|
---|
Category:General FR Notice Comment Letter
MONTHYEARML24141A2812024-02-27027 February 2024 Comment (5) E-mail Regarding North Anna Suppl Dseis ML24054A0912024-02-22022 February 2024 Comment (4) E-mail Regarding North Anna Suppl Dseis ML24052A3672024-02-21021 February 2024 Comment (3) E-mail Regarding North Anna Suppl Dseis ML24052A3122024-02-20020 February 2024 Comment (7) of Ari Sandler on Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Units 1 and 2 ML24052A2592024-02-16016 February 2024 Comment (2) E-mail Regarding North Anna Suppl Dseis ML24045A0072024-02-14014 February 2024 Comment (6) of Anonymous on North Anna Power Station SLR Draft EIS ML24045A0062024-02-13013 February 2024 Comment (5) of Bettina Rayfield on Virginia Electric and Power Company; North Anna Power Station Units 1 and 2; Draft Environmental Impact Statement ML24045A0042024-02-0606 February 2024 Comment (3) of Aviv Goldsmith on Virginia Electric and Power Company; North Anna Power Station Units 1 and 2; Draft Environmental Impact Statement ML24045A0052024-02-0606 February 2024 Comment (4) of Aviv Goldsmith on Virginia Electric and Power Company; North Anna Power Station Units 1 and 2; Draft Environmental Impact Statement ML22350A0622022-12-15015 December 2022 Comment (1) of Harmon Curran on Notice of Intent to Conduct Scoping Process and Prepare Supplement to Draft Environmental Impact Statement Virginia Electric and Power Company North Anna Power, Units 1 and 2 ML22339A2412022-11-21021 November 2022 Comment (1) E-mail Regarding North Anna Suppl Scoping ML21298A1412021-10-14014 October 2021 Comment (12) E-mail Regarding North Anna SLR Draft SEIS ML21285A3082021-10-12012 October 2021 Comment (10) E-mail Regarding North Anna SLR Draft SEIS ML21286A7492021-10-12012 October 2021 Comment (12) of Leo J Schefer on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML21286A7502021-10-12012 October 2021 Comment (13) of Danielle Schefer on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML21285A3232021-10-12012 October 2021 Comment (11) E-mail Regarding North Anna SLR Draft SEIS ML21286A7482021-10-12012 October 2021 Comment (11) of Denise Schefer on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML21286A7472021-10-12012 October 2021 Comment (10) on Alex Schefer on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML21286A7462021-10-11011 October 2021 Comment (9) of Concerned Citizen on Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Unit Nos.1 and 2 ML21284A0112021-10-10010 October 2021 Comment (8) E-mail Regarding North Anna SLR Draft SEIS ML21284A0102021-10-10010 October 2021 Comment (7) E-mail Regarding North Anna SLR Draft SEIS ML21286A7452021-10-0909 October 2021 Comment (8) of Patricia Gordon on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML21286A7422021-10-0909 October 2021 Comment (6) of Kate Johnson on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML21286A7442021-10-0909 October 2021 Comment (7) from Sierra Club on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML21286A7412021-10-0909 October 2021 Comment (5) of William Johnson on Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Unit Nos.1 and 2 ML21286A7402021-10-0808 October 2021 Comment (4) of Donna Shaunesey on Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Unit Nos.1 and 2 ML21284A0122021-10-0808 October 2021 Comment (9) E-mail Regarding North Anna SLR Draft SEIS ML21281A0232021-10-0707 October 2021 Comment (5) E-mail Regarding North Anna SLR Draft SEIS ML21286A7392021-10-0707 October 2021 Comment (3) of John Surr on Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Unit Nos.1 and 2 ML21281A0252021-10-0707 October 2021 Comment (6) E-mail Regarding North Anna SLR Draft SEIS ML21281A0222021-10-0707 October 2021 Comment (4) E-mail Regarding North Anna SLR Draft SEIS ML21279A0182021-10-0505 October 2021 Comment (2) E-mail Regarding North Anna SLR Draft SEIS ML21279A0192021-10-0505 October 2021 Comment (3) E-mail Regarding North Anna SLR Draft SEIS ML21277A1372021-09-28028 September 2021 Comment (1) E-mail Regarding North Anna SLR Draft SEIS ML21272A3522021-09-16016 September 2021 Comment (2) of Judy Lamana on Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Unit Nos.1 and 2 ML21245A3892021-09-0101 September 2021 Comment (1) of Eric Hendrixson on Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Unit Nos.1 and 2 ML20332A1182020-11-25025 