Similar Documents at Ginna |
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24137A1882024-05-16016 May 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23033A6672023-01-30030 January 2023 Public Call with Constellation January 30, 2023 (Slides) ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20175A8722020-06-23023 June 2020 Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML19318F9512019-11-20020 November 2019 Presentation Slides for November 20, 2019, Pre-Application Meeting - Request for Revision to Quality Assurance Program Internal Audit Frequency ML19317C9952019-11-12012 November 2019 In-Service Testing Supplemental Position Indication Relief Request NRC Pre-Application Meeting November 18, 2019 ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19151A6602019-05-31031 May 2019 BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19022A2002019-01-23023 January 2019 Request for Use of ASME Code Case N-879 for Exelon Nuclear Power Plants ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML17142A2382017-05-25025 May 2017 OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML16075A3292016-03-16016 March 2016 OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations ML13053A2962013-02-20020 February 2013 NRC Pre-Meeting Presentation 2-20-13 ML1113605462011-05-16016 May 2011 NRC Meeting Slides, Ginna 2011 Annual Assessment Meeting ML1022500422010-08-13013 August 2010 Exit and RPM Slides - 2010 ML1022500812010-08-13013 August 2010 Public Meeting 2010 - Ceng Slides ML1006807352010-03-18018 March 2010 Annual Meeting Slides ML0926506772009-09-15015 September 2009 Slides from the Public Meeting with Constellation Energy - Ginna ISFSI Presentation ML0808804062008-03-28028 March 2008 Licensee Slides (Constellation) from Ginna Annual Assessment Meeting ML0809504912008-03-25025 March 2008 Attendance List for Ginna Annual Assessment Meeting ML0807011912008-03-10010 March 2008 Slides for Annual Assessment Public Meeting for Ginna Station ML0712403122007-04-25025 April 2007 Slides from Ginna Annual Assessment Meeting, 04/25/2007 ML0710102262007-04-11011 April 2007 Annual Performance Assessment Meeting Slides ML0609404402006-04-0404 April 2006 NRC Slides for Annual Assessment Public Meeting with R. E. Ginna Nuclear Power Plant, LLC to Discuss CY2005 Performance ML0531802872005-09-28028 September 2005 Meeting to Obtain Public Comments on Proposed Release of Part of R.E. Ginna Nuclear Power Plant Site for Unrestricted Use Under 10 CFR 50.83 ML0529208222005-09-15015 September 2005 Presentation for 09/15/2005 Meeting with R. E. Ginna SBLOCA EPU Results Summary ML0525604472005-08-17017 August 2005 B&W Owners Group Reactor Vessel Working Group Summary of the Plans of the B&Wog Reactor Vessel Integrity Program ML0514501832005-05-24024 May 2005 Meeting Presentation, Ginna Extended Power Uprate Power Ascension Testing Program ML0513701772005-05-12012 May 2005 Attachment 3 - Licensee Presentation (Ginna, Perry, Peach Bottom, LaSalle, and Quad Cities) - Public Meeting Summary on FAQ Appeal Meeting May 12, 2005 ML0509800752005-04-0606 April 2005 Handouts - Ginna Power Uprate, NRC Meeting, April 6, 2005 ML0232403132002-11-22022 November 2002 Meeting Summary Enclosure 2 Handouts. Includes NEI Presentation Industry Comments on NRC Program Plan. 2024-05-16
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24137A1882024-05-16016 May 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides2023-02-21021 February 2023 Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23033A6672023-01-30030 January 2023 Public Call with Constellation January 30, 2023 (Slides) ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21162A3322021-06-11011 June 2021 BWR Fleet Relief Request Associated with RPV Instrument Nozzle Repairs ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20175A8722020-06-23023 June 2020 Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML16145A0402016-05-16016 May 2016 Problem Identification and Resolution 3/16/2016 Exit Presentation ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML13053A2962013-02-20020 February 2013 NRC Pre-Meeting Presentation 2-20-13 ML1114502502011-05-25025 May 2011 Constellation Meeting Slides for the Ginna 2011 Annual Assessment Meeting ML1113605462011-05-16016 May 2011 NRC Meeting Slides, Ginna 2011 Annual Assessment Meeting ML1022500422010-08-13013 August 2010 Exit and RPM Slides - 2010 ML1022500812010-08-13013 August 2010 Public Meeting 2010 - Ceng Slides ML1006807352010-03-18018 March 2010 Annual Meeting Slides ML0926506772009-09-15015 September 2009 Slides from the Public Meeting with Constellation Energy - Ginna ISFSI Presentation ML0808804062008-03-28028 March 2008 Licensee Slides (Constellation) from Ginna Annual Assessment Meeting ML0807011912008-03-10010 March 2008 Slides for Annual Assessment Public Meeting for Ginna Station ML0712403122007-04-25025 April 2007 Slides from Ginna Annual Assessment Meeting, 04/25/2007 ML0710102262007-04-11011 April 2007 Annual Performance Assessment Meeting Slides ML0609404402006-04-0404 April 2006 NRC Slides for Annual