Final - Section B Operating Exam (Folder 3)
ML081010170
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 03/31/2008
From:
Constellation Energy Group
To: D'Antonio J
Operations Branch I
Hansell S
Shared Package
ML073040288 List:
References
Download: ML081010170 (72)


Text

NRC JPM P-1 March 2008 NRC JPM P-1 Constellation Energy Group NINE MILE POINT UNIT 2 OPERATOR JOB PERFORMANCE MEASURE

Title:

Startup of Air Dryer 2IAS - DRY1B IAW N2-OP-19 Revision:

NRC 2008 Task Number:

NA Approvals:

/

NA EXAM SECURITY

/

General Supervisor Date General Supervisor Date Operations Training (Designee)

Operations (Designee)

NA EXAM SECURITY

/

Configuration Control Date Performer:

(RO/SRO/AO)

Trainer/Evaluator:

Evaluation Method:

Perform X

Simulate Evaluation Location:

X Plant Simulator Expected Completion Time: 15 min.

Time Critical Task: No Alternate Path Task: No Start Time:

Stop Time:

Completion Time:

JPM Overall Rating:

Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature:

Date:

NRC JPM P-1 March 2008 Recommended Start Location: (Completion time based on the start location)

Plant/ RP Access Point Simulator Set-up (if required):

N/A Directions to the Instructor/Evaluator:

Prior to performance of this JPM, obtain SM / CRO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CRO permission.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CRO, and Auxiliary Operators.

Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated.

Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional /

concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used.

Therefore, either another individual or I will act as the independent/peer verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified in grading areas as Pass/Fail. All steps are sequenced critical unless denoted by a *.
2. During Evaluated JPM:

Self-verification shall be demonstrated.

3. During Training JPM:

Self-verification shall be demonstrated.

No other verification shall be demonstrated.

NRC JPM P-1 March 2008

References:

N2-OP-19, Section E.2.0.

K/A 300000 A2.01 2.9/2.8 Tools and Equipment:

N/A Task Standard:

Dryer 2IAS-DRY1B IN SERVICE and 2IAS-V298 dryers 1A & 1B bypass CLOSED Initial Conditions:

Degrading instrument air dewpoint requires starting the second air dryer.

Initiating Cues:

(Operators name), place Dryer 2IAS-DRY1B in service per N2-OP-19, Section E.2.0.

Performance Steps Standard Grade

1. Provide repeat back of initiating cue. Evaluator Acknowledge repeat back providing correction if necessary Proper communications used for repeat back (GAP-OPS-O1)

Sat/Unsat RECORD START TIME

2. Obtain a copy of the reference procedure and review/utilize the correct section.

N2-OP-19 obtained. Precautions &

Limitations reviewed.

Sat/Unsat

3. Verify CLOSED 2IAS-V280 (282), Air Dryer 1A (1B) Inlet.

Verifies CLOSED 2IAS-V282, Air Dryer 1B Inlet.

Sat/Unsat

4. Verify CLOSED 2IAS-V281 (V283), air Dryer 1A (1B) Outlet.

Verifies CLOSED 2IAS-V283, air Dryer 1B Outlet.

Sat/Unsat

NRC JPM P-1 March 2008 Performance Steps Standard Grade

5. Verify OPEN 2IAS-V288 (V290),

dryer drain trap isolation valve.

Verifies OPEN 2IAS-V290, dryer drain trap isolation valve.

Sat/Unsat

6. Place ON-OFF switch to ON, at dryer.

Places ON-OFF switch to ON, at dryer.

PASS/FAIL

7. Verify COMPRESSOR ON light is lit AND compressor is operating.

Verifies COMPRESSOR ON light is lit AND compressor is operating.

Sat/Unsat CUE: Compressor ON light is LIT

8. Allow dryer to run 15 minutes.

Allows dryer to run 15 minutes.

Sat/Unsat Cue: 15 minutes has elapsed, you may continue.

9. Slowly OPEN 2IAS-V280 (V282)

Air Dryer 1A (1B) Outlet.

OPENS 2IAS-V282 Air Dryer 1B Outlet.

PASS/FAIL

10. Check dryer for air leaks.

Checks dryer for air leaks.

Sat/Unsat

11. Slowly OPEN 2IAS-V281 (V283), Air Dryer 1A (1B) Outlet.

OPENS 2IAS-V283, Air Dryer 1B Outlet.

PASS/FAIL

12. Verify CLOSED 2IAS-V298, Air Dryers 1A & 1B Bypass.

Verifies CLOSED 2IAS-V298, Air Dryers 1A & 1B Bypass.

Sat/Unsat

NRC JPM P-1 March 2008 Performance Steps Standard Grade

13. Monitor dryer operation by periodically checking the following:

Monitors dryer operation by periodically checking the following:

Sat/Unsat Dryer Inlet pressure.

Dryer Inlet pressure.

Dryer Outlet pressure Dryer Outlet pressure Dryer Inlet AND Outlet temperature.

Dryer Inlet AND Outlet temperature.

Cue: Dryer inlet is _120 psig.

Dryer outlet is 116 psig.

Inlet Temperature is 90 degrees F.

Outlet Temp is 85 degrees F.

14. Reports completion.

Reports completion.

Sat/Unsat TERMINATING CUE:

2IAS-V298 dryers 1A & 1B bypass CLOSED and dryer 2IAS-DRY1B IN SERVICE.

RECORD STOP TIME

NRC JPM P-1 March 2008 TURNOVER SHEET INITIAL CONDITIONS:

Degrading instrument air dewpoint requires starting the second air dryer.

INITIATING CUES:

(Operators name), place Dryer 2IAS-DRY1B in service per N2-OP-19, Section E.2.0.

NRC JPM P-2 March 2008 NRC JPM P-2 Constellation Energy Group NINE MILE POINT UNIT 2 OPERATOR JOB PERFORMANCE MEASURE

Title:

Hydro Pump Boron Injection Revision: NRC 2008 Task Number: 2009090504 Approvals:

/

NA EXAM SECURITY

/

General Supervisor Date General Supervisor Date Operations Training (Designee)

Operations (Designee)

NA EXAM SECURITY

/

Configuration Control Date Performer:

(RO/SRO/AO)

Trainer/Evaluator:

Evaluation Method:

Perform X

Simulate Evaluation Location: X Plant Simulator Expected Completion Time: 30 min.

Time Critical Task:

No Alternate Path Task:

No Start Time:

Stop Time:

Completion Time:

JPM Overall Rating:

Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature:

Date:

NRC JPM P-2 March 2008 Recommended Start Location: (Completion time based on the start location)

RB 289 Outside CRD Maintenance Room Simulator Set-up (if required):

None Directions to the Instructor/Evaluator:

Prior to performance of this JPM, obtain SM / CRO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CRO permission.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CRO, and Auxiliary Operators.

Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated.

Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional /

concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used.

Therefore, either another individual or I will act as the independent/peer verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified in grading areas as Pass/Fail. All steps are sequenced critical unless denoted by a *.
2. During Evaluated JPM:

Self-verification shall be demonstrated.

3. During Training JPM:

Self-verification shall be demonstrated.

No other verification shall be demonstrated.

References:

1. N2-EOP-6, Att. 15, SLS Hydro Injection
2. NUREG 1123: 295037 EA1.10 3.7/3.9 Tools and Equipment:
1. F2-57 Key available in CRO desk to open EOP Box Task Standard:

NRC JPM P-2 March 2008 Using hydro pump and hoses staged, establish a flowpath from SLS tank to the Reactor Vessel complete with an air supply to the pump and commence Boron injection.

Initial Conditions:

1. Boron injection is required.
2. The Standby Liquid Control pumps will not start.
3. Instructor to ask operator for any questions.

Initiating Cues:

(Operators name), Commence boron injection with the hydro pump lined up to 2SLS*P1A piping in accordance with EOP-6, Attachment 15.

Performance Steps Standard Grade

1.

Provide repeat back of initiating cue.

Evaluator Acknowledge repeat back providing correction if necessary.

Proper communications used for repeat back (GAP-OPS-01/NIP-HUP-02).

Sat/Unsat RECORD START TIME

2.

Obtain a copy of the reference procedure and review/utilize the correct section of the procedure.

N2-EOP-6, Att. 15 obtained.

Precautions & limitations reviewed &

section 3.1 referenced.

Sat/Unsat

3.

Locate equipment.

At EOP box, open box, remove equipment, and check to ensure specified equipment contained.

Sat/Unsat NOTE: For simulation purposes, actual layout of hoses and connection to pump or plant equipment is not required.

Identification of hose and use along with connection points is all that is required.

4.

Remove test conn. Plug @ SLS*V42.

Cue: Simulate plug removed.

At 2SLS*V42, remove test conn. Plug by rotating plug counter clockwise.

Pass/Fail

5.

Connect suction hose to 2SLS*V42.

Cue: Simulate hose connected.

At 2SLS*V42, connect 25 black suction hose by rotating brass coupling clockwise into the test connection.

Pass/Fail

NRC JPM P-2 March 2008 Performance Steps Standard Grade

6.

Connect hose to the suction of the hydro pump.

Cue: Simulate hose connected.

At hydro pump, connect 25 black suction hose by rotating brass coupling clockwise onto the suction connection. (Located on the bottom of the pump.)

Pass/Fail

7.

Remove 2SLS*V35 cap.

Cue:

Simulate cap removed.

At 2SLS*V35, remove pipe cap by rotating cap counter clockwise.

Pass/Fail

8.

Connect discharge hose to 2SLS*V35.

Cue: Simulate hose connected.

AT 2SLS*V35, connect 25 hydro hose by rotating hose coupling clockwise onto the drain connection.

Pass/Fail

9.

Connect discharge hose to the hydro pump.

Cue: Simulate hose connected.

At hydro pump, connect 25 hydro hose by inserting hose coupling into pump discharge disconnect. (Located middle of hydro unit. Downstream of Relief Valve.)

Pass/Fail

10. Close 2MWS-V24 MWS to SLS System Cue: 2MWS-V24 is closed.

Close 2MWS-V24.

Sat/Unsat

11. Open 2SLS*MOV1A.

Cue: SM permission obtained.

Cue: 2EHS*MCC102-17D is OFF, MOV1A is OPEN.

Open supply breaker to 2SLS*MOV1A, then manually open MOV by rotating handle counter clockwise.

Pass/Fail

12. Open 2SLS*V42.

Cue: Simulate V42 Open.

At 2SLS*V42, rotate the valve handwheel counter clockwise until the valve is at the full open position.

Pass/Fail

13. Establish discharge flowpath.

Cue: Simulate V35 Open.

At 2SLS*V35, rotate the valve handwheel counter clockwise until the valve is in the full open position.

Pass/Fail

14. Establish discharge flowpath.

Cue: Simulate V34 Open.

At 2SLS*V34, rotate the valve handwheel counter clockwise until the valve is in the full open position.

