ML11224A123

From kanterella
Jump to navigation Jump to search
OL - FW: Updated OI List
ML11224A123
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 08/01/2011
From:
Office of Nuclear Reactor Regulation
To:
Division of Operating Reactor Licensing
References
Download: ML11224A123 (59)


Text

WBN2Public Resource From: Poole, Justin Sent: Monday, August 01, 2011 2:25 PM To: Crouch, William D Cc: Clark, Mark Steven; WBN2HearingFile Resource

Subject:

FW: Updated OI List Attachments: 20110729 Open Item List Master NRC Update 07-29-11.docx If this is a duplicate, ie Pat already sent this, please delete. Thanks.

Justin C. Poole Project Manager NRR/DORL/LPWB U.S. Nuclear Regulatory Commission (301)415-2048 email: Justin.Poole@nrc.gov From: Darbali, Samir Sent: Friday, July 29, 2011 2:45 PM To: Milano, Patrick Cc: Poole, Justin; Rahn, David

Subject:

Updated OI List

Pat, Here is the updated OI list to be forwarded to TVA.
Thanks, Samir 1

Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 482 Mail Envelope Properties (19D990B45D535548840D1118C451C74D956B1D9531)

Subject:

FW: Updated OI List Sent Date: 8/1/2011 2:25:11 PM Received Date: 8/1/2011 2:25:15 PM From: Poole, Justin Created By: Justin.Poole@nrc.gov Recipients:

"Clark, Mark Steven" <msclark0@tva.gov>

Tracking Status: None "WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>

Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>

Tracking Status: None Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 471 8/1/2011 2:25:15 PM 20110729 Open Item List Master NRC Update 07-29-11.docx 577417 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N B (

1.

001 All All A The Watts Bar Nuclear Plant FSAR red-line for Unit 2 (Agency 12/15/2009 Presentation Slides Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR contains B (

2.

002 All All A Are there I&C components and systems that have changed to a 12/15/2009 Presentation Slides Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR contains B (

3.

003 All All A Because a digital I&C platform can be configured and programmed 12/15/2009 Presentation Slides Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR contains

( ( ( ( B 004 All All Please identify the information that will be submitted for each Responder: Webb 1/13/10 Public Meeting 4. Y Closed Closed EICB RAI January 13, 2010 NNC 11/19/09: LIC-110 Rev. 1 Section 005 7.1.3. By letter date February 28, 2008 (Agencywide Documents Access Responder: Craig/Webb 5. Y Closed Closed EICB RAI TVA Letter dated 006 Amendment 95 of the FSAR, Chapter 7.3, shows that change 7.3-1 By letter dated February 5, 2010: TVA provided the Unit 2 6. Y Closed Closed EICB RAI TVA Letter dated NNC: WCAP-12096 Rev. 7 D D D D 007 7.1.3. The setpoint methodology has been reviewed and approved by the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 7 7. Y Closed Closed EICB RAI TVA Letter dated TVA to provide Rev. 8 of the Unit 1

( ( ( ( (

008 7.3 There are several staff positions that provide guidance on setpoint TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 8 8. Y Closed Closed EICB RAI TVA Letter dated a a a a (

009 7.3.2 5.6, Change 7.3-2, identified in Watts Bar Nuclear Plant FSAR red-line TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 9 9. Y Closed Closed EICB RAI 3/12/10, G G G G G 010 7.3 7.3 The original SER on Watts Bar (NUREG-0847) documents that the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 10 10. Y Closed Closed EICB RAI 3/12/10, 011 7.3.2 5.6, NUREG-0847 Supplement No. 2 Section 7.3.2 includes an TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 11 11. Closed Closed EICB RAI ML101680598, A

Y 012 7.4 7.4 The original SER on Watts Bar (NUREG-0847) documents that the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 12 12. Y Closed Closed EICB RAI TVA Letter dated 013 7.1.3. Chapter 7 and Chapter 16 of Amendment 95 to the FSAR do not TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 13 13. Y Closed Closed EICB RAI TVA Letter dated TS have been docketed.

( ( B 014 All All Provide the justification for any hardware and software changes Date: 4/27/10 14. Y Closed Closed NRC Meeting TVA Letter dated 015 Verify that the refurbishment of the power range nuclear Date: 4/27/10 15. Y Closed Closed NRC Meeting TVA Letter dated 016 Identify the precedents in license amendment requests (LARs), if Date: 4/27/10 16. Y Closed Closed NRC Meeting TVA Letter dated

( D D (

017 7.3.1 7.3.1, Identify precedents in LARs, if any, for the solid state protection Date: 4/27/10 17. Y Closed Closed NRC Meeting TVA Letter dated

( ( ( ( ( (

018 Identify any changes made to any instrumentation and control Date: 4/27/10 18. Y Closed Closed NRC Meeting TVA Letter dated 019 Verify that the containment purge isolation radiation monitor is the Date: 4/27/10 19. Y Closed Closed NRC Meeting TVA Letter dated C a a C (

020 Provide environmental qualification information pursuant to Section Date: 4/27/10 20. Y Closed Closed NRC Meeting TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:

G G G G G G 021 7.3 For the Foxboro Spec 200 platform, identify any changes in Date: 5/25/10 21. Y Closed Closed NRC Meeting TVA Letter dated The resolution of this item will be A

022 7.3.2 5.6, Verify the auxiliary feedwater control refurbishment results in a like- Date: 4/27/10 22. Y Closed Closed NRC Meeting TVA Letter dated 023 Provide environmental qualification (10 CFR 50.49) information for Date: 4/27/10 23. Y Closed Closed NRC Meeting TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:

024 Provide a schedule by the January 13, 2010, meeting for providing During the January 13, 2010 meeting, TVA presented a 24. Y Closed Closed NRC Meeting N/A - Request for NNC 4/30/10: Carte to address

( ( ( ( ( (

025 7.5.2 7.5.1 For the containment radiation high radiation monitor, verify that the Date: 4/27/10 25. Y Closed Closed NRC Meeting ML101230248, 026 Provide environmental qualification (10 CFR 50.49) information for Date: 4/27/10 26. Y Closed Closed NRC Meeting TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:

( ( ( (

027 7.7.1. For Foxboro I/A provide information regarding safety/non-safety- Date: 4/27/10 27. Y Closed Closed NRC Meeting TVA Letter dated 028 For the turbine control AEH system, verify that the refurbishment Responder: Mark Scansen 28. Y Closed Closed NRC Meeting TVA Letter dated C C C C C S 029 For the rod control system, verify that the refurbishment results in a Date: 4/27/10 29. Y Closed Closed NRC Meeting TVA Letter dated G G G G 030 Regarding the refurbishment of I&C equipment, identify any Responder: Clark 30. Y Closed Closed NRC Meeting TVA Letter dated 031 For the rod position indication system (CERPI), provide information Date: 4/27/10 31. Y Closed Closed NRC Meeting TVA Letter dated CERPI is non-safety related.

i 032 For the process computer, need to consider cyber security issues Date: 4/27/10 32. Y Closed Closed NRC Meeting TVA Letter dated EICB will no longer consider cyber 033 For the loose parts monitoring system, provide information Date: 4/27/10 33. Y Closed Closed NRC Meeting TVA Letter dated The loose parts monitoring system is 034 2/4/2010 Responder: TVA 34. Y Closed Closed N/A TVA Letter dated 034. ( Chapter 7.1 - Introduction 35. Y Closed Closed N/A N/A

( a 034. D Chapter 7.2 - Reactor Trip System 36. Y Closed Closed N/A N/A M ( r 034. 7.3 7.3 a Chapter 7.3 - ESFAS 37. Y Closed Closed N/A N/A a G g 034. 7.5.1. 7.5.2 Chapter 7.5 - Instrumentation Systems Important to Safety 38. Y Closed Closed N/A N/A Closed 034. 7.5.1. 7.5.2 Chapter 7.6 - All Other Systems Required for Safety 39. Y Closed Closed N/A N/A Closed r

c u

034. Chapter 7.7 Control Systems 40. Y Closed Closed N/A N/A n

g h

/

035 ( 2/18/2010 Responder: Clark 41. Y Closed Closed RAI No. 1 TVA Letter dated LIC-110 Section 6.2.2 states: Design

( (

M 036 7.5.2 7.5.1 C S February 18, 2010 Date: 5/25/10 42. Y Closed Closed NRC Meeting NNC: Unit 2 FSAR Section 7.5.1, Post a

i 037 7.5.1. 7.5.2 2/18/2010 Responder: Clark Date: 5/25/10 43. Y Closed Closed N/A TVA Letter dated FSAR Amendment 100 provides

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 038 7.5.1. 7.5.2 ( 2/18/2010 Responder: Clark Date: 5/25/10 44. Y Closed Closed EICB RAI TVA Letter dated The slides presented at the December 039 ( ( M January 13, 2010 Responder: Clark Date: 5/25/10 45. Y Closed Closed EICB RAI FSAR amendment The equation for the calculation of the G G a 040 January 13, 2010 Responder: Clark Date: 5/25/10 46. Y Closed Closed EICB RAI EICB RAI FSAR amendment The equation for the calculation of the B

042 All All February 25, 2010: Telecom Date: 5/25/10 47. Y Closed Closed EICB RAI TVA Letter dated The drawing provided did not have the 044 7.5.2 7.5.1 February 25, 2010 Date: 5/25/10 48. Y Closed Closed EICB RAI TVA Letter dated 045 February 25, 2010 Date: 5/25/10 49. Y Closed Closed EICB RAI TVA Letter dated 046 ( ( ( ( ( ( ( February 25, 2010 Date: 5/25/10 50. Y Closed Closed N/A - Request for N/A 047 7.5.2 7.5.1 ( 4/8/2010 Responder: WEC/Hilmes Date: 5/25/10 51. Y Closed Closed EICB RAI TVA Letter dated C C C C C C C (

048 7.5.2 7.5.1 April 8, 2010 Date: 5/25/10 52. Y Closed Closed EICB RAI TVA Letter dated G

049 7.5.2 7.5.1 4/8/2010 Responder: WEC Date: 5/25/10 53. Y Closed Closed EICB RAI TVA Letter dated A

050 7.5.2 7.5.1 4/8/2010 Responder: WEC Date: 5/25/10 54. N Closed Closed EICB RAI TVA Letter dated NNC 11/18/10: SysRS Rev. 2 contains 051 April 15, 2010 Date: 5/25/10 55. Y Closed Closed N/A N/A Review addressed by another Open

(

052 7.5.2 7.5.1 April 19, 2010 Date: 5/25/10 56. Y Closed Closed RAI No. 12 S

i

(

053 7.5.2 7.5.1 April 19, 2010 Date: 5/25/10 57. Y Closed Closed RAI No. 13 S

i

(

054 7.5.2 7.5.1 4/19/2010 Responder: Slifer/Clark Date: 5/25/10 58. Y Closed Closed RAI No. 14 TVA Letter dated S

i

(

055 7.5.2 7.5.1 4/19/2010 Responder: Slifer/Clark Date: 5/25/10 59. Y Closed Closed RAI No. 15 TVA Letter dated S

i

(

056 April 19, 2010 Date: 5/25/10 60. Y Closed Closed RAI No. 16 TVA Letter dated Sorrento Radiation Monitoring S

i

(

057 7.5.2 7.5.1 4/19/2010 Responder: TVA I&C Staff Date: 5/25/10 61. Y Closed Closed RAI No. 17 TVA Letter dated S

i

(

058 7.5.0 7.5 April 19, 2010 Date: 5/25/10 62. Y Closed Closed RAI No. 18 TVA Letter dated S

i

( ( ( ( ( ( ( ( ( ( ( ( ( ( (

059 7.5.2 7.5.1 April 19, 2010 Date: 63. Y Closed Closed RAI No. 19 TVA Letter dated 060 7.5.2 7.5.1 April 19, 2010 Date: 5/25/10 64. Y Closed Closed N/A N/A Addressed by Open Item No. 47 061 7.5.2 7.5.1 April 19, 2010 Date: 5/25/10 65. Y Closed Closed N/A N/A Addressed by Open Item No. 48

( (

062 7.5.2 7.5.1 April 19, 2010 Date: 5/25/10 66. Y Closed Closed N/A N/A Addressed by Open Item No. 49 063 7.5.2 7.5.1 April 19, 2010 Date: 5/25/10 67. Y Closed Closed N/A N/A Addressed by Open Item No. 50 064 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: Webb Date: 4/8/2010 68. Y Closed Closed N/A - No question TVA Letter dated C C C C C C C C C C C C C C S 065 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 69. Y Closed Closed N/A - No question TVA Letter dated 066 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 70. Y Closed Closed N/A - No question TVA Letter dated 070 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 71. N Closed Closed N/A - No question TVA Letter dated NNC 11/23/10: The dues date in this G G 071 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 72. N Closed Closed N/A - No question N/A NNC 11/23/10: The dues date in this 072 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 73. Y Closed Closed N/A - No question N/A i

073 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 74. N Closed Closed N/A - No question N/A 075 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 75. N Closed Closed N/A - No question N/A 076 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: Clark Date: 5/25/10 76. Y Closed Closed N/A - No question N/A 077 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 77. Y Closed Closed N/A - No question TVA Letter dated 078 4/26/2010 Responder: Clark Date: 5/25/10 78. Y Closed Closed EICB RAI TVA Letter dated 079 4/26/2010 Responder: Clark Date: 5/25/10 79. Y Closed Closed EICB RAI TVA Letter dated Reviewed under Item 154

( ( ( ( (

080 4/26/2010 Responder: WEC 80. Y Closed Closed RAI No. 2 TVA Letter dated 082 7.5.2 7.5.1 5/6/2010 Responder: WEC Date: 6/18/10 81. N Closed Closed EICB RAI TVA Letter dated NNC 11/18/10: See also Open Item No.

083 7.5.2 7.5.1 C C C C S May 6, 2010 Date: 6/18/10 82. Y Closed Closed EICB RAI TVA Letter dated 084 7.5.2 7.5.1 May 6, 2010 Date: 6/18/10 83. Y Closed Closed EICB RAI TVA Letter dated i

085 7.5.2 7.5.1 5/6/2010 Responder: WEC 84. N Closed Closed EICB RAI

(

087 7.5.2 7.5.1 May 6, 2010 Date: 5/24/10 85. Y Closed Closed RAI No. 20 TVA Letter dated S

i 088 7.5.2 7.5.1 May 6, 2010 Date: 5/24/10 86. Y Closed Closed RAI No. 21 TVA Letter dated

(

S i

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

( ( ( ( (

089 5/6/2010 Responder: Clark 87. Y Closed Closed EICB RAI TVA Letter dated NNC: Docketed response states that 090 5/6/2010 Responder: Clark Date: 5/25/10 88. Y Closed Closed EICB RAI TVA Letter dated 091 7.4 7.4 May 20, 2010 Date: 5/25/10 89. Y Closed Closed EICB RAI No.1 TVA Letter dated D D D D D ( (

093 May 20, 2010 Date: 5/25/10 90. Y Closed Closed N/A N/A Will be reviewed under item 154

( (

094 5/20/2010 Responder: Clark Date: 5/25/10 91. Y Closed Closed N/A N/A Information was found in FSAR a a a a a C C 095 7.8.1, XX May 20, 2010 Date: 92. Y Closed Closed EICB RAI No. 2 TVA Letter dated G G 096 7.7.5 XX 5/20/2010 Responder: 93. Y Closed Closed EICB RAI No.3 TVA Letter dated 097 7.4.2 7.4 May 20, 2010 Date: 94. Y Closed Closed EICB RAI No.4 TVA Letter dated 098 7.4.2 7.4 May 25, 2010 Date: 95. Y Closed Closed EICB RAI No.5 TVA Letter dated 099 April 12, 2010 Date: 96. Y Closed Closed Closed to Item 129

( (

(

100 5/20/2010 Responder: WEC 97. Y Closed Closed N/A - No question N/A 102 D D ( ( May 24, 2010 Date: 5/24/10 98. Y Closed Closed N/A TVA Letter dated Request for schedule not information.

103 7.4 7.4 ( B 5/27/2010 Responder: Ayala Date: 5/27/10 99. Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current a a C C G a 104 7.4 7.4 5/27/2010 Responder: Merten Date: 5/27/10 100. Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current 105 April 29, 2010 Date: 101. Y Closed Closed N/A N/A Will be reviewed under item 154.

106 May 6, 2010 Date: 5/25/10 102. Y Closed Closed RAI No. 9 TVA Letter dated

(

S i

107 May 6, 2010 Date: 5/28/10 103. Y Closed Closed RAI No. 22 TVA Letter dated

( (

108 May 6, 2010 Date: 5/25/10 104. Y Closed Closed N/A N/A Will be reviewed under OI#154 109. 7.8 XX 5/6/2010 Responder: N/A 105. Y Closed Closed N/A N/A 109. 5/6/2010 Responder: N/A 106. Y Closed Closed N/A N/A Duplicate of another open Item.

D ( ( ( D (

110 May 6, 2010 Date: 107. Y Closed Closed N/A N/A Information was found.

( ( ( ( ( ( (

111 May 6, 2010 Date: 5/28/10 108. Y Closed Closed N/A TVA Letter dated Request to help find, not a request for 112 June 1, 2010 Date: 109. Y Closed Closed N/A N/A Information was received a C C C a S 113 6/1/2010 Responder: Clark 110. Y Closed Closed EICB RAI TVA Letter dated G G G G G G G 114 7.2 7.2 6/1/2010 Responder: WEC 111. Y Close Closed EICB RAI TVA Letter dated 115 2/25/2010 Responder: Clark 112. Y Closed Closed EICB RAI TVA Letter dated i

116 6/3/2010 Responder: WEC 113. Y Closed Closed EICB RAI TVA Letter dated Letter sent to Westinghouse requesting 117 7.1 7.1 6/3/2010 Responder: Hilmes 114. Y Closed Closed EICB RAI TVA Letter dated 118 7.4 7.4 6/8/2010 Responder: Merten 115. Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current

( ( ( (

119 June 10, 2010 Date: 116. Y Closed Closed RAI No. 23 TVA Letter dated 120 5/6/2010 Responder: Hilmes/Merten/Costley 117. Y Closed Closed EICB RAI TVA Letter dated 121 5/6/2010 Responder: Webb/Webber 118. Y Closed Closed EICB RAI TVA Letter dated D D D D ( ( ( (

122 June 14, 2010 Date: 119. Y Closed Closed N/A - Request for N/A

( (

123 7.7.3 7.4.1, 6/14/2010 Responder: 120. Y Closed Closed ML101720589, TVA Letter dated a a a a C C C S 124 7.7.5 XX 6/14/2010 Responder: 121. Y Closed Closed ML101720589, Item TVA Letter dated G G 125 7.7.8 7.7.1.12 6/14/2010 Responder: 122. Y Closed Closed ML101720589, Item TVA Letter dated 126 7.8 7.8 June 14, 2010 Date: 123. Y Closed Closed ML101720589, Item TVA Letter dated i

127 7.2 7.2 6/16/2010 Responder: WEC/Clark 124. Y Closed Closed EICB RAI TVA Letter dated 128 7.2 7.2 6/18/2010 Responder: WEC Drake /TVA Craig 125. Y Closed Closed EICB RAI TVA Letter dated Track through SE open item

(

129 P 6/12/2010 Responder: WEC 126. Y Closed Closed N/A TVA Letter dated

(

130 P 6/28/2010 Responder: Clark 127. Y Closed Closed N/A TVA Letter dated

(

131 P 6/28/2010 Responder: Clark 128. Y Closed Closed N/A TVA Letter dated

(

132 P 6/28/2010 Responder: Clark 129. Y Closed Closed N/A TVA Letter dated

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

(

133 P 6/28/2010 Responder: Clark 130. Y Closed Closed TVA Letter dated

( (

134 6/28/2010 Responder: Clark 131. Y Closed Closed TVA Letter dated 135 7.3.1 7.3.1 6/30/2010 Responder: Clark 132. Y Closed Closed RAI not necessary TVA Letter dated 136 7.3.2, 7.4, 5.6, 6/30/2010 Responder: Clark 133. Y Closed Closed RAI not necessary TVA Letter dated 137 Several WBN2 PAMS documents contain a table titled, Document Responder: WEC 134. Y Closed Closed ML101650255, Item TVA Letter dated

( ( ( ( ( ( ( D D (

139 The WBN2 PAMS System Requirements Specification (WBN2 Responder: WEC 135. Y Closed Closed ML101650255, Item TVA Letter dated WBN2 PAMS System Requirements 140 The first requirement in the WBN2 PAMS SysRS (i.e., R2.2-1) Responder: Clark 136. N Closed Closed ML101650255, Item TVA Letter dated WBN2 PAMS System Requirements 141 Deleted by DORL Date: 137. Y Closed Closed ML101650255, Item WBN2 PAMS System Requirements C C C C C C C a a P 146 6/17/2010 Responder: 138. Y Closed Closed ML101650255, Item PAMS System Requirements 147 6/17/2010 Responder: 139. Y Closed Closed ML101650255, Item PAMS System Requirements 148 6/17/2010 Responder: 140. Y Closed Closed ML101650255, Item PAMS System Requirements

( ( ( ( ( ( ( ( ( ( ( ( ( ( (

149 7.2 7.2 FSAR Section 7.1.1.2(2), Overtemperature delta T and Responder: Tindell 141. Y Close Closed ML101720589, Item TVA Letter dated 150 7.2 7.2 Many of the changes were based on the Westinghouse document Responder: Clark 142. Y Close Closed ML101720589, Item TVA Letter dated 151 7.2 7.2 Provide the EDCR 52378 and 54504 which discusses the basis for Responder: Clark 143. Y Close Closed ML101720589, Item TVA Letter dated 152 7.2 7.2 Deleted portion of FSAR section 7.2.3.3.4 and moved to FSAR Responder: Merten/Clark 144. Y Close Closed ML101720589, Item TVA Letter dated 153 7.2 7.2 FSAR section 7.2.1.1.7 added the reference to FSAR section Responder: Craig/Webb 145. Y Close Closed ML101720589, Item TVA Letter dated 154 7.2 7.2 FSAR section 7.2.1.1.10, setpoints: NRC staff has issued RIS Responder: Craig/Webb 146. Y Closed Closed ML101720589, Item TVA Letter dated EICB RAI ML102861885 sent to DORL 155 7.2 7.2 Summary of FSAR change document section 7.2 states that Date: 147. Y Closed Closed ML101720589, Item 156 7.2 7.2 FSAR section 7.2.2.1.1 states that dashed lines in Figure 15.1- Responder: WEC 148. Y Closed Closed ML101720589, Item TVA Letter dated Response on hold pending G G G G G G G G G G G G G G G 157 7.2 7.2 FSAR section 7.2.2.1.1, fifth paragraph was deleted except for the Responder: Tindell 149. Y Close Closed ML101720589, Item TVA Letter dated 158 7.2 7.2 FSAR section 7.2.2.1.1, paragraph six was changed to state that Responder: Tindell 150. Y Closed Closed ML101720589, Item TVA Letter dated 159 7.2 7.2 FSAR section 7.2.2.1.2 discusses reactor coolant flow Responder: Craig 151. Y Close Closed ML101720589, Item TVA Letter dated 160 7.2 7.2 FSAR section 7.2.2.2(7) deleted text which has references 12 and Responder: Tindell 152. Y Close Closed ML101720589, Item TVA Letter dated 161 7.2 7.2 FSAR section 7.2.2.3 states that changes to the control function Responder: Clark 153. Y Closed Closed ML101720589, Item TVA Letter dated 162 7.2 7.2 FSAR section 7.2.2.2(14) states that bypass of a protection Responder: Tindell 154. Y Closed Closed ML101720589, Item TVA Letter dated 163 7.2 7.2 Deleted by DORL Date: 155. Y Closed Closed ML101720589, Item 164 7.2 7.2 FSAR section 7.2.2.2(20) has been revised to include the plant Responder: Perkins 156. Y Closed Closed ML101720589, Item TVA Letter dated Item No. 8 sent to DORL a

165 7.2 7.2 FSAR section 7.2.2.3.2, last paragraph of this section has been Responder: Clark 157. Y Closed Closed ML101720589, Item TVA Letter dated 166 7.2 7.2 Changes to FSAR section 7.2.2.2(20) are justified based on the Responder: Clark 158. Y Closed Closed ML101720589, Item TVA Letter dated

( (

167 7.2 7.2 FSAR section 7.2.2.4, provide an analysis or reference to chapter Responder: Clark 159. Y Close Closed ML101720589, Item TVA Letter dated 168 7.2 7.2 FSAR table 7.2-4, item 9 deleted loss of offsite power to station Responder: Clark 160. Y Close Closed ML101720589, Item TVA Letter dated

( ( r 169 6/18/2010 Responder: Clark 161. Y Closed Closed 170 6/17/2010 Responder: Clark 162. Y Closed Closed M M ( ( ( ( ( ( ( ( ( ( ( (

171 7.2 7.2 6/17/2010 Responder: Craig 163. Y Closed Closed EICB RAI TVA Letter dated Closed to SE Open Item 172 6/17/2010 Responder: Craig 164. Y Closed Closed EICB RAI C C g 173 7.1 7.1 6/17/2010 Responder: Craig/Webb/Powers 165. Y Closed Closed EICB RAI 174 6/28/2010 Responder: Hilmes/Craig 166. Y Closed Closed EICB RAI a a G G G G G G G G G G G G 175 June 28, 2010 Responder: 167. Y Closed Closed EICB RAI 176 7.1 7.1 6/28/2010 Responder: Craig/Webb 168. Y Closed Closed EICB RAI l

177 7.5.2. 7.5.1 7/15/2010 Responder: Clark 169. Y Closed Closed N/A TVA Letter dated RAI not required 178 7.5.2. 7.5.1 7/15/2010 Responder: Clark 170. Y Closed Closed N/A TVA Letter dated RAI not required 179 An emphasis is placed on traceability in System Requirements Responder: WEC 171. Y Closed Closed N/A - Closed to NA 180 The SRP, BTP 7-14, Section B.3.3.1 states that Regulatory Guide Responder: WEC 172. Y Closed Closed N/A - Closed to NA

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

(

181 An emphasis is placed on traceability in System Requirements Responder: WEC 173. Y Closed Closed N/A - Closed to NA 182 Characteristics that the SRP states that a Software Requirements Responder: WEC 174. Y Closed Closed N/A - Closed to NA

( ( D ( ( (

184 7/15/2010 Responder: WEC 175. Y Closed Closed N/A - Closed to N/A 186 7.7.8 7.7.1.12 7/15/2010 Responder: Perkins/Clark 176. Y Closed Closed EICB RAI No.6 TVA Letter dated C C a C C C 187 By letter dated June 18, 2010, TVA docketed responses to NRC Responder: Merten 177. N Closed Closed ML101970033, Item TVA Letter dated Are these connections already 188 By letter dated June 30, 2010, TVA docketed, Tennessee Valley Responder: Clark 178. Y Closed Closed ML101970033, Item TVA Letter dated

(

189 7.6.7 7/20/2010 Responder: Clark 179. Y Closed Closed RAI No. 3 TVA Letter dated S

i

( ( ( ( (

190 7.9 FSAR Table 7.1-1 states: Regulatory Guide 1.133, May 1981 Responder: Clark 180. Y Closed Closed RAI No. 4 TVA Letter dated Closed to OI-331.

