ML081010159
ML081010159 | |
Person / Time | |
---|---|
Site: | Nine Mile Point |
Issue date: | 04/10/2008 |
From: | Constellation Energy Group |
To: | D'Antonio J Operations Branch I |
Hansell S | |
Shared Package | |
ML073040288 | List: |
References | |
Download: ML081010159 (33) | |
Text
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE
Title:
Determination of Technical Specification Actions when in Revision: NRC 2008 Single Loop Operation and MCPR is exceeded.
Task Number: 341-032-03-03-2: Evaluate Plant Systems performance and coordinate appropriate actions per Technical Specifications, as required.
Approvals:
/ NA EXAMINATION SECURITY/____
General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)
NA EXAMINATION SECURITY /
Configuration Control Date Performer: (SRO)
Trainer/Evaluator:
Evaluation Method: PERFORM Evaluation Location: SIMULATOR OR OTHER DESIGNATED AREA Expected Completion Time: 15 min. Time Critical Task: No Alternate Path Task: No Start Time: Stop Time: Completion Time:
JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluators Signature: Date:
NRC EXAM Admin SRO/JPM Conduct of Ops#1 1 March 2008
Recommended Start Location: (Completion time based on the start location)
Any appropriate location with the required Reference Material.
Simulator Set-up:
None Directions to the Instructor/Evaluator:
To be performed as an administrative JPM.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the Reactor Engineer, Work Control or other on shift personnel. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional
/ concurrent verification will not be provided; therefore, it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used.
Therefore, either another individual or I will act as the independent/peer verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified in grading areas as Pass/Fail. All steps are sequenced critical unless denoted by a *.
- 2. During Evaluated JPM:
- Self verification shall be demonstrated.
- 3. During Training JPM:
- Self verification shall be demonstrated.
- No other verification shall be demonstrated.
References:
- 1. Plant Technical Specifications
- 2. N2-SOP-29
- 3. N2-OP-29
- 4. NUREG K/A General Knowledges and Abilities 2.1.12(4.0)
Tools and Equipment:
- 1. 3D Monicore Periodic Log indicating MCPR is above 1.0 Task Standard:
Given current plant status and Thermal Limit information, determine the actions required by Technical Specifications.
NRC EXAM Admin SRO/JPM Conduct of Ops#1 2 March 2008
Initial Conditions:
- 1. The Reactor was operating at 100% power when ONE Reactor Recirc Pump tripped due to high motor vibration.
- 2. N2-SOP-29 has been completed through step 5.7.
Initiating Cues:
(Operators name), determine the actions required by Technical Specifications for single loop operation and verify Unit 2 is in compliance.
Performance Steps Standard Grade Comments
- 1. Provide repeat back of Proper communications used for Sat/Unsat initiating cue. Evaluator repeat back (GAP-OPS-Acknowledge repeat back O1/Operations Manual) providing correction if necessary RECORD START TIME
- 2. Obtain a copy of the Obtains a copy of Technical Sat/Unsat Technical Specifications and Specifications.
review/utilize the correct Refers to Reactor Coolant System section. (RCS) Section.
NRC EXAM Admin SRO/JPM Conduct of Ops#1 3 March 2008
Performance Steps Standard Grade Comments
- 3. Enters T.S. - 3.4.1, Enters T.S. - 3.4.1 and determines Pass/Fail Recirculation Loops Single Loop operation is Operating. allowable as long as the specified LCOs are met.
- a. LCO 3.2.1, Average Planar Linear Heat Generation Rate.
- b. LCO 3.2.2, Minimum Critical Power Ratio.
CUE: Tell the candidate the c. LCO 3.3.1.1, Reactor Protection Steps listed as c. and d. System (RPS) Instrumentation.
were accomplished by o Reset APRM Biased I&C. Thermal Power-Upscale for Single Loop.
- d. LCO 3.3.2.1, Control Rod Block Instrumentation.
o Reset RBM - Upscale for Single Loop.
CUE: As the Reactor Engineer, Review 3D Monicore Periodic Log Pass/Fail provide the candidate with and determine MFLCPR is greater a copy of 3D Monicore than 1.0.
Periodic Log. Pass/Fail Determines MFLCPR limit is NOT met.
