaluations, the electrical consequences of such an open phase event, including plant response, can only be evaluated to the extent of what has already been published by the Electric Power Research Institute (EPRI) and Basler; which is a generic overview. The difficulty in applying these documents to the LGS specific response is that these are generic assessments and cannot be formally credited as a basis for an accurate response. The primary reason is that detailed plant specific models would need to be developed (e.g.,

transformer magnetic circuit models, electric distribution models, motor models; including positive, negative, and zero sequence impedances (voltage and currents), and the models would need to be compiled and analyzed for the LGS specific Class 1E Electric Distribution System.

Specific measures implemented at LGS as interim compensatory measures include the following:

Delivery of required reading packages to operators Enhancement of alarm / annunciator response procedures Creation of Procedure SE-17, "Loss of Single Phase from Offsite Source" Issuance of an Engineering Change Request to modify plant voltage alarms to annunciate for a phase unbalance condition upstream of the No. 10 Station Auxiliary Bus.

NRC Request 2.e: If a common or single offsite circuit is used to supply redundant ESF buses, explain why a failure, such as a single-phase open circuit or high impedance ground fault condition, would not adversely affect redundant ESF buses.

EGC Response to NRC Request 2.e:

Not applicable since LGS does not use a common or single offsite circuit to supply redundant ESF busses.

Page 16 of 16

ATTACHMENT 7 Oyster Creek Nuclear Generating Station, Unit 1, 90-Day Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System"

ATTACHMENT 7 Oyster Creek Nuclear Generating Station Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" High Impedance Grounds:

On January 30, 2012, a porcelain insulator broke in the Byron Station switchyard resulting in parting of the C phase conductor of the offsite source. The insulator was on the offsite source side of the Unit 2 System Auxiliary Transformers (SATs), and the connection parted in such a way as to leave an electrically open end on the source side. The parted connection remained electrically connected on the transformer side, and the loose bus bar conductor end fell to the ground. This ground was a direct result of the broken insulator and not an independent event.

The connected loose bus bar provided a path to ground for the transformer high voltage terminal, but did not result in a ground fault (i.e., neither solid nor impedance) as seen from the source. Since the switchyard (i.e., source side) relaying was electrically isolated from the fault, it did not detect a fault; therefore, did not operate.

The significant event was the opening of a single phase connection; the ground on the high voltage side of the SAT is of lesser significance. Regardless of phase discontinuity, if the ground impedance is low on the source side, and currents are high, the source side protective relaying will operate and open all circuit phases. If the ground impedance is high, and currents low, the relaying may not operate depending on the magnitude of ground impedance; the circuit will continue to supply power.

A qualitative analysis has been performed to assess the impact of single phase high impedance ground faults. The primary objective of the analysis was to determine if a high impedance ground fault could result in an unbalanced voltage condition sufficient to adversely affect energized ESF equipment. The cases analyzed include a single phase high impedance ground fault with all three phases intact and a single phase high impedance ground fault concurrent with the loss of the same phase. These cases have been analyzed for both the high and low voltage sides of the SATs analyzed. 1 provides a summary report of the qualitative analysis; therefore, all information discussed in this response attachment is limited to single-phase open circuit conditions.

System Description

NRC Requests 2, 1.d, 2.a, and 2.c request system information, and will be addressed in this section.

NRC Request No. 2: Briefly describe the operating configuration of the ESF buses (Class 1E for current operating plants or non-Class 1E for passive plants) at power (normal operating condition).

Exelon Generation Company, LLC (EGC) Response to NRC Request No. 2 A simplified one-line diagram of the Oyster Creek Nuclear Generating Station (OCNGS) is provided as Figure 1 below.

Page 1 of 11

ATTACHMENT 7 Oyster Creek Nuclear Generating Station Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Figure 1: Simplified One-Line Diagram 4160V buses 1C and 1D are the engineered safety features (ESF) buses at OCNGS.

During normal power operation, ESF Buses 1C and 1D are powered by the 4160V Buses 1A and 1B, respectively. Buses 1A and 1B are powered by the three winding Unit Auxiliary Transformer (UAT). The UAT is directly connected to the main generator with the iso-phase duct bus.

NRC Request 1.d: Describe the offsite power transformer (e.g., start-up, reserve, station auxiliary) winding and grounding configurations.

EGC Response to NRC Request 1.d:

The OCNGS startup transformer winding and grounding configurations are shown in Table 1 below.

Page 2 of 11

ATTACHMENT 7 Oyster Creek Nuclear Generating Station Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Table 1: OCNGS Offsite Power Transformer Winding and Grounding Configurations Winding MVA Size Voltage Rating Grounding Transformer Configuration (AO/FA/FA) (Primary/Secondary) Configuration Neutral Start-up Delta-Wye 12/16/20 34.5kV/4.16kV Grounded with Transformer SA (3 Leg) 2 Resistor Neutral Start-up Delta-Wye 12/16/20 34.5kV/4.16kV Grounded with Transformer SB (3 Leg) 2 Resistor NRC Request 2.a: Are the ESF buses powered by offsite power sources?

If so, explain what major loads are connected to the buses including their ratings.

EGC Response to NRC Request 2.a:

For at power (i.e., normal operating condition) configuration, OCNGS ESF buses are not powered by offsite sources.

The OCNGS ESF bus power sources are shown in Tables 2 and 3 below.

Table 2: OCNGS ESF Buses that Are Normally Powered from Offsite Sources Description of ESF Bus ESF Bus Name Original licensing Power Source (normal operating condition) basis configuration (Y/N)

N/A N/A N/A Table 3: OCNGS ESF Buses That Are Not Normally Powered from Offsite Sources Description of ESF Bus Power ESF Bus Name Original licensing Source (normal operating condition) basis configuration (Y/N)

Unit Auxiliary Transformer (UAT) 4kv Bus 1C Y Unit Auxiliary Transformer (UAT) 4kv Bus 1D Y During normal plant operation, Startup Transformer SA provides power to the Dilution Plant.

The purpose of the Dilution Plant is to offset the effects of the main condenser discharge to the canal. Startup Transformer SB does not carry any load during normal power operation.

Page 3 of 11

ATTACHMENT 7 Oyster Creek Nuclear Generating Station Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" NRC Request 2.c: Confirm that the operating configuration of the ESF buses is consistent with the current licensing basis.

Describe any changes in offsite power source alignment to the ESF buses from the original plant licensing.

EGC Response to NRC Request 2.c:

The OCNGS offsite power was licensed in accordance with 10 CFR 50, Appendix A, "General Design Criteria for Nuclear Power Plants," Criterion (GDC) 17, "Electric power systems." There have been no changes in the offsite power source alignment to the ESF buses since original plant licensing.

Normal operating condition configurations have been confirmed to be consistent with the current licensing basis (CLB.)

Page 4 of 11

ATTACHMENT 7 Oyster Creek Nuclear Generating Station Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" System Protection NRC Requests 1, 1.a, 2.b, and 2.d request information regarding electrical system protection, and will be addressed in this section.

NRC Request 1: Given the requirements above, describe how the protection scheme for ESF buses (Class 1E for current operating plants or non-Class 1E for passive plants) is designed to detect and automatically respond to a single-phase open circuit condition or high impedance ground fault condition on a credited off-site power circuit or another power sources. Also, include the following information:

EGC Response to NRC Request 1:

Consistent with GDC 17, existing protective circuitry will separate the ESF buses from a connected failed offsite source due to a loss of voltage or a sustained, balanced degraded grid voltage concurrent with certain design basis accidents. The relay systems were not specifically designed to detect an open single phase of a three phase system. Detection of a single-open phase condition is beyond the approved design and licensing basis of the plant.

Normal Plant Operation Considerations:

During normal plant operation, the ESF 4160V Buses 1C and 1D are powered from the UAT.

An open phase on the Main Power Transformer (MPT) 230kV side would have no effect on the ESF bus voltage. Since the UAT is tied directly to the generator terminals, it will continue to receive three phase voltage on its primary side for as long as the generator remains online. If the generator trips on negative sequence due to the open MPT phase on 230 kV side, the 1C and 1D buses and upstream balance of plant (BOP) Buses 1A and 1B will automatically transfer to their alternate source (i.e., Startup Transformers SA and SB). Therefore, an open phase on the MPT 230 kV side while the plant is in normal operation is not of concern.

An open phase on the UAT primary side while the iso-phase bus connections at generator and MPT remain intact is not credible due to the iso-phase bus connection arrangement, which makes it highly unlikely that a phase would open without also shorting to ground and tripping the generator.

During normal plant operation an open single-phase on the Startup Transformer primary side has no effect on ESF bus voltage since these buses are powered from the UAT.

Page 5 of 11

ATTACHMENT 7 Oyster Creek Nuclear Generating Station Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" NRC Request 1.a: The sensitivity of protective devices to detect abnormal operating conditions and the basis for the protective device setpoint(s).

EGC Response to NRC Request 1.a:

Consistent with GDC 17, existing electrical protective devices are sufficiently sensitive to detect design basis conditions like a loss of voltage or a degraded voltage, but were not designed to detect a single phase open circuit condition. The OCNGS under-voltage protective device setpoints and the basis for the device setpoints are shown in Table 4 below.

Table 4: Protective Devices Protective UV Setpoint Protection Zone Basis for Setpoint Device Logic (Nominal)

To actuate upon 4 kV ESF Buses Loss of 1 of 1 2870 + 143.5V complete loss of ESF 1C and 1D Voltage Relay bus voltage condition To actuate upon Degraded 4 kV ESF Buses degraded grid Grid Voltage 2 of 3 3840 +20, -40V 1C and 1D condition sustained Relay for 10 + 1 seconds Actuates upon fault 4 kV ESF Buses Phase Over N/A 2400A @ 3.0TD downstream of 1C and 1D current device Actuates upon 4 kV ESF Buses Neutral Over ground fault N/A 240A @ 10.0TD 1C and 1D Current downstream of device Transformer SA and SA and SB Differential N/A

  • See Below SB differential Differential Relay protection S1A and S1B Current Neutral Over N/A 360 A @1.45TD Phase to ground fault Imbalance Current
  • Relay Type BDD 34.5 kV SB (R2) SA (R3)

CT Ratio 80/1 80/1 Range 2.9-8.7 2.9-8.7 Slope 25% 25%

Tap 4.6 4.6 Amp PU 1.38 1.38 Page 6 of 11

ATTACHMENT 7 Oyster Creek Nuclear Generating Station Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" 4.16 kV (R1) (R2)

CT Ratio 600/1 600/1 Tap 8.7 8.7 Amp PU 2.61 2.61 (R1)

CT Ratio 600/1 Tap 8.7 Amp PU 2.61 Existing electrical protective devices are also sufficiently sensitive to detect a phase over current or ground fault. Table 4 also lists ground protection on the ESF buses and the basis for the device setpoints.

NRC Request 2.b. If the ESF buses are not powered by offsite power sources, explain how the surveillance tests are performed to verify that a single-phase open circuit condition or high impedance ground fault condition on an off-site power circuit is detected.

EGC Response to NRC Request 2.b:

OCNGS has two off-site power sources. These power sources are from 34.5 kV Buses A and B located in the OCNGS substation. These two buses are tied together with a breaker and each of the buses is powered by several independent sources. The 34.5 kV buses are connected in a ring configuration. Substation Buses B and A power Startup Transformers SA and SB, respectively. Each of these power sources is independent. In turn, the startup transformers SA and SB power plant non safety 4160 V Buses 1A and 1B, respectively. Buses 1A and 1B power the ESF Buses 1C and 1D, respectively.

Per OCNGS Procedure 681.4.005, "Substation Tour Sheet," the tap positions for all three phases of the voltage regulators for the startup transformers is recorded. The tap positions of the voltage regulators for each transformer must be within two steps of each other. If a single phase was open on either of the two startup transformer supply lines, the tap position for the open phase would be different (i.e., by more than two steps) than the other two phases. If the tap positions are out of position by more than two steps, the acceptance criteria of OCNGS Procedure 681.4.005 is not met and an engineering assessment of the condition is performed.

