Letter Sequence Request |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: ML062900160, ML071620334, ML073320383, ML073390289, ML073390306, ML080300472, ML081000038, ML081000429, PLA-6187, Response for Additional Information Requested in Regard to Proposed License Amendment No. 285, Constant Pressure Power Uprate Environmental, PLA-6255, Proposed License Amendments 285 and 253, Constant Pressure Power Uprate Application Regarding Steam Dryer Flow Effects Verbal and Confirmatory Requests for Additional Information Responses, PLA-6266, Proposed License Amendment No. 285 for Unit 1, License No. NPF-14 & Proposed License Amendment No. 253 for Unit 2, License No. NPF-22, Extended Power Uprate Application Regarding Change to Technical Specification SR 3.7.1 - RHRSW and UHS, PLA-6370, License Renewal Application, Amendment to Section 4.2.2, PLA-6633, Providing Notice That the License Conditions 2.C.(36)(a)3, 2.C.(36(b)7 & 2.C.(36)(f) Have Been Met, PLA-6876, Th Rio Steam Dryer Visual Inspection Report, PLA-7047, Th Rio Steam Dryer Visual Inspection Report
|
MONTHYEARML0716203342006-01-24024 January 2006 GE Ne 0000-0038-8052 Susq-EPU-T506-MSLHiFlo-Calc-2006, Revision 0, Instrument Limits Calculation, PPL Susquehanna, LLC Susquehanna Steam Electric Station Units 1 and 2, Main Steam Line High Flow MSIV Isolation Project stage: Other ML0629001602006-10-11011 October 2006 Proposed License Amendment Numbers 285 for Unit 1 and 253 for Unit 2, Constant Pressure Power Uprate Project stage: Other ML0632500922006-11-21021 November 2006 Extended Power Uprate Acceptance Review Project stage: Acceptance Review PLA-6138, Proposed License Amendments 285 & 253, Constant Pressure Power Uprate - Supplement2006-12-0404 December 2006 Proposed License Amendments 285 & 253, Constant Pressure Power Uprate - Supplement Project stage: Supplement ML0710400302006-12-12012 December 2006 Pennsylvania Fish and Boat Commission Threatened and Endangered Species Project stage: Request PLA-6146, Proposed License Amendment No. 285 for Unit 1 Operating License No. NPF-14 and Proposed License Amendment No. 253 for Unit 2 Operating License No. NPF-22 Re Constant Pressure Power Uprate -Supplement2006-12-26026 December 2006 Proposed License Amendment No. 285 for Unit 1 Operating License No. NPF-14 and Proposed License Amendment No. 253 for Unit 2 Operating License No. NPF-22 Re Constant Pressure Power Uprate -Supplement Project stage: Supplement ML0700800322007-01-0505 January 2007 Extended Power Uprate (EPU) Acceptance Review Results Project stage: Acceptance Review ML0703201532007-02-0808 February 2007 PPL Susquehanna, LLC - Request for Withholding of Proprietary Information from Public Disclosure for Susquehanna Steam Electric Station, Units 1 and 2 Project stage: Withholding Request Acceptance ML0703201762007-02-0808 February 2007 PPL Susquehanna, LLC - Request for Withholding of Proprietary Information from Public Disclosure for Susquehanna Steam Electric Station, Units 1 and 2 Project stage: Withholding Request Acceptance PLA-6155, Proposed License Amendment Nos. 285 and 253, Constant Pressure Power Uprate Supplement2007-02-13013 February 2007 Proposed License Amendment Nos. 285 and 253, Constant Pressure Power Uprate Supplement Project stage: Supplement ML0704301392007-03-0101 March 2007 PPL Susquehanna, LLC-Request for Withholding Information from Public Disclosure for Susquehanna Steam Electric Station, Units 1 and 2 Project stage: Withholding Request Acceptance PLA-6163, Proposed License Amendment Re Constant Pressure Power Uprate - Supplement2007-03-14014 March 2007 Proposed License Amendment Re Constant Pressure Power Uprate - Supplement Project stage: Supplement ML0707304972007-03-15015 March 2007 Request for Additional Information - Extended Power Uprated Application Regarding Turbine Generator Review Project stage: RAI ML0707303892007-03-19019 March 2007 Request for Additional Information (RAI) - Susquehanna, Units 1 and 2 - Extended Power Uprate Application Project stage: RAI ML0707305682007-03-20020 March 2007 (SSES 1 and 2), Request for Additional Information (RAI) - Extended Power Uprate Application Regarding Steam Dryer and Flow Effects Project stage: RAI PLA-6172, Proposed License Amendment for Constant Pressure Power Uprate - Supplement PLA-61722007-03-22022 March 2007 Proposed License Amendment for Constant Pressure Power Uprate - Supplement PLA-6172 Project stage: Supplement ML0708608662007-03-29029 March 2007 RAI, Extended Power Uprate Application; Vessels and Internals Technical Review (TAC Nos. MD3309 and Md3310) Project stage: RAI ML0710001412007-04-10010 April 2007 Request for Additional Information (RAI) - Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2) - Extended Power Uprate Application Piping and Nondestructive Examination Technical Review Project stage: RAI ML0710400252007-04-12012 April 2007 Pennsylvania Efacts Project stage: Request ML0710400222007-04-12012 April 2007 PA Dcnr Wild Resource Conservation Program - Regal Fritillary Project stage: Request ML0710001262007-04-12012 April 2007 Request for Additional Information (RAI) - Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2) - Extended Power Uprate Application Operator Licensing and Human Performance Technical Review Project stage: RAI ML0710202982007-04-12012 April 2007 Request for Additional Information (RAI) - Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2) - Extended Power Uprate Application Health Physics Technical Review Project stage: RAI ML0710300312007-04-12012 April 2007 Request for Additional Information (RAI) - Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2) - Extended Power Uprate Application Materials and Chemical Engineering Technical Review Project stage: RAI ML0710300402007-04-12012 April 2007 Request for Additional Information (RAI) - Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2) - Extended Power Uprate Application Electrical Engineering Technical Review Project stage: RAI ML0710400322007-04-12012 April 2007 Pennsylvania Fish and Boat Commission Threatened and Endangered Species Project stage: Request ML0710400262007-04-12012 April 2007 EPA Envirofacts Project stage: Request PLA-6174, Constant Pressure Power Uprate - PLA-61742007-04-13013 April 2007 Constant Pressure Power Uprate - PLA-6174 Project stage: Request ML0710203152007-04-16016 April 2007 (SSES 1 and 2), Request for Additional Information (Rai), - Extended Power Uprate Application Balance-of-Plant Physics Technical Review Project stage: RAI ML0710601352007-04-18018 April 2007 Request for Additional Information, Extended Power Uprate Application Safety-Related Pumps and Valves and Mechanical Equipment Environmental Qualification Project stage: RAI PLA-6187, Response for Additional Information Requested in Regard to Proposed License Amendment No. 285, Constant Pressure Power Uprate Environmental2007-04-23023 April 2007 Response for Additional Information Requested in Regard to Proposed License Amendment No. 285, Constant Pressure Power Uprate Environmental Project stage: Other PLA-6186, Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Extended Power Uprate Application Vessels and Internals Technical Review Request for Additional Information Responses2007-04-26026 April 2007 Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Extended Power Uprate Application Vessels and Internals Technical Review Request for Additional Information Responses Project stage: Request ML0711403432007-04-27027 April 2007 Request for Additional Information (RAI) - Susquehanna Steam Electric Station, Units 1 and 2) - Extended Power Uprate Application Instrumentation and Controls Technical Review Project stage: RAI ML0711600672007-04-27027 April 2007 Request for Additional Information (RAI) Extended Power Uprate Application Probabilistic Risk Assessment Licensing Review Project stage: RAI ML0711504712007-04-27027 April 2007 Request for Additional Information (Rai), Extended Power Uprate Application Containment and Ventilation Technical Review Project stage: RAI ML0711604062007-04-30030 April 2007 Request for Additional Information (Rai), Extended Power Uprate Application Vessels and Internals Integrity Technical Review Project stage: RAI ML0710900722007-04-30030 April 2007 Request for Additional Information (Rai), Extended Power Uprate Application Mechanical and Civil Engineering Technical Review Project stage: RAI PLA-6191, Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Piping and Nondestructive Examination Technical Review Request for Additional Information Responses2007-05-0303 May 2007 Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Piping and Nondestructive Examination Technical Review Request for Additional Information Responses Project stage: Request PLA-6194, Proposed License Amendments 285 and 253, Extended Power Uprate Application Health Physics Technical Review, Request for Additional Information Responses2007-05-0909 May 2007 Proposed License Amendments 285 and 253, Extended Power Uprate Application Health Physics Technical Review, Request for Additional Information Responses Project stage: Request PLA-6195, Extended Power Uprate Application Electrical Engineering Technical Review Request for Additional Information Responses2007-05-0909 May 2007 Extended Power Uprate Application Electrical Engineering Technical Review Request for Additional Information