MONTHYEARML24277A0812024-10-0303 October 2024 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon Collected on 10/02/2024 ML24269A0362024-09-24024 September 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemps Ridley Sea Turtle Collected on 9/24/2024 ML24248A0452024-09-0303 September 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemps Ridley Sea Turtle Collected on 9/3/2024 ML24229A0422024-08-16016 August 2024 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Implement Optimized ZIRLO Fuel Rod Cladding ML24229A0432024-08-16016 August 2024 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Exemption from 10 CFR 50.46 and 10 CFR 50 Appendix K to Allow the Use of Optimized ZIRLO Fuel Rod Cladding ML24228A1942024-08-14014 August 2024 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form for a Live - Atlantic Sturgeon 8/14/2024 ML24227A5092024-08-14014 August 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemps Ridley Sea Turtle Collected on 8/13/2024 ML24250A0562024-07-11011 July 2024 PSEG to NMFS, Regarding Processing of Fin Clips ML24219A2472024-07-0909 July 2024 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Shortnose Sturgeon 7/9/2024 ML24123A0522024-05-0101 May 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - One Deceased Sturgeon 4/30/2024 ML24106A0542024-04-12012 April 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form - One Alive Atlantic Sturgeon 4/12/2024 ML24101A2192024-04-0909 April 2024 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon 4/8/24 ML24093A1222024-04-0101 April 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form - One Atlantic Sturgeon 4/1/2024 ML24075A1862024-03-14014 March 2024 NRR E-mail Capture - (External_Sender) Biological Opinion Gar 2020-02842 - PSEG Salem and Hope Creek Generating Station Annual Incidental Take Report - 2023 ML24060A0492024-02-28028 February 2024 NRR E-mail Capture - Final Exhb RAI for Hope Creek, Salem 1 and 2 Amendment to Modify Exclusion Area Boundary ML24030A8432024-01-30030 January 2024 NRR E-mail Capture - (External_Sender) 2023 PSEG Sturgeon Pit Tag Data ML24016A1612024-01-10010 January 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms - Two Atlantic Sturgeon 1/9/2024 ML24002A7222023-12-29029 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - 2023 Annual Report - Inspection of the Circulating Water Intake Structure (Cwis) Trash Rack Bars ML24002A7242023-12-28028 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form - Sturgeon 12/28/2023 ML23355A2732023-12-21021 December 2023 NRR E-mail Capture - (External_Sender) PSEG Response to Questions Associated with Supplement to Salem-Hope Creek Eab Reduction LAR ML24002A7252023-12-21021 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Shortnose Sturgeon 12/21/23 ML23346A0962023-12-0606 December 2023 NRR E-mail Capture - Reminder - Final Report - Completion of Required Additional Protocol (AP) Information in Accordance with the U.S. - IAEA Treaty Obligations ML23311A0792023-11-0101 November 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Atlantic Sturgeon Collected on 10/31/2023 ML23277A0482023-10-0404 October 2023 NRR E-mail Capture - 10/4/2023 Email: Acceptance Review - Hope Creek and Salem 1 and 2 - LAR to Modify Exclusion Area Boundary ML23277A0732023-09-29029 September 2023 NRR E-mail Capture - (External_Sender) 9/29/2023 Email from PSEG: Supplement to Proposed Amendment to PSEG Master Decommissioning Trust Amendment ML23226A0702023-08-11011 August 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form for Sturgeon Collected on 8/10/2023 ML23226A0732023-08-10010 August 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Submittal of Necropsy Reports Regarding Sea Turtles Collected on 06/12/2022 ML23201A0132023-07-20020 July 2023 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML23172A0982023-06-21021 June 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemps Ridley Sea Turtle Collected on 06/20/2022 ML23164A2062023-06-13013 June 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemps Ridley Sea Turtle Collected on 06/12/2023 ML23163A0442023-06-0606 June 2023 NRR E-mail Capture - (External_Sender) Biological Opinion GAR-2020-02842; FIN Clip Analysis Facilities ML24250A0572023-06-0606 June 2023 PSEG to NMFS, Request for Sturgeon Fin Clip Analysis Facilities ML23153A1552023-06-0202 June 2023 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon 6/1/2023 ML23151A6582023-05-31031 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms Sturgeon 5/30/2023 ML23137A2632023-05-17017 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms Sturgeon 5/16/2023 ML23135A0102023-05-11011 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report Sturgeon 5/11/2023 ML23136B2832023-05-0404 May 2023 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon 5/3/2023 ML23122A1982023-05-0202 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms for Atlantic Sturgeon 5/1/2023 ML23122A1672023-05-0202 May 2023 NRR E-mail