MONTHYEARML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML24008A2462024-01-18018 January 2024 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) ML23346A1382024-01-0303 January 2024 Regulatory Audit Summary Related to Request to Increase the Number of Tritium Producing Burnable Absorber Rods CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000390/20234412023-12-21021 December 2023 Plantfinal Significance Determination for a Security-Related Greater than Green Finding, Nov, and Assessment Follow-up, 05000390-2023441 and 05000391-2023441-Public CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) IR 05000390/20234042023-12-14014 December 2023 Security Baseline Inspection Report 05000390/2023404 and 05000391/2023404 CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) ML23293A0572023-12-0606 December 2023 Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control IR 05000390/20230102023-11-30030 November 2023 RE-Issue Watts Bar Nuclear Plant - Biennial Problem Identification and Resolution Inspection Report 050000390/2023010 and 05000391/2023010 and Apparent Violation CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20230032023-11-13013 November 2023 Integrated Inspection Report 05000390/2023003 and 05000391/2023003 and Apparent Violation ML23312A1432023-11-0808 November 2023 Submittal of Dual Unit Updated Final Safety Analysis Report (UFSAR) Amendment 5 CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23251A2002023-09-11011 September 2023 Request for Withholding Information from Public Disclosure for Watts Bar Nuclear Plant, Units 1 and 2 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000390/20230052023-08-30030 August 2023 Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2023005 and 05000391/2023005 ML23233A0042023-08-28028 August 2023 Proposed Alternative to the Requirements of the ASME Boiler and Pressure Vessel Code for Upper Head Injection Dissimilar Metal Butt Welds IR 05000390/20230022023-08-16016 August 2023 Reissue - Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2023002 and 05000391/2023002 ML23220A1582023-08-0909 August 2023 Integrated Inspection Report 05000390/2023002 and 05000391/2023002 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills IR 05000390/20230112023-07-24024 July 2023 Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000390 2023011 and 05000391 2023011 CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . ML23122A2322023-06-0707 June 2023 Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs) CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out2023-06-0101 June 2023 Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out IR 05000390/20234032023-05-30030 May 2023 Cyber Security Inspection Report 05000390/2023403 and 05000391/2023403 ML23131A1812023-05-23023 May 2023 Correction to Amendment No. 161 to Facility Operating License No. NPF-90 CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20220032023-05-0909 May 2023 Reissue Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2022003 and 05000391/2022003 ML23125A2202023-05-0505 May 2023 Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances) IR 05000390/20230012023-05-0404 May 2023 Integrated Inspection Report 05000390/2023001 and 05000391/2023001 CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23072A0652023-04-0505 April 2023 Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML23073A2762023-04-0303 April 2023 Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing (EPID L-2023-LLA-0029) (Letter) CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report 2024-01-09
[Table view] |
Text
Tennessee Valley Authority, Post Office Box 2000, Spring City, TN 37381-2000 February 2, 2010 10 CFR 50.36 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 NRC Docket No. 50-391
Subject:
Watts Bar Nuclear Plant (WBN) - Unit 2 - Developmental Revision B of the Technical Specifications (TS), TS Bases, Technical Requirements Manual (TRM), TRM Bases; and Pressure and Temperature Limits Report (PTLR)
Reference:
TVA letter to NRC dated March 4, 2009, 'Watts Bar Nuclear Plant (WBN) Unit 2 - Operating License Application Update" This letter transmits the Developmental Revision B of the WBN Unit 2 TS, TS Bases, TRM, and TRM Bases, reflecting changes made since the March 4, 2009, Developmental Revision A submittal (reference). With the exception of TRM/TRM Bases 3.7.2 discussed below, this submittal provides the final version of the TS, TS Bases, TRM, and TRM Bases required in support of licensing WBN Unit 2.
This letter also submits the WBN Unit 2 Pressure and Temperature Limits Report (PTLR) (WCAP-17035-NP, Revision 2, 'Watts Bar Unit 2 Heatup and Cooldown Limit Curves for Normal Operation and PTLR Support Documentation," December 2009).
This report provides the methodology and results of the generation of heatup and cooldown pressure-temperature (P-T) limit curves for normal operation of the WBN Unit 2 reactor vessel.
The TS/TRM submittal incorporates changes resulting from TVA's ongoing effort to verify TS/TRM numbers, setpoints, and parameters as part of the construction completion of WBN Unit 2. The submittal also incorporates TSTF-493, Revision 4, "Clarify Application of Setpoint Methodology for LSSS Functions," into Section 3.3 of the TS and TS Bases. Please note that TRM/TRM Bases 3.7.2 (as applicable) will require revision to reflect input from the most recent probable maximum flood evaluation data. The TRM/TRM Bases 3.7.2 revision and the Unit 2 Final Safety Analysis Report Section 2.4, "Hydrologic Engineering," revision will be submitted in March 2010.
Printed on recycled paper
U.S. Nuclear Regulatory Commission Page 2 February 2, 2010 The March 4, 2009, letter delineated how the original marked-up versions of the WBN Unit 2 TS, TS Bases, TRM, and TRM Bases were developed. It also discussed how the Review Matrix provided for the documents was developed. A Review Matrix is provided for the Developmental Revision B documents.
The Developmental Revision B of the TS and TS Bases was compared to the WBN Unit 1 TS and TS Bases through Amendment 82 and Revision 100, respectively.