- 4. Determines Technical Refers to T.S. LCO 3.2.2 and Specification LCO determines:
requirements.
- A - The MCPR(s) must be Pass/Fail restored to within limits within two (2) hours.
- B - IF Required Action A.1 is not met, power must be below 25%
RTP in four (4) hours.
NRC EXAM Admin SRO/JPM Conduct of Ops#1 4 March 2008
Performance Steps Standard Grade Comments CUE: If asked as the Reactor Engineer, tell the Candidate that you are investigating Rod patterns that will lower the affected MCPR.
End of JPM TERMINATING CUE: Appropriate Technical Specifications have been entered and LCOs identified.
RECORD STOP TIME NRC EXAM Admin SRO/JPM Conduct of Ops#1 5 March 2008
OK TO PROVIDE AS APPLICANT HANDOUT Initial Conditions:
- 1. The Reactor was operating at 100% power when ONE Reactor Recirc Pump tripped due to high motor vibration.
- 2. N2-SOP-29 has been completed through step 5.7.
Initiating Cues:
(Operators name), determine the actions required by Technical Specifications for single loop operation and verify Unit 2 is in compliance.
NRC EXAM Admin SRO/JPM Conduct of Ops#1 6 March 2008
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE
Title:
Review Daily Checks Log IAW N2-OSP-LOG-D001 Revision: NRC 2008 Task Number: NA Approvals:
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Performer: (SRO)
Trainer/Evaluator:
Evaluation Method: PERFORM Evaluation Location: SIMULATOR OR OTHER DESIGNATED LOCATION Expected Completion Time: 25 minutes Time Critical Task: NO Alternate Path Task: NO Start Time: Stop Time: Completion Time:
JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluator Signature: Date:
NRC EXAM Admin SRO/JPM Conduct of Ops#2 1 March 2008
Recommended Start Location: (Completion time based on the start location)
Any appropriate location with the required Reference Material.
Simulator Set-up:
None Directions to the Instructor/Evaluator:
To be performed as an administrative JPM.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators.
Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional
/ concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used.
Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
- 2. During Evaluated JPM:
- Self-verification shall be demonstrated.
- 3. During Training JPM:
- Self-verification shall be demonstrated.
- No other verification shall be demonstrated.
References:
- 1. N2-OSP-LOG-D001 Rev 12, Daily Checks Log
- 2. K/A 2.1.18(3.0) Ability to make accurate, clear and concise logs, records, status boards, and reports.
Tools and Equipment:
- 1. Calculator Task Standard:
N2-OSP-LOG-D001, Attachment 2 review completed and designated errors documented in the Remarks Section of N2-OSP-LOG-D001.
NRC EXAM Admin SRO/JPM Conduct of Ops#2 2 March 2008
Initial Conditions:
- 1. The plant is operating at 100% power.
- 2. N2-OSP-LOG-DOO1 for the daily checks log has been completed and submitted for CRS/SM review.
- 3. Ask the operator for any questions.
Initiating cue:
(Operators name), Perform a review of N2-OSP-LOG-D001, Attachment 2 and document any unsatisfactory results in the Remarks Section on page 11 of N2-OSP-LOG-D001.
Performance Steps Standard Grade Comments
- 1. Provide repeat back of Proper communications used for Sat/Unsat initiating cue. Evaluator repeat back (GAP-OPS-O1)
Acknowledge repeat back providing correction if necessary EVALUATOR to provide copy of N2-OSP-LOG-D001 to candidate for review.
RECORD START TIME
- 2. *Obtain a copy of the N2-OSP-LOG-D001 obtained. Sat/Unsat reference procedure and - Attachment 2 referenced.
review/utilize the correct section.
NRC EXAM Admin SRO/JPM Conduct of Ops#2 3 March 2008
Performance Steps Standard Grade Comments
- 3. *Reviews Daily Checks Log * (Item #2) Sheet 1 of 20 - sodium Pass/Fail and determines the following pentaborate solution is below TS are outside of their limits. limit.