The substation tour is normally performed on a daily basis (conditions permitting). However when an ESF system is out of service, the Substation Tour is performed every eight (8) hours in accordance with OCNGS Procedure 681.4.004, "Technical Specification Log Sheet."

Page 7 of 11

ATTACHMENT 7 Oyster Creek Nuclear Generating Station Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" NRC Request 2.d: Do the plant operating procedures, including off-normal operating procedures, specifically call for verification of the voltages on all three phases of the ESF buses?

EGC Response to NRC Request 2.d:

OCNGS design does not provide voltage monitoring on the ESF buses; therefore, the plant operating procedures, including operating procedures for off-normal plant conditions, do not call for verification of the voltages on all three phases of the ESF buses. However, if the voltage on any of the three phases goes below the degraded-grid voltage relay setpoint, associated alarms will be received in the Main Control Room. The alarm response procedures for these alarms require operators to check the currents on the primary side of the startup transformers. If the current is zero (0) in one of the phases, the procedure directs operators to trip Breakers 1C and/or 1D to separate the ESF buses from the offsite power sources. This will start the emergency diesels associated with that ESF bus.

Each bus has three (3) single phase potential transformers (i.e., 4200V / 120V). The loss of voltage relays (i.e., 27-1C / 27-1D) monitor the A and B Potential Transformer secondary phases, while the degraded voltage relays monitor all three line-to-Line voltages (i.e.,27-11C /

27-11D) monitor between A and B phases; (i.e.,27-12C / 27-12D) monitor between B and C phases; and (i.e.,27-13C / 27-13D) monitor between A and C phases.

The loss of voltage circuit uses the single loss of voltage relay in series with a 2-out-of-3 logic scheme from the degraded voltage relays with a time delay of three (3) seconds. In addition to the loss of voltage logic, the degraded voltage relay logic circuit is in parallel with the loss of voltage circuit and utilizes 2-out-of-3 logic from time delay relay contacts set for 10 seconds.

Therefore, if the unmonitored phase is lost, then the degraded voltage protective relay scheme will trip the bus in 10 seconds.

See responses to NRC Requests 1.b, 1.c, and 2.e below for further discussion.

Page 8 of 11

ATTACHMENT 7 Oyster Creek Nuclear Generating Station Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Consequences NRC Requests 1.b, 1.c, and 2.e request information regarding the electrical consequences of an event and will be addressed in this section:

NRC Request 1.b: The differences (if any) of the consequences of a loaded (i.e., ESF bus normally aligned to offsite power transformer) or unloaded (e.g., ESF buses normally aligned to unit auxiliary transformer) power source.

EGC Response to NRC Request 1.b:

Installed protective relays were not designed to detect single phase open circuit conditions.

Existing loss of voltage and degraded voltage relays may respond depending on load and possible grounds. In general, there will be no plant response for an unloaded (e.g., ESF buses normally aligned to the UAT) power source in the event of a single-phase open circuit on a credited off-site power circuit because there is insufficient current to detect a single-phase open circuit for this configuration.

The plant response for a loaded power source cannot be calculated without specifying the amount of loading and the specific loads involved.

NRC Request 1.c: If the design does not detect and automatically respond to a single-phase open circuit condition or high impedance ground fault condition on a credited offsite power circuit or another power sources, describe the consequences of such an event and the plant response.

EGC Response to NRC Request 1.c:

A single-phase open condition on an offsite power source will have no effect on OCNGS plant operation.

1. OCNGS did not credit in the CLB that the Class 1E protection scheme for the ESF buses was designed to detect and automatically respond to a single-phase open circuit condition on the credited off-site power source as described in the Updated Final Safety Analysis Report (UFSAR) and Technical Specifications (TS).

The offsite power circuits at the OCNGS consist of two independent circuits from 34.5kV substation buses (i.e., B and A) via startup transformers (i.e., SA and SB) to ESF buses (i.e., 1C and 1D), respectively.

2. Since OCNGS did not credit the ESF bus protection scheme as being capable of detecting and automatically responding to a single phase open circuit condition, an open phase fault was not included in the design criteria for either the loss of voltage, the degraded voltage Page 9 of 11

ATTACHMENT 7 Oyster Creek Nuclear Generating Station Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" relay scheme or secondary level under-voltage protection system design criteria. Since open phase detection was not credited in the OCNGS design or licensing basis, no design basis calculations or design documents exist that previously considered this condition.

3. Without formalized engineering calculations or engineering evaluations, the electrical consequences of such an open phase event, including plant response, can only be evaluated to the extent of what has already been published by the Electric Power Research Institute (EPRI) and Basler; which is a generic overview. The difficulty in applying these documents to the OCNGS specific response is that these are generic assessments and cannot be formally credited as a basis for an accurate response. The primary reason is that detailed plant specific models would need to be developed (e.g., transformer magnetic circuit models, electric distribution models, motor models; including positive, negative, and zero sequence impedances, voltages, and currents), and the models would need to be compiled and analyzed for the OCNGS-specific Class 1E electric distribution system.

4160V ESF Buses 1C and 1D, have two (2) levels of voltage protection. The first level of bus protection is with a loss of voltage protective relay <69% (i.e., 2870V) for three (3) seconds and the second level of bus protection is with the three (3) degraded voltage protective relays

<92.3% (i.e., 3840 +20V,-40V) for 10 + 1 seconds.

Each bus has three (3) single phase potential transformers (i.e., 4200V / 120V). The loss of voltage relays (27-1C / 27-1D) monitor the A and B potential transformer secondary phases, while the degraded voltage relays monitor all three Line-to-Line voltages;27-11C (27-11D) monitor between A and B phases; (i.e.,27-12C / 27-12D) monitor between B and C phases; and (i.e.,27-13C / 27-13D) monitor between A and C phases.

The loss of voltage circuit uses the single loss of voltage relay in series with a two-out-of-three logic scheme from the degraded voltage relays with a time delay of three (3) seconds. In addition to the loss of voltage logic, the degraded voltage logic circuit is in parallel with the loss of voltage circuit and utilizes two-out-of-three logic from time delay relay contacts set for 10 seconds. Therefore, if the unmonitored phase is lost, then the degraded voltage protective relay scheme will trip the bus within 10 + 1 seconds.

OCNGS has implemented the following compensatory measures to minimize the impact should single open phase condition occur in the offsite power source.

All licensed operators were provided training on this issue.

In accordance with OCNGS Procedure 681.4.005, "Substation Tour Sheet", the tap positions for all three phases of the voltage regulators for the startup transformers is recorded. The tap positions of the voltage regulators for each transformer must be within two steps of each other. If a single phase was open on either of the two startup transformer supply lines, the tap position for the open phase would be different (i.e., by more than two steps) than the other two phases. If the tap positions are out of position by more than two steps, the acceptance criteria of OCNGS Procedure 681.4.005 is not met and an engineering assessment of the condition is performed. The substation tour is normally performed on a daily basis, conditions permitting. However when an ESF system is out of Page 10 of 11

ATTACHMENT 7 Oyster Creek Nuclear Generating Station Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" service, the substation tour is performed every eight (8) hours in accordance with OCNGS Procedure 681.4.004, "Technical Specification Log Sheet."

Alarm response procedures for "BUS 1C VOLTS LO" and "BUS 1D VOLTS LO" have been revised to provide guidance to operators for detection and action to separate the ESF buses from the offsite power source, should a loss of a single phase occur.

NRC Request 2.e: If a common or single offsite circuit is used to supply redundant ESF buses, explain why a failure, such as a single-phase open circuit or high impedance ground fault condition, would not adversely affect redundant ESF buses.

EGC Response to NRC Request 2.e:

Not applicable since OCNGS does not use a common or single offsite circuit to supply redundant ESF buses.

Page 11 of 11

ATTACHMENT 8 Peach Bottom Atomic Power Station, Units 2 and 3, 90-Day Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System"

ATTACHMENT 8 Peach Bottom Atomic Power Station, Units 2 and 3 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" High Impedance Grounds:

On January 30, 2012, a porcelain insulator broke in the Byron Station switchyard resulting in parting of the C phase conductor of the offsite source. The insulator was on the offsite source side of the Unit 2 System Auxiliary Transformers (SATs), and the connection parted in such a way as to leave an electrically open end on the source side. The parted connection remained electrically connected on the transformer side, and the loose bus bar conductor end fell to the ground. This ground was a direct result of the broken insulator and not an independent event.

The connected loose bus bar provided a path to ground for the transformer high voltage terminal, but did not result in a ground fault (i.e., neither solid nor impedance) as seen from the source. Since the switchyard (i.e., source side) relaying was electrically isolated from the fault, it did not detect a fault; therefore, did not operate.

The significant event was the opening of a single phase connection; the ground on the high voltage side of the SAT is of lesser significance. Regardless of phase discontinuity, if the ground impedance is low on the source side, and currents are high, the source side protective relaying will operate and open all circuit phases. If the ground impedance is high, and currents low, the relaying may not operate depending on the magnitude of ground impedance; the circuit will continue to supply power.

A qualitative analysis has been performed to assess the impact of single phase high impedance ground faults. The primary objective of the analysis was to determine if a high impedance ground fault could result in an unbalanced voltage condition sufficient to adversely affect energized ESF equipment. The cases analyzed include a single phase high impedance ground fault with all three phases intact and a single phase high impedance ground fault concurrent with the loss of the same phase. These cases have been analyzed for both the high and low voltage sides of the SATs analyzed. 1 provides a summary report of the qualitative analysis; therefore, all information discussed in this response attachment is limited to single-phase open circuit conditions.

System Description

NRC Requests 2, 1.d, 2.a, and 2.c request system information, and will be addressed in this section.

NRC Request No. 2: Briefly describe the operating configuration of the ESF buses (Class 1E for current operating plants or non-Class 1E for passive plants) at power (normal operating condition).

Exelon Generation Company, LLC (EGC) Response to NRC Request No. 2 A simplified single-line diagram of the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3 offsite circuits is shown in Figure 1 below.

Page 1 of 16

ATTACHMENT 8 Peach Bottom Atomic Power Station, Units 2 and 3 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Figure 1: PBAPS Simplified One-Line Diagram The 4kV engineered safety features (ESF) buses are powered only from the dedicated offsite sources, and by procedure cannot be connected to the Main Generator during normal operation.

There are three independent sources of offsite power. One source is an overhead 230kV transmission line which is stepped down to 13kV by the No. 2 startup and emergency auxiliary transformer. The second source is a 230kV overhead transmission line that is stepped down to 13kV by the No. 343 startup transformer. The third source is a 13kV overhead/underground cable from the tertiary winding of the No. 1 autotransformer which connects the 500kV system to the 230kV system transmission lines.

Each offsite source can be used to supply the unit auxiliary buses for plant startup and shutdown and the cooling tower equipment. In addition, each source is stepped down from 13kV to 4kV through an emergency auxiliary transformer, and is connected through interlocked circuit breakers to every 4kV ESF bus. Every 4kV ESF bus is energized from one of these two sources at all times during normal operation. Upon loss of power, automatic transfer is made to Page 2 of 16

ATTACHMENT 8 Peach Bottom Atomic Power Station, Units 2 and 3 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" the second source. If neither offsite source is available, the 4kV ESF buses are supplied from diesel generator units.

NRC Request 1.d: Describe the offsite power transformer (e.g., start-up, reserve, station auxiliary) winding and grounding configurations.

EGC Response to NRC Request 1.d:

The PBAPS offsite power transformer winding and ground configurations including voltage ratings are shown in Table 1 below.

