MONTHYEARNUREG-1433, Draft Audit Questions Technical Specification Conversion to NUREG-1433, Revision 52024-12-16016 December 2024 Draft Audit Questions Technical Specification Conversion to NUREG-1433, Revision 5 ML24326A1482024-11-21021 November 2024 NRR E-mail Capture - Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Request for Additional Information Regarding License Amendment Request to Use Optimized ZIRLO Fuel Rod Cladding ML24310A0542024-10-31031 October 2024 NRR E-mail Capture - (External_Sender) PSEG Salem/Hope Creek Biological Opinion GAR-2020-02842 - Annual Ice Barrier Schedule Notification 20242025 ML24303A1752024-10-29029 October 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Atlantic Sturgeon 10/28/2024 ML24303A4242024-10-29029 October 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Atlantic Sturgeon 10/28/2024 ML24277A0812024-10-0303 October 2024 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon Collected on 10/02/2024 ML24269A0362024-09-24024 September 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemps Ridley Sea Turtle Collected on 9/24/2024 ML24253A1942024-09-0909 September 2024 NRR E-mail Capture - Final Eeeb RAI - Hope Creek Amendment to Revise TS to Change Surveillance Interval to Accommodate 24-Month Fuel Cycle ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24248A0452024-09-0303 September 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemps Ridley Sea Turtle Collected on 9/3/2024 ML24240A2092024-08-27027 August 2024 NRR E-mail Capture - Acceptance Review - Hope Creek - Relief Request VR-04, SSW Rupture Disc Replacement ML24229A0422024-08-16016 August 2024 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Implement Optimized ZIRLO Fuel Rod Cladding ML24229A0432024-08-16016 August 2024 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Exemption from 10 CFR 50.46 and 10 CFR 50 Appendix K to Allow the Use of Optimized ZIRLO Fuel Rod Cladding ML24227A5092024-08-14014 August 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemps Ridley Sea Turtle Collected on 8/13/2024 ML24228A1942024-08-14014 August 2024 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form for a Live - Atlantic Sturgeon 8/14/2024 ML24197A1022024-07-15015 July 2024 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise TS Lift Settings for Reactor Coolant System Safety Relief Valves ML24250A0562024-07-11011 July 2024 PSEG to NMFS, Regarding Processing of Fin Clips ML24219A2472024-07-0909 July 2024 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Shortnose Sturgeon 7/9/2024 ML24163A1632024-06-11011 June 2024 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise TS to Change Surveillance Interval to Accommodate 24-Month Fuel Cycle ML24123A0522024-05-0101 May 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - One Deceased Sturgeon 4/30/2024 ML24106A0542024-04-12012 April 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form - One Alive Atlantic Sturgeon 4/12/2024 ML24101A2192024-04-0909 April 2024 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon 4/8/24 ML24093A1222024-04-0101 April 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form - One Atlantic Sturgeon 4/1/2024 ML24075A1862024-03-14014 March 2024 NRR E-mail Capture - (External_Sender) Biological Opinion Gar 2020-02842 - PSEG Salem and Hope Creek Generating Station Annual Incidental Take Report - 2023 ML24060A0492024-02-28028 February 2024 NRR E-mail Capture - Final Exhb RAI for Hope Creek, Salem 1 and 2 Amendment to Modify Exclusion Area Boundary ML24030A8432024-01-30030 January 2024 NRR E-mail Capture - (External_Sender) 2023 PSEG Sturgeon Pit Tag Data ML24016A1612024-01-10010 January 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms - Two Atlantic Sturgeon 1/9/2024 ML24002A7222023-12-29029 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - 2023 Annual Report - Inspection of the Circulating Water Intake Structure (Cwis) Trash Rack Bars ML24002A7242023-12-28028 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form - Sturgeon 12/28/2023 ML24002A7252023-12-21021 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Shortnose Sturgeon 12/21/23 ML23355A2732023-12-21021 December 2023 NRR E-mail Capture - (External_Sender) PSEG Response to Questions Associated with Supplement to Salem-Hope Creek Eab Reduction LAR ML23346A0962023-12-0606 December 2023 NRR E-mail Capture - Reminder - Final Report - Completion of Required Additional Protocol (AP) Information in Accordance with the U.S. - IAEA Treaty Obligations ML23311A0792023-11-0101 November 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Atlantic Sturgeon Collected on 10/31/2023 ML23277A0482023-10-0404 October 2023 NRR E-mail Capture - 10/4/2023 Email: Acceptance Review - Hope Creek and Salem 1 and 2 - LAR to Modify Exclusion Area Boundary ML23277A0732023-09-29029 September 2023 NRR E-mail Capture - (External_Sender) 9/29/2023 Email from PSEG: Supplement to Proposed Amendment to PSEG Master Decommissioning Trust Amendment ML23226A0702023-08-11011 August 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form for Sturgeon Collected on 8/10/2023 ML23226A0732023-08-10010 August 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Submittal of Necropsy Reports Regarding Sea Turtles Collected on 06/12/2022 ML23201A0132023-07-20020 July 2023 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML23172A0982023-06-21021 June 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemps Ridley Sea Turtle Collected on 06/20/2022 ML23164A2062023-06-13013 June 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemps Ridley Sea Turtle Collected on 06/12/2023 ML23163A0442023-06-0606 June 2023 NRR E-mail Capture - (External_Sender) Biological Opinion GAR-2020-02842; FIN Clip Analysis Facilities ML24250A0572023-06-0606 June 2023 PSEG to NMFS, Request for Sturgeon Fin Clip Analysis Facilities ML23153A1552023-06-0202 June 2023 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon 6/1/2023 ML23151A6582023-05-31031 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms Sturgeon 5/30/2023 ML23137A2632023-05-17017 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms Sturgeon 5/16/2023 ML23135A0102023-05-11011 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report Sturgeon 5/11/2023 ML23129A7892023-05-0909 May 2023 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise Trip and Standby Auto-Start Logic Associated with Safety Related HVAC Trains ML23136B2832023-05-0404 May 2023 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon 5/3/2023 ML23122A1672023-05-0202 May 2023 NRR E-mail Capture - Acceptance Review - Hope Creek and Salem 1 and 2 - Revise TS to Delete TS Section 5.5 - Meteorological Tower Location 2024-09-09
[Table view] |
Text
OHara, Timothy f-,
From: OHara, Timothy Sent: Tuesday, April 27, 2010.2:24 PM To: Conte, Richard; Gray, Harold Cc: OHara, Timothy
Subject:
Salem Unit 1 Notification 20459689 Attachments: Scan File.pdf Harold & Rich, Attached is the notification on the missed pressure testing on the AFW pipe.