( (

191 7.9 NUREG-0800 Chapter 7, Section 7.9, "Data Communication Responder: Jimmie Perkins 181. Y Closed Closed ML10197016, Item TVA Letter dated M M M M M 192 7.5.1. 7.5.2 The NRC Staff is using SRP (NUREG-0800) Chapter 7 Section Responder: Clark 182. Y Closed Closed Item No. 1 sent to TVA Letter dated EICB RAI ML1028618855 sent to C S 193 7.5.1. 7.5.2 The WBU2 FSAR, Section 7.5.2, Plant Computer System, Responder: Clark 183. Y Closed Closed Item No. 2 sent to TVA Letter dated EICB RAI ML1028618855 sent to a a a a a 194 7.5.1. 7.5.2.1 The WBU2 FSAR Section 7.5.2.1, Safety Parameter Display Responder: Costley/Norman 184. Y Closed Closed Item No. 3 sent to TVA Letter dated EICB RAI ML1028618855 sent to i

195 7.5.1. 7.5.2.2 Bypassed and Inoperable Status Indication (BISI) Responder: Costley/Norman 185. Y Closed Closed Item No. 4 sent to TVA Letter dated EICB RAI ML1028618855 sent to 196 7.5.1. 7.5.2.2 Bypassed and Inoperable Status Indication (BISI) Responder: Costley/Norman 186. Y Closed Closed Item No. 5 sent to TVA Letter dated EICB RAI ML1028618855 sent to 197 ( ( Open Item 197 was never issued. 187. Y Closed Closed 198 7.5.1. 7.5.2.2 M M X SRP Section 7.5, Subsection III, Review Procedures states: Responder: Costley/Norman 188. Y Closed Closed Item No. 6 sent to TVA Letter dated EICB RAI ML1028618855 sent to a a 199 7.5.1. 7.5.2.3 The WBU2 FSAR Section 7.5.2.3, Technical Support Center and Responder: Costley/Norman 189. Y Closed Closed Item No. 7 sent to TVA Letter dated Related SE Section 7.5.5.3 EICB RAI 200 7.2 7/21/2010 Responder: Clark 190. Y Closed Closed EICB RAI TVA Letter dated

( ( ( ( ( (

201 7.7.1. 7.7.11 7/21/2010 Responder: Webb 191. Y Closed Closed EICB RAI TVA Letter dated 203 7.5.1. 7.5.2 7/26/2010 Responder: Clark 192. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL

( ( ( (

204 7.5.1. 7.5.2 7/26/2010 Responder: Costley/Norman 193. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 205 7/26/2010 Responder: Clark 194. Y Closed Closed EICB RAI TVA Letter dated Question B related to prior NRC M M M M ( M M 206 7.5.1. 7.5.2 7/27/2010 Responder: Clark 195. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 207 July 27, 2010 Date: 196. Y Closed Closed C C C C 208 7.5.2. 7.5.1 7/27/2010 Responder: Clark 197. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL a a a a G a a 209 7.5.2. 7.5.1 7/27/2010 Responder: Clark 198. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 210 7.5.2. 7.5.1 7/27/2010 Responder: Clark 199. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 211 7.5.1. 7/27/2010 Responder: Clark 200. Y Closed Closed EICB RAI TVA Letter dated Relates to SE Sections:

214 7/27/2010 Responder: WEC 201. Y Closed Closed EICB RAI TVA Letter dated

( ( (

215 7/29/2010 Responder: WEC 202. Y Closed Closed 216 7.5.1. 7.5.2 7/29/2010 Responder: Clark 203. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 217 7/6/2010 Responder: Clark 204. Y Close Closed EICB RAI TVA Letter dated

( ( (

218 7/6/2010 Responder: Clark 205. Y Closed Closed EICB RAI TVA Letter dated 219 8/4/2010 Responder: TVA Licensing 206. Y Closed Closed EICB RAI

( ( M ( ( M ( ( ( ( M 220 8/4/2010 Responder: Ayala 207. Y Closed Closed EICB RAI TVA Letter dated 221 7.7.1. 7.7.1.3 8/4/2010 Responder: Trelease 208. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL C C P 222 8/4/2010 Responder: Clark 209. Y Close Closed EICB RAI TVA Letter dated 223 8/4/2010 Responder: Clark 210. Y Closed Closed EICB RAI G G a G G a G G G G a 224 7.5.1. 7.5.2 8/4/2010 Responder: Norman (TVA CEG) 211. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 225 8/4/2010 Responder: Scansen 212. Y Close Closed EICB RAI TVA Letter dated 226 8/4/2010 Responder: TVA Licensing 213. Y Closed Closed N/A - Information TVA Letter dated See also Open Item Nos. 41 & 270.

227 8/4/2010 Responder: Clark 214. Y Close Closed EICB RAI TVA Letter dated 228 8/4/2010 Responder: Clark 215. Y Closed Closed EICB RAI TVA Letter dated

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 229 ( ( 8/4/2010 Responder: Clark 216. Y Closed Closed EICB RAI TVA Letter dated

(

230 C C 8/4/2010 Responder: Webb 217. Y Closed Closed EICB RAI TVA Letter dated G

231 8/4/2010 Responder: Clark 218. Y Closed Closed EICB RAI TVA Letter dated

( ( ( ( ( (

232 8/4/2010 Responder: Clark 219. Y Closed Closed RAI No. 5 TVA Letter dated 233 8/4/2010 Responder: Clark 220. Y Closed Closed EICB RAI TVA Letter dated

( ( (

234 8/4/2010 Responder: 221. Y Closed Closed N/A - Duplicate N/A C C C C C S 235 8/4/2010 Responder: TVA Licensing 222. Y Closed Closed N/A N/A 236 8/4/2010 Responder: Clark 223. Y Close Closed EICB RAI TVA Letter dated G G G 237 8/4/2010 Responder: Clark 224. Y Closed Closed EICB RAI TVA Letter dated i

238 8/4/2010 Responder: Webb/Hilmes 225. Y Closed Closed N/A - Duplicate N/A 239 8/4/2010 Responder: Hilmes 226. Y Closed Closed N/A - Meeting N/A 240 8/4/2010 Responder: Clark 227. Y Close Closed Ml102910008 TVA Letter dated

( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( (

241 8/4/2010 Responder: Davies 228. Y Closed Closed RAI No. 10 TVA Letter dated 242 8/4/2010 Responder: Hilmes 229. Y Close Closed EICB RAI TVA Letter dated 243 8/3/2010 Responder: WEC 230. Y Closed Closed N/A - Closed to N/A 247 8/8/2010 Responder: WEC 231. Y Closed Closed EICB RAI Response is LIC-101 Rev. 3 Appendix B Section 4,

(

248 8/8/2010 Responder: WEC 232. Y Closed Closed Response is LIC-101 Rev. 3 Appendix B Section 4, 249 8/8/2010 Responder: WEC 233. Y Closed Closed LIC-101 Rev. 3 Appendix B Section 4, 253 8/8/2010 Responder: Clark 234. Y Closed Closed TVA Letter dated Related to Open Item no. 83.

254 8/10/2010 Responder: WEC 235. Y Closed Closed N/A - Request to TVA Letter dated C C C C C C C C C C C C C C C C C C C C S 255 8/10/2010 Responder: WEC 236. Y Closed Closed N/A - Request to TVA Letter dated 256 8/10/2010 Responder: WEC 237. Y Closed Closed N/A - Request to TVA Letter dated 257 8/10/2010 Responder: WEC 238. Y Closed Closed N/A - Request to N/A G

258 8/10/2010 Responder: WEC 239. Y Closed Closed N/A - Request to N/A 259 8/10/2010 Responder: WEC 240. Y Closed Closed N/A - Request to TVA Letter dated 260 8/10/2010 Responder: WEC 241. Y Closed Closed N/A - Request to N/A 261 8/10/2010 Responder: WEC 242. Y Closed Closed N/A - Closed to TVA Letter dated LIC-110 Rev. 1 Section 6.2.2 states:

i 262 8/10/2010 Responder: WEC 243. Y Closed Closed N/A - Request to N/A 263 8/11/2010 Responder: WEC 244. Y Closed Closed ML101650255, Item 264 8/11/2010 Responder: WEC 245. Y Closed Closed ML101650255, Item 265 8/11/2010 Responder: WEC 246. Y Closed Closed ML101650255, Item 266 8/11/2010 Responder: Webb/Webber 247. Y Closed Closed TVA Letter dated 267 8/11/2010 Responder: WEC 248. Y Closed Closed 268 8/19/2010 Responder: WEC 249. N Closed Closed

( (

269 8/20/2010 Responder: NRC 250. Y Closed Closed N/A N/A

( ( (

270 8/23/2010 Responder: Clark 251. Y Closed Closed See also Open Item Nod. 41 & 245.

271 M M 8/23/2010 Responder: WEC 252. Y Closed Closed N/A - Closed to NA C C P a a 272 7.5.2. 7.5.1 8/26/2010 Responder: Clark 253. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 273 7.5.2. 7.5.1 8/26/2010 Responder: Clark 254. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 274. ( ( 8/26/2010 Responder: Stockton 255. Y Closed Closed RAI No. 6 TVA Letter dated M S a i 274. 7.5.2. 7.5.1 8/26/2010 Responder: Clark 256. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 275 ( ( 8/27/2010 Responder: Clark 257. Y Closed Closed Not Required N/A G S i 258. Y 276 7.6 7.6 8/27/2010 Responder: Webb Closed Closed EICB RAI TVA Letter dated

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

( ( ( ( (

277 7.6 7.6.3 8/27/2010 Responder: Clark 259. Y Close Closed EICB RAI TVA Letter dated 278 7.6 7.6.6 8/27/2010 Responder: Trelease 260. Y Close Closed EICB RAI TVA Letter dated 279 7.6 7.6.6 8/27/2010 Responder: Mather 261. Y Close Closed EICB RAI TVA Letter dated 280 7.6 7.6.6 8/27/2010 Responder: Trelease 262. Y Closed Closed EICB RAI TVA Letter dated D D D D D 281 7.6 7.6.8 8/27/2010 Responder: Webb 263. Closed Closed EICB RAI TVA Letter dated

( ( ( ( ( ( (

282 7.6 7.6.9 8/27/2010 Responder: Trelease 264. Y Close Closed EICB RAI TVA Letter dated 283 7.7.5 XX 8/27/2010 Responder: Clark 265. Y Closed Closed EICB RAI No.13 TVA Letter dated This item is a follow-up question to item a a a a a 284 7.7.3 7.4.1 8/27/2010 Responder: Webber 266. Y Closed Closed EICB RAI No.14 TVA Letter dated This item is a follow-up question to item 285 7.3.3 7.3 8/27/2010 Responder: McNeil 267. Y Closed Closed EICB RAI No.15 TVA Letter dated This item is a follow-up question to item G G G G G G G 286 7.7.3 9.3.4.2.4 8/27/2010 Responder: Webber 268. Y Closed Closed EICB RAI No.16 TVA Letter dated 287 7.3 7.3-1 8/27/2010 Responder: Elton 269. Y Closed Closed ML102390538, Item Response 288 7.3 9/2/2010 Responder: McNeil 270. Y Closed Closed EICB RAI

( ( ( ( (

289 9/2/2010 Responder: Faulkner 271. Y Closed Closed RAI No. 24 TVA Letter dated 290 7.7 9/7/2010 Responder: Clark 272. Y Closed Closed N/A N/A This item is a duplicate of item 291.

(

291 7.7 9/7/2010 Responder: Clark 273. Y Closed Closed TVA Letter dated

( D D D D D ( ( (

292 7.2.5 7.2 9/7/2010 Responder: Craig 274. Y Closed Closed EICB RAI TVA Letter dated M (

293 7.7.4 7.2.2.3.5 9/8/2010 Responder: Craig 275. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 294 7.3 7.3.1.1.1 9/9/2010 Responder: Elton 276. Y Closed Closed ML102390538, Item Response C a a a a a C C S 295 7.3 7.3.1.1.2 9/9/2010 Responder: Elton 277. Y Closed Closed ML102390538, Item Response a G 296 7.3 7.3.1.2.1 9/9/2010 Responder: Elton 278. Y Closed Closed ML102390538, Item Response i

297 7.3 7.3.1.2.2 9/9/2010 Responder: Elton 279. Y Closed Closed ML102390538, Item Response 298 7.3 XX 9/9/2010 Responder: Clark 280. Y Closed Closed ML102390538, Item Response 299 Provide Common Q Software Requirements Specification Post Attachment 41 of the 10/5 letter contains the Common Q 281. Y Closed Closed TVA Letter dated

(

300 Need Radiation Monitoring System Description/Design Criteria Responder: Temples/Mather 282. Y Closed Closed RAI No. 25 TVA Letter S

i

( (

301 1.TVA is requested to address the consequences of software Responder: WEC/Davies/Clark 283. Y Closed Closed RAI No. 11 TVA Letter dated Note 1:

302 7.5.2. 7.5.1 09/17/2010 Responder: Tindell 284. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL

( ( ( (

303 7.5.2. 7.5.1 09/17/2010 Responder: Tindell 285. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 304 7.5.2. 7.5.1 09/17/2010 Responder: Tindell 286. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL D D (

305 7.5.2. 7.5.1 09/17/2010 Responder: Tindell 287. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 306 7.1 7.1 FSAR amendment 100, page 7.1-12 provides the definition of Responder: Hilmes 288. Y Closed Closed EICB RAI TVA Letter dated

( ( ( ( ( ( ( ( M M M M 307 7.1 7.1 (1) FSAR amendment 100, Section 7.1, page 7.1-12, definition of Responder: Hilmes 289. Y Closed Closed EICB RAI TVA Letter dated 308 7.1 7.1 (1) FSAR Amendment 100, Section 7.1, page 7.1-13, definition of Responder: Hilmes 290. Y Closed Closed EICB RAI TVA Letter dated a a S 309 7.1 7.1.2.1.9 (1) FSAR amendment 100, Page 7.1-14, Westinghouse setpoint Responder: Hilmes 291. Y Closed Closed EICB RAI TVA Letter dated 292. Y G G G G G G G G a a a a 310 7.1 7.1.2.1.9 (1) FSAR amendment 100, Page 7.1-14, TVA setpoint Responder: Hilmes Closed Closed EICB RAI TVA Letter dated 311 7.1 7.1 Both Westinghouse and TVA setpoint methodology do not have Responder: Hilmes 293. Y Closed Closed EICB RAI TVA Letter dated i

312 7.0 By letter dated September 10,2010, TVA provided the summary Responder: Stockton 294. Y Close Closed EICB RAI TVA Letter dated 313 7.7.8 7.7.1.12 EDCR 52408 (installation of AMSAC in Unit 2) states that Design Responder: Ayala 295. Y Closed Closed EICB RAI No.18 TVA Letter dated 314 7.3 7.3 The following 50.59 changes were listed in the March 12 RAI Responder: Stockton 296. Y Closed Closed EICB RAI No. 19 TVA Letter dated Related to OI 10 315 7.5.3 7.5.3 IE Bulletin 79-27 required that emergency operating procedures to Responder: S. Smith (TVA Operations) 297. Y Close Closed EICB RAI TVA Letter dated

(

316 7.5.2. 7.5 TVA has provided various documents in support of RM-1000 high Responder: Temples/Mather 298. Y Closed Closed RAI No. 26 S

i

(

317 7.5.2. 7.5 TVA has provided a proprietary and a non-proprietary version of Responder: Temples 299. Y Closed Closed RAI No. 27 TVA Letter dated S

i

(

318 7.5.2. 7.5 TVA has provided the following documents for RM-1000 Responder: Temples 300. Y Closed Closed RAI No. 28 TVA Letter dated S

i

(

319 7.5.2. 7.5 TVA provided System Verification Test Results 04507007-1TR Responder: Temples 301. Y Closed Closed RAI No. 29 TVA Letter dated S

i

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N E

320 I Per Westinghouse letter WBT-D-2340, TENNESSEE VALLEY Responder: Clark 302. Y Closed Closed N/A N/A Duplicate of item 156 B B 321 For the purposes of measuring reactor coolant flow for Reactor Responder: Clark 303. Y Closed Closed N/A N/A Duplicate of OI# 157 322 7.7.1.11 ( Section 7.7.1.11 will be added to FSAR Amendment 101 to provide Responder: Clark 304. Y Closed Closed

( ( ( E M

324 Per the NRC reviewer, the BISI calculation is not required to be 305. Y Closed Closed 325 G G C IThe Unit 2 loops in service for Unit 1 that are scheduled to be Responder: TVA Startup Olson 306. Y Closed Closed Closed to open item ?

a 326 TVA uses double-sided methodology for as-found and as-left Responder: Webb 307. Y Closed Closed TVA Letter dated

(

328 7.5.2. 7.5 Provide the model number for the four containment high range Responder: Temples 308. Y Closed Closed RAI No. 30 TVA Letter dated S

i

( 309. Y 329 7.6.1 7.6.7 D ( Section 7.6.7 of the FSAR (Amendment 100) states that, The Responder: Clark Closed Closed RAI No. 1 TVA Letter dated a S i 310. Y 330 7.3 7.3 Related to Item 298 Responder: Hilmes/Faulkner Closed Closed EICB RAI No.20 Item 7, TVA letter 331 7.6.1 7.6.7 ( As a follow up of OI 190, Staff has reviewed the proprietary version Responder: WEC/Harless/Clark 311. Y Closed Closed RAI No. 8 TVA Letter dated Follow-up of OI-190.

( (

332 7.5.2. 7.5.1 D ( 10/26/2010 312. Y Closed Closed ML103000105 Item TBD EICB RAI ML103000105 sent to DORL M M 333 7.5.2. 7.5.1 a S 10/27/2010 313. Y Closed Closed ML103000105 Item TBD EICB RAI ML103000105 sent to DORL a a i

334 7 7 FSAR Figure 7A-3 Mechanical Flow and Control Diagram Responder: Stockton 314. Y Closed Closed RAI not required. N/A RAI not required because the figure is

(

335 7.6.1 7.6.7 LPMS: Reference to OI-331, sub item 2. Responder: WEC 315. Y Closed Closed RAI# 1, EICB letter TVA letter, dated We need to confirm when MEEB when S

i

(

336 7.5.2. 7.5 Re: RM-1000 Report 04508905-QR Responder: GA 316. Y Closed Closed S

i

(

337 7.5.2. 7.5 Re: RM-1000 Report 04508905-QR Responder: GA 317. Y Closed Closed S

i

(

338 7.5.2. 7.5 In page 3-15 and appendix B of Qualification Test Report 04508905-QR, Qualification Test Report for RM-1000 318. Y Closed Closed RAI #4 letter dated FSAR amend 103 Note: Item to be added to Section 3.10 S

i

(

339 7.5.2. 7.5 In the Qualification Test Report 04508905-QR, the licensee As agreed to with the reviewer, Attachment 1 contains the 319. Y Closed Closed RAI #5 letter dated FSAR amend 103 Note: Item to be added to Section 3.10 S

i

(

341 7.5.2. 7.5 FSAR Tables 3.10 list seismically qualified equipment. However, A review of WBN Unit 2 FSAR amendment 102 chapters 320. Y Closed Closed RAI #1 letter dated FSAR amend 103 S

i

(

342 7.5.2. 7.5 Please confirm that RM-1000 monitors and the associated The RM-1000 containment high range radiation monitors are 321. Y Closed Closed S

i g

343 7.5.2. 7.5 ( ( Seismic RRS in the 04508905-QR report Figures 3-2 and 3-3 (1) The cause of the difference between the RRS and TRS 322. Y Closed Closed G S i 323. Y 344 7.6.6  ? Unit 1 SE discussed in Section 7.6.5, Valve Power Lockout. (a) In accordance with0PDP-6, Locked Valve/Breaker Close Closed Close based on TVA letter dated

(

345 7.5.2. 7.5 Provide the normal temperatures and expected periods of high/low RM-1000 in a NIM Bin was Tested at 39°F for 72 Hrs and 324. Y Closed Closed Response S

i

(

347 7.5.2. 7.5 Qualification report 04508905-1SP does not address EMI/RFI Qualification report 04038903-7SP, Qualification Basis for 325. Y Closed Closed S

i

(

348 7.5.2. 7.5 Qualification report 04508905-2SP does not address EMI/RFI Qualification report 04038903-7SP, Qualification Basis for 326. Y Closed Closed S

i

(

350 7.5.2. 7.5 The seismic required response spectra (RRS) is shown in Figures The RM-1000 was seismically tested in a NIM Bin and the 327. Y Closed Closed RAI # 9, letter FSAR amend 103 Note: Item to be added to Section 3.10 S

i

(

351 7.5.2. 7.5 The replacement schedule for the components that have a The replacement schedules stated in 04508905-1SP, 328. Y Closed Closed S

i

(

352 7.5.2. 7.5 Please clarify how many RM-1000 radiation monitors are being The total number of RM-1000 units procured under MR 329. Y Closed Closed S

i

(

354 7.5.2. 7.5 RG 1.180 endorsed the guidance of IEEE-1050-1996 with (1) The WBN Unit 2 grounding system design is in 330. Y Closed Closed The grounding specification used by S

i

(

355 7.5.2. 7.5 Staff has not found the stated exclusion zone for EMI/RFI Cautions and distance limitations for WBN Unit 1 legacy 331. Y Closed Closed S

i

(

356 7.5.2. 7.5 The attachment number refers to your February 25, 2011 letter. The loss of the RM-3 output (current to frequency (I/F) 332. Y Closed Closed Closed by TVA S

i

(

357 7.5.2. 7.5 In Attachment 5, Qualification Test Report Supplement, RM-1000 Attachment 8 contains GA-ESI qualification report 333. Y Closed Closed Closed by TVA S

i 358 7.5.2. 7.5 m The attachment numbers refer to your February 25, 2011 letter. In An incomplete response was inadvertently submitted in TVA 334. Y Closed Closed Closed by TVA p ( (

