Letter Sequence Response to RAI |
---|
|
|
MONTHYEARML20211A1421999-08-19019 August 1999 Ack Receipt of Application for License Renewal for Massachusetts Institute of Technology Research Reactor Dtd 990708.Existing License Will Not Be Deemed to Have Expired Until Application Has Been Finally Determined by Commission Project stage: Other ML0733404852007-11-30030 November 2007 Massachusetts Institute of Technology, Request for Additional Information, License Renewal Project stage: RAI ML0803804532008-02-0808 February 2008 Massachusetts Institute of Technology (Mit) Draft RAI Regarding Application for License Renewal Project stage: Draft RAI ML0803900392008-02-0808 February 2008 E-mail Draft Rai'S Project stage: Draft Other ML0803900352008-02-0808 February 2008 Mitr RAIs Project stage: Other ML0810006272008-02-22022 February 2008 Massachusetts Institute of Technology Research Reactor, Response to Request for Additional Information 2/22/08 Project stage: Response to RAI ML0807103522008-03-12012 March 2008 Massachusetts Institute of Technology - Request for Additional Information License Renewal Request Project stage: RAI ML0810205372008-04-21021 April 2008 Massachusetts Institute of Technology - Request for Additional Information License Renewal Request Project stage: RAI ML0808404452008-05-0202 May 2008 Determination of Acceptability and Sufficiency for Docketing and Opportunity for a Hearing Regarding the Application from the Massachusetts Institute of Technology (Mit) for Renewal of the Facility Operating License for the Mit Reactor Project stage: Other ML0815602462008-05-29029 May 2008 Massachusetts Institute of Technology - Response to Request for Additional Information License Renewal Request Project stage: Response to RAI ML0824010502008-08-21021 August 2008 Massachusetts Institute of Technology, Response to Request for Additional Information License Renewal Request #14.1 Project stage: Response to RAI ML0824705622008-08-26026 August 2008 Massachusetts Institute of Technology - Response to Request for Additional Information License Renewal Request Project stage: Response to RAI ML0829004882008-10-0606 October 2008 Massachusetts Institute of Technology - Request for Additional Information License Renewal Request (TAC No. MA6084); Response Project stage: Request ML0829102412008-10-0707 October 2008 Massachusetts Institute of Technology - Request for Additional Information License Renewal Request Project stage: Request ML0834300062008-12-0101 December 2008 Massachusetts Institute of Technology, Submittal of Response to Request for Additional Information for License Renewal Project stage: Response to RAI ML0929302782009-10-0909 October 2009 Massachusetts Institute of Technology, Response to Request for Additional Information, Dated 07/02/09 Project stage: Response to RAI ML0935216702009-12-23023 December 2009 Massachusetts Institute of Technology, Request for Additional Information Regarding License Renewal Project stage: RAI ML1009703682010-03-30030 March 2010 Mit - Response to Request for Additional Information Regarding Renewal of License No. R-37, Dated 12/23/2009 Project stage: Response to RAI ML1019500022010-07-16016 July 2010 Massachusetts Institute of Technology (Mit), Request for Additional Information Regarding Mit Research Reactor License Renewal. Project stage: RAI ML1023100322010-08-0606 August 2010 Mit Nuclear Reactor Lab, Response to Request for Additional Information Re Relicensing Project stage: Response to RAI ML1024401222010-08-26026 August 2010 Massachusetts Institute of Technology, Submittal of Revised Pages for TS No. 3.3.5 and No. 4.2(4) Project stage: Other ML1010202812010-09-27027 September 2010 FRN: General Notice, Massachusetts Institute of Technology Docket No. 50-020 Massachusetts Institute of Technology Research Reactor Environmental Assessment and Finding of No Significant Impact Project stage: Request ML1010202112010-10-0505 October 2010 Massachusetts Institute of Technology-Environmental Assessment Regarding Renewal of Facility Operating License No. R-37 for the Massachusetts Institute of Technology Research Reactor Project stage: Other ML1025002472010-11-0101 November 2010 Massachusetts Institute of Technology, Issuance of Renewed Facility Operating License No. R-37 Project stage: Request ML1023200682010-11-0101 November 2010 Massachusetts Institute of Technology, Technical Specifications, Renewed Operating License No. R-37 Project stage: Other ML1023200822010-11-0101 November 2010 Massachusetts Institute of Technology, Safety Evaluation, Renewed Facility