The ISI program is implemented by procedures. The 2 procedures listed in the notification are those needed to do the ASMW, IWA-5244 Buried Component tests. There is no direct reference to the AFW piping in the program because the program did not pick the piping up as buried.
Still checking on the time to report this, but I believe it is included in either 10 CFR 50.55(a) or the Code requirements someplace.
Tim OHara
Original Message -----
From: RlScan [1]
Sent: Tuesday, April 27, 2010 2:18 PM To: OHara, Timothy
Subject:
Scan from Salem/Hope Creek HP5035 Please open the attached document. This document was digitally sent to you using an HP Digital Sending device.
- Long Text Object Identification**************
Notification 000.020459689 Long text 04/21/2010. 11:32:25 NUCLEARNOT (NUCLEARNOT)
Notification submitted by: Edley Giles 856-339-2271 ENTNBU\NUITG: AND ITS.
CONDITION DESCRIPTION/LOCATION (THE INAPPROPRIATE ACTION NEGATIVE EFFECT/INCLUDE A DETAILED LOCATION DESCRIPTION) :#
The req-uired ASME Section XI Pressure Te*sýtsing for the buried Axii:ry Feedwater piping required'by the ER-AA-33Q-001 and OU-AA-335-015 procedu~res were not performed. The ISI program manager has found no*
,ev~idence of testing :These, p~rocedures,s, i p~lemen~t 'the: .euirernlents o~f lO0CFR50.-55a. The system pressure test boundary drawing (S2-SPT-336-0) identifies the piping as YARD piping not buried piping. This is applicable to both Salem Units. The Salem unit 1 piping however is being replaced and will be hydro tested to code requirements prior to being placed in service.
ACTIVITIES, PROCESSES, PROCEDURES INVOLVED:
ER-AA-330-001,Section XI pressure Testing OU-AA-335-015, VT-2 Visual Examination WHY DID CONDITION HAPPEN?
The system pressure test boundary drawing ($2-SPT-336-0)Y identifies, the piping as YARD piping not buried piping. However, it is commonly understood that it is buried pipe.
CONSEQUENCES:
The implementation of the ASME Section XI pressure testing may.not have been completed in the current inspection interval as required. However, the in-service testing required by S2.OP-ST.AF-0007, In-service Testing of Aux Feed Water Valves Modes 4-6, infers that the functibonal requirements of the test have been met. The test records pi~mp dp'anid pump flow. The flow measurement occurs down stream of the'buried section of piping. The pump dp is taken at pump. This ST uses the 21 and 22 AF pumps. Review of the IST data taken (12 STs since May 1997) shows that the pump dp and flows have been constant (considering instrument and instrument reading inaccuracies) since 1997. No ST has exceeded its upper or lower IST limits. The Quarterly STs provide evidence that the 21 and 22 AF .pumps are not degraded.. The ability of the AF pumps to achieve required flow downstream of the buried piping section at a consistent pump dp provides assurance that the buried piping system condition has not changed. The test also confirms the code requirement that flow is not impaired.
Salem Unit 1 piping is out of service, is being replaced, and will be subject to Code required pressure testing prior to being placed in service.
AFW System TS 3.7.1.2 requires that the AFW system flow paths shall be operable. TS 4.0.5 requires ASME Class 1, 2 and 3 components t.o be tested in accordance with ASME XI. Since the ASME test was apparently missed, we should treat this as a missed TS surveillance of the buried pipe flow path. TS Surveillance Requirement 4.0.3 states that if the surveillance is not performed within its specified frequency ('in this case two (2) cycles), a delay of up to the limit of the specified frequency is allowed IF a risk evaluation is performed for the delay greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact is managed.
- 2 -
REQUIREMENTS IMPACTED:
ER-AA-330-001, Section XI pressure Testing OU-AA-335-015, VT-2 Visual Examination ADVERSE PHYSICAL CONDITIONS:
No adverse physical condition.
WHO WAS NOTIFIED.:
Engineering Director KNOWLEDGEABLE INDIVIDUALS:
Tim Giles, Ed Maloney, Tom Roberts, H. Berrick, E. Villar REPEAT OR SIMILAR CONDITION:
No IMMEDIATE ACTIONS AND RECOMMENDED ACTIONS:
Engineering to provide risk assessment for Unit 2 Auxiliary Feedwater buried pipe to allow delay in test until next refueling outage (2R18).
The risk impact associated with this evaluation shall be managed.
Perform required In-service Pressure Testing in next outage on unit 2 (2R18). Buried piping on unit l will be tested prior to returning to service during current 1R20 refueling outage.
Revise Ul & U2 Salem In-service Inspection Program Long Term Plans to identify all buried Section XI piping systems and required testing.
Review Hope Creek Section XI Pressure Testing Program for similar conditions.