u.s. Nuclear Regulatory Commission Site-Specific RO Written Examination Applicant Information Name:

Date: 07/22/2009 Facility/Unit: Browns Ferry Region: 10 11001110 IVO Reactor Type: WD CE D BW[JGEr&]

Start Time: Finish Time:

Instructions Use the answer sheets provided to document your answers. Staple this cover sheet on top of the answer sheets. To pass the examination, you must achieve a final grade of at least 80.00 percent. Examilation papers vAH be coIected 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after the examilation begins.

Applicant Certification All work done on this examination is my own. I have neither given nor received aid.

Applicanfs Signature Results Examination Value Points Applicant's Score Points Applicant's Grade Percent

HLT 0801 Written Exam

1. Unit 1 is recovering from a trip of Recirc Pump 1A and while executing the actions of 1-AOI-68-1A, Recirc Pump Trip/Core Flow Decrease OPRMs Operable, the Unit Operator (UO) has just reported that the RECIRC PUMP 1A DISCHARGE VALVE, 1-FCV-68-3, has been manually opened.

The Balance of Plant (BOP) Operator then reports that Recirc Pump 1B has tripped and the Unit has entered Region I of the Power to Flow Map.

Which ONE of the following completes the statement?

For these conditions, the required action in accordance with 1-AOI-68-1A is to ________.

A. insert a manual Reactor Scram.

B. commence a normal Reactor shutdown / cooldown.

C. close the Discharge Valve on the outlet of Recirc Pump 1B.

D. insert Control Rods on the Shove Sheet to exit Region I of the Power to Flow Map.

HLT 0801 Written Exam

2. A LOCA occurs on Unit 1 concurrent with a Loss of Offsite Power on ALL three Units.

A lockout occurs on Unit 1 / 2 Diesel Generator C due to a protective relay actuation.

Which ONE of the following identifies how the loss of power will affect the Unit 1 Low Pressure ECCS systems as reactor pressure lowers below their shutoff head?

There will be injection from__(1)__ of Core Spray AND from __(2)__ of RHR.

A. (1) BOTH loops (2) ONLY one loop B. (1) ONLY one loop (2) ONLY one loop C. (1) BOTH loops (2) BOTH loops D. (1) ONLY one loop (2) BOTH loops

HLT 0801 Written Exam

3. Unit 2 is operating at 100% Reactor Power when the following alarm occurs:

BAT BD 2 BKR TRIPOUT/FUSE BLOWN OR GROUND, (2-9-8C, Window 7)

It has been determined that a ground of (-) 80 volts exists AND the Unit Supervisor has directed that the ground be located and isolated per 0-GOI-300-2, Electrical.

Which ONE of the following is the reason why each breaker cycled during the ground isolation process must be left open for a specified period of time?

A. This allows time for the ground indicator to indicate if the ground has cleared.

B. This allows time to prevent an inadvertent overcurrent trip on the breaker that was cycled.

C. Cycling an individual load breaker quickly could result in a trip of the battery charger due to large swings in current.

D. Cycling an individual load breaker quickly could cause an initiation of the equipment being supplied.

HLT 0801 Written Exam

4. Which ONE of the following completes the statement?

The ACTUAL trip setpoint for the RPS Turbine Control Valve Fast Closure Trip - Low Oil Pressure on Unit 3 is set at __(1)__; AND this ensures that the __(2)__ Safety Limit is NOT exceeded.

A. (1) 550 psig; (2) Reactor Core - MCPR B. (1) 550 psig; (2) Reactor Coolant System Pressure C. (1) 850 psig; (2) Reactor Core - MCPR D. (1) 850 psig; (2) Reactor Coolant System Pressure

HLT 0801 Written Exam

5. The following plant conditions exist:

Reactor Feed Pump (RFP) 1A in AUTO RFP 1B in AUTO RFP 1C warming at 600 rpm Unit 1 Scrams from 50% Reactor Power AND Reactor Water Level lowers to (-) 10 inches.

Based on the above conditions, which ONE of the following is the correct Feed Water Level Control response for RFPs 1A AND 1B?

A. RFPs 1A AND 1B transfer to MANUAL AND runback to 600 rpm.

B. RFPs 1A AND 1B remain in AUTO to control level, max speed 5600 rpm.

C. RFP 1A remains in AUTO to control level, max speed 4100 rpm.

RFP 1B transfers to MANUAL AND runs back to 600 rpm.

D. RFP 1A transfers to MANUAL AND runs back to 600 rpm.

RFP 1B remains in AUTO to control level, max speed 4100 rpm.

HLT 0801 Written Exam

6. Toxic gas has entered the Unit 2 Control Room, requiring it to be abandoned.

Which ONE of the following completes the statement?

Upon entry into 2-AOI-100-2, Control Room Abandonment, the event is classified as a/an

__(1)__ AND the Unit __(2)__ Unit Operator would be responsible for performing EPIP Appendix B, Unit Operator Notifications.

__(1)__ __(2)__

A. Alert 1 B. Alert 3 C. Site Area Emergency 1 D. Site Area Emergency 3

HLT 0801 Written Exam

7. Unit 1 is operating at 100% Reactor Power, when RBCCW Pump 1A trips resulting in the following:

RBCCW Pump discharge header pressure is 48 psig RBCCW PUMP DISCH HDR PRESS LOW, (1-9-4C, Window 12), in alarm Which ONE of the following system loads is still being cooled by RBCCW?

A. Drywell Coolers.

B. Fuel Pool Cooling heat exchangers.

C. RWCU non-regenerative heat exchangers.

D. RWCU Pump seal water and bearing oil coolers.

HLT 0801 Written Exam

8. Which ONE of the following completes the statement?

Following a complete loss of pneumatic supply to the ADS Safety Relief Valves, the accumulators are sized to ensure at least __(1)__ valve actuations OR the valve(s) can be maintained open for at least __(2)__.

A. (1) 5 (2) 30 minutes B. (1) 6 (2) 30 minutes C. (1) 5 (2) 45 minutes D. (1) 6 (2) 45 minutes

HLT 0801 Written Exam

9. 1/2/3-AOI-100-2, Control Room Abandonment, has been entered on ALL Units.

The following conditions exist:

Unit 1 Reactor Pressure is 40 psig, Shutdown Cooling (SDC) NOT yet established Unit 2 Reactor Pressure is 45 psig, Shutdown Cooling (SDC) NOT yet established Unit 3 has established SDC on Loop I, operating the RHR Pump 3A Which ONE of the following describes the PREFERRED SDC alignment, in accordance with 2-AOI-100-2, that Unit 2 would use AND why?

A. Loop I, by aligning AND starting RHR Pump 2A; provides minimum flow protection for the operating RHRSW pumps.

B. Loop I, by aligning AND starting RHR Pump 2C; to prevent flow adjustments on Unit 2 from affecting Unit 3 cooldown rate.

C. Loop II, by aligning AND starting RHR Pump 2B; to prevent flow adjustments on Unit 2 from affecting Unit 3 cooldown rate.

D. Loop II, by aligning AND starting RHR Pump 2D; provides minimum flow protection for the operating RHRSW pumps.

HLT 0801 Written Exam

10. On Unit 3, a Refueling Accident has occurred resulting in the following conditions:

ALL Refuel Zone Radiation Monitor Channels are reading 65 mr/hr Control Room Ventilation Rad Monitors 90-259A/B are reading 100 cpm ALL Reactor Zone Radiation Monitor Channels are reading 75 mr/hr Based on these conditions, which ONE of the following identifies the status of plant systems?

A. NO Standby Gas Treatment Systems are in service; NO CREV is in service.

B. ALL Standby Gas Treatment Systems are in service; NO CREV is in service.

C. NO Standby Gas Treatment Systems are in service; ONLY the selected CREV is in service.

D. ALL Standby Gas Treatment Systems are in service; ONLY the selected CREV is in service.

HLT 0801 Written Exam

11. Which ONE of the following completes the statement?

In accordance with EOI-2, Primary Containment Control, PC/P Leg, Drywell Spray is required to be initiated when __(1)__ exceeds 12 psig AND is required to be secured when Suppression Pool Level __(2)__.

A. (1) Drywell Pressure (2) lowers below 11.5 feet.

B. (1) Suppression Chamber Pressure (2) lowers below 11.5 feet.

C. (1) Drywell Pressure (2) rises above 18 feet.

D. (1) Suppression Chamber Pressure (2) rises above 18 feet.

HLT 0801 Written Exam

12. Unit 1 was operating at 100% Reactor Power, when a spurious scram occurred with the resulting plant conditions:

Hydraulic ATWS occurred and Reactor Power is currently 32%

Lowest Reactor Water Level was (-) 15 inches AND is currently (+) 30 inches and stable Turbine Bypass Valves failed to operate 13 SRVs initially lifted as designed AND 5 SRVs are currently open Which ONE of the following identifies the current status of the Recirc Pumps?

A. tripped.

B. in service at 480 rpm.

C. in service at 1130 rpm.

D. in service with speed unchanged from prior to the transient.

HLT 0801 Written Exam

13. Which ONE of the following completes the statement?

1/2/3-OI-71, Reactor Core Isolation Cooling, P&L states that Suppression Pool Temperature should NOT exceed __(1)__ without Suppression Pool Cooling in service...

The reason for this precaution and the related P&L for the Unit Supervisor to evaluate the necessity for placing Suppression Pool Cooling in service prior to initiating any event which adds heat to the Suppression Pool is __(2)__.

A. (1) 90 ºF (2) because Tech Specs requires the Mode Switch to be placed in Shutdown IMMEDIATELY upon exceeding 105 ºF in the Suppression Pool.

B. (1) 95 ºF (2) because Tech Specs requires the Mode Switch to be placed in Shutdown IMMEDIATELY upon exceeding 105 ºF in the Suppression Pool.

C. (1) 90 ºF (2) due to the potential for developing thermal stagnation, hot spots, in the Suppression Pool during testing.

D. (1) 95 ºF (2) due to the potential for developing thermal stagnation, hot spots, in the Suppression Pool during testing.

HLT 0801 Written Exam

14. A Reactor coolant leak in the Drywell has occurred on Unit 2 resulting in the following conditions:

Drywell Pressure is 15 psig and rising slowly Drywell Temperature is 305° F and steady Emergency Depressurization has been performed and Reactor Pressure is 22 psig ALL Secondary Containment temperatures are less than 100 °F Normal Range Level indicates (+) 29 inches Emergency Range Level indicates (+) 53 inches Shutdown Floodup Range Level indicates (+) 25 inches Post Accident Range Level indicates offscale high Based upon the above conditions, which ONE of the following identifies the instrument(s) that are allowed to be used to determine or trend Reactor Water Level in accordance with EOIs?

[REFERENCE PROVIDED]

A. Emergency Range ONLY.

B. Normal AND Emergency Ranges ONLY.

C. Normal, Emergency AND Shutdown Floodup Ranges.

D. NO Reactor Water Level instrumentation may be used.

HLT 0801 Written Exam

15. The following plant conditions are noted on Unit 2, following a small break LOCA:

Reactor Water Level is (-) 46 inches and rising slowly Reactor Pressure 620 psig and stable Suppression Chamber Pressure 10 psig and rising slowly Suppression Pool Level 12.70 feet and lowering slowly Suppression Pool Temperature is 150 ºF and stable Main Condenser Vacuum is 6 inches Hg Which ONE of the following identifies the required Operator actions for Reactor Water Level control in accordance with 2-EOI-1, RPV Control, AND 2-EOI-2, Primary Containment Control?

A. Secure RCIC AND transition Reactor Water Level control to HPCI.

B. Secure HPCI AND transition Reactor Water Level control to RCIC.

C. Secure HPCI AND transition Reactor Water Level control to the Reactor Feed Pumps.

RCIC may remain in operation.

D. Secure RCIC AND transition Reactor Water Level control to the Reactor Feed Pumps.

HPCI may remain in operation.

HLT 0801 Written Exam

16. Unit 2 has experienced a LOCA with the following plant conditions:

Drywell Pressure is 3.5 psig and rising Reactor Water Level is (-) 120 inches and lowering Reactor Pressure is 105 psig and lowering 4kV Shutdown Board C is locked out Which ONE of the following predicts the total injection flowrate for the Loop I Core Spray Pumps?

A. 0 gpm.

B. 2400 gpm.

C. 6250 gpm.

D. 9100 gpm.

HLT 0801 Written Exam

17. Unit 2 was operating at 100% Reactor Power when the following sequence of events occurred:

0200 a spurious Group 1 Isolation resulted in an ATWS with Reactor Power at 16%

0205 SLC is initiated 0230 SLC Storage Tank Level is at 67%

0247 all control rods are fully inserted Based on the conditions identified, which ONE of the following identifies the EARLIEST time when a cooldown can be commenced AND also identifies the MAXIMUM allowed cooldown rate in accordance with 2-EOI-1, RPV Control, RC/P leg?

A. 0230; Maintain cooldown rate below 90 ºF/hr B. 0247; Maintain cooldown rate below 90 ºF/hr C. 0230; Maintain cooldown rate below 100 ºF/hr D. 0247; Maintain cooldown rate below 100 ºF/hr

HLT 0801 Written Exam

18. A General Emergency is declared due to a valid Wide Range Gaseous Rad Monitor (WRGERMS) reading. The current meteorological data is:

91 meter wind direction: 120 degrees 46 meter wind direction: 115 degrees Which ONE of the following identifies the correct data point to use for this release AND the wind direction?

A. (1) 91 (2) wind is blowing from the Southeast B. (1) 46 (2) wind is blowing from the Southeast C. (1) 91 (2) wind is blowing from the Northwest D. (1) 46 (2) wind is blowing from the Northwest

HLT 0801 Written Exam

19. A fire has occurred in Unit 3 AND the Assistant Unit Operators (AUOs) assigned to Unit 3 have been notified to report to the Unit 3 Control Room.