Pass/Fail

15. Verify either 2SLS*MOV5A or 2SLS*MOV5B open.

Cue: Simulate valve open.

Contact control room and request valve position for 2SLS*MOV5A/B.

Pass/Fail

16. Connect air hose.

Cue: Simulate hose connected.

At hydro pump, connect air hose fitting onto hydro pump air line quick disconnect fitting.

Pass/Fail

NRC JPM P-2 March 2008 Performance Steps Standard Grade

17. Line up hydro pump.

Cue:

Isolation valves shut, regulator spring tension backed off.

At hydro pump, close air inlet isolation and back off air regulator spring tension.

Sat/UnSat

18. Connect air hose.

Cue: Simulate hose connected.

At 2SAS-V529, connect air hose fitting into service air quick disconnect fitting.

Pass/Fail

19. Open 2SAS-V529 Cue: Simulate V529 open.

At 2SAS-V529, open the valve by rotating the T-handle counter clockwise to the in-line position.

Pass/Fail

20. Start hydro pump.

Cue: Simulate Hydro Pump is running.

At hydro pump, open air line isolation valve by rotating T-handle counter clockwise to the in-line position, adjusting spring tension on air regulator.

Pass/Fail

21. Report completion.

Report completion.

Sat/Unsat Terminating Cue:

Hydro pump running with flowpath established from SLS tank to Reactor Vessel.

RECORD STOP TIME

NRC JPM P-2 March 2008 Turnover Sheet Initial Conditions:

1. Boron injection is required.
2. The Standby Liquid Control pumps will not start.
3. Instructor to ask operator for any questions.

Initiating Cues:

Commence boron injection with the hydro pump lined up to 2SLS*P1A piping in accordance with EOP-6, Attachment 15.

NRC JPM P-3 March 2008 NRC JPM P-3 Constellation Energy Group NINE MILE POINT UNIT 2 OPERATOR JOB PERFORMANCE MEASURE

Title:

Placing a Battery Charger In Service (Alternate)

Revision: NRC 2008 Task Number: 2630070104 Approvals:

/

NA EXAM SECURITY

/

General Supervisor Date General Supervisor Date Operations Training (Designee)

Operations (Designee)

NA EXAM SECURITY

/

Configuration Control Date Performer:

(RO/SRO/AO)

Trainer/Evaluator:

Evaluation Method:

Perform X

Simulate Evaluation Location: X Plant Simulator Expected Completion Time: 20 Time Critical Task: NO Alternate Path Task: YES Start Time:

Stop Time:

Completion Time:

JPM Overall Rating:

Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature:

Date:

NRC JPM P-3 March 2008 Recommended Start Location: (Completion time based on the start location)

Plant - Bring copy of N2-OP-73A Simulator Set-up (if required):

N/A Directions to the Instructor/Evaluator:

Prior to performance of this JPM, obtain SM / CRO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec.

Operability, operational status, or the effects are unknown, obtain specific SM / CRO permission.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CRO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated.

Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified in grading areas as Pass/Fail. All steps are sequenced critical unless denoted by a *.
2. During Evaluated JPM:

Self-verification shall be demonstrated.

3. During Training JPM:

Self-verification shall be demonstrated.

No verification shall be demonstrated.

References:

1. N2-OP-73A
2. NUREG 1123 263000 A1.01 2.5/2.8 Tools and Equipment:
1. Per N2-OP-73A

NRC JPM P-3 March 2008

2. Appropriate PPE IAW Personnel Safety Manual Task Standard:

Battery Charger 2BYS-CHGR1A1 is placed in service.

Initial Conditions:

1. Electrical Maintenance has just completed corrective maintenance on 2BYS-CHGR1A1.
2. Battery Charger 2BYS-CHGR1A1 is ready to be placed into service.
3. Instructor to ask operator for any questions.

Initiating Cues:

Place battery charger 2BYS-CHGR1A1 into service IAW N2-OP-73A, Section E.4.0.

Performance Steps Standard Grade

1.

Provide repeat back of initiating cue.

Evaluator Acknowledge repeat back providing correction if necessary.

Proper communications used for repeat back (GAP-OPS-01/ CNG-HU-1.01-1001).

Sat/Unsat RECORD START TIME

2.

Obtain a copy of the reference procedure and review/utilize the correct section of the procedure.

N2-OP-73A obtained. Precautions &

limitations and section reviewed E.4.0.

Sat/Unsat

3.

Verify breakers positions.

AC Power and DC power breakers are verified to be OPEN (Off).

Sat /Unsat

4.

Verify equalizer float of timer.

Equalize float timer is verified to be OFF.

Sat /Unsat

5.

Verify float/equalize Switch in float.

Float/Equalize Switch verified to float.

Sat /Unsat

6.

Close breaker 2BYS-SWG001A-2B.

Cue: If asked, initial breaker position is open.

Breaker 2BYS-SWG001A-2B, 125V DC Bat Charger 2BYS-CHGR1A1, is closed.

Pass/Fail

7.

Close breaker 2NJS-US5-5D.

Cue: If asked, initial breaker position is open.

Breaker 2NJS-US5-5D, 125V DC Norm Bat CHGR 2BYS-CHGR1A1, is closed.

Pass/Fail

8.

Close DC Breaker.

DC Power breaker on charger is closed.

Pass/Fail

9.

Verify voltage.

Cue: If asked, voltage is 110 VDC Battery voltage is observed to be between 105 and 140VDC on 2BYS-CHGR1C1.

Sat /Unsat

10. Close AC breaker.

AC Power breaker on charger is closed.

Pass/Fail

NRC JPM P-3 March 2008 Performance Steps Standard Grade

11. Verify amperage.

Cue: Charging current is 680 amps or off scale high Battery charging current verified to be a positive value but less than the 600 amp limit specified.

(Cue: Operator should recognize current value above amount specified.)

Pass/Fail

12. Contact Electrical Maintenance.

Cue: Elect. Maint. contacted.

Cue: If asked, operator to correct condition.

Electrical Maintenance Contacted.

Operator will probably also contact the Control Room.

Sat /Unsat

13. [Perform Section H.14.0 Manual Current Limiting] Open AC Breaker.

AC Power Breaker on charger is open.

Pass/Fail

14. Loosen float potentiometer lock nut.

Float potentiometer lock nut is loosened by turning counterclockwise.

Sat/Unsat

15. Adjust potentiometer counter clockwise.

Float potentiometer is rotated fully counterclockwise.

Pass/Fail

16. Close AC Breaker.

AC Power breaker on charger is closed.

Pass/Fail

17. Adjust potentiometer.

Cue: Initial adjustment leaves Output voltage at 123VDC and current at 490amps.

While maintaining amperage less than 500 amps, potentiometer is adjusted clockwise until output voltage is 135VDC.

Pass/Fail

18. Obtain multimeter.

Cue: Multimeter obtained.

Obtain/simulate obtaining calibrated multimeter (DVM).

Pass/Fail

19. Connect multimeter.

Cue: Simulator meter connected, when described by operator PPE must be worn.

Connect leads of Digital Multimeter to terminal posts of VOLTS meter of battery charger.

Pass/Fail

20. Adjust potentiometer.

Cue: When adjusted volt meter reads 134.5 VDC.

Adjust FLOAT potentiometer UNTIL output voltage as indicated on Digital Multimeter is between 134.0 AND 135.0 volts.

Pass/Fail

21. Tighten lock nut.

WHILE maintaining FLOAT potentiometer setting, tighten FLOAT potentiometer lock nut.

Sat/Unsat

NRC JPM P-3 March 2008 Performance Steps Standard Grade

22. Place in Equalize.

Place in EQUALIZE the Float/Equalize selector switch.

Pass/Fail

23. Loosen lock nut.

Loosen EQUALIZE potentiometer lock nut.

Pass/Fail

24. Adjust potentiometer.

Cue:

When adjusted volt meter reads 139.8 VDC.

Adjust EQUALIZE potentiometer UNTIL output voltage as indicated on Digital Multimeter is between 139.5 AND 140.0 volts.

Pass/Fail

25. Tighten lock nut.

WHILE maintaining EQUALIZE potentiometer setting, tighten EQUALIZE potentiometer lock nut.

Sat/Unsat

26. Place in float.

Place in FLOAT the Float/Equalize selector switch.

Pass/Fail

27. Remove DVM Remove Digital Multimeter from VOLTS meter terminals.

Sat/Unsat

28. Verify completion of E.4.0 Section Operator should verify completeness.

Sat/Unsat

29. Report completion.

Report completion.

Sat/Unsat Terminating Cue:

2BYS-CHGR-1A1 is in service.

RECORD STOP TIME

NRC JPM P-3 March 2008 Turnover Sheet Initial Conditions:

1.

Electrical Maintenance has just completed corrective maintenance on 2BYS-CHGR1A1.

2.

Battery Charger 2BYS-CHGR1A1 is ready to be placed into service.

3.

Instructor to ask operator for any questions.

Initiating Cues:

Place battery charger 2BYS-CHGR1A1 into service IAW N2-OP-73A, Section E.4.0.

NRC JPM S-1 March 2008 NRC JPM S-1 Constellation Energy Group NINE MILE POINT UNIT 2 OPERATOR JOB PERFORMANCE MEASURE

Title:

Place Main Turbine Shell Warming In Service IAW N2-OP-21 Revision:

NRC 2008 Task Number:

Approvals:

/

NA EXAM SECURITY

/

General Supervisor Date General Supervisor Date Operations Training (Designee)

Operations (Designee)

NA EXAM SECURITY

/

Configuration Control Date Performer:

(RO/SRO/AO)

Trainer/Evaluator:

Evaluation Method:

Perform Simulate Evaluation Location:

Plant Simulator Expected Completion Time: 20 min. Time Critical Task: No Alternate Path Task: Yes Start Time:

Stop Time:

Completion Time:

JPM Overall Rating:

Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature:

Date:

NRC JPM S-1 March 2008 Recommended Start Location: (Completion time based on the start location)

Simulator Simulator Set-up (if required):

IC-157 Malfunction EG09 - TG Oil Pump Failure TRG1 Remote TC03 - Turbine Turning Gear rolloff TRG1 Neck Spray in service Directions to the Instructor/Evaluator:

Prior to performance of this JPM, obtain SM / CRO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CRO permission.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CRO, and Auxiliary Operators.

Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated.

Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional /

concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used.

Therefore, either another individual or I will act as the independent/peer verifier.

Notes to Instructor / Evaluator:

4. Critical steps are identified in grading areas as Pass/Fail. All steps are sequenced critical unless denoted by a *.
5. During Evaluated JPM:

Self-verification shall be demonstrated.

6. During Training JPM:

Self-verification shall be demonstrated.

No other verification shall be demonstrated.

References:

NRC JPM S-1 March 2008 N2-OP-21, Revision 08 K/A 241000 A4.18 2.9/2.8 Tools and Equipment:

None Task Standard:

1. Shell warming placed in service.
2. Shell warming secured.

Initial Conditions:

Reactor Pressure is 60 psig.

