ML092960624

From kanterella
Jump to navigation Jump to search
2009 Initial License Examination Post Examination
ML092960624
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 10/23/2009
From: Shahkarami A
Exelon Corp, Exelon Generation Co, Exelon Nuclear
To:
Document Control Desk, Region 3 Administrator
References
BW090113, NUREG-1021 R9 S1
Download: ML092960624 (1)


Text

October 23, 2009 NUREG 1021, Revision 9 BW090113 Supplement 1 U. S. Nuclear Regulatory Commission Regional Administrator, Region III 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 SUbject: 2009 Initial License Examination Post Examination The Braidwood Station 2009 Operator Initial Licensing Examination was administered on October 19, 2009. In accordance with NUREG-1021 , "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, Section ES-402, "Administering Initial Written Examinations," the facility licensee should submit formal comments within five working days after the examination is administered. The purpose of this letter is to notify the NRC that Braidwood Station does not challenge the test results and has no post examination comments.

Should you have any questions concerning this letter, please contact Mr. David Gullott, Regulatory Assurance Manager, at (815) 417-2810. For questions concerning administration of the examination, please contact Brian Kempen at (815) 458-7860.

Respectfully, Amir Shahkarami Site Vice President Braidwood Station cc: Chief, NRC Operator Licensing Branch NRC Senior Resident Inspector -- Braidwood Station