360 e S In order for staff to review the acceptability of the Incore (a) The Watts Bar Unit 2 In-core Instrumentation System 335. Closed Closed G

i 362 7.6.1 7.6.7 OI #331 requested TVA to provide information regarding how the TVA committed to provide a letter on the docket (targeted is 336. Closed Closed A

375 7.7.9 1. During the conference call held on 4/12, the staff requested TVA Partial Response to NRC Request: 337. N Closed Closed l

v A

377 7.7.9 1. Further explanation is required for the sentence in EDCR TVA Response 338. Closed Closed l

v A

378 Make the following WEC proprietary documents available for NRC Per Westinghouse letter WBT-D-3201 (Reference 1), the 339. Closed Closed l

v A

379 Provide proprietary and non-proprietary versions of the WINCISE The proprietary versions of the slides were provided in TVA 340. Closed Closed l

v A

380 Provide Non-Proprietary functional description of the WINCISE Attachment 3 contains the Westinghouse Non-Proprietary 341. Closed Closed l

v A

382 Non-Proprietary description of the qualification of the SPS cabinet Attachment 5 contains the Westinghouse non-proprietary 342. Closed Closed l

v 1

AP-1000 is a registered trademark of the Westinghouse Electric Company LLC

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N A

384 Non-Proprietary description of the differences between Unit 1 and The only similarities between the WBN Unit 1 and Unit 2 IIS 343. Closed Closed l

v A

385 Non-Proprietary description of the calc note shown to the NRC at Attachment 7 contains Westinghouse non-proprietary 344. Closed Closed l

v A

386 Provide a description of the communications between the SPS and There is no direct communication between the SPS cabinets 345. Closed Closed l

v A

387 Provide a copy of the analysis which states how Westinghouse has As discussed in the Westinghouse WINCISE presentation at 346. Closed Closed l

v 349 7.5.2. 7.5 Radiation testing was not considered in any of the test reports as The design criteria provides the criteria for determining what 1. Y Open Open-Mech Eng to 3 all the equipment has been assumed to be located in nuclear is a mild environment at WBN Unit 2. Calculation revise calculation power plant areas with mild environments and radiation dosages WBNAPS4004 Summary of Mild Environment Conditions for less than 1 x 103 rads for total integrated dose (TID). However, Watts Bar Nuclear Plant provides the actual values for each Due: 2/25/11 the radiation monitors and the I/F converters are located in the area of the plant. In accordance with Table 1, the Control main control room which is defined as mild environment. For Room has a 40 year maximum TID of 3.5x102 RAD and a TVA to provide the WBN-2 mild environment is defined as room or building zone maximum integrated accident dose of 710.5 RAD for a assessment document where (1) the temperature, pressure, or relative humidity resulting maximum TID of 1060.5 RAD. or a summary of the from the direct effects of a design basis event (DBE) (e.g., document with the temperature rise due to steam release) are no more severe than The accident dose of 710.5 RAD is the dose for a 100 day reference to the those which would occur during an abnormal plant operational LOCA at the surface of the HEPA filter in the Mechanical appropriate condition, (2) the temperature will not exceed 130ºF due to indirect Equipment Room. This is documented in TVA calculation document/documents.

effects of a DBE, (3) the event radiation dose is less than or equal WBNTSR-005, Dose Due to the Control Building EICB (Singh) to 1 x 104 rads, and (4) the total event plus the 40 year TID (total Emergency Air Cleanup Filters Revision 3. However, on February 25, 2011 integrated dose) is less than or equal to 5 x 104 rads (reference page 25 of WBNTSR-005, the shine from this source into the response is acceptable.

WB-DC-40-54). TVA to address lack of radiation qualification for control room is negligible and is not considered in the dose Item will be tracked as WBN-2. calculation for the control room. a confirmatory item in the SE. TVA to provide Calculation WBNAPS3-126, EQ Dose in the U1/U2 Auxiliary calculation or summary Instrument Rooms and the Computer Room in the Control of calculation when Building Revision 0 documents the environmental complete.

qualification (EQ) radiation dose in the control building. A review of this document by the TVA radiation protection engineer determined that the TID including the normal and accident dose values for the control room is less than 1x103 RAD. Calculation WBNAPS3-126, will be revised to include the control room by July 1, 2011. Since the control room TID has been determined to be less than 1x103 RAD, radiation qualification of the RM-1000.

041 7.5.2 7.5.1 2/19/2010 Responder: WEC 1. N Open Open-NRC Review NRC Meeting TVA Letter dated See also Open Item Nos. 226 & 270.

EICB (Carte)

Summary NRC 6/18/10 Please provide the following Westinghouse documents: Items (1) and (2) were docketed by TVA letter dated April 8, Pending Submittal of the Test Due 3/29/11 Meeting Summary (1) WNA-DS-01617-WBT Rev. 1, "PAMS System Requirements 2010. Summary Report due 3/29/11 ML093560019, Item TVA Letter dated Specification" NNC 1/27/11: Issues No. 11 10/5/10 (2) WNA-DS-01667-WBT Rev. 0, "PAMS System Design Item (3) will be addressed by Revision 2 of the Licensing Final Response included in letter with the STP were Specification" Technical Report. Due 12/3/10 dated 12/3/10 discussed in the weekly (3) WNA-CD-00018-GEN Rev. 3, "CGD for QNX version 4.5g" public meetings.

Please provide the following Westinghouse documents or pointers Item (4) will be addressed by Westinghouse developing a Partial Response is included in Westinghouse to:

to where the material was reviewed and approved in the CQ TR or WBN2 Specific Test Plan to compensate for the fact that the letter dated 10/5/10. (1) perform STP self SPM: NRC disapproved WNA-PT-00058-GEN during the original The SysRS and SRS incorporate assessment., and (4) WNA-PT-00058-GEN Rev. 0, "Testing Process for Common Q Common Q review. Due 12/7/10 requirements from many other (2) Augment Test Safety systems" documents by reference. Summary report to (5) WNA-TP-00357-GEN Rev. 4, "Element Software Test Item (5) Procedures that are listed in the SPM compliance provide missing test Procedure" table in the Licensing Technical Report revision 1 supersede NNC 8/25/10: (3) An earlier version plan information that test procedure WNA-TP-00357-GEN.Due 10/22/10 of this report was docketed for the Common Q topical report; therefore, NNC 2/3/11: At next For Item 3, Attachment 19 contains the Westinghouse there should be no problem to audit compare &

document Post-Accident Monitoring System (PAMS) docket this version. (4) Per discuss:

Licensing Technical Report, WNA-LI-00058-WBT, Revision ML091560352, the testing process (1) WNA-PT-00058-2, dated December 2010. Attachment 20 contains the document does not address the test GEN Rev. 0 Westinghouse Application for Withholding for the Post- plan requirements of the SPM. (2) WNA-PT-00138-Accident Monitoring System (PAMS) Licensing Technical Please provide a test plan that WBT Rev. 0 Report, WNA-LI-00058-WBT, Revision 2, dated December implements the requirements of the (3) AP1000 STP

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 2010. SPM.

For Item 4, Attachment 9 contains the Westinghouse document Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 2010. Attachment 10 contains the Westinghouse Application for Withholding for the WNA-PT-00138-WBT, Revision 0 Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 17, 2010.

TVA Response to Follow-up NRC Request:

(1) WEC presented the results of the self assessment to the NRC on February 2, 2011.

(2) By agreement between TVA, WEC and the NRC, the Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0 will not be revised. Instead a non-proprietary Common Q PAMS Test Summary Report will be developed and submitted to address the issues with the STP. Attachment 1 contains non-proprietary WNA-TR-02451-WBT, Revision 0, Test Summary Report for the Post Accident Monitoring System, dated March 2011.

043 7.5.2 7.5.1 2/19/2010 Responder: WEC 2. N Open Open-TVA Action EICB RAI TVA Letter dated NNC 8/25/10: A CQ PAMS ISG6 EICB (Carte)

Date: 5/25/10 ML102910002 2/5/10 compliance matrix was docketed on: (1)

The PAMS ISG6 compliance matrix supplied as Enclosure 1 to NNC 7/28/11: TVA to confirm Due: TBD Item No. 2 February, 5 12010, (2) March 12, 2010, TVA letter dated February 5, 2010 is a first draft of the information The PAMS ISG6 compliance matrix supplied as Enclosure 1 acceptable implementation of audit TVA Letter dated & (3) June 18, 2010. The staff has needed. The shortcomings of the first three lines in the matrix are: to TVA letter dated February 5, 2010 is a first draft of the action items (ML1100980761). NNC 2/2/11: Issues 5/12/10 expressed issued with all of these information needed. with Common Q TR & compliance evaluations. The staff is still Line 1: Section 11 of the Common Q topical report did include a Pending Submittal of Revision 3 of SPM compliance were TVA Letter dated waiting for a good compliance commercial grade dedication program, but this program was not By letter dated April 8, 2010 TVA provided the PAMS the Licensing Technical Report due discussed in the weekly 6/18/10 evaluation.

approved in the associated SE. Westinghouse stated that this was Licensing Technical Report provided additional information. 3/29/11. public meetings.

the program and it could now be reviewed. The NRC stated that Westinghouse to TVA Letter dated NNC 11/23/10: WNA-LI-00058-WT-P TVA should identified what they believe was previously reviewed Attachment 3 contains the revised Common Q PAMS ISG-6 Revised response included in letter perform Common Q TR 10/5/10 Rev. 1 Section 7 does not include the and approved. Compliance Matrix, dated June 11, 2010, that addresses dated 12/22/10. & SPM compliance self RSED documents, and it should. Table these items (Reference 13). assessment; his will be 6-1 Item No. 15 should also include the Line 2: TVA stated the D3 analysis was not applicable to PAMS, Response is included in letter dated discussed in detail on RSED RTMs.

but provided no justification. The NRC asked for justification since By letter Dated June 18, 2010 (see Attachment 3) TVA 10/5/10. the next audit.

SRP Chapter 7.5 identified SRM to SECV-93-087 Item II.Q as provided a table, "Watts Bar 2 - Common Q PAMS ISG-6 being SRP acceptance criteria for PAMS. Compliance Matrix." Revised compliance matrix is NNC 7/28/11: The audit unacceptable. mentioned on 2/2/22 Line 3: TVA identified that the Design report for computer integrity It is TVAs understanding that this comment is focused on above, was performed was completed as part of the common Q topical report. The NRC the fact that there are documents that NRC has requested NNC 8/12/10: It is not quite enough 2/28-3/4/2011 noted that this report is applicable for a system in a plant, and the that are currently listed as being available for audit at the to provide all of the documents (ML110980761). This CQ topical report did not specifically address this PAMS system at Westinghouse offices. For those Common Q PAMS requested. There are two possible audit report documents Watts Bar Unit 2. documents that are TVA deliverable documents from routes to review that the NRC can WBN2 specific and Westinghouse, TVA has agreed to provide those to NRC. undertake: (1) follow ISG6, and (2) generic actions NRC then concluded that TVA should go through and provide a Westinghouse documents that are not deliverable to TVA will follow the CQ SPM. The TVA required to address the more complete and thorough compliance matrix. be available for audit as stated above. Requirements response that was originally conditions identified Traceability Matrix issues will be tracked under NRC RAI pursued was to follow ISG6, but during the audit.

Matrix Items 142 (Software Requirements Specification) and some of the compliance items for 145 (System Design Specification). Commercial Item ISG6 were addressed by Dedication issues will be tracked under NRC RAI Matrix referencing the SPM. The NRC Item 138. This item is considered closed. approved the CQ TR and

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N associated SPM; it may be more TVA Response to Follow-up NRC Request: appropriate to review the WBN2 PAMS application to for adherence WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring to the SPM that to ISG6. In either System (PAMS) Licensing Technical Report submitted in path chosen, the applicant should TVA Letter to NRC dated December 3, 2010, (Reference 1) provide documents and a contains the following changes to address the NRC justification for the acceptability of requests: any deviation from the path chosen.

For example, it appears that the (1) While RSEDs are not specifically mentioned, Section 7 Westinghouse's CDIs are has been revised to be applicable to both hardware and commercial grade dedication plans, software which includes the RSEDs. but Westinghouse maintains that (2) Table 6-1 item 15 reference added for WNA-VR-00280- they are commercial grade WBT (RESD) dedication reports; this apparent deviation should be justified or TVA Response to Second Follow-up NRC Request: explained.

The NRC audited the Westinghouse commercial item dedication process for both hardware and software during the week of February 28 to March 4, 2011. The audit found the processes acceptable. Westinghouse and TVA previously agreed to provide additional information to address this item in Revision 3 of the Licensing Technical Report.

Attachment 2 contains WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, dated March 2011 (proprietary).

Attachment 3 contains WNA-LI-00058-WBT-NP, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3 dated March 2011 (non-proprietary).

Attachment 4 contains CWA-11-311, Application for Withholding Proprietary Information from Public Disclosure, WNA-LI-00058-WBT-P, Revision 3 Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post-Accident Monitoring System (PAMS) Licensing Technical Report, dated March 14, 2011.

067 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 3. Y Closed - See ML111150287 Closed N/A - No question TVA Letter dated EICB (Carte) date for the "Commercial Grade Dedication Instructions for AI687, Section 7.5.2.2.3.2.1 on page 14. was asked. Item 6/18/10 AI688, Upgraded PC node box and flat panels." was September The following status is from the revised WB2 Common Q NNC 2/2/11: Section 7 was opened to track 28, 2010. PAMS ISG-6 Compliance Matrix submitted in response to Pending Submittal of Revision 3 of of the WBN2 PAMS committment made Item 43: the Licensing Technical Report due LTR should be updated by applicant.

3/29/11. to include:

a. AI687, AI688 - Scheduled for September 28, 2010 (1) non-proprietary Response included in letter dated description of
b. Upgraded PC node box and flat panel displays - Per 12/22/10. commercial grade Westinghouse letter WBT-D-2024 (Reference 7), these items dedication, and are available for audit at the Westinghouse Rockville office. This item is addressed in Rev. 2 of (2) Software example the Licensing Technical Report
c. Power supplies - Per Westinghouse letter WBT-D-2035 Commercial grade (Reference 12), these items are available for audit at the dedication will also be Westinghouse Rockville office. addressed at the next audit.

To be addressed during 9/20-9/21 audit NNC 7/28/2011: No TVA Response to Follow-up NRC Request: open items related to commercial grade WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring dedication is EICB SE.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following change to address the NRC request:

Section 7, Commercial Grade Dedication Process, has been revised to describe the general commercial grade dedication process for both hardware and software and uses a description of the AI687 dedication process as an example of how the process is applied.

TVA Response to Follow-up NRC Request dated 2/2/11:

The non-proprietary commercial grade dedication discussion is included in Attachment 3, WNA-LI-00058-WBT-NP, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3 dated March 2011 (non-proprietary)

Section 7. The software example is included in Attachment 2, WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, dated March 2011 (proprietary) Section 7.

068 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 4. Y Closed - See ML111150287 Closed N/A - No question TVA Letter dated EICB (Carte) date for the "Summary Report on acceptance of AI687, AI688, Section 7.5.2.2.3.2.1 on page 13. was asked. Item 6/18/10 Upgraded PC node box, flat panels, and power supplies." was The following status is from the revised WB2 Common Q NNC 2/2/11: was opened to track September 28, 2010. PAMS ISG-6 Compliance Matrix submitted in response to Response included in letter dated Commercial grade comm8ittment Item 43: 12/22/10. dedication will be made by applicant.

addressed at the next

a. AI687, AI688 - Scheduled for September 28, 2010 audit. Summary This item is addressed in Rev. 2 of reports for AI687 &
b. Upgraded PC node box - Per Westinghouse letter WBT- the Licensing Technical Report AI688 were docketed D-2024 (Reference 7), this item is available for audit at the one month late.

Westinghouse Rockville office.

NNC 7/28/2011: No

c. Flat panel displays - Per Westinghouse letter WBT-D- open items related to 2024 (Reference 7), this item is available for audit at the commercial grade Westinghouse Rockville office. dedication is EICB SE.
d. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.

To be addressed during 9/20-9/21 audit TVA Response to Follow-up NRC Request:

For the commercial grade dedication process, please see the response to Request for Additional Information (RAI) item 3 in this letter, NRC Matrix Item 067.

The component level EQ/Seismic summary reports for the hardware listed above are available for NRC review/audit as described below:

(1) AI687 and AI688, the following documents were submitted in TVA Letter to NRC dated October 26, 2010, Watts Bar Nuclear Plant (WBN) Unit 2 -

Instrumentation and Controls Staff Information Requests, (Reference 5):

a. EQ-EV-62-WBT, Revision 0, Common Q PAMS

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Comparison of Tested Conditions for the AI687 and AI688 Common Q Modules and Supporting Components to the Watts Bar Unit 2 (WBT)

Requirements, dated September 10, 2010

b. EQLR-171, Revision 0, Environmental and Seismic Test Report, Analog Input (AI)687 &

AI688 Modules for use in Common Q PAMS, dated September 10, 2010

c. CN-EQT-10-44, Revision 0, Dynamic Similarity Analysis for the Watts Bar Unit 2 Post Accident Monitoring System (PAMS), dated September 28, 2010 (2) Upgraded PC Node Box - As stated in Westinghouse letter WBT-D-2024, dated June 9, 2010 NRC Access to Common Q Documents at the Westinghouse Rockville Office, (Reference 6), the following documents are available for NRC audit at the Westinghouse Rockville office:
a. CDI-3722, Revision 7, Next Generation PC Node Box Commercial Dedication Instruction
b. LTR-EQ-10-50 PC Node Box/Flat Panel Display System Components Qualification Summary (3) Flat Panel Displays - As stated in Westinghouse letter WBT-D-2024, dated June 9, 2010 NRC Access to Common Q Documents at the Westinghouse Rockville Office, (Reference 6), the following documents are available for NRC audit at the Westinghouse Rockville office:
a. CDI-3803, Revision 8, Next Generation Flat Panel Display (FPD) Commercial Dedication Instruction
b. LTR-EQ-10-50 PC Node Box/Flat Panel Display System Components Qualification Summary (4) Power supplies - As stated in Westinghouse letter WBT-D-2035 dated June 11, 2010 NRC Access to Common Q Documents at the Westinghouse Rockville Office (Reference 7), the following documents are available for NRC audit at the Westinghouse Rockville office:
a. CDI- 4057, Revision 4, Commercial Dedication Instruction
b. EQ-TP-1 05-GEN, Revision 0, Electromagnetic Compatibility Test Plan and Procedure for Quint Power Supplies and Safety System Line Filter
c. Breakers, EQ-TP-114-GEN, Revision 0, Seismic Qualification Test Procedure For Common Q Power Supplies, Quint Power Supplies, Line Filter Assemblies, and South Texas Units 3 & 4 Circuit
d. EQ-TP-117-GEN, Revision 0, Environmental Qualification Test Procedure For Common Q Powe Supplies, Quint Power Supplies, and Line Filter Assemblies 5.

(

069 7.5.2 7.5.1 C By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 Y Closed - See ML111150287 Closed N/A - No question N/A

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N date for the "Watts Bar 2 PAMS Specific FAT Report" was October Section 7.5.2.2.3.4.2.4.1 on page was asked. Item 2010. Attachment 1 contains non-proprietary WNA-TR-02451- 23. NNC 2/3/11: The was opened to track WBT, Revision 0, Test Summary Report for the Post current due dated comm8ittment As agreed, the Watts Bar 2 PAMS Specific FAT Report will not be Accident Monitoring System, dated March 2011. Pending Submittal of the Test above is 4 months made by applicant.

submitted. Instead a non-proprietary PAMS Test Summary Report Summary Report due 3/29/11 later than planned.

will be submitted.

Awaiting for document to be NNC 7/28/2011: No docketed by TVA. open items related to test reporting is EICB SE.

074 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 6. Y Closed - See ML111150287 Closed N/A - No question N/A Rev. 4 will be available for the NRC EICB (Carte) date for the Post FAT IV&V Phase Summary Report was Section 7.5.2.2.3.4.2.2 on page 20. was asked. Item audit on 2/28/11. This document will not November 30, 2010. Attachment 1 contains WNA-VR-00283-WBT-P, IV&V NNC 2/3/11: At least 3 was opened to track be submitted. Rev. 5 will be submitted Summary Report for the Post Accident Monitoring System, Response in letter dated March 16, months later than commitment made after resolution of the datastorm display Revision 4, dated March 2011 (proprietary). Attachment 2 2011 planned. by applicant. issue.

contains WNA-VR-00283-WBT-NP, IV&V Summary Report for the Post Accident Monitoring System, Revision 4, dated NNC 7/28/2011: No March 2011 (non-proprietary). Attachment 3 contains CWA- open items related to 11-3121, Application for Withholding Proprietary Information V&V reporting is EICB from Public Disclosure, WNA-VR-00283-WBT-P, Revision 4 SE.

Nuclear Automation IV&V Summary Report for the Post Accident Monitoring System" (Proprietary), dated March 3, 2011.

081 7.5.2 7.5.1 5/6/2010 Responder: Merten/WEC 7. N Open Open-TVA to respond EICB RAI TVA Letter dated NNC 1/5/11: See Also Open Item No.

EICB (Carte) to open items in CQ ML102910002 6/18/10 86 and 202.

The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. The codes and standards documents listed in Section 7 of ML101600092 Item No.1: There PAMS SE. Item No. 9 0, Dated April 2010), in Section 7, lists codes and standards the Common Q PAMS Licensing Technical Report are the are three sets of regulatory criteria NNC 4/125/2011: See Open Item No.

applicable to the Common Q PAMS. This list contains references documents that the Common Q platform was licensed to that relate to a Common Q Due: TBD 364.

to old revisions of several regulatory documents, for example: when the NRC approved the original topical report and application (e.g. WBN2 PAMS):

(1) RG 1.29 - September 1978 vs. March 2007 issued the approved SER. The WBN Unit 2 Common Q (a) Common Q platform NNC 2/3/11: The (2) RG 1.53 - June 1973 vs. November 2003 PAMS is designed in accordance with the approved components - Common Q TR above due date has (a) IEEE 379-1994 vs. -2000 Common Q topical report and approved SER and the codes (b) Application Development been missed by at (3) RG 1.75 - September 1975 vs. February 2005 and standards on which the SER was based. Since the Processes - Common Q SPM least 2 months.

(a) IEEE 384-1992 vs. -1992 current versions referenced are not applicable to WBN Unit (c) Application Specific - current Please provide new (4) RG 1.100 - June 1988 vs. September 2009 2, there is no basis for a comparison review. regulatory criteria due date.

(a) IEEE 344-1987 vs. -2004 The Common Q Topical Report and (5) RG 1.152 - January 1996 vs. January 2006 Bechtel to develop a matrix and work with Westinghouse to associated appendices primarily NNC 7/28/2011: CQ (a) IEEE 7-4.33.2-1993 vs. -2003 provide justification. addressed (a) and (b). The PAMS SE lists (as open (6) RG 1.168 - September 1997 vs. February 2004 Common Q SER states: items) all remaining (a) IEEE 1012-1986 vs. -1998 TVA Response to Follow-up NRC Request: standards to be (b) IEEE 1028-1988 vs. -1997 Appendix 1, Post Accident addressed.