CUE: If asked what Suppression * (Item #13) Sheet 5 of 20 - Supp Pool level indication was used, Pool Lvl is below TS limit and not state CMSLA02 and that that this initialed.
level was confirmed on other indications. * (Item #15) Sheet 6 of 20 - RX BLDG Diff Press is below its TS CUE: If asked if the Reactor limit.
Building Differential Pressure was confirmed on other instrument, * (Item #32) Sheet 11 of 20 - CST state YES. Lvl is below its USAR limit.
CUE: If asked if the Reactor * (Items #41 & #37) Sheet 13 of 20 Building is in Summer Reversal, - Max difference between APRM state NO. averages exceeds 2% (may also identify APRM #1 as being more than 2% out of TS limit.
- (Item #57) Sheet 16 of 20 -
Computer Point SWPLA06 is below the TS limit.
- (Item #73 and 77) Sheet 19 of 20
- ECCS room temperature average calculation is incorrect (75.91EF is correct value).
Independent verification is not signed off NRC EXAM Admin SRO/JPM Conduct of Ops#2 4 March 2008
Performance Steps Standard Grade Comments
- 4. Documents any Results documented in Remarks Sat/Unsat unsatisfactory results in the Section on Page 11 of procedure.
Remarks Section of N2-OSP-LOG-D001.
End of JPM TERMINATING CUE: N2-OSP-LOG-D001 review completed and results documented in Remarks Section.
RECORD STOP TIME NRC EXAM Admin SRO/JPM Conduct of Ops#2 5 March 2008
OK TO PROVIDE AS APPLICANT HANDOUT Initial Conditions:
- 1. The plant is operating at 100% power.
- 2. N2-OSP-LOG-DOO1 for the daily checks log has been completed and submitted for CRS/SM review.
- 3. Ask the operator for any questions.
Initiating Cue:
(Operators name), Perform a review of N2-OSP-LOG-D001, Attachment 2 and document any unsatisfactory results in the Remarks Section on page 11 of N2-OSP-LOG-D001.
NRC EXAM Admin SRO/JPM Conduct of Ops#2 6 March 2008
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE
Title:
Clearance Section Review Revision: NRC 2008 Task Number:
Approvals:
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Performer: (SRO)
Trainer/Evaluator:
Evaluation Method: PERFORM Evaluation Location: SIMULATOR OR OTHER DESIGNATED AREA Expected Completion Time: 30 minutes Time Critical Task: NO Alternate Path Task: NO Start Time: Stop Time: Completion Time:
JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluator Signature: Date:
NRC EXAM Admin SRO/JPM Equip Control 1 March 2008
Recommended Start Location: (Completion time based on the start location)
Any appropriate location with the required Reference Material.
Simulator Set-up:
None Directions to the Instructor/Evaluator:
To be performed as an administrative JPM.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used.
Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
- 2. During Evaluated JPM:
- Self-verification shall be demonstrated.
- 3. During Training JPM:
- Self-verification shall be demonstrated.
- No other verification shall be demonstrated.
References:
- 1. GAP-OPS-02, Control Of Hazardous Energy, Clearance, and Tagging
- 2. Drawings: EE-1Q, EE-1AU, P&IDs 31C, 31F and 32A
- 3. General Knowledges and Ability 2.2.13(3.8) 2.2.15(2.9)
Tools and Equipment:
- 1. None Task Standard:
Clearance section review is completed and designated errors are identified and documented.
NRC EXAM Admin SRO/JPM Equip Control 2 March 2008
Initial Conditions:
- 1. The plant is operating at 100% power.
- 2. Maintenance has requested a clearance section to replace the pump seals for 2RHS*P1A.
- 3. A manual clearance section has been generated and is ready for review.
- 4. Ask the operator for any questions.
Initiating cue:
(Operators name), Perform a review of the clearance section for 2RHS*P1A and document on the clearance request any changes required.
Performance Steps Standard Grade Comments
- 4. Provide repeat back of Proper communications used for Sat/Unsat initiating cue. Evaluator repeat back (GAP-OPS-O1)
Acknowledge repeat back providing correction if necessary.
CUE: If asked how to document state they should RECORD START TIME
- Obtain a copy of clearance Clearance section is obtained and Sat/Unsat section for review. Evaluator referenced.
to provide Candidate a copy of clearance section and referenced drawings.
