Text
££L0890011W
~U.S.NRC United Strite. Nuclea.r Regulritory Commission NRC Strategic Plan Goals Protttctmg People tmJ the E"flirtmmmt ft Safety - Ensure adequate protection of public health and safety and the environment 4ia Security - Ensure adequate protection in the secure use and management of radioactive materials
~U.S.NRC NRC Ann u a I Ass e ssme n t Sum mary United States Nuclear Regulatory Commission (It Ginna operated the plant safely and in a manner that preserved the public health and safety and protected the environment during the assessment period.
~ Ginna was in the Degraded Cornerstone column of the NRCs Action Matrix.
(t Ginna had a moderate degradation in safety performance.
~U.S.NRC United States Nuclear Regulatory Commission NRC Inspection Activities ProtectingPtmple anJ* E"viro""""t Ginna for 2009
~ 5800 hours0.0671 days <br />1.611 hours <br />0.00959 weeks <br />0.00221 months <br /> of inspection and related activities
~ 2 resident inspectors on site
~ 10 regional inspections
~ 2 major team inspection
~ Special Inspection Team for the Turbine Driven Auxiliary Feed Water (TDAFW) pump issues
~ Fire Protection Team Inspection
NRC Significance Threshold Summary ~~!-!.§':~'Y~m~
Prot<<:ting AIopu anJ theEnvironmmt Performance Indicators (PI)
, -~
Baseline Inspection
& White Requires additional NRC oversight 8
Requires more NRC oversight
~ Red Requires most NRC oversight Inspection Findings 8 Gre Very low safety issue e White Low to moderate safety issue 8
Substantial safety issue e Red High safety issue
~U.S.NRC United States Nuclear Regulatory CommissIon Ginna Pis and Findings Protet:tirlg AopkmuJtIHt E"uirrlnmnat January 1 through December 31, 2009
~ 1 White PI
~ 2 White inspection findings
~ 12 Green/Severity Level IV inspection findings
~U.S.NRC Summary of Safety Significant United States Nuclear Regulatory Commission Prot<<tmgPttople I#II!ltheEnvironment Inspection Findings and Pis at Ginna
~ 1st gtr '09: White Finding for inadequate implementation of the Preventative Maintenance program for the TDAFW pump
~ 3rd gtr '09: White PI due to system reliability issues associated with TDAFW failures
~ 4th gtr '09: White Finding for inadequate corrective actions to prevent reoccurrence of TDAFW iss
~U.S.NRC United States Nuclear Regulatory Commission NRC Action Matrix PruteaingPeople tmJ theEnflirrm:numl Licensee Regulatory II Degraded \\ I Multiple Repetitive Unacceptable
Response
Response Cornerstone Degraded Performance Cornerstone All Inputs are 1 or 2 White 2 White or1 Multiple Yellow Overall Green; Inputs; Yellow Input; Inputs or 1 Red Unacceptable Cornerstone Cornerstone Cornerstone Input; Cornerstone Performance; Objectives Objectives Objectives Met wI Objectives Met wI Plants not Fully Met Fully Met Moderate Significant permitted to Degradation in )
Degradation in Operate wlin this Safety Safety Performance Column; Performance Unacceptable Margin to Safety L----_~ '------5
'----~
e Increasing safety significance e
Increasing NRC inspection efforts e
Increasing NRC/Licensee management involvement e
Increasing regulatory actions
~U.S.NRC United States Nuclear Regulatory Commlulon NRC Plans for 2010 Protect.ingPeople a:nJ theEnvirrmmtmt
~ Supplemental and Team Inspections:
~ A supplemental inspection (95002) will ensure deficiencies with the TDAFW pump have been corrected
~ An independent spent fuel storage installation (lSFSI) inspection in May
~ A Problem Identification and Resolution (PI&R) inspection in May/June
~ A Component Design Basis Inspection (CDBI) in Oct/Nov
~U.S.NRC United States Nuclear Regulatory Commission Prot<<:thJg hopu aNi the E"virrm:llllmt R. E. Ginna Nuclear Power Plant Response and Remarks