UNITED STATES
NUC LE AR RE G UL AT O RY C O M M I S S I O N
R E GI ON I V
612 EAST LAMAR BLVD , SU I TE 400
AR LI N GTON , TEXAS 76011-4125
September 17, 2008
Mr. Edward E. Halpin
Chief Nuclear Officer
STP Nuclear Operating Company
South Texas Project
P.O. Box 289
Wadsworth, TX 77483
SUBJECT: SOUTH TEXAS PROJECT NUCLEAR OPERATING COMPANY, UNIT 2-
NOTIFICATION OF INSPECTION (NRC INSPECTION
REPORT 05000499/2008005) AND REQUEST FOR INFORMATION
Dear Mr. Halpin:
From October 14 to 24, 2008, reactor inspectors from the U. S. Nuclear Regulatory
Commissions (NRC) Region IV office will perform the baseline inservice inspection at South
Texas Project Nuclear Operating Company, Unit 2, using NRC Inspection Procedure 71111.08
and Temporary Instruction 2515/172, Reactor Coolant System Dissimilar Metal Butt Welds.
Experience has shown that this inspection is resource intensive both for the NRC inspectors
and your staff. In order to minimize the impact to your onsite resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
These documents have been divided into two groups. The first group (Section A of the
enclosure) identifies information to be provided prior to the inspection to ensure that the
inspectors are adequately prepared. The second group (Section B of the enclosure) identifies
the information the inspectors will need upon arrival at the site. It is important that all of these
documents are up to date and complete in order to minimize the number of additional
documents requested during the preparation and/or the onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Robyn Savage of your licensing
organization. Our inspection dates are subject to change based on your updated schedule of
outage activities. If there are any questions about this inspection or the material requested,
please contact the lead inspector S. Graves at (817) 860-8102 (samuel.graves@nrc.gov ).
STP Nuclear Operating Company -2-
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter
and its enclosure will be available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's
document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Russell L. Bywater, Chief
Engineering Branch 1
Division of Reactor Safety
Docket: 50-499
License: NPF-80
Enclosure:
Inservice Inspection Document Request
cc w/enclosure:
D. W. Rencurrel, Site Vice President
STP Nuclear Operating Company
South Texas Project
P.O. Box 289
Wadsworth, TX 77483
Tim Powell, Vice President, Engineering
STP Nuclear Operating Company
South Texas Project
P.O. Box 289
Wadsworth, TX 77483
S. M. Head, Manager, Licensing
STP Nuclear Operating Company
South Texas Project
P.O. Box 289
Wadsworth, TX 77483
C. T. Bowman, General Manager, Oversight
STP Nuclear Operating Company
South Texas Project
P.O. Box 289
Wadsworth, TX 77483
STP Nuclear Operating Company -3-
Ms. Marilyn Kistler
Senior Staff Specialist, Licensing
STP Nuclear Operating Company
South Texas Project
P.O. Box 289, Mail Code 5014
Wadsworth, TX 77483
C. M. Canady
City of Austin
Electric Utility Department
721 Barton Springs Road
Austin, TX 78704
J. J. Nesrsta/R. K. Temple/
E. Alercon/Kevin Pollo
CPS Energy
P.O. Box 1771
San Antonio, TX 78296
Mr. Jon C. Wood
Cox, Smith, & Matthews
112 East Pecan, Suite 1800
San Antonio, TX 78205
A. H. Gutterman, Esq.
1111 Pennsylvania Avenue, NW
Washington, DC 20004
Director, Division of Compliance & Inspection
Bureau of Radiation Control
Texas Department of State Health Services
1100 West 49th Street
Austin, TX 78756
Mr. Brian Almon
Public Utility Commission of Texas
P.O. Box 13326
Austin, TX 78711-3326
Environmental and Natural Resources
Policy Director
P.O. Box 12428
Austin, TX 78711-3189
STP Nuclear Operating Company -4-
Mr. Nate McDonald
County Judge for Matagorda County
1700 Seventh Street, Room 301
Bay City, TX 77414
Mr. Anthony P. Jones, Chief Boiler Inspector
Texas Department of Licensing and Regulation
Boiler Division
E.O. Thompson State Office Building
P.O. Box 12157
Austin, TX 78711
Ms. Susan M. Jablonski
Office of Permitting, Remediation and Registration
Texas Commission on Environmental Quality
MC-122
P.O. Box 13087
Austin, TX 78711-3087
Mr. Ted Enos
4200 South Hulen, Suite 422
Fort Worth, TX 76109
Kevin Howell/Catherine Callaway/Jim von Suskil
NRG Energy, Inc.
1301 McKinney, Suite 2300
Houston, TX 77010
Records Center
700 Galleria Parkway
Atlanta, GA 30339-3064
Mr. Ken Coates, Plant General Manager
STP Nuclear Operating Company
South Texas Project
P.O. Box 289
Wadsworth, TX 77483
STP Nuclear Operating Company -5-
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov )
DRP Director (Dwight.Chamberlain@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.gov )
DRS Director (Roy.Caniano@nrc.gov )
DRS Deputy Director (Troy.Pruett@nrc.gov)
Senior Resident Inspector (John.Dixon@nrc.gov)
Resident Inspector (Binesh.Tharakan@nrc.gov)
Branch Chief, DRP/A (Claude.Johnson@nrc.gov)
Senior Project Engineer, DRP/A (Thomas.Farnholtz@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov )
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov )
RITS Coordinator (Marisa.Herrera@nrc.gov )
STP Site Secretary (Lynn.Wright@nrc.gov)
SUNSI Review Completed: _RLB__ ADAMS: Yes Initials: __RLB_
Publicly Available Non-Sensitive
S:DRS/REPORTS/STP ISI ltr-STG. ML
EB 1 EB 1 C: EB 1
STGraves JFDrake RLBywater
/RA/ /RA/ /RA/
9/17/08 9/17/08 9/17/08
OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
INSERVICE INSPECTION DOCUMENT REQUEST
Inspection Dates: October 14 - 24, 2008
Inspection Procedures: IP 71111.08 Inservice Inspection (ISI) Activities
TI 2515/172 Reactor Coolant System Dissimilar Metal Butt
Inspectors: S. Graves, Senior Reactor Inspector (Lead Inspector - ISI)
J. Drake, Senior Reactor Inspector
A. Information Requested for the In-Office Preparation Week
The following information (Section A of this enclosure) should be sent to the Region IV office in
hard copy or electronic format (ims.certrec.com preferred), in care of S. Graves, by September
29, 2008, to facilitate the selection of specific items that will be reviewed during the onsite
inspection week. The inspector will select specific items from the information requested below
and then request from your staff additional documents needed during the onsite inspection
week (Section B of this enclosure). We ask that the specific items selected from the lists be
available and ready for review on the first day of inspection. *Please provide requested
documentation electronically if possible. If requested documents are large and only hard copy
formats are available, please inform the inspector(s), and provide subject documentation during
the first day of the onsite inspection. If you have any questions regarding this information
request, please call the lead inspector as soon as possible.
A.1 ISI/Welding Programs and Schedule Information
a) A detailed schedule (including preliminary dates) of:
i) Nondestructive examinations (NDEs) planned for Class 1 & 2 systems
and containment, performed as part of your ASME Section XI, Risk
Informed (if applicable), and augmented ISI programs during the
upcoming outage.
Provide a status summary of the NDE inspection activities vs. the
required inspection period percentages for this interval by category per
ASME Section XI, IWX-2400, (Do not provide separately if other
documentation requested contains this information).
ii) Reactor pressure vessel head (RPVH) examinations planned for the
upcoming refueling outage.
iii) Examinations planned for Alloy 82/182/600 components that are not
included in the Section XI scope (If applicable).
