ML112310047
| ML112310047 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 08/18/2011 |
| From: | Division of Reactor Safety II |
| To: | Southern Nuclear Operating Co |
| References | |
| 50-321/11-301, 50-366/11-301 | |
| Download: ML112310047 (87) | |
Text
FINAL Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM SIM 1 RO & SRO-I TITLE INJECT SBLC (WITH A PUMP TRIP & VALVE FAILURE)
AUTHOR MEDIA NUMBER TIME CRITICAL Anthony Ball 2011-301 SIM-1 Before Exceeding the BIIT RECOMMENDED BY APPROVED BY DATE N/R C. M. EDMUND 05/26/2011
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:
OPERATIONS TRAINING Media Number:
2011-301 SIM-1 Rev. No.
Date Reason for Revision Authors Initials Supvs Initials 00 5/26/11 Reworded Initating Cue and added 2B SBLC pump malfunction and Event Trigger to Simulator Setup.
This JPM originated from LR-JP-25011.
ARB CME
2011-301 SIM-1 Page 1 of 6 UNIT 1 ( )
UNIT 2 (X)
TASK TITLE:
INJECT SBLC (WITH A PUMP TRIP & VALVE FAILURE)
JPM NUMBER:
2011-301 SIM-1 TASK STANDARD:
The task shall be completed when the SBLC System is injecting to the Reactor, and Reactor power is decreasing per 34SO-C41-003-2.
TASK NUMBER:
011.002 OBJECTIVE NUMBER: 011.002.C PLANT HATCH JTA IMPORTANCE RATING:
RO SRO K/A CATALOG NUMBER: 211000A201 K/A CATALOG JTA IMPORTANCE RATING:
RO 3.50 SRO 3.80 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)
GENERAL
REFERENCES:
Unit 2 31EO-EOP-011-2 34SO-C41-003-2 (current versions)
REQUIRED MATERIALS:
Unit 2 34SO-C41-003-2 (current version)
Key for Standby Liquid Control Key switch (located in panel)
APPROXIMATE COMPLETION TIME: Before Exceeding the BIIT SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE
2011-301 SIM-1 Page 2 of 6 SIMULATOR SETUP Simulator Initial Conditions:
- 1.
RESET the Simulator to IC #113 or SNAP 611 and leave in FREEZE.
- 2.
INSERT the following MALFUNCTIONS/EVENT TRIGGERS:
MALF #
TITLE FINAL VALUE RAMP RATE ACT.
TIME mfC11_211 Scram Discharge Volume ATWS 50 10000 00000 mfB21_247A Spurious Group I Isolation A Side 3
mfB21_247B Spurious Group I Isolation B Side 00000 mfC41_240A SBLC Pump 2A Failure to Start 00000 mfC41_240B SBLC Pump 2B Failure to Start 00000 mfG31_207B 2G31-F004 Fails to Isolate on Group 5 00000 Trigger #
Description Conditions Expert Command C41-1 Prevents 1st pump (if A) attempted; deletes 2nd pump malfunction (Simulate pump trip)
C41-2 Prevents 1st pump (if B) attempted; deletes 2nd pump malfunction (Simulate pump trip)
- 3.
Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS OR RUN SCENARIO FILE and EVENT TRIGGER (current rev) JPM CR-SIM 1 2011-301.
A.
Place the MSIV control switches in CLOSE.
B.
Allow the simulator to run until Torus temperature reaches approximately 98°F.
C.
Acknowledge annunciators.
D.
Start HPCI for injection at ~1600 gpm.
E.
Trip Recirc Pump.
- 4.
PLACE the Simulator in FREEZE until the INITIATING CUE is given.
- 5.
ESTIMATED Simulator SETUP TIME:
15 Minutes
UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
- 1.
A Unit 2 Reactor scram has occurred and control rods cannot be inserted.
Reactor power is greater than 5%.
- 2.
All MSIVs are closed.
- 3.
31EO-EOP-011-2 (RCA) is in progress.
INITIATING CUES:
Inject boron into the Reactor with the SBLC System per 34SO-C41-003-2.
This is TIME CRITICAL.
2011-301 SIM-1 Page 4 of 6 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
START TIME:__________
- 1. Place SBLC Pump Select Switch to start system A (B) position.
At panel 2H11-P603, the operator has PLACED the SBLC PUMP SELECT SWITCH (keylock) in the START SYS A (B) position.
NOTE: The 1st Standby Liquid Control System pump switch selected is failed and the SBLC System will remain in the Standby lineup.
Event Trigger C41-1 & C41-2 will remove the 2nd pump failure.
- 2. Confirm/verify Squib Valve Ready indicating lights are extinguished and SBLC Loss of Continuity to Squib Valve annunciator is alarmed.
At panel 2H11-P603, the operator has VERIFIED the following:
SQUIB VLV READY amber indicating lights are EXTINGUISHED.
SBLC LOSS OF CONTINUITY TO SQUIB VALVE (603-152) annunciator has ALARMED.
- 3. Confirm SBLC pump has started.
At panel 2H11-P603, the operator has DETERMINED the selected SBLC PUMP has NOT started, green light illuminated.
NOTE: If the operator does not recognize the selected SBLC Pump did not start the operator may go to Step 7 of the JPM.
PROMPT:
IF the operator notifies the Shift Supervisor of SBLC pump failure, as the Shift Supervisor, DIRECT the operator to inject SBLC.
2011-301 SIM-1 Page 5 of 6 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
- 4. Place SBLC Pump Select Switch to start system B (A) position.
At panel 2H11-P603 the operator has PLACED the SBLC PUMP SELECT SWITCH (keylock) is in START SYS B (A) position.
- 5. Confirm/verify Squib Valve Ready indicating lights are extinguished and SBLC Loss of Continuity to Squib Valve annunciator is alarmed.
At panel 2H11-P603, the operator has VERIFIED the following:
SQUIB VLV READY amber indicating lights are EXTINGUISHED.
SBLC LOSS OF CONTINUITY TO SQUIB VALVE (603-152) annunciator has ALARMED.
- 6. Confirm SBLC pump has started.
At panel 2H11-P603, the operator VERIFIES the STANDBY LIQUID CNTL PUMP 1-2 RUNNING, red light illuminated.
At panel 2H11-P601, the operator VERIFIES RX WATER CLEANUP VLV, 2G31-F004, has NOT CLOSED, red light illuminated.
At panel 2H11-P601, the operator has PLACED the 2G31-F004 switch, placed to the CLOSE position.
At panel 2H11-P601, the operator VERIFIES RX WATER CLEANUP VLV, 2G31-F004, has CLOSED, green light illuminated.
2011-301 SIM-1 Page 6 of 6 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
- 10. Confirm that SBLC solution is being injected into the reactor vessel by observing the following:
SBLC tank level is decreasing.
SBLC pressure is greater than Reactor pressure.
Reactor power is decreasing.
At panel 2H11-P603, the operator has VERIFIED SBLC solution is being injected into the reactor vessel by identifying the following:
SBLC tank level is DECREASING as indicated by meter 2C41-R601, TANK LEVEL.
SBLC pressure is GREATER than Reactor pressure as indicated by meter 2C41-R600, DISCH PRESS.
Reactor power is DECREASING as indicated on neutron monitoring instrumentation.
NOTE: The operator may confirm SBLC is injecting by any of the following methods:
- SBLC tank level decreasing
- SBLC pressure is greater than Reactor pressure
END TIME:__________
NOTE: The terminating cue shall be given to the operator when any one of the following is met:
After JPM step #10 is complete.
The BIIT Curve has been exceeded.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
EVALUATOR - PICK UP the Initiating Cue sheet.
FINAL Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM SIM 2 RO & SRO-I TITLE WITH AN EMERGENCY DEPRESS REQUIRED, TERMINATE AND PREVENT CONDENSATE/FEEDWATER AUTHOR MEDIA NUMBER TIME Anthony Ball 2011-301 SIM-2 10 Minutes RECOMMENDED BY APPROVED BY DATE N/R C. M. EDMUND 05/26/2011
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:
OPERATIONS TRAINING Media Number:
2011-301 SIM-2 Rev. No.
Date Reason for Revision Authors Initials Supvs Initials 00 5/26/11 Modified from LR-JP-20102 for NRC Exam 2011-301.
ARB CME
2011-301 SIM-2 Page 1 of 6 UNIT 1 ( )
UNIT 2 (X)
TASK TITLE:
WITH AN EMERGENCY DEPRESS REQUIRED, TERMINATE AND PREVENT CONDENSATE/FEEDWATER JPM NUMBER:
2011-301 SIM-2 TASK STANDARD:
The task shall be complete when the operator has terminated and prevented the Condensate and Feedwater injection systems per 31EO-EOP-113-2.
TASK NUMBER:
201.101 OBJECTIVE NUMBER: 201.101.A PLANT HATCH JTA IMPORTANCE RATING:
RO SRO K/A CATALOG NUMBER: 295037EA202 K/A CATALOG JTA IMPORTANCE RATING:
RO 4.10 SRO 4.20 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)
GENERAL
REFERENCES:
Unit 2 31EO-EOP-017-2 (current version) 31EO-EOP-113-2 (current version)
REQUIRED MATERIALS:
Unit 2 31EO-EOP-113-2 (current version)
APPROXIMATE COMPLETION TIME: 10 Minutes SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE
2011-301 SIM-2 Page 2 of 6 SIMULATOR SETUP Simulator Initial Conditions:
- 1.