NRC EXAM Admin SRO/JPM Equip Control 3 March 2008
Performance Steps Standard Grade Comments
- 5. Review the clearance Reviews clearance request and Pass/Fail request. identifies the following errors:
Tags #4 and 5 are out of order (should be last)
Tag #5 is on the wrong pump (2RHS*P1B)
Tag #13 is in wrong position (correct position is closed)
Clearance does not include tags EXAMINER NOTE: Tag #7 may on normal suction path to pump be a Danger or Reference Tag (2RHS*MOV1A - valve and power supply)
Keep fill is NOT isolated and tagged (RHS*V265)
- 3. Errors identified and noted on All identified errors documented on Sat/Unsat the clearance section. the clearance section.
End of JPM TERMINATING CUE: The clearance section has been reviewed and designated errors identified and documented.
RECORD STOP TIME NRC EXAM Admin SRO/JPM Equip Control 4 March 2008
OK TO PROVIDE AS APPLICANT HANDOUT Initial Conditions:
- 1. The plant is operating at 100% power.
- 2. Maintenance has requested a clearance section to replace the pump seals for 2RHS*P1A.
- 3. A manual clearance section has been generated and is ready for review.
- 4. Ask the operator for any questions.
Initiating Cue:
ators name), Perform a review of the clearance section for 2RHS*P1A and document on the clearance request any changes required.
NRC EXAM Admin SRO/JPM Equip Control 5 March 2008
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE
Title:
Event Classification, Notifications and Reclassification Revision: NRC 2008 Task Number:
Approvals:
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Performer: (SRO)
Trainer/Evaluator:
Evaluation Method: PERFORM Evaluation Location: SIMULATOR OR OTHER DESIGNATED AREA Expected Completion Time: 45 minutes Time Critical Task: YES Alternate Path Task: NO Start Time: Stop Time: Completion Time:
JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluator Signature: Date:
NRC EXAM Admin SRO/JPM Emergency Pr/Plan 1 March 2008
Recommended Start Location: (Completion time based on the start location)
Classroom or Simulator. Ensure sufficient copies of SM/ED Checklist Package are available Simulator Set-up:
None Directions to the Instructor/Evaluator:
To be performed as an administrative JPM. Ideally this JPM should be performed in the Control Room or Simulator to provide adequate procedural resources. If this JPM cannot be performed in one of these locations, then the complete SM/ED Checklist Package must be provided to the Candidate.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the Unit 1 SM, Security Supervisor, Communication Aid, and other personnel as necessary. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
- 2. During Evaluated JPM:
- Self-verification shall be demonstrated.
- 3. During Training JPM:
- Self-verification shall be demonstrated.
- No other verification shall be demonstrated.
References:
- 4. EPIP-EPP-02, Classification Of Emergency Conditions at Unit 2
- 5. EPIP-EPP-18, Attachment 1 SM/ED Checklist
- 6. EPIP-EPP-20, Emergency Notifications
- 7. K/A 2.4.29(4.0), Knowledge of the Emergency Plan.
Tools and Equipment:
1.0 EPIP-EPP-02, ATTACHMENT 2, UNIT 2 EAL FLOWCHART 2.0 SM/ED Checklist Package NRC EXAM Admin SRO/JPM Emergency Pr/Plan 2 March 2008
Task Standard:
Classify the event within 15 minutes of the time that indications are available in the Control Room that an EAL has been exceeded and make all appropriate notifications within 15 minutes of the time the event is classified.
NRC EXAM Admin SRO/JPM Emergency Pr/Plan 3 March 2008
Initial Conditions:
- 6. Unit 2 had been operating at 100% power.
- 7. The following conditions exist:
A Tornado hit the site causing a Station Blackout fifteen minutes ago and has moved out of the area.
The Division 1, 2 and 3 Emergency Diesels tripped immediately after starting and can NOT be restarted.
The Systems Operating Center (Load Dispatcher) expects power restoration within 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.
Drywell Pressure is 1.1 psig and slowly rising.
RCIC is operating and maintaining Reactor Water Level in the normal band.
Reactor Building pressure is positive.
- 8. Unit 1 tripped 15 minutes ago and has not declared an emergency.