Which ONE of the following identifies who is responsible for sounding the site fire alarm bell in accordance with EPIP-17, Fire Emergency Procedure AND the reason why extra AUOs (i.e. those not assigned to Unit 3) are directed to assemble in the Unit 2 Control Room in accordance with 0-AOI-26-1, Fire Response?

A. The Unit 3 Control Room Unit Operator; personnel accountability.

B. The Unit 1 Control Room Unit Operator; personnel accountability.

C. The Unit 3 Control Room Unit Operator; in the event SSI actions are required.

D. The Unit 1 Control Room Unit Operator; in the event SSI actions are required.

HLT 0801 Written Exam

20. Unit 3 is operating at 80% Reactor Power and the crew has entered 0-AOI-57-1E, Grid Instability, due to the 530 kV system voltage being at 513 kV. The crew reaches the following step in the procedure:

RAISE reactive power until voltage returns to 520 kV Which ONE of the following identifies how to raise reactive power AND the 161 kV Capacitor Bank Status that will restore the system voltage in accordance with 0-AOI-57-1E?

A. Depress the EHC load set RAISE pushbutton, 3-HS-47-75C; Check the 161 kV Capacitor Banks are IN service.

B. Depress the EHC load set RAISE pushbutton, 3-HS-47-75C; Check the 161 kV Capacitor Banks are OUT of service C. Place the Generator Field Voltage Auto Adjust (90P), 3-HS-57-26, to the RAISE position; check the 161 kV Capacitor Banks are IN service.

D. Place the Generator Field Voltage Auto Adjust (90P), 3-HS-57-26, to the RAISE position; check the 161 kV Capacitor Banks are OUT of service.

HLT 0801 Written Exam

21. Unit 1 is at 100% Reactor Power when a failure of the Reactor Feed Water Control System results in a Reactor Scram on Reactor Water Low Level.

Which ONE of the following completes the statement?

Immediately following the Scram, the FIRST signal that will cause the RWCU Pumps to trip is

__(1)__; AND the RETURN ISOLATION VALVE, 1-FCV-69-12, will __(2)__.

A. (1) System flow less than 56 gpm; (2) remain OPEN.

B. (1) System flow less than 56 gpm; (2) AUTO-CLOSE.

C. (1) Either ISOLATION VALVE, 1-FCV-69-1 OR 1-FCV-69-2 NOT full open; (2) remain OPEN.

D. (1) Either ISOLATION VALVE, 1-FCV-69-1 OR 1-FCV-69-2 NOT full open; (2) AUTO-CLOSE.

HLT 0801 Written Exam

22. Given the following conditions on Unit 3:

Reactor Water Level is currently (+) 28 inches and stable HPCI has just received a VALID initiation signal Reactor Power is currently 100%

Which ONE of the following identifies the required IMMEDIATE operator action(s)?

A. Verify by two independent means that HPCI is NOT required for level control AND insert an Upper Power Runback to offset the impending power excursion. A manual Scram is NOT required.

B. Depress Reactor Scram pushbuttons AND pause the REACTOR MODE SWITCH in the REFUEL position momentarily on the way to the SHUTDOWN position.

C. Depress Reactor Scram pushbuttons AND pause the REACTOR MODE SWITCH in the START & HOT STBY position for five seconds, on the way to the SHUTDOWN position.

D. Verify first that HPCI System has responded properly to the initiation signal AND then take prompt actions to place the HPCI FLOW CONTROLLER in MANUAL per OPDP-1, Conduct of Operations. A manual Scram is NOT required.

HLT 0801 Written Exam

23. Which ONE of the following completes the statement?

In accordance with EOI Program Manual, the Drywell Spray Initiation Limit Curve is defined to be the highest Drywell temperature at which initiation of Drywell sprays will NOT result in an excessive __(1)__ cooling pressure drop large enough to exceed the capacity of the

__(2)__.

A. (1) convective (2) Drywell-to-Torus Vacuum Breakers.

B. (1) evaporative (2) Reactor Building-to-Torus Vacuum Breakers.

C. (1) convective (2) Reactor Building-to-Torus Vacuum Breakers.

D. (1) evaporative (2) Drywell-to-Torus Vacuum Breakers.

HLT 0801 Written Exam

24. Which ONE of the following completes the statements in accordance with the Radiological Emergency Plan (REP)?

An event in which releases are expected to exceed EPA Protective Action Guideline exposure levels beyond the site boundary is REQUIRED to be classified as a __(1)__.

IF the CECC is NOT operational AND Protective Action Recommendations (PARs) are required, THEN these must be recommended by the __(2)__.

A. (1) Site Area Emergency.

(2) Site Emergency Director.

B. (1) General Emergency.

(2) Site Emergency Director.

C. (1) Site Area Emergency.

(2) Radiation Protection Manager.

D. (1) General Emergency.

(2) Radiation Protection Manager.

HLT 0801 Written Exam

25. Unit 2 is operating at 100% Reactor Power when the running CRD pump trips AND actions to restore a CRD pump have NOT been successful. The following alarm is subsequently received during efforts to restore one CRD Pump:

CONTROL ROD DRIVE UNIT HIGH TEMP, (2-9-5A, Window 17), is in alarm Which ONE of the following identifies the setpoint for this alarm AND the required actions in accordance with 2-ARP-9-5A?

A. 250 °F; declare the affected Control Rod(s) SLOW B. 250 °F; declare the affected Control Rod(s) INOPERABLE C. 350 °F; declare the affected Control Rod(s) SLOW D. 350 °F; declare the affected Control Rod(s) INOPERABLE

HLT 0801 Written Exam

26. During a Unit 2 startup, with power ascension at 20% Reactor Power, a rapid loss of condenser vacuum forces the crew to insert a manual Scram. The following plant conditions exist:

Reactor Water Level initially lowered to 0 inches and is currently being controlled (+) 2 to (+) 51 inches with RCIC AND CRD The MSRVs are being used to control Reactor Pressure AND HPCI was started in pressure control mode Suppression Pool Water Level reaches (+) 7 inches Which ONE of the following predicts the current status of RCIC AND the required operator action in accordance with 2-EOI-1, RPV Control?

RCIC Suction __(1)__ AND the required operator action in accordance with 2-EOI-1, is to

__(2)__.

A. (1) is aligned to the CST (2) continue RCIC operation in the current configuration.

B. (1) is aligned to the CST (2) manually swap RCIC suction path.

C. (1) automatically swaps to the Suppression Pool (2) continue RCIC operation in the current configuration.

D. (1) automatically swaps to the Suppression Pool (2) manually swap RCIC suction path.

HLT 0801 Written Exam

27. Which ONE of the following completes the statement?

Entry into 1-EOI-3, Secondary Containment Control, is required at a MINIMUM RHR System I PUMP Area water level exceeding __(1)__.

Entry into 1-EOI-3 is also required at a MINIMUM RHR System I Pump Area radiation level of

__(2)__.

A. (1) 2 inches (2) 72 mr/hr B. (1) 66 inches (2) 72 mr/hr C. (1) 2 inches (2) ARM Alarm Setpoint D. (1) 66 inches (2) ARM Alarm Setpoint

HLT 0801 Written Exam

28. Given the following plant conditions on Unit 1:

Reactor Water Level is (-) 170 inches Reactor Pressure is 55 psig Vessel injection is 4500 gpm from RHR Based on the above conditions, which ONE of the following completes the statement in accordance with the EOI Program Manual?

Adequate Core Cooling __(1)__ AND Clad temperatures are expected to __(2)__.

A. (1) is met (2) remain <1500 °F.

B. (1) is NOT met (2) remain <1500 °F.

C. (1) is NOT met (2) exceed 1800 °F.

D. (1) is met (2) remain between 1500 °F AND 1800 °F.

HLT 0801 Written Exam

29. Which ONE of the following completes the statement?

The power supply for RHR SYS II INBD INJECTION VLV, 2-FCV-74-67, is from 480 RMOV Board __(1)__.

The power supply for RHR SYS II MINIMUM FLOW VLV, 2-FCV-74-30, is from 480 RMOV Board __(2)__.

A. (1) 2B.

(2) 2B.

B. (1) 2B.

(2) 2E.

C. (1) 2E.

(2) 2B.

D. (1) 2E.

(2) 2E.

HLT 0801 Written Exam

30. Preparations are underway to place Unit 2 in Cold Shutdown following a Scram. When the operator started the 2B RHR Pump for Shutdown Cooling (SDC), Reactor Level lowered to 0 inches.

Which ONE of the following completes both of the following statements for using RHR Loop 1 LPCI to restore vessel level in accordance with 2-AOI-74-1, Loss of Shutdown Cooling?

The RHR SYS 1 SD CLG INBD INJECT ISOL RESET pushbutton, 2-XS-74-126, __(1)__ to be depressed.

Following the start of Loop 1 LPCI pump, then the operator is required to open __(2)__ .

A. (1) is required (2) RHR SYS I OUTBD INJECT VALVE, 2-FCV-74-52.

B. (1) is required (2) RHR SYS I INBD INJECT VALVE, 2-FCV-74-53.

C. (1) is NOT required (2) RHR SYS I OUTBD INJECT VALVE, 2-FCV-74-52.

D. (1) is NOT required (2) RHR SYS I INBD INJECT VALVE, 2-FCV-74-53.

HLT 0801 Written Exam

31. Unit 2 HPCI auto initiated AND injected following a total loss of Feedwater, then subsequently tripped on High Reactor Water Level. The following conditions currently exist:

Reactor Level is (+) 20 inches and lowering slowly Drywell Pressure is 2.0 psig and rising slowly Which ONE of the following completes the statement?

If the Unit Operator depresses the __(1)__pushbutton, then HPCI will__(2)__.

A. (1) HPCI AUTO-INIT RESET, 2-XS-73-59, (2) re-start AND will inject.

B. (1) HPCI AUTO-INIT RESET, 2-XS-73-59, (2) re-start but will NOT inject.

C. (1) HPCI TURBINE TRIP RX LVL HIGH RESET, 2-HS-73-18B, (2) NOT re-start.

D. (1) HPCI TURBINE TRIP RX LVL HIGH RESET, 2-HS-73-18B, (2) re-start AND will inject.

HLT 0801 Written Exam

32. Which ONE of the following completes the statements?

Each Core Spray Loop has a Room Cooler which __(1)__required for Core Spray Operability.

The Room Cooler __(2)__ when the associated Core Spray Loop is manually started.

A. (1) is (2) will NOT automatically start B. (1) is (2) will automatically start C. (1) is NOT (2) will NOT automatically start D. (1) is NOT (2) will automatically start

HLT 0801 Written Exam

33. Unit 1 is executing 1-EOI-1, RPV Control, due to a Scram and an ATWS. The Unit Operator (UO) is directed to inject Standby Liquid Control (SLC) per 1-EOI Appendix 3A, SLC Injection.

The UO places the SLC Pump control switch in the Start-A position.

Given the following plant conditions:

SLC SQUIB VALVE CONTINUITY LOST, (1-9-5B, Window 20) NOT In Alarm SQUIB VALVE A and B CONTINUITY, blue lights on Panel 1-9-5 Illuminated SLC Pump 1A red light Illuminated Which ONE of the following describes the status of SLC AND the required action(s) in accordance with 1-EOI Appendix 3A?

A. ONE squib valve has NOT fired; Place SLC Pump 1A in Stop, start the SLC Pump 1B, AND verify proper operation.

B. NEITHER squib valve has fired; Place SLC Pump 1A in Stop, start the SLC Pump 1B, AND verify proper operation.

C. ONE squib valve has fired; Verify proper system operation by observing the SLC tank level lowering by ~1% per minute.

D. BOTH squib valves have fired; Verify proper system operation by observing the SLC tank level lowering by ~1% per minute.

HLT 0801 Written Exam

34. Unit 2 is at 100% Reactor Power.

IF RPS MG Set A trips, which ONE of the following identifies the expected status?

A. Half of the SSPVs are de-energized; NONE of the Backup Scram Valves are energized.

B. Half of the SSPVs are de-energized; Half of the Backup Scram Valves are energized.

C. ONE Scram Discharge Volume Vent Valve is CLOSED; NONE of the Backup Scram Valves are energized.

D. ALL Scram Discharge Volume Vent & Drain Valves remain OPEN; ONLY ONE of the Backup Scram Valves is energized.

Per phonecon with Bruno Caballero time 0845 (7/22/09), wrote on board the spelled out Acronym for SSPV - Scram Solenoid Pilot Valve. Provided to ALL Candidates.

HLT 0801 Written Exam

35. Unit 3 is starting up in Mode 2. IRM B is indicating 34 on Range 7.

Which ONE of the following would result if IRM B range select switch is placed to Range 6?

A. A Reactor Scram occurs.

B. A Half Reactor Scram occurs.

C. A Control Rod Withdraw Block occurs.

D. NEITHER a Control Rod Block NOR a Scram occurs.

HLT 0801 Written Exam

36. The following plant conditions exist on Unit 2:

Reactor Mode Switch is in STARTUP ALL Intermediate Range Monitors (IRMs) are on Range 3 or 4 Source Range Monitor (SRM) A is retracted AND reading 0.5 cps SRMs B AND C are reading 5.3 x 104 cps SRM D mode switch (S-1) is in the STANDBY position Based on the above indications, which ONE of the following has caused a Rod Block signal to be generated?

A. An SRM High.

B. An SRM NOT Full-In.

C. An SRM Inoperable.

D. An SRM Downscale.

HLT 0801 Written Exam

37. Unit 1 is at 85% Reactor Power AND 75% Core Flow with a centrally located rod selected.

Which ONE of the following identifies the expected alarm(s) if ONE of the 1A Recirc Loop Flow Transmitters, providing input to an APRM, fails to zero output?