Table 1: Offsite Power Transformer Winding and Grounding Configurations Voltage MVA Size Rating Winding Grounding Transformer (Primary/

Configuration (Cooling Mode) Configuration Secondary)

(kV) 27/36/45 Neutral 2SU Start-Up Delta-wye (OA/FOA/FOA) @ 55ºC 230/13.8 Resistance Transformer 50.4 (FOA) @ 65ºC Grounded 343SU Neutral Start-Up Delta-wye 30/40/50 (OA/FA/FA) @ 65ºC 230/13.8 Resistance Transformer Grounded Neutral 3SU Start-Up 36/45 (OA/FA) @ 55ºC Delta-wye 13.8/13.8 Resistance transformer 50.4 (FA) @ 65ºC Grounded 2 Emergency 10.713/13.392 Neutral Auxiliary Delta-wye (OA/FA) @ 55ºC 13.2/4.16 Resistance Transformer 11.998/15 (OA/FA) @ 65ºC Grounded 3 Emergency 10.713/13.392 Neutral Auxiliary Delta-wye (OA/FA) @ 55ºC 13.2/4.16 Resistance Transformer 11.998/15 (OA/FA) @ 65ºC Grounded Note: The 3SU transformer is an autotransformer.

NRC Request 2.a: Are the ESF buses powered by offsite power sources?

If so, explain what major loads are connected to the buses including their ratings.

EGC Response to NRC Request 2.a:

During normal operation, the ESF buses are always powered by offsite power sources.

Page 3 of 16

ATTACHMENT 8 Peach Bottom Atomic Power Station, Units 2 and 3 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" The PBAPS ESF bus power sources during normal operation are shown in Tables 2 and 3 below.

Table 2: PBAPS ESF Buses That Are Normally Powered from Offsite Sources Original licensing Description of ESF Bus Power ESF Bus Name basis configuration Source (normal operating condition)

(Y/N)

Preferred Offsite Circuit 1 E12, E42, E23, E33 Y Preferred Offsite Circuit 2 E22, E32, E13, E43 Y Table 3: PBAPS ESF Buses That Are Not Normally Powered from Offsite Sources Description of ESF Bus Power ESF Bus Name Original licensing Source (normal operating condition) basis configuration (Y/N)

N/A None Y The major loads fed by the ESF buses are shown in Table 4 below.

Notes:

1. The tables shown are arranged such that the equivalent buses for each unit are shown together. For example, E12 is the Unit 2 4kV bus backed by the E1 emergency diesel generator (EDG), while E13 is the equivalent Unit 3 4kV bus, also backed by the E1 EDG. All buses are 4kV.
2. The emergency service water (ESW) and ESW Booster pumps are common for both units, but only fed by Unit 2 ESF buses Table 4: Major ESF Loads Including Ratings and Status during Normal Power Operations ESF Bus E12 / E13 hp/KVA Unit Major Connected Loads Voltage Rating (V)

Rating 2 "A" Control Rod Drive (CRD) Water Pump 4000 250hp 2/3 "A" Core Spray Pump 4000 600hp 2/3 Transformer to E124 / E134 Load Center (LC) 4160 / 480 1000kVA 2/3 "A" Residual Heat Removal (RHR) Pump 4000 2000hp 2/3 "A" High Pressure Service Water (HPSW) Pump 4000 1000hp 3 Transformer to E13A4 Cooling Tower LC 4160 / 480 500kVA Page 4 of 16

ATTACHMENT 8 Peach Bottom Atomic Power Station, Units 2 and 3 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" ESF Bus E22 / E23 hp/kVA Unit Major Connected Loads Voltage Rating (V)

Rating 2/3 "B" RHR Pump 4000 2000hp 2 "A" Emergency Service Water (ESW) Pump 4000 250hp 2/3 "B" Core Spray Pump 4000 600hp 2/3 Transformer to E224 / E234 LC 4160 / 480 1000kVA 2/3 "B" HPSW Pump 4000 1000hp 2 "A" ESW Booster Pump 4000 250hp 3 "A" CRD Water Pump 4000 250hp 3 Transformer to E23A4 Cooling Tower LC 4160 / 480 500kVA ESF Bus E32 / E33 hp/kVA Unit Major Connected Loads Voltage Rating (V)

Rating 2/3 "C" RHR Pump 4000 2000hp 2/3 "C" Core Spray Pump 4000 600hp 2/3 Transformer to E324 / E334 LC 4160 / 480 1000kVA 2 "B" ESW Pump 4000 250hp 2/3 "C" HPSW Pump 4000 1000hp 2 "B" ESW Booster Pump 4000 250hp 3 "B" CRD Water Pump 4000 250hp ESF Bus E42 / E43 hp/kVA Unit Major Connected Loads Voltage Rating (V)

Rating 2/3 "D" RHR Pump 4000 2000hp 2/3 "D" Core Spray Pump 4000 600hp 2/3 "D" HPSW Pump 4000 1000hp 2 "B" CRD Water Pump 4000 250hp 2/3 Transformer to E424 / E434 Load Center 4160 / 480 1000kVA 3 Emergency Cooling Water Pump 4000 250hp 3 Transformer to E43A4 Cooling Tower LC 4160 / 480 500kVA Page 5 of 16

ATTACHMENT 8 Peach Bottom Atomic Power Station, Units 2 and 3 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" The PBAPS ESF loads that are normally energized are shown in Table 5 below.

Table 5: PBAPS ESF Loads That Are Normally Energized Load ESF Bus 1 of the 2 CRD Water Pumps per Unit Either E12 or E42, AND either E23 or E33 Each 4160/480V Emergency LC E12, E22, E32, E42, E13, E23, E33, E43 Transformer Each 4160/480V Emergency Cooling Tower E13, E23, E43 LC Transformer NRC Request 2.c: Confirm that the operating configuration of the ESF buses is consistent with the current licensing basis.

Describe any changes in offsite power source alignment to the ESF buses from the original plant licensing.

EGC Response to NRC Request 2.c:

The operating configuration of the ESF buses is consistent with the current licensing basis (CLB).

There are three independent sources of offsite power. One source is an overhead 230kV transmission line which is stepped down to 13kV by the No. 2 startup and emergency auxiliary transformer. The second source is a 230kV overhead transmission line that is stepped down to 13kV by the No. 343 startup transformer. The third source is a 13kV overhead/underground cable from the tertiary winding of the No. 1 autotransformer which connects the 500kV system to the 230kV system transmission lines.

Each offsite source can be used to supply the unit auxiliary buses for plant startup and shutdown and the cooling tower equipment. In addition, each source is stepped down from 13kV to 4kV through an emergency auxiliary transformer, and is connected through interlocked circuit breakers to every 4kV ESF bus. Every 4kV ESF bus is energized from one of these two sources at all times during normal operation. Upon loss of power, automatic transfer is made to the second source. If neither offsite source is available, the 4kV ESF buses are supplied from diesel generator units.

Since original plant licensing, the follow change has been made to the offsite power source alignment:

The installation of an additional transformer (i.e., the No. 343 startup transformer) to supply offsite power to the station, as documented under Amendment Nos. 149 and 152, issued October 2, 1989.

Page 6 of 16

ATTACHMENT 8 Peach Bottom Atomic Power Station, Units 2 and 3 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" System Protection NRC Requests 1, 1.a, 2.b, and 2.d request information regarding electrical system protection, and will be addressed in this section.

NRC Request 1: Given the requirements above, describe how the protection scheme for ESF buses (Class 1E for current operating plants or non-Class 1E for passive plants) is designed to detect and automatically respond to a single-phase open circuit condition or high impedance ground fault condition on a credited off-site power circuit or another power sources. Also, include the following information:

EGC Response to NRC Request 1:

Consistent with the CLB and 10 CFR 50, Appendix A, "General Design Criteria for Nuclear Power Plants," Criterion (GDC) 17, "Electric power systems,", existing protective circuitry will separate the ESF buses from a connected failed source due to a loss of voltage or a sustained, balanced degraded grid voltage concurrent with certain design basis accidents. The relay systems were not specifically designed to detect an open single phase of a three phase system, nor a high impedance ground fault. Detection of a single open phase or high impedance ground fault condition is beyond the approved design and licensing basis of the plant.

The PBAPS 4kV undervoltage protection scheme only monitors voltage across the A-B phases.

However, the supply to the 4kV ESF buses is substantially different between PBAPS and Byron Station. Byron Station employs a single wye-wye transformer between the offsite power source and the 4kV ESF buses. PBAPS employs two delta-wye transformers. As such, the impact to the 4kV ESF bus voltages, due to a loss of phase condition in the offsite power source, will be different at PBAPS than at Byron Station. A review of plant drawings, protective relays, calculations, and an analysis was done which determined that a loss of "A" or "C" phases in the offsite power source would be detected by the degraded voltage relays and trip the switchgear off of that feed and transfer it. However, for a loss of "B" phase in the offsite power source, the condition would only bring in a Plant Monitoring System (PMS) alarm, and no automatic trip would occur. As such, PBAPS is susceptible to this design vulnerability identified at Byron Station.

Also of importance is the fact that the 4kV switchgear alignment is different at PBAPS. PBAPS typically aligns two of the four 4kV ESF buses, per unit, to each offsite power source, creating a "split" configuration. As such, on a loss of "B" phase in the offsite power source under normal plant alignment, only two of the four buses per Unit would be impacted, rather than all of the associated 4kV buses per Unit, as was experienced at Byron Station.

Page 7 of 16

ATTACHMENT 8 Peach Bottom Atomic Power Station, Units 2 and 3 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" NRC Request 1.a: The sensitivity of protective devices to detect abnormal operating conditions and the basis for the protective device setpoint(s).

EGC Response to NRC Request 1.a:

Consistent with the CLB and GDC 17, existing electrical protective devices are sufficiently sensitive to detect design basis conditions like a loss of voltage or a degraded voltage, but were not designed to detect a single phase open circuit condition.

Table 6 below summarizes the undervoltage protection for each 4kV bus. The protection is identical for all eight 4kV buses. The voltage for each 4kV bus is monitored at five levels, which can be considered as two different undervoltage functions: one level of loss of voltage and four levels of degraded voltage. The degraded voltage function is monitored by four (i.e., Function 2 through 5) undervoltage relays per source. The loss of voltage is monitored by one (i.e., Function 1) undervoltage relay for each 4kV bus. All relays operate on a one-out-of-one logic.

Table 6: PBAPS Degraded Voltage and Loss of Voltage Relaying for the 4kV ESF Buses Protection Protective Setpoint UV Logic /

Basis for Setpoint Zone Device (Nominal) Time delay Loss of 1040V To actuate upon complete 1 of 1 /

Function 1 Voltage (25% of loss of ESF Bus voltage Instantaneous Relay 4160V) condition 1 of 1 /

Degraded 1.8 seconds Ensures separation from a 2496V source providing voltages that Function 2 Voltage Low nominal (60%) would prevent Class 1E Setting (inverse characteristic) equipment from achieving its safety function, and prevents 1 of 1 / Class 1E equipment from Degraded 30 seconds sustaining damage from 3619V Function 3 Voltage nominal prolonged operation at (87%)

High Setting (inverse reduced voltage characteristic)

Ensure that the ESF buses have sufficient voltage to Degraded 1 of 1 /

3801V support the LOCA load Function 4 Voltage 10 seconds (91.38%) sequencing and maintain LOCA nominal adequate voltage to MCC buses.

Ensure that equipment Degraded 1 of 1 / powered from the ESF buses 4151V Function 5 Voltage 61 seconds are not damaged by degraded (99.78%)

Non-LOCA nominal voltage during non-LOCA conditions.