Capture - Acceptance Review - Hope Creek and Salem 1 and 2 - Revise TS to Delete TS Section 5.5 - Meteorological Tower Location ML23117A2722023-04-17017 April 2023 NRR E-mail Capture - (External_Sender) Salem Generating STATION-INCIDENTAL Take of Atlantic Sturgeon Collected on 04/14/2023 ML23079A0032023-03-17017 March 2023 NRR E-mail Capture - Hope Creek, Salem 1 and 2 - Evacuation Time Estimate Review ML23065A0452023-02-23023 February 2023 NRR E-mail Capture - (External_Sender) Salem & Hope Creek Generating STATIONS-ANNUAL Incidental Take REPORT-STATION & REMP ML23033A0302023-02-0808 February 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report Sturgeon 1/24/2023 ML23010A2882023-01-10010 January 2023 NRR E-mail Capture - (External_Sender) Salem Generating STATION-INCIDENTAL Take of Atlantic Sturgeon Collected on 01/09/2023 ML23003A2412023-01-0303 January 2023 NRR E-mail Capture - Final Nvib RAI - Salem Unit 2 Relief Request S2-I4R-211, Fourth Inservice Inspection (ISI) Interval Limited Examinations ML22357A0102022-12-21021 December 2022 NRR E-mail Capture - Final Nphp RAI - Salem Unit 2 Relief Request S2-I4R-211, Fourth Inservice Inspection (ISI) Interval Limited Examinations ML23003A2402022-12-21021 December 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form for Atlantic Sturgeon Collected on 12/20/2022 ML23003A2392022-12-20020 December 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms for Atlantic Sturgeons Collected 12/19/2022 ML22333A9022022-11-29029 November 2022 NRR E-mail Capture - Final Iolb RAI - Salem 1 and 2 LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG ML22291A3702022-10-18018 October 2022 NRR E-mail Capture - Acceptance Review - Salem 2 - Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations (L-2022-LLR-0066) 2024-09-03
[Table view] |
Text
Ennis, Rick From: Schulten, Carl Sent: Friday, May 07, 2010 7:29 AM To: Ennis, Rick
Subject:
RE: Salem Violation Consensus Rick, It would be difficult to conclude there is not a TS compliance issue with TS requirements (SR 4.0.5, Structural Integrity LCO and AFW System TS) if the licensee needs a relief request for IWA-5244 pressure test to permit operation until the next outage. The licensee should document its operability determination to justify they are in compliance with their license with the identified degraded or nonconforming conditions that are adverse to quality or safety.
Carl Schulten Technical Specifications Branch Office of Nuclear Reactor Regulation, USNRC Phone: 301.425.1192 Fax: 301.415.3061 From: Ennis, Rick /rL--
Sent: Friday, May 07, 2010 7:02 AM To: Conte, Richard; OHara, Timothy; Modes, Michael Cc: Burritt, Arthur; DeFrancisco, Anne; Farrar, Karl; Lupold, Timothy; Patnaik, Prakash; Taylor, Robert; Chernoff, Harold; Schulten, Carl; Tsao, John; Manoly, Kamal; Bowman, Eric; Schroeder, Daniel; Balian, Harry; Cline, Leonard
Subject:
RE: Salem Violation Consensus I've copied Pat Patnaik and Rob Taylor on this email since, if a relief is submitted, I believe Pat would likely be the reviewer. Pat - based on our discussions last week, please confirm that you think a relief request is needed to justify not performing the IWA-5244 pressure test on the Salem 2 buried AFW piping until the next outage.
Rich - I agree with your assessment that it's not clear that there is a TS violation. Carl/Eric - do you agree?
It's also not clear if there is a lack of structural integrity on the Salem 2 buried AFW piping. John/Kamal - do you agree?
- Thanks, Rick From: Conte, Richard : (TN Sent: Friday, May 07, 200 {6:13 AM To: OHara, Timothy; Modes, Michael Cc: Ennis, Rick; Burritt, Arthur; DeFrancisco, Anne; Farrar, Karl; Lupold, Timothy
Subject:
RE: Salem Violation Consensus I vote Nah. In sum, I am not sure the Aye votes fully appreciate the ramifications of being beyond the structural integrity LCO when we all agreed it is ok to wait for them to do the test next outage. Using the NOED process which will be forced on the licensee since they do not plan to shutdown sounds like bureacratic response to this issue as unnecessary.
I am guided by 50.55a and the code not the TS with all of its nuiances for which there is a TS amendment to fix it.
The operability guidance presumes operability and gives examples of not meeting code as examples of degraded, not being beyond the limits of the LCO.
We have a TIA that confirms ISl is not a surveillance requirement. The pressure drop test is clearly an NDE or IS[ process.
Structural integiity is determined by meeting design, doing preservice NDE and testing, and maintaining it by Inservice. A failure to meet one test does not necessarily invalidate structural integrity.
As Harold said, even a failure of the test as noted by leak does not necessarily imply a loss of structural integrity, thus the IWA 4160 to evaluate for suitability in this case structural integrity which we told the license at the outbrief.
Salem TS is confusing in the above point; so how can we say it is violated.
