MONTHYEARCNL-24-021, Application to Revise Technical Specification Limiting Condition of Operation 3.5.2, ECCS – Operating, Note 1 to Include Residual Heat Removal Pump Flow Paths (SQN-TS-23-04 and WBN-TS-23-020)2024-11-12012 November 2024 Application to Revise Technical Specification Limiting Condition of Operation 3.5.2, ECCS – Operating, Note 1 to Include Residual Heat Removal Pump Flow Paths (SQN-TS-23-04 and WBN-TS-23-020) ML24312A1552024-11-0606 November 2024 Cycle 27 Core Operating Limits Report, Revision 1 IR 05000327/20240032024-11-0606 November 2024 Integrated Inspection Report 05000327/2024003 and 05000328/2024003 CNL-24-014, License Amendment Request to Revise the Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 Technical Specifications to Use Online Monitoring Methodology (SQN-TS-24-02 and WBN-TS-23-22)2024-11-0404 November 2024 License Amendment Request to Revise the Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 Technical Specifications to Use Online Monitoring Methodology (SQN-TS-24-02 and WBN-TS-23-22) ML24304A8492024-10-31031 October 2024 December 2024 Requalification Inspection Notification Letter IR 05000327/20250102024-10-29029 October 2024 Notification of Sequoyah, Units 1 and 2 - Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000327/2025010 and 05000328/2025010 ML24298A1172024-10-24024 October 2024 Cycle 26, 180-Day Steam Generator Tube Inspection Report CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000327/LER-2024-001, Reactor Trip Due to a Turbine Trip2024-10-17017 October 2024 Reactor Trip Due to a Turbine Trip ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 05000328/LER-2024-001, Reactor Trip Due to an Electrical Trouble Turbine Trip2024-09-25025 September 2024 Reactor Trip Due to an Electrical Trouble Turbine Trip CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24267A0402024-09-19019 September 2024 Cycle 27 Core Operating Limits Report Revision 0 CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24185A1742024-09-18018 September 2024 Cover Letter - Issuance of Exemption Related to Non-Destructive Examination Compliance Regarding Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation ML24253A0152024-09-0808 September 2024 Emergency Plan Implementing Procedure Revisions ML24247A2212024-08-29029 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-21-160, NEI 03-08 Needed Guidance: PWR Lower Radial Support Clevis Insert X-750 Bolt Inspection Requirements, September 1, 2021 ML24247A1802024-08-28028 August 2024 Application to Revise the Fuel Handling Accident Analysis, to Delete Technical Specification 3.9.4, Containment Penetrations, and to Modify Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation for Sequoyah Nuclea IR 05000327/20240052024-08-26026 August 2024 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2024005 and 05000328/2024005 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), IR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24211A0572024-07-29029 July 2024 Submittal of Emergency Plan Implementing Procedure Revision ML24211A0542024-07-29029 July 2024 Operator License Examination Report ML24211A0412024-07-26026 July 2024 Unit 1 Cycle 26 Refueling Outage - 90-Day Inservice Inspection Summary Report ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24191A4652024-07-0909 July 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24177A0282024-06-25025 June 2024 Emergency Plan Implementing Procedure Revisions ML24176A0222024-06-24024 June 2024 Retraction of Interim Report of a Deviation or Failure to Comply – Transducer Model 8005N ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24145A0852024-05-30030 May 2024 1B-B Diesel Generator Failure - Final Significance Determination Letter ML24145A1052024-05-29029 May 2024 301 Exam Approval Letter ML24134A1762024-05-13013 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24128A0352024-05-0707 May 2024 Providing Supplemental Information to Apparent Violation ML24120A0582024-04-26026 April 2024 10 CFR 50.46 Annual Report for Sequoyah Nuclear Plant Units 1 and 2 ML24116A2612024-04-25025 April 2024 Interim Report of a Deviation or Failure to Comply - Transducer Model 8005N ML24114A0482024-04-23023 April 2024 Annual Radioactive Effluent Release Report for 2023 Monitoring Period CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24144A2322024-04-20020 April 2024 Tennessee Multi-Sector Permit (Tmsp), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 ML24144A2362024-04-20020 April 2024 Discharge Monitoring Report (Dmr), March 2024 ML24089A0882024-04-18018 April 2024 – Exemption from Select Requirements of 10 CFR Part 73; Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24102A1212024-04-18018 April 2024 Summary of Conference Call with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Unit 1 Spring 2024 Steam Generator Tube Inspections CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 2024-09-08