(7) IEEE 279-1991 vs. 603-1991 Attachment 4 contains the results of the TVA analysis of Monitoring Systems, provides the (8) IEEE 323-1983 vs. -1974 (RG 1.89 Rev. 1 June 1984 endorses standards and regulatory guides applicable to the Common functional requirements and 323-1974) Q PAMS. Based on the results of the analysis, the Common conceptual design approach for However, LIC-110, "Watts Bar Unit 2 License Application Review," Q PAMS design meets the applicable requirements and is upgrading an existing PAMS based states: "Design features and administrative programs that are acceptable. on Common Q components (page unique to Unit 2 should then be reviewed in accordance with the 58, Section 4.4.1.1, current staff positions." Please identify all differences between the Description)On the basis of the versions referenced and the current staff positions. Please provide above review, the staff concludes a justification for the acceptability PAMS with respect to these that Appendix 1 does not contain differences. sufficient information to establish the generic acceptability of the proposed PAMS design (page 56, Section 4.4.1.3, PAMS Evaluation)

The NRC did not approve the proposed PAMS design. Section 6,

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N References, and Section 7, Codes and Standards Applicable to the Common Q PAMS, of the PAMS Licensing Technical Report contain items that are not the current regulatory criteria.

Please provide an explanation of how the WBN2 PAMS conforms with the application specific regulatory criteria applicable to the WBN2 PAMS design. For example IEEE Std. 603-1991 Clause 5.6.3, Independence Between Safety Systems and Other Systems, and Clause 6.3, Interaction Between the Sense and Command Features and Other Systems, contain application specific requirements that must be addressed by a PAMS system.

Awaiting TVA Response.

086 7.5.2 7.5.1 5/6/2010 Responder: WEC Date: 5/24/10 8. N Open Open-TVA to respond EICB RAI TVA Letter dated NNC 1/6/11: See Also Open Item No.81 EICB (Carte) to open items in CQ ML102910002 6/18/10 & 202 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. The regulatory documents listed in the Common Q PAMS TVA to address with item OI 81. PAMS SE. Item No. 14 0, Dated April 2010), in Section 6, lists references applicable to the Licensing Technical Report are the documents that the Common Q PAMS. This list contains references to old revisions of Common Q platform was licensed to when the NRC Due: TBD several regulatory documents, for example: approved the original topical report and issued the approved (1) DI&C-ISG04 - Rev. 0 (ML072540138) vs. Rev. 1 SER. The WBN Unit 2 Common Q PAMS is designed in NNC 2/3/11: The (ML083310185) accordance with the approved Common Q topical report and above due date has However, LIC-110, "Watts Bar Unit 2 License Application Review," approved SER and the regulatory documents on which the been missed by at states: "Design features and administrative programs that are SER was based. Since the current versions referenced are least 2 months.

unique to Unit 2 should then be reviewed in accordance with the not applicable to WBN Unit 2, there is no basis for a Please provide new current staff positions." Please identify all differences between the comparison review. due date.

versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these Rev 0 of the Licensing Technical Report references Rev. 1 of NNC 7/28/2011: CQ differences. ISG4 PAMS SE lists (as open items) all remaining TVA Response to Follow-up NRC Request: standards to be addressed.

The analysis for compliance with DI&C-ISG04, Revision 0 to Revision 1 was previously submitted as part of the Common Q PAMS Licensing Technical Report Revision 2 on December 22, 2010. Attachment 4 contains the results of the TVA analysis of standards and regulatory guides applicable to the Common Q PAMS. Based on the results of the analysis, the Common Q PAMS design is acceptable.

101 4/12/2010 Responder: Slifer 9. Y Open Open-NRC Review N/A TVA is working with the vendor to meet DORL (Poole) the 6/30 date, however there is the The non-proprietary versions of the following RM-1000, The documents, and affidavits for withholding for the listed Documents provided in letter dated Due 10/14/10 potential this will slip to 7/14.

Containment High Range Post Accident Radiation Monitor documents were submitted to the NRC on TVA letter to the 07/15/10 documents will be provided by June 30, 2010. NRC dated July 15, 2010. Confirm receipt.

1. V&V Report 04508006A
2. System Description 04508100-1TM
3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

4. Functional Testing Report 04507007-1TR 138 By letter dated February 3, 2010, Westinghouse informed TVA that Responder: WEC 10. N Closed - See ML111150287 Closed ML101650255, Item See also No. 82.

EICB (Carte) certain PAMS documentation has been completed. Section 7.5.2.2.3.2.1 on page 13. No. 2 This item is used to track all Commercial Grade NNC 2/2/11:

(a) The draft ISG6 states that a commercial grade dedication plan Dedication issues. Pending Submittal of Revision 3 of Commercial grade should be provided with an application for a Tier 2 review. the Licensing Technical Report due dedication will be

a. WNA-LI-00058-WT-P, Revision 2, Post-Accident 3/29/11. addressed at the next By letter dated February 5, 2010, TVA stated that the commercial Monitoring System (PAMS) Licensing Technical Report audit.

grade dedication plan was included in the Common Q Topical submitted in TVA Letter to NRC dated December 3, Revised response included in letter Report Section 11, Commercial Grade Dedication Program. 2010, (Reference 1) contains the following changes to dated 12/22/10 NNC 2/17/11: The Section 11 includes a description of the Common Q Commercial address the NRC request: description of the Grade Dedication Program, and states: A detailed review plan is TVA agreed to include a description commercial grade developed for each Common Q hardware or software component Section 7, Commercial Grade Dedication Process has of the generic Westinghouse dedication process in that requires commercial grade dedication. been revised to describe the general commercial grade hardware commercial grade the CQ PAMS LTR dedication process for both hardware and software and dedication process in the PAMS Rev. 2 should be Please provide the commercial grade dedication plans for each uses a description of the AI687 dedication process as licensing technical report. (see updated to include a Common Q hardware or software component that has not been an example of how the process is applied. ML102920031 Item No 1) non-proprietary previously reviewed and approved by the NRC. description and to As listed in Table 6-3. Westinghouse Watts Bar 2 TVA agreed to include (in the PAMS include a software (b) The draft ISG6 states that a commercial grade dedication report Common Q PAMS Documents at Westinghouse licensing technical report) an example.

should be provided within 12 months of requested approval for a Rockville Office, the following commercial grade evaluation of WBN2 critical Tier 2 review. dedication documents are available for NRC audit at the characteristics for commercial NNC 7/28/2011: No Westinghouse Rockville office: (list included in letter) Westinghouse hardware open items related to (i) Please provide 00000-ICE-37722 Rev. 0, Commercial Grade components against the generic commercial grade Dedication Report for the QNX Operating System for Common Q b. It is TVAs understanding that the submittal of the critical characteristics. (see dedication is EICB SE.

Applications. documents listed in (b.i) and (b.ii) is no longer required. ML102920031 Item No 2)

Rather, it was agreed, that the inclusion of a description (ii) Please provide WNA-CD-00018-GEN Rev. 3, Commercial of the commercial grade dedication process in revision TVA agreed to include a description Dedication Report for QNX 4.25G for Common Q Applications. 2 of the Post-Accident Monitoring System (PAMS) of the generic Westinghouse Licensing Technical Report, WNA-LI-00058-WT-P, software commercial grade would be sufficient to address this request. dedication process in the PAMS licensing technical report. (see TVA Response to Follow-up NRC Request: ML102920031 Item No 3)

The non-proprietary commercial grade dedication discussion TVA agreed to include (in the PAMS is included in Attachment 3, WNA-LI-00058-WBT-NP, Post- licensing technical report) an Accident Monitoring System (PAMS) Licensing Technical evaluation of WBN2 critical Report, Revision 3 dated March 2011 (non-proprietary) characteristics for commercial Section 7. The software example is included in Attachment software components against the 2, WNA-LI-00058-WBT-P, Post-Accident Monitoring System generic critical characteristics. (see (PAMS) Licensing Technical Report, Revision 3, dated ML102920031 Item No 4)

March 2011 (proprietary) Section 7.

142 The applicable regulatory guidance for reviewing the WBN2 PAMS Responder: WEC 11. N Open Open-TVA to respond ML101650255, Item WBN2 PAMS System Requirements EICB (Carte)

SysRS would be IEEE 830 as endorsed by Regulatory Guide 1.172 to open items in CQ No. 6 Specification and BTP 7-14 Section B.3.3.1, Requirements Activities - Software This item is used to track all traceability issues with the Revised response included in letter PAMS SE.

Requirements Specifications. IEEE 830-1994 Section 4.3.8, Software Requirements Specification (SRS). dated 02/25/11 TVA docketed WNA-DS-01617-WBT Traceable, states: A [requirements specification] is traceable of Due: TBD Rev. 1, RRAS Watts Bar 2 NSSS the origin of each of its requirements is clear Response included in letter dated Completion Program I&C Projects Post 12/22/10 NNC 2/2/11: Updated Accident Monitoring System- System

1. How did TVA ensure the traceability of each requirement in TVA Response to 1: Specifications and Requirements Specification, dated the WBN2 PAMS SysRS. Traceability of requirements for the WBN Unit 2 Common Q TVA/Westinghouse agreed to RTMs to be provided by December 2009.

PAMS is ensured by: include the V&V evaluation of their TVA

a. Preparation of the TVA Contract Compliance Matrix reusable software element contained in WNA-LI-00058-WBT-P, Revision 2, Post- development process in the V&V Tractability to be Accident Monitoring System (PAMS) Licensing design phase summary report. This addressed during the Technical Report submitted in TVA Letter to NRC evaluation would include an next audit.

dated December 3, 2010 (Reference 1). evaluation against the development

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

b. Engineering review/comment/status of each revision process requirements. This NNC 7/28/2011: See of: evaluation would also include an ML111150287 Section
i. WNA-DS-01617-WBT, Post Accident evaluation of how the WBN2 7.5.2.2.3.4.2.5 on page Monitoring System - System Requirements specific requirements were 24 and Section Specification addressed by the reusable software 7.5.2.2.3.4.3.1 on page ii. WNA-DS-01667-WBT, Post Accident elements. (see ML102920031 Item 26.

Monitoring System - System Design No 5)

Specification (hardware) iii. WNA-SD-00239-WBT, Software Requirements Specification for the Post Accident Monitoring System (software)

TVA Response to 2:

2. Explain the source(s) of the requirements present in the Post As documented in the RTM, some software requirements Accident Monitoring Systems Software Requirements are taken from generic documents. The decision to include Specification. To clarify, many documents have requirements generic software requirements was to reduce the overall that are incorporated by reference into the SRS, but what scope for Common Q features that are unchanged across served to direct the author to include those various projects. Westinghouse reviewed the generic PAMS documents in the SRS or, if the requirement is based on the requirements and included those requirements that were System Requirements Specification, what directed the author applicable to WBN Unit 2 PAMS.

to include the requirement there?

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

3. Clarify whether the unnumbered paragraphs in the Post TVA Response to 3:

Accident Monitoring Systems Software Requirements Unnumbered paragraphs in the Post Accident Monitoring Specification, such as in the section headings, or are all such Systems Software Requirements Specification, such as in sections simply considered to be informative? the section headings, are informative and are not to be interpreted as requirements. All requirements are explicitly Does the same apply to documents referenced by the SRS? numbered.

Such as WCAP-16096-NP-A, Rev. 1A, Software Program Manual for Common Q Systems, which is incorporated by It depends on the document type. The statement would be reference in requirement R2.3-2 in the SRS. true for requirements documents (such as the SysRS or SDS) if they were incorporated by reference. However, for R2.3-2 [The PAMS software shall comply with the the specific item cited, WCAP-16096-NP-A, Rev. 1A, it does requirements and guidelines defined in WCAP-16096-NP-A, not contain numbered requirements. The requirements Software Program Manual for Common Q Systems contained in this document are contained within the text of (reference 5).] the various sections.

If any requirements are expressed in such unnumbered Source: E-mail from Westinghouse (Matthew A. Shakun) to paragraph form instead of individually identified requirements, Bechtel (Mark S. Clark), RE: December 22 letter review, please list them, describe why they satisfy the fundamental dated December 17, 2010 (Reference 13) requirement of unambiguity, and describe how they were verified.

4. Are there any sources of requirements in parallel with the TVA Response to 4:

Post Accident Monitoring Systems Software Requirements The Westinghouse SRS, WNA-SD-00239-WBT, Revision 3 Specification? Meaning does the SRS contain, explicitly or contains references to other Westinghouse software by reference, all the requirements that were used in the requirements documents. Specifically, design phase for the application specific software, or do software design phase activities use requirements found in 00000-ICE-3238, Revision 5, Software Requirements any other source or document? If so, what are these Specification Post Accident Monitoring System sources or documents?

00000-ICE-3239, Revision 13, Software Requirements Specification for the Common Q Generic Flat Panel Display Software Source: E-mail from Westinghouse (Matthew A. Shakun) to

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

5. References 12, 27, 29, and 31-44 in the Post Accident TVA Response to 5:

Monitoring Systems Software Requirements Specification Requirements for the reusable software elements (RSEDs) are various types of Reusable Software Element. are evaluated in WNA-VR-00283-WBT-P, Revision 3, IV&V Summary Report for the Post Accident Monitoring System, These references are used in the body of the SRS, for dated December 2010 (Attachment 10).

example:

RSED traceability is contained in WNA-VR-00280-WBT, R5.3.14-2 [The Addressable Constants CRC error signal shall Revision 2, Watts Bar 2 NSSS Completion Program I&C be TRUE when any CAL CRC's respective ERROR terminal Projects Requirements Traceability Matrix for the Reactor

= TRUE (WNA-DS-00315-GEN, "Reusable Software Element Vessel Level Indication System (RVLIS) Custom PC Document CRC for Calibration Data" [Reference 12]).] Elements. This document can be made available for audit at the Westinghouse Rockville office.

They are also included via tables such as found in requirement R7.1.2-1 At the September 15 public meeting in Rockville, the following actions were agreed to. These items address the

[The Watts Bar 2 PAMS shall use the application-specific traceability concerns with the Software Requirements type circuits and custom PC elements listed in Table 7.1-1.] Specification.

1. Westinghouse will perform a review of the Do the referenced reusable software element documents include Requirements Traceability Matrix(RTM), using the requirements not explicitly stated in the SRS? If so what is their issues identified at the 9/15 public meeting as a guide origin? (documented below) and update the RTM as required.

TVA Response:

See response to letter Item 13 (NRC Matrix Item 145).

2. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.

TVA Response:

See response to letter Item 13 (NRC Matrix Item 145).

3. Westinghouse will add a comments column in the Requirements Traceability Matrix (RTM) to address items not in the SRS or SysRS.

TVA Response:

A comments column has been added to WNA-VR-00279-WBT, Revision 3, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

4. IEEE 830 says you shouldnt have planning information in the SRS. Westinghouse has agreed to remove this information.

TVA Response:

Westinghouse has confirmed that process requirements have been removed from the SRS.

Source: E-mail from Westinghouse (Andrew P. Drake)

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)

5. IEEE 830 says you shouldnt have process requirements in the SRS. Westinghouse has agreed to remove these requirements.

TVA Response:

Westinghouse confirmed that process requirements have been removed from the SRS.

Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)

6. Westinghouse will perform and document an evaluation of the SRS to ensure compliance with Reg.

Guide 1.172 and justify any deviations.

TVA Response:

WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1):

Section 9, Compliance Evaluation Of The Watts Bar 2 PAMS Software Requirements Specification To IEEE Standard 830-1998 And Regulatory Guide 1.172 has been added.

7. 25 issues identified by V&V where some requirements have not been included in the System Design Specification (SDS) (14) and SRS (11) at the revisions reviewed by V&V. Have these been addressed?

TVA Response:

The twenty-five (25) issues are captured in Exception Reports (ERs): V&V-769 and V&V-770. These ERs have all been addressed and the ERs have been closed satisfactorily by Westinghouse IV&V.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

8. Some hardware requirements are contained in the SRS instead of the System Design Specification (SDS). These will be removed from the SRS and incorporated into the next revision of the SDS.

TVA Response:

The hardware requirements in the Software Requirements Specification have been deleted and moved to System Design Specification.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 16, 2010 (Reference 15)

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

9. RTM item R4.2-2 protection class software set to 0.

Needs to be fixed internally. Write CAPs to revise the application restrictions document on AC160.

TVA Response:

Westinghouse CAPs IR# 10-259-M034 has been issued. This item will be addressed in revision 4 of the RTM.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

10. Westinghouse to improve the traceability of the tests that are performed with the function enable (FE) switch in the ENABLE position.

TVA Response:

The tests that are performed with the FE keyswitch in the ENABLE position are defined in the SRS Sections:

6.2 Manually Initiated Testing, 7.2.23 Annunciator Test Display, 7.2.25 Saturation Margin Test Display, and 7.2.26 Analog Output Test Display.

11. Westinghouse to revise documents to be consistent with referring to the FE switch in the ENABLE position.

TVA Response:

Westinghouse has elected to standardize on the terms FE keyswitch and ENABLE. A review of recent documents for compliance with this comment and commitment was performed with the following results:

a. Revision 3 of the SysRS, and SDS have been revised to use the terms FE keyswitch. Revision 3 of the SDS is consistent in use of the term ENABLE.
b. SysRS Revision 3 is not consistent in use of the term ENABLE as noted below:
i. R2.5.2.1-2 uses the term ENABLED instead of ENABLE ii. R2.5.2.1.3-3, R2.6.3.3-1, R2.6.3.3-2, R2.6.3.3-3, and R2.6.3.3-7, use the term Enable instead of ENABLE
c. Revision 3 of the SRS is not consistent in use of the terms FE keyswitch and ENABLE as noted below:
i. Tables 7.2-1 Train A PAMS Data Transmitted to the Plant Computer and 7.2-2 Train B PAMS Data Transmitted to the Plant Computer items 101 and 102 in the SRS refer to the FE switch.

All other items in the SRS refer to the FE keyswitch.

ii. Section 2.1, page 2-4, uses the term Enable instead of ENABLE iii. Requirements R7.2.14-6 and R7.2.16-7 use the term active instead of ENABLE iv. Requirements R7.2.23-2, R7.2.25-2, R7.2.26-2, R7.2.31-4, 7.2.56 FPDS Availability, and

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N R7.2.57-4 use the term enabled instead of ENABLE

d. WNA-AR-00180-WBT-P, Revision 0, Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System, dated October 2010, submitted in TVA letter to NRC dated (Reference
12) is not consistent in use of the term FE keyswitch as noted below:
i. Section 2.2 System Description and Table 3-1 WB2 PAMS FMEA refer to the FE switch.

ii. Table 3-1 describes the switch as the Functional Enable (FE) switch and the FE key-switch

e. Revision 2 of the Licensing Technical Report is not consistent in use of the term FE keyswitch as noted below:
i. Sections 2.2, 5.3 use the term (FE) keylock switch on pages 2-3 (2 places), page 5-3, page 5-6 (4 places)

The identified discrepancies in the use of the terms FE keyswitch and ENABLE in the SysRS, SRS, FMEA and Licensing Technical Report, will be corrected in the next revision of the documents.

12. The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS.

Need a good write up of how the process works.

TVA Response:

See response to letter item 13 (NRC Matrix Item 145).

13. Westinghouse and TVA will develop a revised schedule for document submittals and provide it to the NRC no later than 9/30/10 TVA Response:

The revised document submittal schedule was included as item 3 NRC Request (Matrix Item Number 142, TVA Commitments Nos. 10 and 17) in TVA letter to NRC dated October 26, 2010 (Reference 5).

14. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.

TVA Response:

The Procurement Requisition Resolution Matrix has been updated and is included in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS)

Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1), as Section 11, TVA Contract Compliance Matrix.

15. Westinghouse to add the Software Design Descriptions to the RTM

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N TVA Response:

The Software Design Description documents were added to the RTM in WNA-VR-00279-WBT, Rev 2.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

16. Westinghouse to clarify how requirements or documents are incorporated by reference into the Common Q PAMS requirements.

TVA Response:

When a Common Q PAMS requirements document references a section of another document, all requirements in that section are applicable.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

17. Westinghouse to review the use of shall outside of numbered paragraphs in requirements documents to ensure that all requirements are captured and clearly identified.

TVA Response:

See response in letter dated December 22, 2010, item 2 (NRC Matrix Item 050).

18. Westinghouse to resolve the following questions concerning Software Design Descriptions (SDDs)
a. Is the SDD a standalone document or will it incorporate the generic SDD by reference?
b. What are the SDDs?
c. PAMS is a delta document so how do we capture all the generic requirements for traceability.

TVA Response:

a. There are three SDDs prepared specifically for the Watts Bar 2 PAMS project. These are listed below in Item b. These documents and superior requirements documents refer to other generic SDDs also listed in Item b.
b. The SDDs developed for this project are:
i. WNA-SD-00248-WBT, Revision 1, Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System Flat Panel Display ii. WNA-SD-00250-WBT, Revision 1, Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System AC160 Software

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N iii. WNA-SD-00277-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System Flat Panel Display System Screen Design Details iv. Other generic SDDs referenced by the PAMS project are:

(a) 00000-ICE-20157, Revision 18, Software Design Description for the Common Q Generic Flat-Panel Software (b) 00000-ICE-30152, Revision 5, Software Design Description Post Accident Monitoring System AC160 (c) 00000-ICE-30140, Revision 4, Software Design Description for the Common Q Core Protection Calculator System Database and Utility Functions

c. Refer to WNA-VR-00279-WBT, Revision 3.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

19. For Reusable Software Elements, Westinghouse to describe as qualified libraries by following the SPM and qualified using the Software Elements Test procedure under Appendix B program. Provide a summary of RSEDs generic WCAP. Westinghouse to determine if the WCAP was docketed under the AP1000. RSED concept is not in the SPM. WCAP-15927 AP-1000 does not discuss RCEDs. WCAP process was acceptable. RSEDs are listed in the SDD References.

TVA Response:

Section 3.2.4.1 of WCAP-15927 describes the RSED design process for custom PC elements and type circuits. The Glossary of Terms in the SPM defines custom PC elements and type circuits as modules.

Therefore, the relationship between WCAP-15927 describing the RSED process as circuits, is defined in the SPM requirements for software module development.

WCAP-15927 is on the AP1000 docket.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

TVA Response to Follow-up NRC Request:

WNA-VR-00279-WBT, Revision 4, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System is scheduled to be available for audit at the Westinghouse Rockville office

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N February 21, 2011. The document will be available at the Westinghouse Cranberry offices to support the NRC Common Q PAMS audit.

Attachment 9 contains the proprietary version of WNA-DS-01617-WBT-P, Revision 4, Post Accident Monitoring System - System Requirements Specification, dated February 2011. Attachment 10 contains the non-proprietary version WNA-DS-01617-WBT-NP, Revision 4, Post Accident Monitoring System - System Requirements Specification, dated February, 2011. Attachment 11 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-DS-01617-WBT-P, Revision 4, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System - System Requirements Specification (Proprietary),

dated February 10, 2011.

Attachment 12 contains the proprietary version of WNA-DS-01667-WBT-P, Revision 4, Post Accident Monitoring System - System Design Specification, dated February 2011. Attachment 13 contains the non-proprietary version WNA-DS-01667-WBT-NP, Revision 4, Post Accident Monitoring System - System Design Specification, dated February 2011. Attachment 14 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-DS-01667-WBT-P, Revision 4, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (Proprietary), dated February 11, 2011.

Attachment 15 contains the proprietary version of WNA-SD-00239-WBT-P, Revision 4, Software Requirements Specification for the Post Accident Monitoring System, dated February 2011. Attachment 16 contains the non-proprietary version WNA-SD-00239-WBT-NP, Revision 4, Software Requirements Specification for the Post Accident Monitoring System, dated February 2011. Attachment 17 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-SD-00239-WBT-P, Revision 4, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Software Requirements Specification for the Post Accident Monitoring System (Proprietary), dated February 10, 2011.

143 The WBN2 PAMS Software Requirements Specification (WBN2 Responder: WEC 12. N Open Open-TVA to respond ML101650255, Item WBN2 PAMS System Requirements EICB (Carte)

PAMS SRS - ML101050202) contains a table (see page iii) titled, to open items in CQ No. 7 Specification Document Traceability & Compliance, which states that the Addressed in the 9/15 public meeting and 9/20 - 9/21 audit. Response included in letter dated PAMS SE.

