Letter Sequence RAI |
|---|
|
|
MONTHYEARML20211A1421999-08-19019 August 1999 Ack Receipt of Application for License Renewal for Massachusetts Institute of Technology Research Reactor Dtd 990708.Existing License Will Not Be Deemed to Have Expired Until Application Has Been Finally Determined by Commission Project stage: Other ML0215003512002-06-0606 June 2002 Mit - Request for Additional Information License Renewal Request Project stage: RAI ML0733404852007-11-30030 November 2007 Massachusetts Institute of Technology, Request for Additional Information, License Renewal Project stage: RAI ML0803900392008-02-0808 February 2008 E-mail Draft RAIs Project stage: Draft Other ML0803900352008-02-0808 February 2008 Mitr RAIs Project stage: Other ML0803804532008-02-0808 February 2008 Massachusetts Institute of Technology (Mit) Draft RAI Regarding Application for License Renewal Project stage: Draft RAI ML0810006272008-02-22022 February 2008 Massachusetts Institute of Technology Research Reactor, Response to Request for Additional Information 2/22/08 Project stage: Response to RAI ML0807103522008-03-12012 March 2008 Massachusetts Institute of Technology - Request for Additional Information License Renewal Request Project stage: RAI ML0810205372008-04-21021 April 2008 Massachusetts Institute of Technology - Request for Additional Information License Renewal Request Project stage: RAI ML0808404452008-05-0202 May 2008 Determination of Acceptability and Sufficiency for Docketing and Opportunity for a Hearing Regarding the Application from the Massachusetts Institute of Technology (Mit) for Renewal of the Facility Operating License for the Mit Reactor Project stage: Other ML0815602462008-05-29029 May 2008 Massachusetts Institute of Technology - Response to Request for Additional Information License Renewal Request Project stage: Response to RAI ML0824010502008-08-21021 August 2008 Massachusetts Institute of Technology, Response to Request for Additional Information License Renewal Request 14.1 Project stage: Response to RAI ML0824705622008-08-26026 August 2008 Massachusetts Institute of Technology - Response to Request for Additional Information License Renewal Request Project stage: Response to RAI ML0825608062008-09-24024 September 2008 Massachusetts Institute of Technology, Request for Additional Information, Application for License Renewal Project stage: RAI ML0829004882008-10-0606 October 2008 Massachusetts Institute of Technology - Request for Additional Information License Renewal Request (TAC No. MA6084); Response Project stage: Request ML0829102412008-10-0707 October 2008 Massachusetts Institute of Technology - Request for Additional Information License Renewal Request Project stage: Request ML0834300062008-12-0101 December 2008 Massachusetts Institute of Technology, Submittal of Response to Request for Additional Information for License Renewal Project stage: Response to RAI ML0915907372009-07-21021 July 2009 Massachusetts Institute of Technology - Request for Additional Information Concerning Application for License Renewal Project stage: RAI ML0929302732009-10-0505 October 2009 Massachusetts Institute of Technology - Submittal of Revised Technical Specifications for Relicensing Project stage: Request ML0929302782009-10-0909 October 2009 Massachusetts Institute of Technology, Response to Request for Additional Information, Dated 07/02/09 Project stage: Response to RAI ML0935216702009-12-23023 December 2009 Massachusetts Institute of Technology, Request for Additional Information Regarding License Renewal Project stage: RAI ML1009703682010-03-30030 March 2010 Mit - Response to Request for Additional Information Regarding Renewal of License No. R-37, Dated 12/23/2009 Project stage: Response to RAI ML1019500022010-07-16016 July 2010 Massachusetts Institute of Technology (Mit), Request for Additional Information Regarding Mit Research Reactor License Renewal Project stage: RAI ML1023100322010-08-0606 August 2010 Mit Nuclear Reactor Lab, Response to Request for Additional Information Re Relicensing Project stage: Response to RAI ML1024401222010-08-26026 August 2010 Massachusetts Institute of Technology, Submittal of Revised Pages for TS No. 3.3.5 and No. 4.2(4) Project stage: Other ML1010202812010-09-27027 September 2010 FRN: General Notice, Massachusetts Institute of Technology Docket No. 50-020 Massachusetts Institute of Technology Research Reactor Environmental Assessment and Finding of No Significant Impact Project stage: Request