- 9. Ask the operator for any questions.
Initiating Cue:
(Operators name), Based on the above conditions determine the event classifications per EPIP-EPP-02 and complete steps 1 through 7.b of EPIP-EPP-18, Attachment 1, SM/ED Checklist.
al.
After this event is classified and the notifications identified, the plant conditions will change as stated below and a reclassification will be required.
Initial Conditions #2:
- 1. The Division 3 Diesel Generator has been restored and has been started but NOT connected to any bus.
- 2. Reactor Level is normal.
- 3. Drywell Pressure is 1.1 psig and stable.
- 4. The Security Supervisor notified the Control Room that four armed intruders have taken control of the Division 1, 2, and 3 Switchgear Rooms.
Initiating Cue:
(Operators name), Based upon the above changes in the conditions, determine how would this effect your previous EPIP-EPP-02 classification.
This is time critical.
NRC EXAM Admin SRO/JPM Emergency Pr/Plan 4 March 2008
Performance Steps Standard Grade Comments
- 6. Provide repeat back of initiating Proper communications used for repeat Sat/Unsat cue. Evaluator Acknowledge back (GAP-OPS-O1) repeat back providing correction if necessary RECORD START TIME
- 7. *Obtain a copy of EPIP-EPP-02 EPIP-EPP-02 is obtained. Sat/Unsat and review/utilize the correct section.
- 8. *Reviews the given conditions Declares a Site Area Emergency within Pass/Fail EXAMINER NOTE:
and determines that a Site Area fifteen minutes of the JPM in accordance Emergency declaration is with EAL 6.1.4. Time of Declaration: ____________.
required.
CUE: If asked, cue that Unit 1 is not in any EAL.
- 9. *Enters EPIP-EPP-18, Completes Attachment 1A and Pass/Fail EXAMINER NOTE:
Attachment 1, SM/ED Checklist Attachment 4 correctly.
and completes Steps 1 through Time Attachment 4 is completed through step 4:
7.b. Completes applicable _________.
portions of EPIP-EPP-20, Attachments 1A and 4.
CUE: When asked for meteorological data state:
Wind Speed @ 30 = 4 mph Wind Speed @ 200 = 6 mph Wind Dir @ 30 = 45º NRC EXAM Admin SRO/JPM Emergency Pr/Plan 5 March 2008
Performance Steps Standard Grade Comments Wind Dir @ 200 = 45º Stability Class D EXAMINER NOTE:
Once Attachment 1, CAN Notification Form is completed and prior to it being faxed, provide the Candidate with Initial Conditions #2.
CUE: If contacted as Security or state police for road access state that road access is normal.
NOTE: This is also Time Critical.
- 5. *Reviews the given conditions Declares General Emergency within 15 Pass/Fail EXAMINER NOTE:
and determine that a General minutes per EAL 8.1.10.
Emergency declaration is Time of notification of status change: ____________.
required per EAL 8.1.10.
Time of Declaration: ____________.
End of JPM TERMINATING CUE: The event has been classified and re-classified and all appropriate notifications initiated.
RECORD STOP TIME NRC EXAM Admin SRO/JPM Emergency Pr/Plan 6 March 2008
Initial Conditions:
- 2. Unit 2 had been operating at 100% power.
- 3. The following conditions exist:
A Tornado hit the site causing a Station Blackout fifteen minutes ago and has moved out of the area.
The Division 1, 2 and 3 Emergency Diesels tripped immediately after starting and can NOT be restarted.
The Systems Operating Center (Load Dispatcher) expects power restoration within 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.
Drywell Pressure is 1.1 psig and slowly rising.
RCIC is operating and maintaining Reactor Water Level in the normal band.
Reactor Building pressure is positive.
- 4. Unit 1 tripped 15 minutes ago and has not declared an emergency.
- 5. Ask the operator for any questions.
Initiating Cue:
(Operators name), Based on the above conditions determine the event classifications per EPIP-EPP-02, and complete steps 1 through 7.b of EPIP-EPP-18, Attachment 1, SM/ED Checklist.
This is time critical.
NRC EXAM Admin SRO/JPM Emergency Pr/Plan 7 March 2008
Initial Conditions #2
- 1. The Division 3 Diesel Generator has been restored and has been started but NOT connected to any bus.
