ML080790171
| ML080790171 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 03/19/2008 |
| From: | NRC Region 1 |
| To: | |
| Dentel, G RGN-I/DRP/BR1/610-337-5233 | |
| References | |
| Download: ML080790171 (20) | |
Text
NRC Annual Performance Assessment of Calvert Cliffs 2007 Reactor Oversight Program
Purpose of Todays Meeting Discuss Constellations Plant Performance for 2007 Provide Constellation the opportunity to respond to the NRCs Annual Performance Assessment and identify new or existing programs to maintain or improve their performance Provide stakeholders the opportunity to engage the NRC staff on plant performance issues and our role in ensuring safe plant operations
Agenda Introduction NRC Organization and Performance Goals Reactor Oversight Process (ROP)
National Summary of Plant Performance Calvert Cliffs Plant Performance Assessment Constellation Response and Remarks NRC Closing Remarks Break NRC available to address public questions
Region I Organization Samuel J. Collins Regional Administrator Marc J. Dapas Deputy Regional Administrator David C. Lew Director Division of Reactor Projects James W. Clifford Deputy Director Marsha K. Gamberoni Director Division of Reactor Safety Darrell J. Roberts Deputy Director Glenn T. Dentel Branch Chief Regional Specialists Calvert Cliffs Resident Inspectors Silas Kennedy Marlone Davis Project Engineers Brice Bickett Justin Hawkins
NRC Strategic Plan Goals 3/4 Safety: Ensure adequate protection of public health and safety and the environment 3/4 Security: Ensure adequate protection in the secure use and management of radioactive materials
Reactor Oversight Process 3 Strategic Areas & 7 Cornerstones Reactor Safety Radiation Safety Safeguards Initiating Events Mitigating Systems Barrier Integrity Emergency Preparedness Occupational Radiation Safety Public Radiation Safety Physical Protection
Reactor Oversight Process Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas
Examples of Baseline Inspection Areas Equipment Alignment Maintenance Fire Protection Operator Response Emergency Preparedness Radiological and Environmental Monitoring Worker Radiation Protection Corrective Action Program Corrective Action Case Reviews
Significance Threshold Performance Indicators 3/4 Green Baseline Inspection 3/4 White May increase NRC oversight 3/4 Yellow Requires more NRC oversight 3/4 Red Requires most NRC oversight Inspection Findings 3/4 Green Very low safety issue 3/4 White Low to moderate safety issue 3/4 Yellow Substantial safety issue 3/4 Red High safety issue
Action Matrix Concept Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions Licensee
Response
Regulatory
Response
Degraded Cornerstone Multiple/Rep.
Degraded Cornerstone Unacceptable Performance
National Summary of Plant Performance Status at End of 2007 Licensee Response 87 Regulatory Response 8
Degraded Cornerstone 8
Multiple/Repetitive Degraded Cornerstone 1
Unacceptable 0
Total 104
National Summary of Plant Performance Status at End of 2007 Performance Indicator Results 3/4 Green 1954 3/4 White 8
3/4 Yellow 2
3/4 Red 0
Total Inspection Findings 3/4 Green 918 3/4 White 9
3/4 Yellow 2
3/4 Red 0
NRC Inspection Activities at Calvert Cliffs 3/4 8000 hours0.0926 days <br />2.222 hours <br />0.0132 weeks <br />0.00304 months <br /> of inspection and related activities 3/4 2 resident inspectors on-site 3/4 12 regional inspections 3/4 6 major team inspections:
Physical Security Inspection Fire Triennial Inspection Modifications Inspection Emergency Preparedness Exercise Problem Identification and Resolution Supplemental Inspection 95001
2007 Calvert Cliffs PIs / Findings All Performance Indicators (PIs) were Green 13 Green inspection findings
NRC Annual Assessment Summary Constellation operated the plant safely and in a manner that preserved public health and safety and protected the environment Calvert Cliffs Unit 1 was in the Licensee Response column of the NRCs Action Matrix for the last two quarters of 2007 and Regulatory Response column in the first two quarters of 2007 Calvert Cliffs Unit 2 was in the Licensee Response column of the NRCs Action Matrix for all four quarters of 2007 All cornerstone objectives were fully met NRC plans baseline inspections at Calvert Cliffs, Units 1 and 2, for the remainder of 2008
Constellation Response and Remarks Mr. James Spina Site Vice President -
Calvert Cliffs Constellation Energy
Contacting the NRC Report an emergency (301) 816-5100 (call collect)
Report a safety concern:
(800) 695-7403 Allegation@nrc.gov General information or questions www.nrc.gov Select About NRC
- Select How We Regulate
Reference Sources Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Public Electronic Reading Room http://www.nrc.gov/reading-rm.html Public Document Room 1-800-397-4209 (Toll Free)
NRC Representatives Glenn T. Dentel, Branch Chief 3/4 (610) 337-5233 Silas Kennedy, Senior Resident Inspector 3/4 (410) 586-2626 Marlone Davis, Resident Inspector 3/4 (410) 586-2626 Justin Hawkins, Project Engineer 3/4 (610) 337-6954 Douglas Pickett, Project Manager, NRR 3/4 (301) 415-1364
End of the Presentation Nuclear Regulatory Commission -
Region I King of Prussia, Pennsylvania April 8, 2008