ML1010202112010-10-0505 October 2010 Massachusetts Institute of Technology-Environmental Assessment Regarding Renewal of Facility Operating License No. R-37 for the Massachusetts Institute of Technology Research Reactor Project stage: Other ML1025002472010-11-0101 November 2010 Massachusetts Institute of Technology, Issuance of Renewed Facility Operating License No. R-37 Project stage: Request NRC-2010-0313, FRN: General Notice, Notice of Issuance of Massachusetts Institute of Technology Renewed Facility Operating License No. R-372010-11-0101 November 2010 FRN: General Notice, Notice of Issuance of Massachusetts Institute of Technology Renewed Facility Operating License No. R-37 Project stage: Approval ML1023200682010-11-0101 November 2010 Massachusetts Institute of Technology, Technical Specifications, Renewed Operating License No. R-37 Project stage: Other ML1023200822010-11-0101 November 2010 Massachusetts Institute of Technology, Safety Evaluation, Renewed Facility Operating License No. R-37 Project stage: Approval ML1023201012010-11-0101 November 2010 FRN: General Notice, Notice of Issuance of Massachusetts Institute of Technology Renewed Facility Operating License No. R-37 Project stage: Approval ML1023105452010-11-0101 November 2010 Massachusetts Institute of Technology-Issuance of Renewed Facility License No. R-37 for the Massachusetts Institute of Technology Reactor Project stage: Approval 2008-08-21
[Table View] |
Text
July 21, 2009 Dr. John A. Bernard, Director Nuclear Reactor Laboratory Massachusetts Institute of Technology 138 Albany Street Cambridge, MA 02139-4296
SUBJECT:
MASSACHUSETTS INSTITUTE OF TECHNOLOGY - REQUEST FOR ADDITIONAL INFORMATION CONCERNING APPLICATION FOR LICENSE RENEWAL (TAC NO. MA6084)
Dear Dr. Bernard:
The U.S. Nuclear Regulatory Commission (NRC) is continuing our review of your application for renewal of Facility Operating License No. R-37 for the Massachusetts Institute of Technology Research Reactor dated July 8, 1999, as supplemented by letters dated May 8, 2000, January 29, 2004, and February 22, May 29, August 15, August 21, August 26, October 6, October 7, November 7, and December 1, 2008. During our review, questions have arisen for which we require additional information and clarification. Please provide responses to the enclosed request for additional information no later than August 21, 2009. In accordance with Title 10 Code of Federal Regulations (10 CFR) Section 50.30(b), your response must be executed in a signed original under oath or affirmation.
If you have any questions regarding this review, please contact me at 301-415-2784 or by electronic mail at William.Kennedy@nrc.gov.
Sincerely,
/RA/
William B. Kennedy, Project Manager Research and Test Reactors Branch A Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No.50-020
Enclosure:
As stated cc w/ enclosure: See next page
Massachusetts Institute of Technology Docket No.50-020 cc:
City Manager City Hall Cambridge, MA 02139 Department of Environmental Protection One Winter Street Boston, MA 02108 Director Radiation Control Program Department of Public Health 90 Washington Street Dorchester, MA 02121 Nuclear Preparedness Manager Massachusetts Emergency Management Agency 40 Worcester Road Framingham, MA 01702-5399 Test, Research, and Training Reactor Newsletter University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611
ML091590737 OFFICE DPR/PRTA:PM DPR/PRTA:LA DPR/PRTA:BC DPR/PRTA:PM NAME WKennedy GLappert KBrock WKennedy DATE 6/15/09 6/15/09 6/15/09 7/21/09
Enclosure OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR ADDITIONAL INFORMATION REGARDING ACCIDENT ANALYSIS FOR LICENSE RENEWAL FOR MASSACHUSETTS INSTITUTE OF TECHNOLOGY RESEARCH REACTOR LICENSE NO. R-37 DOCKET NO.50-020
- 1.
Chapter 13 section 13.2.1, Step Reactivity Insertion - Provide a reactivity transient analysis using a verified and validated analysis method that demonstrates that the worst case credible reactivity transient consistent with the limitations specified in the technical specifications (TS) does not result in exceeding the heat flux and temperature limitations of the fuel as described in the safety analysis report (SAR). The inputs and assumptions used in the analysis should be conservative selections of the ranges of each input parameter and should be able to be determined from information provided in the SAR and TS. The results of the analysis should account for the uncertainties in the input parameters and the analysis methodology.