- 2. Reactor Level is normal.
- 3. Drywell Pressure is 1.1 psig and stable.
- 4. The Security Supervisor notified the Control Room that four armed intruders have taken control of the Division 1, 2, and 3 Switchgear Rooms.
Initiating Cue:
(Operators name), Based upon the above changes in the conditions, determine how would this effect your previous EPIP-EPP-02 classification.
This is time critical.
NRC EXAM Admin SRO/JPM Emergency Pr/Plan 8 March 2008
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE
Title:
Generate and Approve an Emergency Exposure Authorization Revision:
NRC 2008 Task Number: 3439100303 Approvals:
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Performer: (SRO)
Trainer/Evaluator:
Evaluation Method: PERFORM Evaluation Location: SIMULATOR OR OTHER DESIGNATED AREA Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task:
NO Start Time: Stop Time: Completion Time:
JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluator Signature: Date:
NRC EXAM Admin SRO/JPM Rad Control 1 March 2008
Recommended Start Location: (Completion time based on the start location)
Any appropriate location with the required Reference Material.
Simulator Set-up:
None Directions to the Instructor/Evaluator:
To be performed as an administrative JPM. A calculator should be available or be provided.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the Radiation Protection, the SM, CRO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used.
Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
- 2. During evaluated JPM:
- Self-verification shall be demonstrated.
- 3. During training JPM:
- Self-verification shall be demonstrated.
- No other verification shall be demonstrated.
References:
- 3. EPIP-EPP-15
- 4. K/A 2.3.4 (3.1), Knowledge of radiation exposure limits and contamination control, including permissible levels in excess of those authorized.
Tools and Equipment:
- 2. Calculator Task Standard:
Generate and approve an Emergency Exposure Authorization Form and estimate exposure.
NRC EXAM Admin SRO/JPM Rad Control 2 March 2008
Initial Conditions:
- 1. You have assumed the responsibilities of the Shift Manager/Emergency Director.
- 2. Entry to the reactor building is required to manually close ICS*MOV121
- 3. Time to complete the task for an experienced operator will be approximately 12 minutes.
- 4. Time to complete the task for a new operator will be approximately 15 minutes
- 5. A RCIC steam leak into the Reactor Building can not be isolated without manually shutting ICS*MOV121.
- 6. Radiation levels at the valve are as high as 15 R/hr.
- 7. Three (3) individuals are available to perform the task.
- Worker A is a volunteer who is an experienced Licensed Reactor Operator that has previously received a planned special exposure at another facility (TLD #1, Employee # - 00001, SSN: 111-11-1111).
- Worker B is a volunteer who is an experienced Licensed Reactor Operator and is a declared pregnant worker and has received a dose of 15 mR this year (TLD #2, Employee # - 00002, SSN: 222-22-2222).
- Worker C is a volunteer who is an experienced Licensed Reactor Operator that has received a dose of 1200 mR this year (TLD #3, Employee # 00003, SSN: 333-33-3333).
- Worker D is a volunteer who is a new Licensed Reactor Operator that has received a dose of 250 mR this year (TLD #4, Employee #
00004, SSN: 444-44-4444).
- 8. Ask the operator for any questions.
Initiating Cue:
(Operators name), choose an individual to close ICS*MOV121, estimate the expected radiation exposure and document your authorization for an Emergency Exposure and state the reason why that worker was chosen.
EXAMINER NOTE: If asked, inform the candidate that RP recommends limiting the exposure to 24 minutes.
Performance Steps Standard Grade Comments
- 10. Provide repeat back of Proper communications used for Sat/Unsat initiating cue. Evaluator repeat back (GAP-OPS-O1).
Acknowledge repeat back providing correction if necessary NRC EXAM Admin SRO/JPM Rad Control 3 March 2008
Performance Steps Standard Grade Comments RECORD START TIME
- 11. *Obtain a copy of the EPIP-EPP-15 is obtained and Sat/Unsat reference procedure and Attachments 1 and 1-1 are review/utilize the correct referenced.
section.
- 12. *Determines the expected For an experienced worker - Pass/Fail exposure for the task Calculates that a 12 minute exposure in a 15 R/hr field will cause a dose of 3 R.