The Developmental Revision B of the TRM and TRM Bases was compared to the WBN Unit 1 TRM and TRM Bases through Revision 45.
The electronic files of the Unit 2 TS, TS Bases, TRM, and TRM Bases; the review matrixes for each; and the PTLR are contained on the enclosed Optical Storage Media (OSM). Enclosure 1 lists the electronic files and the file sizes.
There are no new commitments contained in this letter. If you have any questions, please contact me at (423) 365-2351.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 2nd day of February, 2010.
Respectfully, Masoud Ba tani Watts Bar it 2 Vice President
Enclosure:
List of Electronic Files
Attachment:
OSM containing electronic files of documents listed above cc: See Page 3
U.S. Nuclear Regulatory Commission Page 3 February 2, 2010 Enclosure cc (w/enclosure):
U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Resident Inspector Unit 2 Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381
ENCLOSURE 1 TVA Watts Bar Nuclear Plant Unit 2 Technical Specifications/Technical Requirements ManualI/PTLR List of Files File Name File Size - Bytes TVAWBN-2 TS REVIEWMATRIX 338,272 001_TVAWBN-2 TS MATRIX.pdf TVAWBN-2 TS Files 001_TVA WBN-2 TS TOC.pdf 133,890 002 TVA WBN-2 TS 1.0.pdf 181,944 003 TVA WBN-2 TS 2.0.pdf 70,075 004_-VA WBN-2 TS 3.0.pdf 71,275 005 TVA WBN-2 TS 3.1.pdf 512,654 006 TVA WBN-2 TS 3.2.pdf 187,100 007WTVA WBN-2 TS 3.3.pdf 345,802 008 TVA WBN-2 TS 3.4.pdf 697,850 009 TVA WBN-2 TS 3.5.pdf 200,850 010 TVA WBN-2 TS_3.6.pdf 735,786 011WTVAWBN-2 TS 3.7.pdf 250,264 012 TVA WBN-2 TS 3.8.pdf 232,350 013WTVA WBN-2 TS3.9.pdf 393,646 014 TVA WBN-2 TS 4.0.pdf 260,339 015 TVA WBN-2 TS 5.0.pdf 151,124 Total 4,424,949 TVA_WBN-2 TS BasesFiles 001_-VAWBN-2 TS BasesTOC.pdf 153,341 002 WVA WBN-2 TS Bases 2.0.pdf 139,332 003_TVA_WBN-2_TSBases_3.0.pdf 92,832 004 TVA WBN-2 TS Bases 3.1.pdf 519,903 005WTVAWBN-2 TS Bases 3.2.pdf 258,409 006 TVA WBN-2 TS Bases 3.3.pdf 521,067 Page 1 of 3
I I I ENCLOSURE I TVA Watts Bar Nuclear Plant Unit 2 Technical Specifications/Technical Requirements Manual/PTLR List of Files File Name File Size - Bytes 007 WVA WBN-2 TS Bases 3.4.pdf 677,584 008 TVA WBN-2 TS Bases 3.5.pdf 244,428 009_-VAWBN-2 TS Bases 3.6.pdf 672,937 010 TVA WBN-2 TS Bases 3.7.pdf 391,695 011 WVA WBN-2 TS Bases 3.8.pdf 375,333 012_TVA_WBN-2 TS Bases_3.9.pdf 457,502 Total 4,351,022 TVAWBN-2 TRMREVIEW MATRIX 001 TVA WBN-2 TRM Review MATRIX 145,574 TVAWBN-2_TRMFiles 001 TVA WBN-2_TRM and TRM Bases TOC.pdf 107,900 002 TVA WBN-2 TRM_1.0.pdf 420,319 003 TVA WBN-2 TRM _3.0.pdf 69,711 004 TVA WBN-2 TRM_3.1.pdf 550,821 005WTVA WBN-2 TRM_3.3.pdf 178,885 006 TVA WBN-2 TRM_3.4.pdf 320,233 007 TVA WBN-2 TRM_3.6.pdf 92,292 008 TVA WBN-2_TRM_3.7.pdf 141,322 009WTVAWBN-2 TRM_3.8.pdf 122,516 010 TVA WBN-2 TRM_3.9.pdf 174,925 011 TVA WBN-2 TRM_5.0.pdf 50,144 Total 2,229,068 TVAWBN-2 TRM Bases Files 001 WVA WBN-2 TRM Bases_3.0.pdf 82,235 002 TVA WBN-2_TRM Bases 3.1 .pdf 159,847 003WTVA WBN-2 TRM Bases 3.3.pdf 188,241 004WTVAWBN-2_TRM Bases 3.4.pdf 216,446 Page 2 of 3
ENCLOSURE 1 TVA Watts Bar Nuclear Plant Unit 2 Technical Specifications/Technical Requirements ManuaI/PTLR List of Files File Name File Size - Bytes 005 TVA WBN-2 TRM Bases 3.6.pdf 104,540 006_TVA WBN-2 TRM Bases 3.7.pdf 137,800 007_TVAWBN-2_TRM Bases 3.8.pdf 127,477 008_TVAWBN-2_TRMBases_3.9.pdf 186,347 Total 1,202,933 TVAWBN-2 PTLR 001 TVA WBN-2 PTLR.pdf 328,320 Page 3 of 3