Text

February 13, 2008 Mr. Dennis R. Madison Vice President - Hatch Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513

SUBJECT:

EDWIN I. HATCH NUCLEAR PLANT, UNIT NOS. 1 AND 2 (HNP), REQUEST FOR ADDITIONAL INFORMATION (RAI) REGARDING ALTERNATE SOURCE TERM APPLICATION (TAC NOS. MD2934 AND MD2935)

Dear Mr. Madison:

By letter to the Nuclear Regulatory Commission dated August 29, 2006, Southern Nuclear Operating Company, Inc., proposed to revise the HNP licensing and design basis with a full scope implementation of an alternative source term. We have reviewed your application and have identified a need for additional information on electrical power issues as set forth in the Enclosure.

We discussed this issue with your staff on January 15 and February 1, 2008. Please provide a response within thirty (30) days of receipt of this letter.

Sincerely,

/RA/

Robert E. Martin, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366

Enclosure:

RAI cc w/encl: See next page

ML080380141

  • by memo OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/AADB/BC NRR/LPL2-1/BC(A)

NAME RMartin:nc MOBrien GWilson

  • MWong DATE 02/13/08 02/13/08 02/06/08 02/13/08

ENCLOSURE REQUEST FOR ADDITIONAL INFORMATION CONCERNING IMPLEMENTATION OF AN ALTERNATIVE SOURCE TERM APPLICATION FOR EDWIN I. HATCH NUCLEAR PLANT, UNIT NOS. 1 AND 2 (HNP)

1.

Provide assurance that the emergency diesel generators are capable of supporting the electrical load being added as a result of supplying the turbine building exhaust fans from a Class 1E power source. Include a detailed summary of any analyses used to make this determination.

2.

Discuss how the reliability and availability of the turbine building exhaust fans and the associated electrical circuits, including individual fans and transfer switches, will be monitored and maintained.

3.

Describe how electrical isolation will be maintained between non-Class 1E and Class 1E circuits. If double isolation (e.g., two breakers in series, a breaker and a fuse, or a breaker supplied with a loss-of-offsite power signal) is not used, provide a detailed discussion on how a fault on the non-Class 1E electrical circuit will not propagate to the Class 1E electrical circuit.

Edwin I. Hatch Nuclear Plant, Units 1 & 2 cc:

Laurence Bergen Oglethorpe Power Corporation 2100 E. Exchange Place P.O. Box 1349 Tucker, GA 30085-1349 Mr. R. D. Baker Manager - Licensing Southern Nuclear Operating Company, Inc.

P.O. Box 1295 Birmingham, AL 35201-1295 Resident Inspector Plant Hatch 11030 Hatch Parkway N.

Baxley, GA 31531 Harold Reheis, Director Department of Natural Resources 205 Butler Street, SE., Suite 1252 Atlanta, GA 30334 Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia 1470 Riveredge Parkway, NW Atlanta, GA 30328-4684 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission 244 Washington St., SW Atlanta, GA 30334 Arthur H. Domby, Esq.

Troutman Sanders Nations Bank Plaza 600 Peachtree St, NE, Suite 5200 Atlanta, GA 30308-2216 Chairman Appling County Commissioners County Courthouse Baxley, GA 31513 Mr. Jeffrey T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc.

P.O. Box 1295 Birmingham, AL 35201-1295 General Manager Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Company, Inc.

U.S. Highway 1 North P.O. Box 2010 Baxley, GA 31515 Mr. K. Rosanski Resident Manager Oglethorpe Power Corporation Edwin I. Hatch Nuclear Plant P.O. Box 2010 Baxley, GA 31515