For a new worker - Calculates that a 15 minute exposure in a 15 R/hr field will cause a dose of 3.75 R.
- Since the action is required to limit dose to the public, 25 R is the limit.
- 3 R is well within the 25 R limit.
- The experienced worker will receive the lowest dose.
- 13. *Selects the best worker to Determines the best worker for the Pass/Fail perform the task. task:
- Worker A has previously received a planned special exposure
- Worker B is a declared pregnant worker NRC EXAM Admin SRO/JPM Rad Control 4 March 2008
Performance Steps Standard Grade Comments
- Worker C is an experienced Licensed Reactor Operator
- Worker D is a new Licensed Reactor Operator
- 14. *Determines workers The absolute exposure limit for the Sat/Unsat exposure limit. job is 25 R. If the recommendation of RP is used the limit is 6 R. If the limit EXAMINER NOTE: The is based on a stay time of 12 minutes authorized Exposure limit may be the exposure limit is 3 R.
25 R or less based on whether the candidate limits the volunteers exposure to the anticipated stay time (12 min) or Worker C is assigned to the task.
a recommendation from RP. Choosing this individual will result in the lowest total dose for the job if CUE: If asked, inform the completed in 12 minutes (3R). This candidate that RP recommends will result in an accumulated limiting the exposure to 24 individual dose of 4.2R (Station minutes. AlARA total dose goal consideration)
Worker D is assigned to the task.
Choosing this individual will result in a total dose of 3.75 if completed in 15 minutes and an accumulated individual dose of 4.0R (Lowest Individual dose goal consideration).
CUE: The Candidate may CUE: Role play as Worker C and choose to brief the worker on acknowledge the briefing.
NRC EXAM Admin SRO/JPM Rad Control 5 March 2008
Performance Steps Standard Grade Comments Radiological conditions, potential for steam leakage in the area, planned task, applicable ALARA measures, and contingency measures, CUE: The Candidate may ask for CUE: Role play as RP and state an RWP to be generated. that an RWP has been generated.
- 15. *Generates an Emergency
- Candidate obtains a copy of EPIP- Pass/Fail Exposure Authorization form. EPP-15 Attachment 1-1.
- Candidate completes Section A.
End of JPM TERMINATING CUE: When the Candidate completes the Emergency Exposure Authorization Form.
RECORD STOP TIME NRC EXAM Admin SRO/JPM Rad Control 6 March 2008
OK TO PROVIDE AS APPLICANT HANDOUT Initial Conditions:
- 1. You have assumed the responsibilities of the Shift Manager/Emergency Director.
- 2. Entry to the reactor building is required to manually close ICS*MOV121
- 3. Time to complete the task for an experienced operator will be approximately 12 minutes.
- 4. Time to complete the task for a new operator will be approximately 15 minutes
- 5. A RCIC steam leak into the Reactor Building can not be isolated without manually shutting ICS*MOV121.
- 6. Radiation levels at the valve are as high as 15 R/hr.
- 7. Three (3) individuals are available to perform the task.
- Worker A is a volunteer who is an experienced Licensed Reactor Operator that has previously received a planned special exposure at another facility (TLD #1, Employee #
- 00001, SSN: 111-11-1111).
- Worker B is a volunteer who is an experienced Licensed Reactor Operator and is a declared pregnant worker and has received a dose of 15 mR this year (TLD #2, Employee # - 00002, SSN: 222-22-2222).
- Worker C is a volunteer who is an experienced Licensed Reactor Operator that has received a dose of 1200 mR this year (TLD #3, Employee # 00003, SSN: 333-33-3333).
- Worker D is a volunteer who is a new Licensed Reactor Operator that has received a dose of 250 mR this year (TLD #4, Employee # 00004, SSN: 444-44-4444).
- 8. Ask the operator for any questions.
Initiating Cue:
(Operators name), choose an individual to close ICS*MOV121, estimate the expected radiation exposure and document your authorization for an Emergency Exposure.
NRC EXAM Admin SRO/JPM Rad Control 7 March 2008
NRC EXAM Admin SRO/JPM Rad Control 8 March 2008