WBN2 PAMS SRS was created to support the three documents A detailed explanation will be provided. 12/22/10 TVA docketed WNA-DS-01617-WBT identified (one of which is the WBN2 PAMS SysRS). Section 1.1, Due: TBD Rev. 1, RRAS Watts Bar 2 NSSS Overview, of the WBN2 PAMS SRS states: This document TVA Response: Completion Program I&C Projects Post describes requirements for the major software components To be addressed by Accident Monitoring System- System (a) and (b) The requested information is provided in the Revision of the RTM, Requirements Specification, dated (a) Please list and describe each of the major software following documents: SRS, SysRS, and December 2009.

components. Please include a description of any NRC review for i. WNA-LI-00058-WBT-P, Revision 2, Post- SysDS.

each of these components. Accident Monitoring System (PAMS) Licensing Technical Report, Table 6-1, Document NNC 2/2/11: Updated (b) Please list and describe each of the other software Requirements which lists the software Specifications and components. Please include a description of any NRC review for documentation requirements for the Common Q RTMs to be provided by

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N each of these components. PAMS and Section 11 TVA Contract TVA Compliance Matrix submitted in TVA Letter to (c) What other documents contain the requirements for the other NRC, dated December 3, 2010 (Reference 1). NNC 2/3/11: The software components? ii. WNA-DS-01617-WBT-P, Revision 3, Post above due date has Accident Monitoring System- System been missed by at The WBN2 PAMS System Design Specification (WBN2 PAMS Requirements Specification, dated December least 2 months.

SDS) contains a table (see page iii) titled, Document Traceability 2010 (Attachment 1) Please provide new

& Compliance, which states that the WBN2 PAMS SysRS was iii. WNA-SD-00239-WBT-P, Revision 3, Software due date.

created to support the WBN2 PAMS SysRS. Section 1.1, Requirements Specification for the Post Accident NNC 7/28/2011: See Purpose, of the WBN2 PAMS SDS states: The purpose of this Monitoring System, dated December 2010 ML111150287 Section document is to define the hardware design requirements (Attachment 7) 7.5.2.2.3.4.3.1 on page iv. WNA-VR-00279-WBT, Revision 3, Watts Bar 2 26.

(c) Do the WBN2 PAMS SRS and SDS, together, implement all of NSSS Completion Program I&C Projects the requirements in the WBN2 PAMS SysRS? Requirements Traceability Matrix for the Post Accident Monitoring System (available for NRC (e) Please briefly describe all of the documents that implement audit at the Westinghouse Rockville office) the WBN2 PAMS SysRS. To the best of TVAs knowledge, no prior NRC review of the software components has been performed.

(c) WNA-VR-00280-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements (available for NRC audit at the Westinghouse Rockville office)

(d) No. Please see Item (e) below.

(e) The documents that describe the requirements that implement the WBN Unit 2 SysRS are:

i. WNA-VR-00279-WBT, Revision 3, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System (available for NRC audit at the Westinghouse Rockville office) ii. WNA-VR-00280-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements (available for NRC audit at the Westinghouse Rockville office)

Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

TVA Response to Follow-up NRC Request:

See Response to item 3 (Item number 142) 144 The WBN2 PAMS Software Requirements Specification (WBN2 Responder: WEC 13. N Open Open-TVA to respond ML101650255, Item TVA Letter dated WBN2 PAMS Software Requirements EICB (Carte)

PAMS SRS) contains a table (see page iii) titled, Document to open items in CQ No. 8 10/5/10 Specification Traceability & Compliance, which states that the WBN2 PAMS (a) The purpose of NABU-DP-00014-GEN document is to Pending Submittal of Revision 3 of PAMS SE.

define the process for system level design, software design SRS was created to support the three documents identified (two of the Licensing Technical Report due By letter dated April 8, 2010 these documents have been provided on the docket). and implementation, and hardware design and 3/29/11. Due: TBD (ML10101050203), TVA docketed implementation for Common Q safety system development. WNA-SD-00239-WBT, Revision 1, (a) Please describe the third document (i.e., NABU-DP-00014-GEN This document supplements the Common Q SPM, WCAP- Responses to items a "RRAS Watts Bar 2 NSSS Completion Revision 2, Design Process for Common Q Safety Systems). 16096-NP-A. The scope of NABU-DP-00014-GEN includes Revised response included in letter and e provided. Program I&C Projects, Software the design and implementation processes for the application dated 12/22/10 Requirements Specification for the Post

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N (b) Please describe the flow of information between these three development. For a fuller description of the design process NNC 11/18/10: Accident Monitoring System, dated documents. described in NABU-DP-00014-GEN please refer to the Response provided in letter dated (1) Items b-d closed to February 2010 (ML101050202).

Design Process for AP1000 Common Q Safety Systems, 10/5/10 other Open Item nos.

(c) Does the PAMS SRS implement the requirements in these WCAP-15927 on the AP1000 docket. Since this is a (2) The point of these three documents? Westinghouse process document that is not specifically NRC Review and WEC to complete questions was to referenced in the SRS, it will be removed in the next revision response. understand how the (d) Please describe if and how these three documents are used in of the document. origin of the the development of the PAMS Software Design Description. b-d to be addressed at public requirements in the (b) - Closed to items 142 and 145 meeting and audit. Will require requirements (e) Do the WBN2 V&V activities include verification that the information to be docketed. specifications were requirements of these three documents have been incorporated (c) - Closed 142 documented. TVA into the WBN2 PAMS SRS. stated that the origin of (d) - Closed to Item 142 the requirements would be demonstrated in (e) WBN2 PAMS Software Requirements Specification Rev. 2 of the CQ PAMS (WNA-SD-00239-WBT, Rev. 1) refers to Document LTR.

Traceability & Compliance table on page iii. This table has three entries; Design Process for Common Q Safety NNC 2/3/11: CQ Systems (NABU-DP-00014-GEN, Rev. 2), RRAS Watts Bar PAMS LTR Rev. 2 2 NSSS Completion Program I&C Projects Post Accident Section 11 & 12 do not Monitoring System - System Requirements Specification adequately (WNA-DS-01617-WBT, Rev. 1), and RRAS Watts Bar 2 demonstrate the origin NSSS Completion Program I&C Projects Post Accident of requirements in Monitoring System - System Design Specification (WNA- SysRS. TVA to DS-01667-WBT, Rev. 1). describe how to address concern.

IV&V performed a Requirements Traceability Assessment during which it reviewed Software Requirements NNC 7/28/2011: See Specification (WBN2 PAMS SRS, WNA-SD-00239-WBT, ML111150287 Section Rev. 1) against System Requirements Specification (WNA- 7.5.2.2.3.4.2.5 on page DS-01617-WBT, Rev. 1) and System Design Specification 24 and Section (WNA-DS-01667-WBT, Rev. 1). Requirements within 7.5.2.2.3.4.3.1 on page Software Requirements Specification that are referring to 26.

NABU-DP-00014-GEN, Rev 2, Design Process for Common Q Safety Systems, have also been reviewed for traceability and compliance. During IV&V's RTA effort the anomaly reports V&V-769 and V&V- 770 have been initiated and reported in the IV&V Phase Summary Report for the System Definition Phase, WNA-VR-00283-WBT, Rev. 0.

IV&V has verified that the requirements in SRS are derived from the specified documents listed in the Document Traceability and Compliance Table of WBN2 PAMS SRS.

TVA Response to Follow-up NRC Request:

(1) Item (a) in the original list, NABU-DP-00014-GEN Revision 2, Design Process for Common Q Safety Systems, is available for NRC audit at the Westinghouse Rockville office.

(2) WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following change to address the NRC request:

Section 11, TVA Contract Compliance Matrix showing the origin of the requirements was added.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N TVA Response to Second Follow-up NRC Request:

Section 13, Origin Tracing of WBN2 PAMS System Requirements Specification was added to the Licensing Technical Report Revision 3 to address this concern.

Attachment 2 contains WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, dated March 2011 (proprietary).

145 The WBN2 PAMS System Design Specification (WBN2 PAMS Responder: WEC 14. N Open Open-TVA to respond ML101650255, Item WBN2 PAMS System Design EICB (Carte)

SDS) contains a table (see page iii) titled, Document Traceability to open items in CQ No. 9 Specification

& Compliance, which states that the WBN2 PAMS SDS was (1) The review and update of the RTM is complete. The Response included in letter dated PAMS SE.

created to support the WBN2 PAMS SysRS. revised RTM can be made available for NRC audit at 12/22/10 TVA docketed WNA-DS-01667-WBT the Westinghouse office in Rockville. Due: TBD Rev. 1, RRAS Watts Bar 2 NSSS (a) Does the WBN2 PAMS SDS implement all of the hardware During the September 20-21, 2010 Completion Program I&C Projects Post requirements in the WBN2 PAMS SysRS? (2) Please see letter Item 10 (NRC Matrix Item 142, sub audit at Westinghouse, it was To be addressed by Accident Monitoring System- System item 13). acknowledged that Revision of the RTM, Design Specification, dated December (b) Please briefly describe all of the documents that implement the TVA/Westinghouse had previously SRS, SysRS, and 2009.

hardware requirements of the WBN2 PAMS SysRS. (3) Please see letter Item 10 (NRC Matrix Item 142, sub (in September 15, 2010 public SysDS.

item 12). meeting) stated:

This item is used to track all traceability issues with the NNC 7/28/2011: See System Design Specification (SDS). (4) Section 11 TVA Contract Compliance Matrix was TVA would provide the RSED RTM. ML111150287 Section added to WNA-LI-00058-WBT-P, Revision 2, Post- (see ML102920031 Item No 6) 7.5.2.2.3.4.2.5 on page At the September 15 public meeting in Rockville, the following Accident Monitoring System (PAMS) Licensing 24 and Section actions were agreed to. These items partially address the Technical Report submitted in TVA Letter to NRC TVA would revise and resubmit the 7.5.2.2.3.4.3.2 on page traceability concerns with the System Design Specification. dated December 3, 2010, (Reference 1). PAMS RTM to address all types of 28.

This item will be updated with the results of the September 20 issues identified in the public and 21 Commercial Grade Dedication and SDS RTM audit. (5) WNA-VR-00283-WBT, Revision 1, IV&V Summary meeting. (see ML102920031 Item Report for the Post Accident Monitoring System, No 7)

1. Westinghouse will perform completed a review of the submitted in TVA to NRC letter dated December 3, Requirements Traceability Matrix(RT), using the issues 2010 (Reference 1) includes the Requirements and TVA would revise and resubmit the identified at the 9/15 public meeting as a guide (documented Design phase reviews. Software Verification and Validation below) and update the RTM as required. phase summary report for the (6) Per Westinghouse letter WBT-D-2268 NRC Access to requirements phase to document
2. Some hardware requirements are contained in the SRS Common Q Documents at the Westinghouse Rockville the completion of the requirements instead of the System Design Specification (SDS). These will Office dated August 16, 2010 (Reference 9) System phase review. (see ML102920031 be removed from the SRS and incorporated into the next Requirements Specification for the Common Q Generic Item No 8) revision of the SDS. Flat Panel Display, 00000-ICE-30155, Revision 9 is available for audit at the Westinghouse Rockville office.
3. 25 issues identified by V&V where some requirements have not been included in the SDS (14) and SRS (11) at the The generic AC160 specifications are contained in the revisions reviewed by V&V. Have these been addressed? documents listed below. The documents are available Yes. The next revisions of the SDS and SRS address these for NRC audit at the Westinghouse Rockville office in issues. accordance with the letter number referenced. List is contained in letter.
4. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS (7) A schedule was developed and is reviewed weekly by design meets the contract requirements. Westinghouse and TVA project management.
5. The next issue of the IV&V report will include the (8) The revised document submittal schedule was Requirements phase review of the RTM and a partial review included as item 3 NRC Request (Matrix Item Number for the Design phase. 142, TVA Commitments Nos. 10 and 17) in TVA letter to NRC dated October 26, 2010.
6. Westinghouse to provide the generic AC160 and flat panel specifications. (9) The flow of documentation information was provided to the NRC inspector during the Common Q PAMS audit.
7. Westinghouse and TVA to develop a schedule of licensing document submittals that can be met by the project team. Source: E-mail from Westinghouse (Andrew P. Drake) to

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Bechtel (Mark S. Clark), RE: RAI on SysRS, dated

8. The flow of information is from the SysRS to the SDS December 8, 2010 (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS. Need a TVA Response to Follow-up NRC Request:

good write up of how the process works.

See Response to item 3 (Item number 142) 183 7/15/2010 Responder: WEC 15. Y Open Open-TVA to respond EICB RAI TVA Letter dated EICB (Carte) to open items in CQ ML102980066 Item 10/21/10 An emphasis is placed on traceability in System Requirements The generic Software Requirements Specification applies Pending Submittal of Revision 3 of PAMS SE. No. 9 Enclosure 1 Item Specifications in the SRP, in the unmodified IEEE std 830-1993, except as modified by the WBN Unit 2 System Requirements the Licensing Technical Report due No. 4 and even more so given the modifications to the standard listed in Specification. 3/29/11. Due: TBD Regulatory Guide 1.172, which breaks with typical NRC use of the word should to say Each identifiable requirement in an SRS must TVA Response to Follow-up NRC Request: NNC 11/18/10: The be traceable backwards to the system requirements and the design Revised response included in letter point behind this open bases or regulatory requirements that is satisfies Please see the response to RAI item 12 in letter dated dated 12/22/10. item was that TVA must 12/22/10, NRC Matrix Item 144. demonstrate that the On page 1-2 of the Post Accident Monitoring Systems Software origin of each Requirements Specification in the background section, is the TVA Response to Second Follow-up NRC Request: Response provided in letter dated requirement in the sentence Those sections of the above references that require 10/21/10 WEC requirements modification from the generic PAMS are defined in the document This item was addressed by updating the Contract specification is known referring purely to the changes from WNA-DS-01617-WBT Post Compliance Matrix and adding Section 13, Origin Tracing of and documented. TVA Accident Monitoring System-System Requirements Specification WBN2 PAMS System Requirements Specification to the stated that this or is it saying that there are additional changes beyond those and Licensing Technical Report Revision 3 to address this information would be in that the SRS defines them? concern. Attachment 2 contains WNA-LI-00058-WBT-P, CQ PAMS LTR Rev. 2.

Post-Accident Monitoring System (PAMS) Licensing If there are additional changes, what is their origin? Technical Report, Revision 3, dated March 2011 NNC 2/3/11: CQ PMS (proprietary). LTR Rev. 2 Sections 11

& 12 do not prove this information. TVA to provide a plan to address requested information.

NNC 7/28/2011: See ML111150287 Section 7.5.2.2.3.4.2.5 on page 24 and Section 7.5.2.2.3.4.3.1 on page 26.

185 7/15/2010 Responder: WEC 16. N Open Open-TVA to respond EICB RAI EICB (Carte) to open items in CQ ML102980066 Item An emphasis is placed on the traceability of requirements in Steve Clark to look at how to combine traceability items. Response included in letter dated PAMS SE. No. 17 Software Requirements Specifications in the SRP, in the 12/22/10.

unmodified IEEE std 830-1993, and even more so given the Was addressed to during the 9/15 meeting and 9/20 - 9/21 Due: TBD modifications to the standard listed in Regulatory Guide 1.172, audit.

which breaks with typical NRC use of the word should to say NNC 11/18/10: (1)The Each identifiable requirement in an SRS must be traceable TVA Response to Follow-up NRC Request: point behind this open backwards to the system requirements and the design bases or (1) See NRC Matrix Item 144 item was that TVA must regulatory requirements that is satisfies Also the NRC considers (2) There is no RTM for development of the individual demonstrate that the that the SRS is the complete set of requirements used for the reusable software elements. As listed in item 15 of origin of each design of the software, whether it is contained within one document Table 6-1 Document Requirements of WNA-LI-00058- requirement in the or many. In order to evaluate an SRS against the guidance in the WT-P, Revision 2, Post-Accident Monitoring System WEC requirements SRP the staff needs access to all the requirements. (PAMS) Licensing Technical Report submitted in TVA specification is known Letter to NRC, dated December 3, 2010, a RTM for and documented. TVA References 12, 27, 29, and 31-44 in the Post Accident Monitoring implementation of the RSEDs (WNA-VR-00280-WBT) stated that this Systems Software Requirements Specification are various types of for the WBN Unit 2 Common Q PAMS has been information would be in Reusable Software Element. developed. This document is available for NRC audit at CQ PAMS LTR Rev. 2.

the Westinghouse Rockville office. (2) TVA also said it

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N These references are used in the body of the SRS, for example: would provide a RTM for the RSED R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE NNC 2/3/11: To be (WNA-DS-00315-GEN, "Reusable Software Element Document addressed during next CRC for Calibration Data" [Reference 12]).] audit.

They are also included via tables such as found in requirement NNC 7/28/2011: See R7.1.2-1 ML111150287 Section 7.5.2.2.3.4.2.5 on page

[The Watts Bar 2 PAMS shall use the application-specific type 24 and Section circuits and custom PC elements listed in Table 7.1-1.] 7.5.2.2.3.4.3.1 on page 26.

Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin?

202 7.5.2 7/22/2010 Responder: WEC 17. N Open Open-TVA to respond EICB RAI TVA Letter dated NNC 1/5/11: See Also Open Item No.

EICB (Carte) to open items in CQ ML102980066 Item 10/5/10 81 and 86.

The letter (ML0003740165) which transmitted the Safety Revision 1 of the Licensing Technical Report will provide Pending Submittal of Revision 3 of PAMS SE. No. 4 Evaluation for the Common Q topical report to Westinghouse more detailed information on the changes to the platform. the Licensing Technical Report due stated: "Should our criteria or regulations change so that our 3/29/11. Due: TBD conclusions as to the acceptability of the report are invalidated, CE Nuclear Power and/or the applicant referencing the topical report Rev. 2 of the Licensing Technical Report will include the Response included in letter dated will be expected to revise and resubmit their respective applicability of guidance. 12/22/10 documentation, or submit justification for continued applicability of the topical report without revision of the respective documentation." TVA Response to Follow-up NRC Request: Partial Response provided in letter Question No 81 identified many criteria changes; please revise the WNA-LI-00058-WBT-P, Revision 2, Post-Accident dated 10/5/10 respective documentation or submit justification for continued Monitoring System (PAMS) Licensing Technical Report applicability of the topical report. (LTR) submitted in TVA Letter to NRC dated December 3, NNC 1/5/11: Summary provided in 2010, contains the following change to address the NRC Licensing Technical Report R2 has request: been reviewed and found to be unacceptable.

Section 9, Compliance Evaluation of the Watts Bar 2 PAMS Software Requirements Specification to IEEE Standard 830- LTR Section 9 evaluates the 1998 and Regulatory Guide 1.172 to show the origin of the compliance of the SRS to IEEE requirements has been added. 830-1998. There are two issues with this evaluation:

The descriptions and commitments in the Topical Report (1) IEEE 830-1998 is not the current (TR) still apply. The LTR provides compliance evidence to SRP acceptance criteria. IEEE the new ISG-04 criteria. The statement in the SE means that 830-1998 has not been formally the TR can be evaluated against later NRC criteria when it endorsed by a regulatory guide.

appears. (2) Westinghouse committed to evaluate the SRS against 830 when Source: E-mail from Westinghouse (Matthew A. Shakun) to the NRC identified several Bechtel (Mark S. Clark), RE: December 22 letter review, inconsistencies.

dated December 17, 2010 Yes ISG-4 is one new criteria, and Partial TVA Response to Follow-up NRC Request: an evaluation against it has been provided.

Attachment 4 contains the results of the TVA analysis of standards and regulatory guides applicable to the Common In addition, LTR Rev. 2 Section 13 Q PAMS. Based on the results of the analysis, the Common states: The applicable NRC Q PAMS design is acceptable. regulatory guides, IEEE and EPRI industry standards for the common The final response is pending submittal of the Licensing Q PAMS are shown below.

Technical Report Revision 3 scheduled for March 29, 2011. Compliance to these codes and standards are stated in Section 4 of TVA Response to Follow-up NRC Request: Reference 1. Reference 1 is the

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N common Q topical report.

(1) As discussed on page 9-1 of the Licensing Technical Report (Attachment 2) a comparison of IEEE 830-1993 and IEEE 830-1998 was performed and it was determined that the 1998 version enveloped all the requirements of the 1993 version which is endorsed by Regulatory Guide 1.172. Therefore the use of IEEE 830-1998 is acceptable.

(2) Table 9.1 IEEE Std 830-1998 Compliance of the Licensing Technical Report (Attachment 2) evaluates the Software Requirements Specification against the requirements of IEEE 830-1998.

(3) See TVA to NRC letter Watts Bar Nuclear Plant (WBN)

Unit 2 - Instrumentation And Controls Staff Information Requests, dated February 25, 2011 Attachment 4 Common Q PAMS Regulatory Guide and IEEE Standard Analysis.

(4) This section of the Licensing Technical Report (Attachment 2) has been relocated to section 15. The comment has been addressed by adding Reference 40 to TVA to NRC letter dated February 25, 2011, Attachment 4 which is the Common Q PAMS Regulatory Guide and IEEE Standard Analysis.

212 7.5.2 7/27/2010 Responder: WEC 18. N Open Open-TVA to respond EICB RAI EICB (Carte) to open items in CQ ML102980066 Item By letter dated June 18, 2010 (ML101940236) TVA stated Application specific requirements for testing. This cannot be Partial Response included in letter PAMS SE. No. 10 (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system addressed in a topical report. Evaluation of how the dated 03/16/11 design specification and software requirements specification hardware meets the regulatory requirements. Due: TBD contain information to address the "Design Report on Computer Final response due 3/29/11 Integrity, Test and Calibration..." The staff has reviewed these WEC to provide the information and determine where the documents, and it is not clear how this is the case. information will be located.

(1) Please describe how the information provided demonstrates compliance with IEEE 603-1991 Clauses 5.5, 5.7, 5.10, & 6.5. IEEE-603 1991:

(2) Please describe how the information provided demonstrates 5.5 System Integrity. The safety systems shall be NNC 2/17/2011: IEEE conformance with IEEE 7-4.3.2-2003 Clauses 5.5 & 57. designed to accomplish their safety functions under the 603 Clause 5.5 full range of applicable conditions enumerated in the basically states that design basis. conditions identified in IEEE 603 Clauses 4.7 TVA Response: The applicable conditions and & 4.8 must be Common Q PAMS system compliance are contained in addressed in the WNA-LI-00058-WBT-P, Rev. 2, Post-Accident design. Energy supply Monitoring System (PAMS) Licensing Technical conditions have not Report submitted in TVA Letter to NRC dated been identified, or December 3, 2010, Section 11, Contract Compliance explicitly addressed.

Matrix items:

  • 87 and 88 Seismic
  • 89, 90, 91, 92 and 185 EMI/RFI
  • 300, 301 and 302 Environmental Seismic qualification of the equipment to meet the design basis requirements 5.7 Capability for Test and Calibration. Capability for NNC 2/18/11: Clause testing and calibration of safety system equipment 5.7 is acceptably shall be provided while retaining the capability of the

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N safety systems to accomplish their safety functions. addressed.

The capability for testing and calibration of safety system equipment shall be provided during power operation and shall duplicate, as closely as practicable, performance of the safety function. Testing of Class 1E systems shall be in accordance with the requirements of IEEE Std 338-1987. Exceptions to testing and calibration during power operation are allowed where this capability cannot be provided without adversely affecting the safety or operability of the generating station. In this case:

(1) appropriate justification shall be provided (for example, demonstration that no practical design exists),

(2) acceptable reliability of equipment operation shall be otherwise demonstrated, and (3) the capability shall be provided while the generating station is shut down.

TVA Response: The requirements for test and calibration and Common Q PAMS system compliance, are contained in WNA-LI-00058-WBT-P, Rev. 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11, TVA Contract Compliance Matrix items:

  • 202 self test
  • 350 Maintenance Bypass
  • 351 Loop Tuning Parameters,
  • 400 and 401 3.7.2 Testing, Calibration, and Verification NNC 2/18/2011: WNA-
  • 402, 403 and 404, 3.7.3 Channel Bypass or AR-00189-WBT Rev. 0 Removal from Operation Table 5-2 shows a MTTR of 7.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. It 5.10 Repair. The safety systems shall be designed to is not clear how this facilitate timely recognition, location, replacement, satisfies the repair, and adjustment of malfunctioning equipment. contractual item No.