November 2020 Comment (125) of Shira Futterman on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20330A2242020-11-23023 November 2020 Comment (86) of Jean Stokes on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20330A2252020-11-23023 November 2020 Comment (87) of Jean Stokes on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20330A2332020-11-23023 November 2020 Comment (88) of Rayhan Daudani on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20330A2302020-11-23023 November 2020 Comment (89) of Michael Chenkovich on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20330A2342020-11-23023 November 2020 Comment (90) of Paula Chow on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20332A0572020-11-23023 November 2020 Comment (94) of Alison Kaufmann on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20332A0582020-11-23023 November 2020 Comment (95) of Darius Johnson on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20332A0552020-11-23023 November 2020 Comment (92) of Igor Prskalo on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 ML20332A0612020-11-23023 November 2020 Comment (97) of Mel Holley on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 ML20329A4252020-11-23023 November 2020 Comment (67) of Elena Day on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2; Correction ML20329A4242020-11-23023 November 2020 Comment (66) of Brenda Finchum on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20329A4232020-11-23023 November 2020 Comment (65) of Jonathan Bransky to Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20329A4212020-11-23023 November 2020 Comment (63) of Cathy Horne on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 2024-02-06
[Table view] |
Text
Pa'.n 1 n\f 1"- As of: September 06, 2011 Received:
September 05, 2011 PUBLIC SUBMISSION Status: PendingPost Tracking No. 80fl 18b4 Comments Due: October 31, 2011 Submission Type: Web Docket: NRC-2011-0204 Proposed Generic Communication
-Draft Generic Letter on Seismic Risk Evaluations for Operating Reactors Comment On: NRC-2011-0204-0001 Proposed Generic Communication; Draft NRC Generic Letter 2011 -XX: Seismic Risk Evaluations for Operating Reactors Document:
NRC-2011-0204-DRAFT-0003 Comment on FR Doc # 2011-22422 7=]Submitter Information
-Name: dean wilkie C-Address: niv@q.com Meridian, ID, 83646 -i. 1 -Government Agency Type: Local 0 ,0 General Comment I have over 40 years in the nuclear industry and want to submit some comments on the purposed Seismic Risk Evaluation for Operating Reactors.
I want to express my concerns over how the seismic is applied in so many different formats with so many different methods and modes to complete the seismic analyses for USA NPP's.In addition, the many different ways that that NPP's reactor to an earthquake event (some with no automatic seismic scram capabilities and others with procedural requirements to manually scram after an earthquake (if the reactor didn't automatically scram) based on plant conditions upon inspection..
This is wrong. The report that I want to reference is found on http://www-pub.iaea.org/MTCD/publications/PDF/Pub1473_web.pdf.
Are the vent towers in US NPP required to have stabilizing shock absorbers?
The vent towers at Fuku had them installed at some point. Even with the shock absorbers we saw vent piping that pulled away from the tower.Without the shocks the towers would have had more damage Auxilliary systems that back up safety systems such as diesel generators and other components that are designated as plant safety systems are not hardened nor do they meet seismic criteria and have failed recently at plants in the usa following seismic events and at the FUKUSHIMA reactors.I have many more examples of issues with the seismic concerns at the plants in USA and would be very willing to testify and/or add additional information.
Another example is the fault like which North Anna was build on"active fault line" and even with warning from local citizens the construction went on and today we have seen the consequence of allowing it with the recent seismic events at that facility which prompted the NRC to dispatch the highest level of inspectors to the plant. Please let me know how I can provide additional information.
Regards, DEan _ --https://fdms.erulemaking.net/fdms-web-agency/component/contentstreamer?obj ectld=0900006480fl 18b... 09/06/2011