A. ONLY APRM UPSCALE, (1-9-5A, Window 11).

B. ONLY APRM FLOW BIAS OFF NORMAL, (1-9-5A, Window 32).

C. APRM UPSCALE, (1-9-5A, Window 11), AND OPRM TRIP ENABLED, (1-9-5A, Window 30).

D. APRM FLOW BIAS OFF NORMAL, (1-9-5A, Window 32), AND OPRM TRIP ENABLED, (1- 9-5A, Window 30).

HLT 0801 Written Exam

38. Unit 2 RCIC is in pressure control in accordance with 2-EOI Appendix 11B, Alternate RPV Pressure Control System RCIC Test Mode."

A leak in the Drywell results in Drywell Pressure of 2.5 psig and rising slowly.

Which ONE of the following identifies the impact of the High Drywell Pressure on the RCIC Pressure Control lineup?

A. NOT affected.

B. RCIC PUMP CST TEST VLV, 2-FCV-71-38, closes.

C. HPCI / RCIC CST TEST VLV, 2-FCV-73-36, closes.

D. RCIC TURB EXH VAC REL SOV, 2-FCV-71-59, closes.

HLT 0801 Written Exam

39. Unit 3 has the following conditions:

Reactor Level is (-) 30 inches and stable with RCIC injecting at 600 gpm Reactor Pressure is 970 psig with MSIVs closed and MSRVs being used to control pressure NO other High Pressure Injection systems are available ALL Low Pressure ECCS are available With a subsequent loss of the Division I ECCS Inverter, which ONE of the following completes the statements?

Upon losing the Inverter, RCIC will __(1)__.

Given these current conditions, __(2)__.

A. (1) continue injecting to the reactor at greater than 600 gpm.

(2) RCIC alone will ensure adequate core cooling.

B. (1) continue injecting with flow controller failed at current output.

(2) RCIC alone will ensure adequate core cooling.

C. (1) continue injecting with flow controller failed at current output.

(2) RCIC alone will NOT ensure adequate core cooling.

D. (1) stop injecting to the reactor as the controller fails downscale.

(2) Emergency Depressurization is required to ensure adequate core cooling.

HLT 0801 Written Exam

40. A Recirculation Loop leak results in Unit 2 Drywell Pressure of 2.5 psig.

Six minutes later, plant conditions are as follows:

Reactor water level is (-) 110 inches and lowering slowly Drywell pressure is 5.1 psig A Unit Operator manually starts Core Spray Pumps 2A AND 2C Which ONE of the following identifies the current status of ADS?

A. ADS 95-second timer is still reset (i.e., has NOT yet started).

B. ADS Valves will open IMMEDIATELY after the Core Spray Pumps starts.

C. ADS Valves are closed but will open 95 seconds after the Core Spray Pumps start.

D. ADS Valves are closed but will open IMMEDIATELY when Reactor Level reaches Level 1.

HLT 0801 Written Exam

41. Unit 1 is operating at 100% Reactor Power when a Loss of Offsite Power results in the following plant conditions:

Reactor Level lowered to (-) 20 inches and is now at (+) 20 inches and stable Drywell pressure rose to 2.7 psig and is now 1.2 psig and steady Reactor Building and Refuel Building Ventilation tripped and was subsequently restarted in accordance with 1-EOI Appendix 8F, Restoring Refueling Zone Ventilation Fans Following Group 6 Isolation, and 1-EOI Appendix 8E, Bypassing RPV Low Level and High Drywell Pressure Isolation Interlocks Which ONE of the following conditions would cause the Reactor Zone Ventilation to re-isolate?

A. Drywell Pressure rises above 2.45 psig.

B. Reactor Water Level lowers to less than (+) 2 inches.

C. Reactor Zone Exhaust Radiation rises above 72 mr/hr.

D. Refuel Floor Zone Exhaust Radiation rises above 72 mr/hr.

HLT 0801 Written Exam

42. Which ONE of the following identifies the required sequence to RESET Unit 1 Traversing Incore Probe (TIP) Isolation Logic?

A. Rotate BOTH PCIS Div I AND Div II RESET to the LEFT and RIGHT on Panel 1-9-4.

THEN, depress TIP ISOLATION RESET pushbutton on Panel 1-9-13.

B. Rotate EITHER PCIS Div I OR Div II RESET to the LEFT and RIGHT on Panel 1-9-4.

THEN, depress TIP ISOLATION RESET pushbutton on Panel 1-9-13.

C. Depress TIP ISOLATION RESET pushbutton on Panel 1-9-13.

THEN, rotate BOTH PCIS Div I AND Div II RESET to the LEFT and RIGHT on Panel 1-9-4.

D. Depress TIP ISOLATION RESET pushbutton on Panel 1-9-13.

THEN, rotate EITHER PCIS Div I OR Div II RESET to the LEFT and RIGHT on Panel 1-9-4.

HLT 0801 Written Exam

43. Unit 1 is operating at 100% Reactor Power when the following annunciator alarms:

MAIN STEAM RELIEF VALVES OPEN, (1-9-3C, Window 24)

Which ONE of the following completes the statements?

The annunciator is DIRECTLY triggered by the __(1)__ .

A MSRV leaking can be verified by observing the __(2)__.

A. (1) tail pipe acoustic monitor.

(2) light indication above the control switch at Panel 1-9-3.

B. (1) tail pipe acoustic monitor.

(2) Temperature Recorder 1-TR-1-1 on Panel 1-9-47.

C. (1) Temperature Recorder 1-TR-1-1 on Panel 1-9-47.

(2) SPDS Display, Main Steam / SRV Status.

D. (1) Temperature Recorder 1-TR-1-1 on Panel 1-9-47.

(2) tail pipe acoustic monitor.

HLT 0801 Written Exam

44. Unit 3 is operating at 100% when the following alarms / indications are observed:

RFPT B ABNORMAL, (3-9-6C, Window 8)

RFPT TRIP, (3-9-6C, Window 29)

RFP DISCH FLOW LOW, (3-9-6C, Window 32)

REACTOR WATER LEVEL ABNORMAL, (3-9-5A, Window 8)

Reactor Water Level is currently (+) 26 inches Which ONE of the following completes the statements?

In accordance with 3-AOI-3-1, Loss of Reactor Feedwater or Reactor Water Level High/Low, the crew is required to __(1)__ .

Unit 3 Reactor Feed Pump speeds are limited to __(2)__ in accordance with 3-OI-3, Reactor Feedwater System.

A. (1) Verify Automatic Runback of Reactor Recirculation Pumps.

(2) 5050 rpm B. (1) Reduce Core Flow to 50% to 60%; then, manually Scram the Reactor.

(2) 5050 rpm C. (1) Verify Automatic Runback of Reactor Recirculation Pumps.

(2) 5850 rpm D. (1) Reduce Core Flow to 50% to 60%; then, manually Scram the Reactor.

(2) 5850 rpm

HLT 0801 Written Exam

45. Which ONE of the following completes the statement?

With Unit 1 RPS in its normal line up, a loss of RPS Motor Generator set 1A will result in

__(1)__ Standby Gas Treatment Trains in operation AND isolation of Reactor Zone Ventilation on __(2)__ .

A. (1) NO (2) Unit 1 ONLY.

B. (1) NO (2) ALL three Units.

C. (1) ALL three (2) Unit 1 ONLY.

D. (1) ALL three (2) ALL three Units.

HLT 0801 Written Exam

46. Unit 3 was operating at 100% Reactor Power when a total Loss of Offsite Power occurs in conjunction with a LOCA.

Which ONE of the following completes the statements?

After the Unit 3 Diesel Generator Output Breakers close, then the first Core Spray Pump will start __(1)__seconds later.

RHRSW Pumps assigned to EECW Automatic will start __(2)__seconds after the Unit 3 Diesel Generator Output Breakers close.

A. (1) 0 (2) 14 B. (1) 7 (2) 14 C. (1) 0 (2) 28 D. (1) 7 (2) 28

HLT 0801 Written Exam

47. Unit 3 is operating in Mode 1, when a loss of 480V RMOV Board 3E occurs.

Which ONE of the following identifies the MINIMUM required actions in accordance with Tech Spec 3.8.7, Distribution Systems-Operating?

A.

REQUIRED ACTION COMPLETION TIME Declare RHR Loop I Inoperable. IMMEDIATELY B.

REQUIRED ACTION COMPLETION TIME Declare RHR Loop II Inoperable. IMMEDIATELY C.

REQUIRED ACTION COMPLETION TIME Declare RHR Loop I Inoperable. 1 HOUR D.

REQUIRED ACTION COMPLETION TIME Declare RHR Loop II Inoperable. 1 HOUR

HLT 0801 Written Exam

48. Which ONE of the following completes the statements?

The Plant Preferred Motor Generator (MG) NORMAL power supply is from __(1)__ .

A complete loss of the AC Plant Preferred power supplies AND a subsequent failure of the Plant Preferred MG would result in the CO2 Master Solenoid 1, (0-FCV-39-11) AND CO2 Master Solenoid 2, (0-FCV-39-4) failing__(2)__.

A. (1) Battery Board 4 (2) CLOSED B. (1) Battery Board 4 (2) OPEN C. (1) 480 V SD Board 2A (2) CLOSED D. (1) 480 V SD Board 2A (2) OPEN

HLT 0801 Written Exam

49. The Unit 1 Unit Preferred Inverter output fails.

Which ONE of the following completes the statements?

If ONLY the Unit Preferred Inverter output failed, the Reactor Feedwater Level Control PDS indication __(1)__ .

When the Unit Preferred Inverter output is restored, the Unit Preferred Static Switch will

__(2)__ to the NORMAL Unit Preferred Inverter power supply.

A. (1) was NOT lost.

(2) automatically return B. (1) was lost.

(2) automatically return C. (1) was NOT lost.

(2) NOT automatically return D. (1) was lost.

(2) NOT automatically return

HLT 0801 Written Exam

50. Unit 2 is operating at 100% Reactor Power when a ground is detected on 250 VDC RMOV Board 2A. Ground Isolation steps indicate the ground is in the normal power supply feeder breaker.

The affected board has been transferred to its alternate power supply.

In accordance with 0-OI-57D, DC Electrical System, which ONE of the following identifies the alternate supply to the RMOV Board; AND when is a DC MOV allowed to be operated while its battery is supplying any RMOV Board alternate supply?

A. Battery Board 1; to comply with Tech Spec LCO Actions.

B. Battery Board 3; to comply with Tech Spec LCO Actions.

C. Battery Board 1; to perform Tech Spec Surveillance Testing.

D. Battery Board 3; to perform Tech Spec Surveillance Testing.

HLT 0801 Written Exam

51. Unit 3 is Operating at 100% Reactor Power, with the following conditions:

Diesel Generator (D/G) 3C is running unloaded to support testing Preparations are being made, at Panel 3-9-23, to parallel AND load the diesel with its Shutdown Board The synchroscope is rotating slow-in-the-clockwise direction Which ONE of the following completes the statement?

To maintain the D/G within limits, the Diesel Generator Mode Selector Switch must be in the

__(1)__ position prior to paralleling. The reason for this is to prevent the D/G from overloading due to Speed Droop being set at __(2)__.

To maintain the D/G within limits, the Diesel Generator Mode Selector Switch must be in the

__(1)__ position prior to paralleling, to ensure the Speed Droop setting is __(2)__.

A. (1) UNITS IN PARALLEL (2) 5%.

B. (1) UNITS IN PARALLEL (2) 0%.

C. (1) PARALLEL WITH SYSTEM (2) 5%.

D. (1) PARALLEL WITH SYSTEM (2) 0%.

HLT 0801 Written Exam

52. ALL three Units are operating at 100% Reactor Power, when an undervoltage condition occurs on 480V Shutdown Board 1B.

(Assume ALL Air Compressors are operating in a normal alignment.)

Which ONE of the following describes the impact of this board loss on the Air System?

A. Control Air Compressors B AND C will trip.

B. Service Air Compressors E AND F will trip.

C. Control Air Compressor G will trip.

D. Control Air Compressor A will trip.

HLT 0801 Written Exam

53. At 10:00 a.m., the Unit 2 RBCCW Temperature Control Valve (TCV), (2-TIC-24-80(85)) was placed in Manual as follows:

REG was selected MAN was selected Before transferring from Manual back to Automatic, in order to NULL the controller, the RBAUO is required to place the __(1)__AND adjust the thumbwheel until the RED pointer lines up with the BLACK pointer.

At 11:00 a.m., the controller was transferred to auto. If the RBAUO observes the following indications after the controller was transferred back to auto, this means that the TCV will modulate to a more __(2)__ .

After Transfer:

M

  • MAN VALVE
  • NULLMATIC /P CONTROLLER
  • SEAL REG *
  • AUTO 40 60 20 80 0 100 MOORE PRODUCTS CO.

VALVE OPENS A. (1) Transfer Switch to SEAL.

(2) open position.

B. (1) Selector Switch to VALVE.

(2) closed position.

C. (1) Transfer Switch to SEAL.

(2) closed position.

D. (1) Selector Switch to VALVE.

(2) open position.

HLT 0801 Written Exam

54. Unit 2 was operating at 100% Reactor Power when a loss of BOTH RPS MG sets occurred.

Which ONE of the following describes the effects on the Control Rod Drive Hydraulic (CRDH)

System during this transient?

FLOW CONTROL VALVE, 1-FCV-85-11A (B), travels __(1)__ due to __(2)__ Water header.

A. (1) OPEN (2) increased flow on the Charging B. (1) OPEN (2) increased flow on the Exhaust C. (1) CLOSED (2) increased flow on the Charging D. (1) CLOSED (2) increased flow on the Exhaust

HLT 0801 Written Exam

55. Unit 1 is operating in Mode 1, with the following conditions:

Traversing Incore Probe (TIP) testing is in progress TIP Channel E is currently located at the Top of Core position Which ONE of the following completes the statement?

IF a Group 8 Isolation signal were to occur, TIP E Ball Valve will automatically close as soon as the TIP retracts to the __(1)__; AND the N2 Purge Valve __(2)__.