RESET the Simulator to (75%) IC #111 or SNAP 612 and leave in FREEZE.
- 2.
INSERT the following MALFUNCTIONS:
MALF #
TITLE FINAL VALUE RAMP RATE ACT.
TIME mfC11_211 Scram Discharge Volume ATWS (Var) 55 1000 00000 mfN37_134 All Bypass Valves Fail Closed 00000 mfN30_122 Main Turbine Trip 5
- 3.
Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS OR RUN SCENARIO FILE and EVENT TRIGGER (current rev) JPM CR-SIM 2 2011-301 A.
Ensure Malfunction mfC11_211 is active.
B.
Activate Malfunction mfN30_122.
C.
Inhibit ADS.
D.
Inject SBLC.
E.
Perform RC-2 F.
Ensure HPCI is NOT running and Aux Oil Pump is in PULL TO LOCK OFF.
- 4.
PLACE the Simulator in FREEZE until the INITIATING CUE is given.
- 5.
ESTIMATED Simulator SETUP TIME:
15 Minutes
UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
- 1.
An ATWS condition exists and Reactor power is greater than 5%.
- 2.
RWL is above TAF.
- 3.
SRVs are open and controlling pressure with Low-Low Set.
- 4.
Another Operator is performing an Emergency Depress
- 5.
31EO-EOP-017-2 (CP-3) is in progress.
INITIATING CUES:
The SS directs you, as an extra operator, to Terminate and prevent Condensate and Feedwater injection per 31EO-EOP-113-2.
2011-301 SIM-2 Page 4 of 6 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
START TIME:__________
PROMPT:
IF the operator addresses RHR and Core Spray Systems (i.e. Jumpers/
Links), as the Shift Supervisor, INFORM the operator that another operator will terminate and prevent those systems.
At panel 2H11-P650, the operator has PLACED the 2B RFP RESET-TRIP, to the TRIP position, red permissive light EXTINGUISHED while in TRIP and RFPT 2B TRIP annunciator ILLUMINATED.
- 2. Operator trips 2A Condensate Booster Pump (CBP).
At panel 2H11-P650, the operator has PLACED 2N21-C002A, CBP, to the TRIP position, then to the Pull-To-Lock (PTL) position, green light ILLUMINATED.
- 3. Operator trips 2B Condensate Booster Pump.
At panel 2H11-P650, the operator has PLACED 2N21-C002B, CBP to the TRIP position, then to the PTL position, green light ILLUMINATED.
- 4. Operator trips 2C Condensate Booster Pump.
At panel 2H11-P650, the operator has PLACED 2N21-C002C, CBP, to the TRIP position, then to the PTL position, green light ILLUMINATED.
2011-301 SIM-2 Page 5 of 6 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
NOTE: FOR STEPS 5, 6 & 7, it is permissible for the operator to chose which Condensate Pump will be left in service, and therefore, will ONLY perform TWO (2) of the THREE (3) CRITICAL steps below.
- 5. Operator trips 2A Condensate Pump.
At panel 2H11-P650, the operator has PLACED 2N21-C001A, Condensate Pump, to the TRIP position, then to the PTL position, green light ILLUMINATED.
- 6. Operator trips 2B Condensate Pump.
At panel 2H11-P650, the operator has PLACED 2N21-C001B, Condensate Pump, to the TRIP position, then to the PTL position, green light ILLUMINATED.
- 7. Operator trips 2C Condensate Pump.
At panel 2H11-P650, the operator has PLACED 2N21-C001C, Condensate Pump, to the TRIP position, then to the PTL position, green light ILLUMINATED.
2011-301 SIM-2 Page 6 of 6 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
- 8. Confirms 2N21-F110, S/U LEVEL CONTROL BYPASS, is closed.
At panel 2H11-P650, the operator CONFIRMS 2N21-F110, S/U Level Control Bypass, green light ONLY ILLUMINATED.
- 9. Closes 2N21-F125, S/U LEVEL CONTROL ISOL.
At panel 2H11-P650, the operator has PLACED the control switch for 2N21-F125, S/U Level Control Isol, to the CLOSE position, green light ILLUMINATED.
PROMPT:
IF the operator addresses System realignment, as the Shift Supervisor, INFORM the operator that it is not desired at this time.
NOTE: IF the operator trips ALL Condensate pumps; the JPM critical task WILL BE MET; however, followup questions may be necessary concerning procedure use.
END TIME:__________
NOTE: The terminating cue shall be given to the operator when any one of the following is met:
After JPM step #9 is complete.
With no reasonable progress, the operator exceeds double the allotted time.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
EVALUATOR - PICK UP the Initiating Cue sheet.
FINAL Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM SIM 3 RO & SRO-I TITLE REACTOR PRESSURE CONTROL WITHIN BAND WITH BPVs & SRVs AUTHOR MEDIA NUMBER TIME Anthony Ball 2011-301 SIM-3 20 Minutes RECOMMENDED BY APPROVED BY DATE N/R C. M. EDMUND 05/26/2011
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:
OPERATIONS TRAINING Media Number:
2011-301 SIM-3 Rev. No.
Date Reason for Revision Authors Initials Supvs Initials 00 5/26/11 Initial development for use on 2011-301 NRC Exam.
ARB CME
2011-301 SIM-3 Page 1 of 8 UNIT 1
( )
UNIT 2 (X)
TASK TITLE:
REACTOR PRESSURE CONTROL WITHIN BAND WITH BPVs & SRVs JPM NUMBER:
2011-301 SIM-3 TASK STANDARD:
The task will be completed when the operator is controlling Reactor pressure in a band using SRVs per 34SO-B21-001-2.
TASK NUMBER:
200.034 OBJECTIVE NUMBER: 200.034.C PLANT HATCH JTA IMPORTANCE RATING:
RO SRO K/A CATALOG NUMBER: 239002A4.01 K/A CATALOG JTA IMPORTANCE RATING:
RO 3.10 SRO 3.20 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)
GENERAL
REFERENCES:
Unit 2 34SO-N30-001-2 (current version) 34SO-B21-001-2 (current version)
REQUIRED MATERIALS:
Unit 2 34SO-N30-001-2 (current version) 34SO-B21-001-2 (current version)
APPROXIMATE COMPLETION TIME: 20 Minutes SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE
2011-301 SIM-3 Page 2 of 8 2
SIMULATOR SETUP Simulator Initial Conditions:
- 1.
RESET the Simulator to IC #113 or Snap 613 and leave in FREEZE.
- 2.
INSERT the following MALFUNCTIONS and EVENT TRIGGERS:
KEY MALF #
DESCRIPTION FINAL RAMP DELAY ST-0 mfB21_129A SRV A Fails Stuck 0000 ST-0 mfB21_129B SRV B Fails Stuck 0000 ST-0 mfB21_129C SRV C Fails Stuck 0000 ST-0 mfB21_129D SRV D Fails Stuck 0000 ST-0 mfB21_129E SRV E Fails Stuck 0000 ST-0 mfB21_129F SRV F Fails Stuck 0000 ST-0 mfB21_129G SRV G Fails Stuck 0000 ST-0 mfB21_129H SRV H Fails Stuck 0000 ST-0 mfB21_129K SRV K Fails Stuck 0000 ST-0 mfB21_129L SRV L Fails Stuck 0000 ST-0 mfB21_129M SRV M Fails Stuck 0000 ST-0 mfE41_104 HPCI Turbine Trip 0000 ST-0 mfE51_110 RCIC Turbine Trip 0000 ST-0 mfN21_87A Feedwater Pump A Trip 0000 ST-0 svoB21053 PT-N127A SRV Electrical open 1000 1000 0000 ST-0 svoB21054 PT-N127B SRV Electrical open 1000 1000 0000 ST-0 svoB21055 PT-N127C SRV Electrical open 1000 1000 0000 ST-0 svoB21056 PT-N127D SRV Electrical open 1000 1000 0000 ST-0 mfB21_226A Low-Low Set A Fails Inop 0000 ST-0 mfB21_226B Low-Low Set B Fails Inop 0000 ST-0 mf60131129 Leak Det Diff Temp Hi 0000 ST-0 mf60131135 Leak Ambient Temp Hi 0000
2011-301 SIM-3 Page 3 of 8 3
RB-1 mfN37_134 ALL Bypass Valves Fail CLOSED 9999 RB-2 diN32-C001A EHC Pump 2A Switch Trip 9999 RB-2 diN32-C001B EHC Pump 2B Switch Trip 9999 ACTIVATE THE FOLLOWING EVENT TRIGGERS:
Trigger #
DESCRIPTION CONDITIONS Expert Command B21-21 SRV B Stuck, opens when control switch is in OPEN B21-22 SRV G Stuck, opens when control switch is in OPEN B21-23 SRV F Stuck, opens when control switch is in OPEN B21-24 SRV D Stuck, opens when control switch is in OPEN
- 3.
Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS OR RUN SCENARIO FILE and EVENT TRIGGER (current rev) JPM CR-SIM 3 2011-301:
A. Perform RC-1 and RC-2 actions such that the 2N21-F110 is closed and the SULCV is in auto and set at +20.
B. Perform TC-1; ensuring 2N11-F004A and B are closed.
C. Lower Pressure Set to 825 psig.
D. Ensure Reactor pressure stabilizes at ~825 psig.
E. Ensure Bypass Valve screen and Speed screen is called up.
F. Place Pressure in the P603 plasma display.
- 4.
