Lacrosse Boiling Water Reactor Ltr. Response to Order for Additional Security Measures at Independent Spent Fuel Storage Installation, EA-09-118
ML101270031
Person / Time
Site: La Crosse  File:Dairyland Power Cooperative icon.png
Issue date: 04/30/2010
From: Sanscrainte C
Dairyland Power Cooperative
To:
Document Control Desk, NRC/NMSS/SFST
References
EA-09-118, LAC-14115
Download: ML101270031 (2)


Text

CHARLES V. SANS CRAINTE, P.E.

Vice President, Generation DAIRYLAND POWER C 0 0 P E R A T I V E April 30, 2010 In reply, please refer to LAC- 14115 DOCKET NO. 72-46 Document Control Desk Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards US Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Dairyland Power Cooperative (DPC)

La Crosse Boiling Water Reactor (LACBWR)

Possession-Only License No. DPR-45

REFERENCE:

(1) Letter of June 19, 2008, DPC to NRC, Affirmation of Need for Dry Cask Certificate of Compliance Amendment (2) Letter of June 3, 2009, NRC to DPC, and attached Order for Additional Security Measures at the La Crosse Boiling Water Reactor Independent Spent Fuel Storage Installation, EA-09-118 (3) Letter of June 22, 2009, DPC to NRC, and attached response to EA-09-118, containing the Additional Security Measures (ASM) for physical protection of the Independent Spent Fuel Storage Installation (ISFSI) and access authorization and fingerprinting (4) Letter of November 2, 2009, DPC to NRC, Supplemental Response to Order of June 3,2009, Modifying Licenses (5) Letter of November 24, 2009, DPC to NRC, Relaxation of Scheduled Analysis Delivery Date and Notification of Scheduled Fuel Loading (6) Letter of February 18, 2010, NRC to DPC, Relaxation of Schedule for Implementing Requirements of order for Implementation of ASM and Fingerprinting Unescorted Access to LACBWR ISFSI In References 3, 4 & 5, DPC committed to providing an analysis to the NRC by May 1, 2010.

The analysis completes the LACBWR response to the Order for Additional Security Measures at the La Crosse Boiling Water Reactor Independent SpentFuel Storage Installation, EA-09-118.

The results of the analysis are contained in the Attachment 1. 0J k5_-9T A Touchstone Energy Cooperative ,bbT 3200 East Ave. S.

  • PO Box 817 - La Crosse, WI 54602-0817
  • 608-787-1233 ° 608-787-1462 fax
  • www.dairynet.com

Document Control Desk Page 2 April 30, 2010 It is anticipated that construction of the vehicle barrier system will begin on August 1, 2010. We would appreciate a response prior to this date in order to remain on schedule.

If you have any questions, please call Michael Brasel of my staff at (608) 689-4220.

Sincerely, DAIRYLAND POWER COOPERATIVE Charles V. Sans Crainte Vice President, Generation CVS:MAB:two:krm G:\GnrAdmin\Letters 2010\LAC-14115 NRC Letter 043010-cvs-mab043010.doc

Attachment:

ISFSI Additional Security Measures Analysis Results (SAFEGUARDS INFORMATION) cc w/att: Kristina Banovac Project Manager U.S. Nuclear Regulatory Commission Washington, DC 20555 Douglas Garner Security Specialist Office of Nuclear Security and Incident Response Mail Stop T4-F25M U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Mark Satorius Regional Administrator, Region III 2443 Warrenville Rd.

Lisle, IL 60532 Raynard Wharton Division of Spent Fuel Storage and Transport Office of Nuclear Material Safety and Safeguards Mail Stop E-3-D-2M U.S. Nuclear Regulatory Commission Washington, DC 20555 cc w/o att: Paul Schmidt Manager, Radiation Protection Section State of Wisconsin PO Box 2659 Madison, WI 53701-26459