Letter Sequence Other |
|---|
|
|
MONTHYEARML20211A1421999-08-19019 August 1999 Ack Receipt of Application for License Renewal for Massachusetts Institute of Technology Research Reactor Dtd 990708.Existing License Will Not Be Deemed to Have Expired Until Application Has Been Finally Determined by Commission Project stage: Other ML0215003512002-06-0606 June 2002 Mit - Request for Additional Information License Renewal Request Project stage: RAI ML0733404852007-11-30030 November 2007 Massachusetts Institute of Technology, Request for Additional Information, License Renewal Project stage: RAI ML0803900392008-02-0808 February 2008 E-mail Draft RAIs Project stage: Draft Other ML0803900352008-02-0808 February 2008 Mitr RAIs Project stage: Other ML0803804532008-02-0808 February 2008 Massachusetts Institute of Technology (Mit) Draft RAI Regarding Application for License Renewal Project stage: Draft RAI ML0810006272008-02-22022 February 2008 Massachusetts Institute of Technology Research Reactor, Response to Request for Additional Information 2/22/08 Project stage: Response to RAI ML0807103522008-03-12012 March 2008 Massachusetts Institute of Technology - Request for Additional Information License Renewal Request Project stage: RAI ML0810205372008-04-21021 April 2008 Massachusetts Institute of Technology - Request for Additional Information License Renewal Request Project stage: RAI ML0808404452008-05-0202 May 2008 Determination of Acceptability and Sufficiency for Docketing and Opportunity for a Hearing Regarding the Application from the Massachusetts Institute of Technology (Mit) for Renewal of the Facility Operating License for the Mit Reactor Project stage: Other ML0815602462008-05-29029 May 2008 Massachusetts Institute of Technology - Response to Request for Additional Information License Renewal Request Project stage: Response to RAI ML0824010502008-08-21021 August 2008 Massachusetts Institute of Technology, Response to Request for Additional Information License Renewal Request 14.1 Project stage: Response to RAI ML0824705622008-08-26026 August 2008 Massachusetts Institute of Technology - Response to Request for Additional Information License Renewal Request Project stage: Response to RAI ML0825608062008-09-24024 September 2008 Massachusetts Institute of Technology, Request for Additional Information, Application for License Renewal Project stage: RAI ML0829004882008-10-0606 October 2008 Massachusetts Institute of Technology - Request for Additional Information License Renewal Request (TAC No. MA6084); Response Project stage: Request ML0829102412008-10-0707 October 2008 Massachusetts Institute of Technology - Request for Additional Information License Renewal Request Project stage: Request ML0834300062008-12-0101 December 2008 Massachusetts Institute of Technology, Submittal of Response to Request for Additional Information for License Renewal Project stage: Response to RAI ML0915907372009-07-21021 July 2009 Massachusetts Institute of Technology - Request for Additional Information Concerning Application for License Renewal Project stage: RAI ML0929302732009-10-0505 October 2009 Massachusetts Institute of Technology - Submittal of Revised Technical Specifications for Relicensing Project stage: Request ML0929302782009-10-0909 October 2009 Massachusetts Institute of Technology, Response to Request for Additional Information, Dated 07/02/09 Project stage: Response to RAI ML0935216702009-12-23023 December 2009 Massachusetts Institute of Technology, Request for Additional Information Regarding License Renewal Project stage: RAI ML1009703682010-03-30030 March 2010 Mit - Response to Request for Additional Information Regarding Renewal of License No. R-37, Dated 12/23/2009 Project stage: Response to RAI ML1019500022010-07-16016 July 2010 Massachusetts Institute of Technology (Mit), Request for Additional Information Regarding Mit Research Reactor License Renewal Project stage: RAI ML1023100322010-08-0606 August 2010 Mit Nuclear Reactor Lab, Response to Request for Additional Information Re Relicensing Project stage: Response to RAI ML1024401222010-08-26026 August 2010 Massachusetts Institute of Technology, Submittal of Revised Pages for TS No. 3.3.5 and No. 4.2(4) Project stage: Other ML1010202812010-09-27027 September 2010 FRN: General Notice, Massachusetts Institute of Technology Docket No. 50-020 Massachusetts Institute