Page 8 of 16

ATTACHMENT 8 Peach Bottom Atomic Power Station, Units 2 and 3 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" The remainder of the relays between the PBAPS 4kV ESF buses and switchyard are shown in Table 7 below. The 4kV ESF protection (i.e, phase / ground overcurrent and differential) as well as the emergency auxiliary transformer protection (i.e., phase / ground overcurrent and differential) is identical for each respective bus / transformer, and therefore the settings are only listed once. The protection for each start-up transformer and associated switchgear, however, varies from source to source, and was therefore listed separately.

Table 7: Additional Protective Relaying Time Delay (Based On Protection Protective Setpoint 400% Pickup Additional Notes Zone Device (Nominal) Unless or Comments Otherwise Noted) 4kV ESF 124V Differential Instantaneous buses 191A 4kV ESF Phase O/C 1400 A 75 Cycles buses 4kV ESF Ground O/C 100 A 50 Cycles buses Main Unit:

274 A (pri) 905 A (sec)

Emergency Instantaneous Auxiliary Differential Inst. Unit:

Transformers 7296 A (pri) 24140 A (sec) 40% slope -

Emergency Ground O/C Auxiliary 120 A 95 Cycles (neutral)

Transformers Emergency Ground O/C Auxiliary 17 A Instantaneous (Pri)

Transformers Emergency 960 A 45 Cycles Auxiliary Phase O/C (Pri)

Transformers 8000 A Instantaneous Line Between 2100 A Transformer is 343SU (phase) approximately one Transformer Differential Instantaneous 240 A mile from and (ground) switchgear Switchgear Page 9 of 16

ATTACHMENT 8 Peach Bottom Atomic Power Station, Units 2 and 3 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Time Delay (Based On Protection Protective Setpoint 400% Pickup Additional Notes Zone Device (Nominal) Unless or Comments Otherwise Noted)

Main Unit:

57.6 A (pri) 905 A (sec) 343SU Instantaneous Differential Inst. Unit:

Transformer 1536 A (pri) 24140 A (sec) 40% slope -

343SU 240 A 80 Cycles Phase O/C (pri)

Transformer 1020 A Instantaneous 343SU Ground O/C 60 A 5 Cycles Transformer (pri) 343SU Ground O/C 480 A 100 Cycles Transformer (neutral)

Protects the 58.5 Hz 343SU source in 343SU Underfrequency 6 Cycles the scenario where Transformer (sec) (VA-B) Muddy Run is islanded 343SU Phase O/C 3600 A 65 Cycles Transformer (sec) 343SU Ground O/C 300 A 90 Cycles Transformer (sec)

Main unit:

57.6 A (pri) 2SU 905 A (sec)

Transformer Instantaneous Differential Inst. Unit:

and Switchgear 1536 A (pri) 24140 A (sec) 40% slope -

2SU Ground O/C 400A 115 Cycles Transformer (neutral)

Page 10 of 16

ATTACHMENT 8 Peach Bottom Atomic Power Station, Units 2 and 3 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Time Delay (Based On Protection Protective Setpoint 400% Pickup Additional Notes Zone Device (Nominal) Unless or Comments Otherwise Noted)

Zero Seq. 30.4% VA-C 2SU 9-11 Sec @

overvoltage Transformer (70kV) 67% (102.7kv)

(pri) 2SU Undervoltage 47.8% VA-B 5 Sec @ 0 V Transformer (pri) (110kV)

Note: The 2SU source primary undervoltage relay senses the voltage across the "A" and "B" phases. This relay will detect an open phase condition on either the "A" or "B" phase on the high side of the 2SU source, and trip the source, which would cause a transfer of the 4kV ESF buses being fed from 2SU to the other aligned offsite source.

2SU 1200A Instantaneous Phase O/C (pri)

Transformer 180 A 150 Cycles 2SU Ground O/C 90 A 25 Cycles Transformer (pri) 75V Pickup Voltage produced Differential 87L Min fault 3SU by differentially current to trip Instantaneous Switchgear connected CT's

= 71.5 A Differential 87H 1200 A 75V Pickup Min fault Voltage produced Cross-Tie Differential 87L by differentially Between 3SU current to trip Instantaneous

= 38 A connected CT's and 343SU Differential 87H 800 A Cross-Tie Between 3SU Phase O/C 2000 A 135 Cycles and 343SU Cross-Tie Between 3SU Ground O/C 240 A 70 Cycles and 343SU Line between Pilot wire Phase: Transformer is Instantaneous 3SU 4 A (both) approximately one Page 11 of 16

ATTACHMENT 8 Peach Bottom Atomic Power Station, Units 2 and 3 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Time Delay (Based On Protection Protective Setpoint 400% Pickup Additional Notes Zone Device (Nominal) Unless or Comments Otherwise Noted)

Transformer Ground: mile from and switchgear 0.5 A (both)

Switchgear Phase:

6 A (both)

Arms the pilot wire Fault detector Ground: Instantaneous scheme 2 A (swgr) 1 A (trans)

Main Unit:

905 A (pri and sec) 3SU Instantaneous Differential Inst. Unit:

Transformer 24140 A (pri and sec) 40% slope -

3SU Ground O/C 480 A 100 Cycles Transformer (neutral) 3SU Phase Current 1800 A 12 Cycles At 10 Protects the Transformer Balance 120% Slope Amps exciting winding 3SU 3600 A 65 Cycles Phase O/C (pri)

Transformer 15600 A Instantaneous 3SU Ground O/C 300 A 90 Cycles Transformer (pri)

NRC Request 2.b. If the ESF buses are not powered by offsite power sources, explain how the surveillance tests are performed to verify that a single-phase open circuit condition or high impedance ground fault condition on an off-site power circuit is detected.

EGC Response to NRC Request 2.b:

Not applicable - the ESF buses at PBAPS are powered by the offsite power sources.

Page 12 of 16

ATTACHMENT 8 Peach Bottom Atomic Power Station, Units 2 and 3 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" NRC Request 2.d: Do the plant operating procedures, including off-normal operating procedures, specifically call for verification of the voltages on all three phases of the ESF buses?

EGC Response to NRC Request 2.d:

Yes. The PBAPS plant operating procedure entered by Operations upon a receipt of a plant monitoring system (PMS) alarm that will actuate during a loss of phase event, specifically calls for verification of each phase-to-phase voltage for the offsite source upon receipt of the alarm.

Page 13 of 16

ATTACHMENT 8 Peach Bottom Atomic Power Station, Units 2 and 3 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Consequences NRC Requests 1.b, 1.c, and 2.e request information regarding the electrical consequences of an event, and will be addressed in this section.

NRC Request 1.b: The differences (if any) of the consequences of a loaded (i.e., ESF bus normally aligned to offsite power transformer) or unloaded (e.g., ESF buses normally aligned to unit auxiliary transformer) power source.

EGC Response to NRC Request 1.b:

Installed relays were not designed to detect single phase open circuit or high impedance ground fault conditions. Existing loss of voltage and degraded voltage relays may respond depending on loading conditions and possible grounds.

Voltage profiles (e.g., magnitude and phase relationship) on the load side of the open phase will vary depending on plant load, such as heavy loading compared to light loading, as well as whether a ground is present or not. A formal calculation is currently under development to determine precise voltages under various different loading scenarios.

NRC Request 1.c: If the design does not detect and automatically respond to a single-phase open circuit condition or high impedance ground fault condition on a credited offsite power circuit or another power sources, describe the consequences of such an event and the plant response.

EGC Response to NRC Request 1.c:

PBAPS does not credit in the CLB that the Class 1E protection scheme (i.e., for the ESF buses) was designed to detect and automatically respond to a single-phase open circuit condition, nor a high impedance fault condition, on the credited offsite power source as described in the Updated Safety Analysis Report (UFSAR) and Technical Specifications (TS).

Since PBAPS did not credit the ESF bus protection scheme as being capable of detecting and automatically responding to a single phase open circuit condition, an open phase fault was not included in the design criteria for either the loss of voltage, or the degraded voltage relay schemes or design criteria. Open phase detection was not credited in the PBAPS design or licensing basis; therefore, no design basis calculations or design documents exist that previously considered this condition.

Without formalized engineering calculations or engineering evaluations, the electrical consequences of such an open phase event, including plant response, can only be evaluated to the extent of what has already been published by the Electric Power Research Institute (EPRI)

Page 14 of 16

ATTACHMENT 8 Peach Bottom Atomic Power Station, Units 2 and 3 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" and Basler; which is a generic overview. The difficulty in applying these documents to the PBAPS specific response is that these are generic assessments and cannot be formally credited as a basis for an accurate response. The primary reason is that detailed plant specific models would need to be developed (e.g., transformer magnetic circuit models, electric distribution models, motor models; including positive, negative, and zero sequence impedances, voltage, and currents), and the models would need to be compiled and analyzed for the PBAPS specific Class 1E electric distribution system.

If a similar event occurred, the possibility exists that operating loads would trip or starting loads would not reach rated speed and voltage. Additionally, a PMS alarm will be received in the Main Control Room. Upon receipt of this alarm, Operations enters a procedure which would aid in diagnosing the condition, including voltage checks of all three phases for the offsite sources.

At this point, Operations would transfer the 4kV ESF buses being fed by the offsite source experiencing an open phase onto the other aligned offsite source.

PBAPS has implemented interim enhancement actions to minimize the impact should the open phase event occur. These measures include those listed below:

Distributed a required reading package to all licensed operators Enhanced Operations procedure that is entered upon receipt of the PMS alarm, including aligning plant voltmeters to ensure all phases are monitored.

Analyses are being performed for each startup source to evaluate options available to resolve the undesirable plant impacts due to an open phase or high impedance fault condition. The preliminary results of these analyses are that an electro-mechanical relaying solution will not provide both protection from an open phase and prevent nuisance offsite source trips. Based on these results, a vendor has been contracted to develop an algorithm for a digital relay solution that can provide both protection against an open phase condition, and security from undesired trips of the offsite sources.

Page 15 of 16

ATTACHMENT 8 Peach Bottom Atomic Power Station, Units 2 and 3 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" NRC Request 2.e: If a common or single offsite circuit is used to supply redundant ESF buses, explain why a failure, such as a single-phase open circuit or high impedance ground fault condition, would not adversely affect redundant ESF buses.

EGC Response to NRC Request 2.e:

PBAPS requires three of the four 4kV ESF buses in order to ensure safe shutdown of the plant.

Due to the lineup of the offsite sources, an open phase or high impedance ground fault condition that does not result in a trip of the offsite source could result in two of the four 4kV ESF buses not being able to perform their design function.

Consistent with the CLB and GDC 17, protective circuitry will separate the ESF buses from a failed source due to a loss of voltage or a sustained balanced degraded grid voltage concurrent with certain design basis accidents. The failure of a single-phase open circuit is beyond the approved design and licensing basis of the plant. Calculations for each offsite source are currently under development.

In the interim, other enhancement actions were incorporated, including:

Revision of the Operations procedure used when the 13.8kV PMS alarm is received to better diagnose an open phase condition. This included steps to verify voltage on all three phases.

A required reading on the event was given to all Operators. This reading provided background on the event, the differences between Byron Station and PBAPS, the expected plant response to a similar condition at PBAPS, and the required actions by PBAPS operators.

Page 16 of 16

ATTACHMENT 9 Quad Cities Nuclear Power Station, Units 1 and 2, 90-Day Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System"

ATTACHMENT 9 Quad Cities Nuclear Power Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" High Impedance Grounds:

On January 30, 2012, a porcelain insulator broke in the Byron Station switchyard resulting in parting of the C phase conductor of the offsite source. The insulator was on the offsite source side of the Unit 2 System Auxiliary Transformers (SATs), and the connection parted in such a way as to leave an electrically open end on the source side. The parted connection remained electrically connected on the transformer side, and the loose bus bar conductor end fell to the ground. This ground was a direct result of the broken insulator and not an independent event.

