ML11161A148
ML11161A148 | |
Person / Time | |
---|---|
Site: | Braidwood |
Issue date: | 06/10/2011 |
From: | Robert Daley Engineering Branch 3 |
To: | Pacilio M Exelon Nuclear Generation Corp, Exelon Nuclear |
Loretta Sellers | |
References | |
IR-11-008 | |
Download: ML11161A148 (8) | |
See also: IR 05000456/2011008
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE ROAD, SUITE 210
LISLE, IL 60532-4352
June 10, 2011
Mr. Michael J. Pacilio
Senior Vice President, Exelon Generation Company, LLC
President and Chief Nuclear Officer (CNO), Exelon Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT: BRAIDWOOD STATION, UNITS 1 AND 2 - INFORMATION REQUEST FOR
AN NRC TRIENNIAL PERMANENT MODIFICATIONS AND 10 CFR 50.59
(MOD/50.59) BASELINE INSPECTION 05000456/2011008; 05000457/2011008
Dear Mr. Pacilio:
On September 12, 2011, the U.S. Nuclear Regulatory Commission (NRC) will begin a
MOD/50.59 baseline inspection at the Braidwood Station, Units 1 and 2. This inspection
will be performed in accordance with the NRC baseline Inspection Procedure (IP) 71111.17.
The onsite portion of the inspection will take place on September 12 - 16 and
September 26 - 30, 2011.
Experience has shown that these baseline inspections are extremely resource intensive, both
for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on
the site and to ensure a productive inspection for both parties, we have enclosed a request for
documents needed for the inspection. These documents have been divided into three groups.
The first group of information is necessary to ensure that the inspection team is adequately
prepared for the inspection. This information should be made available via compact disc and
delivered to the regional office no later than July 15, 2011. The inspection team will review this
information by July 29, 2011, and will request specific items that should be provided for review
in the regional office by August 26, 2011.
The second group of requested documents contains additional items that the team will
review, or need access to, during the inspection. Certain documents contained within this
group, i.e., Item (1), will be requested for review in the regional office prior to the inspection by
August 26, 2011, as identified above. The remaining documents should be available by the first
day of the onsite inspection, September 12, 2011.
The third group lists information necessary to aid the inspection team in tracking issues
identified as a result of the inspection. The remaining documents in group three should be
available by the first day of onsite inspection, September 12, 2011. It is requested that this
information be provided to the lead inspector as the information is generated during the
inspection. It is important that all of these documents are up to date and complete in order to
minimize the number of additional documents requested during the preparation and/or the
onsite portions of the inspection.
M. Pacilio -2-
The lead inspector for this inspection is Dariusz Szwarc. We understand that our regulatory
contact for this inspection is Mr. James Gerrity of your organization. If there are any
questions about the inspection or the material requested, please contact the lead inspector at
(630) 829-9803 or via e-mail at Dariusz.Szwarc@nrc.gov.
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document system
(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room).
Sincerely,
/RA by R. A. Langstaff For/
Robert C. Daley, Chief
Engineering Branch 3
Division of Reactor Safety
Docket Nos. 50-456; 50-457
Enclosure: Modification and 50.59 Inspection Document Request
cc w/encl: Distribution via ListServ
MODIFICATION AND 50.59 INSPECTION DOCUMENT REQUEST
Inspection Report: 05000456/2011008; 05000457/2011008
Inspection Dates: September 12 - 16 and September 26 - 30, 2011
Inspection Procedure: IP 71111.17, Evaluations of Changes, Tests, or Experiments and
Permanent Plant Modifications
Lead Inspector: Dariusz Szwarc
(630) 829-9803
Dariusz.Szwarc@nrc.gov
I. Information Requested for in-Office Preparation Week
The following information is requested by July 15, 2011, or sooner, to facilitate the
selection of specific items that will be reviewed during the onsite inspection week. The
inspection team will select specific items from the information requested below and
submit a list to your staff by July 29, 2011. We will request that certain items be made
available to the regional office prior to the inspection by August 26, 2011. We request
that the remaining items selected from the lists be available and ready for review on the
first day of inspection. All requested information should identify the associated system
and cover the time frame from the receipt of information for the last inspection on
February 23, 2007, to the present.
The required information identified below should be provided on compact disc (CD).
Please provide three copies of each CD submitted (i.e., one for each inspector). The
preferred file format is a searchable pdf file. The CDs should be indexed and hyper-
linked to facilitate ease of use, if possible. If you have any questions regarding this
information, please call the inspection team leader as soon as possible.
1. List of permanent plant modifications to systems, structures, or components that
are field work complete. (For the purpose of this inspection, permanent plant
modifications include permanent: plant changes, design changes, set point
changes, equivalency evaluations, suitability analyses, and commercial grade
dedications.)
The list should contain the number of each document, the title, the revision
(or date), and the affected system. In addition to the list, please provide a
description of each modification and a list of associated calculations and affected
procedures.
2. List of all 10 CFR 50.59 completed evaluations involving (a) calculations,
(b) procedure revisions, (c) changes to the facility (modifications), (d) non-routine
operating configurations, or (e) departures in methods of analyses. This list
should include 50.59 evaluations for the following:
1 Enclosure
MODIFICATION AND 50.59 INSPECTION DOCUMENT REQUEST
a. Changes that have been made under the provisions of 10 CFR 50.59
that have been updated in accordance with 10 CFR 50.71(e)(4) since
February 23, 2007;
b. Modifications that are field work complete; and
c. Changes to calculations (or initiation of new calculations) that have been
issued. The list should contain the number and title of each document, a
brief description of the change, and the corresponding number and type of
the affected document (i.e., the modification or procedure to which the
evaluation applies). The list should NOT include any evaluations in
which prior NRC approval was sought and obtained.