Operating License No. R-37 Project stage: Approval ML1023201012010-11-0101 November 2010 FRN: General Notice, Notice of Issuance of Massachusetts Institute of Technology Renewed Facility Operating License No. R-37 Project stage: Approval NRC-2010-0313, FRN: General Notice, Notice of Issuance of Massachusetts Institute of Technology Renewed Facility Operating License No. R-372010-11-0101 November 2010 FRN: General Notice, Notice of Issuance of Massachusetts Institute of Technology Renewed Facility Operating License No. R-37 Project stage: Approval ML1023105452010-11-0101 November 2010 Massachusetts Institute of Technology-Issuance of Renewed Facility License No. R-37 for the Massachusetts Institute of Technology Reactor Project stage: Approval 2008-05-29
[Table View] |
|
---|
Category:Letter
MONTHYEARML24022A0972024-01-22022 January 2024 Massachusetts Institute of Technology Change of Facility Backup Project Manager ML23354A1442024-01-0505 January 2024 Examination Confirmation Letter No. 50-020/OL-24-01, Massachusetts Institute of Technology IR 05000020/20232032023-11-21021 November 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2023203 ML23242A3382023-11-0606 November 2023 Examination Report Letter No. 50-020/OL-23-01, Massachusetts Institute of Technology ML23242A3392023-11-0606 November 2023 Examination Result Letter No. 50-020/OL-23-01, Massachusetts Institute of Technology IR 05000020/20232012023-10-12012 October 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2023201 IR 05000020/20232022023-09-27027 September 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Security Inspection Report No. 05000020/2023202 ML23194A0412023-07-11011 July 2023 Mit Research Reactor - Duties of Reactor Superintendent ML23103A2632023-05-10010 May 2023 Examination Confirmation Letter No. 50-020/OL-23-01 Massachusetts Institute of Technology ML23094A1102023-03-30030 March 2023 Massachusetts Institute of Technology (Mit), Submittal of Annual Report for 2022, Technical Specification 7.7.1 ML23072A0242023-03-0707 March 2023 Mit, Nuclear Reactor Lab., Proposal for Conversion to Low Enriched Uranium (Leu), Mit Research Reactor IR 05000020/20222012023-02-0707 February 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2022201 ML22189A0492022-07-25025 July 2022 Examination Confirmation Letter No.50-020/OL-22-02, Massachusetts Institute of Technology ML22095A2412022-03-31031 March 2022 Annual Report for the Mit Research Reactor for the Period from January 1, 2021, to December 31, 2021 ML22062B0422022-02-10010 February 2022 Proposal for Conversion to Low Enriched Uranium (Leu), Mit Research Reactor, Docket No. 50-20, 10 CFR 50.64 (c)(2)(ii) of That Paragraph ML21328A2342021-11-29029 November 2021 Examination Confirmation Letter No. 50-020/OL-22-01, Massachusetts Institute of Technology IR 05000020/20212032021-11-0909 November 2021 Massachusetts Institutes of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2021203 IR 05000020/20212012021-09-30030 September 2021 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report 05000020/2021201 ML21186A0032021-07-16016 July 2021 Examination Confirmation Letter No. 50-020/OL-21-02, Massachusetts Institute of Technology ML21165A1542021-05-28028 May 2021 Mit - Emergency Plan and Procedures, 10 CFR 50.54(q)(5) ML21140A3622021-05-17017 May 2021 Massachusetts Institute of Technology (Mit) - Supplement to Response to the Request for Additional Information for Battery Upgrade License Amendment Request (EPID: L-2021 -NFA-0000) ML21132A2512021-05-0606 May 2021 Massachusetts Institute of Technology, License No. R-37, Docket No. 50-20, Reportable Occurrence 50-20/2021-: Operation with Less than the Required Staffing on Site; NRC OPS Center Log EN 55212 ML21112A1672021-04-12012 April 2021 Massachusetts Institute of Technology - Physical Security Plan Revision Regarding Biometric Readers ML21105A3602021-04-0707 April 2021 Duties of Reactor Superintendent ML21099A1132021-03-31031 March 2021 Massachusetts Institute of Technology - Annual Report, Docket No. 50-20, License R-37, Technical Specification 7.7.1 ML21091A2082021-03-24024 March 2021 Mit Nuclear Reactor Lab - Response to Request for Additional Information for Battery Upgrade License Amendment Request ML21076A0232021-03-18018 March 2021 Requests for Additional Information - Related to License Amendment Request to Replace Emergency Power System Batteries ML21070A1852021-03-0202 March 2021 Mit Nuclear Reactor Laboratory, License Amendment Request Regarding Emergency Battery Surveillances in Technical Specification 