PLACE the Simulator in FREEZE until the INITIATING CUE is given.
- 5.
ESTIMATED Simulator SETUP TIME:
15 minutes
UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
- 1. Unit 2 Reactor has been scrammed.
- 2. Other operators are performing scram actions.
- 3. A Reactor pressure reduction is required due to an unisolable steam leak in the Reactor Building.
- 4. You are assigned Reactor Pressure control.
INITIATING CUES:
LOWER AND THEN MAINTAIN Reactor pressure between 700 and 800 psig using the Bypass Valves.
2011-301 SIM-3 Page 5 of 8 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
START TIME:__________
- 1. Operator identifies the procedure needed to perform the task.
Operator has obtained procedure 34GO-OPS-013-2, step 7.5.5 or uses Placard at Turbine Panel.
NOTE: For Steps 2 through 8 all indication will be on panel 2H11-P650 using HMI Screens 2N32-K4001A or B.
- 2. Selects *Control* / *psi-load*
screen The operator has SELECTED the
- Control* screen and also has SELECTED the *psi-load*
button on 2N32-K4001A or B.
- 3. Selects *Ramp Rate* button The operator has SELECTED the
- Ramp Rate* button on 2N32-K4001A or B.
NOTE: An acceptable Ramp Rate results in a cooldown rate NOT exceeding 100ºF/hr OR RWL exceeding 100 inches.
- 4. Enters a ramp rate The operator has ENTERED a ramp rate >0 and <100 displayed on 2N32-K4001A or B.
- 5. Selects *Pressure* button The operator has SELECTED the
- Pressure* button on 2N32-K4001A or B.
- 6. Enters desired target pressure The operator has ENTERED a target pressure between 700 and 800 psig on 2N32-K4001A or B.
2011-301 SIM-3 Page 6 of 8 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
- 7. Adjusts *Ramp Rate* AND/OR the
- Pressure* setpoints to maintain pressure/cooldown rate.
The operator has VARIED the ramp rate/pressure to maintain a cooldown rate 100° F/Hr OR RWL exceeding 100 inches change on 2N32-K4001A or B.
NOTE: ALTERNATE PATH starts here.
NOTE: SIMULATOR OPERATOR, WHEN the operator has successfully opened Bypass Valves (BPVs) and reactor pressure is being reduced AND with the Chief Examiners approval, ENTER RB-1 malfunction which FULLY CLOSES ALL Bypass Valves.
- 8. The failure of ALL BPVs is recognized.
Operator identifies all BPVs closed on 2N32-K4001A or B.
PROMPT:
IF the operator reports the failure of the BPVs, INFORM the operator that you will get Maintenance to investigate, and to continue control Reactor pressure in the band.
NOTE: SIMULATOR OPERATOR, AFTER 3 minutes ONLY IF the operator is still at the P650 panel AND with the Chief Examiners approval, ENTER RB-2 malfunction which TRIPS BOTH EHC Pumps.
PROMPT:
IF the operator addresses the failure of EHC Pumps, INFORM the operator that you will get Maintenance to investigate, and to continue control Reactor pressure in the band.
PROMPT:
IF alarm 650-124, Max Combined Flow Limit Limiting, is received, INFORM the operator that another operator will address the ARP.
PROMPT:
IF the operator addresses using other systems to control Reactor pressure, INFORM the operator to use SRVs.
NOTE: The operator can use any of the following procedures to control reactor pressure:
- Placard on 2H11-P602 panel
- 34SO-B21-001-2, Automatic Depressurization (ADS) And Low-Low Set (LLS) Systems
2011-301 SIM-3 Page 7 of 8 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
- 9. Operator identifies applicable procedures to perform the task.
Operator has IDENTIFIED the correct procedure as:
Placard on 2H11-P602 panel 34SO-B21-001-2, step 7.4.1.
PROMPT:
IF the operator addresses using the Placard sequence for opening the SRVs, DIRECT the operator to follow the procedure.
NOTE: ALL SRVs, EXCEPT LLS SRVs, fail to open with the switch.
- 10. Attempts to OPEN SRV 2B21-F013M.
At Panel 2H11-P602, the operator has PLACED the control switch for 2B21-F013M into the OPEN position, red light ILLUMINATES.
- 11. The failure of the 2B21-F013M to open is recognized.
At 2H11-P602, the operator has RECOGNIZED the failure of the 2B31-F013M to OPEN, amber light remains EXTINGUISHED.
PROMPT:
IF the operator reports the failure of the 2B21-F013M to open, INFORM the operator that you will get Maintenance to investigate, and to continue control Reactor pressure in the band.
NOTE: LLS will NOT arm with Reactor pressure >1074 psig.
- 12. OPEN SRV 2B21-F013B At Panel 2H11-P602, the operator has PLACED the control switch for 2B21-F013B into the OPEN position prior to 1250 psig, red light ILLUMINATED.
PROMPT:
IF the operator addresses checking SRV tailpipe temperature on recorder 2B21-R614, at Panel 2H11-P614, INFORM the operator that another operator will check the recorder for proper SRV operation.
2011-301 SIM-3 Page 8 of 8 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
- 13. Reactor pressure in band:
700 to 800 psig The operator CONTROLS pressure in band:
700 to 800 psig (+/-50 psig)
- 14. Before Reactor decreases below 700 psig, CLOSE SRV 2B21-F013B At panel 2H11-P602 the operator has PLACED the control switch for 2B21-F013B into the CLOSE position PRIOR to Reactor pressure lowering below its band
(-50 psig), green light ILLUMINATED.
NOTE: AFTER the operator has demonstrated proper control of Reactor pressure, INFORM the operator that another operator will continue maintaining Reactor pressure in band.
END TIME:__________
NOTE: The terminating cue shall be given to the operator when any one of the following is met:
After JPM step #14 is complete.
With no reasonable progress, the operator exceeds double the allotted time.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
EVALUATOR - PICK UP the Initiating Cue sheet.
FINAL Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM SIM 4 RO ONLY TITLE PLACE RCIC IN PRESSURE CONTROL MODE AUTHOR MEDIA NUMBER TIME Anthony Ball 2011-301 SIM-4 10 Minutes RECOMMENDED BY APPROVED BY DATE N/R C. M. EDMUND 05/26/2011
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:
OPERATIONS TRAINING Media Number:
2011-301 SIM-4 Rev. No.
Date Reason for Revision Authors Initials Supvs Initials 00 5/26/11 Initial development for use on 2011-301 NRC Exam.
ARB CME
2011-301 SIM-4 Page 1 of 6 UNIT 1
()
UNIT 2 (X)
TASK TITLE:
PLACE RCIC IN PRESSURE CONTROL MODE JPM NUMBER:
2011-301 SIM-4 TASK STANDARD:
The task will be met when RCIC has been placed in pressure control mode.
TASK NUMBER:
005.015 OBJECTIVE NUMBER: 005.015.A PLANT HATCH JTA IMPORTANCE RATING:
RO SRO K/A CATALOG NUMBER: 206000A4.06 K/A CATALOG JTA IMPORTANCE RATING:
RO 3.9 SRO 3.8 OPERATOR APPLICABILITY: Reactor Operator (RO)
GENERAL
REFERENCES:
Unit 2 31EO-EOP-107-2 REQUIRED MATERIALS:
Unit 2 31EO-EOP-107-2 APPROXIMATE COMPLETION TIME: 10 Minutes SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE
2011-301 SIM-4 Page 2 of 6 2
SIMULATOR SETUP Simulator Initial Conditions:
- 1.
RESET the Simulator to IC #107 or Snap 614 and leave in FREEZE.
- 2.
INSERT the following MALFUNCTIONS:
None
- 3.
INSERT the following SIMULATOR VALUE OVERRIDES (SVO):
None
- 4.
INSERT the following REMOTE FUNCTIONS:
None
- 5.
INSERT the following ORS OVERRIDES:
TAG #
P/L DESCRIPTION STATUS ACT.
TIME rfE51_155 RCIC TORUS SUCTION BYPASS OVRD 0000
- 6.
Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS OR RUN SCENARIO FILE and EVENT TRIGGER (current rev) JPM CR-SIM 4 2011-301:
A. Insert a manual scram.
B. Perform RC-1 and RC-2.
C. Lower pressure set to 820 psig.
D. Allow the plant to stabilize with turbine bypass valves controlling reactor pressure (820 psig) and RFPTs controlling water level.
E. Place HPCI in pressure control mode, barely in control of pressure and reduce pressure to approx. 805 psig with a slightly increasing trend (not more than 1 psig/min).
F. Ensure RCIC is in standby with NO initiation signal present.
- 7.
PLACE the Simulator in FREEZE until the INITIATING CUE is given.
- 8.
PLACE DANGER TAGS on the following equipment:
MPL #
COMPONENT TAGGED POSITION NONE
- 9.
ESTIMATED Simulator SETUP TIME:
15
UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
- 1. The unit has been scrammed due to a leak on the EHC system
- 2. RFPTs are controlling reactor water level.
- 3. HPCI is controlling reactor pressure at 806 psig.
- 4. The RCIC High Torus Level Suction Swap has been over-ridden per 31EO-EOP-100-2.