3. A list of all 10 CFR 50.59 changes that have been screened out as not requiring a
full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes to
the facility (modifications); (d) non-routine operating configurations; or
(e) departures in methods of analyses.
The list should contain the number and title of each document, a brief description
of the change, and the corresponding number and type of the affected document
(i.e., the modification or procedure to which the evaluation applies).
4. A list of any modifications, procedure revisions, or UFSAR changes where it was
determined that 10 CFR 50.59 did not apply.
5. A list of calculation changes that have been issued for use.
6. A list of corrective action documents (open and closed) that address permanent
plant modifications or 10 CFR 50.59 issues, concerns, or processes. These
documents should also include the corrective action documents associated with
the modification and the 50.59 change implementation.
The list should contain the number, title and revision (or date) of each document,
the affected system and corresponding documentation (if applicable), and should
be sorted in order of significance.
7. Copies of procedures addressing the following: modifications, design changes,
set point changes, equivalency evaluations or suitability analyses, commercial
grade dedications, post-modification testing, 10 CFR 50.59 evaluations and
screenings, and UFSAR updates.
8. UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide
copies of the complete submittal.
2 Enclosure
MODIFICATION AND 50.59 INSPECTION DOCUMENT REQUEST
9. Copy of the UFSAR change log or a synopsis of the changes. This
should include all of the changes made to the UFSAR that were
incorporated in the last 10 CFR 50.71(e)(4) submittal.
10. Electronic copy of the UFSAR and technical specifications, if available.
11. Name(s) and phone numbers for the regulatory and technical contacts.
12. Current management and engineering organizational chart.
II. Information Requested to be Available Prior to Inspection (Request will be
made by July 29, 2011 for availability of documents by August 26, 2011) or
on First Day of Inspection (September 12, 2011)
1. Copies of all selected items from Section I. This includes copies of
associated documents such as calculations, post-modification test
packages, 10 CFR 50.59 evaluations, or screenings, and any corrective
action documents.
2. Copies of these documents do not need to be solely available to the
inspection team as long as the inspectors have easy and unrestrained
access to them.
a. Updated Final Safety Analysis Report, if not previously provided;
b. Original FSAR Volumes;
c. Original SER and Supplements;
d. FSAR Question and Answers;
e. Quality Assurance Plan;
f. Technical Specifications, if not previously provided;
g. Latest IPE/PRA Report;
h. Vendor Manuals; and
i. The latest 10 CFR 50.59 UFSAR Update Submittal.
3. Please ensure that other supporting documents for the selected items
have been located and are readily retrievable as the inspection team will
likely be requesting these documents during the inspection. Examples of
supporting documents are:
a. Drawings supporting the modifications;
b. Procedures affected by the modifications; and
c. UFSAR change papers generated due to a 10 CFR 50.59 evaluation.
3 Enclosure
MODIFICATION AND 50.59 INSPECTION DOCUMENT REQUEST
4. Assessment and Corrective Actions:
a. The most recent MOD/50.59 Quality Assurance (QA) audit and/or
self-assessment; and
b. Corrective action documents (e.g., condition reports, including status
of corrective actions) generate as a result of the most recent
MOD/50.59 Quality Assurance (QA) audit and/or self-assessment.
III. Information Requested to be provided throughout the inspection
1. Copies of any corrective action documents generated as a result of the
inspection teams questions or queries during this inspection.
2. Copies of the list of questions submitted by the inspection team members
and the status/resolution of the information requested (provide daily
during the inspection to each inspection team member).
If you have any questions regarding the information requested, please contact the
inspection team leader.
4 Enclosure
M. Pacilio -2-
The lead inspector for this inspection is Dariusz Szwarc. We understand that our regulatory
contact for this inspection is Mr. James Gerrity of your organization. If there are any
questions about the inspection or the material requested, please contact the lead inspector at
(630) 829-9803 or via e-mail at Dariusz.Szwarc@nrc.gov.
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, control number
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document Room
or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public
Electronic Reading Room).
Sincerely,
/RA by R. A. Langstaff For/
Robert C. Daley, Chief
Engineering Branch 3
Division of Reactor Safety
Docket Nos. 50-456; 50-457
Enclosure: Modification and 50.59 Inspection Document Request
cc w/encl: Distribution via ListServ
DISTRIBUTION:
See next page
DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr 061011 Braidwood Mod50 59 RFI DXS.docx
Publicly Available Non-Publicly Available Sensitive Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE RIII RIII
NAME DSzwarc RDaley
DATE 06/10/11 06/10/11
OFFICIAL RECORD COPY
Letter to Mr. Michael J. Pacilio from Mr. Robert C. Daley dated June 10, 2011.
SUBJECT: BRAIDWOOD STATION, UNITS 1 AND 2 - INFORMATION REQUEST
FOR AN NRC TRIENNIAL PERMANENT MODIFICATIONS AND 10 CFR
50.59 (MOD/50.59) BASELINE INSPECTION 05000456/2011008;
DISTRIBUTION:
RidsNrrDorlLpl3-2 Resource
RidsNrrPMBraidwood Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
DRPIII
DRSIII
Patricia Buckley
ROPreports Resource