The connected loose bus bar provided a path to ground for the transformer high voltage terminal, but did not result in a ground fault (i.e., neither solid nor impedance) as seen from the source. Since the switchyard (i.e., source side) relaying was electrically isolated from the fault, it did not detect a fault; therefore, did not operate.

The significant event was the opening of a single phase connection; the ground on the high voltage side of the SAT is of lesser significance. Regardless of phase discontinuity, if the ground impedance is low on the source side, and currents are high, the source side protective relaying will operate and open all circuit phases. If the ground impedance is high, and currents low, the relaying may not operate depending on the magnitude of ground impedance; the circuit will continue to supply power.

A qualitative analysis has been performed to assess the impact of single phase high impedance ground faults. The primary objective of the analysis was to determine if a high impedance ground fault could result in an unbalanced voltage condition sufficient to adversely affect energized ESF equipment. The cases analyzed include a single phase high impedance ground fault with all three phases intact and a single phase high impedance ground fault concurrent with the loss of the same phase. These cases have been analyzed for both the high and low voltage sides of the SATs analyzed. 1 provides a summary report of the qualitative analysis; therefore, all information discussed in this response attachment is limited to single-phase open circuit conditions.

System Description

NRC Requests 2, 1.d, 2.a, and 2.c request system information, and will be addressed in this section.

NRC Request No. 2: Briefly describe the operating configuration of the ESF buses (Class 1E for current operating plants or non-Class 1E for passive plants) at power (normal operating condition).

Exelon Generation Company, LLC (EGC) Response to NRC Request No. 2 The electrical distribution system for Quad Cities Nuclear Power Station (QCNPS), Units 1 and 2 is a split-bus configuration, consisting of two divisions of 4.16kV buses. During normal operation, one division (i.e., both safety and non-safety) is fed from the Reserve Auxiliary Page 1 of 11

ATTACHMENT 9 Quad Cities Nuclear Power Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Transformer (RAT) connected to the 345kV switchyard. The other division is normally fed from the Unit Auxiliary Transformer (UAT).

A simplified one-line diagram of the QCNPS electrical distribution system is shown in Figure 1 below.

Figure 1: QCNPS Simplified One-Line Diagram Page 2 of 11

ATTACHMENT 9 Quad Cities Nuclear Power Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" NRC Request 1.d: Describe the offsite power transformer (e.g., start-up, reserve, station auxiliary) winding and grounding configurations.

EGC Response to NRC Request 1.d:

The QCNPS offsite power transformer winding and grounding configurations are shown in Table 1 below.

Table 1: Offsite Power Transformer Winding and Grounding Configurations Voltage Winding MVA Size Rating Grounding Transformer Configuration (Cooling Mode) (Primary/ Configuration Secondary)

Neutral H - 37.5/50/62.5 MVA Wye-Wye-Wye (3 Grounded (ONAN/ONAF/ONAF)@65°C Leg) with Low-side 345kV - Primary, Y - 18.75/25/31.25 MVA RAT 12 Delta Tertiary 4.28kV - Neutral (ONAN/ONAF/ONAF)@65°C Stabilizing 4.28kV Resistive X - 18.75/25/31.25 MVA Windings Grounded (ONAN/ONAF/ONAF)@65°C Secondary Neutral H - 37.5/50/62.5 MVA Wye-Wye-Wye (3 Grounded (ONAN/ONAF/ONAF)@65°C Leg) with Low-side 345kV - Primary, Y - 18.75/25/31.25 MVA RAT 22 Delta Tertiary 4.28kV - Neutral (ONAN/ONAF/ONAF)@65°C Stabilizing 4.28kV Resistive X - 18.75/25/31.25 MVA Windings Grounded (ONAN/ONAF/ONAF)@65°C Secondary NRC Request 2.a: Are the ESF buses powered by offsite power sources?

If so, explain what major loads are connected to the buses including their ratings.

EGC Response to NRC Request 2.a:

For at power (i.e., normal operating condition) configurations, 1 of 2 divisions of engineered safety features (ESF) buses are powered by offsite sources. Additionally, several non-safety-related loads are fed by the same offsite power sources.

Page 3 of 11

ATTACHMENT 9 Quad Cities Nuclear Power Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" The power sources for the QCNPS ESF buses during normal power operations are shown in Tables 2 and 3 below.

Table 2: QCNPS ESF Buses That Are Normally Powered from Offsite Sources Original licensing basis Description of ESF Bus ESF Bus Name configuration Power Source (normal operating condition)

(Y/N)

RAT 12 4kV Bus 13 Y RAT 12 via 4kV Bus 13 4kV Bus 13-1 Y RAT 22 4kV Bus 23 Y RAT 22 via 4kV Bus 23 4kV Bus 23-1 Y Table 3: QCNPS ESF Buses That Are Not Normally Powered from Offsite Sources Original licensing basis Description of ESF Bus ESF Bus Name configuration Power Source (normal operating condition)

(Y/N)

UAT 11 4kV Bus 14 Y UAT 11 via 4kV Bus 14 4kV Bus 14-1 Y UAT 21 4kV Bus 24 Y UAT 21 via 4kV Bus 24 4kV Bus 24-1 Y The major QCNPS ESF bus loads that are energized during normal power operations, including their ratings, are shown in Table 4 below.

Table 4: Major ESF Loads That Are Energized during Normal Power Operations Normally Voltage Rating ESF Bus Energized Load Quantity/ Description Level (hp/kVA)

(Y/N) (V) 4160V Bus 13(23) Y 2-Circulating Water Pump 4000 1750hp 2-Condensate and 4160V Bus 13(23) Y 4000 1750hp Condensate Booster Pump 4160V Bus 13(23) Y 1-Service Water Pump 4000 1000hp 2-Residual Heat Remove 4160V Bus 13(23) N System (RHRS) Service 4000 900hp Water Pump 1-Control Rod Drive Feed 4160V Bus 13(23) Y* 4000 250hp Pump 4160V Bus 13(23) Y 1-480V Transformer 15(25) 4160:480 1500kVA 4160V Bus 13(23) Y 1-480V Transformer 1A(2A) 4160:480 750kVA Page 4 of 11

ATTACHMENT 9 Quad Cities Nuclear Power Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Normally Voltage Rating ESF Bus Energized Load Quantity/ Description Level (hp/kVA)

(Y/N) (V) 4160V Bus 13-1(23-1) N 1-Core Spray Pump 4000 800hp 4160V Bus 13-1(23-1) N 2- RHRS Pump 4000 600hp 4160V Bus 13-1(23-1) Y 1-480-V Transformer 18(28) 4160:480 1500kVA 1-480V Transformer at 4160V Bus 13-1 Y 4160:480 500kVA Pump House (Unit 1 only) 4160V Bus 13-1(23-1) Y 1-480-V Transformer 10(20) 4160:480 500kVA

  • Only energized non-coincident with another division.

NRC Request 2.c: Confirm that the operating configuration of the ESF buses is consistent with the current licensing basis.

Describe any changes in offsite power source alignment to the ESF buses from the original plant licensing.

EGC Response to NRC Request 2.c:

The following at power (i.e., normal operating condition) configurations have been confirmed to be consistent with the current licensing basis (CLB):

1. Unit 1 Offsite Power Circuit #1 - Power to ESF buses via 345kV switchyard (RAT 12)
2. Unit 2 Offsite Power Circuit #1 - Power to ESF buses via 345kV switchyard (RAT 22)

The following additional configurations have been confirmed to be consistent with the CLB, although not used during normal operation:

1. Unit 1 Offsite Power Circuit #2 - Power to ESF Buses via 345kV switchyard (RAT 22) and 4kV bus cross-ties.
2. Unit 2 Offsite Power Circuit #2 - Power to ESF Buses via 345kV switchyard (RAT 12) and 4kV bus cross-ties.
3. Additional Unit 1 Offsite Power Circuit- Power to ESF buses from 345kV Switchyard when the main generator is off-line via backfeed ( UAT 11 and Main Power Transformer (MPT) 1)
4. Additional Unit 2 Offsite Power Circuit- Power to ESF buses from 345kV Switchyard when the main generator is off-line via backfeed ( UAT 11 and MPT 2)

The backfeed sources (i.e., items 3 and 4) listed above were not originally part of the plant licensing and is only used during station refueling outages.

Page 5 of 11

ATTACHMENT 9 Quad Cities Nuclear Power Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" System Protection NRC Requests 1, 1.a, 2.b, and 2.d request information regarding electrical system protection and will be addressed in this section:

NRC Request 1: Given the requirements above, describe how the protection scheme for ESF buses (Class 1E for current operating plants or non-Class 1E for passive plants) is designed to detect and automatically respond to a single-phase open circuit condition or high impedance ground fault condition on a credited off-site power circuit or another power sources. Also, include the following information:

EGC Response to NRC Request 1:

Consistent with the CLB and 10 CFR 50, Appendix A, "General Design Criteria for Nuclear Power Plants," Criterion (GDC) 17, "Electric power systems," existing protective circuitry will separate the ESF buses from a connected failed offsite source due to a loss of voltage or a sustained, balanced degraded grid voltage concurrent with certain design basis accidents. The relay systems were not specifically designed to detect an open single phase of a three phase system. Detection of a single-open phase condition is beyond the approved design and licensing basis of the plant.

NRC Request 1.a: The sensitivity of protective devices to detect abnormal operating conditions and the basis for the protective device setpoint(s).

EGC Response to NRC Request 1.a:

Consistent with the CLB and GDC 17, existing electrical protective devices are sufficiently sensitive to detect design basis conditions like a loss of voltage or a degraded voltage, but were not designed to detect a single phase open circuit condition. The QCNPS undervoltage protective devices, their setpoints, and the basis for the setpoint(s) are shown in Table 5 below.

Table 5: Protective Devices Protection UV Setpoint Protective Device Basis for Setpoint Zone Logic (Nominal)

Actuates upon fault 67A at 345kV within protection zone. Provides high RAT 12(22) Differential Protection N/A 5023A at 4.16kV speed protection of 25% slope the transformer windings.

Page 6 of 11

ATTACHMENT 9 Quad Cities Nuclear Power Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Protection UV Setpoint Protective Device Basis for Setpoint Zone Logic (Nominal)

Actuates upon ground fault in X Winding Neutral protection zone.

RAT 12(22) N/A 360A@4TD Ground Detection Provides backup protection for transformer windings.

Actuates upon ground fault in Y Winding Neutral protection zone.

RAT 12(22) N/A 480A@2.7TD Ground Detection Provides backup protection for transformer windings.

RAT 12(22) Actuate upon low X Winding 3455V@0.2TD and 4.16kV 2 of 2 voltage at RAT Undervoltage (83% of 4160V)

ESF Bus Winding RAT 12(22) Actuate upon low Y Winding 3455V@0.2TD and 4.16kV 2 of 2 voltage at RAT Undervoltage (83% of 4160V)

Bus Winding Actuates upon fault within protection X Winding Ground zone. Provides high RAT 12(22) N/A 200A@3.0TD Differential speed protection of the transformer windings.

Actuates upon fault within protection Y Winding Ground zone. Provides high RAT 12(22) N/A 400A@2.5TD Differential speed protection of the transformer windings.

Actuates upon fault downstream of device. Provides H Winding Phase RAT 12(22) N/A 161.7A@2.25TD backup protection in Overcurrent the event a downstream device does not actuate.

2929.5V@1.0TD Actuates upon 4.16kV ESF Loss of Voltage 2 of 2 complete loss of ESF Buses (70% of 4160V) Bus voltage.

Page 7 of 11

ATTACHMENT 9 Quad Cities Nuclear Power Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Protection UV Setpoint Protective Device Basis for Setpoint Zone Logic (Nominal)

Actuates upon 4.16kV ESF Second Level 3906V@5TD degraded voltage 2 of 2 Buses Undervoltage (94% of 4160V) provided to the ESF Bus.

