Board Notice Re Diablo Canyon IPEEE Report
ML15183A397
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/02/2015
From: Lindell J
NRC/OGC
To: Gary Arnold, Paul Ryerson, Nicholas Trikouros
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-275-LR, 50-323-LR, ASLBP 10-900-01-LR-BD01, RAS 28020
Download: ML15183A397 (3)


Text

July 2, 2015 Administrative Judge Administrative Judge Paul S. Ryerson, Chair Dr. Gary S. Arnold Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Mail Stop: T-3F23 Washington, DC 20555-001 Washington, DC 20555-0001 Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Washington, DC 20555-0001 In the Matter of PACIFIC GAS AND ELECTRIC COMPANY (Diablo Canyon Power Plant, Units 1 and 2)

Docket Nos. 50-275-LR and 50-323-LR RE: Notice that the Diablo Canyon IPEEE Report is Now Publicly Available

Dear Administrative Judges:

The NRC Staffs Answer to the San Luis Obispo Mothers for Peaces Motion to File New Contentions Regarding Adequacy of Severe Accident Mitigation Alternatives Analysis for Diablo Canyon License Renewal Application cited Pacific Gas & Electric Companys June 1994 Individual Plant Examination of External Events Report for Diablo Canyon Power Plant Units 1 and 2, (IPEEE Report) and noted that it was not publicly available.1 The Staff wishes to inform the Board that the IPEEE Report is now publicly available, and can be found in the Agencywide Documents and Access Management System (ADAMS) at Accession No. ML073600371.

Respectfully submitted,

/Signed (electronically) by/

Joseph A. Lindell Counsel for NRC Staff U.S. Nuclear Regulatory Commission 1

NRC Staff Answer to San Luis Obispo Mothers for Peaces Motion to File New Contentions Regarding the Adequacy of the Severe Accident Mitigation Alternatives Analysis for Diablo Canyon, at 19 n.96 (May 11, 2015).

Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1474 E-mail: joseph.lindell@nrc.gov Date of signature: July 2, 2015

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

PACIFIC GAS AND ELECTRIC COMPANY ) Docket Nos. 50-275-LR/ 50-323-LR

)

(Diablo Canyon Nuclear Power Plant, )

Units 1 and 2) )

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305, I hereby certify that a copy of the foregoing letter regarding the public availability of Diablo Canyons IPEEE Report, dated July 2, 2015, has been filed through the Electronic Information Exchange, the NRCs E-Filing System, in the above captioned proceeding, this 2nd day of July, 2015:

/Signed (electronically) by/

Joseph A. Lindell Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1474 E-mail: joseph.lindell@nrc.gov Date of signature: July 2, 2015