INITIATING CUES:
Place RCIC in Pressure Control Mode per 31EO-EOP-107-2, ALTERNATE RPV PRESSURE CONTROL and control reactor pressure between 500 and 800 psig.
Page 4 of 6 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
START TIME:__________
- 1. Resets the RCIC initiation signal, IF the RCIC initiation cannot be reset, THEN do NOT perform this section.
Confirm a RCIC initiation signal does not exist by verifying the RCIC auto initiation light is not illuminated On 2H11-P602.
- 2. IF RCIC system isolation has occurred and the isolation signal has cleared, THEN take RCIC Auto Isolation Signal A and B switches to RESET.
OR IF RCIC system isolation has occurred and CANNOT be reset, DO NOT continue with this subsection.
Confirm a RCIC isolation does not exist by verifying the RCIC isolation alarms are not illuminated and that 2E51-F007 and 2E51-F008 are open, red lights illuminated On 2H11-P602 PROMPT:
IF the operator addresses High Torus Level Suction Swap INFORM that this action is complete.
- 3. Confirm OPEN 2E51-F025, Steam Line Drain 2E51-F008, Steam Supply Line Isol 2E51-F026 Steam Line Drain The operator has VERIFIED the red light is ILLUMINATED for the following valves; 2E51-F025, panel 2H11-P602 2E51-F008, panel 2H11-P602 2E51-F026, panel 2H11-P601.
- 4. Confirm OPEN 2E51-F007, Steam Supply Line Isol Valve.
On 2H11-P602, the operator has VERIFIED that 2E51-F007 is open, red light ILLUMINATED.
- 5. Confirm CLOSE 2E51-F013, Pump Discharge Valve.
On 2H11-P602, the operator has VERIFIED that 2E51-F013 is close, green light ILLUMINATED.
On 2H11-P602, the operator has PLACED the switch for 2E51-F046 into the OPEN position, red light ILLUMINATED.
Page 5 of 6 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
- 7. START RCIC Vacuum Pump.
On 2H11-P602, the operator has PLACED the switch for the RCIC vacuum pump to the START position, red light ILLUMINATED.
On 2H11-P602, the operator has VERIFIED that 2E51-F010 is OPEN, red light ILLUMINATED.
On 2H11-P601, the operator has PLACED the switch for 2E41-F011 into the OPEN position, red light ILLUMINATED.
On 2H11-P602, the operator has PLACED the switch for 2E51-F022 into the OPEN position, red light ILLUMINATED.
- 11. TAKE the RCIC TEST Switch to START.
On 2H11-P602, the operator has PLACED the RCIC Test Switch into the START position.
- 12. Confirm OPEN 2E51-F045, Steam to Turbine, Valve.
On 2H11-P602, the operator has VERIFIED that 2E51-F045 is OPEN, red light ILLUMINATED.
Page 6 of 6 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
On 2H11-P602, the operator has ADJUSTED the RCIC flow controller 2E51-R612 and/or has THROTTLED 2E51-F022 to CONTROL reactor pressure between 500 psig and 800 psig.
PROMPT:
IF the operator addresses shifting from pressure control to water level control, as the Shift Supervisor, INFORM the operator that it is not desired at this time.
PROMPT:
IF the operator addresses system restoration, as the Shift Supervisor, INFORM the operator that it is not desired at this time.
END TIME:__________
NOTE: The terminating cue shall be given to the operator when any one of the following is met:
After JPM step #13 is complete.
Bypass Valve #1 closes > 2%.
With no reasonable progress, the operator exceeds double the allotted time.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
EVALUATOR - PICK UP the Initiating Cue sheet.
FINAL Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM SIM 5 FINAL ALL TITLE PERFORM A MANUAL INITIATION OF TORUS SPRAY (VALVE FAILURE)
AUTHOR MEDIA NUMBER TIME Anthony Ball 2011-301 SIM-5 10 Minutes RECOMMENDED BY APPROVED BY DATE N/R C. M. EDMUND 05/26/2011
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:
OPERATIONS TRAINING Media Number:
2011-301 SIM-5 Rev.
No.
Date Reason for Revision Authors Initials Supvs Initials 00 5/26/11 Initial development for use on 2011-301 NRC Exam.
ARB CME
2011-301 SIM-5 Page 1 of 7 UNIT 1 ( )
UNIT 2 (X)
TASK TITLE:
PERFORM A MANUAL INITIATION OF TORUS SPRAY (VALVE FAILURE)
JPM NUMBER:
2011-301 SIM-5 TASK STANDARD:
The task shall be completed when the RHR System has been initiated in the Torus Spray Mode, per 34SO-E11-010-2.
TASK NUMBER:
007.001 OBJECTIVE NUMBER: 007.001.O PLANT HATCH JTA IMPORTANCE RATING:
RO SRO K/A CATALOG NUMBER: 230000A402 K/A CATALOG JTA IMPORTANCE RATING:
RO 3.80 SRO 3.60 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)
GENERAL
REFERENCES:
Unit 2 34SO-E11-010-2 (current version) 31EO-EOP-012-2 (current version REQUIRED MATERIALS:
Unit 2 34SO-E11-010-2 (current version)
Key for 2E11-F028 A(B)
APPROXIMATE COMPLETION TIME: 10 SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE
2011-301 SIM-5 Page 2 of 7 SIMULATOR SETUP Simulator Initial Conditions:
- 1.
RESET the Simulator to IC #113 or Snap 615 and leave in FREEZE.
- 2.
INSERT the following MALFUNCTIONS/EVENT TRIGGERS:
MALF #
TITLE FINAL VALUE RAMP RATE ACT.
TIME mfB21_48A Steam Line A Break (After Restrictor) (Var) 0.02 1000 00000 mfE41_235B HPCI Fails to Start on High DW Pressure 00000 mfE51_110 RCIC Turbine Trip 00000 Trigger #
Description Conditions Expert Command E11-1 Prevents first 2E11-F027 valve attempted to fail; deletes other 2E11-F027 malfunction E11-2 Prevents first 2E11-F027 valve attempted to fail; deletes other 2E11-F027 malfunction
- 3.
INSERT the following REMOTE FUNCTIONS:
REM #
DESCRIPTION STATUS None
- 4.
INSERT the following ORS OVERRIDES:
TAG #
P/L DESCRIPTION STATUS ACT.
TIME diE11-F027A P
Torus Spray CLOSE 00000 diE11-F027B P
Torus Spray CLOSE 00000
- 5.
Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS OR RUN SCENARIO FILE and EVENT TRIGGER (current rev) JPM CR-SIM 5 2011-301:
A. Take the simulator out of FREEZE.
B. Allow Torus pressure to increase to ~2.5 psig.
- 6.
PLACE the Simulator in FREEZE until the crew assumes the shift.
- 7.
ESTIMATED Simulator SETUP TIME:
20 Minutes
UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
- 1. Torus pressure is ~2.5 psig and going up at ~0.5 psig/min.
- 2. Torus level is <215 inches.
- 3. 31EO-EOP-012-2, PC Primary Containment Control is in progress.
INITIATING CUES:
Initiate Torus sprays.
2011-301 SIM-5 Page 4 of 7 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
START TIME:__________
NOTE: If the applicant starts with the A Loop of RHR, then ONLY the B Loop steps designated are critical.
If the applicant starts with the B Loop of RHR, then ONLY the A Loop steps designated are critical.
- 1. IF reactor water level is < 2/3 core height, (-193 inches indicated on 2B21-R623A or B, Rx Level, at 2H11-P601), PLACE 2E11-S18A, Cnmt Spray Vlv Cntl 2/3 Core Ht Permis switch, in the MANUAL OVERRD position.
Operator has OBSERVED that RWL is above -193 inches as indicated on 2B21-R623A or B, Rx Level, at 2H11-P601 and that overriding the 2/3 interlock is NOT required.
- 2. Place the Containment Spray Valve control switch 2E11-S17A to the Manual position.
At panel 2H11-P601, the Operator has PLACED the Containment Spray Valve Control switch into the MANUAL position, white light ILLUMINATED.
NOTE: The Operator may throttle or close 2E11-F017A even though the RHR System is not injecting into the Reactor.
- 3. Confirm or start RHR pumps in Loop A.
At panel 2H11-P601, the Operator has CONFIRMED the A Loop RHR pumps are RUNNING, red lights ILLUMINATED.
2011-301 SIM-5 Page 5 of 7 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
NOTE: The first 2E11-F027 A or B switch selected is failed. Event Trigger E11-2 will remove the other 2E11-F027 A or B switch failure.
- 4.
Open Torus Spray/Test Vlv 2E11-F028A.
At panel 2H11-P601, the Operator has PLACED 2E11-F028A control switch into the OPEN position, red light ILLUMINATED.
- 5. If this is the second loop attempted, slowly opens the Torus Spray Vlv.
2E11-F027A to start flow.
At panel 2H11-P601, the Operator has THROTTLED 2E11-F027A OPEN, red light ILLUMINATED.
- 6. If this is the first loop attempted, attempts to throttle open the Torus Spray Vlv. 2E11-F027A.
At panel 2H11-P601, the Operator has RECOGNIZED that 2E11-F027A failed to OPEN, green light ILLUMINATED.
NOTE: Do not order B loop to be placed in Torus spray since this is an Alternate Path JPM, the operators must determine this is the correct action on their own.
PROMPT:
WHEN the Operator reports that 2E11-F027A will not open ACKNOWLEDGE the failure and INFORM the operator that conditions are still met to spray the Torus, ORDER the Operator to Spray the Torus.