A. (1) IN-SHIELD position; (2) remains open.

B. (1) INDEXER position; (2) remains open.

C. (1) IN-SHIELD position; (2) will AUTOMATICALLY close.

D. (1) INDEXER position; (2) will AUTOMATICALLY close.

HLT 0801 Written Exam

56. Which ONE of the following describes the Rod Block Monitoring System?

A. Uses inputs from SELECTED LPRMs to generate a Control Rod block; RBM A AND RBM B BOTH receive flow inputs from ALL 4 APRM channels.

B. Uses inputs from ALL LPRMs to generate a Control Rod block; RBM A AND RBM B BOTH receive flow inputs from ALL 4 APRM channels.

C. Uses inputs from ALL LPRMs to generate a Control Rod block; RBM B receives flow inputs from ONLY APRM 1, 3, 4.

D. Uses inputs from SELECTED LPRMs to generate a Control Rod block; RBM A receives flow inputs from ONLY APRM 1, 3, 4.

HLT 0801 Written Exam

57. Which ONE of the following completes the statement?

The power supply for RHR Pump 1B is from 4 kV Shutdown Board __(1)__ AND its associated RHR SYS II SUPPR POOL CLG/TEST VLV, 1-FCV-74-73, is from 480 RMOV Board __(2)__.

A. (1) B (2) 1E.

B. (1) B (2) 1B.

C. (1) C (2) 1E.

D. (1) C (2) 1B.

HLT 0801 Written Exam

58. Which ONE of the following identifies the MSIV Leakage Control flowpath AND the reason for this flowpath?

A. Main Steam Lines ONLY (NO MSL Drain Piping);

Facilitates the increased allowable leakage limit for each MSIV.

B. Main Steam Lines AND MSL Drain Piping to the Main Condenser; Facilitates the increased allowable leakage limit for each MSIV.

C. Main Steam Lines ONLY (NO MSL Drain Piping);

Ensures that equalization of the MSIVs can be performed prior to re-opening.

D. Main Steam Lines AND MSL Drain Piping to the Main Condenser; Ensures that equalization of the MSIVs can be performed prior to re-opening.

HLT 0801 Written Exam

59. Unit 3 is at 93% Reactor Power.

Which ONE of the following completes the statements?

For this power level, EHC Pressure Set is nominally set to __(1)__ psig.

IF ONE Turbine Control Valve were to fail OPEN, then Reactor Pressure, upon stabilizing, would be __(2)__.

A. (1) 955 (2) lower B. (1) 1036 (2) lower C. (1) 955 (2) the same D. (1) 1036 (2) the same

HLT 0801 Written Exam

60. Unit 3 is operating at 100% Reactor Power. Generator parameters are as follows:

Generator Load is 1153 MWe Generator Reactive Load is (+) 150 MVARs Generator Hydrogen Pressure is 45 psig Which ONE of the following identifies actions that will place the Unit within the safe area of the Estimated Reactive Capability Curve?

[REFERENCE PROVIDED]

A. Lower MWe AND Raise MVARs.

B. Raise Generator Gas pressure AND Raise MVARs.

C. Raise Generator Gas pressure OR Lower MWe.

D. Raise Generator Gas Pressure OR Raise MVARs.

HLT 0801 Written Exam

61. Unit 2 is conducting a shutdown, with the following conditions:

Reactor Power is 50%

Condensate Booster Pump 2A has just been shut down Which ONE of the following completes the statements?

In accordance with 2-OI-2, Condensate System, maintain SJAE/OG CNDR CNDS FLOW, 2-FI-2-42, between __(1)__ mlbm/hr.

As Reactor Power is lowered, flow adjustments will be required from __(2)__.

A. (1) 2 and 3 (2) Panel 2-9-7.

B. (1) 1 and 4 (2) Panel 2-9-7.

C. (1) 1 and 4 (2) Panel 2-9-6.

D. (1) 2 and 3 (2) Panel 2-9-6.

HLT 0801 Written Exam

62. Which ONE of the following completes the statements related to Control Panel indications for the Steam Packing Exhauster (SPE) System?

Prior to starting the FIRST SPE Blower, __(1)__.

Once the SPE Blower is started, IF the STEAM PACKING EXHAUSTER VACUUM LOW, (1-9-7A, Window 12) alarm is received, then __(2)__.

A. (1) BOTH blowers AND the discharge valves have GREEN lights illuminated.

(2) the Standby fan AUTOMATICALLY starts after a 10 second time delay AND the operating fan is then MANUALLY stopped.

B. (1) BOTH blowers AND the discharge valves have GREEN lights illuminated.

(2) the Standby fan AUTOMATICALLY starts after a 10 second time delay AND the operating fan AUTOMATICALLY stops.

C. (1) NEITHER blower has a light illuminated AND the discharge valves have GREEN lights illuminated.

(2) the Standby fan AUTOMATICALLY starts after a 5 second time delay AND the operating fan AUTOMATICALLY stops.

D. (1) NEITHER of the blowers NOR the discharge valves have any lights illuminated.

(2) the Standby fan AUTOMATICALLY starts after a 5 second time delay AND the operating fan is MANUALLY stopped.

HLT 0801 Written Exam

63. ALL units are operating at 100% Reactor Power. Weather predictions indicate that Outside Ambient Air Temperature will reach 20 °F for an overnight low, AND is NOT expected to rise above 32 °F for the next 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.

Which ONE of the following completes the statement?

In accordance with 0-GOI-200-1, Freeze Protection Inspection, for the above weather prediction, the required action is to verify that ______.

A. the Hot Water Generator is in service to heat the Control Bay.

B. EACH unit has its respective Hot Water Generator in service to heat the Diesel Generator Buildings.

C. a MINIMUM of TWO Auxiliary Boilers are in operation to supply hot water to the Diesel Generator Buildings.

D. EACH unit has its respective Turbine Building AND Reactor Building Air Wash Systems in operation.

HLT 0801 Written Exam

64. Given the following plant conditions:

Unit 2 is at 100% power A rupture of the Spent Fuel Pool has resulted in lowering level ALL Reactor AND Refuel Zone radiation monitors trip on high radiation NO Standby Gas Treatment (SGT) train can be started Which ONE of the following completes the statements?

Secondary Containment pressure __(1)__ equalize with atmospheric pressure.

2-EOI-3, Secondary Containment Control __(2)__ restarting of the Reactor Zone and Refuel Zone Ventilation Systems.

A. (1) will (2) does allow B. (1) will (2) does NOT allow C. (1) will NOT (2) does allow D. (1) will NOT (2) does NOT allow

HLT 0801 Written Exam

65. Which ONE of the following completes the statement?

HPCI injects into Feedwater Line __(1)__ AND the purpose of the sparger thermal sleeve is to__(2)__.

A. (1) A (2) prevent excessive thermal stress in the Feedwater nozzles.

B. (1) A (2) assist in avoiding cold water impingement on the vessel wall.

C. (1) B (2) prevent excessive thermal stress in the Feedwater nozzles.

D. (1) B (2) assist in avoiding cold water impingement on the vessel wall.

HLT 0801 Written Exam

66. The following conditions exist on Unit 3:

3-GOI-100-1A, Unit Startup, is in progress Single notch withdrawal of Control Rods is required during the approach to criticality Following a notch withdrawal of Control Rod 30-31, the Operator observes a Reactor Period of 50 seconds.

Which ONE of the following describes the required action(s) to take based on the above conditions?

A. Shut down the Reactor until a thorough assessment has been performed.

B. Re-insert the last Control Rod pulled to achieve a stable period of greater than 60 seconds.

C. Insert Control Rods until the reactor is Subcritical. ALL Control Rods do NOT have to be inserted.

D. Stop Control Rod withdrawal AND monitor conditions, allowing power to decay to greater than 100 seconds before proceeding. Control Rod insertion is NOT required.

HLT 0801 Written Exam

67. Which ONE of the following completes the statements in accordance with OPDP-1, Conduct of Operations?

Peer Checks __(1)__ required during the performance of AOI Immediate Operator Actions.

Abnormal Annunciator Response is allowed following entry into __(2)__ .

A. (1) are NOT (2) abnormal OR emergency procedures.

B. (1) are NOT (2) ONLY emergency procedures.

C. (1) are (2) abnormal OR emergency procedures.

D. (1) are (2) ONLY emergency procedures.

HLT 0801 Written Exam

68. Which ONE of the following completes the following statements regarding the thawing process for a freeze plug in accordance with SPP-10.2, Appendix E, Special Requirements For Mechanical Clearances?

During the time that the freeze plug is being thawed, the clearance is required to be __(1)__

AND the vents/drains are required to be verified __(2)__.

A. (1) Released but tags still on boundary valves (2) OPEN B. (1) Released but tags still on boundary valves (2) CLOSED C. (1) Actively Issued (held) all tags in place (2) OPEN D. (1) Actively Issued (held) all tags in place (2) CLOSED

HLT 0801 Written Exam

69. Given the following conditions on Unit 2:

Reactor Power is 75%

TOTAL RCS Leakage is 5.1 gpm Unidentified Leakage is 2.6 gpm Unidentified Leakage has increased 2.1 gpm within the previous 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period Which ONE of the following describes RCS Leakage in accordance with Tech Spec 3.4.4, Operational Leakage?

A. ALL RCS Leakage is within TS limits.

B. TOTAL RCS Leakage EXCEEDS the TS limit.

C. The INCREASE in Unidentified Leakage within the previous 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period is within TS limits; however, TOTAL Unidentified Leakage EXCEEDS the TS limit.

D. TOTAL Unidentified Leakage is within TS limits; however, the INCREASE in Unidentified Leakage within the previous 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period EXCEEDS the TS limit.

HLT 0801 Written Exam

70. Which ONE of the following processes will eventually (long term) result in LOWER Main Steam Line radiation levels during power operations?

A. Injecting Zinc.

B. Injecting Oxygen.

C. Application of Noble Metals.

D. Hydrogen Water Chemistry operation.

HLT 0801 Written Exam

71. The following 4 volunteers have agreed to receive an Emergency Exposure to save a life.

The female is NOT pregnant AND is capable of reproduction.

Previous Individual Lifetime Exposure Emergency Exposure Age Gender 1 38 Rem 2 Rem 39 F 2 21 Rem 0 Rem 25 M 3 35 Rem 5 Rem 28 M 4 40 Rem 0 Rem 38 M In accordance with EPIP-15, Emergency Exposures, which ONE of the above individuals should be selected FIRST?

A. Individual 1.

B. Individual 2.

C. Individual 3.

D. Individual 4.

HLT 0801 Written Exam

72. Three operators are in the Unit 1 RHR Loop II Pump Room performing the Quarterly Pump Surveillance. The operator monitoring pump suction pressure receives a Dose RATE Alarm ONLY on his Electronic Dosimeter (ED).

Which ONE of the following identifies the required actions in accordance with RCI-9.1, Radiation Work Permits, as a result of the Dose Rate Alarm ONLY?

A. ONLY the Individual who received the alarm must leave the area AND he CANNOT return until dose rates are evaluated by RP.

B. ONLY the Individual who received the alarm must leave the area AND he must meet with the RP Manager prior to returning to the RCA.

C. ALL work activities are stopped; ALL personnel must leave the area AND CANNOT return until dose rates are evaluated by RP.

D. ALL work activities are stopped; ALL personnel must leave the area AND the individual who received the alarm must meet with the RP Manager prior to returning to the RCA.

HLT 0801 Written Exam

73. EOI-1, RPV Control, includes the following override step RC/L-3.

IF Primary Containment Water Level CANNOT be maintained below ____, THEN STOP injection to the RPV from sources external to the PC not required for adequate core cooling.

In accordance with the EOI Program Manual, which ONE of the following choices completes the override AND identifies the basis for this override?

A. 70 feet; prevent covering the MSRV solenoids.

B. 70 feet; prevent covering the primary containment vent.

C. 105 feet; prevent covering the MSRV solenoids.

D. 105 feet; prevent covering the primary containment vent.

HLT 0801 Written Exam

74. In accordance with 0-AOI-26-1, Fire Response, which ONE of the following identifies whether the Standby Gas Treatment System (SBGTS) can be used for smoke removal AND, if so, any consequences?

A. CANNOT be used.

B. CAN be used / SBGTS Remains OPERABLE.

C. CAN be used / SBGTS is INOPERABLE due to clogging of HEPA Filters.

D. CAN be used / SBGTS is INOPERABLE due to hydrocarbon loading on the charcoal beds.

HLT 0801 Written Exam

75. An ATWS has occurred on Unit 2 with the following plant conditions:

Reactor Water Level is currently being controlled (+) 2 to (+) 51 inches with CRD Suppression Pool Temperature 92º F and stable ALL APRM downscale lights are illuminated 19 Control Rods failed to insert ALL SRVs are closed Which ONE of the following completes the statement?

In accordance with EOI-1, RPV Control, Reactor Recirc Pumps __(1)__ required to be tripped AND the SLC Pumps __(2)__required to be started.

A. (1) are (2) are B. (1) are NOT (2) are C. (1) are (2) are NOT D. (1) are NOT (2) are NOT

HLT 0801 Written Exam

1. Unit 1 is recovering from a trip of Recirc Pump 1A and while executing the actions of 1-AOI-68-1A, Recirc Pump Trip/Core Flow Decrease OPRMs Operable, the Unit Operator (UO) has just reported that the RECIRC PUMP 1A DISCHARGE VALVE, 1-FCV-68-3, has been manually opened.

The Balance of Plant (BOP) Operator then reports that Recirc Pump 1B has tripped and the Unit has entered Region I of the Power to Flow Map.

Which ONE of the following completes the statement?

For these conditions, the required action in accordance with 1-AOI-68-1A is to ________.

A. insert a manual Reactor Scram.

B. commence a normal Reactor shutdown / cooldown.

C. close the Discharge Valve on the outlet of Recirc Pump 1B.

D. insert Control Rods on the Shove Sheet to exit Region I of the Power to Flow Map.

Correct Answer: A

HLT 0801 Written Exam

2. A LOCA occurs on Unit 1 concurrent with a Loss of Offsite Power on ALL three Units.

A lockout occurs on Unit 1 / 2 Diesel Generator C due to a protective relay actuation.