179.

TVA Response: The requirements for repair and Common Q PAMS system compliance are contained in The Contract WNA-LI-00058-WBT-P, Rev. 2, Post-Accident Compliance Matrix Item Monitoring System (PAMS) Licensing Technical 179 in Revision 3 of the Report Section 11, TVA Contract Compliance Matrix LTR has been revised items: to show this item as a

  • 179 Mean time to repair deviation and to reflect
  • 202 self test TVAs acceptance of the 7.2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> MTTR
  • 398 3.7 Maintenance value. Attachment 2
  • 399 3.7.1 Troubleshooting contains WNA-LI-00058-WBT-P, Post-6.5 Capability for Testing and Calibration Accident Monitoring System (PAMS) 6.5.1 Means shall be provided for checking, with a high Licensing Technical degree of confidence, the operational availability of Report, Revision 3, each sense and command feature input sensor dated March 2011 required for a safety function during reactor operation.

(proprietary).

This may be accomplished in various ways; for example:

(1) by perturbing the monitored variable, (2) within the constraints of 6.6, by introducing and

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N varying, as appropriate, a substitute input to the sensor of the same nature as the measured variable, or (3) by cross-checking between channels that bear a known relationship to each other and that have readouts available.

6.5.2 One of the following means shall be provided for assuring the operational availability of each sense and command feature required during the post-accident period:

(1) Checking the operational availability of sensors by use of the methods described in 6.5.1.

(2) Specifying equipment that is stable and retains its calibration during the post-accident time period.

TVA Response: The requirements for sense and command feature testing and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11 TVA Contract Compliance Matrix items:

  • 10, display of sensor diagnostic information
  • 202 self test
  • 205 self diagnostics and watchdog timer
  • 264 through 271, system self checks
  • 311 system status displays,
  • 341 alarms,
  • 344 on-line diagnostics IEEE 7-4.3.2-2003 5.5 System integrity In addition to the system integrity criteria provided by IEEE Std 603-1998, the following are necessary to achieve system integrity in digital equipment for use in safety systems:

Design for computer integrity Design for test and calibration Fault detection and self-diagnostics 5.5.1 Design for computer integrity The computer shall be designed to perform its safety function when subjected to conditions, external or internal, that have significant potential for defeating the safety function. For example, input and output processing failures, precision or round off problems, improper recovery actions, electrical input voltage and frequency fluctuations, and maximum credible number of coincident signal changes.

If the system requirements identify a safety system preferred failure mode, failures of the computer shall not preclude the safety system from being placed in that mode. Performance of computer system restart operations shall not result in the safety system being inhibited from performing its function.

TVA Response: Common Q PAMS system reliability

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N and failure modes are described in:

  • WNA-AR-00189-WBT, Revision 0 Post Accident Monitoring System Reliability Analysis The requirements for mean time between failure and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Section 11 TVA Contract Compliance Matrix item 178.

5.5.2 Design for test and calibration Test and calibration functions shall not adversely affect the ability of the computer to perform its safety function. Appropriate bypass of one redundant channel is not considered an adverse effect in this context. It shall be verified that the test and calibration functions do not affect computer functions that are not included in a calibration change (e.g., setpoint change).

V&V, configuration management, and QA shall be required for test and calibration functions on separate computers (e.g., test and calibration computer) that provide the sole verification of test and calibration data.

V&V, configuration management, and QA shall be required when the test and calibration function is inherent to the computer that is part of the safety system.

V&V, configuration management, and QA are not required when the test and calibration function is resident on a separate computer and does not provide the sole verification of test and calibration data for the computer that is part of the safety system.

TVA Response: The requirements for test and calibration and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11 TVA Contract Compliance Matrix items:

  • 202 self test
  • 350 Maintenance Bypass
  • 351 Loop Tuning Parameters,
  • 400 and 401 3.7.2 Testing, Calibration, and Verification
  • 402, 403 and 404, 3.7.3 Channel Bypass or Removal from Operation 5.5.3 Fault detection and self-diagnostics Computer systems can experience partial failures that can degrade the capabilities of the computer system, but may not be immediately detectable by the system.

Self-diagnostics are one means that can be used to

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N assist in detecting these failures. Fault detection and self-diagnostics requirements are addressed in this sub-clause.

The reliability requirements of the safety system shall be used to establish the need for self-diagnostics. Self diagnostics are not required for systems in which failures can be detected by alternate means in a timely manner. If self-diagnostics are incorporated into the system requirements, these functions shall be subject to the same V&V processes as the safety system functions.

If reliability requirements warrant self-diagnostics, then computer programs shall incorporate functions to detect and report computer system faults and failures in a timely manner. Conversely, self-diagnostic functions shall not adversely affect the ability of the computer system to perform its safety function, or cause spurious actuations of the safety function. A typical set of self-diagnostic functions includes the following:

Memory functionality and integrity tests (e.g.,

PROM checksum and RAM tests)

Computer system instruction set (e.g., calculation tests)

Computer peripheral hardware tests (e.g.,

watchdog timers and keyboards)

Computer architecture support hardware (e.g.,

address lines and shared memory interfaces)

Communication link diagnostics (e.g., CRC checks)

Infrequent communication link failures that do not result in a system failure or a lack of system functionality do not require reporting.

When self-diagnostics are applied, the following self-diagnostic features shall be incorporated into the system design:

a) Self-diagnostics during computer system startup b) Periodic self-diagnostics while the computer system is operating c) Self-diagnostic test failure reporting TVA Response: The requirements for fault detection and self diagnostics and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Rev. 2, Post-Accident Monitoring System (PAMS)

Licensing Technical Report Section 11 TVA Contract Compliance Matrix items:

  • 107 error free download
  • 202 self test
  • 205 self diagnostics and watchdog timer
  • 263 primary and backup communication
  • 264 through 271, continuous on-line self checks
  • 311 system status displays,
  • 341 alarms,

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

  • 344 on-line diagnostics 5.7 Capability for test and calibration No requirements beyond IEEE Std 603-1998 are necessary.

TVA Response: No response required.

Concurrence: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: RAI 212 Response - Errors in the Contract Compliance Matrix, dated December 17, 2010 (a) Energy Supply conditions are specified in WNA-DS-01617-WBT-P, System Requirements Specification Rev.

4, Requirement 4.1-1 which requires 120Vac +/-10% and 60+/-3Hz. Power to the Common Q PAMS is provided from the 120Vac vital power system. Per WBN Unit 2 FSAR section 8.3.1.1 the vital 120 volt ac system specifications are 120Vac +/-2% and 60+/-0.5Hz. Based on this, the power provided meets the system requirements.

Electromagnetic compatibility, seismic and environmental qualification of the equipment to meet the design basis requirements is documented in EQ-QR WBT-P, Revision 0 Qualification Summary Report for Post-Accident Monitoring System (PAMS)" (Proprietary)

(Attachment 4). Attachment 5 contains EQ-QR WBT-NP, Revision 0 Qualification Summary Report for Post-Accident Monitoring System (PAMS)" (non-proprietary). Attachment 6 contains CWA-11-3118, Application for Withholding Proprietary Information from Public Disclosure, EQ-QR-68-WBT-P, Revision 0 Qualification Summary Report for Post-Accident Monitoring System (PAMS), (Proprietary), dated February 28, 2011.

(b) The Contract Compliance Matrix Item 179 in Revision 3 of the Licensing Technical Report will be revised to show this item as a deviation and to reflect TVAs acceptance of the 7.2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> MTTR value. WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, (proprietary) dated March 2011, will be submitted no later than March 29, 2011.

244 8/3/2010 Responder: WEC 19. N Open Open-NRC Review EICB RAI Response is LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)

ML102980066 Item provided in letter "Safety Evaluation" states: "the Section 8.2.2 of the Common Q SPM (ML050350234) states that The process related requirements have been removed from Revised response is included in Due 2/25/11 Document No. 14 dated 10/25/10. information relied upon in the SE must the Software Requirements Specification (SRS) shall be developed revision 2 of the Software Requirements Specification (SRS). letter dated 12/22/10 revisions be docketed correspondence."

using IEEE 830 and RE 1.172. Clause 4.8, "Embedding project requirements in the SRS," of the IEEE 830 states that an SRS Attachment 3 of letter dated 10/25/10 contains the Response is provided in letter dated NNC 2/2/11: Issues LIC-101 Rev. 3 states: "The safety should address the software product, not the process of producing proprietary version of Westinghouse document Nuclear 10/25/10. with Common Q TR & analysis that supports the change the software. In addition Section 4.3.2.1 of the SPM states "Any Automation, Watts Bar 2 NSSS Completion Program, I&C SPM compliance were requested should include technical alternatives to the SPM processes or additional project specific Projects, Software Requirements Specification for the Post NNC 11/18/10: SysRS Rev. 2 also discussed in the weekly information in sufficient detail to enable information for the ...SCMP...shall be specified in the PQP. Accident Monitoring System, WNA-SD-00239-WBT, contains process requirements that public meetings. the NRC staff to make an independent Revision 2, Dated September 2010. are more appropriately incorporated Westinghouse to assessment regarding the acceptability Contrary to these two statements in the SPM, the WBN2 PAMS into process documentation. perform Common Q TR of the proposal in terms of regulatory SRS (ML101050202) contains many process related requirements, & SPM compliance self requirements and the protection of

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N for example all seventeen requirements in Section 2.3.2, TVA Response to Follow-up NRC Request: assessment; this will be public health and safety."

"Configuration Control," address process requirements for As shown is the listed documents, process related discussed in detail on configuration control. requirements have been deleted from the SRS and SysRS in the next audit.

Revision 3:

Please explain how the above meets the intent of the approved SPM. Attachment 1 contains proprietary version of WNA-DS-01617-WBT-P, Revision 3, Post Accident Monitoring System-System Requirements Specification, dated December 2010.

Attachment 7 contains the proprietary version of WNA-SD-00239-WBT-P, Revision 3, Software Requirements Specification for the Post Accident Monitoring System, dated December 2010.

Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)

TVA Response to Follow-up NRC Request:

The documents discussed in Item 3 have been revised to address compliance with the Topical Report (TR) and the Software Program Manual (SPM).

245 8/3/2010 Responder: WEC 20. N Open Open-NRC Review EICB RAI LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)

ML102980066 Item "Safety Evaluation" states: "the Section 5.8 of the Common Q SPM (ML050350234) identifies the Relates to the commitment to provide the test plan and the Pending Submittal of the Test Due 3/29/11 No. 119 information relied upon in the SE must required test documentation for systems developed using the SPM compliance matrix Summary Report due 3/29/11 be docketed correspondence."

Common Q SPM. Please provide sufficient information for the NNC 2/2/11: Issues NRC staff to independently assess whether the test plan for WBN2 Attachment 9 contains the Westinghouse document Post Response included in letter dated with the Common Q TR LIC-101 Rev. 3 states: "The safety PAMS, is as described in the SPM (e.g., Section 5.8.1). Accident Monitoring System Test Plan, WNA-PT-00138- 12/3/10 & SPM were discussed analysis that supports the change WBT, Revision 0, dated November 2010. Attachment 10 in the weekly public requested should include technical contains the Westinghouse Application for Withholding for Common Q PAMS Test Summary meetings. information in sufficient detail to enable the Post Accident Monitoring System Test Plan, WNA-PT- Report scheduled to be submitted Westinghouse to the NRC staff to make an independent 00138-WBT, Revision 0, dated November 2010. March 29, 2011. perform Common Q TR assessment regarding the acceptability

& SPM compliance self of the proposal in terms of regulatory TVA Response to Follow-up NRC Request: assessment requirements and the protection of public health and safety."

The results of the self assessment were reviewed by Westinghouse with the NRC on February 2, 2011 and were further reviewed by TVA during the NRC Common Q PAMS audit during the week of February 28 to March 4, 2011.

Corrections to WNA-TR-02451-WBT, Test Summary Report for the Post Accident Monitoring System and the self assessment were made as a result of the TVA review to ensure this comment was fully addressed.

By agreement between TVA, WEC and the NRC, the Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0 will not be revised. Instead a non-proprietary Common Q PAMS Test Summary Report will be developed and submitted to address the issues with TR and SPM compliance. Attachment 1 contains non-proprietary WNA-TR-02451-WBT, Revision 0, Test Summary Report for the Post Accident Monitoring System, dated March 2011.

246 EICB 8/3/2010 Responder: WEC 21. N Open Open-NRC Review EICB RAI Response is LIC-101 Rev. 3 Appendix B Section 4, (Carte ML102980066 Item provided in letter "Safety Evaluation" states: "the

)

Section 4.3.2.1, "Initiation Phase" of the Common Q SPM As agreed ISG6 does not apply to the Common Q PAMS Due 3/29/11 No. 15 dated 10/25/10 information relied upon in the SE must

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N (ML050350234) requires that a Project Quality Plan (PQP) be platform. The information required to address this question Pending Submittal of Revision 3 of be docketed correspondence."

developed. Many other section of the SPM identify that this PQP concerning the PQP and SPM has been added to the Licensing Technical Report due NNC 2/2/11: Issues should contain information required by ISG6. Please provide the compliance matrix in revision 1 of the Licensing Technical 3/29/11. PQP provided for audit the with the Common Q TR LIC-101 Rev. 3 states: "The safety PQP. If "PQP" is not the name of the documentation produced, Report. week of 2/28/11. & SPM implementation analysis that supports the change please describe the documentation produced and provide the were discussed in the requested should include technical information that the SPM states should be in the PQP. Attachment 1 of letter dated 10/25/10 contains the Response is provided in letter dated weekly public meetings. information in sufficient detail to enable proprietary version of Westinghouse document Tennessee 10/25/10 Westinghouse to the NRC staff to make an independent Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post- perform Common Q TR assessment regarding the acceptability Accident Monitoring System (PAMS), Licensing Technical NNC 11/18/10: PQP has not been & SPM compliance self of the proposal in terms of regulatory Report, Revision 1, WNA-LI-00058-WBT-P, Dated October provided and CQ PAMS LTR Rev. 1 assessment requirements and the protection of 2010 does not contain comparable public health and safety."

information.

TVA Response to Follow-up NRC Request:

The results of the Common Q TR and SPM self assessment were reviewed by Westinghouse with the NRC on February 2, 2011.

The Westinghouse Watts Bar Unit 2 NSSS Completion I&C Projects Project Quality Plan, WNA-PQ-00220-WBT, Revision 1 is available for NRC audit at the Westinghouse Rockville Office and was available for review during the NRC Common Q PAMS audit during the week of February 28 to March 4, 2011. During the audit, the Westinghouse Quality Assurance in process audit of the Common Q PAMS project was reviewed by the NRC inspector with no issues identified.

250 8/8/2010 Responder: WEC 22. N Open Open-NRC Review LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)

"Safety Evaluation" states: "the The SPM describes the software and documents that will be Westinghouse develops Software Release Reports/Records Revised response included in letter NNC 2/2/11: To be information relied upon in the SE must created and placed under configuration control. The SCMP (e.g., and a Configuration Management Release Report. Describe dated 12/22/10 addressed during the be docketed correspondence."

SPM Section 6, Software Configuration Management Plan) the documents and when they will be produced. Summarize next audit.

describes the implementation tasks that are to be carried out. The guidance on how to produce these records, focus on project Response included in letter dated LIC-101 Rev. 3 states: "The safety acceptance criterion for software CM implementation is that the specific requirements in SPM etc. 10/25/10. analysis that supports the change tasks in the SCMP have been carried out in their entirety. requested should include technical Documentation should exist that shows that the configuration TVA Response to Follow-up NRC Request: information in sufficient detail to enable management tasks for that activity group have been successfully the NRC staff to make an independent accomplished. Please provide information that shows that the CM The following documentation shows that the configuration assessment regarding the acceptability tasks have been successfully accomplished for each life cycle management tasks for that activity group have been of the proposal in terms of regulatory activity group. successfully accomplished. requirements and the protection of public health and safety."

2. WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC requests:
a. Section 2.2.1 Hardware/Software Change Process has been added to describe the process of how changes are evaluated.
b. Section 2.2.2, Software has been expanded to include a table detailing evolutionary software changes that have occurred since the initial submittal and the change evaluation of the life cycle.
3. WNA-PT-00138-WBT, Revision 0, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects,

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Post Accident Monitoring System Test Plan, (Proprietary), dated November 2010 submitted in TVA Letter to NRC, dated December 3, 2010 (Reference 1).

251 8/8/2010 Responder: WEC 23. N Open Open-NRC Review LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)

"Safety Evaluation" states: "the The SPM describes the software testing and documents that will be The software testing performed and documents created are Pending Submittal of the Test Due 3/29/11 information relied upon in the SE must created. The SPM also describes the testing tasks that are to be addressed by the SPM Compliance matrix contained in Summary Report due 3/29/11 be docketed correspondence."

carried out. The acceptance criterion for software test Revision 1 of the Licensing Technical Report. NNC 2/2/11: Issues implementation is that the tasks in the SPM have been carried out Revised response included in letter with the Common Q TR LIC-101 Rev. 3 states: "The safety in their entirety. Please provide information that shows that Attachment 1 of the letter dated 10/25/10 contains the dated 12/22/10 & SPM were discussed analysis that supports the change testing been successfully accomplished. Proprietary version of Westinghouses document titled: in the weekly public requested should include technical Tennessee Valley Authority (TVA), Watts Bar Unit 2 Partial response is provided in letter meetings. information in sufficient detail to enable (WBN2), Post-Accident Monitoring System (PAMS), dated 10/25/10 Westinghouse to the NRC staff to make an independent Licensing Technical Report, Revision 1, WNA-LI-00058- perform Common Q TR assessment regarding the acceptability WBT-P, Dated October 2010 & SPM compliance self of the proposal in terms of regulatory assessment requirements and the protection of TVA Response to Follow-up NRC Request: public health and safety."

Please see the response to RAI item 21 in letter dated 12/22/10, NRC Matrix Item 250.

TVA Response to second Follow-up NRC Request:

The results of the Common Q TR and SPM self assessment were reviewed by Westinghouse with the NRC on February 2, 2011.

By agreement between TVA, WEC and the NRC, the Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0 will not be revised. Instead a non-proprietary Common Q PAMS Test Summary Report will be developed and submitted to address the issues with TR and SPM compliance. Attachment 1 contains non-proprietary WNA-TR-02451-WBT, Revision 0, Test Summary Report for the Post Accident Monitoring System, dated March 2011.

252 8/8/2010 Responder: WEC 24. N Open Open-NRC Review LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)

"Safety Evaluation" states: "the The SPM contain requirements for software requirements Explain response to AP1000 audit report. Response included in letter dated Due 2/25/11 (document information relied upon in the SE must traceability analysis and associated documentation (see Section RTM docketed NRC awaiting V&V evaluation of RTM. 12/22/10 submittals) be docketed correspondence."

5.4.5.3, Requirements Traceability Analysis). Please provide information that demonstrates that requirements traceability The following responses are based on WBN Unit 2 Common Read ML091560352 NNC 2/2/11: Updated LIC-101 Rev. 3 states: "The safety analysis has been successfully accomplished. Q PAMS traceability: RTMs and analysis that supports the change specifications to be requested should include technical Software requirements traceability analysis is described in provided. information in sufficient detail to enable the following documents: the NRC staff to make an independent Requirements assessment regarding the acceptability

1. WNA-LI-00058-WBT-P, Revision 2, Post-Accident traceability to be of the proposal in terms of regulatory Monitoring System (PAMS) Licensing Technical addressed during the requirements and the protection of Report submitted in TVA Letter to NRC dated next audit. public health and safety."

December 3, 2010, (Reference 1) Section 11, TVA Contract Compliance Matrix

2. WNA-VR-00279-WBT, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System (available for NRC audit at the Westinghouse Rockville office)

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

3. WNA-VR-00280-WBT, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements (available for NRC audit at the Westinghouse Rockville office) This document addresses the RSEDs used in the WBN Unit 2 Common Q PAMS.

The V&V evaluation of the RTM is documented in section 2.2.2 of the following documents:

1. The Independent Verification & Validation (IV&V) report covering the Concept and Definition phases (Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, (Proprietary), WNA-VR-00283-WBT, Revision 1, dated November 2010), submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).
2. The Independent Verification &Validation (IV&V) report covering the Design and Implementation phases (Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, (Proprietary), WNA-VR-00283-WBT, Revision 2, dated November 2010), submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).
3. The integration phase is covered in Attachment 10, the proprietary version of IV&V Summary Report for the Post Accident Monitoring System, WNA-VR-00283-WBT-P, Revision 3, dated December 2010.

Attachment 11 contains the non-proprietary version of IV&V Summary Report for the Post Accident Monitoring System, WNA-VR-00283-WBT-NP, Revision 3, dated December 2010. Attachment 12 contains the Application For Withholding Proprietary Information From Public Disclosure WNA-VR-00283-WBT-P, Revision 3, IV &V Summary Report for the Post Accident Monitoring System (Proprietary), dated December 2010.

TVA Response to Follow-up NRC Request:

See Response to item 3 (Matrix Item Number 142) 323 WCAP-13869 revision 1 was previously reviewed under WBN Unit Responder: Hilmes/Unit 1 25. Y Open Open-NRC Review TVA Letter dated 1 SER SSER 13 (Reference 8). Unit 2 references revision 2. An 10/29/10 analysis of the differences and their acceptability will be submitted Attachment 12 contains the WCAP 13869 Revision 1 to Due 3/29/11 Due: Enclosure 1 Item to the NRC by November 15, 2010 Revision 2 Change Analysis. No. 36 Revised Response is included in Need to provide EICB(Garg)

TVA Response to Follow-up NRC Request letter dated 10/29/10 additional info on why A FSAR change will be submitted in a future FSAR Rev. 1 is acceptable for amendment to change the revision level back to 1. The staff is confused with the both units.

response since both units have TVA Response to Second Follow-up NRC Request reference leg not insulated Rev 2 3/10/11 should apply to Unit 1 also and Staff does not agree The differences between the Revision 1 and Revision 2 there should be no difference with the statement that

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N WCAPs is documented in Attachment 12, WCAP 13869 between Unit 1 and 2 there is no technical Revision 1 to Revision 2 Change Analysis, to TVA to NRC differences between letter dated October 29, 2010 (Reference 2). The design Amendment 104 has been WCAP-13869 rev.1 and bases for the response to feedwater break inside submitted with this change. Please rev2., but staff agree containment, as documented in Chapter 15 of the WBN Unit verify and close. that rev1 and change 2 FSAR, is the same for WBN Unit 1. Since WBN Unit 2 is analysis could be basis required to match the WBN Unit 1 licensing basis to the for acceptance for both extent practical, the decision was made to revise the WBN Watts Bar units.

Unit 2 FSAR to agree with the WBN Unit 1 FSAR which uses Revision 1. 4/6/11 TVA response is acceptable, however this item remains open until TVA makes changes to FSAR.

327 Attachment 36 contains Foxboro proprietary drawings 08F802403- Responder: Webber 26. Y Open Open-NRC Review SC-2001 sheets 1 through 6. An affidavit for withholding and non-DORL (Poole) proprietary versions of the drawings will be submitted by January In accordance with correspondence from Foxboro, there is Response Included in letter dated Due 11/24/10 31, 2011. no proprietary information contained in the 08F802403-SC- 11/24/10 2001 drawings. Based on this, no affidavit for withholding is required. Attachment 1 contains versions of the drawings with the proprietary information block removed.

340 7.5.2. 7.5 Provide test result curves for all EMI/RFI tests listed in Table 3.2.3 Responder: GA 27. N Open Open-NRC Review 3 (page 3-8) of the Qualification Test Report 04508905-QR. In addition, please provide the standards or the guidance documents The following responses are based on e-mail: GA-ESI to Due 4/30/11 Provide the qual reports used as the source for ENV 50140, ENV 55011 Class A, and EN Bechtel, dated December 8, 2010 (Reference 20), by 1/28/11 per TVA 55022 Class B. Response included in letter dated letter of 12/22/10.

(1) The EMI/RFI tests described in Table 3-2 are based on 12/22/10.