Responses Project stage: Request ML0715000582007-05-14014 May 2007 Proposed License Amendments 285 and 253, Extended Power Uprate Application Balance-of-Plant Safety Systems Request for Additional Information Responses Project stage: Request ML0712906522007-05-14014 May 2007 Request for Additional Information (RAI) - Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2) - Extended Power Uprate Application Reactor Systems Technical Review Project stage: RAI PLA-6198, Proposed License Amendments 285 and 253, Extended Power Uprate Application Balance-of-Plant Safety Systems Request for Additional Information Responses2007-05-14014 May 2007 Proposed License Amendments 285 and 253, Extended Power Uprate Application Balance-of-Plant Safety Systems Request for Additional Information Responses Project stage: Request PLA-6210, Extended Power Uprate Application Vessels and Internals Integrity Technical Review Request for Additional Information Responses2007-05-21021 May 2007 Extended Power Uprate Application Vessels and Internals Integrity Technical Review Request for Additional Information Responses Project stage: Request PLA-6212, Extended Power Uprate Application Materials and Chemical Engineering Technical Review Request for Additional Information Responses2007-06-0101 June 2007 Extended Power Uprate Application Materials and Chemical Engineering Technical Review Request for Additional Information Responses Project stage: Request PLA-6200, Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Mechanical and Civil Engineering Technical Review Request for Additional Information Responses2007-06-0101 June 2007 Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Mechanical and Civil Engineering Technical Review Request for Additional Information Responses Project stage: Request PLA-6196, Proposed License Amendments 285 and 253, Extended Power Uprate Application Safety Related Pumps and Valves and Mechanical Equipment Environmental Qualification Review Request for Additional Information Responses2007-06-0101 June 2007 Proposed License Amendments 285 and 253, Extended Power Uprate Application Safety Related Pumps and Valves and Mechanical Equipment Environmental Qualification Review Request for Additional Information Responses Project stage: Request PLA-6204, Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Instrumentation and Controls Technical Review Request for Additional Information Responses2007-06-0101 June 2007 Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Instrumentation and Controls Technical Review Request for Additional Information Responses Project stage: Request PLA-6203, Proposed License Amendment Extended Power Uprate Application Containment and Ventilation Technical Review Request for Additional Information Responses, PLA-62032007-06-0404 June 2007 Proposed License Amendment Extended Power Uprate Application Containment and Ventilation Technical Review Request for Additional Information Responses, PLA-6203 Project stage: Request PLA-6225, Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Supplement to Request for Additional Information Responses2007-06-0808 June 2007 Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Supplement to Request for Additional Information Responses Project stage: Supplement PLA-6231, Proposed License Amendment No. 285 for Unit 1 and Proposed License Amendment No. 253 for Unit 2, Extended Power Uprate Application Electrical Engineering Technical Review Request for Additional Information Response Supplement, PLA-62312007-06-20020 June 2007 Proposed License Amendment No. 285 for Unit 1 and Proposed License Amendment No. 253 for Unit 2, Extended Power Uprate Application Electrical Engineering Technical Review Request for Additional Information Response Supplement, PLA-6231 Project stage: Supplement 2007-04-10
[Table View] |
Text
Brltt T. McKinney Sr. Vice President & Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3149 Fax 570.542.1504 btmckinney@pplweb.com SP tI JUL 1 2 2007 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop OP1-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION PROPOSED LICENSE AMENDMENT NO. 285 FOR UNIT 1 OPERATING LICENSE NO. NPF-14 AND PROPOSED LICENSE AMENDMENT NO. 253 FOR UNIT 2 OPERATING LICENSE NO. NPF-22 EXTENDED POWER UPRATE APPLICATION RE:
MATERIALS AND CHEMICAL ENGINEERING TECHNICAL REVIEW REQUEST FOR ADDITIONAL INFORMATION RESPONSES PLA-6245 Docket Nos. 50-387 and 50-388 References. 1) PPL Letter PLA-6076, B. T McKinney (PPL) to USNRC, "Proposed License Amendment Numbers 285for Unit 1 Operating License No. NPF-14 and 253for Unit 2 Operating License No. NPF-22 Constant Pressure Power Uprate, "ddated October 11, 2006.