NOTE: It is acceptable for the operator to place the 2/3 core height switch to override even though not required.
- 7. IF reactor water level is < 2/3 core height, (-193 inches indicated on 2B21-R623A or B, Rx Level, at 2H11-P601), PLACE 2E11-S18B, Cnmt Spray Vlv Cntl 2/3 Core Ht Permis switch, in the MANUAL OVERRD position.
Operator has OBSERVED that RWL is above -193 inches, as indicated on 2B21-R623A or B, Rx Level, at 2H11-P601 and that overriding the 2/3 interlock is NOT required.
2011-301 SIM-5 Page 6 of 7 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
- 8. Verify the Containment Spray Valve control switch 2E11-S17B is in the Manual position.
At panel 2H11-P601, the Operator has VERIFED the Containment Spray Valve Control is in the MANUAL position, white light ILLUMINATED.
NOTE: The Operator may throttle or close 2E11-F017B even though the RHR System is not injecting into the Reactor.
- 9. Confirm or start RHR pumps in Loop B.
At panel 2H11-P601, the Operator has CONFIRMED that the B Loop RHR pumps are RUNNING, red lights ILLUMINATED.
- 10. Open Torus Spray/Test Vlv 2E11-F028B.
At panel 2H11-P601, the Operator has PLACED 2E11-F028B, control switch into the OPEN position, red light ILLUMINATED.
- 11. If this is the second loop attempted, slowly opens the Torus Spray Vlv.
2E11-F028B to start flow.
At panel 2H11-P601, the Operator has THROTTLED 2E11-F028B OPEN, red light ILLUMINATED.
- 12. If this is the first loop attempted, attempts to throttle open the Torus Spray Vlv. 2E11-F027B.
At panel 2H11-P601, the Operator has RECOGNIZED that 2E11-F027B failed to OPEN, green light ILLUMINATED.
2011-301 SIM-5 Page 7 of 7 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
END TIME:__________
NOTE: The terminating cue shall be given to the operator when any one of the following is met:
After JPM step #12 is complete.
With no reasonable progress, the Operator exceeds double the allotted time.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
EVALUATOR - PICK UP the Initiating Cue sheet.
FINAL Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM SIM 6 FINAL ALL TITLE TRANSFER A STATION SERVICE 4160 VAC BUS FROM STARTUP SUPPLY TO THE AUXILIARY TRANSFORMER AUTHOR MEDIA NUMBER TIME Anthony Ball 2011-301 SIM-6 8.0 Minutes RECOMMENDED BY APPROVED BY DATE C. M. EDMUND 05/26/2011
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:
OPERATIONS TRAINING Media Number:
2011-301 SIM-6 Rev. No.
Date Reason for Revision Authors Initials Supvs Initials 00 5/26/11 General revision for 2011-301 NRC Exam. This JPM originated from LR-JP-27.40.
ARB CME
2011-301 SIM-6 Page 1 of 6 UNIT 1 (X)
UNIT 2 (X)
TASK TITLE:
TRANSFER A STATION SERVICE 4160 VAC BUS FROM STARTUP SUPPLY TO THE AUXILIARY TRANSFORMER JPM NUMBER:
2011-301 SIM-6 TASK STANDARD:
The task shall be completed when the operator has transferred one station service bus from its Alternate to Normal source per 34SO-R22-001.
TASK NUMBER:
027.040 OBJECTIVE NUMBER: 027.040.A PLANT HATCH JTA IMPORTANCE RATING:
RO SRO K/A CATALOG NUMBER: 262001A4.04 K/A CATALOG JTA IMPORTANCE RATING:
RO 3.60 SRO 3.70 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)
GENERAL
REFERENCES:
Unit 1 Unit 2 34SO-R22-001-1 (current version) 34SO-R22-001-2 (current version)
REQUIRED MATERIALS:
Unit 1 Unit 2 34SO-R22-001-1 (current version) 34SO-R22-001-2 (current version)
APPROXIMATE COMPLETION TIME: 8.0 Minutes SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE
2011-301 SIM-6 Page 2 of 6 SIMULATOR SETUP Simulator Initial Conditions:
- 1.
RESET the Simulator to IC #112 or SNAP 616 and leave in FREEZE.
- 2.
Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:
A. Place 4160 VAC Bus 2A on SUT 2C.
B. Reduce Reactor power to 85% as indicated on the APRMs.
- 3.
PLACE the Simulator in FREEZE until the INITIATING CUE is given.
- 4.
ESTIMATED Simulator SETUP TIME:
10 Minutes
UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
- 1.
The Reactor is at 85% power.
- 2.
All systems are in their normal full power configuration with the exception of 4160 VAC Station Service Bus 2A. It is being powered by its Alternate Supply.
INITIATING CUES:
Hot Transfer 4160 VAC Station Service Bus 2A to its Normal Supply per 34SO-R22-001-2.
2011-301 SIM-6 Page 4 of 6 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
START TIME:__________
- 1. Operator reviews the procedures precautions and limitations.
Operator has reviewed the precautions and limitations.
- 2. Operator confirms ASD Bus Transfer Logic switch is in the ON position.
At panel 2H11-P651, the operator has VERIFIED the ASD Bus Transfer Logic switch is in the ON position.
- 3. Place the Interlock Cutout switch for Bus 2A to OFF.
At panel 2H11-P651, the operator has PLACED the ACB 135434-135454 STATION SVC INTERLOCK CUTOUT Switch into the OFF (down) position.
- 4. Place ACB 135434 Sync Switch (SSW) in ON.
At panel 2H11-P651, the operator has PLACED the SSW ACB 135434 into the ON position.
NOTE: Step 5 requires the operator to place the VOLT SELECT UNIT AUX XFMR 2B voltmeter switch to ON position.
2011-301 SIM-6 Page 5 of 6 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
- 5. Confirm that both 4160 VAC Bus 2A supply sources are synchronized and voltage is normal on UAT 2B.
At panel 2H11-P651, the operator has VERIFIED:
The SYNCHSCOPE indicates 12 OCLOCK.
SYNCHSCOPE lights are EXTINGUISHED.
VOLT SELECT UNIT AUX XFMR 2B voltmeter switch is in ON position.
4160V VOLTMETER indicates approx. 4160 VAC (accept 4100 to 4400 VAC).
- 6. Close ACB 135434, the Normal Supply breaker for 4160 VAC Bus 2A.
At panel 2H11-P651, the operator has PLACED the NORMAL SUPPLY ACB 135434 into the CLOSE position, red light ILLUMINATED.
NOTE: The next step requires 2R22-S001(BUS 2A) XFMR 2B AMPS SELECT switch to be in position 1, 2, or 3.
- 7. Confirm that current increases from UAT 2B.
At panel 2H11-P651, the operator has VERIFIED ACB 135434 AC AMPS meter indicates an increase in amperage.
- 8. Trip ACB 135454, the Alternate Supply breaker for 4160 VAC Bus 2A.
At panel 2H11-P651, the operator has PLACED the ALTERNATE SUPPLY ACB 135454 switch into the OPEN position, green light ILLUMINATED.
2011-301 SIM-6 Page 6 of 6 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
- 9. Place ACB 135434 Sync Switch in OFF.
At panel 2H11-P651, the operator has PLACED the SSW ACB 135434 switch into the OFF position.
- 10. Place the Interlock Cutout switch for 4160 VAC Bus 2A in NORMAL position.
At panel 2H11-P651, the operator has PLACED the ACB 135434-135454 STATION SVC INTERLOCK CUTOUT Switch into the NORMAL (up) position.
END TIME:__________
NOTE: The terminating cue shall be given to the operator when the following is met:
Operator states the task is complete.
TERMINATING CUE: That completes your task.
EVALUATOR - PICK UP the Initiating Cue sheet.
FINAL Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM SIM 7 RO & SRO-I TITLE Respond to the trip of a Reactor Recirc Pump while the Recirc pumps are running at less than 35% speed, and plot plant operation on the Power/Flow Map.
AUTHOR MEDIA NUMBER TIME Ed Jones 2011-301 SIM-7 20 Minutes RECOMMENDED BY APPROVED BY DATE N/R C. M. EDMUND 5/26/2011
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:
OPERATIONS TRAINING Media Number:
2011-301 SIM-7 Rev.
No.
Date Reason for Revision Authors Initials Supvs Initials 00 5/26/11 Initial development for NRC Exam 2011-301.
ELJ CME
2011-301 SIM-7 Page 1 of 7 UNIT 1
( )
UNIT 2 (X)
TASK TITLE:
Respond to the trip of a Reactor Recirc Pump while the Recirc pumps are running at less than 35% speed, and plot plant operation on the Power/Flow Map.
JPM NUMBER:
2011-301 SIM-7 TASK STANDARD:
The task shall be completed when the tripped Recirc Pump Discharge valve has been closed and then re-opened AND the operator plots where the plant is operating on the Power/Flow map.
