MONTHYEARML24137A1882024-05-16016 May 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23033A6672023-01-30030 January 2023 Public Call with Constellation January 30, 2023 (Slides) ML22013A3942022-01-13013 January 2022 Presentation Information for Pre-Submittal Meeting Regarding Relief Request to Use the Carbon Fiber Reinforced Polymer (Cfrp) Composite System ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21144A0172021-05-24024 May 2021 Spent Fuel Pool Cooling - Shutdown Cooling Licensing Design Basis License Amendment Request Pre-Submittal Meeting ML21134A0162021-05-24024 May 2021 Spent Fuel Pool Cooling - Shutdown Cooling Licensing Design Basis License Amendment Request - NRC Pre-submittal Meeting Telecon May 24, 2021 (EPID L-2021-LRM-0051) (Slides) ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20246G8772020-09-0303 September 2020 Licensee'S Presentation for September 3, 2020 Public Telephone Conference ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20175A8722020-06-23023 June 2020 Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20168A3192020-06-15015 June 2020 Joint Annual Assessment Meeting for Pa/Md Power Plants - Webinar Presentation ML19318F9512019-11-20020 November 2019 Presentation Slides for November 20, 2019, Pre-Application Meeting - Request for Revision to Quality Assurance Program Internal Audit Frequency ML19317C9952019-11-12012 November 2019 In-Service Testing Supplemental Position Indication Relief Request NRC Pre-Application Meeting November 18, 2019 ML19246B7162019-08-29029 August 2019 Meeting Between NRC and Exelon Regarding Calvert Cliffs-2 LAR to Use Framatome ATF LTAs ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19151A6602019-05-31031 May 2019 BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19022A2002019-01-23023 January 2019 Request for Use of ASME Code Case N-879 for Exelon Nuclear Power Plants ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18276A0712018-10-0404 October 2018 Exelon'S Presentation for October 4, 2018 Public Pre-Submittal Meeting on Planned Calvert Cliffs 10CFR50.69 LAR ML18171A0842018-06-21021 June 2018 GSI-191 Program Use of Risk Metrics for Containment Sump Tech Spec Operability Determination June 21, 2018 Public Meeting Slides (MF8521, MF8522; L-2016-LRM-0001) ML18190A3922018-06-14014 June 2018 Licensee Presentation Material for June 14, 2018 Public Meeting ML18136A4932018-05-16016 May 2018 Licensee'S Slides for Pre-Application Meeting W/Exelon Re Planned GSI-191 LAR for Calvert Cliffs (L-2016-LRM-0001) ML18096A0222018-04-0404 April 2018 Annual Assessment Meeting 04/04/2018 Handouts ML18096A9902018-03-12012 March 2018 NRC Pre-Submittal Call Briefing Notes, Calvert Cliffs Emergency Planning Future Licensing Actions ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML17142A2382017-05-25025 May 2017 OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns ML17143A1612017-05-23023 May 2017 Annual Assessment Meeting Handout and Sign in Sheet ML16274A0012016-09-30030 September 2016 PWR MSIP Analysis and Measurements ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML16075A3292016-03-16016 March 2016 OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations ML15321A3702015-12-0101 December 2015 GSI-191 Program Strainer Head Loss Testing and Option 2b Closure Approach ML15308A1072015-11-0505 November 2015 TSTF-505 LAR - NRC Pre-Submittal, November 5, 2015 Meeting Slides ML15282A0832015-10-0808 October 2015 October 8, 2015, Public Meeting Regarding the NFPA-805 License Amendment Application - Final ML15279A4992015-10-0808 October 2015 October 8, 2015, Public Meeting Regarding the NFPA-805 License Amendment Application ML15222A5472015-08-31031 August 2015 GSI 191 Program Chemical Effects Testing Update Option 2b Closure Approach ML15152A0822015-06-0404 June 2015 Presentation for the June 4, 2015 Public Meeting Regarding the National Fire Protection Association Standard 805 License Amendment Request 2024-05-16