-1- Enclosure
iv) Examinations planned as part of your Boric Acid Corrosion Control
Program (Mode 3 walkdowns, bolted connection walkdowns, etc.).
v) Welding activities that are scheduled to be completed during the
upcoming outage (ASME Class 1, 2, or 3 structures, systems, or
components (SSCs)).
b) A copy of ASME Section XI Code Relief Requests and associated NRC Safety
Evaluations applicable to the examinations identified above.
c) A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrant,
Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code
Class 1 & 2 systems since the beginning of the last refueling outage. This should
include the previousSection XI pressure test(s) conducted during start up and
any evaluations associated with the results of the pressure tests. Also, include in
the list the NDE reports with relevant conditions in the RPVH penetration nozzles
which have been accepted for continued service. The list of NDE reports should
include a brief description of the SSC where the relevant condition was identified.
d) A list with a brief description (e.g., system, material, pipe size, weld number, and
NDE performed) of the welds in Code Class 1 and 2 systems which have been
fabricated due to component repair/replacement activities since the beginning of
the last refueling outage, or are planned to be fabricated in this refueling outage.
e) If reactor vessel weld examinations required by the ASME Code are scheduled to
occur during the upcoming outage, provide a detailed description of the welds to
be examined and the extent of the planned examination. Please also provide
reference numbers for applicable procedures that will be used to conduct these
examinations.
f) Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of
Section XI of the ASME Code that have been identified since the beginning of the
last refueling outage.
g) A list of any temporary non-code repairs in service (e.g., pinhole leaks).
h) Please provide copies of the most recent self assessments for the ISI, Welding,
and Alloy 600 Programs.
A.2 Reactor Pressure Vessel Head (RPVH)
a) Provide the detailed scope of the planned NDE of the reactor vessel head which
identifies the types of NDE methods to be used on each specific part of the
vessel head to fulfill commitments made in response to NRC Bulletin 2002-02
and NRC Order EA-03-009. Also, include examination scope expansion criteria
and planned expansion sample sizes if relevant conditions are identified (if
applicable).
-2- Enclosure
b) A list of the standards and/or requirements that will be used to evaluate indications
identified during NDE of the reactor vessel head (e.g., the specific industry or
procedural standards which will be used to evaluate potential leakage and/or flaw
indications).
A.3 Boric Acid Corrosion Control Program (BACCP)
a) Copy of the procedures that govern the scope, equipment and implementation of
the inspections required to identify boric acid leakage and the procedures for
boric acid leakage/corrosion evaluation.
b) Please provide a list of leaks (including Code class of the components) that have
been identified since the last refueling outage and associated corrective action
documentation. If during the last cycle, the Unit was shutdown, please provide
documentation of containment walkdown inspections performed as part of the
BACCP.
c) Please provide a copy of the most recent self-assessment performed for the
BACCP.
A.4 Steam Generator Tube (SGT) Inspections
a) A detailed schedule of:
i) SGT inspection, data analyses, and repair activities for the upcoming
outage (if occurring).
ii) SG secondary side inspection activities for the upcoming outage (if
occurring).
b) Please provide a copy of your SG ISI Inspection Program and Plan. Please
include a copy of the Operational Assessment from last outage and a copy of the
following documents as they become available:
i) Degradation Assessment
ii) Condition Monitoring Assessment
c) If you are planning on modifying your Technical Specifications such that they are
consistent with TSTF-449, please provide copies of your correspondence with
the NRC regarding deviations from the STS.
d) Copy of SG history documentation given to vendors performing eddy current (ET)
testing of the SGs during the upcoming outage.