Main Turbine Turning Gear is in operation.

N2-OP-21 Main Turbine System Section E.3.0. is complete through step E.3.1 Initiating Cues:

(Operators name), Place main turbine shell warming in service IAW N2-OP-21, Section E.3.0.

beginning at step E.3.2.

Performance Steps Standard Grade

3. Provide repeat back of initiating cue. Evaluator Acknowledge repeat back providing correction if necessary Proper communications used for repeat back (GAP-OPS-O1)

Sat/Unsat RECORD START TIME

4. Obtain a copy of the reference procedure and review/utilize the correct section.

N2-OP-21 obtained. Precautions &

Limitations reviewed.

Sat/Unsat

3. Push Turbine RESET pushbutton UNTIL the Turbine TRIPPED light goes out AND verify the following:

Pushes Turbine RESET pushbutton UNTIL the Turbine TRIPPED light goes out AND verifies the following:

PASS/FAIL

  • Turbine RESET light lit.
  • Turbine RESET light lit.

Sat/Unsat

  • CONDENSER VACUUM TRIP RESET light lit.
  • CONDENSER VACUUM TRIP RESET light lit.

Sat/Unsat

  • MECHANICAL TRIP RESET light lit.
  • MECHANICAL TRIP RESET light lit.

Sat/Unsat

  • Intermediate Stop Valves ISV1 through ISV6 ALL indicate 100% on COMBINED INTERMEDIATE STOP VALVE POSITION indicators.

Intermediate Stop Valves ISV1 through ISV6 ALL indicate 100% on COMBINED INTERMEDIATE STOP VALVE POSITION indicators.

Sat/Unsat

NRC JPM S-1 March 2008 Performance Steps Standard Grade

  • Intercept Valves IV1 through IV6 ALL indicate 0% on COMBINED INTERCEPT VALVE POSITION indicators.
  • Intercept Valves IV1 through IV6 ALL indicate 0% on COMBINED INTERCEPT VALVE POSITION indicators.

Sat/Unsat

  • Main Stop Valves MSV1 through MSV4 ALL indicate 0% on MAIN STOP VALVE POSITION indicators.

Main Stop Valves MSV1 through MSV4 ALL indicate 0% on MAIN STOP VALVE POSITION indicators.

Sat/Unsat

  • Control Valves CV1 through CV4 ALL indicate 0% on CONTROL VALVE POSITION indicators.
  • Control Valves CV1 through CV4 ALL indicate 0% on CONTROL VALVE POSITION indicators.

Sat/Unsat

4. Verify 2MSS-AOV92A, REHEATER 1A STM SUPPLY VLV is CLOSED.

Verifies 2MSS-AOV92A, REHEATER 1A STM SUPPLY VLV is CLOSED.

Sat/Unsat 5 Verify 2MSS-AOV92B, REHEATER 1B STM SUPPLY VLV is CLOSED.

Verifies 2MSS-AOV92B, REHEATER 1B STM SUPPLY VLV is CLOSED.

Sat/Unsat

6. Place TURBINE SHELL/CHEST WARMING switch in ON position at 2CEC-PNL824, MAIN REHEAT & AUX ST DR TURB BLDG MISC DR.

Places TURBINE SHELL/CHEST WARMING switch in ON position at 2CEC-PNL824, MAIN REHEAT &

AUX ST DR TURB BLDG MISC DR.

PASS/FAIL

7. Close the following valves at 2CEC-PNL824:

Closes the following valves at 2CEC-PNL824:

PASS/FAIL

  • CRS-MOV7A, COLD REHEAT STM DRAIN VLV
  • CRS-MOV7A, COLD REHEAT STM DRAIN VLV
  • CRS-MOV7B, COLD REHEAT STM DRAIN VLV
  • CRS-MOV7B, COLD REHEAT STM DRAIN VLV
  • CRS-MOV8A, COLD REHEAT STM DRAIN VLV
  • CRS-MOV8A, COLD REHEAT STM DRAIN VLV
  • CRS-MOV8B, COLD REHEAT STM DRAIN VLV
  • CRS-MOV8B, COLD REHEAT STM DRAIN VLV
  • CRS-MOV9A, COLD REHEAT STM DRAIN VLV
  • CRS-MOV9A, COLD REHEAT STM DRAIN VLV
  • CRS-MOV9B, COLD REHEAT STM DRAIN VLV
  • CRS-MOV9B, COLD REHEAT STM DRAIN VLV
  • CRS-MOV18A, COLD REHEAT STM DRAIN VLV
  • CRS-MOV18A, COLD REHEAT STM DRAIN VLV

NRC JPM S-1 March 2008 Performance Steps Standard Grade

  • CRS-MOV18B, COLD REHEAT STM DRAIN VLV
  • CRS-MOV18B, COLD REHEAT STM DRAIN VLV
  • DSM-MOV79A, MOISTURE SEPARATOR A DRAIN VLV
  • DSM-MOV79A, MOISTURE SEPARATOR A DRAIN VLV
  • DSM-MOV79B, MOISTURE SEPARATOR B DRAIN VLV
  • DSM-MOV79B, MOISTURE SEPARATOR B DRAIN VLV
  • HRS-MOV1, CROSSAROUND PIPING DRAIN VLV
  • HRS-MOV1, CROSSAROUND PIPING DRAIN VLV
  • HRS-MOV2, CROSSAROUND PIPING DRAIN VLV
  • HRS-MOV2, CROSSAROUND PIPING DRAIN VLV
  • ESS-MOV28A, 5TH POINT HEATER A EXTRACTION STM ISOL VLV
  • ESS-MOV28A, 5TH POINT HEATER A EXTRACTION STM ISOL VLV
  • ESS-MOV28B, 5TH POINT HEATER B EXTRACTION STM ISOL VLV
  • ESS-MOV28B, 5TH POINT HEATER B EXTRACTION STM ISOL VLV
  • ESS-MOV28C, 5TH POINT HEATER C EXTRACTION STM ISOL VLV
  • ESS-MOV28C, 5TH POINT HEATER C EXTRACTION STM ISOL VLV
  • ESS-MOV-3A, 6TH POINT HEATER A EXTRACTION STM ISOL VLV
  • ESS-MOV-3A, 6TH POINT HEATER A EXTRACTION STM ISOL VLV
  • ESS-MOV-3B, 6TH POINT HEATER B EXTRACTION STM ISOL VLV
  • ESS-MOV-3B, 6TH POINT HEATER B EXTRACTION STM ISOL VLV
  • ESS-MOV-3C, 6TH POINT HEATER C EXTRACTION STM ISOL VLV
  • ESS-MOV-3C, 6TH POINT HEATER C EXTRACTION STM ISOL VLV
8. Verify LOAD LIMIT SET potentiometer set at 8.69 (102.5%).

Verifies Verify LOAD LIMIT SET potentiometer set at 8.69 (102.5%).

Sat/Unsat

9. Push FAST pushbutton at START UP RATE controls.

Pushes FAST pushbutton at START UP RATE controls.

Sat/Unsat

10. Observe FAST pushbutton lit.

Observes FAST pushbutton lit.

Sat/Unsat

11. Verify LOAD SET indication is 0 Megawatts.

Verifies LOAD SET indication is 0 Megawatts.

Sat/Unsat

NRC JPM S-1 March 2008 Performance Steps Standard Grade

12. Push SHELL pushbutton at MAIN STOP VALVE POSITION DEMAND FOR CHEST/SHELL WARMING controls.

Pushes SHELL pushbutton at MAIN STOP VALVE POSITION DEMAND FOR CHEST/SHELL WARMING controls.

PASS/FAIL

13. Verify the following indications:

Verifies the following indications:

  • SHELL pushbutton lit.
  • SHELL pushbutton lit.

Sat/Unsat

  • Control Valve CV1 through CV3 ALL indicate 100% on CONTROL VALVE POSITION indicators AND CV4 indicates approximately 40 - 60% control valve position.
  • Control Valve CV1 through CV3 ALL indicate 100% on CONTROL VALVE POSITION indicators AND CV4 indicates approximately 40 - 60% control valve position.

Sat/Unsat

  • Intermediate Stop Valves ISV1 through ISV6 ALL indicate 0% on COMBINED INTERMEDIATE STOP VALVE POSITION indicators.
  • Intermediate Stop Valves ISV1 through ISV6 ALL indicate 0%

on COMBINED INTERMEDIATE STOP VALVE POSITION indicators.

Sat/Unsat

CUE: As field operator report the valve is closed

Sat/Unsat

CUE: As field operator report the valve is closed

Sat/Unsat EXAMINER NOTE: The following procedure step (step 3.13) will be reviewed by the applicant but not performed at this time. The applicant must return to this step once the JPM malfunction is inserted.

14. IF during shell warming the Turbine rolls off Turning Gear, immediately stop shell warming by performing the following:

Closes 2MSS-MSV1D, MSV2, by pushing the DECREASE pushbutton UNTIL CHEST/SHELL WARMING DEMAND meter indicates

< 0 Percent.

N/A at this time

NRC JPM S-1 March 2008 Performance Steps Standard Grade

  • Close 2MSS-MSV1D, MSV2, by pushing the DECREASE pushbutton UNTIL CHEST/SHELL WARMING DEMAND meter indicates

< 0 Percent.

15. Start shell warming by preheating crossaround piping as follows:

NOTE: The High Pressure Turbine Shell Inner Temperature will be utilized in determining soak time requirements of Attachment 1.

  • Reviews the note regarding soak time requirements.
16. Record High Pressure Turbine Shell Inner Temperature in Control Room Log, using Computer Point TMITA10 OR TMITA14, OR 2TMI-TJR137, Point 4.

CUE: When applicant checks temperature, ask for the value they determined and state that you will record the value in the logs Records High Pressure Turbine Shell Inner Temperature in Control Room Log, using Computer Point TMITA10 OR TMITA14, OR 2TMI-TJR137, Point 4.

Sat/Unsat 17.Throttle 2MSS-MSV1D, MSV2 (Turbine Main Stop Valve),

by intermittently pushing INCREASE or DECREASE pushbuttons as necessary at MAIN STOP VALVE POSITION DEMAND FOR CHEST/SHELL WARMING control.

  • Throttles 2MSS-MSV1D, MSV2 (Turbine Main Stop Valve), by intermittently pushing INCREASE or DECREASE pushbuttons as necessary at MAIN STOP VALVE POSITION DEMAND FOR CHEST/SHELL WARMING control.

Pass/Fail

NRC JPM S-1 March 2008 Performance Steps Standard Grade EXAMINER NOTE: IAW P&L D.25, Low Pressure Turbine Shell Temperature changes should be limited to a rate of 125 degrees/hr OR about 30 degrees every 15 minutes.

The examiner should ensure that shell temperatures are being closely monitored EXAMINER & SIMULATOR OPERATOR NOTE: Insert malfunction for turning gear after the applicant begins to check crossaround piping temperatures as required in the next step.