Which ONE of the following identifies how the loss of power will affect the Unit 1 Low Pressure ECCS systems as reactor pressure lowers below their shutoff head?

There will be injection from__(1)__ of Core Spray AND from __(2)__ of RHR.

A. (1) BOTH loops (2) ONLY one loop B. (1) ONLY one loop (2) ONLY one loop C. (1) BOTH loops (2) BOTH loops D. (1) ONLY one loop (2) BOTH loops Correct Answer: B

HLT 0801 Written Exam

3. Unit 2 is operating at 100% Reactor Power when the following alarm occurs:

BAT BD 2 BKR TRIPOUT/FUSE BLOWN OR GROUND, (2-9-8C, Window 7)

It has been determined that a ground of (-) 80 volts exists AND the Unit Supervisor has directed that the ground be located and isolated per 0-GOI-300-2, Electrical.

Which ONE of the following is the reason why each breaker cycled during the ground isolation process must be left open for a specified period of time?

A. This allows time for the ground indicator to indicate if the ground has cleared.

B. This allows time to prevent an inadvertent overcurrent trip on the breaker that was cycled.

C. Cycling an individual load breaker quickly could result in a trip of the battery charger due to large swings in current.

D. Cycling an individual load breaker quickly could cause an initiation of the equipment being supplied.

Correct Answer: A

HLT 0801 Written Exam

4. Which ONE of the following completes the statement?

The ACTUAL trip setpoint for the RPS Turbine Control Valve Fast Closure Trip - Low Oil Pressure on Unit 3 is set at __(1)__; AND this ensures that the __(2)__ Safety Limit is NOT exceeded.

A. (1) 550 psig; (2) Reactor Core - MCPR B. (1) 550 psig; (2) Reactor Coolant System Pressure C. (1) 850 psig; (2) Reactor Core - MCPR D. (1) 850 psig; (2) Reactor Coolant System Pressure Correct Answer: C

HLT 0801 Written Exam

5. The following plant conditions exist:

Reactor Feed Pump (RFP) 1A in AUTO RFP 1B in AUTO RFP 1C warming at 600 rpm Unit 1 Scrams from 50% Reactor Power AND Reactor Water Level lowers to (-) 10 inches.

Based on the above conditions, which ONE of the following is the correct Feed Water Level Control response for RFPs 1A AND 1B?

A. RFPs 1A AND 1B transfer to MANUAL AND runback to 600 rpm.

B. RFPs 1A AND 1B remain in AUTO to control level, max speed 5600 rpm.

C. RFP 1A remains in AUTO to control level, max speed 4100 rpm.

RFP 1B transfers to MANUAL AND runs back to 600 rpm.

D. RFP 1A transfers to MANUAL AND runs back to 600 rpm.

RFP 1B remains in AUTO to control level, max speed 4100 rpm.

Correct Answer: D

HLT 0801 Written Exam

6. Toxic gas has entered the Unit 2 Control Room, requiring it to be abandoned.

Which ONE of the following completes the statement?

Upon entry into 2-AOI-100-2, Control Room Abandonment, the event is classified as a/an

__(1)__ AND the Unit __(2)__ Unit Operator would be responsible for performing EPIP Appendix B, Unit Operator Notifications.

__(1)__ __(2)__

A. Alert 1 B. Alert 3 C. Site Area Emergency 1 D. Site Area Emergency 3 Correct Answer: B

HLT 0801 Written Exam

7. Unit 1 is operating at 100% Reactor Power, when RBCCW Pump 1A trips resulting in the following:

RBCCW Pump discharge header pressure is 48 psig RBCCW PUMP DISCH HDR PRESS LOW, (1-9-4C, Window 12), in alarm Which ONE of the following system loads is still being cooled by RBCCW?

A. Drywell Coolers.

B. Fuel Pool Cooling heat exchangers.

C. RWCU non-regenerative heat exchangers.

D. RWCU Pump seal water and bearing oil coolers.

Correct Answer: A

HLT 0801 Written Exam

8. Which ONE of the following completes the statement?

Following a complete loss of pneumatic supply to the ADS Safety Relief Valves, the accumulators are sized to ensure at least __(1)__ valve actuations OR the valve(s) can be maintained open for at least __(2)__.

A. (1) 5 (2) 30 minutes B. (1) 6 (2) 30 minutes C. (1) 5 (2) 45 minutes D. (1) 6 (2) 45 minutes Correct Answer: A

HLT 0801 Written Exam

9. 1/2/3-AOI-100-2, Control Room Abandonment, has been entered on ALL Units.

The following conditions exist:

Unit 1 Reactor Pressure is 40 psig, Shutdown Cooling (SDC) NOT yet established Unit 2 Reactor Pressure is 45 psig, Shutdown Cooling (SDC) NOT yet established Unit 3 has established SDC on Loop I, operating the RHR Pump 3A Which ONE of the following describes the PREFERRED SDC alignment, in accordance with 2-AOI-100-2, that Unit 2 would use AND why?

A. Loop I, by aligning AND starting RHR Pump 2A; provides minimum flow protection for the operating RHRSW pumps.

B. Loop I, by aligning AND starting RHR Pump 2C; to prevent flow adjustments on Unit 2 from affecting Unit 3 cooldown rate.

C. Loop II, by aligning AND starting RHR Pump 2B; to prevent flow adjustments on Unit 2 from affecting Unit 3 cooldown rate.

D. Loop II, by aligning AND starting RHR Pump 2D; provides minimum flow protection for the operating RHRSW pumps.

Correct Answer: B

HLT 0801 Written Exam

10. On Unit 3, a Refueling Accident has occurred resulting in the following conditions:

ALL Refuel Zone Radiation Monitor Channels are reading 65 mr/hr Control Room Ventilation Rad Monitors 90-259A/B are reading 100 cpm ALL Reactor Zone Radiation Monitor Channels are reading 75 mr/hr Based on these conditions, which ONE of the following identifies the status of plant systems?

A. NO Standby Gas Treatment Systems are in service; NO CREV is in service.

B. ALL Standby Gas Treatment Systems are in service; NO CREV is in service.

C. NO Standby Gas Treatment Systems are in service; ONLY the selected CREV is in service.

D. ALL Standby Gas Treatment Systems are in service; ONLY the selected CREV is in service.

Correct Answer: D

HLT 0801 Written Exam

11. Which ONE of the following completes the statement?

In accordance with EOI-2, Primary Containment Control, PC/P Leg, Drywell Spray is required to be initiated when __(1)__ exceeds 12 psig AND is required to be secured when Suppression Pool Level __(2)__.

A. (1) Drywell Pressure (2) lowers below 11.5 feet.

B. (1) Suppression Chamber Pressure (2) lowers below 11.5 feet.

C. (1) Drywell Pressure (2) rises above 18 feet.

D. (1) Suppression Chamber Pressure (2) rises above 18 feet.

Correct Answer: D

HLT 0801 Written Exam

12. Unit 1 was operating at 100% Reactor Power, when a spurious scram occurred with the resulting plant conditions:

Hydraulic ATWS occurred and Reactor Power is currently 32%

Lowest Reactor Water Level was (-) 15 inches AND is currently (+) 30 inches and stable Turbine Bypass Valves failed to operate 13 SRVs initially lifted as designed AND 5 SRVs are currently open Which ONE of the following identifies the current status of the Recirc Pumps?

A. tripped.

B. in service at 480 rpm.

C. in service at 1130 rpm.

D. in service with speed unchanged from prior to the transient.

Correct Answer: A

HLT 0801 Written Exam

13. Which ONE of the following completes the statement?

1/2/3-OI-71, Reactor Core Isolation Cooling, P&L states that Suppression Pool Temperature should NOT exceed __(1)__ without Suppression Pool Cooling in service...

The reason for this precaution and the related P&L for the Unit Supervisor to evaluate the necessity for placing Suppression Pool Cooling in service prior to initiating any event which adds heat to the Suppression Pool is __(2)__.

A. (1) 90 ºF (2) because Tech Specs requires the Mode Switch to be placed in Shutdown IMMEDIATELY upon exceeding 105 ºF in the Suppression Pool.

B. (1) 95 ºF (2) because Tech Specs requires the Mode Switch to be placed in Shutdown IMMEDIATELY upon exceeding 105 ºF in the Suppression Pool.

C. (1) 90 ºF (2) due to the potential for developing thermal stagnation, hot spots, in the Suppression Pool during testing.

D. (1) 95 ºF (2) due to the potential for developing thermal stagnation, hot spots, in the Suppression Pool during testing.

Correct Answer: D

HLT 0801 Written Exam

14. A Reactor coolant leak in the Drywell has occurred on Unit 2 resulting in the following conditions:

Drywell Pressure is 15 psig and rising slowly Drywell Temperature is 305° F and steady Emergency Depressurization has been performed and Reactor Pressure is 22 psig ALL Secondary Containment temperatures are less than 100 °F Normal Range Level indicates (+) 29 inches Emergency Range Level indicates (+) 53 inches Shutdown Floodup Range Level indicates (+) 25 inches Post Accident Range Level indicates offscale high Based upon the above conditions, which ONE of the following identifies the instrument(s) that are allowed to be used to determine or trend Reactor Water Level in accordance with EOIs?

[REFERENCE PROVIDED]

A. Emergency Range ONLY.

B. Normal AND Emergency Ranges ONLY.

C. Normal, Emergency AND Shutdown Floodup Ranges.

D. NO Reactor Water Level instrumentation may be used.

Correct Answer: B

HLT 0801 Written Exam

15. The following plant conditions are noted on Unit 2, following a small break LOCA:

Reactor Water Level is (-) 46 inches and rising slowly Reactor Pressure 620 psig and stable Suppression Chamber Pressure 10 psig and rising slowly Suppression Pool Level 12.70 feet and lowering slowly Suppression Pool Temperature is 150 ºF and stable Main Condenser Vacuum is 6 inches Hg Which ONE of the following identifies the required Operator actions for Reactor Water Level control in accordance with 2-EOI-1, RPV Control, AND 2-EOI-2, Primary Containment Control?

A. Secure RCIC AND transition Reactor Water Level control to HPCI.

B. Secure HPCI AND transition Reactor Water Level control to RCIC.

C. Secure HPCI AND transition Reactor Water Level control to the Reactor Feed Pumps.

RCIC may remain in operation.

D. Secure RCIC AND transition Reactor Water Level control to the Reactor Feed Pumps.

HPCI may remain in operation.

Correct Answer: B

HLT 0801 Written Exam

16. Unit 2 has experienced a LOCA with the following plant conditions:

Drywell Pressure is 3.5 psig and rising Reactor Water Level is (-) 120 inches and lowering Reactor Pressure is 105 psig and lowering 4kV Shutdown Board C is locked out Which ONE of the following predicts the total injection flowrate for the Loop I Core Spray Pumps?

A. 0 gpm.

B. 2400 gpm.

C. 6250 gpm.

D. 9100 gpm.

Correct Answer: C

HLT 0801 Written Exam

17. Unit 2 was operating at 100% Reactor Power when the following sequence of events occurred:

0200 a spurious Group 1 Isolation resulted in an ATWS with Reactor Power at 16%

0205 SLC is initiated 0230 SLC Storage Tank Level is at 67%

0247 all control rods are fully inserted Based on the conditions identified, which ONE of the following identifies the EARLIEST time when a cooldown can be commenced AND also identifies the MAXIMUM allowed cooldown rate in accordance with 2-EOI-1, RPV Control, RC/P leg?

A. 0230; Maintain cooldown rate below 90 ºF/hr B. 0247; Maintain cooldown rate below 90 ºF/hr C. 0230; Maintain cooldown rate below 100 ºF/hr D. 0247; Maintain cooldown rate below 100 ºF/hr Correct Answer: D

HLT 0801 Written Exam

18. A General Emergency is declared due to a valid Wide Range Gaseous Rad Monitor (WRGERMS) reading. The current meteorological data is:

91 meter wind direction: 120 degrees 46 meter wind direction: 115 degrees Which ONE of the following identifies the correct data point to use for this release AND the wind direction?

A. (1) 91 (2) wind is blowing from the Southeast B. (1) 46 (2) wind is blowing from the Southeast C. (1) 91 (2) wind is blowing from the Northwest D. (1) 46 (2) wind is blowing from the Northwest Correct Answer: A

HLT 0801 Written Exam

19. A fire has occurred in Unit 3 AND the Assistant Unit Operators (AUOs) assigned to Unit 3 have been notified to report to the Unit 3 Control Room.

Which ONE of the following identifies who is responsible for sounding the site fire alarm bell in accordance with EPIP-17, Fire Emergency Procedure AND the reason why extra AUOs (i.e. those not assigned to Unit 3) are directed to assemble in the Unit 2 Control Room in accordance with 0-AOI-26-1, Fire Response?

A. The Unit 3 Control Room Unit Operator; personnel accountability.

B. The Unit 1 Control Room Unit Operator; personnel accountability.

C. The Unit 3 Control Room Unit Operator; in the event SSI actions are required.

D. The Unit 1 Control Room Unit Operator; in the event SSI actions are required.

Correct Answer: D

HLT 0801 Written Exam

20. Unit 3 is operating at 80% Reactor Power and the crew has entered 0-AOI-57-1E, Grid Instability, due to the 530 kV system voltage being at 513 kV. The crew reaches the following step in the procedure:

RAISE reactive power until voltage returns to 520 kV Which ONE of the following identifies how to raise reactive power AND the 161 kV Capacitor Bank Status that will restore the system voltage in accordance with 0-AOI-57-1E?

A. Depress the EHC load set RAISE pushbutton, 3-HS-47-75C; Check the 161 kV Capacitor Banks are IN service.

B. Depress the EHC load set RAISE pushbutton, 3-HS-47-75C; Check the 161 kV Capacitor Banks are OUT of service C. Place the Generator Field Voltage Auto Adjust (90P), 3-HS-57-26, to the RAISE position; check the 161 kV Capacitor Banks are IN service.