Alarms upon A-B or 4.16kV ESF Second Level 3906V@5TD B-C degraded 1 of 2 Buses Undervoltage (94% of 4160V) voltage provided to the ESF Bus Protection for 4.16kV ESF Main/Reserve Feed N/A 4800A@3.5TD multiphase faults on Bus 13(23) Phase Overcurrent station buses.

Protection for phase 4.16kV ESF Main/Reserve Feed N/A 240A@3.5TD to ground faults on Bus 13(23) Ground Fault station buses.

4.16kV ESF Provides high-speed Bus 13(23)

Differential Protection N/A 240A protection of bus and 13-feeds.

1(23-1)

Protection for 4.16kV ESF Main/Reserve Feed N/A 4800A@3.5TD multiphase faults on Bus 14(24) Phase Overcurrent station buses.

Protection for phase 4.16kV ESF Main/Reserve Feed N/A 240A@3.5TD to ground faults on Bus 14(24) Ground Fault station buses.

4.16kV ESF Provides high-speed Bus 14(24)

Differential Protection N/A 240A protection of bus and 14-feeds.

1(24-1) 4.16kV ESF Protection for Main/Reserve Feed Bus 13- N/A 1920A@3.5TD multiphase faults on Phase Overcurrent 1(23-1) station buses.

4.16kV ESF Protection for phase Main/Reserve Feed Bus 13- N/A 120A@3.0TD to ground faults on Ground Fault 1(23-1) station buses.

4.16kV ESF Protection for Main/Reserve Feed Bus 14- N/A 1920A@3.5TD multiphase faults on Phase Overcurrent 1(24-1) station buses.

Page 8 of 11

ATTACHMENT 9 Quad Cities Nuclear Power Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Protection UV Setpoint Protective Device Basis for Setpoint Zone Logic (Nominal) 4.16kV ESF Protection for phase Main/Reserve Feed Bus 14- N/A 120A@3TD to ground faults on Ground Fault 1(24-1) station buses.

Existing electrical protective devices are also sufficiently sensitive to detect a ground fault.

Table 5 lists ground protection/alarms on the ESF buses and the basis for the device setpoint(s).

NRC Request 2.b. If the ESF buses are not powered by offsite power sources, explain how the surveillance tests are performed to verify that a single-phase open circuit condition or high impedance ground fault condition on an off-site power circuit is detected.

EGC Response to NRC Request 2.b:

Not Applicable - one division of ESF buses at Quad Cities Station is powered by offsite power sources. The other division is fed from the UAT and Main Generator through non-segregated bus bar (on-site source). However, operator walkdowns of the offsite power sources are conducted on a regular basis which would detect an open phase or high impedance ground condition.

NRC Request 2.d: Do the plant operating procedures, including off-normal operating procedures, specifically call for verification of the voltages on all three phases of the ESF buses?

EGC Response to NRC Request 2.d:

The current plant operating procedures, including operator rounds and operating procedures for off-normal conditions, specifically call for verification of the voltages on all three phases of the ESF buses. The plant operating procedures provide clear operator direction to address a potential single open phase event. This enhances station operators ability to promptly diagnose and respond to single-phase open circuit conditions on off-site power supplies to Class 1E ESF buses.

Page 9 of 11

ATTACHMENT 9 Quad Cities Nuclear Power Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Consequences NRC Requests 1.b, 1.c, and 2.e request information regarding the electrical consequences of an event, and will be addressed in this section.

NRC Request 1.b: The differences (if any) of the consequences of a loaded (i.e., ESF bus normally aligned to offsite power transformer) or unloaded (e.g., ESF buses normally aligned to unit auxiliary transformer) power source.

EGC Response to NRC Request 1.b:

Installed relays were not designed to detect single phase open circuit conditions. Existing loss of voltage and degraded voltage relays may respond depending on load and possible grounds.

In general, there will be no plant response for an unloaded (e.g., ESF buses normally aligned to unit auxiliary transformer) power source in the event of a single-phase open circuit on a credited off-site power circuit because there is insufficient current to detect a single-phase open circuit for this configuration.

The plant response for a loaded power source cannot be calculated without specifying the amount of loading and the specific loads involved.

NRC Request 1.c: If the design does not detect and automatically respond to a single-phase open circuit condition or high impedance ground fault condition on a credited offsite power circuit or another power sources, describe the consequences of such an event and the plant response.

EGC Response to NRC Request 1.c:

1. Quad Cities Station did not credit in the CLB that the Class 1E protection scheme for the ESF buses was designed to detect and automatically respond to a single-phase open circuit condition on the credited off-site power source as described in the Updated Final Safety Analysis Report (UFSAR) and Technical Specifications.

The offsite power circuits at the QCNPS consist of two independent circuits from the 345kV switchyard to the ESF Buses.

2. Since Quad Cities Station did not credit the ESF bus protection scheme as being capable of detecting and automatically responding to a single phase open circuit condition, an open phase fault was not included in the design criteria for either the loss of voltage, the degraded voltage relay or second level undervoltage protection system design criteria. Since open phase detection was not credited in the QCNPS design or licensing basis, no design basis calculations or design documents exist that considered this condition.

Page 10 of 11

ATTACHMENT 9 Quad Cities Nuclear Power Station, Units 1 and 2 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System"

3. Without formalized engineering calculations or engineering evaluations, the electrical consequences of such an open phase event (including plant response), can only be evaluated to the extent of what has already been published by the Electric Power Research Institute (EPRI) and Basler; which is a generic overview. The difficulty in applying these documents to the QCNPS-specific response is that these are generic assessments and cannot be formally credited as a basis for an accurate response. The primary reason is that detailed plant specific models would need to be developed (e.g., transformer magnetic circuit models, electric distribution models, motor models; including positive, negative, and zero sequence impedances (i.e., voltage and currents),

and the models would need to be compiled and analyzed for the QCNPS specific Class 1E electric distribution system..

The loss of voltage and degraded voltage relaying scheme is capable of responding to degraded grid conditions as described in applicable NRC guidelines and remains operable.

However, the loss of voltage and degraded voltage relaying scheme are not capable of detecting an unbalanced voltage due to a single phase condition and automatically disconnecting the offsite source in all cases. If a similar event occurred, the possibility exists that operating loads would trip or starting loads would not reach to rated speed and voltage.

Quad Cities Station has implemented several interim compensatory measures to minimize the impact should the open phase event occur. These measures include:

Modification of plant voltage alarms to annunciate during such an event Alignment of plant voltmeters to ensure all phases are monitored Preparation of required reading packages for operators for enhanced awareness Enhancement of alarm / annunciator response procedures NRC Request 2.e: If a common or single offsite circuit is used to supply redundant ESF buses, explain why a failure, such as a single-phase open circuit or high impedance ground fault condition, would not adversely affect redundant ESF buses.

EGC Response to NRC Request 2.e:

Consistent with the CLB and GDC 17, protective circuitry will separate the ESF buses from a failed offsite source due to a loss of voltage or a sustained balanced degraded grid voltage concurrent with certain design basis accidents. The relay systems were not specifically designed to detect an open single phase of a three phase system. Detection of a single-open phase circuit is beyond the approved design and licensing basis of the plant.

QCNPS has reviewed the vulnerability for impact on plant operability using the Operability Evaluation process. QCNPS has implemented several interim compensatory measures including several procedure revisions, such as annunciator response and surveillance procedures, as needed in response to the Byron Station event. These procedures now provide effective controls to promptly diagnose and mitigate a singe-phase event. Operators have been trained to check voltages, currents, and other control room alarms in order to diagnose and respond to a single-phase open circuit event.

Page 11 of 11

ATTACHMENT 10 Three Mile Island Nuclear Station, Unit 1, 90-Day Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System"

ATTACHMENT 10 Three Mile Island Nuclear Station, Unit 1 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" High Impedance Grounds:

On January 30, 2012, a porcelain insulator broke in the Byron Station switchyard resulting in parting of the C phase conductor of the offsite source. The insulator was on the offsite source side of the Unit 2 System Auxiliary Transformers (SATs), and the connection parted in such a way as to leave an electrically open end on the source side. The parted connection remained electrically connected on the transformer side, and the loose bus bar conductor end fell to the ground. This ground was a direct result of the broken insulator and not an independent event.

The connected loose bus bar provided a path to ground for the transformer high voltage terminal, but did not result in a ground fault (i.e., neither solid nor impedance) as seen from the source. Since the switchyard (i.e., source side) relaying was electrically isolated from the fault, it did not detect a fault; therefore, did not operate.

The significant event was the opening of a single phase connection; the ground on the high voltage side of the SAT is of lesser significance. Regardless of phase discontinuity, if the ground impedance is low on the source side, and currents are high, the source side protective relaying will operate and open all circuit phases. If the ground impedance is high, and currents low, the relaying may not operate depending on the magnitude of ground impedance; the circuit will continue to supply power.

A qualitative analysis has been performed to assess the impact of single phase high impedance ground faults. The primary objective of the analysis was to determine if a high impedance ground fault could result in an unbalanced voltage condition sufficient to adversely affect energized ESF equipment. The cases analyzed include a single phase high impedance ground fault with all three phases intact and a single phase high impedance ground fault concurrent with the loss of the same phase. These cases have been analyzed for both the high and low voltage sides of the SATs analyzed. 1 provides a summary report of the qualitative analysis; therefore, all information discussed in this response attachment is limited to single-phase open circuit conditions.

System Description

NRC Requests 2, 1.d, 2.a, and 2.c request system information and will be addressed in this section:

NRC Request No. 2: Briefly describe the operating configuration of the ESF buses (Class 1E for current operating plants or non-Class 1E for passive plants) at power (normal operating condition).

Exelon Generation Company, LLC (EGC) Response to NRC Request No. 2 Three Mile Island Nuclear Station, Unit 1 (TMI-1) has two Station Auxiliary Transformers (SATs) connected to two 230kV buses. TMIs switchyard buses are designated as the 4 and 8 Bus, and are both fed by the 1091, 1092, and 1051 lines from Met Eds 230kV grid, and through an autotransformer from the PJM 500kV grid. The 1A Auxiliary Transformer is lined up to Bus 8, Page 1 of 11

ATTACHMENT 10 Three Mile Island Nuclear Station, Unit 1 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" and the 1B Auxiliary Transformer is lined up to Bus 4. There are two 4160V vital switchgear engineered safeguards features (ESF) buses which are each fed by one of the auxiliary transformers. Each transformer also feeds a 6900V switchgear that feeds two Reactor Coolant Pumps. Two 4160V balance of plant (BOP) Switchgear are fed from the 1A Auxiliary Transformer, and one 4160V BOP Switchgear is fed from the 1B Auxiliary Transformer. Each auxiliary transformer is capable of carrying all the loads. If one of the auxiliary transformers loses power, the BOP 4160V and 6900V switchgear are transferred to the energized auxiliary transformer, and the associated emergency diesel will start and supply power to the 4160V ESF switchgear associated with the de-energized transformer.

A simplified one-line diagram is shown in Figure 1 below.

Page 2 of 11

ATTACHMENT 10 Three Mile Island Nuclear Station, Unit 1 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Figure 1: TMI-1 Simplified One-Line Diagram Page 3 of 11

ATTACHMENT 10 Three Mile Island Nuclear Station, Unit 1 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" NRC Request 1.d: Describe the offsite power transformer (e.g., start-up, reserve, station auxiliary) winding and grounding configurations.

EGC Response to NRC Request 1.d:

Both auxiliary transformers are identical. They are Y:Y-Delta () configuration. The primary is 230kV Y with grounded neutral, and a secondary with a 4160V Y with neutral 4ohm ()

resistance to ground and a 6900V ungrounded . These transformers have a load tap changer (LTC) that maintains the 4160V voltages on the associated 4160V ESF buses between 4162V and 4218V.

