Letter Sequence Supplement |
---|
|
|
MONTHYEARML1001506442010-01-14014 January 2010 Supplement to License Amendment Request (LAR) for Approval of the Northern States Power Company - Minnesota (NSPM) Cyber Security Plan Project stage: Supplement ML1011708792010-05-21021 May 2010 Letter Request the Licensee to Revise the Applications for Cyber Security Amendment Project stage: Other ML1011605352010-05-21021 May 2010 Request for Dominion to Revise the Application Re. Cyber Security Amendment Project stage: Other ML1013802062010-06-0303 June 2010 License Amendment Request for Approval of the Cyber Security Plan Project stage: Other ML1020201642010-07-20020 July 2010 License Amendment Request for Approval of the Northern States Power Company - Minnesota Cyber Security Plan Project stage: Request ML1021405702010-08-0909 August 2010 Acknowledge Withdrawal of 11/23/09 Application for Proposed Cyber Security Amendment Project stage: Withdrawal 2010-06-03
[Table View] |
|
---|
Category:Letter
MONTHYEARML24298A0552024-10-30030 October 2024 Response to Alternative RR-10, Auxiliary Feedwater Valve Testing ML24283A1192024-10-28028 October 2024 Letter to Shawn Hafen, Re Monticello Subsequent License Renewal Schedule Change IR 05000282/20244032024-10-25025 October 2024 – Security Baseline Inspection Report 05000282/2024403 and 05000306/2024403 05000282/LER-2024-001-01, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-10-22022 October 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies L-PI-24-044, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-10-21021 October 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program L-MT-24-038, Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI2024-10-15015 October 2024 Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI ML24277A0202024-10-0303 October 2024 Operator Licensing Examination Approval Monticello Nuclear Generating Plant, October 2024 ML24277A1012024-10-0303 October 2024 Closure of Interim Report of a Potential Deviation or Failure to Comply Associated with Bentley Systems Incorporated Autopipe Software IR 05000263/20240112024-10-0101 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000263/2024011 ML24199A1752024-10-0101 October 2024 Issuance of Amendment No. 212 Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 ML24221A3622024-09-27027 September 2024 Issuance of Amendment Nos. 245 and 233 Revise Technical Specification 3.8.1, AC Sources-Operating, Surveillance Requirement 3.8.1.2, Note 3 L-MT-24-025, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2024-09-26026 September 2024 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML24241A1682024-09-23023 September 2024 Transmittal Letter Amendment No. 13 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation 05000282/LER-2024-001, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-09-16016 September 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies IR 05000282/20243012024-09-13013 September 2024 NRC Initial License Examination Report 05000282/2024301 and 05000306/2024301 L-MT-24-029, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI2024-09-13013 September 2024 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI IR 05000263/20240052024-08-30030 August 2024 Updated Inspection Plan and Follow-Up Letter for Monticello Nuclear Generating Plant, Unit 1 (Report 05000263/2024005) L-MT-24-028, Response to RCI for RR-017 ISI Impracticality2024-08-28028 August 2024 Response to RCI for RR-017 ISI Impracticality IR 05000282/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2024005 and 05000306/2024005) ML24222A1822024-08-27027 August 2024 – Proposed Alternative Request VR-09 to the Inservice Testing Requirements of the ASME OM Code for Main Steam Safety Relief Valves 05000263/LER-2024-002, Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure2024-08-27027 August 2024 Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure L-PI-24-040, Post-Submittal Package Letter2024-08-23023 August 2024 Post-Submittal Package Letter IR 05000263/20244202024-08-21021 August 2024 Security Baseline Inspection Report 05000263/2024420 - Cover Letter IR 05000263/20240022024-08-14014 August 2024 Integrated Inspection Report 05000263/2024002 ML24218A2282024-08-0505 August 2024 Request for Confirmation of Information for Relief Request RR-017, Inservice Inspection Impracticality During the Fifth Ten-Year Interval IR 05000282/20245012024-08-0505 August 2024 Emergency Preparedness Inspection Report 05000282/2024501 and 05000306/2024501 ML24213A1592024-07-31031 July 2024 Operator Licensing Examination Approval - Prairie Island Nuclear Generating Plant IR 05000282/20240022024-07-30030 July 2024 Integrated Inspection Report 05000282/2024002 and 05000306/2024002 ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24215A2992024-07-23023 July 2024 Minnesota State Historic Preservation Office Comments on Monticello SLR Draft EIS ML24198A2372024-07-18018 July 2024 Information Request to Support Upcoming Biennial Problem Identification and Resolution (Pi&R) Inspection at Monticello Nuclear Generating Plant ML24197A2012024-07-15015 July 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2024004 L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations2024-07-0909 July 2024 – Preparation and Scheduling of Operator Licensing Examinations IR 05000282/20240102024-06-28028 June 2024 Comprehensive Engineering Team Inspection Report 05000282/2024010 and 05000306/2024010 L-PI-24-036, – Preparation and Scheduling of Operator Licensing Examinations2024-06-28028 June 2024 – Preparation and Scheduling of Operator Licensing Examinations L-MT-24-019, Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii)2024-06-10010 June 2024 Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii) ML24164A2402024-06-10010 June 2024 Minnesota State Historic Preservation Office- Comments on Draft Monticello SLR Draft EIS ML24158A5912024-06-0606 June 2024 CFR 50.46 LOCA Annual Report L-PI-24-031, Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-06-0505 June 2024 Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) L-MT-24-017, Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-01602024-06-0404 June 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-0160 ML24137A2792024-06-0303 June 2024 Audit Summary for License Amendment Request to Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 L-PI-24-014, License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption2024-06-0303 June 2024 License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption 05000306/LER-2024-001-01, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-05-31031 May 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump ML24155A1922024-05-31031 May 2024 Refueling Outage Unit 2 R33 Owners Activity Report for Class 1, 2, 3 and Mc Inservice Inspections ML24262A1992024-05-29029 May 2024 L-PI-24-018 PINGP 75 Day Letter ML24149A3712024-05-29029 May 2024 (Ping) - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-PI-24-030, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.12024-05-22022 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.1 ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information ML24141A1782024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML24141A0452024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection 2024-09-27
[Table view] |
Text
414 Nicollet Mall - MP4 Minneapolis, MN 55401 January 14,2010 L-XE-10-001 10 CFR 50.90 U.S. Nuclear Regulatory Commission AlTN: Document Control Desk Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant, Monticello Nuclear Generating Plant Units 1 and 2 Docket 50-263 Dockets 50-282 and 50-306 Renewed License No. DPR-22 License Nos. DPR-42 and DPR-60 Supplement to License Amendment Request (LAR) for Approval of the Northern States Power Companv - Minnesota (NSPM) Cyber Security Plan
References:
I. Letter from Northern States Power Company, a Minnesota corporation (NSPM) to the Nuclear Regulatory Commission (NRC), "Request for Approval of the Northern States Power Company - Minnesota (NSPM) Cyber Security Plan," dated November 23,2009.
In Reference 1, NSPM, doing business as Xcel Energy, submitted an LAR for the Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2, and Monticello Nuclear Generating Plant (MNGP) requesting NRC approval of the NSPM Cyber Security Plan, proposed Implementation Schedule, and addition of a sentence to the existing PINGP and MNGP Facility Operating Licenses (FOL) Physical Protection license conditions to require NSPM to fully implement and maintain in effect all provisions of the Commission approved Cyber Security Plan. The proposed amendments generally conformed to the model application prepared by the Nuclear Energy Institute (NEI). Subsequently NEI has issued a revised model for the determination of no significant hazards consideration (NSHC) which is the basis for to this letter. The NSHC provided in Enclosure Ito this letter replaces Section 4.2 in Enclosure 1 of Reference I.NSPM submits this supplement in accordance with the provisions of 10 CFR 50.90.
In accordance with 10 CFR 50.91, NSPM is notifying the State of Minnesota of this LAR supplement by transmitting a copy of this letter to the designated State Official.
If you have questions regarding this submittal, please contact Mr. Dale Vincent, P.E., at 651-388-1121.
Document Control Desk Page 2 Summarv of Commitments This letter contains no new commitments and no revisions to existing commitments.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on January 14,2010.