TASK NUMBER:
200.037 OBJECTIVE NUMBER: 200.037.A PLANT HATCH JTA IMPORTANCE RATING:
RO SRO K/A CATALOG NUMBER: 216000A3.01 K/A CATALOG JTA IMPORTANCE RATING:
RO 3.4 SRO 3.4 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)
GENERAL
REFERENCES:
Unit 2 34AB-B31-001-2 (current version) 34GO-OPS-005-2(current version) 34SO-B31-001-2 (current version)
REQUIRED MATERIALS:
Unit 2 34AB-B31-001-2 (current version) 34GO-OPS-005-2(current version) 34SO-B31-001-2 (current version)
APPROXIMATE COMPLETION TIME: 20 Minutes SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE
2011-301 SIM-7 Page 2 of 7 SIMULATOR SETUP Simulator Initial Conditions:
- 1.
RESET the Simulator to IC #110 or SNAP 617 and leave in FREEZE.
- 2.
INSERT the following MALFUNCTIONS:
RB#
MALF #
TITLE FINAL VALUE RAMP RATE ACT.
TIME RB-1 mfB31_38B Recirc Pump B Motor Protection Trip N/A N/A 9999
- 3.
Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:
A. REDUCE Reactor Recirc Pumps to MINIMUM speed.
B. INSERT control rods to reduce power to approx. 36%, with the goal of remaining below the 78% load line.
C. PRESS RB-1 to activate Recirc Pump B Motor Protection Trip.
D. Allow plant conditions to STABILIZE.
E. Acknowledge/reset alarms.
F.
TURN OFF the Process Computer monitor.
- 4.
PLACE the Simulator in FREEZE until the INITIATING CUE is given.
- 5.
ESTIMATED Simulator SETUP TIME:
25 Minutes
UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
- 1.
Unit 2 was operating approximately 36% power.
- 2.
Both Reactor Recirc Pumps were running at minimum speed.
- 3.
- 4.
The Process Computer monitor is NOT functional.
- 5.
The 2B Reactor Recirc pump has just tripped.
- 6.
Personnel have been directed to investigate the cause of the pump trip.
INITIATING CUES:
- 1.
RESPOND to the trip of the 2B Reactor Recirc Pump IAW 34AB-B31-001-2.
AND
- 2.
PLOT the plant operating point on the Unit 2 Power/Flow map
2011-301 SIM-7 Page 4 of 7 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
START TIME:__________
- 1. The operator identifies correct procedure SECTION to use.
The operator has IDENTIFIED the correct section: Section 1 Loss Of A Single Reactor Recirculation Pump A or B.
- 2. Verify whether the OPRM System is INOPERABLE.
The operator has DETERMINED the OPRMs are OPERABLE, (information provided in JPM Initial Conditions) and that it is NOT necessary to enter 34AB-C51-001-2 NOTE: It is expected that the operator will read the NOTE, located just before step 4.2. The NOTE describes how to determine core flow with one Recirc Pump out of service when the Running pump is operating below 35% pump speed.
- 3. Verify the Running Recirc. Pump is operating below rated flow for one pump.
The operator has VERIFIED that the 2A Recirc pump is operating below rated flow using 2B31-R617, Drive Flow indicator (P602).
2011-301 SIM-7 Page 5 of 7 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
NOTE: The operator may choose to plot position on the Power/Flow map at this time. These steps are NOT required to be done in order.
NOTE: The operator will calculate actual core flow as follows:
1st step: ADD Jet Pump Total Flow indications (2B21-R611A/R611B (P602)). The values total approx 24 MLB/hr for these plant conditions.
2nd step: This number is divided by 77 MLB/hr (rated core flow).
The result is ACTUAL CORE FLOW, approx. 31% then, 3rd step: The operator uses 2C51-K620A&B, APRM Display (P603) to determine that Rx power is approx. 36%.
- 4. Verfy whether or not the plant is operating inside the Immediate Exit Region of the Power/Flow Map.
The operator has PLOTTED the operating point on the Power/Flow map (P603) and has DETERMINED the plant is operating in the ACCEPTABLE region with the following values:
ACTUAL CORE FLOW, approx.
31% (Accept 28.0% - 34.0%)
Rx power is approx. 36%
(Accept +/- 3%);
NOTE: If the operator uses the 2B31-R613, Core Plate dp/Rx Core Flow recorder (P603), the plotted point will erroneously indicate the plant is operating in the Safety Limit Region of the Power/Flow map, approx. 7%
core flow with 36% power. See attached Evaluator Answer Key.
PROMPT:
IF the operator reports that the plant is in the Safety Limit area of the Power/Flow Map, DIRECT the operator to continue responding to the tripped Recirc Pump (unless all required actions have previously been taken).
2011-301 SIM-7 Page 6 of 7 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
- 5. Close Reactor Recirc Pump Discharge Valve, 2B31-F031B and record the time.
The operator has PLACED the PUMP DISCH VLV, 2B31-F031B onto the close position, green light ILLUMINATED (P602), and the operator has RECORDED the time the valve is fully CLOSED.
PROMPT:
IF addressed, INFORM the Operator it is desired to maintain Recirc loop temperature.
- 6. Within 5 mintues, throttle open Reactor Recirc Pump Discharge Valve, 2B31-F031B.
The operator has THROTTLED PUMP DISCH VLV, 2B31-F031B OPEN (P602) within 5 minutes of the time recorded in JPM step 6, red and green lights ILLUMINATED.
PROMPT:
WHEN the operator addresses subsequent steps in the procedure as the SS, INFORM the operator that another operator will complete the rest of the procedure steps.
END TIME:__________
NOTE: The terminating cue shall be given to the operator when any one of the following is met:
Operator states the task is complete.
TERMINATING CUE: That completes your task.
EVALUATOR - PICK UP the Initiating Cue sheet.
2011-301 SIM-7 Page 7 of 7 Evaluator Answer Key
FINAL Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM CR 8 ALL TITLE PLACE THE CONTROL ROOM HVAC SYSTEM IN THE PRESSURIZATION MODE WITH SYSTEM FAILURE AUTHOR MEDIA NUMBER TIME Anthony Ball 2011-301 SIM-8 21.0 Minutes RECOMMENDED BY APPROVED BY DATE N/R C. M. EDMUND 5/26/2011
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:
OPERATIONS TRAINING Media Number:
2011-301 SIM-8 Rev. No.
Date Reason for Revision Authors Initials Supvs Initials 00 5/26/11 First Recirc Fan started fails. This JPM was modified from LR-JP-25017.
ARB CME
2011-301 SIM-8 Page 1 of 7 UNIT 1 (X)
UNIT 2 ( )
TASK TITLE:
PLACE THE CONTROL ROOM HVAC SYSTEM IN THE PRESSURIZATION MODE WITH SYSTEM FAILURE JPM NUMBER:
2011-301 SIM-8 TASK STANDARD:
The task shall be completed when the Control Room Ventilation System has been placed in the Pressurization Mode per 34SO-Z41-001-1.
TASK NUMBER:
037.008 OBJECTIVE NUMBER: 037.008.A PLANT HATCH JTA IMPORTANCE RATING:
RO SRO K/A CATALOG NUMBER: 2930003A4.01 K/A CATALOG JTA IMPORTANCE RATING:
RO 3.20 SRO 3.20 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)
GENERAL
REFERENCES:
Unit 1 34SO-Z41-001-1 34AR-603-214-2 34AR-603-215-2 (current versions)
REQUIRED MATERIALS:
Unit 1 34SO-Z41-001-1 (current version)
APPROXIMATE COMPLETION TIME: 21.0 Minutes SIMULATOR SETUP: N/A
UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:
- 1.
Unit 1 and Unit 2 have been operating at 100% power with ALL systems operating in their NORMAL mode.
- 2.
Subsequently, Unit 2 received a Group I isolation on a Main Steam Line High Flow signal.
- 3.
The Unit 2 operators are addressing the 603-214, MAIN STEAM LINE FLOW A HIGH AND 603-215, MAIN STEAM LINE FLOW B HIGH, Annunciator Response Procedures.
- 4.
The Unit 1 Shift Supervisor has been notified of the Unit 2 transient.
INITIATING CUES:
IAW 34AR-603-214-2 & 215-2, CONFIRM Control Room Ventilation is shifted to Pressurization Mode per 34SO-Z41-001-1, Control Room Ventilation System.
2011-301 SIM-8 Page 3 of 7 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
START TIME:__________
NOTE: The following steps are performed from Section 7.1.2 and then transitioning to Section 7.1.3 of 34SO-Z41-001-1.
- 1. Operator reviews the procedures precautions and limitations.
Operator has reviewed the precautions and limitations.
PROMPT:
WHEN the operator states confirming Pressurization Mode Trip Ch A & B lights illuminated, INFORM the operator the lights are NOT illuminated.
- 2. Confirms Pressurization Mode Trip Ch A & B lights are ON at 1H11-P657/P654.
At panel the operator has DETERMINED 1H11-P657 (P654), red lights are NOT ILLUMINATED.
- 3. Open Roll Filter Bypass, 1Z41-F015.
At MCR Door the operator has PLACED the C70, Roll Filter Bypass, 1Z41-F015 control switch into the OPEN position, red light ILLUMINATED.
- 4. Open Filter Inlet, 1Z41-F013A.
At panel 1H11-P657, the operator has PLACED the Filter Inlet control switch, 1Z41-F013A, into the OPEN position, red light ILLUMINATED.
- 5. Open Filter Inlet, 1Z41-F013B.
At panel 1H11-P654, the operator has PLACED the Filter Inlet control switch, 1Z41-F013B, into the OPEN position, red light ILLUMINATED.
2011-301 SIM-8 Page 4 of 7 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
NOTE: The operator can start either Recirc Fan (1Z41-C012A or C012B).