D. Place the Generator Field Voltage Auto Adjust (90P), 3-HS-57-26, to the RAISE position; check the 161 kV Capacitor Banks are OUT of service.

Correct Answer: C

HLT 0801 Written Exam

21. Unit 1 is at 100% Reactor Power when a failure of the Reactor Feed Water Control System results in a Reactor Scram on Reactor Water Low Level.

Which ONE of the following completes the statement?

Immediately following the Scram, the FIRST signal that will cause the RWCU Pumps to trip is

__(1)__; AND the RETURN ISOLATION VALVE, 1-FCV-69-12, will __(2)__.

A. (1) System flow less than 56 gpm; (2) remain OPEN.

B. (1) System flow less than 56 gpm; (2) AUTO-CLOSE.

C. (1) Either ISOLATION VALVE, 1-FCV-69-1 OR 1-FCV-69-2 NOT full open; (2) remain OPEN.

D. (1) Either ISOLATION VALVE, 1-FCV-69-1 OR 1-FCV-69-2 NOT full open; (2) AUTO-CLOSE.

Correct Answer: D

HLT 0801 Written Exam

22. Given the following conditions on Unit 3:

Reactor Water Level is currently (+) 28 inches and stable HPCI has just received a VALID initiation signal Reactor Power is currently 100%

Which ONE of the following identifies the required IMMEDIATE operator action(s)?

A. Verify by two independent means that HPCI is NOT required for level control AND insert an Upper Power Runback to offset the impending power excursion. A manual Scram is NOT required.

B. Depress Reactor Scram pushbuttons AND pause the REACTOR MODE SWITCH in the REFUEL position momentarily on the way to the SHUTDOWN position.

C. Depress Reactor Scram pushbuttons AND pause the REACTOR MODE SWITCH in the START & HOT STBY position for five seconds, on the way to the SHUTDOWN position.

D. Verify first that HPCI System has responded properly to the initiation signal AND then take prompt actions to place the HPCI FLOW CONTROLLER in MANUAL per OPDP-1, Conduct of Operations. A manual Scram is NOT required.

Correct Answer: B

HLT 0801 Written Exam

23. Which ONE of the following completes the statement?

In accordance with EOI Program Manual, the Drywell Spray Initiation Limit Curve is defined to be the highest Drywell temperature at which initiation of Drywell sprays will NOT result in an excessive __(1)__ cooling pressure drop large enough to exceed the capacity of the

__(2)__.

A. (1) convective (2) Drywell-to-Torus Vacuum Breakers.

B. (1) evaporative (2) Reactor Building-to-Torus Vacuum Breakers.

C. (1) convective (2) Reactor Building-to-Torus Vacuum Breakers.

D. (1) evaporative (2) Drywell-to-Torus Vacuum Breakers.

Correct Answer: D

HLT 0801 Written Exam

24. Which ONE of the following completes the statements in accordance with the Radiological Emergency Plan (REP)?

An event in which releases are expected to exceed EPA Protective Action Guideline exposure levels beyond the site boundary is REQUIRED to be classified as a __(1)__.

IF the CECC is NOT operational AND Protective Action Recommendations (PARs) are required, THEN these must be recommended by the __(2)__.

A. (1) Site Area Emergency.

(2) Site Emergency Director.

B. (1) General Emergency.

(2) Site Emergency Director.

C. (1) Site Area Emergency.

(2) Radiation Protection Manager.

D. (1) General Emergency.

(2) Radiation Protection Manager.

Correct Answer: B

HLT 0801 Written Exam

25. Unit 2 is operating at 100% Reactor Power when the running CRD pump trips AND actions to restore a CRD pump have NOT been successful. The following alarm is subsequently received during efforts to restore one CRD Pump:

CONTROL ROD DRIVE UNIT HIGH TEMP, (2-9-5A, Window 17), is in alarm Which ONE of the following identifies the setpoint for this alarm AND the required actions in accordance with 2-ARP-9-5A?

A. 250 °F; declare the affected Control Rod(s) SLOW B. 250 °F; declare the affected Control Rod(s) INOPERABLE C. 350 °F; declare the affected Control Rod(s) SLOW D. 350 °F; declare the affected Control Rod(s) INOPERABLE Correct Answer: C

HLT 0801 Written Exam

26. During a Unit 2 startup, with power ascension at 20% Reactor Power, a rapid loss of condenser vacuum forces the crew to insert a manual Scram. The following plant conditions exist:

Reactor Water Level initially lowered to 0 inches and is currently being controlled (+) 2 to (+) 51 inches with RCIC AND CRD The MSRVs are being used to control Reactor Pressure AND HPCI was started in pressure control mode Suppression Pool Water Level reaches (+) 7 inches Which ONE of the following predicts the current status of RCIC AND the required operator action in accordance with 2-EOI-1, RPV Control?

RCIC Suction __(1)__ AND the required operator action in accordance with 2-EOI-1, is to

__(2)__.

A. (1) is aligned to the CST (2) continue RCIC operation in the current configuration.

B. (1) is aligned to the CST (2) manually swap RCIC suction path.

C. (1) automatically swaps to the Suppression Pool (2) continue RCIC operation in the current configuration.

D. (1) automatically swaps to the Suppression Pool (2) manually swap RCIC suction path.

Correct Answer: A & B

HLT 0801 Written Exam

27. Which ONE of the following completes the statement?

Entry into 1-EOI-3, Secondary Containment Control, is required at a MINIMUM RHR System I PUMP Area water level exceeding __(1)__.

Entry into 1-EOI-3 is also required at a MINIMUM RHR System I Pump Area radiation level of

__(2)__.

A. (1) 2 inches (2) 72 mr/hr B. (1) 66 inches (2) 72 mr/hr C. (1) 2 inches (2) ARM Alarm Setpoint D. (1) 66 inches (2) ARM Alarm Setpoint Correct Answer: C

HLT 0801 Written Exam

28. Given the following plant conditions on Unit 1:

Reactor Water Level is (-) 170 inches Reactor Pressure is 55 psig Vessel injection is 4500 gpm from RHR Based on the above conditions, which ONE of the following completes the statement in accordance with the EOI Program Manual?

Adequate Core Cooling __(1)__ AND Clad temperatures are expected to __(2)__.

A. (1) is met (2) remain <1500 °F.

B. (1) is NOT met (2) remain <1500 °F.

C. (1) is NOT met (2) exceed 1800 °F.

D. (1) is met (2) remain between 1500 °F AND 1800 °F.

Correct Answer: A

HLT 0801 Written Exam

29. Which ONE of the following completes the statement?

The power supply for RHR SYS II INBD INJECTION VLV, 2-FCV-74-67, is from 480 RMOV Board __(1)__.

The power supply for RHR SYS II MINIMUM FLOW VLV, 2-FCV-74-30, is from 480 RMOV Board __(2)__.

A. (1) 2B.

(2) 2B.

B. (1) 2B.

(2) 2E.

C. (1) 2E.

(2) 2B.

D. (1) 2E.

(2) 2E.

Correct Answer: D

HLT 0801 Written Exam

30. Preparations are underway to place Unit 2 in Cold Shutdown following a Scram. When the operator started the 2B RHR Pump for Shutdown Cooling (SDC), Reactor Level lowered to 0 inches.

Which ONE of the following completes both of the following statements for using RHR Loop 1 LPCI to restore vessel level in accordance with 2-AOI-74-1, Loss of Shutdown Cooling?

The RHR SYS 1 SD CLG INBD INJECT ISOL RESET pushbutton, 2-XS-74-126, __(1)__ to be depressed.

Following the start of Loop 1 LPCI pump, then the operator is required to open __(2)__ .

A. (1) is required (2) RHR SYS I OUTBD INJECT VALVE, 2-FCV-74-52.

B. (1) is required (2) RHR SYS I INBD INJECT VALVE, 2-FCV-74-53.

C. (1) is NOT required (2) RHR SYS I OUTBD INJECT VALVE, 2-FCV-74-52.

D. (1) is NOT required (2) RHR SYS I INBD INJECT VALVE, 2-FCV-74-53.

Correct Answer: B

HLT 0801 Written Exam

31. Unit 2 HPCI auto initiated AND injected following a total loss of Feedwater, then subsequently tripped on High Reactor Water Level. The following conditions currently exist:

Reactor Level is (+) 20 inches and lowering slowly Drywell Pressure is 2.0 psig and rising slowly Which ONE of the following completes the statement?

If the Unit Operator depresses the __(1)__pushbutton, then HPCI will__(2)__.

A. (1) HPCI AUTO-INIT RESET, 2-XS-73-59, (2) re-start AND will inject.

B. (1) HPCI AUTO-INIT RESET, 2-XS-73-59, (2) re-start but will NOT inject.

C. (1) HPCI TURBINE TRIP RX LVL HIGH RESET, 2-HS-73-18B, (2) NOT re-start.

D. (1) HPCI TURBINE TRIP RX LVL HIGH RESET, 2-HS-73-18B, (2) re-start AND will inject.

Correct Answer: D

HLT 0801 Written Exam

32. Which ONE of the following completes the statements?

Each Core Spray Loop has a Room Cooler which __(1)__required for Core Spray Operability.

The Room Cooler __(2)__ when the associated Core Spray Loop is manually started.

A. (1) is (2) will NOT automatically start B. (1) is (2) will automatically start C. (1) is NOT (2) will NOT automatically start D. (1) is NOT (2) will automatically start Correct Answer: B

HLT 0801 Written Exam

33. Unit 1 is executing 1-EOI-1, RPV Control, due to a Scram and an ATWS. The Unit Operator (UO) is directed to inject Standby Liquid Control (SLC) per 1-EOI Appendix 3A, SLC Injection.

The UO places the SLC Pump control switch in the Start-A position.

Given the following plant conditions:

SLC SQUIB VALVE CONTINUITY LOST, (1-9-5B, Window 20) NOT In Alarm SQUIB VALVE A and B CONTINUITY, blue lights on Panel 1-9-5 Illuminated SLC Pump 1A red light Illuminated Which ONE of the following describes the status of SLC AND the required action(s) in accordance with 1-EOI Appendix 3A?

A. ONE squib valve has NOT fired; Place SLC Pump 1A in Stop, start the SLC Pump 1B, AND verify proper operation.

B. NEITHER squib valve has fired; Place SLC Pump 1A in Stop, start the SLC Pump 1B, AND verify proper operation.

C. ONE squib valve has fired; Verify proper system operation by observing the SLC tank level lowering by ~1% per minute.

D. BOTH squib valves have fired; Verify proper system operation by observing the SLC tank level lowering by ~1% per minute.

Correct Answer: B

HLT 0801 Written Exam

34. Unit 2 is at 100% Reactor Power.

IF RPS MG Set A trips, which ONE of the following identifies the expected status?

A. Half of the SSPVs are de-energized; NONE of the Backup Scram Valves are energized.

B. Half of the SSPVs are de-energized; Half of the Backup Scram Valves are energized.

C. ONE Scram Discharge Volume Vent Valve is CLOSED; NONE of the Backup Scram Valves are energized.

D. ALL Scram Discharge Volume Vent & Drain Valves remain OPEN; ONLY ONE of the Backup Scram Valves is energized.

Correct Answer: A Per phonecon with Bruno Caballero time 0845 (7/22/09), wrote on board the spelled out Acronym for SSPV - Scram Solenoid Pilot Valve. Provided to ALL Candidates.

HLT 0801 Written Exam

35. Unit 3 is starting up in Mode 2. IRM B is indicating 34 on Range 7.

Which ONE of the following would result if IRM B range select switch is placed to Range 6?

A. A Reactor Scram occurs.

B. A Half Reactor Scram occurs.

C. A Control Rod Withdraw Block occurs.

D. NEITHER a Control Rod Block NOR a Scram occurs.

Correct Answer: C

HLT 0801 Written Exam

36. The following plant conditions exist on Unit 2:

Reactor Mode Switch is in STARTUP ALL Intermediate Range Monitors (IRMs) are on Range 3 or 4 Source Range Monitor (SRM) A is retracted AND reading 0.5 cps SRMs B AND C are reading 5.3 x 104 cps SRM D mode switch (S-1) is in the STANDBY position Based on the above indications, which ONE of the following has caused a Rod Block signal to be generated?

A. An SRM High.

B. An SRM NOT Full-In.

C. An SRM Inoperable.

D. An SRM Downscale.

Correct Answer: C

HLT 0801 Written Exam

37. Unit 1 is at 85% Reactor Power AND 75% Core Flow with a centrally located rod selected.

Which ONE of the following identifies the expected alarm(s) if ONE of the 1A Recirc Loop Flow Transmitters, providing input to an APRM, fails to zero output?

A. ONLY APRM UPSCALE, (1-9-5A, Window 11).

B. ONLY APRM FLOW BIAS OFF NORMAL, (1-9-5A, Window 32).

C. APRM UPSCALE, (1-9-5A, Window 11), AND OPRM TRIP ENABLED, (1-9-5A, Window 30).

D. APRM FLOW BIAS OFF NORMAL, (1-9-5A, Window 32), AND OPRM TRIP ENABLED, (1- 9-5A, Window 30).

Correct Answer: C

HLT 0801 Written Exam

38. Unit 2 RCIC is in pressure control in accordance with 2-EOI Appendix 11B, Alternate RPV Pressure Control System RCIC Test Mode."

A leak in the Drywell results in Drywell Pressure of 2.5 psig and rising slowly.

Which ONE of the following identifies the impact of the High Drywell Pressure on the RCIC Pressure Control lineup?

A. NOT affected.

B. RCIC PUMP CST TEST VLV, 2-FCV-71-38, closes.

C. HPCI / RCIC CST TEST VLV, 2-FCV-73-36, closes.

D. RCIC TURB EXH VAC REL SOV, 2-FCV-71-59, closes.

Correct Answer: C

HLT 0801 Written Exam

39. Unit 3 has the following conditions:

Reactor Level is (-) 30 inches and stable with RCIC injecting at 600 gpm Reactor Pressure is 970 psig with MSIVs closed and MSRVs being used to control pressure NO other High Pressure Injection systems are available ALL Low Pressure ECCS are available With a subsequent loss of the Division I ECCS Inverter, which ONE of the following completes the statements?