Gabor Salamon Director, Nuclear Licensing and Emergency Preparedness Northern States Power Company - Minnesota Enclosures (1) cc: Administrator, Region Ill, USNRC Project Manager, PINGP, USNRC Resident Inspector, PINGP, USNRC Project Manager, MNGP, USNRC Resident Inspector, MNGP, USNRC State of Minnesota
ENCLOSURE I 4.2 Significant Hazards Consideration This license amendment request proposes changes to the Prairie Island Nuclear Generating Plant (PINGP), Uniis 1 and 2, and Monticello Nuclear Generating Plant (MNGP) Facility Operating Licenses (FOLs) required by 10 CFR 73.54 (the Rule) and includes three parts. The first part is the submittal of the Cyber Security Plan (Plan) for NRC review and approval. The Plan conforms to the template provided in NEI 08-09, Revision 3, (with some deviations) and provides a description of how the requirements of the Rule will be implemented at PINGP and MNGP. The Plan establishes the licensing basis for the Northern States Power Company, a Minnesota corporation (NSPM), Cyber Security Program for PINGP and MNGP. The Plan establishes how to achieve high assurance that nuclear power plant digital computer and communication systems and networks associated with the following are adequately protected against cyber attacks up to and including the design basis threat:
Safety-related and important-to-safety functions, Security functions, Emergency preparedness functions including offsite communications, and Support systems and equipment which if compromised, would adversely impact safety, security, or emergency preparedness functions.
The second part of the proposed changes is a proposed Implementation Schedule. The third part adds a sentence to the existing PINGP and MNGP FOL license conditions for Physical Protection. Both of these changes are administrative.
Northern States Power Company, a Minnesota corporation (NSPM), has evaluated the proposed amendments using the criteria in 10 CFR 50.92 and has determined that the proposed amendments do not involve a significant hazards consideration. An analysis of the issue of no significant hazards consideration is presented below:
I. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No Page 1 of 3 Supplement The proposed amendments incorporate new requirements in the Facility Operating Licenses (FOLs) to implement and maintain a Cyber Security Plan (Plan) as part of the facilities' overall program for physical protection.
Inclusion of the Plan in the FOLs itself does not involve any modifications to the safety-related structures, systems or components (SSCs). Rather, the Plan describes how the requirements of 10 CFR 73.54 are to be implemented to identify, evaluate, and mitigate cyber attacks up to and including the design basis cyber attack threat, thereby achieving high assurance that the facilities' digital computer and communications systems and networks are protected from cyber attacks. The Plan and any plant modifications will not alter previously evaluated Updated Safety Analysis Report (USAR) design basis accident analysis assumptions, add any accident initiators, or affect the function of the plant safety-related SSCs as to how they are operated, maintained, modified, tested, or inspected. Therefore, the proposed amendments do not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No The proposed amendments provide assurance that safety-related SSCs are protected from cyber attacks. Implementation of 10 CFR 73.54 and the inclusion of a Plan in the FOLs do not result in the need of any new or different USAR design basis accident analysis. It does not introduce new equipment that could create a new or different kind of accident, and no new equipment failure modes are created. As a result, no new accident scenarios, failure mechanisms, or limiting single failures are introduced as a result of these proposed amendments. Therefore, the proposed amendments do not create a possibility for an accident of a new or different type than those previously evaluated.
- 3. Does the proposed amendment involve a significant reduction in a margin of safety?
Response: No The margin of safety is associated with the confidence in the ability of the fission product barriers (i.e., fuel cladding, reactor coolant pressure boundary, and containment structure) to limit the level of radiation to the public. The proposed amendments would not alter the way any safety-related SSC functions and would not alter the way the plants are Page 2 of 3 Supplement operated, These amendments provide assurance that safety-related SSCs are protected from cyber attacks. The proposed amendments would not introduce any new uncertainties or change any existing uncertainties associated with any safety limit. The proposed amendments would have no impact on the structural integrity of the fuel cladding, reactor coolant pressure boundary, or containment structure. Based on the above considerations, the proposed amendments would not degrade the confidence in the ability of the fission product barriers to limit the level of radiation to the public. Therefore, the proposed amendments do not involve a significant reduction in a margin of safety.
Based on the above considerations, Northern States Power Company, a Minnesota corporation (NSPM), concludes that the proposed amendments present no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and accordingly, a finding of no significant hazards consideration is justified.