19. At 2CEC*PNL842, monitor Crossaround Piping Temperature on 2TMI-TR137/ZDR135, TURBINE TEMP.

Monitors Crossaround Piping Temperature on 2TMI-TR137/ZDR135, TURBINE TEMP.

Sat/Unsat EXAMINER NOTE: With the malfunction inserted, the applicant must now secure shell warming because the turbine is no longer on the turning gear. The applicant must refer back to procedure step 3.13. That step was previously shown in this JPM (step

15) and is repeated below.
20. IF during shell warming the Turbine rolls off Turning Gear, immediately stop shell warming by performing the following:

Closes 2MSS-MSV1D, MSV2, by pushing the DECREASE pushbutton UNTIL CHEST/SHELL WARMING DEMAND meter indicates

< 0 Percent.

PASS/FAIL

  • Close 2MSS-MSV1D, MSV2, by pushing the DECREASE pushbutton UNTIL CHEST/SHELL WARMING DEMAND meter indicates

< 0 Percent.

TERMINATING CUE:

Shell warming secured IAW Step 20.

RECORD STOP TIME

TURNOVER SHEET NRC JPM S-1 March 2008 INITIAL CONDITIONS:

Reactor Pressure is 60 psig. Main Turbine Turning Gear is in operation.

N2-OP-21 Main Turbine System Section E.3.0. is complete through step E.3.1 INITIATING CUES:

(Operators name), Place main turbine shell warming in service IAW N2-OP-21, Section E.3.0. beginning at step E.3.2

NRC JPM S-2 March 2008 NRC JPM S-2 Constellation Energy Group NINE MILE POINT UNIT 2 OPERATOR JOB PERFORMANCE MEASURE

Title:

Initiate Division I H2/O2 Monitoring to Monitor Sample Path 4, Post LOCA Restart Required Revision:

NRC 2008 Task Number:

Approvals:

/

NA EXAM SECURITY

/

General Supervisor Date General Supervisor Date Operations Training (Designee)

Operations (Designee)

NA EXAM SECURITY

/

Configuration Control Date Performer:

(RO/SRO/AO)

Trainer/Evaluator:

Evaluation Method: X Perform Simulate Evaluation Location:

Plant X

Simulator Expected Completion Time: 15 min. Time Critical Task: No Alternate Path Task: No Start Time:

Stop Time:

Completion Time:

JPM Overall Rating:

Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature:

Date:

NRC JPM S-2 March 2008 Recommended Start Location: (Completion time based on the start location)

Simulator Simulator Set-up (if required):

IC-183 Directions to the Instructor/Evaluator:

Prior to performance of this JPM, obtain SM / CRO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CRO permission.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CRO, and Auxiliary Operators.

Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated.

Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional /

concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used.

Therefore, either another individual or I will act as the independent/peer verifier.

Notes to Instructor / Evaluator:

7. Critical steps are identified in grading areas as Pass/Fail. All steps are sequenced critical unless denoted by a *.
8. During Evaluated JPM:

Self-verification shall be demonstrated.

9. During Training JPM:

Self-verification shall be demonstrated.

No other verification shall be demonstrated.

NRC JPM S-2 March 2008

References:

N2-OP-82, Revision 06 K/A 223001 A4.04 3.5/3.6, A4.05 3.6/3.6 Tools and Equipment:

None Task Standard:

H2O2 Analyzers ON and sampling from the suppression chamber Initial Conditions:

The plant is shutdown following a LOCA.

Initiating Cues:

(Operators name), perform a post LOCA restart of 2CMS*CAB10A per N2-OP-82, Section H.1.0, and sample the Suppression Chamber per Section F.1.0.

Performance Steps Standard Grade

5. Provide repeat back of initiating cue. Evaluator Acknowledge repeat back providing correction if necessary Proper communications used for repeat back (GAP-OPS-O1)

Sat/Unsat RECORD START TIME

6. Obtain a copy of the reference procedure and review/utilize the correct section.

N2-OP -82 obtained. Precautions &

Limitations reviewed.

Sat/Unsat

3. Obtain SSS/ASSS permission to restart 2CMS*CAB10A(B)

Obtains SSS/ASSS permission to restart 2CMS*CAB10A Sat/Unsat Cue:

Give SSS permission when asked.

4. PRIOR to overriding the LOCA isolation signal, notify Radiation Protection of the intent to restart 2CMS*CAB10A(B) AND that radiological conditions could change.

Prior to overriding the LOCA isolation signal, notifies Radiation Protection of the intent to restart 2CMS*CAB10AAND that radiological conditions could change.

Sat/Unsat Cue:

As RP, acknowledge.

NRC JPM S-2 March 2008 Performance Steps Standard Grade

5. Place the following keylock switches to OVERRIDE:

Places the following keylock switches to OVERRIDE:

PASS/FAIL ISOL VLV OVERRIDE on 2CEC*PNL873 2CEC*PNL873 ISOL VLV OVERRIDE on 2CEC*PNL875 2CEC*PNL875

6. At 2CEC*PNL873, open the following valves:

OPENS the following valves:

PASS/FAIL 2CMS*SOV60A(B),

CONTMT ATM MON DW OUTBD ISOL SUPPLY 2CMS*SOV60A, CONTMT ATM MON DW OUTBD ISOL SUPPLY 2CMS*SOV62A(B),

CONTMT ATM MON DW OUTBD ISOL RETURN 2CMS*SOV62A, CONTMT ATM MON DW OUTBD ISOL RETURN

7. At 2CEC*PNL875, open the following valves OPENS the following valves:

PASS/FAIL 2CMS*SOV61A(B),

CONTMT ATM MON DW IND ISOL SUPPLY 2CMS*SOV61A, CONTMT ATM MON DW IND ISOL SUPPLY 2CMS*SOV63A(B),

CONTMT ATM MON DW INBD ISOL RETRUN 2CMS*SOV63A, CONTMT ATM MON DW INBD ISOL RETRUN

8. Direct Radiation Protection to place 2CMS*CAB10A(B) in service.

Directs Radiation Protection to place 2CMS*CAB10Ain service.

Sat/Unsat CUE: Inform operator that 2CMS*CAB10A is in service.

9. Verify 2CMS*CAB10A(B) is in service AND notify the SSS/ASSS.

Verifies 2CMS*CAB10A is in service AND notifies the SSS/ASSS.

Sat/Unsat

NRC JPM S-2 March 2008 Performance Steps Standard Grade Cue:

As SSS, acknowledge.

Evaluators Note:

Applicant returns to Section F.1.0 to sample from Path 4 (Suppression Chamber) reference.

10. Placing H2/O2 Analyzer in Service:

Operator reviews the steps. Panel 2CEC*PNL873 will be used.

Sat/Unsat This Subsection is written for both divisions with Division II components in parentheses.

Actions in this Subsection are performed at 2CEC*PNL873(875) unless otherwise specified.

Position 4 lines up the Suppression Chamber sample stream. It is only used as directed by procedure.

Performance of this Subsection may be required by the EOPs. Changes to this Subsection (including renumbering) are required to be reviewed by this EOP Coordinator.

Control Room indication for H2 and O2 will be less than 0% if the analyzer is self-calibration OR TROUBLE condition. The only location to determine if the unit is in self-cal or in TROUBLE is the indicating lights on the remote panel 2CMS*PNL73A(B) (240 El.

Aux Bay). Control Room indication will return when self-calibration is complete, 30 minutes.

NRC JPM S-2 March 2008 Performance Steps Standard Grade

11. If required defeat LOCA isolation per Section H.2.0 Refers to Section H.2.0 N/A
12. If LOCA isolation signal is present, using PA 235 Key, place the following keylock switches to OVERRIDE
  • ISOL VLV OVERRIDE on 2EC*PNL873(875)

Operator notes that this step was performed earlier in the JPM (step

5) and verifies switches in OVERRIDE Sat/Unsat
13. At 2CEC*PNL873(875), place the Division I(II) SAMPLE PATH SELECTOR SWITCH in the RESET position At 2CEC*PNL873, places the Division I SAMPLE PATH SELECTOR SWITCH in the RESET position.

Pass/Fail

14. Return to Section F.1.0 to place H2O2 Analyzers in service Returns to section F.1.0 Sat/Unsat Note:

IF a LOCA Isolation occurs while the Analyzer is in service, it will cause the analyzer to trip.

Placing the H2/O2 ANALYZER PMP switch to STANDBY will reset the trip logic.

15. Verify the 2CMS*P2A(B), H2/O2 ANALYZER PMP, in STANDBY.

Verifies the 2CMS*P2A, H2/O2 ANALYZER PMP, in STANDBY.

16.Establish a sample flowpath by placing the SAMPLE PATH SELECTOR SWITCH to Position 1, 2 or 3 (Drywell) OR 4 (Suppression Chamber) as directed by SSS/CRS.

Establishes a sample flowpath by placing the SAMPLE PATH SELECTOR SWITCH to Position 4 (Suppression Chamber)

PASS/FAIL

17. Verify EITHER a Drywell OR Suppression Chamber sample flow path exists, as follows:

Verifies a Drywell OR Suppression Chamber sample flow path exists.

Sat/Unsat

NRC JPM S-2 March 2008 Performance Steps Standard Grade

17. (cont.) Suppression chamber sample flow path:

PASS/FAIL 2CMS*SOV26A(B),

SAMPLE FROM SUPPR CHAM INBOARD ISOL VLV, OPEN 2CMS*SOV26A, SAMPLE FROM SUPPR CHAM INBOARD ISOL VLV, OPEN 2CMS*SOV26C(D),

SAMPLE FROM SUPPR CHAM OUTBOARD ISOL VLV, OPEN 2CMS*SOV26C, SAMPLE FROM SUPPR CHAM OUTBOARD ISOL VLV, OPEN 2CMS*SOV34A(B), SUPPR CHAM SAMPLE TRN INBOARD ISOL VLV, OPEN 2CMS*SOV34A, SUPPR CHAM SAMPLE TRN INBOARD ISOL VLV, OPEN 2CMS*SOV35A(B), SUPPR CHAM SAMPLE TRN OUTBOARD ISOL VLV, OPEN 2CMS*SOV35A, SUPPR CHAM SAMPLE TRN OUTBOARD ISOL VLV, OPEN 2CMS*SOV64A(B), H2/O2 ANALYZER VLV, OPEN 2CMS*SOV64A, H2/O2 ANALYZER VLV, OPEN 2CMS*SOV65A(B), H2/O2 ANALYZER OUTLET VLV, OPEN 2CMS*SOV65A, H2/O2 ANALYZER OUTLET VLV, OPEN Notes:

Alarms for High O2 concentrations are expected for first 20 minutes until analyzer warm up period is complete.

Allow 30 minutes for system stabilization after placing the 2CMS*P2A(B), H2/O2 ANALYZER PMP to ANALYZE. It takes approximately 6 minutes to receive and accurately read the sample by the H2/O2 Analyzer, when changing sample locations.