Assessment Public Meeting with R. E. Ginna Nuclear Power Plant, LLC to Discuss CY2005 Performance ML0529208222005-09-15015 September 2005 Presentation for 09/15/2005 Meeting with R. E. Ginna SBLOCA EPU Results Summary ML0525604472005-08-17017 August 2005 B&W Owners Group Reactor Vessel Working Group Summary of the Plans of the B&Wog Reactor Vessel Integrity Program ML0512600932005-04-21021 April 2005 Slides Summary of Annual Assessment Meeting with Constellation Generation Group, Constellation Energy Co ML0508100072005-03-22022 March 2005 Slides for Ginna Annual Assessment Meeting ML0330903442003-10-31031 October 2003 Preliminary Results of Environmental Review R.E. Ginna Nuclear Plant, Nuclear Regulatory Commission, August 7, 2003 (Encl. 5) ML0309901532003-04-0202 April 2003 Region I - Ginna Annual Assessment Meeting Slides ML0232901842002-11-20020 November 2002 Slides for 11/4/2002 Lrsc Meeting ML0235301402002-11-0606 November 2002 Environmental Scoping Meeting R.E. Ginna, NRC, November 6, 2002 (Enclosure 2) ML0228200482002-10-0808 October 2002 Slides and Viewgraphs of September 24, 2002, Summary of Meeting with Rochester Gas and Electric Corporation Proposed Digital Upgrades to the Emergency Control Room Air Treatment System Actuation Instrumentation ML0211201362002-04-17017 April 2002 Attachment 2 to the 04/17/2002 Meeting Summary with R.E.Ginna 2024-05-16
[Table view] |
Text
££L0890011W
~U.S.NRC NRC Strategic Plan Goals United Strite. Nuclea.r Regulritory Commission Protttctmg People tmJ the E"flirtmmmt ft Safety - Ensure adequate protection of public health and safety and the environment 4ia Security - Ensure adequate protection in the secure use and management of radioactive materials
~U.S.NRC NRC Ann uaI Assessme nt Sum mary United States Nuclear Regulatory Commission (It Ginna operated the plant safely and in a manner that preserved the public health and safety and protected the environment during the assessment period.
~ Ginna was in the Degraded Cornerstone column of the NRCs Action Matrix.
(t Ginna had a moderate degradation in safety performance.
~U.S.NRC NRC Inspection Activities United States Nuclear Regulatory Commission Protecting Ptmple anJ
- E"viro""""t Ginna for 2009
~ 5800 hours0.0671 days <br />1.611 hours <br />0.00959 weeks <br />0.00221 months <br /> of inspection and related activities
~ 2 resident inspectors on site
~ 10 regional inspections
~ 2 major team inspection
~ Special Inspection Team for the Turbine Driven Auxiliary Feed Water (TDAFW) pump issues
~ Fire Protection Team Inspection
NRC Significance Threshold Summary ~~!-!.§':~'Y~m~
Prot<<:ting AIopu anJ the Environmmt Performance Indicators (PI)
& , -~ Baseline Inspection
& White Requires additional NRC oversight 8 Requires more NRC oversight
~ Red Requires most NRC oversight Inspection Findings 8 Gre Very low safety issue e White Low to moderate safety issue 8 Substantial safety issue e Red High safety issue
~U.S.NRC Ginna Pis and Findings United States Nuclear Regulatory CommissIon Protet:tirlg Aopk muJtIHt E"uirrlnmnat January 1 through December 31, 2009
~ 1 White PI
~ 2 White inspection findings
~ 12 Green/Severity Level IV inspection findings
Summary of Safety Significant ~U.S.NRC United States Nuclear Regulatory Commission Prot<<tmg Pttople I#II!l the Environment Inspection Findings and Pis at Ginna
~ 1st gtr '09: White Finding for inadequate implementation of the Preventative Maintenance program for the TDAFW pump
~ 3rd gtr '09: White PI due to system reliability issues associated with TDAFW failures
~ 4th gtr '09: White Finding for inadequate corrective actions to prevent reoccurrence of TDAFW iss
~U.S.NRC NRC Action Matrix United States Nuclear Regulatory Commission Pruteaing People tmJ the Enflirrm:numl Licensee
Response
Regulatory
Response
II Degraded \
Cornerstone I Multiple Repetitive Degraded Unacceptable Performance Cornerstone All Inputs are 1 or 2 White 2 White or1 Multiple Yellow Overall Green; Inputs; Yellow Input; Inputs or 1 Red Unacceptable Cornerstone Cornerstone Cornerstone Input; Cornerstone Performance; Objectives Objectives Objectives Met wI Objectives Met wI Plants not Fully Met Fully Met Moderate Significant permitted to Degradation in) Degradation in Operate wlin this Safety Safety Performance Column; Performance Unacceptable Margin to Safety L----_~ '------5 '----~
e Increasing safety significance e Increasing NRC inspection efforts e Increasing NRC/Licensee management involvement e Increasing regulatory actions
~U.S.NRC NRC Plans for 2010 United States Nuclear Regulatory Commlulon Protect.ingPeople a:nJ the Envirrmmtmt
~ Supplemental and Team Inspections:
~ A supplemental inspection (95002) will ensure deficiencies with the TDAFW pump have been corrected
~ An independent spent fuel storage installation (lSFSI) inspection in May
~ A Problem Identification and Resolution (PI&R) inspection in May/June
~ A Component Design Basis Inspection (CDBI) in Oct/Nov
~U.S.NRC United States Nuclear Regulatory Commission Prot<<:thJg hopu aNi the E"virrm:llllmt R. E. Ginna Nuclear Power Plant Response and Remarks