4.6, Docket No. 50-20, License R-37 ML21063A2552021-02-25025 February 2021 Proposal for Conversion to Low Enriched Uranium (Leu), :Mit Research Reactor, Docket No. 50-20, 10 CFR 50.64 (c)(2)(ii) of That Paragraph ML21053A4372021-02-23023 February 2021 Examination Confirmation Letter No. 50-020/OL-21-01, Massachusetts Institute of Technology ML21036A0852021-02-19019 February 2021 Massachusetts Institute of Technology - Acceptance of License Amendment Request to Revise Surveillance Frequency During Extended Reactor Shutdown ML21035A2582021-01-29029 January 2021 Massachusetts Institute of Technology (Mit), Supplement to Technical Specifications Surveillance Frequency Definition Update for Improved Compliance Under 10 CPR 50.36(c)(3) ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20307A4202020-11-0505 November 2020 Granting of Extension Request to Supplement License Amendment to Revise Surveillance Requirement Frequency ML20304A1172020-10-19019 October 2020 Time Extension Request for LAR on Technical Specifications Surveillance Frequency Update for Improved Compliance Under 10 CFR 50.36(c)(3) for the Mit Research Reactor ML20248H5682020-09-22022 September 2020 Mit Research Reactor Routine Inspection Report with Enforcement Discretion (EA-20-109) - August 2020 ML20161A3342020-07-24024 July 2020 Massachusetts Institute of Technology - Issuance of Amendment NO.44 to Renewed Facility Operation License No. R-37 to Amend Technical Specifications Related to Level 1 Position Title Change ML20182A7092020-07-0909 July 2020 Acceptance Review Amendment Request to Revise Surveillance Frequency - Opportunity to Supplement ML20192A0762020-06-30030 June 2020 Mit - Supplemental Information for License Amendment Request for Position Title Change in Technical Specifications for Level 1 Staff ML20070H2672020-06-0404 June 2020 Examination Report No. 50-020/OL-20-01, Massachusetts Institute of Technology ML20119A8272020-05-29029 May 2020 Massachusetts Institute of Technology - Issuance of Amendment No. 43 Extending Time to Implement License Amendment No. 42 to Facility Operating License No. R-37 ML20149K4142020-05-27027 May 2020 NRC LAR Extension Supplemental Letter 2020-05-27 ML20135H1882020-05-15015 May 2020 Massachusetts Institute of Technology - Exemption from Select Requirements of 10 CFR Part 55, Operators' Licenses ML20122A0622020-04-21021 April 2020 Massachusetts Institute of Technology, Regarding the, Amendment No. 42 to Renewed Facility Operating License No. R-37 for the Nuclear Safety System Digital Upgrade (Epdi No. L-2016-LLA-0003) ML20090E2272020-04-16016 April 2020 Massachusetts Institute of Technology - Acceptance of the Application for a License Amendment Level 1 Position Title Change ML20097B6932020-03-31031 March 2020 Amendment No. 42 to Renewed Facility Operating License No. R-37 Regarding the Nuclear Safety System Digital Upgrade (Epdi No. L-2016-LLA-0003) ML20097D2992020-03-27027 March 2020 Massachusetts Institute of Technology (Mit) - Annual Report for the Year 2019 ML20078J4852020-03-12012 March 2020 Massachusetts Institute of Technology (Mit), License Amendment Request for Position Title Change in Technical Specifications for Level 1 Staff ML20055D3322020-02-18018 February 2020 Proposal for Conversion to Low Enriched Uranium (Leu), Mit Research Reactor, Docket No. 50-20, 10 CFR 50.64 (c)(2)(ii) of That Paragraph IR 05000020/20192032020-01-15015 January 2020 Massachusetts Institute of Technology U.S. Nuclear Regulatory Commission Security-Related Inspection Report 05000020/2019203 2024-01-05
[Table view] |
Text
NUCLEAR REACTOR LABORATORY AN INTERDEPARTMENTAL CENTER OF MASSACHUSETTS INSTITUTE OF TECHNOLOGY John A. Bernard Mail Stop: NW12-208A Phone: 617 253-4202 Director of Reactor Operations 138 Albany Street Fax: 617 253-7300 Cambridge, MA 02139 Email: bernardj@mit.edu August 21, 2008 U.S. Nuclear Regulatory Commission Attn: Document Control Room Washington, DC 20555 Re: Massachusetts Institute of Technology - Request for Additional Information License Renewal Request (TAC No. MA6084); License No. R-37; Docket No. 50-20
Dear Sir or Madam:
The Massachusetts Institute of Technology hereby provides the response for
- 14.1.
Please contact the undersigned with any questions.
Sincerely, o~hn Bernard, Ph.D. E, CHP Director of Reactor Operations I declare under the penalty of perjury that the foregoing is true and correct.
Executed on 1 A- I 0.- V {/ 1. et A/
Date I Signature 7 cc:
w/enclosures Stephen Pierce, Project Manager Research and Test Reactors Branch A Division of Policy.and Rulemaking.