18. Place the 2CMS*P2A(B), H2/O2 ANALYZER PMP switch to ANALYZE.

Places the 2CMS*P2A, H2/O2 ANALYZER PMP switch to ANALYZE.

PASS/FAIL

NRC JPM S-2 March 2008 Performance Steps Standard Grade

19. Verify 2CMS*P2A(B), Sample Pump GREEN light goes OUT and RED light is LIT.

Verifies 2CMS*P2A, Sample Pump GREEN light goes OUT and RED light is LIT.

Sat/Unsat TERMINATING CUE:

Analyzer RED light ON. Sampling from the Suppression Chamber.

RECORD STOP TIME

NRC JPM S-2 March 2008 INITIAL CONDITIONS:

The plant is shutdown following a LOCA.

INITIATING CUES:

(Operators name), perform a post LOCA restart of 2CMS*CAB10A per N2-OP-82, Section H.1.0, and sample the Suppression Chamber per Section F.1.0.

NRC JPM S-4 March 2008 NRC JPM S-3 Constellation Energy Group NINE MILE POINT UNIT 2 OPERATOR JOB PERFORMANCE MEASURE

Title:

Transfer Feedwater Level Control to FWS-LV-55A at Approximately 2%

Power IAW N2-OP-3 Revision:

NRC 2008 Task Number:

Approvals:

/

NA EXAM SECURITY

/

General Supervisor Date General Supervisor Date Operations Training (Designee)

Operations (Designee)

NA EXAM SECURITY

/

Configuration Control Date Performer:

(RO/SRO/AO)

Trainer/Evaluator:

Evaluation Method: X Perform Simulate Evaluation Location:

Plant X

Simulator Expected Completion Time: 20 min. Time Critical Task: NO Alternate Path Task: NO Start Time:

Stop Time:

Completion Time:

JPM Overall Rating:

Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature:

Date:

NRC JPM S-4 March 2008 Recommended Start Location: (Completion time based on the start location)

Simulator Simulator Set-up (if required):

IC-8 Start 2nd Condensate and Condensate Booster Pump (per N2-OP-3, Section E.3.0)

(NOTE: Added as post exam comment, since setup per IC-8 is one pump running)

REMOTE FW03A FW AUX LUBE OIL PUMP A, OFF on TRG 1 Directions to the Instructor/Evaluator:

Prior to performance of this JPM, obtain SM / CRO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CRO permission.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CRO, and Auxiliary Operators.

Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated.

Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional /

concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used.

Therefore, either another individual or I will act as the independent/peer verifier.

Notes to Instructor / Evaluator:

10. Critical steps are identified in grading areas as Pass/Fail. All steps are sequenced critical unless denoted by a *.
11. During Evaluated JPM:

Self-verification shall be demonstrated.

12. During Training JPM:

Self-verification shall be demonstrated.

No other verification shall be demonstrated.

NRC JPM S-4 March 2008

References:

N2-OP-3, Rev.15 K/A 259001 A4.05 4.0/3.9 Tools and Equipment:

None Task Standard:

Reactor Feed Pump A running and reactor water level maintained via the 2FWS LV55A in automatic.

Initial Conditions:

A startup is in progress. Reactor power is at approximately 2%. Procedure N2-OP-3 is complete through step E.3.16.

Initiating Cues:

(Operators name), start Reactor Feed Pump A and transfer Feedwater Level Control to 2FWS-LV55A in accordance with N2-OP-3, beginning at Step E.3.17 and ending after 2FWS-LV55A is in automatic.

Performance Steps Standard Grade

7. Provide repeat back of initiating cue. Evaluator Acknowledge repeat back providing correction if necessary Proper communications used for repeat back (GAP-OPS-O1)

Sat/Unsat RECORD START TIME

8. Obtain a copy of the reference procedure and review/utilize the correct section.

N2-OP-3 obtained. Precautions &

Limitations reviewed.

Sat/Unsat

3. START 2FWS-P1A, REACTOR FW PMP 1A, by placing the control switch to Normal-After-START (Red flagged).

STARTS 2FWS-P1A, REACTOR FW PMP 1A, by placing the control switch to Normal-After-START (Red flagged).

PASS/FAIL

4. Confirm 2FWR-FV2A,

REACTOR FD P1A RECIRC VLV, starts to OPEN.

Verifies 2FWR-FV2A, REACTOR FD P1A RECIRC VLV, starts to OPEN.

Sat/Unsat

NRC JPM S-4 March 2008 Performance Steps Standard Grade

5. When 2FWR-FV2A is 15%

open, confirm 2FWS-P1A starts.

Verifies 2FWR-FV2A is 15% open, confirms 2FWS-P1A starts.

Sat/Unsat

6. Using 2CNM-FI68A, RX FD WTR P1A FOW meter, confirm 2FWS-P1A flow is approximately 8,000 gpm.

Confirms 2FWS-P1A flow is approximately 8,000 gpm.

Sat/Unsat

7. At 2FWS-P1A, place the Auxiliary Lube Oil Pump control switch 2FWL-LCS752 (753) to AUTO AND verify 2FWL-P2A stops.

Dispatches operator to 2FWS-P1A, to place the Auxiliary Lube Oil Pump control switch 2FWL-LCS752 (753) to AUTO AND verify 2FWL-P2A stops.

Sat/Unsat Sim Operator: When requested, activate remote FW03A on TRG 1, to stop aux lube oil pump and report completion.

8. At the operating Feedwater Pump, CLOSE 2FWS-V25A, FD WTR PUMP 1A WRMUP LN ISOLATION.

Contacts field operator to verify CLOSED 2FWS-V25A, FD WTR PUMP 1A WRMUP LN ISOLATION.

Sat/Unsat Cue: As Local Operator, report valve is CLOSED.

9. At the operating feedwater pump, verify OPEN 2FWS-V103A, FEEDWATER PUMP 1A LOW FLOW LINE ISOL.

Contacts field operator to verify OPEN 2FWS-V103A, FEEDWATER PUMP 1A LOW FLOW LINE ISOL by contacting the field operator.

Sat/Unsat Cue:

As local operator confirm 2FWS-V103A is OPEN.

NRC JPM S-4 March 2008 Performance Steps Standard Grade

10. If 2FWS-LV55A(B) is being used to augment 2CNM-LV137, perform the following:

Examiner Note: Examinee should note from board indications that the LV 55A is not being used but LV55B is augmenting.

If 2FWS-LV55A(B) is being used to augment 2CNM-LV137, perform the following:

a. Throttle open the 2FWS-LV55A (running feed pump)

Throttles open the 2FWS-LV55A WHILE throttling closed the in-service 2FWS-LV55B PASS/FAIL

b. WHEN 2FWS-LV55B for the non-running feed pump is fully shut, close its associated manual blocking valve (2FWS-V103B)

WHEN 2FWS-LV55B for the non-running feed pump is fully shut, dispatches operator to close its associated manual blocking valve (2FWS-V103B)

Sat/Unsat Cue:

As Local Operator, report valve is CLOSED.

11. Throttle open 2FWS-LV55A, HI PRESS LO FLOW FD WTR A CONTROL VLV, by using the OPEN detent pushbutton on 2FWS-LV55A controller.

Throttles open 2FWS-LV55A, HI PRESS LO FLOW FD WTR A CONTROL VLV, by using the OPEN detent pushbutton on 2FWS-LV55A controller.

PASS/FAIL

12. Maintain Reactor water level in the desired band AND confirm CNM-LV137 closes as 2FWS-LV55A is opened.

Maintains Reactor water level in the desired band AND confirm CNM-LV137 closes as 2FWS-LV55A is opened.

Sat/Unsat

Operates valves such that Level 8 (202.3 inch) and Level 3 (159.3 inch) trips do not occur.

PASS/FAIL

13. Place 2CNM-LV137 controller in Manual (M) AND close 2CNM-LV137 by using the CLOSE detent pushbutton.

Places 2CNM-LV137 controller in Manual (M) AND close 2CNM-LV137 by using the CLOSE detent pushbutton.

PASS/FAIL

NRC JPM S-4 March 2008 Performance Steps Standard Grade

14. WHEN 2FWS-LV55A is at least 5% open, adjust 2CNM-HIC137, FEEDWATER LO FLOW CONTROLLER, tape setpoint to obtain equal signals as read in the input (vertical) AND output (horizontal) signal on 2FWS-LV55A controller.

Adjusts 2CNM-HIC137, FEEDWATER LO FLOW CONTROLLER, tape setpoint to obtain equal signals as read in the input (vertical) AND output (horizontal) signal on 2FWS-LV55(B) controller.

PASS/FAIL

15. Verify 2CNM-HIC137 indicator is in the green band.

Verifies 2CNM-HIC137 indicator is in the green band.

Sat/Unsat

16. Depress Auto (A) pushbutton on 2FWS-LV55A controller.

Depresses Auto (A) pushbutton on 2FWS-LV55A controller.

PASS/FAIL

17. Verify that Reactor water level is being maintained at the desired setpoint.

Verifies that Reactor water level is being maintained at the desired setpoint.

Sat/Unsat TERMINATING CUE:

Reactor Feed Pump A running and reactor water level maintained via the 2FWS LV55A in automatic.

RECORD STOP TIME

NRC JPM S-4 March 2008 INITIAL CONDITIONS:

A startup is in progress. Reactor power is at approximately 2%.

Procedure N2-OP-3 is complete through step E.3.16.

INITIATING CUES:

(Operators name), start Reactor Feed Pump A and transfer Feedwater Level Control to 2FWS-LV55A in accordance with N2-OP-3, beginning at Step E.3.17 and ending after 2FWS-LV55A is in automatic.

NRC JPM S-4 March 2008 NRC JPM S-4 Constellation Energy Group NINE MILE POINT UNIT 2 OPERATOR JOB PERFORMANCE MEASURE

Title:

Inject with RCIC (Alternate path)

Revision: NRC 2008 Task Number: 2179150101 Approvals:

/

NA EXAM SECURITY

/

General Supervisor Date General Supervisor Date Operations Training (Designee)

Operations (Designee)

NA EXAM SECURITY

/

Configuration Control Date Performer:

(RO/SRO/AO)

Trainer/Evaluator:

Evaluation Method: X Perform Simulate Evaluation Location:

Plant X

Simulator Expected Completion Time: 12 min.

Time Critical Task:

No Alternate Path Task: Yes Start Time:

Stop Time:

Completion Time:

JPM Overall Rating:

Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature:

Date:

NRC JPM S-4 March 2008 Recommended Start Location: (Completion time based on the start location)

Simulator Simulator Set-up (if required): IC-181 (ENSURE CORRECT SETUP WITH RC16)

1. RPV pressure >300 psig
2. OVR-01 A1S065D1096 Inop RCIC Manual Initiation - OFF -Preset
3. RC11 RCIC Isolation Failure
4. RC16 RCIC Steam Leak Into RCIC Pump Room, 7%, TRG 2
5. Auto trigger for TRG 2; zarcr606>= 0.5; Initiates RC16 when RCIC flow above 400 gpm Directions to the Instructor/Evaluator:

Prior to performance of this JPM, obtain SM / CRO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CRO permission.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CRO, and Auxiliary Operators.

Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated.

Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional /

concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used.

Therefore, either another individual or I will act as the independent/peer verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified in grading areas as Pass/Fail. All steps are sequenced critical unless denoted by a *.
2. During Evaluated JPM:

Self-verification shall be demonstrated.

3. During Training JPM:

Self-verification shall be demonstrated.

No other verification shall be demonstrated.

References:

1. N2-OP-35, Rev 5, Sect. F 2.0 and F 3.0
2. NUREG K/A 217000 A2.01 3.8/3.7 A4.01 3.7/3.7, A3.06 3.5/3.5 Tools and Equipment:

NRC JPM S-4 March 2008 None Task Standard:

RCIC injection manually aligned following failure to initiate and injecting to RPV at approximately 600 gpm. Following a failed isolation, RCIC is isolated using keylock switches for ICS*MOV121 or 128.

Initial Conditions:

1. Reactor pressure is (report digital pressure reading on P603)
2. The main turbine is tripped.
3. RPV level is lowering.
4. Instructor to ask operator for any questions.

Initiating Cues:

(Operators name), Initiate RCIC, inject into the RPV and establish rated flow.

Performance Steps Standard Grade

1.

Provide repeat back of initiating cue.

Evaluator Acknowledge repeat back providing correction if necessary.

Proper communications used for repeat back (GAP-OPS-01/NIP-HUP-02).

Sat/Unsat RECORD START TIME

2.

Obtain a copy of the reference procedure and review/utilize the correct section of the procedure.

Reviews RCIC Hard Card Sat/Unsat

3. Initiate RCIC.

601337 RCIC MANUAL INITIATION SW ARMED alarms.

At P601, rotate RCIC manual initiation pushbutton collar to armed position.

Pass/Fail

4. Report system response.

Initiation fails to due switch contact failure.

Depress RCIC manual initiation pushbutton. Report to CRS that RCIC did not initiate.

Pass/Fail Cue:

If asked, Instructor should direct operator to manually start RCIC, inject into the RPV and establish rated flow.

NOTE: Applicant will refer to manual initiation steps in Hard Card

5. Preset flow controller.

Place 2ICS*FC101, Flow Controller in M for Manual, and set to 20% output.

Sat/Unsat

NRC JPM S-4 March 2008 Performance Steps Standard Grade

6. Start gland seal air compressor.

Place Gland Seal System Air Compressor control switch to START then allow control switch to spring return to AUTO.

Sat/Unsat

7. Establish lube oil cooling water supply.

Open 2ICS*MOV116, Lube Oil Cooling Wtr Supply (Red light ON, Green light OFF).

Pass/Fail

8. Start RCIC turbine.

When MOV120 is opened, the turbine speed begins to rise.

Open ICS*MOV120, TURBINE STEAM SUPPLY VLV. (Red light ON, Green light OFF)

Verify RCIC Turbine Speed rising on E51-C002-M1.

Pass/Fail

9. Verify open ICS*MOV143, Pmp Minimum flow to Suppression Pool.

Verifies open ICS*MOV143, Pmp Minimum flow to Suppression Pool.

Sat/Unsat

10. Open pump discharge.

601347 RCIC INJECTION VLV NOT FULLY CLOSED and 601318 RCIC PUMP 1 DISCH FLOW LOW alarm.

Open ICS*MOV126, Pmp 1 Disch to Reactor (Green light OFF, Red light ON)

Pass/Fail

11. Raise turbine speed.

Slowly raise RCIC turbine speed using the RCIC flow controller in M for Manual Sat/Unsat

12. Verify the following.

As controller is adjusted, turbine speed and pump discharge pressure rise.

Verify the following:

RCIC turbine speed rises (E51-C002-M1)

RCIC pump discharge pressure rises (E51-R601)

Sat/Unsat

13. Raise injection flow.

When RCIC pump discharge pressure exceeds Rx pressure, verify the following:

Verify the following:

ICS*AOV156, Reactor Injection Outbd Test Check Vlv is open. (Green light OFF, Red light ON)

Sat/Unsat ICS*AOV157, Reactor Injection Inbd Test Check Vlv is open. (Green light OFF, Red light ON)

Sat/Unsat When RCIC flow rises above 400 gpm, malfunction RC16 actuates resulting in steam leakage in to RCIC pump room.

Simulator Operator: Confirm malfunction actuates RCIC injection flow rises. (E51-R606)

When system flow exceeds 220 gpm, verify ICS*MOV143 Pmp Minimum Flow to Suppression Pool closes.

(Green light ON, Red light OFF)

Sat/Unsat Sat/Unsat

NRC JPM S-4 March 2008 Performance Steps Standard Grade RC16 RCIC Steam Leak in Pump Room 7%

TRG 2 851254 PROCESS AIRBORNE RADN MON ACTIVATED alarms 601332 RCIC EQUIP ROOM TEMPERATURE HIGH alarms (Recorder E31-R608 Point 9).

Trip Units N602A and N602B at back panels P632 and P642 red trip light is on.

Additional alarms that may come in are 601333 (Recorder E31-R608 Point 8) and 601341 (Trip Units E31-N602A and B.

Examiner Note: Alarm Response Procedures specify that valves MOV121, MOV128, and MOV170 should have closed.

Closure of valves is also appropriate per N2-SOP-83 Containment Isolation Failure/Reset.

Responds to ARP 601332

  • Checks recorder E31-R608 for alarming points.
  • Monitors P632 and P642 trip units.
  • Verify RCIC Room Unit Coolers HVR*UC412A and B running (P870 and 871).
  • May dispatch operator to investigate.
  • Should determine other systems are available for injection and that system isolation is required.

Sat/Unsat Sat/Unsat Sat/Unsat Sat/Unsat Sat/Unsat

14. Initiates isolation.

Automatic isolation failure occurs due to malfunction RC11 active. RCIC MANUAL ISOLATION pushbutton has no affect, unless the white SEAL IN light is lit.

Depressing this pushbutton under manual start conditions will not result in an isolation signal.

Examiner Note: The examinee may proceed directly to closing the MOVs.

15. Perform isolation.

At P601, insert key into control switch for 2ICS*MOV121, 128 and rotate the key counter clockwise to Shut position, release and verify Green light(s) On, and Red light(s) Off.

Pass/Fail

16. Report RCIC isolation.

Cue:

As SRO acknowledge report, and if requested, inform performer no other tasks required at this time.

Report to SRO that RCIC isolation valve(s) are shut.

Sat/Unsat

17. Verify the following (NOT sequence critical):

At P601, manually depress turbine trip pushbutton or rotate control switch Sat/Unsat

NRC JPM S-4 March 2008 Performance Steps Standard Grade A.

ICS*MOV150 shut.

counter clockwise to close and visually observe 2ICS&MOV150 Green light On, Red light Off.

B.

ICS*MOV126 shut.

At P601, visually observe 2ICS*MOV126 Green light On, Red light Off, or rotate control switch counter clockwise to close and visually observe shut indications. Green light On, Red light Off.

Sat/Unsat C.

ICS*MOV121 shut.

At P601, visually observe 2ICS*MOV121 Green light On, Red light Off, or rotate control switch counter clockwise to close and visually observe shut indications. Green light On, Red light Off.

Sat/Unsat D.

ICS*MOV143 shut.

At P601, visually observe 2ICS*MOV143 Green light On, Red light Off, or rotate control switch counter clockwise to close and visually observe shut indications. Green light On, Red light Off.

Sat/Unsat E.

ICS*MOV128 shut.

At P601, visually observe 2ICS*MOV128 Green light On, Red light Off, or rotate control switch counter clockwise to close and visually observe shut indications. Green light On, Red light Off.

Sat/Unsat F.

ICS*MOV170 shut.

At P601, visually observe 2ICS*MOV170 Green light On, Red light Off, or rotate control switch counter clockwise to close and visually observe shut indications. Green light On, Red light Off.

Sat/Unsat Terminating Cue: RCIC isolated by operation of isolation valve control switches and procedural actions verified.

RECORD STOP TIME

NRC JPM S-4 March 2008 Work Practices Competencies

a. Communications Per GAP-OPS-01 Per NIP-HUP-02 Sat/Unsat
b. Verification of Actions Per NIP-PRO-01 Per NIP-HUP-02 Sat/Unsat
c. Procedural Compliance/Placekeeping Per NIP-PRO-01 Per NIP-HUP-02 Sat/Unsat
d. Safety Compliance Per NIP-OSH-01 Per Personnel Safety Manual Sat/Unsat
e. Radiation Protection Compliance Per GAP-RPP-01 Per GAP-RPP-02 Sat/Unsat NOTE: UNSAT in any competency area requires oral remediation of unsat area and / or reevaluation of work practices using the Work Practices JPM (O2-OPS-SJE-WPJ 00).

NRC JPM S-4 March 2008 Turnover Sheet Initial Conditions:

1. Reactor pressure is (report digital pressure reading on P603)
2. The main turbine is tripped.
3. RPV level is lowering.
4. Instructor to ask operator for any questions.

Initiating Cues:

(Operators name), Initiate RCIC, inject into the RPV and establish rated flow.

NRC JPM S-5 March 2008 NRC JPM S-5 Constellation Energy Group NINE MILE POINT UNIT 2 OPERATOR JOB PERFORMANCE MEASURE

Title:

Align SBGTS Train A to the Drywell Revision: NRC 2008 Task Number: 2000070501 Approvals:

/

NA EXAM SECURITY

/

General Supervisor Date General Supervisor Date Operations Training (Designee)

Operations (Designee)

NA EXAM SECURITY

/

Configuration Control Date Performer:

(RO/SRO/AO)

Trainer/Evaluator:

Evaluation Method: X Perform Simulate Evaluation Location:

Plant X

Simulator Expected Completion Time: 25 minutes Time Critical Task:

No Alternate Path Task: No Start Time:

Stop Time:

Completion Time:

JPM Overall Rating:

Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature:

Date:

NRC JPM S-5 March 2008 Recommended Start Location: (Completion time based on the start location)

Simulator Simulator Set-up (if required):

IC-8 Directions to the Instructor/Evaluator:

Prior to performance of this JPM, obtain SSS / CRO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SSS / CRO permission.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SSS, CRO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated.

Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified in grading areas as Pass/Fail. All steps are sequenced critical unless denoted by a *.
2. During Evaluated JPM:

Self-verification shall be demonstrated.

3. During Training JPM:

Self-verification shall be demonstrated.

No other verification shall be demonstrated.

References:

1. N2-OP-61A, Primary Containment Ventilation Purge & Nitrogen System, Section H.1.0
2. NUREG K/A: 295024, EA1.20 3.5 / 3.6

NRC JPM S-5 March 2008 Tools and Equipment:

None Task Standard:

SBGTS Train A running, aligned to the Drywell in accordance with applicable procedures.

