ML111020618

From kanterella
Jump to navigation Jump to search
Submittal of Material Information Related to the Diablo Canyon Power Plant, Units 1 and 2, License Renewal Application
ML111020618
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/12/2011
From: Repka D
Pacific Gas & Electric Co, Winston & Strawn, LLP
To: Abramson P, Karlin A, Nicholas Trikouros
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 19906, 50-275-LR, 50-323-LR, ASLBP 10-900-01-LR-BD01
Download: ML111020618 (4)


Text

David a. Repka 202-282-5726 drepka@winston.com April 12, 2011 BY ELECTRONIC INFORMATION EXCHANGE Administrative Judge Alex S. Karlin Administrative Judge Nicholas G. Trikouros Administrative Judge Paul B. Abramson Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike Mail Stop: T-3F23 Rockville, MD 20852 In the Matter of PACIFIC GAS AND ELECTRIC COMPANY (Diablo Canyon Power Plant, Units 1 and 2)

Docket Nos. 50-275-LR and 50-323-LR RE: Material Information Related to License Renewal Application

Dear Administrative Judges:

The purpose of this letter is to inform the Licensing Board and parties of the attached letter submitted to the license renewal application docket by Pacific Gas and Electric Company (PG&E), on April 10, 2011. In the letter, PG&E provided the NRC Staff with information regarding the status of certain seismic studies for Diablo Canyon Power Plant (DCPP) previously approved and funded by the California Public Utilities Commission. PG&E also discussed the relationship of those studies to reviews in the State of California under the Coastal Zone Management Act (CZMA) and the California Coastal Act.

In short, in light of the recent events in Japan and the interest in California on the issue of seismic safety at DCPP, PG&E believes it prudent to complete these studies and issue a report addressing the results prior to issuance of a state CZMA consistency certification and a renewed NRC operating license.

In the attached letter, PG&E has requested that the NRC confirm that it will delay the final processing of the DCPP license renewal application, such that the renewed operating licenses, if approved, would not be issued until after PG&E has completed the 3-D seismic studies and submitted a report to the NRC addressing the results of those studies.

Atomic Safety and Licensing Board Panel April 12, 2011 Page 2 PG&E has not requested any suspension or delay in the NRC Staffs ongoing safety and environmental reviews of the DCPP license renewal application. Nonetheless, the NRC ordinarily under the CZMA could not issue a renewed license until the certification process is complete.

PG&E also is not requesting any delay in the schedule for this licensing hearing process. PG&E has previously requested (Tr. 476-77) only a deferral in the current schedule for mandatory disclosures on Contentions TC-1 and EC-4, as established by the Licensing Board Order of January 19, 2011. No party opposed that request. The Licensing Board has not yet ruled on the issue. PG&E continues to request that limited relief with respect to the disclosure schedule.

Sincerely,

/s/ signed electronically by David A. Repka Counsel for Pacific Gas and Electric Company cc: EIE Service DC:649871.2

Pacific Gas and flectric Company*

John T. Conway 77 Beale Straet Suniar Vice President.Energy Supply 8. MI~ Code 832 Chief Nuclear Officer Sin Franciuo, CA 94105 April 10, 2011 415.973.3336 Internal: 223.3336 FBI: 415.973.2313 PG&E Letter DCL-ll-047 A/tlm,t, Address Diablo Canyon Power Planl P.QBoIS6 US Nuclear Regulatory Commission Avila Baach, CA 93424 ATTN: Document Control Desk 805.545.3333 Fu: 805.545.4884 Wash ington , DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Request for Deferral of Issuance of Diablo Canyon Power Plant Renewed Operating Licenses

Dear Commissioners and Staff:

By Pacific Gas and Electric Company (PG&E) Letter DCL-09-079, "License Renewal Application," dated November 23,2009, PG&E submitted an application to the Nuclear Regulatory Commission (NRC) for the renewal of Facility Operating Licenses DPR-80 and DPR-82, for Diablo Canyon Power Plant (DCPP) Units 1 and 2, respectively. The application included the license renewal application (LRA),

and Applicant's Environmental Report - Operating License Renewal Stage.

As you know, the Commission's review of the LRA includes consideration of whether license renewal is consistent with the Coastal Zone Management Act (CZMA). The agencies responsible for periorming the coastal consistency review for DCPP are San Luis Obispo County and the California Coastal Commission. In light of recent events at the Fukushima Daiichi Power Plant, and the considerable public concern regarding the need to assure the seismic safety at DCPP, PG&E has decided it is most prudent to have completed certain seismic studies at DCPP prior to issuance of the coastal consistency certification and the renewed NRC operating licenses, if approved.

The seismic studies referenced above are the seismic studies approved and funded by the California Public Utilities Commission (CPUC), including 3-D seismic studies recommended by the California Energy Commission (collectively referred to in th is letter as the "3-D seismic studies"). The CZMA and the California Coastal Act, and their implementing regulations, do not necessarily require the 3-D seismic studies to be completed prior to issuance of the coastal consistency certification or that a coastal development permit be obtained in connection with license renewal.

Nonetheless, as noted above , PG&E believes it prudent to co mplete these studies and issue a report addressing the results prior to issuance of a consistency certification and/or renewed operating licenses, if approved.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway. Comanche Peak . Diablo Can'Yon

  • Palo Verde. San Onofre . South Texas Project . Wolf Creek

Document Control Desk PG&E Letter DCL-11-047 April 10,2011 Page 2 The CPUC approved PG&E's application for funding to perform the 3-D seismic studies on August 16, 2010. PG&E estimates that implementation of the 3-0 seismic studies and investigations will occur over a minimum three-year period, which started in 2010. However, because this task will require the acquisition of all necessary State of California permits for seismic sources that exceed the 2-kilojoule energy limit, compliance with the California Environmental Quality Act, conducting data collection over the defined off-shore survey area, and data interpretation and integration , it is possible for the completion date for the studies to be delayed. In any event, presuming PG&E obtains all necessary permits, PG&E expects the 3-D seismic studies to be completed, and intends to issue a report addressing the results of those studies, as soon as possible after completing the analysis of the data and no later than December 2015.

PG&E therefore requests that the Commission delay the final processing of the LRA such that the renewed operating licenses, if approved, would not be issued until after PG&E has completed the 3-D seismic studies and submitted a report to the NRC addressing the results of those studies. PG&E would appreciate a Commission response to this letter granting this request on the docket for the License Renewal Application, Docket No. 50-275, OL-DPR-80, Docket No. 50-323, OL-DPR-82 .

Please contact Mr. Terence L. Grebel, License Renewal Project Manager, at (805) 545-4160 with any questions about this letter.

Executed on April 10, 2011 .

Sincerely,

'C)4.,I~~-7---><

Jo(lT. Conway Senior Vice President - Energy Supply and Chief Nuclear Officer jlp/223-9809 cc: Elmo E. Collins, NRC Region IV Regional Administrator Nathanial B. Ferrer, NRC Project Manager, License Renewa l Kimberly J. Green, NRC Project Manager, License Renewal Michael S. Peck, NRC Senior Resident Inspector James T. Polickoski, Project Manager, Office of Nuclear Reactor Regu lation Alan B. Wang, Project Manager, Office of Nuclear Rea ctor Regulation Diablo Distribution A member of the STARS (Strategic T eaming and Resource Sharing) All iance Ca llaway . Comanche Pe ak . Diablo Canyon ' Palo Verd e. S an Onofre. South Te xas Project . Wolf C reek