PROMPT:
WHEN the operator states placing 1Z41-C012A or B to RUN, INFORM the operator the selected Recirc Fan green light remains illuminated.
NOTE: The following steps (7 through 12) are written for the operator starting Recirc Fan, 1Z41-C012A, FIRST.
If the operator starts Recirc Fan, 1Z41-C012B, FIRST, THEN substitute the information in the parenthesis.
- 6. Places Recirc Fan, 1Z41-C012A (C012B) to RUN.
At panel 1H11-P657 (P654), the operator has PLACED the Recirc Fan, 1Z41-C012A (C012B),
control switch into the RUN position, green light ONLY IS ILLUMINATED.
- 7. Confirms 1Z41-F007A (F008A), Inlet to Unit 1Z41-B003A, OPEN At panel 1H11-P657 (P654), the operator has VERIFIED that 1Z41-F007A (F008A), green light ONLY IS ILLUMINATED.
- 8. Confirms 1Z41-F007B (F008B), Inlet to Unit 1Z41-B003B, OPEN.
At panel 1H11-P657 (P654), the operator has VERIFIED that 1Z41-F007B (F008B), green light ONLY IS ILLUMINATED.
- 9. Confirms 1Z41-F007C (F008C), Inlet to Unit 1Z41-B003C, OPEN.
At panel 1H11-P657 (P654), the operator has VERIFIED that 1Z41-F007C (F008C), green light ONLY IS ILLUMINATED.
PROMPT:
IF the operator notifies the Shift Supervisor of 1Z41-C012A (C012B) failure, as the Shift Supervisor, DIRECT the operator to continue to place the MCREC System in the proper operational configuration for the present conditions IAW 34SO-Z41-001-1.
2011-301 SIM-8 Page 5 of 7 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
- 10. Starts Recirc Fan, 1Z41-C012B (C012A).
At panel 1H11-P654 (P657), the operator has PLACED the Recirc Fan, 1Z41-C012B (C012A) control switch into the RUN position, red light ILLUMINATED.
- 11. Confirms the following dampers are open:
1Z41-F008A (F007A) 1Z41-F008B (F007B) 1Z41-F008C (F007C) 1Z41-F014B (F014A)
At panel 1H11-P654 (P657), the operator has VERIFIED that the following dampers are OPEN for Fan 1Z41-C012B (C012A), red lights ILLUMINATED:
1Z41-F008A (F007A), to B003A 1Z41-F008B (F007B), to B003B 1Z41-F008C (F007C), to B003C 1Z41-F014B (F014A), Recirc Inlet
- 12. Closes the following dampers:
1Z41-F012 1Z41-F019 1Z41-F020 At panel 1H11-P654, the operator has PLACED the control switches for the following dampers into the CLOSE position, green lights ILLUMINATED:
1Z41-F012, Filter Bypass 1Z41-F019, Mens Restroom Vent Isol Dmpr 1Z41-F020, Womens Restroom Vent Isol Dmpr
2011-301 SIM-8 Page 6 of 7 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
- 13. Close Filter Bypass, 1Z41-F011.
At panel 1H11-P657, the operator has PLACED the Filter Bypass damper 1Z41-F011 control switch into the CLOSE position, green light ILLUMINATED.
- 14. Confirm Mens Restroom Door is closed.
In the Control Room, the operator has VERIFIED that the Mens Restroom Door is CLOSED.
- 15. Places/Confirms control switch for Recirc Fan 1Z41-C012A (C012B) in Standby.
At panel 1H11-P657 (P654), the operator has PLACED the Recirc Fan 1Z41-C012A (C012B) control switch into STANDBY, green light ILLUMINATED.
- 16. Confirm the following dampers are closed:
1Z41-F007A (F008A) 1Z41-F007B (F008B) 1Z41-F007C (F008C) 1Z41-F014A (F014B)
At panel 1H11-P657 (P654), the operator has VERIFIED that the following dampers are CLOSED for Fan 1Z41-C012A (C012B),
green lights ILLUMINATED:
1Z41-F007A (F008A), to B003A 1Z41-F007B (F008B), to B003B 1Z41-F007C (F008C), to B003C 1Z41-F014A (F014B), Recirc Inlet
2011-301 SIM-8 Page 7 of 7 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
- 17. Secures Cable Spreading Room Supply Fan 1Z41-C009.
At panel 1H11-P654, the operator has PLACED the Cable Spreading Room Supply Fan, 1Z41-C009, control switch into the OFF position, green light ILLUMINATED.
- 18. Secure Cable Spreading Room Exhaust Fan 1Z41-C010.
At panel 1H11-P654,, the operator has PLACED the Cable Spreading Room Exhaust Fan 1Z41-C010 control switch into the OFF position, green light ILLUMINATED.
PROMPT: IF the Operator addresses compensatory actions: INFORM the operator someone else is taking care of the compensatory action & any necessary Engineering Evaluations.
END TIME:__________
NOTE: The terminating cue shall be given to the operator when any one of the following is met:
After JPM step #18 is complete.
With no reasonable progress, the operator exceeds double the allotted time.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
EVALUATOR - PICK UP the Initiating Cue sheet.
FINAL Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM PLANT 1 ALL TITLE CROSSTIE REACTOR BUILDING PLANT SERVICE WATER, ALTERNATE PATH AUTHOR MEDIA NUMBER TIME Anthony Ball 2011-301 PLANT-1 12.0 Minutes RECOMMENDED BY APPROVED BY DATE N/R C. M. EDMUND 5/26/2011
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:
OPERATIONS TRAINING Media Number: 2011-301 PLANT-1 Rev. No.
Date Reason for Revision Authors Initials Supvs Initials 00 5/26/11 Initial development to be used on Unit 2 ONLY for HLT-06 NRC Exam 2011-301. This JPM originated from LR-JP-25029A.
ARB CME
2011-301 PLANT-1 Page 1 of 4 UNIT 1
( )
UNIT 2 (X)
TASK TITLE:
CROSSTIE REACTOR BUILDING PLANT SERVICE WATER, ALTERNATE PATH JPM NUMBER:
2011-301 PLANT-1 TASK STANDARD:
The task shall be complete when the operator has crosstied Reactor Building Plant Service Water divisions per 34AB-P41-001-2, Alternate Path TASK NUMBER:
200.013 OBJECTIVE NUMBER: 200.013.E PLANT HATCH JTA IMPORTANCE RATING:
RO SRO K/A CATALOG NUMBER: 295018AA101 K/A CATALOG JTA IMPORTANCE RATING:
RO 3.30 SRO 3.40 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)
GENERAL
REFERENCES:
Unit 1 Unit 2 N/A 34AB-P41-001-2 (current version)
REQUIRED MATERIALS:
Unit 1 Unit 2 N/A 34AB-P41-001-2 (current version)
APPROXIMATE COMPLETION TIME: 12.0 Minutes SIMULATOR SETUP: N/A
UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
- 1.
The Unit 2 Reactor has been scrammed due to a loss of Plant Service Water.
- 2.
Valves 2P41-F316A, B, C, and D are closed. This isolated the PSW break.
- 3.
Both the A and C PSW pumps will not operate.
INITIATING CUES:
Crosstie Reactor Building Plant Service Water divisions per 34AB-P41-001-2.
2011-301 PLANT-1 Page 3 of 4 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
START TIME:__________
PROMPT:
IF requested, INFORM the Operator that 2P41-F316A, B, C, & D are closed and the PSW break is isolated.
NOTE: IAW Section 4.18, Crosstie Cooling Sources, the procedure allows the Operator to open either set of valves to crosstie Divisions.
The **CRITICAL STEPS are satisfied when either set are opened.
(2P41-F070A and 2P41-F070B) or (2P41-F052A and 2P41-F052B)
- 1. Confirm the 2P41-F316A, B, C, & D are closed.
The Control Room is CONTACTED to VERIFY the 2P41-F316A, B, C, & D are closed.
- 2 Open 2P41-F070A.
At 135RLR19, the operator has TURNED 2P41-F070A handwheel, fully counter-clockwise.
PROMPT:
IF this is the first set opened, WHEN the Operator asked for response of valve stem moving, INFORM the Operator 1P41-F070B valve stem is NOT moving.
NOTE: The applicant should address restoring the first valve opened to a standby condition but may wait until cooling water is established before addressing re-closing this valve.
- 3. Open 2P41-F070B.
At 135RLR19, the Operator has TURNED 2P41-F070B handwheel, fully counter-clockwise.
(IF F070A & F070B are the first set of valves opened, this valve stem does NOT move, OTHERWISE it will open).
- 4 Open 2P41-F052A.
At 135RLR19, the Operator has TURNED 2P41-F052A handwheel, fully counter-clockwise.
2011-301 PLANT-1 Page 4 of 4 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
PROMPT:
IF this is the first set opened, WHEN the Operator asked for response of valve stem moving, INFORM the Operator 2P41-F052B valve stem is NOT moving.
NOTE: The applicant should address restoring the first valve opened to a standby condition but may wait until cooling water is established before addressing re-closing this valve.
- 5. Open 2P41-F052B.
At 135RLR19, the Operator has TURNED 2P41-F052B handwheel, fully counter-clockwise.
(IF F052A & F052B are the first set of valves opened, this valve stem does NOT move, OTHERWISE it will open).