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24137A1882024-05-16016 May 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides2023-02-21021 February 2023 Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23033A6672023-01-30030 January 2023 Public Call with Constellation January 30, 2023 (Slides) ML22124A1492022-05-10010 May 2022 (Ccnpp) Control Element Assembly (CEA) Recovery Time Improvement Project LAR Pre-Submittal Non-Proprietary (Public) ML22124A1482022-05-10010 May 2022 (Ccnpp) Control Element Assembly (CEA) Recovery Time Improvement Project LAR Pre-Submittal Redacted (Public) ML22013A3942022-01-13013 January 2022 Presentation Information for Pre-Submittal Meeting Regarding Relief Request to Use the Carbon Fiber Reinforced Polymer (Cfrp) Composite System ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21162A3322021-06-11011 June 2021 BWR Fleet Relief Request Associated with RPV Instrument Nozzle Repairs ML21144A0172021-05-24024 May 2021 Spent Fuel Pool Cooling - Shutdown Cooling Licensing Design Basis License Amendment Request Pre-Submittal Meeting ML21134A0162021-05-24024 May 2021 Spent Fuel Pool Cooling - Shutdown Cooling Licensing Design Basis License Amendment Request - NRC Pre-submittal Meeting Telecon May 24, 2021 (EPID L-2021-LRM-0051) (Slides) ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20246G8772020-09-0303 September 2020 Licensee'S Presentation for September 3, 2020 Public Telephone Conference ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20175A8722020-06-23023 June 2020 Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach ML20163A6542020-06-18018 June 2020 2020 NRC Annual Assessment Webinar Presentation - Pennsylvania and Maryland Facilities (Beaver Valley, Calvert Cliffs, Limerick, Peach Bottom, Susquehanna) ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20168A3192020-06-15015 June 2020 Joint Annual Assessment Meeting for Pa/Md Power Plants - Webinar Presentation ML19246B7162019-08-29029 August 2019 Meeting Between NRC and Exelon Regarding Calvert Cliffs-2 LAR to Use Framatome ATF LTAs ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18276A0712018-10-0404 October 2018 Exelon'S Presentation for October 4, 2018 Public Pre-Submittal Meeting on Planned Calvert Cliffs 10CFR50.69 LAR ML18171A0842018-06-21021 June 2018 GSI-191 Program Use of Risk Metrics for Containment Sump Tech Spec Operability Determination June 21, 2018 Public Meeting Slides (MF8521, MF8522; L-2016-LRM-0001) ML18136A4932018-05-16016 May 2018 Licensee'S Slides for Pre-Application Meeting W/Exelon Re Planned GSI-191 LAR for Calvert Cliffs (L-2016-LRM-0001) ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML16328A2832016-11-18018 November 2016 Supplemental Presentation Slides for 10/25/2016 Public Meeting Via E-mail from K.Greene to R.Guzman Calvert Cliffs GSI-191 Resolution Update ML16307A4902016-10-25025 October 2016 Presentation Slides from Public Meeting Calvert Cliffs GSI-191 Resolution Update ML16274A0012016-09-30030 September 2016 PWR MSIP Analysis and Measurements ML16242A1782016-09-0101 September 2016 Presentation Slides from Public Meeting Regarding Calvert Cliffs GSI-191 Resolution Update ML16198A0012016-07-18018 July 2016 Presentation Slides from Public Meeting Regarding Calvert Cliffs GSI-191 Resolution Update ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML15321A3702015-12-0101 December 2015 GSI-191 Program Strainer Head Loss Testing and Option 2b Closure Approach ML15308A1072015-11-0505 November 2015 TSTF-505 LAR - NRC Pre-Submittal, November 5, 2015 Meeting Slides ML15279A4992015-10-0808 October 2015 October 8, 2015, Public Meeting Regarding the NFPA-805 License Amendment Application ML15282A0832015-10-0808 October 2015 October 8, 2015, Public Meeting Regarding the NFPA-805 License Amendment Application - Final ML15222A5472015-08-31031 August 2015 GSI 191 Program Chemical Effects Testing Update Option 2b Closure Approach ML15152A0822015-06-0404 June 2015 Presentation for the June 4, 2015 Public Meeting Regarding the National Fire Protection Association Standard 805 License Amendment Request ML14230A9132014-08-18018 August 2014 Enclosure - Fuel Performance and Cask Internals - July 17, 2014, Summary of Meeting with Exelon Corporation to Discuss Request for Additional Information No. 4 to the Calvert Cliffs ISFSI License Renewal Application (Docket No. 72-08) TAC L ML14230A9112014-08-18018 August 2014 Enclosure - Example AMP - July 17, 2014, Summary of Meeting with Exelon Corporation to Discuss Request for Additional Information No. 4 to the Calvert Cliffs ISFSI License Renewal Application (Docket No. 72-08) TAC L24475 2024-05-16
[Table view] |
Text
NRC Annual Performance Assessment of Calvert Cliffs 2007 Reactor Oversight Program
Purpose of Todays Meeting
- Discuss Constellations Plant Performance for 2007