GA-ESI report 04509050 and are summarized in GA- Due: 2/25/11 ESI report 04508905-QR. The independent laboratory Clarification Needed:

report, with curves, is part of GA-ESI report 04509050. Per 2/25/11 response Subsequent to issuing GA-ESI report 04508905-QR TVA document SS-additional EMC testing was performed in accordance E18.14.01, Rev. 3 is with TVA specific requirements. The results of the the source document subsequent EMC testing are reported in GA-ESI report for all testing. Please 04038800. GA-ESI report 04038800 includes the test provide this document curves and the report is used as the basis for EMC for staff review. In qualification of the Upper and Lower Inside addition British EICB (Singh)

Containment Post Accident Radiation Monitors (2-RE- Standards (e.g. ENV 90-271 through -274). The results of the testing and 50140) have been cited the acceptability of the RM-1000 monitors for use at in testing which are not WBN Unit 2 are addressed in GA-ESI report per RG 1.180, R1. TVA 04038903-7SP. This report will be submitted no later to describe compliance than January 28, 2010. of SS-E18-14.01 to RG 1.180 with justification (2) ENV 50140, EN 55011, and EN 55022 are British for deviations. No test Standard Institution (BSI) publications concerning curves have been equipment electromagnetic and radio frequency provided in any of the performance. The standard titles are shown below: reports. As a minimum

a. ENV 50140 - Electromagnetic Compatibility - TVA to provide a few Basic Immunity Standard - Radiated Radio- sample test curves or Frequency Electromagnetic Field - Immunity Test justify not supplying
b. EN 55011 - Industrial, scientific and medical them.

equipment - Radio-frequency disturbance characteristics - Limits and methods of No EMI/RFI curves measurement have been provided as

c. EN 55022 - Information technology equipment - yet. TVA to provide Radio disturbance characteristics - Limits and representative curves.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N methods of measurement NRC review proceeding TVA Response to Follow-up NRC Request: in parallel.

The total EMI/RFI testing of the RM-1000 and current-to- NRC current review frequency converter is documented in the following reports: guidance is based on compliance with RG

  • Attachment 5 contains the proprietary version of 1.180 or equal with General Atomics Electronic Systems 04508905-1SP, justification for Qualification Test Report Supplement, RM-1000 variations. TVA is Upgrade. See sections 5.1.1, 5.1.2 and 5.1.4 for requested to provide EMI/RFI. the roadmap for
  • Attachment 7 contains the proprietary version of compliance to RG General Atomics Electronic Systems 04038903-7SP, 1.180 with justifications Qualification Basis for 04034101 (2-RE-90-271, 272, for any deviations.

273 & 274). See section 5 for EMC qualification basis. Simply following TVA

  • Attachment 8 contains the proprietary version of standard specification General Atomics Electronic Systems 04038903-QSR, SS E18.14.01, Rev. 3 is Qualification Summary Report for Watts Bar Nuclear not sufficient.

Plant Unit 2 Replacement Radiation Monitors. See section 3.4 for electromagnetic compatibility qualification requirements.

  • Attachment 23 contains the proprietary version of General Atomics Electronic Systems 04508905-QR, Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter. See sections 3.2.1 through 3.2.5 and 6.2 for EMI/RFI.

Attachments 7 and 8 document the EMI/RFI testing specific to the WBN Unit 2 RM-1000 monitors and current-to-frequency converters.

TVA Response to Second Follow-up NRC Request:

GA-ESI qualification report 04038903-7SP, Qualification Basis for 04034101 (2-RE-90-271, 272, 273 & 274) Revision C dated February 22, 2011(Proprietary), submitted on TVA to NRC letter dated February 25, 2011 (Reference 2),

section 5.1 states:

GA-ESI has performed the tests on a 2 channel RM-1000 radiation monitoring system the configuration of which is shown in GA-ESI drawing 04509000 System Installation Configuration, RFI/EMI Test, RM-1000 the results of which are issued in GA-ESI report 04038800, RM-1000 EMC Test Report, TVA and 04509050, RM-1000 EMC Test Report.

The equipment tested used an RM-1000 microprocessor radiation monitor Display/Control NIM Bin Assembly, an I-F Converter, line filter, and an RD-23 detector. The monitor system being qualified is the same as the monitor system tested and includes ECO-17656 modifications to ensure EMC compliance.

Attachment 1 contains the TVA Browns Ferry High Range Radiation Monitor which contains the requested EMI test curves. We have confirmed that the GA-ESI reports (04509050, RM-1000 EMC Test Report, dated 4/22/03 and 04038800, RM-1000 EMC Test Report, dated 11/11/99)

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N included in the TVA report are applicable to the WBN Unit 2 RM-1000 monitors. The non-proprietary versions and affidavit for withholding of GA-ESI reports (04509050 and 04038800) will be submitted within two weeks of receipt from GA-ESI.

GA-ESI qualification report 04038903-7SP, section 5, provides a detailed discussion of the test results in GA-ESI report 04509050.

TVA Response to Follow-up NRC Request Attachment 1 provides a comparison of the TVA EMC specification SS E18.14.01, Revision 3 requirements to RG 1.180 requirements.

359 7.7.1. Was the CERPI system developed under a 10 CFR 50 Appendix B CERPI is a non-safety related system. Therefore, 10 CFR 28. Open Open-NRC Review 1 EICB compliant program? 50 Appendix B is not applicable.

(Carte) Due 4/15/11 361 7.7.1. Was the Foxboro IA system developed under a 10 CFR 50 Foxboro I/A is a non-safety related system. Therefore, 10 29. Open Open-NRC Review 1 EICB Appendix B compliant program? CFR 50 Appendix B is not applicable.

(Carte) Due 4/15/11 363 7.5.1. 7.5.2 OI#199 requested TVA to provide information concerning how TVA TVA Procedure SPP-2.6 Computer Software Control has 30. Open-NRC Review 1.3 plans to meet regulatory criteria for Quality (10 CFR 50.55a(a)(1)) been superseded by TVA Procedure NPG-SPP-12.7, Due 4/30/11 and associated with the Technical Support Center and Nuclear Data Computer Software Control, Revision 0, dated December 7.9.1 Link. TVA responded in Letter Dated October 5, 2010, Item 63; 17, 2010 (Attachment 3).

however, TVAs response does not address the quality aspects of these system features. A similar question had been asked for To ensure quality, the design, testing, and inspection of all Quality Criteria adherence for the SPDS and the BISI functions of Integrated Computer System (ICS) software including a) the Integrated Computer System. In response to that request SPDS, b) BISI and c) Technical Support Center (TSC) and (same letter) TVA provided a description of TVA procedures, BISI Nuclear Data Link (NDL) functionality is controlled by software development procedures, and various management qualified personnel in accordance with TVA procedure NPG-measures that will be taken to assure high quality in the design, SPP-12.7. The TSC and NDL functions are provided and operation, and maintenance of the SPDS and BISI functions of the performed by the ICS and, in the case of NDL, the Central ICS. Since the TSC and Nuclear Data Link information originates Emergency Control Center (CECC) computers in EICB (Rahn and Mossman) in the SPDS function of the ICS, are there any aspects of the Chattanooga.

quality measures that apply to the TSC and NDL features developed as part of quality processes for the ICS that are Any changes to ICS software must be documented and applicable to the data communications features? controlled using TVA procedure NPG-SPP-12.7. This includes the a) SPDS, b) BISI and c) TSC and NDL Specifically, what is the scope of TVA Procedure SPP-2.6 functions. The procedure details controls and processes Computer Software Control? How does it apply to the ICS required for the development, modification, and configuration functions of a) SPDS, b) BISI, and c) TSC and NDL functions? management of computer software used to support the Wouldnt there be aspects of the quality procedures that apply to design, operation, modification, and maintenance of TVAs the development, maintenance, and operations of the software nuclear power plants consistent with the Nuclear Quality needed to support the data communications features. Also, what Assurance Plan.

quality measures will be applied to develop, maintain, and operate the hardware that accomplishes the TSC and NDL functions to Controls in NPG-SPP-12.7 guide the development and ensure that these features will be reliable and available when testing of the software changes. Other controls established needed? by this procedure to further maintain quality standards are:

  • The application custodian implements controls to prevent unauthorized changes to the software.
  • Changes are made in a non-production environment, and validation testing takes place before the change is installed on the ICS when possible.
  • Once validation testing begins, the source code is

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N placed under configuration control.

  • When the modifications are installed on the ICS, an operability test is performed to demonstrate that the software is installed correctly and is functioning correctly in its operating environment.
  • Documentation related to ICS software changes are QA records.
  • The software source code is kept in a physically secure, environmentally controlled space to prevent inadvertent changes.
  • Cyber security considerations are also considered in the storage environment.
  • The data goes through several validation steps before being presented to the operators.
  • When redundant sensors are used, the data received by the computer can be processed by software to determine if the quality of one or more points is questionable.

The hardware involved in the TSC and NDL functionality is verified to be operable on a periodic basis.

In the case of the NDL functionality, the ICS transmits the required data to the CECC on a continuous basis. The CECC monitors the status of the ICS data communications and alarms are generated when the link is not active. The Emergency Plan (EP) staff conducts a quarterly test that verifies that NDL data is successfully transmitted from each unit to the NRC.

367 7.5.2. 7.5 On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an Common Q PAMS complies with Regulatory Guide 1.153 31. Y Open Open-NRC Review NNC 4/125/2011: See Open Item No.

2 evaluation of the Common Q PAMS against the current staff Revision 1. The response in Attachment 4 to TVA to NRC 81.

position. letter dated February 25, 2011 (Reference 3) was in error. Due 5/15/11 By letter dated 2/25/11 (ML110620219), TVA docketed a response.

The WBN2 FSAR (Amendment 103) references RG 1.153 Rev. 0, Criteria for Safety Systems. The Common Q PAMS is designed to meet the requirements of RG 1.153 Rev. 1. By letter dated February 25, 2010 (ML110620219), TVA stated:

The subject Regulatory Guides [RG 1.153 Rev. 0 & 1]

endorse and reference other standards. Common Q PAMS has been evaluated to comply with the requirements of these EICB (Carte) other endorsed standards ([Comparison report in this letter titled IEEE-279-1971 to IEEE-603-1991 Comparison]).

Therefore no additional analysis needs to be performed and no further action is necessary.

However, the Comparison report in this letter titled IEEE-279-1971 to IEEE-603-1991 Comparison, stated:

The first of the two standards, IEEE-279, is part of the design basis of WBN2 but is not relevant to Common Q PAMS. The second standard, IEEE-603-1991 is not part of the design basis for the Common Q PAMS forWBN2.

Based on the reasoning quoted above, WBN2 did not evaluate the Common Q PAMS against the criteria of RG 1.153 Rev. 1; therefore, the staff finds the following open item (see also Open Items No. 1 & 2 above.):

1 TVA to evaluate Common Q PAMS for conformance with RG 1.153 Rev. 1.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 368 7.5.2. 7.5 On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an Attachment 6 contains the evaluation for Common Q PAMS 32. Y Open Open-NRC Review NNC 4/125/2011: See Open Item No.

2 evaluation of the Common Q PAMS against the current staff for conformance with RG 1.152 Revision 2 81.

position. Due 5/15/11 By letter dated 2/25/11 (ML110620219), TVA docketed a response.

The WBN2 FSAR (Amendment 103) references RG 1.152 Rev. 0, Criteria for Digital Computers in Safety Systems of Nuclear Power Plants. The Common Q PAMS was designed to meet the EICB (Carte) requirements of RG 1.152 Rev. 1. RG 1.152 Rev. 2 is the current revision of this guide and is endorsed by the NRC. By letter dated February 25, 2010 (ML110620219), TVA stated:

RG 1.152 rev 2 endorses ANSI/IEEE-ANS-7-4.3.2-2003, but also provides extra regulatory guidance concerning computer based cyber security. Since this revision was not part of the design basis of WBN2 or Common Q PAMS, the project makes no commitment to the compliance of RG 1.152 rev 2.

Based upon the review of this item, the staff finds the following open item:

1 TVA to evaluate Common Q PAMS for conformance with RG 1.152 Rev. 2.

372 7.5.2. 7.5 On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an TVA Partial Response to NRC Request: 33. Y Open Open-NRC Review NNC 4/125/2011: See Open Item No.

2 evaluation of the Common Q PAMS against the current staff 81.

position. 1. Attachment 7 contains the evaluation for how the Response submitted 6/13/11 Common Q PAMS SysRS and SRS implement the By letter dated 2/25/11 (ML110620219), TVA docketed a response. design basis requirements of IEEE 603-1991 Clause 4.

The requirements in the SysRS and SRS are not traceable back to 2. This item is the result of a request made by the NRC the design basis (e.g., IEEE Std 603-1991 Section 4) for the staff on the Watts Bar 2 PAMS project conducted at the system. The SRS does not include any documented evidence that Westinghouse facility in Warrendale, PA the week of it was ever independently reviewed in accordance with the February 28, 2011:

10CFR50 Appendix B Criterion III, Design Control. (Note: It appears that the only Common Q or WBN2 PAMS document that "For the WB N2 PAMS project, Westinghouse will was independently reviewed in accordance with 10 CFR 50 provide documentation in their Rockville MD offices Appendix B requirements is the SysRS.) demonstrating that each document requiring Based upon the review of the SysRS and SRS, the staff finds that independent review was in fact independently reviewed there is reasonable assurance that the systems fully conform to the CAPs No. 11-061-M047 will contain a commitment to applicable guidelines, except for the following open items: provided documented evidence of appropriate EICB (Carte) 1 TVA to produce an acceptable description of how the SysRS independent reviews. "

and SRS implement the design basis requirements of IEEE 603-1991 Clause 4. The referenced CAPS issue has been closed. To 2 TVA to produce a final SRS that is independently reviewed in summarize the CAPS disposition:

accordance with 10CFR50Appendix B, Criterion III Design Control, requirements. All revisions of the Watts Bar NSSS Completion Program I&C Projects Post Accident Monitoring System "System Design Specification (WNA-DS-O1 667-WBT-PINP, Revision 0 to Revision 4)", "Software Requirements Specification (WNA-SD-00239-WBT-PINP Revision 0 to Revision 4)", "Software Design Description for the AC 160 Software (WNA-SD-00250-WBT, Revision 0 to Revision 3)", and "Software Design Description for the FPDS Software (WNA-SD-00248-WBT, Revision 0 to Revision 3)" documents have been independently reviewed (verified) per WEC 6.1. Please note that according to NSNP 3.3.3, the independent review is considered as an acceptable method of verification.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N The above documents, for all revisions, include a verifier (an independent reviewer) who is a competent individual other than the document author to verify that the document is technically correct and satisfactorily meets the intended requirements.

The front page of each document lists the author, the independent reviewer (the first reviewer listed; second reviewer listed is the Project Manager verifying document's compliance to the program rules). The second page lists any contributors to the document. It is important to note that the document's independent reviewer (verifier) is NOT included within the list of contributors indicating their independence from the original work.

In summary, according to WEC 6.1 the Responsible Manager (also listed on the front page) must 1) approve the document for issuance, 2) ensure that the verification method and design methodology are demonstrated appropriately, and; 3) ensure that the qualifications of the originator and verifier are adequate.

The manager(s) listed on the document attests to the fact that he or she has completed these responsibilities.

Moreover, the manager has ensured that 1) the verifier is competent to perform the independent review, 2) did not perform the original work even though they may be from the same organization or group, and 3) assigned to verify that the document is technically correct and satisfactorily meets the intended requirements.

373 7.5.2. 7.5 The SDDs do not include any documented evidence that they were 1. See the response to Letter Item 4 (NRC Matrix Item 34. N Open Open-NRC Review 2 independently reviewed in accordance with the 10CFR50 Appendix Number 372) response to question 2.

EICB (Carte)

B Criterion III, Design Control. Response submitted 6/13/11 Based upon the review of the SDDs, the staff the following open item:

1 TVA to produce final SDDs that are independently reviewed in accordance with 10 CFR50 Appendix B Criterion III, Design Control, requirements.

374 7.5.2. 7.5 By letter dated October 29, 2010 (ML103120711), TVA docketed a 1. The Technical Specification Changes required by 35. N Open Open-NRC Review 2 draft technical evaluation associated with an engineering design implementation of the Common Q PAMS were made in change (ML103120712) that states the Common Q PAMS will Revision B of the Technical Specifications which were Due 5/15/11 EICB (Carte) require changes in the technical specifications. The technical submitted on TVA to NRC letter dated February 2, 2010, specifications (TS) have not be received yet for review. The TS will Watts Bar Nuclear Plant (WBN) - Unit 2 -

be reviewed once they are received. Developmental Revision B of the Technical 1 Confirm/Verify Technical Specification changes associated Specifications (TS), TS Bases, Technical Requirements with Common Q PAMS are acceptable. Manual (TRM), TRM Bases; and Pressure and Temperature Limits Report (PTLR) ADAMS ascension number ML100550326 (Reference 2).

376 7.7.9 DCI-CVIB Input: TVA does not agree with this recommendation. The IITA 36. Open Open-NRC Review Related to OI 360 assemblies cannot be inspected for wall thinning using EICB (Alvarado)

ReferenceEDCR # 52321, Revision AEDCR Unit Difference internal eddy current methods as can a thimble tube. In Response submitted 6/13/11 Form --- Bechtel Document addition, after the IITAs are irradiated, inspection using external ultrasonic measurements as are done for pipe Page 2 -Maintenance Difference inspections would result in excessive personnel exposure.

While visual inspection is possible, it cannot detect wall The proposed In-Core Instrument Thimble Assemblies (IITAs) thinning.

which will replace Movable In-Core Detectable Systems (MIDs)

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N have the following features: As documented in Westinghouse to TVA letter WBT-D-3072 WINCISE Vibration Induced Wear Calculation Conclusion, (1) IITAs are not fully extracted and they are held in a dated April 6, 2011 (Reference 8) calculation CN-PO-09-15, movable frame assembly. "Westinghouse Incore Information Surveillance and Engineering (WINCISE) Incore Instrument Thimble Assembly (2) IITAs exert lower vibration amplitude and therefore, aging (IITA) Vibration Analysis for Watts Bar Unit 2", M. J. Reho, degradation due to wear does not occur. September 22, 2010, demonstrates that the assemblies are not subject to vibration induced wear. Based on the above (3) Loss of reactor coolant system pressure boundary due to and the fact that the outer wall of the IITA is not a RCS breach of IITA outer sheath does not occur. pressure boundary, TVA does not agree to include an IITA inspection program in the plant maintenance program. The Question: referenced proprietary letter and calculation are available for The staff believes that the licensee should provide an review at the Westinghouse Rockville office.

inspection program to confirm that the aforementioned attributes associated with IITAs are valid and this inspection program can be a part of a routine maintenance program.

Replacement of 58 CETs for the current 65 CETs -to be addressed by the fuels division.

213 7.5.2 7/27/2010 Responder: WEC 1. N Open Open-TVA/Bechtel EICB RAI EICB (Carte)

ML102980066 Item By letter dated June 18, 2010 (ML101940236) TVA stated Conformance with IEEE 603 is documented in the revised Due 7/22/11 Due 3/29/11 No. 18 (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system Common Q PAMS Licensing Technical Report and the design specification and software requirements specification Common Q PAMS System Design Specification. Prepare a design basis report for NNC 2/3/11: The contain information to address the "Theory of Operation the Common Q PAMS based on identified Description." The staff has reviewed these documents, and it is not Attachment 1 contains the proprietary version of IEEE 603-1991 Clause 4. documentation does clear how this is the case. The docketed material does not appear Westinghouse document Tennessee Valley Authority not include the design to contain the design basis information that is required to evaluate (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring bases. Please provide compliance with the Clause of IEEE 603. System (PAMS), Licensing Technical Report, Revision 1, schedule for providing (1) Please provide the design basis (as described in IEEE 604 WNA-LI-00058-WBT-P, Dated October 2010 the requested Clause 4) of the Common Q PAMS. information.

(2) Please provide a regulatory evaluation of how the PAMs Attachment 8 contains the proprietary version of complies with the applicable regulatory requirements for the theory Westinghouse document Nuclear Automation Watts Bar 2 of operation. NSSS Completion Program I&C Projects Post Accident For example: Regarding IEEE 603 Clause 5.8.4 (1) What are the Monitoring System - System Design Specification, WNA-manually controlled protective actions? (2) How do the documents DS-01667-WBT, Rev. 2 dated September 2010.

identified demonstrate compliance with this clause?

TVA Response to Follow-up NRC Request:

The Regulatory Guide 1.97 classification of the Common Q PAMS variables is documented in TVA Design Criteria WB-DC-30-7 Post Accident Monitoring Instrumentation which was submitted as Attachment 5 on TVA to NRC letter Watts Bar Nuclear Plant (WBN) Unit 2 - Instrumentation And Controls Staff Information Requests dated June 18, 2010 (Reference 1)

The hardware design bases for the Common Q PAMS is described in the WBN Unit 2 FSAR section 7.5.1.8 Post Accident Monitoring System (PAMS).

The Common Q PAMS indications are used to support operator response to events described in chapter 15 of the WBN Unit 2 FSAR such as:

  • RCCA/RCCA Bank dropped/misaligned
  • Inadvertent Loading of a Fuel Assembly Into an

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Improper Position

  • Loss of Shutdown Power
  • Major Secondary System Pipe Rupture 346 7.5.2. 7.5 TVA has previously stated in response to open item 319 that RM- Document 04507007-1TR is the RM-1000 System 2. N Open Open-TVA/Bechtel MSC 7/11/11: Assigned to J. Temples 3 1000 System Verification Test Results report, 04507007-1TR is not Verification Test Results. 04038903-QSR, Qualification as GA-ESI Contract Manager for applicable to WBN-2. However, TVA has not provided a WBN-2 Summary Report for Watts Bar Nuclear Plant Unit 2 Due: TBD Due: 2/25/11 Licensing Support to confirm procedure specific test results report. Please identify and provide the Replacement Radiation Monitors (Attachment 8) and was developed under 10CFR50 appropriate test results reports to complete the review. 04038903-7SP, Qualification Basis for 04034101 (2-RE The proposed response Appendix B.

271, 272, 273 & 274) (Attachment 7) are the Watts Bar Unit appears to be 2 equipment specific qualification reports. conflicting with the proposed response for TVA Response to Follow up NRC Request: OI-351 regarding not submitting the Report 04507007-1TR RM-1000 System Verification Test 04508905-QR report.

Results is applicable to the WBN Unit 2 monitors. The TVA to re-assess applicability is that 04507007-1TR includes all test cases proposed response for called out in the 04507006 RM-1000 System Test both OIs.

Procedure Specification and contains evidence that the V&V tests were performed with version 1.0 software code. The TVA to re-evaluate verification report for version 1.1 software is document previous responses to 04508005 RM-1000 Software Version 1.1 Software OI-316 and OI-319 Verification Report. Document 04508006 RM-1000 Version which have conflicting 1.2 Software Verification and Validation Report shows that responses regarding the required test was completed to validated version 1.2 the applicability of code for the RM-1000. 04507007-1TR.

The Engineering reviewed and approved proprietary versions NRC Follow-up of 04507007-1TR, 04508005 and 04508006 will be question EICB (Singh) submitted within two weeks of receipt from GA-ESI. The unreviewed proprietary versions, non-proprietary versions Report 04507007-1TR, and affidavit for withholding were submitted on TVA to NRC 1999 states in the Test letter July 15, 2010 (Reference 3). Summary that Initially the testing was done TVA Response to Follow up NRC Request using the SE safety related production GA-ESI has a single process for buying material, assembling modules that had and testing modules. The same process is used for any part undergone software number, safety related or not so they can avoid having to V&V testing. The store the same part number in two different locations and majority of the testing avoid the possibility of mixing them up. Therefore, the was done by using two Sorrento Electronics safety-related production modules and of the Sequoyah non-the Sequoyah non-safety-related modules are physically safety related identical. Based on the above the report is acceptable. production modules for the TVA contract, substituted for the SE modules. Since the report is based on primarily non safety related components TVA to clarify and justify why NRC should accept this test report for safety related V&V testing.