of Technology Research Reactor Environmental Assessment and Finding of No Significant Impact Project stage: Request ML1010202112010-10-0505 October 2010 Massachusetts Institute of Technology-Environmental Assessment Regarding Renewal of Facility Operating License No. R-37 for the Massachusetts Institute of Technology Research Reactor Project stage: Other ML1025002472010-11-0101 November 2010 Massachusetts Institute of Technology, Issuance of Renewed Facility Operating License No. R-37 Project stage: Request NRC-2010-0313, FRN: General Notice, Notice of Issuance of Massachusetts Institute of Technology Renewed Facility Operating License No. R-372010-11-0101 November 2010 FRN: General Notice, Notice of Issuance of Massachusetts Institute of Technology Renewed Facility Operating License No. R-37 Project stage: Approval ML1023200682010-11-0101 November 2010 Massachusetts Institute of Technology, Technical Specifications, Renewed Operating License No. R-37 Project stage: Other ML1023200822010-11-0101 November 2010 Massachusetts Institute of Technology, Safety Evaluation, Renewed Facility Operating License No. R-37 Project stage: Approval ML1023201012010-11-0101 November 2010 FRN: General Notice, Notice of Issuance of Massachusetts Institute of Technology Renewed Facility Operating License No. R-37 Project stage: Approval ML1023105452010-11-0101 November 2010 Massachusetts Institute of Technology-Issuance of Renewed Facility License No. R-37 for the Massachusetts Institute of Technology Reactor Project stage: Approval 2008-08-21
[Table View] |
Text
MIT NUCLEAR REACTOR LABORATORY AN MIT INTERDEPARTMENTAL CENTER John A. Bernard Mail Stop: NW12-208a Phone: 617 253-4202 Director of Reactor Operations 138 Albany Street Fax: 617 253-7300 Principal Research Engineer Cambridge, MA 02139 Email: Bernardj@mit.edu August 26, 2010 U.S. Nuclear Regulatory Commission Attn: Document Control Room Washington, DC 20555 Re: Massachusetts Institute of Technology; License No. R-37; Docket No. 50-20; Continued Response to RAI (TAC No. MA 6084) dated 7/16/10
Dear Sir or Madam:
Enclosed are revised pages for TS No. 3.3.5 and No. 4.2(4). The changes are:
TS 3.3.5 - Third sentence of last paragraph of basis is modified to read, "Accordingly, either a daily analysis is done for tritium or an in-line tritium monitor is in service if secondary coolant is supplied to..."
TS 4.2(4) - The first sentence is modified to read, "...and each time before startup of the reactor if the reactor has been in a secured condition or if the instrument or channel has been repaired or de-energized."
Please contact the undersigned if there are any questions.
Sincerely, o
A. Bernard, P D, PE, CHP Director of Reactor Operations I declare under the penalty of perjury that the foregoing is true and correct.
(2 1 Executed on Date
/
/1 Signare cc:
William B. Kennedy Project Manager Research and Test Reactors Branch A U.S. Nuclear Regulatory Commission t "')L
beta particle. Accordingly, either a daily analysis is done for tritium or an in-line tritium monitor is in service if secondary coolant is supplied to a D20 heat exchanger (main or cleanup). If tritium levels exceed that permitted by Specification 3.7.2.2, corrective action is to be in accordance with that specification. In addition, if other detectable activity in excess of 10 CFR 20 limits is identified, the affected heat exchanger will be identified and removed from service.
3-39
reactor if the reactor has been in a secured condition or if the instrument or channel has been repaired or de-energized. Calibration of these instruments or channels (except those such as scram pushbuttons that do not require calibration) shall be done at least annually.
- 5.
Channel Tests:
Channel tests of the instruments or channels listed in Table 4.2-1 shall be performed if the channel or instrument has been modified or repaired.
- 6.
The following instruments shall be calibrated and trip points verified when initially installed, any time a significant change in indication is noted, and at least annually:
a)
Period b)
Neutron Flux Level c)
Primary Coolant Outlet Temperature d)
Core Tank Level e)
Reflector Tank Level f)
Primary Coolant Flow g)
D20 Reflector Flow h)
Shield Coolant Flow i)
Period Channel Level Signal Off-Scale
- 7.
Thermal Power: The signals used to compute thermal power shall be calibrated at least annually.
4-5