- Provide Constellation the opportunity to respond to the NRCs Annual Performance Assessment and identify new or existing programs to maintain or improve their performance
- Provide stakeholders the opportunity to engage the NRC staff on plant performance issues and our role in ensuring safe plant operations
Agenda
- NRC Organization and Performance Goals
- Reactor Oversight Process (ROP)
- National Summary of Plant Performance
- Calvert Cliffs Plant Performance Assessment
- Constellation Response and Remarks
- NRC available to address public questions
Region I Organization Samuel J. Collins Regional Administrator Marc J. Dapas Deputy Regional Administrator David C. Lew Marsha K. Gamberoni Director Division of Reactor Projects Director Division of Reactor Safety James W. Clifford Darrell J. Roberts Deputy Director Deputy Director Glenn T. Dentel Regional Specialists Branch Chief Calvert Cliffs Project Engineers Resident Inspectors Brice Bickett Silas Kennedy Justin Hawkins Marlone Davis
NRC Strategic Plan Goals 3/4 Safety: Ensure adequate protection of public health and safety and the environment 3/4 Security: Ensure adequate protection in the secure use and management of radioactive materials
Reactor Oversight Process 3 Strategic Areas & 7 Cornerstones Reactor Radiation Safeguards Safety Safety Public Occupational Initiating Mitigating Barrier Emergency Physical Radiation Radiation Events Systems Integrity Preparedness Protection Safety Safety
Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response
Examples of Baseline Inspection Areas
- Radiological and Environmental Monitoring
- Worker Radiation Protection
- Corrective Action Program
- Corrective Action Case Reviews
Significance Threshold Performance Indicators 3/4 Green Baseline Inspection 3/4 White May increase NRC oversight 3/4 Yellow Requires more NRC oversight 3/4 Red Requires most NRC oversight Inspection Findings 3/4 Green Very low safety issue 3/4 White Low to moderate safety issue 3/4 Yellow Substantial safety issue 3/4 Red High safety issue
Action Matrix Concept Licensee Regulatory Degraded Multiple/R ep. Unacceptable Response Response Cornerstone Degraded Perform ance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions
National Summary of Plant Performance Status at End of 2007 Licensee Response 87 Regulatory Response 8 Degraded Cornerstone 8 Multiple/Repetitive Degraded Cornerstone 1 Unacceptable 0 Total 104
National Summary of Plant Performance Status at End of 2007
- Performance Indicator Results 3/4 Green 1954 3/4 White 8 3/4 Yellow 2 3/4 Red 0
- Total Inspection Findings 3/4 Green 918 3/4 White 9 3/4 Yellow 2 3/4 Red 0
NRC Inspection Activities at Calvert Cliffs 3/4 8000 hours0.0926 days <br />2.222 hours <br />0.0132 weeks <br />0.00304 months <br /> of inspection and related activities 3/4 2 resident inspectors on-site 3/4 12 regional inspections 3/4 6 major team inspections:
Physical Security Inspection Fire Triennial Inspection Modifications Inspection Emergency Preparedness Exercise Problem Identification and Resolution Supplemental Inspection 95001
2007 Calvert Cliffs PIs / Findings
- All Performance Indicators (PIs) were Green
- 13 Green inspection findings
NRC Annual Assessment Summary Constellation operated the plant safely and in a manner that preserved public health and safety and protected the environment Calvert Cliffs Unit 1 was in the Licensee Response column of the NRCs Action Matrix for the last two quarters of 2007 and Regulatory Response column in the first two quarters of 2007 Calvert Cliffs Unit 2 was in the Licensee Response column of the NRCs Action Matrix for all four quarters of 2007 All cornerstone objectives were fully met NRC plans baseline inspections at Calvert Cliffs, Units 1 and 2, for the remainder of 2008
Constellation Response and Remarks Mr. James Spina Site Vice President - Calvert Cliffs Constellation Energy
Contacting the NRC
- (301) 816-5100 (call collect)
- (800) 695-7403
- Allegation@nrc.gov
- General information or questions
- www.nrc.gov
- Select About NRC
- Select How We Regulate
Reference Sources Reactor Oversight Process
- http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Public Electronic Reading Room
- http://www.nrc.gov/reading-rm.html Public Document Room 800-397-4209 (Toll Free)
NRC Representatives
- Glenn T. Dentel, Branch Chief 3/4 (610) 337-5233
- Douglas Pickett, Project Manager, NRR 3/4 (301) 415-1364
End of the Presentation Nuclear Regulatory Commission - Region I King of Prussia, Pennsylvania April 8, 2008