NRC Follow-up

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N All safety related work must be quality controlled per 10CFR50, App. B. TVA to confirm that the procedure used for the system verification tests (04507007) was actually a procedure that was prepared per 10CFR50, App. B.

353 7.5.2. 7.5 Please provide a summary of the [manufacturers] commercial GA-ESI submitted their commercial grade dedication 3. N Open Open-TVA/Bechtel MSC 7/11/11: Assigned to J. Temples 3 dedication plan for radiation monitors with references to the procedure (OP-7.3-240, Safety-Related Commercial Grade as GA-ESI Contract Manager for guidance document that it follows. Also please include different Item Parts Acceptance, Revision H) to engineering for Due: TBD TVA to note that staff Licensing Support to obtain revised facets (e.g. receiving, inspection, testing etc.) of the plan. review. Engineering review of the procedure found that the has written a safety procedure.

procedure, Section 5, did not require multiple dedication evaluation and methods for complex CGI or CGI used in digital safety accepted EPRI TR-systems. As a result, it was determined that the GA-ESI 106439 (1996) as an program did not meet the requirements of NUREG-800, acceptable method of Section 7.0A, Revision 5. addressing commercial dedication. EPRI NP-A discussion with GA-ESI found that while not required by 5652 must be used in procedure, GA-ESI does perform vendor surveys as required conjunction with the by Method 2 of NP-5652. The surveys are done based on additional guidance in prudent business practices. Based on this discussion, GA- EPRI TR-106439 for ESI agreed to review the CGI used in the WBN Unit 2 digital commercial dedication safety-related monitors to determine if they had been processes e.g. EPRI dedicated by more than one method. NP-6404, EPRI TR-102260, GL 89-02, and The review of the CGI used in the WBN Unit 2 digital safety- GL-91-05 per Section related monitors determined that all CGI had been dedicated 3.3 of EPRI TR-using Method 1 of EPRI guideline NP-5652. However, in the 106439.

EICB (Singh) sample of items reviewed, there were CGI that were dedicated using a single method. Based on the results of the Follow-up engineering procedure review and the results of the GA-ESI clarification:

CGI review, Service Request 346896 was initiated to document the condition and to place the monitors in TVA to review and Conditional Release status. satisfy itself with the procedure and provide Based on the results of the previous reviews, GA-ESI agreed NRC a copy of the to the following plan of action to resolve the CGD issue: procedure for review.

In addition, TVA and

1. GA-ESI shall revise its commercial grade dedication GA to provide procedure (OP-7.3-240) to require multiple dedication information as to what methods be utilized for complex commercial grade additional measures items and commercial grade items for digital safety were taken by GA with class systems. The evidence that this has been available completed will be provided to TVA by April 15, 2011. documentation to prove that more than one Specifically, Method 1 and at least one additional method was followed method from the list below will be used to ensure that for commercial the CGD procedure complies with the current SRP. dedication.

Method 1 - Special Tests and Inspections Follow-up comments Method 2 - Commercial Grade Survey of Supplier Method 3 - Source Verification Staff has reviewed GA Method 4 - Acceptable Supplier/Item Performance document OP-7.3-240

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Record and requests further clarification, addition, or

2. GA-ESI shall take actions consistent with the revised amplification on the operating procedure to address the CGls used in the following comments:

WBN Unit 2 safety-related digital monitors. Evidence that those actions have been completed will be provided Section 2, Applicable no later than September 1, 2011. Documents Please add EPRI TR-102260 and Based on the above action plan, TVA will resolve the issues IEEE 7-4.3.2 for digital with the GA-ESI CGD of CGI used in the WBN Unit 2 components. Also add monitors and submit documentation of the resolution to the generic letter GL 91-05, NRC by: Licensee Commercial-Grade Procurement

  • GA-ESI procedure OP-7.3-240 revision: April 30, 2011 and Dedication
  • Resolution of CGD of CGI used in WBN Unit 2 RM- Program.

1000 monitors: September 15, 2011 Section 3, Definitions, Approved Supplier List TVA Response to Follow up NRC Request (ASL) How is Quality Assurance Program approved? Is a vendor (1) TVA has reviewed the revised GA-ESI procedure and survey performed?

determined that changes bring the CGD program into Please explain the conformance with the requirements of NUREG-800, basis for approving the Section 7.0A, Revision 5 EPRI topical report TR- Quality Assurance 106439 and EPRI guideline NP-5652. Attachment 2 Plan.

contains GA-ESI procedure OP-7.3-240 Safety-Related Section 3, Definitions, Commercial Grade Item Parts Acceptance, Revision I. Basic Components Incomplete definition.

(2) As stated in TVA to NRC letter dated April 15, The definition for basic 2011(Reference 1), Attachment 4, List of New components must Commitment Items, item 2, the due date for resolution match the definition in of this issue is September 15, 2011. 10CFR Part 21.

Section 3, Definitions, Components Please use or add the examples in the definitions which are relevant to General Atomics supplied equipment.

Section 3, Definitions, Critical Characteristics (CC) Incomplete definition. Use the definition in 10CFR Part 21.

Section 3, Definitions, Dedication Incomplete definition. Please use the definition in 10CFR Part 21. 10CFR Part 21 applies to components subject to 10CFR50, Appendix B and other facilities (other than nuclear power plants).

Section 3, Definitions, Identical Item Include

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N same manufacturer and manufactured at the same time (Per Inspection Procedure 43004) along with same part, make and model number.

Section 3, Definitions, Like-for-Like This should be defined the same as identical item as noted in the comment above.

Section 4, Selection of SR CGI Acceptance Methods In the introductory paragraph of this section please elaborate where guidance for technical evaluation can be found.

Section 4, Method 1, Sub-item a Bullet No. 5 states the sample size to be taken but does not provide any guidance regarding the methodology for sample size selection.

Please include the guidance for sample selection methodology that is based on a recognized industry statistical method (e.g.

EPRI 7218).

Section 4.a, Method 1 Bullet No. 6 describes tests and inspections but does not provide the parameters of acceptability.

Section 4.b, Method 2 In the second paragraph please modify the wording to clarify that a commercial grade survey can be used to accept critical characteristics of simple or complex parts.

Section 4.b, Method 2 Bullet No. 5 Suggest that the wording be changed to clarify that the critical

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N characteristics cannot be verified easily.

Section 4.b, Method 2 Paragraph following Bullet No. 5 Staff agrees that the approach is acceptable initially as long as receipt inspection is performed (Reference GL 89-02).

Subsequently a design engineer must evaluate the performance based on a defined frequency.

Section 4.b, Method 2 Second paragraph following Bullet No. 5.

After the first sentence add the sentence that engineering will determine the acceptability of critical characteristics.

Section 4.c. Method 3 -

Source Verification Please add an opening sentence explaining that this method is used when a supplier does not have adequate programmatic controls in place.

Section 4.e.

Combination of two or more methods In the first paragraph please state that method 2 and method 4 alone are not sufficient per the guidance of GL 89-02.

Section 6.e. Part Changes Add the fact that the change should be based on equivalency evaluations.

Section 6.f. Previous Dedication Review In the first paragraph please make it clear that engineering should evaluate there have been no design changes.

Section 6.h. Technical Evaluation In the first paragraph (Item 1) there is a need to

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N augment guidance for technical evaluation.

Need to explain the comment further.

Section 6.h. Technical Evaluation In the fourth paragraph (Item 4)

This paragraph does not match the definition of like-for-like replacement as noted by staff comments.

Section 6.i.

Determination of Critical Characteristics It is not clear why the critical characteristics should be limited to environment. Please expand or justify the statement.

Section 9, 10CFR21 Please modify the requirements of reporting per the guidance of 10CFR21.21. These requirements apply to, Each individual, corporation, partnership, dedicating entity, or other entity subject to the regulations in this part.

Section 10 Certifications Please change the last sentence to clarify that once the critical characteristics have been verified and the item dedicated it is no longer commercial grade. Present wording causes confusion.

General It is recommended that the order in which the procedure is organized be re-evaluated.

Following the Definitions section, safety classification should be addressed first then followed by technical evaluation, and then the acceptance methods.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 364 7.5.2. 7.5 On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an TVA Partial Response to NRC Request 4. N Open Open-TVA/Bechtel NNC 4/125/2011: See Open Item No.

2 evaluation of the Common Q PAMS against the current staff Due 7/22/11 81.

position. 2. Table 7.1-1 will be updated to reference IEEE Std 603- Submit FSAR Amend 1991 for the Common Q PAMS. Requires preparation and submittal 105 By letter dated 2/25/11 (ML110620219), TVA docketed a response: of FSAR Amendment 105 to update TVA performed an analysis and concluded that the Common Q TVA has reviewed the requirements of IEEE Std 603- table 7.1-1 PAMS equipment does not need to meet either IEEE 279-1971 or 1991 for the Sorrento Containment High Range IEEE 603-1991 and so no analysis was performed or provided. Radiation Monitors and determined that IEEE Std 603-1991 is not applicable. IEEE 603-1991 is applicable to However, SRP (NUREG-0800 Rev. 2 dated March 2007) Section actuation systems. While TVA lists the containment 7.7, Information System Important to Safety, specifically identifies high range radiation monitors as RG 1.97 Revision 2 IEEE Std 603-1991 as being applicable to accident monitoring Type A variables, the classification is not based on the instrumentation. Based upon the review of this item, the staff finds RG 1.97 requirements which states:

the following open items:

1 TVA to demonstrate that the Common Q PAMS meets the Type A, those variables that provide primary applicable regulatory requirements in IEEE Std 603-1991. information needed to permit the control room operating 2 TVA to updated FSAR (Amendment 103) Table 7.1-1 to personnel to take the specified manually controlled reference IEEE Std 603-1991 for WBN2 Common Q PAMS actions for which no automatic control is provided and and Sorrento Containment High Radiation Monitors. that are required for safety systems to accomplish their safety functions for design basis accident event.

TVA calculation WBN0SG4047, PAM Type "A NNC 5/4/2011: Please explain why the Variables Determination uses a broader definition. TVA calculation WBN0SG4047, PAM The calculation definition is: Type "A Variables Determination uses a broader definition for Type A EICB (Carte)

The type "A variables will be divided into three groups variables than is in the FSAR based on the parameter's purpose. The groups are: (1) (Amendment 103). Why is this event identification, (2) event recovery to plant definition not in the FSAR?

stabilization, and (3) maintaining the stabilized conditions from event recovery to hot standby.

Following a reactor trip, the termination point for transients at WBNP is considered a stabilized condition at hot standby per chapter 15 of the WBN FSAR. Event recovery actions are those manual actions taken to mitigate a design basis accident to a stabilized condition. The plant can be considered stabilized when the plant parameters vary slowly and automatic systems are not being initiated. The diagnostic process consciously performed by the operator via the plant variables to interpret an event indication will be considered as a safety-related operator action regardless of the lack of manual manipulation of equipment. This diagnostic process is necessary to enable the operator to distinguish the "type" of transient and take the correct mitigating actions.

A review of TVA calculation WBN0SG4047 and the associated Emergency Instructions found that there are NNC 5/4/2011: Will the FSAR no operator actions that are meet the RG 1.97 Revision (Amendment 103) Table 7.5-2 Variable 2 definition for a Type A variable which are based on No. 4, Containment Radiation be the containment high range radiation monitors. Based updated to change the variable type on this review, IEEE 603 is not applicable to the designation? Will this variable still be containment high range radiation monitors. Qualification Category No. 1?

365 7.5.2. 7.5 On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an The Common Q PAMS panel internals meets the 5. Y Open Open-TVA/Bechtel NNC 4/125/2011: See Open Item No.

2 evaluation of the Common Q PAMS against the current staff requirements of Regulatory Guide of 1.75 and IEEE Std 384 81.

EICB position. 1992. The external Common Q PAMs cables are routed as Due 7/22/11 (Carte) 1E, 10 CFR 50.49, trained cables in accordance with Watts By letter dated 2/25/11 (ML110620219), TVA docketed a response: Bar Design Criteria WB-DC-30-4, which is not in Requires preparation and submittal

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N that WBN2 is not committed in complying with Reg. Guide conformance with Regulatory Guide 1.75 Revision 3 or IEEE of FSAR Amendment 105 to update 1.75Since WBN2 is not committed to RG 1.75 or IEEE-384, no Std 384-1992. table 7.1-1 comparison is required As noted in WBN Unit 2 FSAR section 8.1.5.3 Compliance However, WBN2 is committed to RG 1.75 Rev. 2, Physical to Regulatory Guides and IEEE Standards note 2 Independence of Electric Systems. RG 1.75 Rev. 3 and IEEE Std. Regulatory Guide 1.75 was issued after the Watts Bar 384-1992 are used, in part, to address IEEE Std 603-1991 Clause design was complete. Separations criteria for WBNP are 5.6.1. The current NRC staff position for RG 1.75 is documented in given in Section 8.3.1.4.2.

Rev. 3. Based upon the review of this item, the staff finds the following open item: FSAR section 8.3.1.4.2 provides a detailed discussion of the 1 TVA to updated FSAR (Amendment 103) Table 7.1-1 to WBN Unit 2 separation requirements and compensatory include RG 1.75 Rev. 3 for WBN2 Common Q PAMS and the actions. To ensure that non-1E cables do not degrade 1E Sorrento Containment High Radiation monitor. cables, non-1E routed in a Class 1 structures are evaluated to ensure that they are adequately protected to prevent The Common Q PAMS was designed to meet the requirements of propagation of damage from the non 1E cables to 1E cables.

RG 1.75 Rev. 2. WBN2 did not perform an analysis to RG 1.75 Rev. 3. Based upon the review of this item, the staff finds the The NRC reviewed TVAs separation criteria as following open item: supplemented by a breaker testing program in SSER 16 and 2 TVA to evaluate Common Q PAMS and the Sorrento found it to be acceptable. The same criteria and breaker Containment High Radiation monitor for conformance with RG testing program are applicable to WBN Unit 2.

1.75 Rev. 3.

366 7.5.2. 7.5 On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an The Common Q PAMS and RM-1000 radiation monitors 6. Y Open Open-TVA/Bechtel NNC 4/125/2011: See Open Item No.

2 evaluation of the Common Q PAMS against the current staff comply with IEEE 344-2004 and with Reg. Guide 1.100 81.

position. Revision 3 with the exception of testing above 30Hz. Table Due 7/22/11 7.1-1 will be updated to reflect conformance.

By letter dated 2/25/11 (ML110620219), TVA docketed a response: Requires preparation and submittal TVA stated that the Common Q PAMS equipment fully meets the of FSAR Amendment 105 to update RG 1.100 Rev. 0 and is compliant with Rev. 3, with exception of table 7.1-1 testing above 33 Hz, which is not applicable to Watts Bar.

The WBN2 FSAR (Amendment 103) references Regulatory Guide 1.100 Rev. 1 Seismic Qualification of Electrical Equipment for EICB (Carte)

Nuclear Power Plants. The Common Q PAMS was designed to meet the requirements of RG 1.100 Rev. 2. RG 1.100 Rev. 3 is the current revision of this guide and is endorsed by the NRC. RG 1.100 Rev. 3 endorses IEEE 344-2004.

Based upon the review of this item, the staff finds the following open item:

1 TVA to updated FSAR (Amendment 103) Table 7.1-1 to include RG 1.100 Rev. 3 for WBN2 Common Q PAMS and the Sorrento Containment High Radiation monitor.

or 2 TVA to evaluate Common Q PAMS for conformance with RG 1.100 Rev. 1.

370 7.5.2. 7.5 On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an TVA Partial Response to NRC Request: 7. Y Open Open-TVA/Bechtel NNC 4/125/2011: See Open Item No.

2 evaluation of the Common Q PAMS against the current staff 81.

position. Common Q PAMS is designed in accordance with Due 7/22/11 Submit FSAR Amend Regulatory Guide 1.168, Revision 1, IEEE 1012-1998 and 105 EICB (Carte)

By letter dated 2/25/11 (ML110620219), TVA docketed a response. IEEE 1028-1997. These references will be added to FSAR Requires preparation and submittal Table 7.1-1. of FSAR Amendment 105 to update The WBN2 FSAR (Amendment 103) does not reference RG 1.168, table 7.1-1 IEEE 1012, or IEEE 1028. IEEE Std 7-4.3.2-2003 indentifies IEEE Std 1012-1998 as normative. RG 1.168 Rev. 1 endorses, with clarifications, IEEE 1012-1998. The current staff positions are documented in RG 1.168 Rev. 1, IEEE 1012-1998, and IEEE 1028-

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 1997. Based upon the review of this item, the staff finds the following open item:

1 WBN2 to updated FSAR Table 7.1-1 to reference RG 1.168 Rev. 1, IEEE 1012-1998, and IEEE 1028-1997 as being applicable to WBN2 Common Q PAMS and the Sorrento Containment High Radiation monitor.

396 3.10 Provide proprietary, non-proprietary versions and affidavits for 8. Open Open-TVA/Bechtel MSC 7/11/11: Assigned to J. Temples withholding for the following documents: as GA-ESI Contract Manager for

  • General Atomics Electronic Systems 04038903-1SP, Schedule: TBD Licensing Support.

Qualification Basis for 04031101-001 (2-RE-90-130 &131).

Civil Request from NRC Civil branch

  • General Atomics Electron Systems 04038903-2SP, Qualification Basis for 04031301-001 (2_RE-90-106). received from J. Poole via e-mail on July 6, 2011.
  • General Atomics Electronic Systems 04038903-4SP, Qualification Basis for 04031501-001 (2-RE-90-112).

092 5/20/2010 Responder: Hilmes 1. Y Open Open-TVA/Oversight Continuous review as items are added DORL (Poole) TVA to review Licensee Open Item list and determine which items This item will close when we are no longer using this Due SER Issue Due: SER Issue are proprietary. document as a communications tool.

381 Non-Proprietary description of the qualification of the MI cable Attachment 4 contains the Westinghouse non-proprietary 1. Open Open-TVA/WEC assemblies with references to any EQ report (if applicable) - June description of the qualification of the mineral insulated (MI) 10th cable assemblies. Due: TBD Still Pending Response submitted 6/13/11 NRC Update (Alvarado) - need the proprietary versions of reports, such as EQ tests, EMI/RFI tests, calculations, and other documents EICB (Alvarado) to make a safety determination, not non-proprietary reports that reference these reports and calculations.

NRC update (RA) 6/16: The ifnormation provided in this attachment was identical to the information provided on May 6 letter. However, we have not received the information related that show compliance with RG 1.180 (Regarding EMI and RFI) for the MI cable assemblies. So this item is still open.

383 Non-Proprietary description of the qualification of the IITA with Attachment 6 contains the Westinghouse non-proprietary 2. Open Open-TVA/WEC references to EQ report(s) description of the qualification of the IITA.

Due: TBD Still Pending EICB (Alvarado)

Response submitted 6/13/11 NRC Update (Alvarado) - need the proprietary versions of reports, such as EQ tests, EMI/RFI tests, calculations, and other documents to make a safety determination, not non-proprietary reports that reference these reports and

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N calculations.

NRC update (RA) 6/16: The report will be available after June 30. This is still an open item 388 Provide the following documents, which describe operation of the 3. Open Open-TVA/WEC WINCISE Applicaiton Server.

  • Sections 1 and 2 of the WNA-GO-00075-WBT, WINCISE Due: TBD Signal Processing System Cabinet Operation &

Maintenance Manual. Revision 0.

  • WNA-DS-01811-WBT, WINCISE Signal Processing System Design Requirements. Revision 0, May 2010
  • 420A90, WINCISE Functional Specification for Watts Bar Unit 2. Revision 2.

389 Provide the proprietary version of the calculation described in 4. Open Open-TVA/WEC WNA-CN-00157-WBT, Watts Bar 2 IIS Signal Processing System Isolation Requirements. Revision 0. Due: TBD 390 Westinghouse has indicated that the WINCISE Application 5. Open Open-TVA/WEC Servers, as well as the BEACON are redundant. However, the WINCISE Application Server communicates only with Due: TBD Beacon A. Westinghouse also explained that to switch from Beacon A to Beacon B, the operator must perform this manually. After reviewing Westinghouse documents, we couldnt find explanation that automatic switchover to the other server is not permitted.

391 Clarify the type of connector used with the MI cable in Unit 2. 6. Open Open-TVA/WEC During this review, we identified the following connectors, but we could not establish which one will be used in unit 2. Also Due: TBD explain if the qualification performed is still valid or if it is going to be revised.

o Whittaker connectors o Litton connectors o Electronic Resources Division (ERD) connectors 392 Clarify the logic to substract failed detectors from the 7. Open Open-TVA/WEC algorithm used to calculate core power. During the May 12 meeting with Westinghouse and TVA, Westinghouse Due: TBD explained that the WINCISE Application Server includes an algorithm to substract failed detectors. However, during our review in Westinghouse office, we could not find description on how this algorithm is accomplished. Furthermore, the document BEACON Data Processing Application Program Software Requirements Specification includes the following assumption: BEACON will perform the substraction between various length elements for the vanadium detector design. This is appropriate, as BEACON is more equipped to support the replacement value algorithm should an element fail. BEACON has knowledge of the flux shape which is critical to this process.

393 Clarify if the IITA assembly and the 6-to-1 transition cable 8. Open Open-TVA/WEC have been subjected to the 600VDC dielectric strength test.

Document Watts Bar 2 IIS Signal Processing System

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad3F1FE.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Isolation Requirements states that the MI and IITA assemblies need to be subjected to a 600VDC dielectric strength test. Letter LTR-ME-10-3 summarizes the result for the MI cable. However, similar documentation was not available for the IITA assembly.

394 Confirm that power supply cables to the WINCISE SPS 9. Open Open-TVA/WEC cabinet are not routed with cables that are greater than 264V.

395 Confirm that power supply to the WINCISE SPS cabinet are 10. Open Open-TVA/WEC from isolated 1E sources, such that power supply routed to PAMS train A is the same routed to SPS cabinet 1, and power supply routed to PAMS train B is the same routed to SPS cabinet 2.

369 7.5.2. 7.5 On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an 1. N Open Open-TVA/WEC/GA NNC 4/125/2011: See Open Item No.

2 evaluation of the Common Q PAMS against the current staff 81.

position. Due 7/22/11 By letter dated 2/25/11 (ML110620219), TVA docketed a response. Due date reflects Common Q.

The WBN2 FSAR (Amendment 103) references IEEE 7-4.3.2- Date for Sorrento RM-1000 1982, "IEEE Standard Criteria for Digital Computers in Safety monitors is 1/15/12 EICB (Carte)

Systems of Nuclear Power Generating Stations" as endorsed by Regulatory Guide (RG) 1.152, "Criteria for Use of Computers in Safety Systems of Nuclear Power Plants," Revision 0 for the Eagle 21 system. The current regulatory position is documented in RG 1.152 Rev. 2 which endorses IEEE Std 7-4.3.2-2003 as an acceptable method for using digital computers to meet IEEE Std 603-1991. Based upon the review of this item, the staff finds the following open item:

1 WBN2 to updated FSAR Table 7.1-1 to reference IEEE 7-4.3.2-2003 as being applicable to WBN2 Common Q PAMS and the Sorrento Containment High Radiation monitor.

371 7.5.2. 7.5 On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an 2. N Open Open-TVA/WEC/GA NNC 4/125/2011: See Open Item No.

2 evaluation of the Common Q PAMS against the current staff 81.

position. Due 7/22/11 By letter dated 2/25/11 (ML110620219), TVA docketed a response. Due date reflects Common Q.

The WBN2 FSAR (Amendment 103) does not reference Date for Sorrento RM-1000 Regulatory Guide 1.209, Guidelines for Environmental monitors is 1/15/12 EICB (Carte)

Qualification of Safety-Related Computer-Based Instrumentation and Control Systems in Nuclear Power Plants. Based upon the review of this item, the staff finds the following open item:

1 WBN2 to updated FSAR Table 7.1-1 to reference RG 1.209 and IEEE Std. 323-2003 as being applicable to WBN2 Common Q PAMS and the Sorrento Containment High Radiation monitor.

TVA did not docket an evaluation against the criteria in RG 1.209.

Based upon the review of this item, the staff finds the following open item:

2 WBN2 to evaluate Common Q PAMS for conformance with RG 1.209 and IEEE Std. 323-2003.