-3- Enclosure
e) Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy
Current Technique Specification Sheets (ETSS). Additionally, please provide a
copy of EPRI Appendix H ETSS Qualification Records.
f) Identify and quantify any SGT leakage experienced during the previous operating
cycle. Also provide documentation identifying which SG was leaking and
corrective actions completed or planned for this condition (If applicable).
g) Provide past history of the condition and issues pertaining to the secondary side
of the steam generators (including items such as loose parts, fouling, top of tube
sheet condition, crud removal amounts, etc.).
h) Please provide copies of your most recent self assessments of the SG
monitoring, loose parts monitoring, and secondary side water chemistry control
programs.
i) Please also indicate where the primary, secondary, and resolution analyses are
scheduled to take place.
j) Please provide a summary of the scope of the SGT examinations, including
examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the
percentage of tubes to be examined. *Do not provide these documents
separately if already included in other information requested.
A.5 Metals Reliability (MRP-139) Program Activities
a) A list of, with verification that, the baseline inspections of all applicable Dissimilar
Metal Butt Welds (DMBWs) have been completed by December 31, 2007.
b) Verification that baseline inspection of hot leg and cold leg temperature DMBWs
have been included in the inspection program and that the schedules for the
baseline inspections are consistent with the baseline schedules in MRP-139.
c) A list and schedule (examination dates) of all DMBW examinations planned for
the upcoming refueling outage. If none are scheduled, then data from previous
examinations should be available for review.
d) A list and schedule for any welding to be performed on DMBWs in the upcoming
outage. If no welding will be performed then provide records of previous welding
on DMBWs and postweld NDE documentation.
e) A list and schedule of any stress improvement (SI) activities planned for the
upcoming refueling outage. If none are scheduled then have qualification reports
for any SIs previously performed.
f) Documentation and description of how the baseline and inservice inspection
specifications in MRP-139 are satisfied at your facility.
-4- Enclosure
A.6 Additional information related to all ISI activities
a) A list with a brief description of ISI, BACCP, and SGT inspection related issues
(e.g., condition reports) entered into your corrective action program since the
beginning of the last refueling outage (for Unit 2). For example, a list based upon
data base searches using key words related to piping or SG tube degradation
such as: ISI, ASME Code,Section XI, NDE, cracks, wear, thinning, leakage, rust,
corrosion, boric acid, or errors in piping/SGT examinations.
b) Please provide names and phone numbers for the following program leads:
ISI contacts (Examination, planning)
Containment Exams
RPVH Exams
Snubbers and Supports
Repair and Replacement Program Manager
Licensing Contact
Site Welding Engineer
Boric Acid Corrosion Control Program
SG Inspection Activities (site lead and vendor contact)
B. Information to be provided onsite to the inspector(s) at the entrance meeting
(October 14, 2008):
B.1 ISI / Welding Programs and Schedule Information
a) Updated schedules for ISI/NDE activities, including SGT inspections, planned
welding activities, and schedule showing contingency repair plans, if available.
b) For ASME Code Class 1 and 2 welds selected by the inspector from the lists
provided from section A of this enclosure, please provide copies of the following
documentation for each subject weld:
i) Weld data sheet (traveler)
ii) Weld configuration and system location
iii) Applicable Code Edition and Addenda for weldment
iv) Applicable Code Edition and Addenda for welding procedures
v) Applicable weld procedures (WPS) used to fabricate the welds
vi) Copies of procedure qualification records (PQRs) supporting the WPS
from B.1.b.v
vii) Copies of mechanical test reports identified in the PQRs above
viii) Copies of the nonconformance reports for the selected welds (If
applicable)
ix) Radiographs of the selected welds and access to equipment to allow
viewing radiographs (If RT was performed)
x) Copies of the preservice examination records for the selected welds.
xi) Copies of welder performance qualifications records applicable to the
-5- Enclosure
selected welds, including documentation that welder maintained
proficiency in the applicable welding processes specified in the WPS (at
least six months prior to the date of subject work)
xii) Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable
c) For the ISI related corrective action issues selected by the inspector(s) from
section A of this enclosure, provide a copy of the corrective actions and
supporting documentation.
d) For the NDE reports with relevant conditions on Code Class 1 & 2 systems
selected by the inspector from section A above, provide a copy of the
examination records, examiner qualification records, and associated corrective
action documents.