The TMI-1 offsite power transformer winding and grounding configurations are shown in Table 1 below.

Table 1: TMI-1 Offsite Power Transformer Winding and Grounding Configurations Voltage Grounding Winding MVA Size Rating Transformer Configuratio Configuration (AO/FA/FA) (Primary/

n Secondary)

Y - primary neutral 1A Auxiliary grounded, Transformer Y - 4160V with LTC 230kV-39/52/65 MVA @ 65C 230kV to secondary controlling Y:Y- 6800V-21/28/35 MVA @ 65C 4160/6900V Neutral 4ohm voltage on 4160V-18/24/30 @ 65C resistance the 4160kV Grounded; ESF bus 6900 ungrounded Y - primary neutral 1B Auxiliary grounded, Transformer 230kV-39/52/65 MVA @ 65C Y - 4160V with LTC 230kV to secondary controlling Y:Y- 6900V-21/28/35 MVA @ 65C 4160/6900V Neutral 4ohm voltage on 4160V-18/24/30 @ 65C resistance the 4160kV Grounded; ESF bus 6900 ungrounded Page 4 of 11

ATTACHMENT 10 Three Mile Island Nuclear Station, Unit 1 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" NRC Request 2.a: Are the ESF buses powered by offsite power sources?

If so, explain what major loads are connected to the buses including their ratings.

EGC Response to NRC Request 2.a:

The two 4160V ESF buses at TMI-1 are continuously powered by offsite power sources during normal power operations. They are not connected to the output of the Main Generator, but each ESF bus has a 3000kW emergency diesel generator as a backup.

The power sources for the TMI-1 ESF buses during normal power operations are shown in Tables 2 and 3 below.

Table 2: TMI-1 ESF Buses That Are Normally Powered from Offsite Sources Original licensing Description of ESF Bus ESF Bus Name basis configuration Power Source (normal operating condition)

(Y/N) 1A Auxiliary Transformer 1E 4160V Switchgear Y 1E 4160V Switchgear 1S 480V ESF Bus Y 1E 4160V Switchgear 1T 480V ESF Bus Y 1B Auxiliary Transformer 1D 4160V Switchgear Y 1D 4160V Switchgear 1P 480V ESF Bus Y 1D 4160V Switchgear 1R 480V ESF bus Y Table 3: TMI-1 ESF Buses That Are Not Normally Powered from Offsite Sources Original licensing Description of ESF Bus ESF Bus Name basis configuration Power Source (normal operating condition)

(Y/N)

N/A The TMI-1 ESF bus major loads energized during normal power operations, including their ratings, are shown in Table 4 below.

Page 5 of 11

ATTACHMENT 10 Three Mile Island Nuclear Station, Unit 1 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Table 4: Major ESF Loads Including Ratings and Status during Normal Power Operations 4160V ESF Bus Load Voltage Level (V) Rating (kW) 1D 4160V *MU-P-1B 4160 588 1P 480V ESF 4160 1020 1R 480V ESF 4160 452 1N 480V (Non-ESF) 4160 476 1E 4160V 1S-480V-ES 4160 1043

  • MU-P-1B can be aligned to either the 1D or 1E 4160V Switchgear; however, it is normally aligned to the 1E 4160V Switchgear.

1C 480V ESF bus can be aligned to either the 1S or 1P-480V-ES; however it is normally aligned to the 1S-480V-ES Switchgear.

Either AH-C-4A or 4B is normally operating.

NRC Request 2.c: Confirm that the operating configuration of the ESF buses is consistent with the current licensing basis.

Describe any changes in offsite power source alignment to the ESF buses from the original plant licensing.

EGC Response to NRC Request 2.c:

The offsite power circuits at the TMI-1 switchyard consist of four independent circuits from the 230kV grid to Bus 4 and Bus 8 and are both fed by the 1091, 1092, and 1051 lines from Met Eds 230kV grid, and through an autotransformer from the PJM 500kV grid. Each of these buses is aligned to an Auxiliary Transformer that then provides power to one of the two ESF 4160V buses.

The design and operation of the electrical system is consistent with the current licensing basis (CLB) in accordance with the TMI-1 Updated Final Safety Analysis Report (UFSAR),

Section 8.1, "Design Bases," UFSAR Section 8.2.2.2, "Auxiliary Transformers," and Technical Specification (TS) 3.07, "Unit Electric Power System."

The TMI-1 at-power (i.e., normal operating condition) configurations have been confirmed to be consistent with the CLB and no changes regarding the alignment of the ESF buses have been made since initial plant licensing.

Page 6 of 11

ATTACHMENT 10 Three Mile Island Nuclear Station, Unit 1 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" System Protection NRC Requests 1, 1.a, 2.b, and 2.d request information regarding electrical system protection, and will be addressed in this section.

NRC Request 1: Given the requirements above, describe how the protection scheme for ESF buses (Class 1E for current operating plants or non-Class 1E for passive plants) is designed to detect and automatically respond to a single-phase open circuit condition or high impedance ground fault condition on a credited off-site power circuit or another power sources. Also, include the following information:

EGC Response to NRC Request 1:

Consistent with the CLB and 10 CFR 50, Appendix A, "General Design Criteria for Nuclear Power Plants," Criterion (GDC) 17, "Electric power systems," existing protective circuitry will separate the ESF buses from a connected failed offsite source due to a loss of voltage or a sustained, balanced degraded grid voltage concurrent with certain design basis accidents. The relay systems were not specifically designed to detect an open single phase of a three phase system. Detection of a single-open phase condition is beyond the approved design and licensing basis of the plant based on an analysis of the above configuration, there may be potential design vulnerability in the TMI-1 protective relaying scheme for protection from an open phase condition.

NRC Request 1.a: The sensitivity of protective devices to detect abnormal operating conditions and the basis for the protective device setpoint(s).

EGC Response to NRC Request 1.a:

Consistent with the CLB and GDC 17, existing electrical protective devices are sufficiently sensitive to detect design basis conditions like a loss of voltage or a degraded voltage, but were not designed to detect a single phase open circuit condition. The TMI-1 undervoltage protective devices and the basis for the device setpoint(s) are shown in Table 5 below.

Page 7 of 11

ATTACHMENT 10 Three Mile Island Nuclear Station, Unit 1 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Table 5: TMI-1 Protective Devices Protection UV Setpoint Protective Device Basis for Setpoint Zone Logic (Nominal) 2413V To actuate upon complete Loss of Voltage 4kV ESF 2 of 3 (58% of loss of ESF Bus voltage Relay 4160V) condition in 1.5 seconds 3760V To actuate upon degraded 4kV ESF Degraded Grid 2 of 3 (90.4% of grid condition with a 10 4160V) second time delay 1A/1B 230kV Neutral Actuates on a 230kV neutral Auxiliary 1 of 1 120 amps Ground Relays ground overcurrent Transformer 1A/1B Actuates on Aux Transformer 4160V Neutral Auxiliary 1 of 1 220 amps 4160V neutral ground Ground Relays Transformer overcurrent 1D/1E ESF 4160V ESF Neutral Actuates on 4160V ESF Bus 4160V 1 of 1 120 amps Ground Relays neutral ground overcurrent SWGR Actuates on differential between 230kV input to Aux 1A/1B Auxiliary Transformer and the 6900V Auxiliary Transformer 1 of 1 Slope 30%

bus and the 4160V bus Transformer Differential Relays associated with the transformer.

The relays operate for a through fault not cleared by a 1A/1B 230 kV Backup 200 amps @

downstream breaker, and are Auxiliary Phase Overcurrent 1 of 1 4.0 seconds set based on the through fault Transformer Protection TD protection curve for the transformer.

Existing electrical protective devices are also sufficiently sensitive to detect a ground fault. As shown in Table 5, ground protection is listed for the ESF buses along with the basis for the device setpoints.

Page 8 of 11

ATTACHMENT 10 Three Mile Island Nuclear Station, Unit 1 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" NRC Request 2.b. If the ESF buses are not powered by offsite power sources, explain how the surveillance tests are performed to verify that a single-phase open circuit condition or high impedance ground fault condition on an off-site power circuit is detected.

EGC Response to NRC Request 2.b:

Not Applicable - the ESF buses at TMI-1 are powered by offsite power sources.

NRC Request 2.d: Do the plant operating procedures, including off-normal operating procedures, specifically call for verification of the voltages on all three phases of the ESF buses?

EGC Response to NRC Request 2.d:

The current plant operating procedures, including operating procedures for off-normal alignments, specifically call for verification of the voltages on all three phases of the ESF buses.

Page 9 of 11

ATTACHMENT 10 Three Mile Island Nuclear Station, Unit 1 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Consequences NRC Requests 1.b, 1.c, and 2.e request information regarding the electrical consequences of an event, and will be addressed in this section.

NRC Request 1.b: The differences (if any) of the consequences of a loaded (i.e., ESF bus normally aligned to offsite power transformer) or unloaded (e.g., ESF buses normally aligned to unit auxiliary transformer) power source.

EGC Response to NRC Request 1.b:

Installed relays were not designed to detect single phase open circuit conditions. Existing loss of voltage and degraded voltage relays may respond depending on load and possible grounds.

In general, there will be no plant response for an unloaded (e.g., ESF buses normally aligned to unit auxiliary transformer) power source in the event of a single-phase open circuit on a credited off-site power circuit because there is insufficient current to detect a single-phase open circuit for this configuration. The plant response for a loaded power source cannot be calculated without specifying the amount of loading and the specific loads involved.

NRC Request 1.c: If the design does not detect and automatically respond to a single-phase open circuit condition or high impedance ground fault condition on a credited offsite power circuit or another power sources, describe the consequences of such an event and the plant response.

EGC Response to NRC Request 1.c:

1. TMI-1 did not credit in the CLB that the Class 1E protection scheme for the ESF buses was designed to detect and automatically respond to a single-phase open circuit condition on the credited off-site power source as described in the UFSAR and TS.

The offsite power circuits at the TMI-1 switchyard consists of four independent circuits from the 230kV grid to Bus 4 and Bus 8. Each of these buses is aligned to an Auxiliary Transformer that then provides power to one of the two ESF 4160V buses.

2. Since TMI-1 did not credit the ESF bus protection scheme as being capable of detecting and automatically responding to a single phase open circuit condition, an open phase fault was not included in the design criteria for either the loss of voltage, the degraded voltage relay scheme or secondary level undervoltage protection system design criteria. Since open phase detection was not credited in the TMI-1 design or licensing basis, no design basis calculations or design documents exist that considered this condition.
3. Without formalized engineering calculations or engineering evaluations, the electrical consequences of such an open phase event, including plant response, can only be evaluated to the extent of what has already been published by the Electric Power Research Page 10 of 11

ATTACHMENT 10 Three Mile Island Nuclear Station, Unit 1 Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System" Institute (EPRI) and Basler; which is a generic overview. The difficulty in applying these documents to the TMI-1 specific response is that these are generic assessments and cannot be formally credited as a basis for an accurate response. The primary reason is that detailed plant specific models would need to be developed (e.g., transformer magnetic circuit models, electric distribution models, motor models; including positive, negative, and zero sequence impedances, voltage, and currents), and the models would need to be compiled and analyzed for the TMI-1 specific Class 1E electric distribution system.

The Byron Station event was reviewed by TMI-1 Engineering for applicability. The TMI-1 degraded voltage relaying schemes are capable of responding to a degraded grid condition as described in TMI-1s UFSAR section 8.2.1.2.f. The TMI-1 degraded grid and dead bus relaying schemes monitor the phase to neutral voltages of all three phases. The 4kV distribution system design at TMI-1 is different from that of Byron Station because TMI-1 has two independent offsite sources which provide power to the appropriate 4kV safeguard buses through the 1A and 1B Auxiliary Transformers, whereas Byron Station aligns both of their 4kV safeguard buses to one offsite source. Also, the TMI-1 4kV safeguard bus configuration is redundant to prevent a total loss of 4kV safeguard loads by means of divisions (i.e., A and B trains). A loss of phase on one offsite source would affect only one train of safeguard busses. The 4kV degraded grid protective relay schemes at TMI-1 is a two-out-of-three logic for each 4kV safeguard bus, which uses a Y-Y potential transformer configuration to monitor degraded voltage condition on all three phases. This is different from the Byron Station design of two-out-of-two logic with two independent relays monitoring the line "A" to "B" phases and the line "B" to "C" phases.