- 2) PPL Letter PLA-6212, B. T McKinney (PPL) to USNRC, "Proposed License Amendment No. 285for Unit 1 Operating License No. NPF-14 and Proposed License Amendment No. 253 for Unit 2 Operating License No. NPF-22 Extended Power Uprate Application Re: Materials and Chemical Engineering Technical Review Request for Additional Information Responses, "dated June 1, 2007.
Pursuant to 10 CFR 50.90, PPL Susquehanna LLC (PPL) requested in Reference 1 approval of amendments to the Susquehanna Steam Electric Station (SSES) Unit 1 and Unit 2 Operating Licenses (OLs) and Technical Specifications (TSs) to increase the maximum power level authorized from 3489 Megawatts Thermal (MWt) to 3952 MWt, an approximate 13% increase in thermal power. The proposed Constant Pressure Power Uprate (CPPU) represents an increase of approximately 20% above the Original Licensed Thermal Power (OLTP).
The purpose of this letter is to supplement the response to NRC Question 4 contained in the Request for Additional Information Response transmitted to NRC in Reference 2.
The Enclosure contains the PPL supplemental response.
0Avo
2 -
Document Control Desk PLA-6245 There are no new regulatory commitments associated with this submittal.
PPL has reviewed the "No Significant Hazards Consideration" and the "Environmental Consideration" submitted with Reference 1 relative to the Enclosure. We have determined that there are no changes required to either of these documents.
If you have any questions or require additional information, please contact Mr. Michael H. Crowthers at (610) 774-7766.
I declare under perjury that the foregoing is true and correct.
Executed on:
7
-O B. T. McKinney
Enclosure:
Supplement to Request for Additional Information Response Copy:
NRC Region I Mr. A. J. Blamey, NRC Sr. Resident Inspector Mr. R. V. Guzman, NRC Sr. Project Manager Mr. R. R. Janati, DEP/BRP
Enclosure to PLA-6245 Supplement to Request for. Additional Information Response
Enclosure to PLA-6245 Page 1 of 4 Supplemental Ouestions and Responses to PPL Response NRC Ouestion 4 of PLA-6212:
NRC Question:
Please describe how the thickness values predicted by your CHECWORKS model compare to the measured thickness values. For example, for the components listed in the response to NRC Question 4 on flow-accelerated corrosion (PLA-6212, dated June 1, 2007), or for another sample of components at Susquehanna 1 & 2 representing a range of FAC rates, please compare the most recent wall thickness measurements to the CHECWORKS model predictions.
PPL Response:
The CHECWORKS (CW) models for Susquehanna Units 1 & 2 (SSES) were developed only recently (03/2005) and are not yet considered to be 'calibrated' as defined in EPRI NSAC-202L. Since the models are not 'calibrated,' associated predictive analysis results may not provide the desired correlation with actual (measured) plant data.
Prior to CW, FAC-susceptible plant systems were modeled using PPL in-house software that utilized FAC predictive methodologies available in the public domain. The FAC analyses were used to determine the relative susceptibility of components in each system; components with the highest predicted wear rate / lowest remaining life were incorporated into the FAC Program inspection scope. These components were monitored for wear and inspection frequencies were determined based on a conservative analysis of SSES FAC wear data. While a large number of component inspections were performed, the component type / parallel train coverage required for model calibration by the current NSAC-202L guidance was not satisfied. In addition, component gridding requirements and conventions have evolved over time, so only a limited amount of component UT grid data could be loaded into CW (UT grids must be compatible for CW analysis), which also affected the calibration status of the CW models.