Initial Conditions:

1. EOPs have been entered due to high suppression pool temperature.
2. Conditions require standby gas be placed on the drywell to reduce pressure.
3. Drywell and Suppression Chamber vent samples have been obtained and are satisfactory.
4. There is no Nitrogen makeup to the Primary Containment in progress.

Initiating Cues:

(Operators name), Place Standby Gas Train A on the Drywell in accordance with N2-OP-61A, Section H.1.0.

Performance Steps Standard Grade

1.

Provide repeat back of initiating cue.

Evaluator Acknowledge repeat back providing correction if necessary.

Proper communications used for repeat back (GAP-OPS-O1/Operations Manual)

Sat/Unsat RECORD START TIME

2. Obtain a copy of the reference procedure and review/utilize the correct section of the procedure.

NOTE: If necessary, instructor cue operator that time does not permit the filling out of attachment 3.

N2-OP-61A obtained. Precautions &

limitations reviewed & section H.1.0 referenced.

Sat/Unsat

3.

Open 2IAS*SOV168.

At P851, open PRI CONTMT OUTBRD ISOL VLV TO DW, 2IAS*SOV168 by rotating control switch clockwise to the open position and observing Red Light ON, Green Light OFF.

Pass/Fail

NRC JPM S-5 March 2008 Performance Steps Standard Grade

4.

Open 2IAS*SOV180.

At P851, open PRI CONTMT INBD ISOL VLV TO DW, 2IAS*SOV180 by rotating control switch clockwise to the open position and observing Red Light ON, Green Light OFF.

Pass/Fail

5.

At 2CEC*PNL870, start SBGTS A.

The following alarms actuate:.

870102 SBGTS TRAIN A HTR CHAN 1A DIFF TEMP LO 870110 SBGTS TRAIN A AIR FLOW LOW At P870, start SBGTS A by rotating the Train A Initiation switch clockwise to the start position and releasing. Observe Red Light ON and Green Light OFF.

Pass/Fail

6.

At CEC*PNL870, verify the following:

GTS*MOV1A opens GTS*AOV2A opens GTS*AOV3A opens GTS*FN1A starts At P870, verify GTS*MOV1A, GTS*AOV2A, GTS*AOV3A open and GTS*FN1A starts. Observe Red Light ON, Green Light OFF.

Sat/Unsat

7. Verify that chemistry is standing by to start the sampling required during the vent.

Cue:

If requested, inform Operator that Chemistry has started sampling during the vent.

Contacts Chemistry Sat/Unsat

8.

IF GTS operation is affecting RB Differential pressure, adjust controller 2GTS*PDIK5A, REACTOR BLDG INLET/OUTLET DIFF PRESS, to throttle 2GTS*PV5A, RX BLDG PRESSURE CONTROL, as necessary Checks that RB diff pressure is stable Sat/Unsat

9.

At CEC*PNL873, verify the following valves closed:

CPS*AOV104 CPS*AOV105 CPS*AOV110 CPS*AOV111 GTS*SOV102 GTS*AOV101 At P873, verify valves closed by observing Green Light ON and Red Light OFF.

Sat/Unsat

NRC JPM S-5 March 2008 Performance Steps Standard Grade

10. At CEC*PNL875, verify the following valves closed:

CPS*AOV106 CPS*SOV132/AOV107 CPS*AOV108 CPS*SOV133/AOV109 At P875, verify valves closed by observing Green Light ON and Red Light OFF.

Sat/Unsat

11. At CEC*PNL873, open 2GTS*SOV102.

At P873, open CONTMT DEPRESSURIZE TO SBGTS ISOL VLV, 2GTS*SOV102 by rotating control switch clockwise to the open position and observing Red Light ON, Green Light OFF.

Pass/Fail

12. At CEC*PNL873/875, open the following:

CPS*AOV108 CPS*AOV110 At P875, open 2CPS*AOV108 and, at P873, open 2CPS*AOV110 by rotating control switch clockwise to the open position and observing Red Light ON, Green Light OFF.

Pass/Fail

13. Monitor Drywell Pressure closely via 2CMS*P11A/B on 2CEC*PNL601 OR Computer Point CMSPA04.

Monitors Drywell Pressure Sat/Unsat Terminating Cue:

SBGTS Train A running on the Drywell.

RECORD STOP TIME

NRC JPM S-5 March 2008 Work Practices Competencies

a. Communications Per GAP-OPS-01 Sat/Unsat
b. Verification of Actions Per Ops Manual.

Sat/Unsat

c. Procedural Compliance/Placekeeping Per Ops Manual.

Per NIP-PRO-01.

Per N2-ODP-OPS-0001 (Unit 2).

Sat/Unsat

d. Safety Compliance Per NIP-OSH-01.

Sat/Unsat

e. Radiation Protection Compliance Per GAP-RPP-01.

Per GAP-RPP-02.

Per NDD-ALA.

Sat/Unsat NOTE: UNSAT in any competency area requires oral remediation of unsat area and / or reevaluation of work practices using the Work Practices JPM (O2-OPS-SJE-WPJ-2-00).

NRC JPM S-5 March 2008 Turnover Sheet Initial Conditions:

1. EOPs have been entered due to high suppression pool temperature.
2. Conditions require standby gas be placed on the drywell to reduce pressure.
3. Drywell and Suppression Chamber vent samples have been obtained and are satisfactory.
4. There is no Nitrogen makeup to the Primary Containment in progress.

Initiating Cues:

(Operators name), place Standby Gas Train A on the Drywell in accordance with N2-OP-61A, Section H.1.0.

NRC JPM S-6 March 2008 NRC JPM S-6 Constellation Energy Group NINE MILE POINT UNIT 2 OPERATOR JOB PERFORMANCE MEASURE

Title:

Manual Start and Load of Div III EDG Revision: NRC 2008 (Overspeed trip failure)

Task Number: 2649030101 Approvals:

/

NA EXAM SECURITY

/

General Supervisor Date General Supervisor Date Operations Training (Designee)

Operations (Designee)

NA EXAM SECURITY

/

Configuration Control Date Performer:

(RO/SRO/AO)

Trainer/Evaluator:

Evaluation Method: X Perform Simulate Evaluation Location:

Plant X

Simulator Expected Completion Time: 20 Time Critical Task:

NO Alternate Path Task: YES Start Time:

Stop Time:

Completion Time:

JPM Overall Rating:

Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature:

Date:

NRC JPM S-6 March 2008 Recommended Start Location: (Completion time based on the start location)

Unit 2 Simulator Simulator Set-up (if required):

1. IC-183 (for NRC Exam)
2. DG05B for EDG to Overspeed TRG 3 (auto activates when output breaker opens).
3. DG06B for EDG Overspeed Trip Fail PRESET Directions to the Instructor/Evaluator:

Prior to performance of this JPM, obtain SSS / CRO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SSS / CRO permission.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CRO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated.

Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified in grading areas as Pass/Fail. All steps are sequenced critical unless denoted by a *.
2. During Evaluated JPM:

Self-verification shall be demonstrated.

3. During Training JPM:

Self-verification shall be demonstrated.

Additional verification shall be demonstrated.

References:

1. N2-OP-100B, Section F.2.0
2. NUREG 1123, 264000, A4.04, 3.7/3.7

NRC JPM S-6 March 2008 Tools and Equipment:

None Required Task Standard:

Div III EDG started, paralleled with off site, loaded to 1000 KW and 1100 KVAR.

Initial Conditions:

1. Division III EDG is in Standby.
2. Attachment 2 from N2-OP-100B is complete.
3. Attachment 3 from N2-OP-100B has initial data recorded, and an operator is on station to record running data.
4. Division III EDG is to be started and loaded as an exercise.
5. N2-OP-100B is complete through step F.2.2 Initiating Cues:

Perform a manual start and load of the Division III EDG from Panel P-852 IAW N2-OP-100B. Load the generator to 700 KW.

Performance Steps Standard Grade

1.

Provide repeat back of initiating cue.

Evaluator Acknowledge repeat back providing correction if necessary.

Proper communications used for repeat back (GAP-OPS-O1/Operations Manual)

Sat/Unsat RECORD START TIME

2.

Obtain a copy of the reference procedure and review/utilize the correct section of the procedure.

N2-OP-100B obtained.

Precautions & limitations reviewed & section F.2.0 referenced.

Sat/Unsat

3.

Rotate SPEED DROOP Knob to 40 CUE: Acknowledge as field operator that speed droop is at 40.

Contacts field operator to Rotate SPEED DROOP Knob to 40 Sat/Unsat

4.

Start HPCS Diesel Generator by placing Division III 2EGS*EG2 control switch to START.

Observe the following indications at 2CEC*PNL852:

RPM rises to 900 RPM VOLTS rises to 4160 AC VOLTS.

FREQUENCY is 60 Hz.

SWP*MOV94A AND SWP*MOV94B, SERVICE WTR OUTLET open.

2SWP*FI535, SERVICE WTR FLOW indicates >600 gpm.

Division III EDG control switch positioned to START and observe the following indications at 2CEC*PNL852:

RPM rises to 900 RPM VOLTS rises to 4160 AC VOLTS.

FREQUENCY is 60 Hz.

SWP*MOV94A AND SWP*MOV94B, SERVICE WTR OUTLET open.

2SWP*FI535, SERVICE WTR FLOW indicates >600 gpm.

Pass/Fail

Performance Steps Standard Grade NRC JPM S-6 March 2008

5.

Verify governor control.

Verifies governor control by positioning governor control switch to LOWER and observing frequency lowering; positions governor control switch to RAISE and raises frequency to 60 Hz.

Sat/Unsat

6.

Verify Voltage control.

Verifies voltage control by positioning the voltage regulator control switch to LOWER and observes DG voltage lowering; positions voltage regulator control switch to RAISE and raises voltage to 4160 AC Volts.

Sat/Unsat

7.

Run DG for 5 minutes unloaded at rated voltage and frequency.

Cue: Five minutes has elapsed.

Starts a five minute clock.

Sat/Unsat

8.

Place SYNCHRONIZE TO BUS 102 sync key switch to ON.

CUE: If asked loading is required for this test.

Sync Key placed in ON.

Sat/Unsat

9.

Adjust VOLTAGE REGULATOR control switch UNTIL INCOMING VOLTS AND RUNNING VOLTS are matched.

Incoming volts and Running volts match.

Sat/Unsat

10. Using GOVERNOR control switch, adjust SYNCHROSCOPE indication to establish slow clockwise rotation.

Using GOVERNOR control switch, adjust SYNCHROSCOPE indication to establish slow clockwise rotation (slow in fast direction), as indicated by:

Meter movement between 1/2 to 1 inch per second. 12 to 24 seconds for 360 degree meter sweep.