We all anticipate this test when done is going to pass. It would have passed at Unit 1 with the known external degradation.
I do agree they need a code relief to cover the situation from now to the next outage - this appears to be the main issue in all of this as a reasonable next step.
That is the relief is not to cover the failure to do the test in the first two periods of the interval, that would condone the violation and turn it into acceptable status should the relief be approved on those grounds..
Since I have the alternate view and Darrell loves listening to alternate views I will try to set up something today with Darrell. Harold and Tim it sounds like you will be available to to discuss with him so I don't prejudice any
,view.
I will let you know what time. How is this; Darrell is acting RA.
I do agree with Rick Ennis; this is all as clear as mud; but thanks for your help.
In an open collaborative work environment I would propose we get guidance form the Acting RA and bring the views to Lupold and company on Monday. I would not set up anything with PSEG-just yet.
I plan to call Len Rajkowski today to better understand what they view are the degraded LCOs Art Burritt if you are in the office today, you are welcome to join us.
I still don't have an immediate safety issue; nothing indicates otherwise in these emails.
I added Tim Lupold as a heads up.
From: OHara, Timothy.
Sent: Thursday, May 06, 2010 9:42 PM To: Modes, Michael; Conte, Richard Cc: Ennis, Rick; Burritt, Arthur; DeFrancisco, Anne; Farrar, Karl
Subject:
RE: Salem Violation Consensus
- Rich, I think this is the best way to handle the situation and address all the possibilities.
2
I propose we arrange a call with PSEG on Monday to communicate the following:
(1) "clarify" the preliminary violation we informed them about at the Debrief on Wednesday with the details (below), i.e. add that they are in violation of the structural integrity tech. spec. and, (2) inform PSEG that a relief request explaining the missed "inservice inspections (pressure tests)" will be needed to eventually restore compliance (when approved by NRR).
I'll be working at home on Monday and I'll be available to lead the call or participate. I can call Howard Berrick on Friday to ask him to coordinate the PSEG people for a Monday call if you want. Please keep me involved in what happens on this so that I get the violation and report correct.
Tim OHara From: Modes,'Michal)L Sent:' Thursday, May 0U, 2010 4:15 PM To: Conte, Richard Cc: OHara, Timothy; Ennis, Rick; Burritt, Arthur; DeFrancisco, Anne; Farrar, Karl
Subject:
Salem Violation Consensus We are going to site the regulation 50.55a In turn the ASME requirement they did not comply with.
This will then result in a failure to show structural integrity.
We will cover the absence of a NOED by also citing, concurrently, the tech spec violation as a subtier of the violation.
We will issue an NOV (with 30 day reply) if they have not submitted the relief request by the time we issue the report in order to faciliate the correct behavior.
If NRR has the request in hand we will issue this as non-cited.
As a secondary benefit we establish a precident for pressure testing and structural integrity for buried piping that will stand in the absence of the tech spec requirement. This tech spec requirement does not exist in Standard Tech Specs, nor will it last long in the Salem tech specs.
All in favor say "Aye".
The ayes have it ... the motion carries.
3
Received: from HQCLSTR02.nrc.gov ([148.184.44.77]) by TWMS01 .nrc.gov
([148.184.200.145]) with mapi; Fri, 7 May 2010 07:29:02 -0400 Content-Type: application/ms-tnef; name="winmail.dat" Content-Transfer-Encoding: binary From: "Schulten, Carl" <Carl.Schulten@nrc.gov>
To: "Ennis, Rick" <Rick.Ennis@nrc.gov>
Date: Fri, 7 May 2010 07:29:01 -0400
Subject:
RE: Salem Violation Consensus Thread-Topic: Salem Violation Consensus Thread-Index: AcrtWL++OpzaBWBCRu6Oq EeKwqOLkgAKwxAAABFIasAAAkUqsAABRNfQ Message-ID: <36CF286628C20846A68047F2463233091 EF1 ECD218@HQCLSTRO2.nrc.gov>
References:
<F858CAD8A3CD394A8F6D77BC7ED9161213384FA6FE@R1 CLSTRO1 .nrc.gov>
<F6C63642BC5EFD4FB7DC9C2578893109133716CB38@R1 CLSTRO1 .nrc.gov>
<4AD9FA22854D084695734CAFFA3F1 446138569F1 8A@R1 CLSTRO1 nrc.gov>
<9E2871 0E0B702149AEC663972863644023681 B4149@HQCLSTRO1 .nrc.gov>
In-Reply-To: <9E28710EOB702149AEC663972863644023681 B4149@HQCLSTRO1 .nrc.gov>
Accept-Language: en-US Content-Language: en-US X-MS-Has-Attach:
X-MS-Exchange-Organization-SCL: -1 X-MS-TNEF-Correlator:
<36CF286628C20846A68047F2463233091 EF1 ECD218@HQCLSTRO2 .nrc.gov>
MIME-Version: 1.0