Upon losing the Inverter, RCIC will __(1)__.

Given these current conditions, __(2)__.

A. (1) continue injecting to the reactor at greater than 600 gpm.

(2) RCIC alone will ensure adequate core cooling.

B. (1) continue injecting with flow controller failed at current output.

(2) RCIC alone will ensure adequate core cooling.

C. (1) continue injecting with flow controller failed at current output.

(2) RCIC alone will NOT ensure adequate core cooling.

D. (1) stop injecting to the reactor as the controller fails downscale.

(2) Emergency Depressurization is required to ensure adequate core cooling.

Correct Answer: A

HLT 0801 Written Exam

40. A Recirculation Loop leak results in Unit 2 Drywell Pressure of 2.5 psig.

Six minutes later, plant conditions are as follows:

Reactor water level is (-) 110 inches and lowering slowly Drywell pressure is 5.1 psig A Unit Operator manually starts Core Spray Pumps 2A AND 2C Which ONE of the following identifies the current status of ADS?

A. ADS 95-second timer is still reset (i.e., has NOT yet started).

B. ADS Valves will open IMMEDIATELY after the Core Spray Pumps starts.

C. ADS Valves are closed but will open 95 seconds after the Core Spray Pumps start.

D. ADS Valves are closed but will open IMMEDIATELY when Reactor Level reaches Level 1.

Correct Answer: A

HLT 0801 Written Exam

41. Unit 1 is operating at 100% Reactor Power when a Loss of Offsite Power results in the following plant conditions:

Reactor Level lowered to (-) 20 inches and is now at (+) 20 inches and stable Drywell pressure rose to 2.7 psig and is now 1.2 psig and steady Reactor Building and Refuel Building Ventilation tripped and was subsequently restarted in accordance with 1-EOI Appendix 8F, Restoring Refueling Zone Ventilation Fans Following Group 6 Isolation, and 1-EOI Appendix 8E, Bypassing RPV Low Level and High Drywell Pressure Isolation Interlocks Which ONE of the following conditions would cause the Reactor Zone Ventilation to re-isolate?

A. Drywell Pressure rises above 2.45 psig.

B. Reactor Water Level lowers to less than (+) 2 inches.

C. Reactor Zone Exhaust Radiation rises above 72 mr/hr.

D. Refuel Floor Zone Exhaust Radiation rises above 72 mr/hr.

Correct Answer: C

HLT 0801 Written Exam

42. Which ONE of the following identifies the required sequence to RESET Unit 1 Traversing Incore Probe (TIP) Isolation Logic?

A. Rotate BOTH PCIS Div I AND Div II RESET to the LEFT and RIGHT on Panel 1-9-4.

THEN, depress TIP ISOLATION RESET pushbutton on Panel 1-9-13.

B. Rotate EITHER PCIS Div I OR Div II RESET to the LEFT and RIGHT on Panel 1-9-4.

THEN, depress TIP ISOLATION RESET pushbutton on Panel 1-9-13.

C. Depress TIP ISOLATION RESET pushbutton on Panel 1-9-13.

THEN, rotate BOTH PCIS Div I AND Div II RESET to the LEFT and RIGHT on Panel 1-9-4.

D. Depress TIP ISOLATION RESET pushbutton on Panel 1-9-13.

THEN, rotate EITHER PCIS Div I OR Div II RESET to the LEFT and RIGHT on Panel 1-9-4.

Correct Answer: A

HLT 0801 Written Exam

43. Unit 1 is operating at 100% Reactor Power when the following annunciator alarms:

MAIN STEAM RELIEF VALVES OPEN, (1-9-3C, Window 24)

Which ONE of the following completes the statements?

The annunciator is DIRECTLY triggered by the __(1)__ .

A MSRV leaking can be verified by observing the __(2)__.

A. (1) tail pipe acoustic monitor.

(2) light indication above the control switch at Panel 1-9-3.

B. (1) tail pipe acoustic monitor.

(2) Temperature Recorder 1-TR-1-1 on Panel 1-9-47.

C. (1) Temperature Recorder 1-TR-1-1 on Panel 1-9-47.

(2) SPDS Display, Main Steam / SRV Status.

D. (1) Temperature Recorder 1-TR-1-1 on Panel 1-9-47.

(2) tail pipe acoustic monitor.

Correct Answer: B

HLT 0801 Written Exam

44. Unit 3 is operating at 100% when the following alarms / indications are observed:

RFPT B ABNORMAL, (3-9-6C, Window 8)

RFPT TRIP, (3-9-6C, Window 29)

RFP DISCH FLOW LOW, (3-9-6C, Window 32)

REACTOR WATER LEVEL ABNORMAL, (3-9-5A, Window 8)

Reactor Water Level is currently (+) 26 inches Which ONE of the following completes the statements?

In accordance with 3-AOI-3-1, Loss of Reactor Feedwater or Reactor Water Level High/Low, the crew is required to __(1)__ .

Unit 3 Reactor Feed Pump speeds are limited to __(2)__ in accordance with 3-OI-3, Reactor Feedwater System.

A. (1) Verify Automatic Runback of Reactor Recirculation Pumps.

(2) 5050 rpm B. (1) Reduce Core Flow to 50% to 60%; then, manually Scram the Reactor.

(2) 5050 rpm C. (1) Verify Automatic Runback of Reactor Recirculation Pumps.

(2) 5850 rpm D. (1) Reduce Core Flow to 50% to 60%; then, manually Scram the Reactor.

(2) 5850 rpm Correct Answer: A

HLT 0801 Written Exam

45. Which ONE of the following completes the statement?

With Unit 1 RPS in its normal line up, a loss of RPS Motor Generator set 1A will result in

__(1)__ Standby Gas Treatment Trains in operation AND isolation of Reactor Zone Ventilation on __(2)__ .

A. (1) NO (2) Unit 1 ONLY.

B. (1) NO (2) ALL three Units.

C. (1) ALL three (2) Unit 1 ONLY.

D. (1) ALL three (2) ALL three Units.

Correct Answer: C

HLT 0801 Written Exam

46. Unit 3 was operating at 100% Reactor Power when a total Loss of Offsite Power occurs in conjunction with a LOCA.

Which ONE of the following completes the statements?

After the Unit 3 Diesel Generator Output Breakers close, then the first Core Spray Pump will start __(1)__seconds later.

RHRSW Pumps assigned to EECW Automatic will start __(2)__seconds after the Unit 3 Diesel Generator Output Breakers close.

A. (1) 0 (2) 14 B. (1) 7 (2) 14 C. (1) 0 (2) 28 D. (1) 7 (2) 28 Correct Answer: B

HLT 0801 Written Exam

47. Unit 3 is operating in Mode 1, when a loss of 480V RMOV Board 3E occurs.

Which ONE of the following identifies the MINIMUM required actions in accordance with Tech Spec 3.8.7, Distribution Systems-Operating?

A.

REQUIRED ACTION COMPLETION TIME Declare RHR Loop I Inoperable. IMMEDIATELY B.

REQUIRED ACTION COMPLETION TIME Declare RHR Loop II Inoperable. IMMEDIATELY C.

REQUIRED ACTION COMPLETION TIME Declare RHR Loop I Inoperable. 1 HOUR D.

REQUIRED ACTION COMPLETION TIME Declare RHR Loop II Inoperable. 1 HOUR Correct Answer: B

HLT 0801 Written Exam

48. Which ONE of the following completes the statements?

The Plant Preferred Motor Generator (MG) NORMAL power supply is from __(1)__ .

A complete loss of the AC Plant Preferred power supplies AND a subsequent failure of the Plant Preferred MG would result in the CO2 Master Solenoid 1, (0-FCV-39-11) AND CO2 Master Solenoid 2, (0-FCV-39-4) failing__(2)__.

A. (1) Battery Board 4 (2) CLOSED B. (1) Battery Board 4 (2) OPEN C. (1) 480 V SD Board 2A (2) CLOSED D. (1) 480 V SD Board 2A (2) OPEN Correct Answer: B

HLT 0801 Written Exam

49. The Unit 1 Unit Preferred Inverter output fails.

Which ONE of the following completes the statements?

If ONLY the Unit Preferred Inverter output failed, the Reactor Feedwater Level Control PDS indication __(1)__ .

When the Unit Preferred Inverter output is restored, the Unit Preferred Static Switch will

__(2)__ to the NORMAL Unit Preferred Inverter power supply.

A. (1) was NOT lost.

(2) automatically return B. (1) was lost.

(2) automatically return C. (1) was NOT lost.

(2) NOT automatically return D. (1) was lost.

(2) NOT automatically return Correct Answer: C

HLT 0801 Written Exam

50. Unit 2 is operating at 100% Reactor Power when a ground is detected on 250 VDC RMOV Board 2A. Ground Isolation steps indicate the ground is in the normal power supply feeder breaker.

The affected board has been transferred to its alternate power supply.

In accordance with 0-OI-57D, DC Electrical System, which ONE of the following identifies the alternate supply to the RMOV Board; AND when is a DC MOV allowed to be operated while its battery is supplying any RMOV Board alternate supply?

A. Battery Board 1; to comply with Tech Spec LCO Actions.

B. Battery Board 3; to comply with Tech Spec LCO Actions.

C. Battery Board 1; to perform Tech Spec Surveillance Testing.

D. Battery Board 3; to perform Tech Spec Surveillance Testing.

Correct Answer: B

HLT 0801 Written Exam

51. Unit 3 is Operating at 100% Reactor Power, with the following conditions:

Diesel Generator (D/G) 3C is running unloaded to support testing Preparations are being made, at Panel 3-9-23, to parallel AND load the diesel with its Shutdown Board The synchroscope is rotating slow-in-the-clockwise direction Which ONE of the following completes the statement?

To maintain the D/G within limits, the Diesel Generator Mode Selector Switch must be in the

__(1)__ position prior to paralleling. The reason for this is to prevent the D/G from overloading due to Speed Droop being set at __(2)__.

To maintain the D/G within limits, the Diesel Generator Mode Selector Switch must be in the

__(1)__ position prior to paralleling, to ensure the Speed Droop setting is __(2)__.

A. (1) UNITS IN PARALLEL (2) 5%.

B. (1) UNITS IN PARALLEL (2) 0%.

C. (1) PARALLEL WITH SYSTEM (2) 5%.

D. (1) PARALLEL WITH SYSTEM (2) 0%.

Correct Answer: C

HLT 0801 Written Exam

52. ALL three Units are operating at 100% Reactor Power, when an undervoltage condition occurs on 480V Shutdown Board 1B.

(Assume ALL Air Compressors are operating in a normal alignment.)

Which ONE of the following describes the impact of this board loss on the Air System?

A. Control Air Compressors B AND C will trip.

B. Service Air Compressors E AND F will trip.

C. Control Air Compressor G will trip.

D. Control Air Compressor A will trip.

Correct Answer: D

HLT 0801 Written Exam

53. At 10:00 a.m., the Unit 2 RBCCW Temperature Control Valve (TCV), (2-TIC-24-80(85)) was placed in Manual as follows:

REG was selected MAN was selected Before transferring from Manual back to Automatic, in order to NULL the controller, the RBAUO is required to place the __(1)__AND adjust the thumbwheel until the RED pointer lines up with the BLACK pointer.

At 11:00 a.m., the controller was transferred to auto. If the RBAUO observes the following indications after the controller was transferred back to auto, this means that the TCV will modulate to a more __(2)__ .

After Transfer:

M

  • MAN VALVE
  • NULLMATIC /P CONTROLLER
  • SEAL REG *
  • AUTO 40 60 20 80 0 100 MOORE PRODUCTS CO.

VALVE OPENS A. (1) Transfer Switch to SEAL.

(2) open position.

B. (1) Selector Switch to VALVE.

(2) closed position.

C. (1) Transfer Switch to SEAL.

(2) closed position.

D. (1) Selector Switch to VALVE.

(2) open position.

HLT 0801 Written Exam

54. Unit 2 was operating at 100% Reactor Power when a loss of BOTH RPS MG sets occurred.

Which ONE of the following describes the effects on the Control Rod Drive Hydraulic (CRDH)

System during this transient?

FLOW CONTROL VALVE, 1-FCV-85-11A (B), travels __(1)__ due to __(2)__ Water header.

A. (1) OPEN (2) increased flow on the Charging B. (1) OPEN (2) increased flow on the Exhaust C. (1) CLOSED (2) increased flow on the Charging D. (1) CLOSED (2) increased flow on the Exhaust Correct Answer: C

HLT 0801 Written Exam

55. Unit 1 is operating in Mode 1, with the following conditions:

Traversing Incore Probe (TIP) testing is in progress TIP Channel E is currently located at the Top of Core position Which ONE of the following completes the statement?

IF a Group 8 Isolation signal were to occur, TIP E Ball Valve will automatically close as soon as the TIP retracts to the __(1)__; AND the N2 Purge Valve __(2)__.

A. (1) IN-SHIELD position; (2) remains open.

B. (1) INDEXER position; (2) remains open.

C. (1) IN-SHIELD position; (2) will AUTOMATICALLY close.

D. (1) INDEXER position; (2) will AUTOMATICALLY close.

Correct Answer: C

HLT 0801 Written Exam

56. Which ONE of the following describes the Rod Block Monitoring System?

A. Uses inputs from SELECTED LPRMs to generate a Control Rod block; RBM A AND RBM B BOTH receive flow inputs from ALL 4 APRM channels.

B. Uses inputs from ALL LPRMs to generate a Control Rod block; RBM A AND RBM B BOTH receive flow inputs from ALL 4 APRM channels.

