Summary of the April 2010 Annual Assessment Open-house Public Meeting Regarding Safety Performance of the Calvert Cliffs Nuclear Power Plant for 2009
ML101031290
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 04/13/2010
From: Glenn Dentel
Reactor Projects Branch 1
To:
Dentel, G RGN-I/DRP/BR1/610-337-5233
Shared Package
ML100470419 List:
References
Download: ML101031290 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406*1415 April 13. 2010 MEETING

SUMMARY

LICENSEE: CONSTELLATION ENERGY FACILITY: CALVERT CLIFFS NUCLEAR POWER PLANT

SUBJECT:

SUMMARY

OF THE APRIL 2010 ANNUAL ASSESSMENT OPEN-HOUSE PUBLIC MEETING On April 6, 2010, at 5:00 p.m., the NRC conducted an Annual Assessment Open-House Meeting at the Holiday Inn Express in Prince Fredrick, MD. The NRC conducted the open-house meeting to discuss the NRC's assessment of the safety performance of the Calvert Cliffs Nuclear Power Plant for 2009.

A notice of the open-house meeting was issued on March 19, 2010, and was posted on the NRC's external (public) web page (ADAMS Accession No. ML100780100).

The NRC presented poster boards and was available to discuss its assessment of the safety performance of Calvert Cliffs Nuclear Power Plant for the period of January 1 through December 31,2009, as documented in our letter dated March 3, 2010 (ADAMS Accession No. ML100620809). The NRC poster boards presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Calvert Cliffs Nuclear Power Plant can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Constellation employees and members of the media attended the open-house and were offered the opportunity to question the NRC regarding Constellation's performance and the role of the agency in ensuring safe plant operations.

Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects

Attachment:

List of Attendees

April 13, 2010 MEETING

SUMMARY

LICENSEE: CONSTELLATION ENERGY FACILITY: CALVERT CLIFFS NUCLEAR POWER PLANT

SUBJECT:

SUMMARY

OF THE APRIL 2010 ANNUAL ASSESSMENT OPEN-HOUSE PUBLIC MEETING On April 6, 2010, at 5:00 p.m., the NRC conducted an Annual Assessment Open-House Meeting at the Holiday Inn Express in Prince Fredrick, MD. The NRC conducted the open-house meeting to discuss the NRC's assessment of the safety performance of the Calvert Cliffs Nuclear Power Plant for 2009.

A notice of the open-house meeting was issued on March 19, 2010, and was posted on the NRC's external (public) web page (ADAMS Accession No. ML100780100).

The NRC presented poster boards and was available to discuss its assessment of the safety performance of Calvert Cliffs Nuclear Power Plant for the period of January 1 through December 31,2009, as documented in our letter dated March 3, 2010 (ADAMS Accession No. ML100620809). The NRC poster boards presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Calvert Cliffs Nuclear Power Plant can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Constellation employees and members of the media attended the open-house and were offered the opportunity to question the NRC regarding Constellation's performance and the role of the agency in ensuring safe plant operations.

Sincerely, IRA!

Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects

Attachment:

List of Attendees SUNSI Review Complete: GTD (Reviewer's Initials) ML101031290 DOCUMENT NAME: G:\ORP\BRANCH1\ROP Assessment Process Documents'l2010 ROP EOC\Annual Assessment Ltrs & Mtgs\CCNPP 2010 AAM Summary. doc After declaring this document "An Official Agency Record" it will be released to the Public.

To receive a copy of this document, indicate in the box: "C' = Copy without attachment/enclosure "e" = Copy

=

with attachment/enclosure "N" No copy OFFICE RIIDRP I RI/DRP I 1 NAME JHawkins/JH GDentel/GD DATE 04/13110 04112/10 OFFICIAL RECORD COpy

LIST OF ATTENDEES CALVERT CUFFS NUCLEAR POWER PLANT APRIL 2010 ANNUAL ASSESSMENT OPEN*HOUSE MEETING TUESDAY, APRIL 6, 2010 ORGANIZATION David Fitz CENG Doug Laufer CENG Carey Fleming CENG Ken Robinson CENG George Gellrich CENG Justin Hawkins NRC Silas Kennedy NRC Glenn Dentel NRC Diane Screnci NRC Tony Baratta Jeff Newman The Calvert Recorder Marty Madden Calvert Independent Michael Griffen MOE Marlone Davis NRC Mike Canova . NRC/NRO Lisa Decker CENG