e) A copy of (or ready access to) most current revision of the ISI Program Manual
and Plan for the current Interval.
f) For the NDEs selected by the inspector from section A of this enclosure, provide
copy of the NDE procedures used to perform the examinations (including
calibration and flaw characterization/sizing procedures). For ultrasonic
examination procedures qualified in accordance with ASME Code,Section XI,
Appendix VIII, provide documentation supporting the procedure qualification
(e.g., the EPRI performance demonstration qualification summary sheets). Also,
include qualification documentation of the specific equipment to be used (e.g.,
ultrasonic unit, cables, and transducers including serial numbers) and NDE
personnel qualification records.
B.2 Reactor Pressure Vessel Head (RPVH)
a) Provide the NDE personnel qualification records for the examiners who will
perform examinations of the RPVH.
b) Provide drawings showing the following (If a visual examination is planned for the
upcoming refueling outage):
i) RPVH and CRDM nozzle configurations
ii) RPVH insulation configuration
The drawings listed above should include fabrication drawings for the nozzle
attachment welds as applicable.
c) Copy of NDE reports from the last RPVH examination.
d) Copy of evaluation or calculation demonstrating that the scope of the visual
examination of the upper head will meet the 95% minimum coverage required by
NRC Order EA-03-009 (If a visual examination is planned for the upcoming
-6- Enclosure
refueling outage).
e) Provide a copy of the procedures that will be used to identify the source of any
boric acid deposits identified on the RPVH. If no explicit procedures exist which
govern this activity, provide a description of the process to be followed including
personnel responsibilities and expectations.
f) Provide a copy of the updated calculation of effective degradation years (EDY)
for the RPVH susceptibility ranking.
g) Provide copy of the vendor qualification report(s) that demonstrates the detection
capability of the NDE equipment used for the RPVH examinations. Also, identify
any changes in equipment configurations used for the RPVH examinations which
differ from that used in the vendor qualification report(s).
B.3 Boric Acid Corrosion Control Program (BACCP)
a) Please provide boric acid walkdown inspection results, an updated list of boric
acid leaks identified so far this outage, associated corrective action
documentation, and overall status of planned boric acid inspections.
b) Please provide any engineering evaluations completed for boric acid leaks
identified since the end of the last refueling outage. Please include a status of
corrective actions to repair and/or clean these boric acid leaks. Please identify
specifically which known leaks, if any, have remained in service or will remain in
service as active leaks.
B.4 Steam Generator Tube (SGT) Inspections
a) Copies of the Examination Technique Specification Sheets (ETSS) and
associated justification for any revisions.
b) Copy of the guidance to be followed if a loose part or foreign material is identified
in the SGs.
c) Please provide a copy of the ET procedures used to perform the SGT
inspections (specifically calibration and flaw characterization/sizing procedures,
etc.). Also include documentation for the specific equipment to be used.
d) Please provide copies of your responses to NRC and industry operating
experience communications such as Generic Letters, Information Notices, etc.
(as applicable to SGT inspections) *Do not provide these documents separately if
already included in other information requested such as the degradation
assessment.
e) List of corrective action documents generated by the vendor and/or site with
respect to SG inspection activities.
-7- Enclosure
B.5 Codes and Standards
a) Ready access to (i.e., copies provided to the inspector(s) for use during the
inspection at the onsite inspection location, or room number and location where
available):
i) Applicable Editions of the ASME Code (Sections V, IX and XI) for the
inservice inspection program and the repair/replacement program.
ii) EPRI and industry standards referenced in the procedures used to
perform the SGT eddy current examination.
Inspector Contact Information:
Samuel T. Graves James F. Drake
Senior Reactor Inspector Senior Reactor Inspector
817-860-8102 817-276-6558
samuel.graves@nrc.gov james.drake@nrc.gov
Mailing Address:
US NRC Region IV
Attn: S. Graves
612 East Lamar Blvd, Suite 400
Arlington, TX 76011
-8- Enclosure