Sat/Unsat

11. IF 102-1, EMERG DIESEL GEN2 OUTPUT BREAKER is in PULL TO LOCK, THEN coincident with the sync scope indicating 5 minutes before 12 oclock, place control switch in AUTO AFTER TRIP (green flagged)

Recognizes Output breaker is NOT in PULL TO LOCK and step is not required Sat/Unsat

12. WHEN SYNCHROSCOPE reaches 5 minutes before 12 oclock, close 102-1 EMERG DIESEL GEN2 OUTPUT BREAKER, AND verify generator picks up approximately 200 KW load.

EDG output breaker closed at 5 minutes until 12 oclock, approximately 200 KW load on the generator.

Pass/Fail

Performance Steps Standard Grade NRC JPM S-6 March 2008

13. Place SYNCHRONIZE TO BUS 102 sync key switch to OFF.

SYNCHRONIZE TO BUS 102 sync key switch placed in OFF.

Sat/Unsat

14. Gradually raise load in 500 KW increments to desired load, using GOVERNOR control switch.

CUE: After load is raised to 700 KW, tell the applicant that the EDG can now be removed from service. Procedure Section G.2.0 should be referenced for removing EDG from service.

Raises load to 700 KW.

Pass/Fail

15. Place SYNCHRONIZE TO BUS 102 sync key switch to ON.

Places SYNCHRONIZE TO BUS 102 sync key switch to ON.

Sat/Unsat

16. Lower Generator load to 200 KW, using GOVERNOR control switch.

Lowers Generator load to 200 KW, using GOVERNOR control switch.

Sat/Unsat

17. Lower VAR load to 0 KVAR, using VOLTAGE REGULATOR control switch.

Lowers VAR load to 0 KVAR, using VOLTAGE REGULATOR control switch.

Sat/Unsat

18. Open 102-1, EMERG DIESEL GEN2 OUTPUT BREAKER.

Opens 102-1, EMERG DIESEL GEN2 OUTPUT BREAKER.

19. EDG overspeeds when output breaker opens.

SIMULATOR OPERATOR NOTE:

WHEN the output breaker is opened malfunction DG05B activates to overspeed the engine. With DG06B already active, engine fails to trip.

Recognizes EDG overspeed and trips EDG with control switch OR via the Emergency Trip PB Pass/Fail Terminating Cue:

Div III EDG stopped RECORD STOP TIME

NRC JPM S-6 March 2008 Work Practices Competencies

f. Communications Per Ops Manual.

Sat/Unsat

g. Verification of Actions Per Ops Manual.

Per N2-ODP-OPS-0001 (Unit 2).

Sat/Unsat

h. Procedural Compliance/Placekeeping Per Ops Manual.

Per NIP-PRO-01.

Per N2-ODP-OPS-0001 (Unit 2).

Sat/Unsat

i.

Safety Compliance Per NIP-OSH-01.

Per N2-ODP-OPS-0106 (Unit 2).

Sat/Unsat

j.

Radiation Protection Compliance Per GAP-RPP-01.

Per GAP-RPP-02.

Per NDD-ALA.

Sat/Unsat NOTE: UNSAT in any competency area requires oral remediation of unsat area and / or reevaluation of work practices using the Work Practices JPM (O2-OPS-SJE-WPJ-2-00).

NRC JPM S-6 March 2008 Turnover Sheet Initial Conditions:

1. Division III EDG is in Standby.
2. Attachment 2 from N2-OP-100B is complete.
3. Attachment 3 from N2-OP-100B has initial data recorded, and an operator is on station to record running data.
4. Division III EDG is to be started and loaded as an exercise.
5. N2-OP-100B is complete through step F.2.2 Initiating Cues:

Perform a manual start and load of the Division III EDG from Panel P-852 IAW N2-OP-100B.

Load the generator to 700 KW.

NRC JPM S-7 March 2008 NRC JPM S-7 Constellation Energy Group NINE MILE POINT UNIT 2 OPERATOR JOB PERFORMANCE MEASURE

Title:

Resetting a Reactor Scram Revision:

NRC 2008 Task Number:

Approvals:

/

NA EXAM SECURITY

/

General Supervisor Date General Supervisor Date Operations Training (Designee)

Operations (Designee)

NA EXAM SECURITY

/

Configuration Control Date Performer:

(RO/SRO/AO)

Trainer/Evaluator:

Evaluation Method:

Perform Simulate Evaluation Location:

Plant Simulator Expected Completion Time: 10 min. Time Critical Task: NO Alternate Path Task: NO Start Time:

Stop Time:

Completion Time:

JPM Overall Rating:

Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature:

Date:

NRC JPM S-7 March 2008 Recommended Start Location: (Completion time based on the start location)

Simulator Simulator Set-up (if required):

IC-189 Post Scram Loss of Feedwater with Level Recovered and scram ready to reset.

Malfunctions FW03A and FW03B Following scram, Mode switch placed in SHUTDOWN RPV level recovered using CSH and RCIC ARI initiated on Level 2 Directions to the Instructor/Evaluator:

Prior to performance of this JPM, obtain SM / CRO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CRO permission.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CRO, and Auxiliary Operators.

Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated.

Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional /

concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used.

Therefore, either another individual or I will act as the independent/peer verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified in grading areas as Pass/Fail. All steps are sequenced critical unless denoted by a *.
2. During Evaluated JPM:

Self-verification shall be demonstrated.

3. During Training JPM:

Self-verification shall be demonstrated.

No other verification is required to be demonstrated.

NRC JPM S-7 March 2008

References:

N2-SOP-101C N2-OP-36B H.3.0 K/A 212000 A4.14 3.8/3.8 Tools and Equipment:

Four keys for SDV hi level bypass Task Standard:

RPS and ARI logics are reset with SDV Vents and Drains open.

Initial Conditions:

A Reactor scram occurred due to loss of feedwater Level is recovered following automatic start of RCIC and HPCS N2-SOP-101C, Reactor Scram procedure is being executed Another operator is assigned level and pressure control Initiating Cues:

(Operators name), Reset the scram.

Performance Steps Standard Grade

1. Provide repeat back of initiating cue. Evaluator Acknowledge repeat back providing correction if necessary Proper communications used for repeat back (GAP-OPS-O1)

Sat/Unsat RECORD START TIME

2. Obtain a copy of the reference procedure and review/utilize the correct section.

N2-OP-SOP-101C obtained and reviewed.

Sat/Unsat

3. IF the reactor scram can be promptly reset (and remain reset)

THEN reset the scram Determines all scram signals are clear except Scram Discharge High Level trips and the scram can be reset.

Sat/Unsat

NRC JPM S-7 March 2008 Performance Steps Standard Grade

4. Reset the scram as follows:
5. Notify radwaste to operate all pumps for 2DER-TK2A.

Cue: As Radwaste, report all pumps for 2DER-TK2A are operating Contacts Radwaste to operate all pumps for 2DER-TK2A Sat/Unsat

6. Place all four SDV high level bypass switches to BYPASS.

603117 RPS A SDV HIGH LEVEL BYPASS alarms 603417 RPS B SDV HIGH LEVEL BYPASS alarms Using four keys, places four DISH VOLUME HI WTR LEVEL BYPASS switches to BYPASS CHANNEL A1 to BYPASS CHANNEL A2 to BYPASS CHANNEL B1 to BYPASS CHANNEL B2 to BYPASS PASS/FAIL PASS/FAIL PASS/FAIL PASS/FAIL

7. IF initiated, reset ARI per N2-OP-36B, H.3.0.

Determines ARI reset is required, based on ARI INIT and ARI READY TO RESET amber lights lit.

Sat/Unsat OBTAINS N2-OP36B Per N2-OP-36B H.3.0

8. To reset the ARI initiation signal, perform the following:

Confirm the RRCS Division I ARI READY TO RESET amber light is energized.

Observe Division I ARI READY TO RESET amber light is energized.

Sat/Unsat

NRC JPM S-7 March 2008 Performance Steps Standard Grade Confirm the RRCS Division II ARI READY TO RESET amber light is energized.

Momentarily depress ALL four ARI RESET black pushbuttons.

Observe Division II ARI READY TO RESET amber light is energized.

Depress all four ARI RESET pushbuttons Observe amber ARI RESET and READY TO RESET lights extinguish Sat/Unsat PASS/FAIL Sat/Unsat NOTE: If RRCS READY TO RESET amber light is lit, candidate may also reset RRCS. N2-SOP-101C does not require RRCS reset as part of the scram reset procedure.

9. To reset the RRCS initiation signal, perform the following:

Confirm the RRCS Division I READY TO RESET amber light is energized.

Observe Division I READY TO RESET amber light is energized.

Sat/Unsat/

NA Confirm the RRCS Division II READY TO RESET amber light is energized.

Momentarily depress ALL four RRCS RESET black pushbuttons.

Observe Division II READY TO RESET amber light is energized.

Depress RRCS RESET pushbuttons Observe amber ARI RESET and READY TO RESET lights extinguish Sat/Unsat/

NA Sat/Unsat/

NA Sat/Unsat

NRC JPM S-7 March 2008 Performance Steps Standard Grade

10. Using scram reset switches, reset the scram; verify all 8 pilot solenoid lights are lit.

603110 RPS A AUTO TRIP clears and four RPS A scram solenoid lights illuminate.

603410 RPS B AUTO TRIP clears and four RPS B scram solenoid lights illuminate.

Momentarily places switches to RESET and observes pilot solenoid lights are lit.

REACTOR SCRAM RESET LOGIC A

REACTOR SCRAM RESET LOGIC C

REACTOR SCRAM RESET LOGIC B

REACTOR SCRAM RESET LOGIC D

PASS/FAIL PASS/FAIL PASS/FAIL PASS/FAIL

11. Reseat rods if necessary by applying insert signal.

Cue: If asked inform candidate reseating rods is not necessary.

Determines reseat is not necessary Sat/Unsat

/NA 12.Verify SDV vent and drain valves open.

The following alarms clear as the vents and drains open.

603433 SDV DRAIN AOV123 CLOSED 603434 SDV DRAIN AOV130 CLOSED 603435 SDV VENT AOV1234 CLOSED 603433 SDV VENT AOV132 CLOSED Observe SCRAM DISCH VOLUME VENT VLVS RDS*AOV124/132 red light on and green light extinguishes.

Observe SCRAM DISCH VOLUME DRAIN VLVS RDS*AOV123/130 red light on and green light extinguishes.

Sat/Unsat

13. Report reactor scram is reset.

Report scram reset is complete TERMINATING CUE:

RPS and ARI logics are reset with SDV Vents and Drains open.

RECORD STOP TIME

TURNOVER SHEET NRC JPM S-7 March 2008 INITIAL CONDITIONS:

1.

A Reactor scram occurred due to loss of feedwater

2.

Level is recovered following automatic start of RCIC and HPCS

3.

N2-SOP-101C, Reactor Scram procedure is being executed

4.

Another operator is assigned level and pressure control INITIATING CUES:

(Operators name), Reset the scram.