NOTE: The **CRITICAL STEPS are satisfied when both valves in either set are opened. (2P41-F070A and 2P41-F070B) or (2P41-F052A and 2P41-F052B)
END TIME:__________
NOTE: The terminating cue shall be given to the operator when any one of the following is met:
After, either, JPM step #3 or 5 is complete.
With no reasonable progress, the operator exceeds double the allotted time.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
EVALUATOR - PICK UP the Initiating Cue sheet.
FINAL Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM PLANT 2 ALL TITLE FROM OUTSIDE THE CONTROL ROOM, INSERT A MANUAL REACTOR SCRAM BY DE-ENERGIZING RPS ON UNIT 2 AUTHOR MEDIA NUMBER TIME Anthony Ball 2011-301 PLANT-2 8.0 Minutes RECOMMENDED BY APPROVED BY DATE N/R C. M. EDMUND 5/26/2011
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:
OPERATIONS TRAINING Media Number: 2011-301 PLANT-2 Rev.
No.
Date Reason for Revision Authors Initials Supvs Initials 00 5/26/11 Initial development to be used on Unit 2 ONLY for HLT-06 NRC Exam 2011-301. This JPM originated from LR-JP-10.17.
ARB CME
2011-301 PLANT-2 Page 1 of 3 UNIT 1
( )
UNIT 2 (X)
TASK TITLE:
FROM OUTSIDE THE CONTROL ROOM, INSERT A MANUAL REACTOR SCRAM BY DE-ENERGIZING RPS ON UNIT 2 JPM NUMBER:
2011-301 PLANT-2 TASK STANDARD:
The task shall be completed when the operator has successfully opened both RPS Trip Channel breakers to de-energize RPS per 31RS-OPS-001-2.
TASK NUMBER:
010.017 OBJECTIVE NUMBER: 010.017.O PLANT HATCH JTA IMPORTANCE RATING:
RO SRO K/A CATALOG NUMBER: 295016AA101 K/A CATALOG JTA IMPORTANCE RATING:
RO 3.80 SRO 3.90 OPERATOR APPLICABILITY: Systems Operator (SO)
GENERAL
REFERENCES:
Unit 1 Unit 2 N/A 31RS-OPS-001-2 (current version)
REQUIRED MATERIALS:
Unit 1 Unit 2 N/A 31RS-OPS-001-2 (current version)
Screwdriver to open panel APPROXIMATE COMPLETION TIME: 8.0 Minutes SIMULATOR SETUP: N/A
UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
- 1.
A condition has occurred which required the Control Room to be evacuated.
- 2.
The Reactor is not shutdown.
- 3.
31RS-OPS-001-2 is in progress.
INITIATING CUES:
Insert a scram by de-energizing RPS on Unit 2 IAW 31RS-OPS-001-2.
2011-301 PLANT-2 Page 3 of 3 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
START TIME:__________
NOTE: The following steps are performed from Step 4.4 of 31RS-OPS-001-2
- 1. Open breaker, 2C71-CB3A.
At panel 2C71-P001, breaker 2C71-CB3A, has been PLACED in the OFF position.
- 2. Open breaker, 2C71-CB3B.
At panel 2C71-P001, breaker 2C71-CB3B, has been PLACED in the OFF position.
- 3. Close the following breakers:
2C71-CB3A 2C71-CB3B At panel 2C71-P001, the following breakers have been PLACED in the ON position:
2C71-CB3A 2C71-CB3B END TIME:__________
NOTE: The terminating cue shall be given to the operator when any one of the following is met:
After JPM step #3 is complete.
With no reasonable progress, the operator exceeds double the allotted time.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
EVALUATOR - PICK UP the Initiating Cue sheet.
FINAL Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM PLANT 3 RO & SRO-I TITLE TRANSFER THE VITAL AC SYSTEM FROM ALTERNATE POWER TO THE INVERTER AUTHOR MEDIA NUMBER TIME Anthony Ball 2011-301 PLANT-3 12.0 Minutes RECOMMENDED BY APPROVED BY DATE N/R C. M. EDMUND 5/26/2011
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:
OPERATIONS TRAINING Media Number: 2011-301 PLANT-3 Rev. No.
Date Reason for Revision Authors Initials Supvs Initials 00 5/26/11 Initial development to be used on Unit 1 ONLY for HLT-06 NRC Exam 2011-301. This JPM originated from LR-JP-02731.
ARB CME
2011-301 PLANT-3 Page 1 of 5 UNIT 1 (X)
UNIT 2
( )
TASK TITLE:
TRANSFER THE VITAL AC SYSTEM FROM ALTERNATE POWER TO THE INVERTER JPM NUMBER:
2011-301 PLANT-3 TASK STANDARD:
The task shall be completed when Vital AC Power has been transferred from the alternate source to the inverter per 34SO-R25-002-1.
TASK NUMBER:
027.031 OBJECTIVE NUMBER: 027.031.O PLANT HATCH JTA IMPORTANCE RATING:
RO SRO K/A CATALOG NUMBER: 262002A4.01 K/A CATALOG JTA IMPORTANCE RATING:
RO 2.80 SRO 3.10 OPERATOR APPLICABILITY: System Operator (SO)
GENERAL
REFERENCES:
Unit 1 Unit 2 34SO-R25-002-1 (current version)
N/A REQUIRED MATERIALS:
Unit 1 Unit 2 34SO-R25-002-1 (current version)
N/A APPROXIMATE COMPLETION TIME: 12.0 Minutes SIMULATOR SETUP: N/A
UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:
- 1.
Vital AC room cooler is in operation.
- 2.
The Vital AC rectifier and inverter have been started.
INITIATING CUES:
Transfer Unit 1 Vital AC from the Alternate Source to the Vital AC Inverter per 34SO-R25-002-1.
2011-301 PLANT-3 Page 3 of 5 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
START TIME:__________
NOTE: The following steps are performed from Section 7.1.4 of 34SO-R25-002-1.
- 1. Operator may review the procedures precautions and limitations.
Operator has reviewed the precautions and limitations.
- 2. Confirm the SYNC - Monitor light is illuminated.
At the Vital AC Panel, location 112TET12, SYNC - MONITOR clear light is illuminated.
- 3. Confirm the Return Mode Switch is in AUTO.
At Vital AC Panel, 112TET12, the RETURN MODE switch is in AUTO.
- 4. Place the Manual Bypass Switch in BYP-SYNC.
At Vital AC Panel, 112TET12, the MANUAL BYPASS switch has been PLACED in the BYP-SYNC position.
- 5. Confirm the SYNC-MONITOR light is extinguished.
At Vital AC Panel, 112TET12, the clear SYNC-MONITOR light is extinguished.
- 6. Place the Manual Bypass Switch in BYP-TEST.
At Vital AC Panel, 112TET12, MANUAL BYPASS switch has been PLACED in the BYP-TEST position.
- 7. Confirm the following indicators:
Inverter light illuminated.
Alt Line light extinguished.
Sync Monitor light extinguished.
At Vital AC Panel, 112TET12, the operator has IDENTIFIED the following indications:
INVERTER red light illuminated.
ALT LINE white light extinguished.
SYNC MONITOR clear light extinguished.
- 8. Notifies Control Room of Vital AC Sys Trouble (651-156) and Vital AC Sys On Alt Supply (651-157) alarms will be received.
The operator has NOTIFIED the Control Room of the impending alarms.
2011-301 PLANT-3 Page 4 of 5 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
- 9. Place the TEST toggle switch in Alt Line position.
At Vital AC Panel, 112TET12, the TEST toggle switch has been PLACED in the ALT LINE (down) position.
- 10. Confirm the following indications:
Alt line light illuminated.
Inverter light extinguished.
Sync Monitor light extinguished.
At Vital AC Panel, 112TET12, the operator has IDENTIFIED the following indications:
ALT LINE white light illuminated.
INVERTER red light extinguished.
SYNC MONITOR clear light extinguished.
NOTE: Per the Caution prior to JPM step #11, JPM step #9 must be completed prior to JPM step #11.
- 11. Place the MANUAL BYPASS Switch in Normal.
At Vital AC Panel, 112TET12, the MANUAL BYPASS Switch has been PLACED in the NORMAL position.
- 12. Place the TEST toggle switch in Center position.
At Vital AC Panel, 112TET12, the TEST toggle switch has been PLACED in the CENTER position.
- 13. Confirm the following indications:
Inverter light illuminated.
Alt Line light extinguished.
Sync Monitor light extinguished.
At Vital AC Panel, 112TET12, the operator has IDENTIFIED the following indications:
INVERTER red light illuminated.
ALT LINE White light extinguished.
SYNC MONITOR clear light extinguished.
2011-301 PLANT-3 Page 5 of 5 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
PROMPT:
WHEN addressed by the operator, as the Shift Supervisor, INFORM the operator that it is desired to place the Return Mode Switch to Manual.
- 14. Place the RETURN MODE switch in manual.
At Vital AC Panel, 112TET12, the RETURN MODE switch has been PLACED in the MAN position.
NOTE: The procedure gives the operator the option of placing the RETURN MODE SWITCH to manual. While simulating the JPM, the student may notice that the switch is in the AUTO position. This is NOT a problem.
END TIME:__________
NOTE: The terminating cue shall be given to the operator when any one of the following is met:
After JPM step #14 is complete.
With no reasonable progress, the operator exceeds double the allotted time.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
EVALUATOR - PICK UP the Initiating Cue sheet.