Office of Nuclear Reactor Regulation w/ enclosures Senior Project Manager Research and Test Reactors Branch A Division of Policy and Rulemaking Office of Nuclear Reactor Regulation w/. enclosure Senior Reactor Inspector Research and Test Reactors Branch B Division of Policy and Rulemaking Office of Nuclear Reactor Regulation w/o enclosure Document Control Desk
14.1 The surveillance requirements that are contained in TS 3.3.5 will be relocated to TS 4.3 and deleted from TS 3.3.5. Thus, a) Specification 4 of TS 4.3 will be revised to read:
- 4. Analysis of the primary, D 20, and secondary coolant for radioactivity shall be as follows:
Analyses Frequency Primary gross activity Weekly during any week that the reactor is operating above 1 MW continuously for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and at least quarterly.
Primary isotopic identification Quarterly D 20 gross activity Quarterly D2 0 tritium Quarterly Secondary gross activity Daily any day that the reactor is operating or that secondary flow is supplied to a D2 0 exchanger.
Secondary tritium Daily any day that the reactor is operating or that secondary flow is supplied to a D2 0 exchanger.
See Appendix H for the revised version of TS3.3.5 NOTE: We are considering purchase and installation of an online monitor for tritium. If we do so, the above requirements for secondary gross activity and for tritium would be changed from daily to weekly provided that the monitor was operational.
H Appendix Limits Radioactivity
- "Coolant
-TS #3.3.5
3.3.5 Coolant Radioactivity Limits Applicability The specification is applicable to the primary, D20, and secondary coolants.
Objective To assure detection of deterioration of components in the reactor coolant systems and to identify leakage in heat exchangers.
Specification
- 1. The primary coolant shall be analyzed for gross activity and for identification. If the primary coolant activity exceeds 3 times the nominal fission product activity, primary coolant sampling frequency shall be increased and action shall be initiated in accordance with Specification 3.1.6 to determine if any in-core fuel element is damaged and with specification 3.3.6 to determine if water chemistry requirements are being meet. Reactor operation may continue if the cause of the problem is known and if such operation is allowed pursuant to specifications 3.1.6 and 3.3.6
- 2. The D20 reflector coolant shall be analyzed for gross activity and tritium.
The radioactivity of the tritium in the D20 coolant should not exceed 5 mCi/ml. If the radioactivity of the tritium in the D20 coolant approaches this guideline limit, preparations shall be initiated to replace the D2 0 coolant. Reactor operation may continue while these preparations are in progress, provided that tritium concentration does not exceed 6 mCi/ml.
- 3. The secondary coolant shall be analyzed for gross activity and for tritium.
The tritium activity shall be in accordance with Specification 3.7.2(b). If not, action shall be taken as required by the specification. In addition, the presence of other detectable activity in excess of 10 CFR 20 limits in the secondary coolant shall require isolation of the affected heat exchanger.
Reactor operation may be continued only as necessary to identify the affected heat exchanger.
Basis
The basis of this specification is given in Sections 5.2.1.11, 5.3.1.11, 5.4.1.11 and 5.5.1.5 of the SAR. Core performance is monitored continuously by the core purge detector which is addressed by Specification 3.7.1.3. The primary coolant sample analysis serves as a backup to the indication provided by that monitor. Also, it provides a means for the detection of trends. An elevated activity level could be the result of a damaged fuel or it could be the result of an activated impurity.
The former would require a reactor shutdown. The latter would require verification that the primary cleanup system was functional. Accordingly, if the guideline limit is exceeded, the actions required by Specifications 3.1.6 and 3.3.6 will be initiated. Also, the primary ion column will be evaluated for operability.
The principal concern of the D 20 reflector coolant system is tritium which builds up slowly over many years. The system is closed and hence the tritium that is contained within it does not pose a hazard during normal operation. However, the radiological controls needed to perform maintenance activities become greater as the activity levels increases.
Accordingly, a guideline tritium activity limit of 5 mCi/ml is established along with requirement to initiate preparations for changing the reflector coolant if the tritium activity approaches this guideline limit. Reactor operation may continue while preparations, which can take many months, are progressing.
The secondary coolant is continuously monitored for activity by on-line detectors (Specification 3.7.1.6). These detectors do not sense tritium because it emits a very low energy beta particle. Accordingly, a daily analysis is done for tritium if secondary coolant is supplied to a D2 0 heat exchanger (main or cleanup). If tritium levels exceed that permitted by Specification 3.7.2.1 (b), corrective action is to be in accordance with that specification. In addition, if other detectable activity in excess of 10 CFR 20 limits is identified, the affected heat exchanger will be identified and removed from service.