Specific measures implemented at TMI-1 as interim compensatory measures include the following: Operators are instructed to check the incoming currents to the Auxiliary Transformers for an alarm on Main Control Room Annunciator Window B-3-1, which indicates a low voltage on the 4160V ESF bus. This activates when a low voltage or degraded grid voltage relay activates. Follow-on actions if the loss is confirmed are to isolate the 4160V ESF bus from the Auxiliary Transformer and feed it from the associated emergency diesel as required by TSs. Alarm from annunciator AA-3-2 will provide additional indication to the Operators of a low voltage condition. This alarms for a low voltage on the 6900V bus. All operators have been briefed on these procedure revisions for awareness.

NRC Request 2.e: If a common or single offsite circuit is used to supply redundant ESF buses, explain why a failure, such as a single-phase open circuit or high impedance ground fault condition, would not adversely affect redundant ESF buses.

EGC Response to NRC Request 2.e:

Not applicable since TMI-1 does not use a common or single offsite circuit to supply redundant ESF buses.

Page 11 of 11

ATTACHMENT 11 Exelon Generation Company, LLC's Evaluation of the Effects of High Impedance Ground Faults

ATTACHMENT 11 Exelon Generation Company, LLC's Evaluation of the Effects of High Impedance Ground Faults

1. INTRODUCTION On January 30, 2012, Byron Station, Unit 2 experienced a single open phase in the off-site power circuit that resulted in a reactor trip and loss of off-site power due to the failure of an insulator. The protection schemes associated with detecting the degraded off-site source and faulted lines failed to detect the condition.

NRC Bulletin 2012-01 was issued to document questions the NRC had related to the plant response to this event. The NRC clarified that a single phase high impedance ground be discussed in the bulletin response. Two cases should be discussed: 1) A single phase high impedance ground with all three phases intact, and 2) A single phase high impedance fault concurrent with the loss (i.e. open) of the same phase. The cases should be performed for both high and low voltage side of the transformers.

The following discussion provides a summary report of the qualitative analysis performed for the two cases identified above at the Exelon Generation Company, LLC (EGC) stations. Specifically, the objectives of the study cover the following:

High impedance ground with all three phases intact on the high voltage (HV) side of the System Auxiliary Transformer (SAT)

High impedance ground with all three phases intact on the low voltage (LV) side of the SAT High impedance ground with a concurrent open on the same phase on the HV side of the SAT, and High impedance ground on the LV side of the SAT with a concurrent open on the same phase on the HV side of the SAT.

2. METHODOLOGY The engineered safety features (ESF) motors connected to the LV side of the SAT are either connected in DELTA or ungrounded WYE. Therefore, these motors have an infinite zero sequence impedance. These ESF motors will not draw any zero sequence current. As a result, zero sequence voltage resulting from system unbalance across the motor terminals will not impact the motor performance. The effect of unbalanced voltages on polyphase induction motors is equivalent to the introduction of a negative sequence voltage having a rotation opposite to that occurring with balanced voltages (Reference 4.2).

A system unbalance will also generate negative sequence voltage that will impact the motor performance. It is a well known fact that a small percentage of negative sequence voltage will result in a relatively larger current unbalance due to the low negative sequence impedance of the ESF motors. The relative effect is essentially double frequency current in the rotor. Consequently, the temperature rise of the motor operating at a particular load and voltage unbalance will be greater compared to the motor operating under the same conditions with balanced voltages.

Motor performances are not affected when operated under a voltage unbalance of 1% or Page 1 of 5

ATTACHMENT 11 Exelon Generation Company, LLC's Evaluation of the Effects of High Impedance Ground Faults less (Reference 4.2). This can be verified using Figure 20-2 (Reference 4.2), where the derating factor for motors with a 1% voltage unbalance is almost 1.00 (i.e., their performance is not affected). Therefore, for voltage unbalance more than 1%, the motors may either stall and/or trip on an over-current protection scheme of the motor.

This analysis therefore uses a 1% voltage unbalance to obtain the limiting impedance for the high impedance ground fault.

The following steps will be used to perform a qualitative analysis of the four cases described in Section 1 above.

Case1: High impedance ground with all three phases intact on the HV side of the SAT

a. Determine the magnitude of unbalanced voltage that will not impact the performance of the ESF loads (motors) connected to the LV side of the SAT.
b. Determine the minimum value of impedance on a line to ground fault that will generate the unbalanced voltage that does not impact the motor performance.
c. Determine the ground fault current that will flow due to the fault impedance from a line to ground determined in Step b.
d. Determine if any of the existing relays used in the protection scheme will trip and isolate the high impedance ground fault.
e. If the existing protection scheme will not trip, then, determine the minimum fault impedance value of a line to ground fault that will be detected by EGCs protection scheme.
f. Determine the unbalanced voltages that will result at the motor terminals for the minimum fault impedance value (i.e., Step e above) on a line to ground fault.
g. Evaluate the capability of the ESF motors to withstand the amount of unbalance that will not be detected by the existing protection scheme for a high impedance ground fault.
h. Determine if any of the protective devices for the loads (e.g., motors) would trip under above conditions.

Case 2: High impedance ground with all three phases intact on the LV side of the SAT:

a. Determine the minimum high impedance ground fault that will be detected by the existing relays used in the protection scheme.
b. Determine the unbalanced voltage that will result at the ESF motor terminals for the impedance slightly above the impedance determined in Step a above.
c. Evaluate the capability of the ESF motors to withstand the amount of unbalance determined in Step b.
d. Determine if any of the protective devices for the loads (e.g., motors) would trip under above conditions.

Page 2 of 5

ATTACHMENT 11 Exelon Generation Company, LLC's Evaluation of the Effects of High Impedance Ground Faults Case 3: High impedance ground with a concurrent open on the same phase on the HV side of the SAT:

a. Determine the unbalanced voltage that will result at the motor terminals as a function of the high impedance ground fault.
b. Determine the minimum value of impedance on a line to ground fault, which will not be detected by EGCs protection scheme.
c. Evaluate the capability of the motors to withstand the amount of unbalance that will not be detected by the existing protection scheme for a high impedance ground fault.
d. Determine if any of the protective devices for the loads (motors) would trip under above conditions.

Case 4: High impedance ground on the LV side of the SAT with a concurrent open on the same phase on the HV side of the SAT:

a. Determine the unbalanced voltage that will result at the motor terminals as a function of the high impedance ground fault.
b. Determine the minimum value of impedance on a line to ground fault, which will not be detected by the EGC protection scheme.
c. Evaluate the capability of the motors to withstand the amount of unbalance that will not be detected by the existing protection scheme for a high impedance ground fault.
d. Determine if any of the protective devices for the loads (e.g., motors) would trip under above conditions.
3.

SUMMARY

AND CONCLUSIONS This report performed a qualitative analysis for the following conditions:

1) A single phase high impedance ground with all three phases intact, and
2) A single phase high impedance fault concurrent with the loss (i.e., open) of the same phase.

Specifically, the following cases were studied:

Case 1: High impedance ground with all three phases intact on the HV side of the SAT Case 2: High impedance ground with all three phases intact on the LV side of the SAT Case 3: High impedance ground with a concurrent open on the same phase on the HV side of the SAT Case 4: High impedance ground on the LV side of the SAT with a concurrent open on the same phase on the HV side of the SAT The analysis concludes the following for Braidwood Station, Byron Station, Clinton Power Station, Dresden Nuclear Power Station, LaSalle County Station, Limerick Page 3 of 5

ATTACHMENT 11 Exelon Generation Company, LLC's Evaluation of the Effects of High Impedance Ground Faults Generating Station, Oyster Creek Nuclear Generating Station, Peach Bottom Atomic Power Station, Quad Cities Nuclear Power Station, and Three Mile Island Nuclear Station:

Case 1: High impedance ground on HV side with all the three phases intact on HV side The existing protection schemes on the auxiliary transformers (i.e.,

SAT/Reserve Auxiliary Transformer (RAT)/Emergency Reserve Auxiliary Transformer (ERAT)/Startup Transformer (SUT)) will detect and isolate the high impedance ground fault. For a high impedance fault limited to the HV terminals of the auxiliary transformers, the existing protection schemes would prevent the connected ESF motors on the LV side from operating at more than 1% voltage unbalance. Therefore, the performance on the connected ESF motors would not be impacted.

The existing protection scheme on the HV bus (i.e. switchyard side) is also available to provide protection for both bolted and high impedance ground faults on the HV bus. These relays are designed to operate for both phase and ground faults on the HV bus. For high impedance ground faults on one phase of the HV bus, these relays are expected to trip to limit the negative sequence voltage within acceptable levels across the connected ESF motors. In addition, due to the switchyard design configurations and high voltage nature of the system, a high impedance to ground fault is not expected to be credible due to the grounding grid in the switchyard. In the unlikely event this scenario occurs, it is expected to become a "dead bolt fault," which would then be detected and isolated by existing protection schemes.

Case 2: High impedance ground on the LV side with all the three phases intact on HV side The existing protection schemes would detect and isolate the high impedance ground fault. The connected ESF motors on the LV side would not experience more than 1% voltage unbalance. The performance on the connected ESF motors would not be impacted and the over-current protection for these motors would not actuate to trip these motors.

Case 3: High impedance ground with a concurrent open on the same phase on the HV side of the auxiliary transformer The existing protection schemes on the HV side of the transformer may not detect and isolate the high impedance ground fault. However, the degraded voltage relays on the LV side may detect the open phase condition based on the loading of the transformer and the high impedance to ground. A substantial amount of negative sequence voltage would be present based Page 4 of 5

ATTACHMENT 11 Exelon Generation Company, LLC's Evaluation of the Effects of High Impedance Ground Faults on the high impedance to ground fault and load on the auxiliary transformer at the ESF buses. This may potentially damage the motors. These motors may stall and/or ultimately trip on over-current protection. Efforts are underway to resolve the open phase vulnerability at all EGC Nuclear operating stations. These solutions are at varying states of completion at each site. Interim compensatory actions have been taken to address the vulnerabilities where appropriate as discussed in Attachments 1 through 10.

Case 4: High impedance ground on the LV side of the auxiliary transformer with a concurrent open on the same phase on the HV side of the auxiliary transformer The existing protection schemes on the HV side of the transformer may not detect and isolate the high impedance ground. However, the degraded voltage relays on the LV side may detect the open phase condition based on the loading of the transformer and the high impedance to ground. The 51N relay on the LV side would see fault current but the magnitude of the fault current would depend on the load on the LV side and high impedance ground fault. Therefore, the tripping of this relay would be dependent on several factors. A substantial amount of negative sequence voltage may be present based on the auxiliary transformer load at the ESF buses. This has the potential to degrade and derate the motors. These motors may stall and/or ultimately trip on over-current protection. Efforts are underway to resolve the open phase vulnerability at all EGC Nuclear operating stations.

These solutions are at varying states of completion at each site. Interim compensatory actions have been taken to address the vulnerabilities where appropriate as discussed in Attachments 1 through 10.

4. REFERENCES 4.1 Power System Analysis by Arthur R. Bergen, Prentice Hall, ISBN 0 687864-4, Pages 403 thru 420.

4.2 NEMA MG 1-2011, Section 20.24, Figure 20-2.

Page 5 of 5