ML11311A322

From kanterella
Jump to navigation Jump to search
Ltr. 11/4/11 Point Beach Nuclear Plant Confirmation of Operator License Exam
ML11311A322
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/04/2011
From: Hironori Peterson
Operations Branch III
To: Meyer L
Point Beach
loretta.sellers@nrc.gov
References
Download: ML11311A322 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 November 4, 2011 Mr. Larry Meyer Site Vice President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241

SUBJECT:

CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS:

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2

Dear Mr. Meyer:

We have received your letter, NRC 2011-0062, dated June 20, 2011. In that letter, you requested a rescheduling of the 2014 initial operator licensing examination dates. Additionally, you requested an initial operator licensing examination be scheduled for August of 2016.

In response, we have scheduled an initial operator licensing examination for the week of August 15, 2016, at the Point Beach Nuclear Plant with an on-site validation scheduled for the week of July 25, 2016.

We note that you previously were scheduled for an initial operator licensing examination for November 2014. Per your request, we have rescheduled this exam to the weeks of July 14 and 21, 2014, with an on-site validation scheduled for the week of June 23, 2014.

In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately upon discovery of that need. Because your letter indicated that there were more than nine applicants being considered for the 2014 examination, the 2014 examination was each scheduled for two weeks. Please inform us if the number of applicants decline below ten for any examination as this will impact the examination schedule. Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.

A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiners name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the training program.

L. Meyer In accordance with 10 CFR 2.930 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRCs Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 cc: Distribution via ListServ'

L. Meyer In accordance with 10 CFR 2.930 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRCs Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 cc: Distribution via ListServ' DISTRIBUTION:

Amy Snyder RidsNrrDorlLpl3-1 Resource RidsNrrPMPointBeach RidsNrrDirsIrib Resource Cynthia Pederson Jennifer Uhle Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource Document Name: G:\DRSIII\DRS\Work in Progress\Ltr 110411 PtBeach Units 1 and 2 Exam 2011.docx 9 Publicly Available 9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII N NAME RKWalton:ls HPeterson DATE 10/31/11 11/04/11 OFFICIAL RECORD COPY