C. Uses inputs from ALL LPRMs to generate a Control Rod block; RBM B receives flow inputs from ONLY APRM 1, 3, 4.

D. Uses inputs from SELECTED LPRMs to generate a Control Rod block; RBM A receives flow inputs from ONLY APRM 1, 3, 4.

Correct Answer: A

HLT 0801 Written Exam

57. Which ONE of the following completes the statement?

The power supply for RHR Pump 1B is from 4 kV Shutdown Board __(1)__ AND its associated RHR SYS II SUPPR POOL CLG/TEST VLV, 1-FCV-74-73, is from 480 RMOV Board __(2)__.

A. (1) B (2) 1E.

B. (1) B (2) 1B.

C. (1) C (2) 1E.

D. (1) C (2) 1B.

Correct Answer: D

HLT 0801 Written Exam

58. Which ONE of the following identifies the MSIV Leakage Control flowpath AND the reason for this flowpath?

A. Main Steam Lines ONLY (NO MSL Drain Piping);

Facilitates the increased allowable leakage limit for each MSIV.

B. Main Steam Lines AND MSL Drain Piping to the Main Condenser; Facilitates the increased allowable leakage limit for each MSIV.

C. Main Steam Lines ONLY (NO MSL Drain Piping);

Ensures that equalization of the MSIVs can be performed prior to re-opening.

D. Main Steam Lines AND MSL Drain Piping to the Main Condenser; Ensures that equalization of the MSIVs can be performed prior to re-opening.

Correct Answer: B

HLT 0801 Written Exam

59. Unit 3 is at 93% Reactor Power.

Which ONE of the following completes the statements?

For this power level, EHC Pressure Set is nominally set to __(1)__ psig.

IF ONE Turbine Control Valve were to fail OPEN, then Reactor Pressure, upon stabilizing, would be __(2)__.

A. (1) 955 (2) lower B. (1) 1036 (2) lower C. (1) 955 (2) the same D. (1) 1036 (2) the same Correct Answer: C

HLT 0801 Written Exam

60. Unit 3 is operating at 100% Reactor Power. Generator parameters are as follows:

Generator Load is 1153 MWe Generator Reactive Load is (+) 150 MVARs Generator Hydrogen Pressure is 45 psig Which ONE of the following identifies actions that will place the Unit within the safe area of the Estimated Reactive Capability Curve?

[REFERENCE PROVIDED]

A. Lower MWe AND Raise MVARs.

B. Raise Generator Gas pressure AND Raise MVARs.

C. Raise Generator Gas pressure OR Lower MWe.

D. Raise Generator Gas Pressure OR Raise MVARs.

Correct Answer: C

HLT 0801 Written Exam

61. Unit 2 is conducting a shutdown, with the following conditions:

Reactor Power is 50%

Condensate Booster Pump 2A has just been shut down Which ONE of the following completes the statements?

In accordance with 2-OI-2, Condensate System, maintain SJAE/OG CNDR CNDS FLOW, 2-FI-2-42, between __(1)__ mlbm/hr.

As Reactor Power is lowered, flow adjustments will be required from __(2)__.

A. (1) 2 and 3 (2) Panel 2-9-7.

B. (1) 1 and 4 (2) Panel 2-9-7.

C. (1) 1 and 4 (2) Panel 2-9-6.

D. (1) 2 and 3 (2) Panel 2-9-6.

Correct Answer: D

HLT 0801 Written Exam

62. Which ONE of the following completes the statements related to Control Panel indications for the Steam Packing Exhauster (SPE) System?

Prior to starting the FIRST SPE Blower, __(1)__.

Once the SPE Blower is started, IF the STEAM PACKING EXHAUSTER VACUUM LOW, (1-9-7A, Window 12) alarm is received, then __(2)__.

A. (1) BOTH blowers AND the discharge valves have GREEN lights illuminated.

(2) the Standby fan AUTOMATICALLY starts after a 10 second time delay AND the operating fan is then MANUALLY stopped.

B. (1) BOTH blowers AND the discharge valves have GREEN lights illuminated.

(2) the Standby fan AUTOMATICALLY starts after a 10 second time delay AND the operating fan AUTOMATICALLY stops.

C. (1) NEITHER blower has a light illuminated AND the discharge valves have GREEN lights illuminated.

(2) the Standby fan AUTOMATICALLY starts after a 5 second time delay AND the operating fan AUTOMATICALLY stops.

D. (1) NEITHER of the blowers NOR the discharge valves have any lights illuminated.

(2) the Standby fan AUTOMATICALLY starts after a 5 second time delay AND the operating fan is MANUALLY stopped.

Correct Answer: C

HLT 0801 Written Exam

63. ALL units are operating at 100% Reactor Power. Weather predictions indicate that Outside Ambient Air Temperature will reach 20 °F for an overnight low, AND is NOT expected to rise above 32 °F for the next 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.

Which ONE of the following completes the statement?

In accordance with 0-GOI-200-1, Freeze Protection Inspection, for the above weather prediction, the required action is to verify that ______.

A. the Hot Water Generator is in service to heat the Control Bay.

B. EACH unit has its respective Hot Water Generator in service to heat the Diesel Generator Buildings.

C. a MINIMUM of TWO Auxiliary Boilers are in operation to supply hot water to the Diesel Generator Buildings.

D. EACH unit has its respective Turbine Building AND Reactor Building Air Wash Systems in operation.

Correct Answer: A

HLT 0801 Written Exam

64. Given the following plant conditions:

Unit 2 is at 100% power A rupture of the Spent Fuel Pool has resulted in lowering level ALL Reactor AND Refuel Zone radiation monitors trip on high radiation NO Standby Gas Treatment (SGT) train can be started Which ONE of the following completes the statements?

Secondary Containment pressure __(1)__ equalize with atmospheric pressure.

2-EOI-3, Secondary Containment Control __(2)__ restarting of the Reactor Zone and Refuel Zone Ventilation Systems.

A. (1) will (2) does allow B. (1) will (2) does NOT allow C. (1) will NOT (2) does allow D. (1) will NOT (2) does NOT allow Correct Answer: B

HLT 0801 Written Exam

65. Which ONE of the following completes the statement?

HPCI injects into Feedwater Line __(1)__ AND the purpose of the sparger thermal sleeve is to__(2)__.

A. (1) A (2) prevent excessive thermal stress in the Feedwater nozzles.

B. (1) A (2) assist in avoiding cold water impingement on the vessel wall.

C. (1) B (2) prevent excessive thermal stress in the Feedwater nozzles.

D. (1) B (2) assist in avoiding cold water impingement on the vessel wall.

Correct Answer: A

HLT 0801 Written Exam

66. The following conditions exist on Unit 3:

3-GOI-100-1A, Unit Startup, is in progress Single notch withdrawal of Control Rods is required during the approach to criticality Following a notch withdrawal of Control Rod 30-31, the Operator observes a Reactor Period of 50 seconds.

Which ONE of the following describes the required action(s) to take based on the above conditions?

A. Shut down the Reactor until a thorough assessment has been performed.

B. Re-insert the last Control Rod pulled to achieve a stable period of greater than 60 seconds.

C. Insert Control Rods until the reactor is Subcritical. ALL Control Rods do NOT have to be inserted.

D. Stop Control Rod withdrawal AND monitor conditions, allowing power to decay to greater than 100 seconds before proceeding. Control Rod insertion is NOT required.

Correct Answer: B

HLT 0801 Written Exam

67. Which ONE of the following completes the statements in accordance with OPDP-1, Conduct of Operations?

Peer Checks __(1)__ required during the performance of AOI Immediate Operator Actions.

Abnormal Annunciator Response is allowed following entry into __(2)__ .

A. (1) are NOT (2) abnormal OR emergency procedures.

B. (1) are NOT (2) ONLY emergency procedures.

C. (1) are (2) abnormal OR emergency procedures.

D. (1) are (2) ONLY emergency procedures.

Correct Answer: A

HLT 0801 Written Exam

68. Which ONE of the following completes the following statements regarding the thawing process for a freeze plug in accordance with SPP-10.2, Appendix E, Special Requirements For Mechanical Clearances?

During the time that the freeze plug is being thawed, the clearance is required to be __(1)__

AND the vents/drains are required to be verified __(2)__.

A. (1) Released but tags still on boundary valves (2) OPEN B. (1) Released but tags still on boundary valves (2) CLOSED C. (1) Actively Issued (held) all tags in place (2) OPEN D. (1) Actively Issued (held) all tags in place (2) CLOSED Correct Answer: B

HLT 0801 Written Exam

69. Given the following conditions on Unit 2:

Reactor Power is 75%

TOTAL RCS Leakage is 5.1 gpm Unidentified Leakage is 2.6 gpm Unidentified Leakage has increased 2.1 gpm within the previous 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period Which ONE of the following describes RCS Leakage in accordance with Tech Spec 3.4.4, Operational Leakage?

A. ALL RCS Leakage is within TS limits.

B. TOTAL RCS Leakage EXCEEDS the TS limit.

C. The INCREASE in Unidentified Leakage within the previous 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period is within TS limits; however, TOTAL Unidentified Leakage EXCEEDS the TS limit.

D. TOTAL Unidentified Leakage is within TS limits; however, the INCREASE in Unidentified Leakage within the previous 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period EXCEEDS the TS limit.

Correct Answer: D

HLT 0801 Written Exam

70. Which ONE of the following processes will eventually (long term) result in LOWER Main Steam Line radiation levels during power operations?

A. Injecting Zinc.

B. Injecting Oxygen.

C. Application of Noble Metals.

D. Hydrogen Water Chemistry operation.

Correct Answer: C

HLT 0801 Written Exam

71. The following 4 volunteers have agreed to receive an Emergency Exposure to save a life.

The female is NOT pregnant AND is capable of reproduction.

Previous Individual Lifetime Exposure Emergency Exposure Age Gender 1 38 Rem 2 Rem 39 F 2 21 Rem 0 Rem 25 M 3 35 Rem 5 Rem 28 M 4 40 Rem 0 Rem 38 M In accordance with EPIP-15, Emergency Exposures, which ONE of the above individuals should be selected FIRST?

A. Individual 1.

B. Individual 2.

C. Individual 3.

D. Individual 4.

Correct Answer: D

HLT 0801 Written Exam

72. Three operators are in the Unit 1 RHR Loop II Pump Room performing the Quarterly Pump Surveillance. The operator monitoring pump suction pressure receives a Dose RATE Alarm ONLY on his Electronic Dosimeter (ED).

Which ONE of the following identifies the required actions in accordance with RCI-9.1, Radiation Work Permits, as a result of the Dose Rate Alarm ONLY?

A. ONLY the Individual who received the alarm must leave the area AND he CANNOT return until dose rates are evaluated by RP.

B. ONLY the Individual who received the alarm must leave the area AND he must meet with the RP Manager prior to returning to the RCA.

C. ALL work activities are stopped; ALL personnel must leave the area AND CANNOT return until dose rates are evaluated by RP.

D. ALL work activities are stopped; ALL personnel must leave the area AND the individual who received the alarm must meet with the RP Manager prior to returning to the RCA.

Correct Answer: C

HLT 0801 Written Exam

73. EOI-1, RPV Control, includes the following override step RC/L-3.

IF Primary Containment Water Level CANNOT be maintained below ____, THEN STOP injection to the RPV from sources external to the PC not required for adequate core cooling.

In accordance with the EOI Program Manual, which ONE of the following choices completes the override AND identifies the basis for this override?

A. 70 feet; prevent covering the MSRV solenoids.

B. 70 feet; prevent covering the primary containment vent.

C. 105 feet; prevent covering the MSRV solenoids.

D. 105 feet; prevent covering the primary containment vent.

Correct Answer: D

HLT 0801 Written Exam

74. In accordance with 0-AOI-26-1, Fire Response, which ONE of the following identifies whether the Standby Gas Treatment System (SBGTS) can be used for smoke removal AND, if so, any consequences?

A. CANNOT be used.

B. CAN be used / SBGTS Remains OPERABLE.

C. CAN be used / SBGTS is INOPERABLE due to clogging of HEPA Filters.

D. CAN be used / SBGTS is INOPERABLE due to hydrocarbon loading on the charcoal beds.

Correct Answer: D

HLT 0801 Written Exam

75. An ATWS has occurred on Unit 2 with the following plant conditions:

Reactor Water Level is currently being controlled (+) 2 to (+) 51 inches with CRD Suppression Pool Temperature 92º F and stable ALL APRM downscale lights are illuminated 19 Control Rods failed to insert ALL SRVs are closed Which ONE of the following completes the statement?

In accordance with EOI-1, RPV Control, Reactor Recirc Pumps __(1)__ required to be tripped AND the SLC Pumps __(2)__required to be started.

A. (1) are (2) are B. (1) are NOT (2) are C. (1) are (2) are NOT D. (1) are NOT (2) are NOT Correct Answer: D

0801 NRC WRITTEN EXAM REFERENCES PROVIDED 14 2-EOI-1-Cautions, Caution #1 2-EOI Curve 8 - RPV Saturation Temp 2-EOI Table 6 - Secondary Contmt Instrument Runs 60 3-OI-47 Illustration 6 - Estimated Reactivity Capability Curve 76 U1 TS 3.1.3 (NO Bases / SRs) 80 2-EOI-1 Curve 4 - SRV Tail Pipe Lvl Limit 86 U1 TS 3.3.5.1 (NO Bases / SRs)

HPCI Initiation Logic Diagram 87 EPIP-1 Emergency Classification Matrix Section 1, REACTOR, including HCTL curves 88 EPIP-1 Emergency Classification Matrix Section 3, SECONDARY CONTAINMENT, including MAXIMUM SAFE OPERATING AREA TEMPERATURE LIMITS, Table 3.1 89 U2 TS 3.4.3 / 3.5.1 (NO Bases / SRs) 90 U1/U2/U3 TS 3.6.4.3 (NO Bases / SRs) 97 U3 TS 3.1.3 / 3.1.4 (NO Bases / SRs) 3-OI-85 Illustration 3