Ltr. 10/22/12 Braidwood 2013 CDBI Schedule Change
ML12296A891
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 10/22/2012
From: Ann Marie Stone
NRC/RGN-II/DRS/EB2
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
Benny Jose
References
Download: ML12296A891 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 October 22, 2012 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

INSPECTION DATE CHANGE FOR THE 2013 COMPONENT DESIGN BASES INSPECTION FOR THE BRAIDWOOD STATION, UNITS 1 AND 2

Dear Mr. Pacilio:

This letter confirms our plans to change the schedule of Components Design Bases Inspection (CDBI) for 2013 at your Braidwood Station, which was conveyed to you in our Mid-Cycle Assessment Letter dated September 4, 2012. The reason for the change is to accommodate a scheduling conflict associated with inspections at the Clinton Power Station.

Per discussion with Murtaza Abbas, Senior Regulatory Specialist for the Braidwood Station, on October 15, 2012, the new dates for on-site inspections were acceptable. The new on-site inspection weeks will be the weeks of July 29, August 12 and August 26, 2013.

Sincerely,

/RA/

Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 cc: Distribution via ListServ'

Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

INSPECTION DATE CHANGE FOR THE 2013 COMPONENT DESIGN BASES INSPECTION FOR THE BRAIDWOOD STATION, UNITS 1 AND 2

Dear Mr. Pacilio:

This letter confirms our plans to change the schedule of Components Design Bases Inspection (CDBI) for 2013 at your Braidwood Station, which was conveyed to you in our Mid-Cycle Assessment Letter dated September 4, 2012. The reason for the change is to accommodate a scheduling conflict associated with inspections at the Clinton Power Station.

Per discussion with Murtaza Abbas, Senior Regulatory Specialist for the Braidwood Station, on October 15, 2012, the new dates for on-site inspections were acceptable. The new on-site inspection weeks will be the weeks of July 29, August 12, and August 26, 2013.

Sincerely,

/RA/

Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 cc: Distribution via ListServ' DISTRIBUTION:

See next page DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr 102212 BRW 2013 CDBI Schedule Change.docx G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME AMStone for BJose:ls AMStone DATE 10/22/12 10/22/12 OFFICIAL RECORD COPY

Letter to Mr. Michael Pacilio from Ms. Ann Marie Stone dated October 22, 2012.

SUBJECT:

INSPECTION DATE CHANGE FOR THE 2013 COMPONENT DESIGN BASES INSPECTION FOR THE BRAIDWOOD STATION, UNITS 1 AND 2 DISTRIBUTION:

Cayetano Santos RidsNrrDorlLpl3-2 Resource RidsNrrPMBraidwood Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker DRPIII DRSIII Christine Lipa Carole Ariano Linda Linn Patricia Buckley Tammy Tomczak