ML15069A574

From kanterella
Jump to navigation Jump to search
March 2015 Seismic Study Update Letter
ML15069A574
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/10/2015
From: Post J, Repka D
Pacific Gas & Electric Co, Winston & Strawn, LLP
To: Gary Arnold, Paul Ryerson, Nicholas Trikouros
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-275-LR, 50-323-LR, ASLBP 10-900-01-LR-BD01, RAS 27353
Download: ML15069A574 (3)


Text

March 10, 2015 by Electronic Information Exchange Administrative Judge Paul S. Ryerson Administrative Judge Nicholas G. Trikouros Administrative Judge Gary S. Arnold Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike Mail Stop: T-3F23 Rockville, MD 20852 In the Matter of PACIFIC GAS AND ELECTRIC COMPANY (Diablo Canyon Power Plant, Units 1 and 2)

Docket Nos. 50-275-LR and 50-323-LR RE: Status Report

Dear Administrative Judges:

As directed by the Licensing Board Order of June 7, 2011, Pacific Gas and Electric Company (PG&E) hereby provides its monthly report specifying its current best estimate of the dates on which it expects to complete milestones related to the coastal zone consistency certification associated with NRC license renewal for DCPP. PG&E issued the final seismic report in September 2014. In response to NRC request dated July 3, 2014 (ADAMS Accession No. ML14167A492) PG&E submitted updates to the technical and environmental reports supporting DCPP license renewal in December 2014, with the exception of additional updates, which were provided in February 2015. PG&E will inform the NRC of the timing of any updated coastal consistency review filings when a schedule is established. PG&E is in the process of addressing comments on the original Coastal Consistency Certification submitted to the California Coastal Commission in 2009.

PG&E will continue to provide specific dates in the monthly reports to the extent practicable, recognizing that these dates may be modified as more accurate information becomes available.

Executed in accord with 10 CFR 2.304(d),

/s/ signed electronically by Jennifer K. Post Attorney Pacific Gas and Electric Company 77 Beale St., B30A San Francisco, CA 94105 (415) 973-9809 jklm@pge.com

/s/ signed electronically by David A. Repka Winston & Strawn LLP 1700 K Street, NW Washington, DC 20006 (202) 282-5726 drepka@winston.com cc: Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Service List (via Electronic Information Exchange)

Pacific Gas and Electric Company Updated Best Estimate Schedule for Seismic Studies Description of Activity Prior Estimate Current Estimate Final Seismic Report Issued September 10, 2014(a) September 10, 2014(a)

Response to NRC Request for Additional Information for Safety and Environmental December 2014(a)(c) December 2014(a)(c)

Reviews(b)

Additional updates to Technical and Environmental February 2015 February 2015(a)

Reports CZMA or Coastal Consistency File Coastal Development Permit TBD TBD Coastal Consistency Issued TBD TBD (a)

Note: - Actual Date Completed (b)

- Reference PG&E Letter DCL-14-043, dated June 4, 2014 (c)

- With the exception of additional updates subsequently provided in February 2015