ML12275A237
From kanterella
Jump to navigation
Jump to search
ML12275A237 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs |
Issue date: | 09/18/2012 |
From: | Calvert Cliffs, Constellation Energy Nuclear Group, EDF Group |
To: | Office of Nuclear Material Safety and Safeguards |
References | |
Download: ML12275A237 (1) | |
Similar Documents at Calvert Cliffs | |
---|---|
Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML21278A2832021-09-0707 September 2021
[Table view]2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.18, Fuel Handling Incident ML21278A2602021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 13, Section 13.4, Post-Refueling Startup Event ML21278A2692021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.9, Loss-of-Coolant Flow Event ML21278A3042021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 16, Table 16.1, Aging Management Programs (Amp), Indexed by LRA Section and System ML22115A0432021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 02, Section 2.2, Population and Land Use_Redacted ML22115A0462021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 9, Figures 9.1 Through 9.30_Redacted ML21278A3022021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 16, Section 16.5, References ML21278A2932021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.22, Waste Gas Incident ML21278A2962021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 16, Section 16.4, 10 CFR 54.67(B) Update ML21278A3032021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 16, Section 16.3, Evaluation of Time-Limited Aging Analyses ML22115A0472021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10A Figure 10A.1-1, Main Steam System: Redacted ML21278A2852021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.21, Deleted ML21278A2872021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.15, Steam Generator Tube Rupture Event ML21278A2912021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.26, Feedline Break Event ML21278A2552021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.1, Organization and Methodology ML21278A2762021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations, Table of Contents ML21278A2802021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 15, Table of Contents ML21278A2842021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.16, Seized Rotor Event ML21278A2922021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.23, Waste Processing System Incident ML21278A2712021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.7, Excess Feedwater Heat Removal Event ML21278A2742021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.12, Asymmetric Steam Generator Event ML21278A2672021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.10, Loss-Of-Non-Emergency AC Power ML21278A2622021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 12, Figures, Deleted ML21278A2642021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.6, Loss of Feedwater Flow Event ML21278A2682021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.8, Reactor Coolant System Depressurization ML21278A2752021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.2, Control Element Assembly Withdrawal Event ML21278A2612021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.14, Steam Line Break Event ML21278A2772021-09-0707 September 2021 2 to Final Safety Analysis Report, Chapter 14, Safety Analysis, Table of Contents ML21278A2532021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.5, Loss of Load Event ML21278A2522021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 11, Section 11.3, Radiation Safety ML22115A0482021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 11, Figures: Redacted ML21278A2892021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.24, Maximum Hypothetical Accident ML21278A2572021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 13, Initial Tests and Operation, Table of Contents ML21278A2662021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 13, Section 13.0, Initial Tests and Operation ML21278A2992021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 16, Section 16.1, Introduction ML22115A0422021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 1, Figures: Redacted ML21278A2822021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14 Section 14.25, Excessive Charging Event ML21278A2862021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Figures 14.2.1 Through 14.26-10 ML21278A2702021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 12, Section 12.5, Review and Audit of Operations ML21278A2542021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.11, Control Element Assembly Drop Event ML21278A2562021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 12, Section 12.6, Emergency Planning ML21278A2722021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.13, Control Element Assembly Ejection ML22115A0442021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 2, Section 2.10, Other Design Considerations: Redacted ML21278A2942021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.19, Turbine-Generator Overspeed Incident ML21278A2982021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 16, Section 16.2, Aging Management Programs and Activities ML22115A0452021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 5, Section 5.6, Other Structures - Redacted ML21278A2882021-09-0707 September 2021 2 to Updated Safety Analysis Report, Chapter 14, Section 14.20, Containment Response ML21278A2782021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.4, Excess Load Event ML21278A2812021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 15, Section 15.0, Technical Requirements Manual ML21278A2902021-09-0707 September 2021 2 to Final Safety Analysis Report, Chapter 14 ,Section 14.17, Loss-of-Coolant Accident 2021-09-07 Category:Graphics incl Charts and Tables MONTHYEARML21278A2862021-09-0707 September 2021
[Table view]2 to Updated Final Safety Analysis Report, Chapter 14, Figures 14.2.1 Through 14.26-10 ML21278A3042021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 16, Table 16.1, Aging Management Programs (Amp), Indexed by LRA Section and System NMP1L3339, R. E. Ginna Station - Constellation Energy Group, LLC: Notification of Change in Indirect Ownership2020-04-24024 April 2020 R. E. Ginna Station - Constellation Energy Group, LLC: Notification of Change in Indirect Ownership ML18036A1882018-01-31031 January 2018 GSl-191 Commitment Changes ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML14307B7072014-12-10010 December 2014 Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-T ML12275A2352012-09-18018 September 2012 Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21 - Figure 2.4-3, Generalized Time Frequency Curve. ML12275A2372012-09-18018 September 2012 Independent Spent Fuel Storage Installation, Undated Safety Analysis Report, Revision 21 - Figure 2.4-5 ML12275A2432012-09-18018 September 2012 Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21 - Figure 2.5-5A, Grain Size Distribution. ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 ML0930206472009-10-23023 October 2009 Supplemental Response to Generic Letter 2004-02 ML0916717822009-06-12012 June 2009 Final Table Showing Numbers of Adult Tiger Beetles within Sections of the Shoreline at Calvert Cliffs Sites ML0836500592008-12-29029 December 2008 Response to Request for Additional Information Dated October 15, 2008 - Measurement Uncertainty Recapture Power Uprate ML0835801432008-12-23023 December 2008 Appendix F Construction Emissions and Air Impacts and Calculations ML0834605612008-12-11011 December 2008 Attachment (1) - Evaluation of Acid Production by Beta Dose ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists ML0524404152005-03-0808 March 2005 Attachment 3 and 4 (Tubesheet Map and the List of Tubes with Indications, Respectively) ML0412001052004-04-0606 April 2004 Emergency Action Level Criteria 2021-09-07 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML12275A237&oldid=1393462"