The CW predictive analysis results are used primarily for the selection of components for inspection in the effort to achieve model 'calibration' using NSAC-202L guidance. The CW analysis results are used in conjunction with the trended historical data from past component inspections to select components for inspection that will serve to monitor the condition of the predicted highest wear / lowest remaining service life components in a given system as well as to achieve 'calibration' of the CW model. A 'calibrated' predictive model closely predicts actual FAC wear and allows a reduction in the number of components that must be monitored in a given system.
Enclosure to PLA-6245 Page 2 of 4 A summary of predicted thickness values and corresponding measured thickness values are provided in the below Table. The data provided for components listed in the response to NRC Question 4 on flow-accelerated corrosion (PLA-6212, dated June 1, 2007) is current inspection data if it was available (U1RIO14-2006 / U2RIO13-2007, unless noted otherwise). If data for the specific component was not available, a component was selected that was located in a line that was subject to similar operating conditions.
Enclosure to PLA-6245 Page 3 of 4 CHECWORKS PREDICTED THICKNESS VALUES VS. MEASURED THICKNESS VALUES Measured Predicted Measured /
Description Component Name Geometry Same / Similar Component Geometry Thickness Thickness Predicted (PLA-6212)
(PLA-6212)
[Inspection Outage / Comment]
(in)
(in)
Thickness EXTRACTION to GFD-101-2-5020-T TEE GFD-l01-2-5020-T TEE 0.426 0.106 4.019 FWH #5
[U1RIO14]
FEEDWATER GBD-118-1-1000-N EXIT GBD-118-2-151 0-E 90 DEG 0.707 0.532 1.329 FWH2 to FWH3 NOZZLE
[U1RIO14]
ELBOW FEEDWATER GBD-121-2-5655-N INLET GBD-121-2-5620-T TEE 0.884 0.500 1.768 FWH5 to RFP B
NOZZLE
[U1RIO14]
FEEDWATER RFP DBD-101-6-1105-ORIFICE ORIFICE 1.891 0.686 2.757 to REACTOR
[U1RIO14]
FWH DRAIN FWH5 90 DEG GBD-136-2-5040-E 90 DEG to DRI GBD-103-1-1010-E ELBOW
[U1RIO14; FWH DRAIN ELBOW 0.507 0.403 1.258 to LCV ELBOW
[RI1,FHDANELBOW FWH4 to LCV]
REACTOR to DBA-121-1-9600-N EXIT DBA-101-1-2505-E 90 DEG 0.429 0.041 10.463 RWCU PUMPS NOZZLE
[U1RIO14]
ELBOW RWCU RGEN HX DBC-103-1-7000-N EXIT DBC-103-1-7095-E 90 DEG 0.558 0.324 1.722 TUBSIDE NOZZLE
[U1RIO14]
ELBOW RWCU RGEN HX to DBB-122-1-8605-O ORIFICE DBB-122-1-8570-P PIPE D/S 0.400 0.411 0.973 FEEDWATER
[U1RIO14]
VALVE FEEDWATER RFP DBD-201-4-1130-P PIPE D/S 1.191 1.160 to REACTOR
[U2RIO 13]
ORIFICE 1.38 1 RWCU RGEN HX to DBB-222-2-8620-O ORIFICE DBB-222-2-8625-P PIPE D/S 0.430 0.392 1.097 FEEDWATER
[U2RIO 12]
ORIFICE
Enclosure to PLA-6245 Page 4 of 4 It is apparent from the data provided that the CW predicted thickness values are generally conservative. In one case, the predicted thickness value is marginally less than the measured value (2.7%). This can be attributed to the fact that there is less historical data available for the RWCU system since it did not become significantly susceptible to FAC until hydrogen water chemistry was implemented.
NRC Question Please identify the non-destructive test methods used in your FAC program for measuring component thickness.
PPL Response:
The SSES FAC Program utilizes ultrasonic testing (UT) as the primary NDE method for determining component wall thickness. While program procedures allow the use of other NDE technologies such as radiography (RT), UT has been the only method utilized by the Program to date.