Slides NRC Annual Performance Assessment of Calvert Cliffs 2007 Reactor Oversight Program
ML080790171
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 03/19/2008
From:
NRC Region 1
To:
Dentel, G RGN-I/DRP/BR1/610-337-5233
References
Download: ML080790171 (20)


Text

NRC Annual Performance Assessment of Calvert Cliffs 2007 Reactor Oversight Program

Purpose of Todays Meeting

  • Discuss Constellations Plant Performance for 2007
  • Provide Constellation the opportunity to respond to the NRCs Annual Performance Assessment and identify new or existing programs to maintain or improve their performance
  • Provide stakeholders the opportunity to engage the NRC staff on plant performance issues and our role in ensuring safe plant operations

Agenda

  • Introduction
  • NRC Organization and Performance Goals
  • Reactor Oversight Process (ROP)
  • National Summary of Plant Performance
  • Calvert Cliffs Plant Performance Assessment
  • Constellation Response and Remarks
  • NRC Closing Remarks
  • Break
  • NRC available to address public questions

Region I Organization Samuel J. Collins Regional Administrator Marc J. Dapas Deputy Regional Administrator David C. Lew Marsha K. Gamberoni Director Division of Reactor Projects Director Division of Reactor Safety James W. Clifford Darrell J. Roberts Deputy Director Deputy Director Glenn T. Dentel Regional Specialists Branch Chief Calvert Cliffs Project Engineers Resident Inspectors Brice Bickett Silas Kennedy Justin Hawkins Marlone Davis

NRC Strategic Plan Goals 3/4 Safety: Ensure adequate protection of public health and safety and the environment 3/4 Security: Ensure adequate protection in the secure use and management of radioactive materials

Reactor Oversight Process 3 Strategic Areas & 7 Cornerstones Reactor Radiation Safeguards Safety Safety Public Occupational Initiating Mitigating Barrier Emergency Physical Radiation Radiation Events Systems Integrity Preparedness Protection Safety Safety

Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response

Examples of Baseline Inspection Areas

  • Equipment Alignment
  • Maintenance
  • Fire Protection
  • Operator Response
  • Radiological and Environmental Monitoring
  • Worker Radiation Protection
  • Corrective Action Program
  • Corrective Action Case Reviews

Significance Threshold Performance Indicators 3/4 Green Baseline Inspection 3/4 White May increase NRC oversight 3/4 Yellow Requires more NRC oversight 3/4 Red Requires most NRC oversight Inspection Findings 3/4 Green Very low safety issue 3/4 White Low to moderate safety issue 3/4 Yellow Substantial safety issue 3/4 Red High safety issue

Action Matrix Concept Licensee Regulatory Degraded Multiple/R ep. Unacceptable Response Response Cornerstone Degraded Perform ance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions

National Summary of Plant Performance Status at End of 2007 Licensee Response 87 Regulatory Response 8 Degraded Cornerstone 8 Multiple/Repetitive Degraded Cornerstone 1 Unacceptable 0 Total 104

National Summary of Plant Performance Status at End of 2007

  • Performance Indicator Results 3/4 Green 1954 3/4 White 8 3/4 Yellow 2 3/4 Red 0
  • Total Inspection Findings 3/4 Green 918 3/4 White 9 3/4 Yellow 2 3/4 Red 0

NRC Inspection Activities at Calvert Cliffs 3/4 8000 hours0.0926 days <br />2.222 hours <br />0.0132 weeks <br />0.00304 months <br /> of inspection and related activities 3/4 2 resident inspectors on-site 3/4 12 regional inspections 3/4 6 major team inspections:

Physical Security Inspection Fire Triennial Inspection Modifications Inspection Emergency Preparedness Exercise Problem Identification and Resolution Supplemental Inspection 95001

2007 Calvert Cliffs PIs / Findings

  • All Performance Indicators (PIs) were Green
  • 13 Green inspection findings

NRC Annual Assessment Summary Constellation operated the plant safely and in a manner that preserved public health and safety and protected the environment Calvert Cliffs Unit 1 was in the Licensee Response column of the NRCs Action Matrix for the last two quarters of 2007 and Regulatory Response column in the first two quarters of 2007 Calvert Cliffs Unit 2 was in the Licensee Response column of the NRCs Action Matrix for all four quarters of 2007 All cornerstone objectives were fully met NRC plans baseline inspections at Calvert Cliffs, Units 1 and 2, for the remainder of 2008

Constellation Response and Remarks Mr. James Spina Site Vice President - Calvert Cliffs Constellation Energy

Contacting the NRC

  • Report an emergency

- (301) 816-5100 (call collect)

  • Report a safety concern:

- (800) 695-7403

- Allegation@nrc.gov

  • General information or questions

- www.nrc.gov

- Select About NRC

- Select How We Regulate

Reference Sources Reactor Oversight Process

- http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Public Electronic Reading Room

- http://www.nrc.gov/reading-rm.html Public Document Room 800-397-4209 (Toll Free)

NRC Representatives

  • Glenn T. Dentel, Branch Chief 3/4 (610) 337-5233
  • Douglas Pickett, Project Manager, NRR 3/4 (301) 415-1364

End of the Presentation Nuclear Regulatory Commission - Region I King of Prussia, Pennsylvania April 8, 2008