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARCNL-24-021, Application to Revise Technical Specification Limiting Condition of Operation 3.5.2, ECCS – Operating, Note 1 to Include Residual Heat Removal Pump Flow Paths (SQN-TS-23-04 and WBN-TS-23-020)2024-11-12012 November 2024 Application to Revise Technical Specification Limiting Condition of Operation 3.5.2, ECCS – Operating, Note 1 to Include Residual Heat Removal Pump Flow Paths (SQN-TS-23-04 and WBN-TS-23-020) CNL-24-014, License Amendment Request to Revise the Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 Technical Specifications to Use Online Monitoring Methodology (SQN-TS-24-02 and WBN-TS-23-22)2024-11-0404 November 2024 License Amendment Request to Revise the Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 Technical Specifications to Use Online Monitoring Methodology (SQN-TS-24-02 and WBN-TS-23-22) ML24247A1802024-08-28028 August 2024 Application to Revise the Fuel Handling Accident Analysis, to Delete Technical Specification 3.9.4, Containment Penetrations, and to Modify Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation for Sequoyah Nuclea ML24247A1752024-08-28028 August 2024 Enclosure 1: Description and Assessment of the Proposed Changes CNL-23-006, Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03)2024-04-15015 April 2024 Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03) CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) CNL-22-037, Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533)2023-01-31031 January 2023 Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533) CNL-22-030, Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03)2022-07-27027 July 2022 Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) CNL-22-071, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)2022-07-13013 July 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08) ML22165A1052022-07-12012 July 2022 Issuance of Amendment Nos. 357 and 351 Regarding Revision to Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation CNL-22-008, And Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 And Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) ML22115A0022022-05-17017 May 2022 Correction to Amendment No. 350 Regarding One-Time Change to Technical Specification3.4.12, Low Temperature Overpressure Protection System, CNL-22-034, Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03)2022-05-13013 May 2022 Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03) ML22125A1272022-05-0404 May 2022 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification Bases CNL-22-023, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf2022-04-28028 April 2022 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf CNL-22-001, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)2022-04-0404 April 2022 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08) CNL-21-085, License Amendment Request to Modify Approved 10 CFR 50.69 Categorization Process (SQN-TS-21-07)2022-02-24024 February 2022 License Amendment Request to Modify Approved 10 CFR 50.69 Categorization Process (SQN-TS-21-07) CNL-21-001, Application to Modify the Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation (SQN-TS-21-01)2021-11-29029 November 2021 Application to Modify the Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation (SQN-TS-21-01) CNL-21-091, Exigent License Amendment Request to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System (SQN-TS-21-06)2021-10-22022 October 2021 Exigent License Amendment Request to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System (SQN-TS-21-06) CNL-21-026, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03)2021-08-0505 August 2021 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03) CNL-21-045, Bellefonte Nuclear Plant, Units 1 and 2; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN82021-04-29029 April 2021 Bellefonte Nuclear Plant, Units 1 and 2; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN89- CNL-20-014, Application to Modify the Technical Specification to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09)2020-09-23023 September 2020 Application to Modify the Technical Specification to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09) CNL-20-041, License Amendment Request to Remove Licensee Control (BFN TS-527, SQN-TS-20-08, and WBN-TS-20-016)2020-08-14014 August 2020 License Amendment Request to Remove Licensee Control (BFN TS-527, SQN-TS-20-08, and WBN-TS-20-016) CNL-20-047, Brown Ferry Nuclear Plant, Sequoyah Nuclear Plant & Watts Bar Nuclear Plant - Tennessee Valley Authority License Amendment Request to Revise Radiological Emergency Plan Regarding On-shift Emergency Medical Technician and Onsite Ambulance2020-07-31031 July 2020 Brown Ferry Nuclear Plant, Sequoyah Nuclear Plant & Watts Bar Nuclear Plant - Tennessee Valley Authority License Amendment Request to Revise Radiological Emergency Plan Regarding On-shift Emergency Medical Technician and Onsite Ambulance Re CNL-20-042, Exigent License Amendment Request to Revise Technical Specification 4.2.2, Control Rod Assemblies (SQN-TS-20-05)2020-04-17017 April 2020 Exigent License Amendment Request to Revise Technical Specification 4.2.2, Control Rod Assemblies (SQN-TS-20-05) CNL-20-010, Application to Revise Sequoyah Nuclear Plant (SQN) Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency (SQN-TS-20-01)2020-02-24024 February 2020 Application to Revise Sequoyah Nuclear Plant (SQN) Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency (SQN-TS-20-01) CNL-19-066, Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, (TS-19-02)2020-01-14014 January 2020 Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, (TS-19-02) CNL-19-116, Exigent License Amendment Request to Revise Technical Specification 4.2.2, Control Rod Assemblies (SQN-TS-19-05)2019-11-16016 November 2019 Exigent License Amendment Request to Revise Technical Specification 4.2.2, Control Rod Assemblies (SQN-TS-19-05) CNL-19-005, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program (SQN-TS-19-01)2019-02-0101 February 2019 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program (SQN-TS-19-01) CNL-18-130, Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays2018-11-19019 November 2018 Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays CNL-18-085, License Amendment Request to Change the Implementation Date for License Amendments to Upgrade Emergency Action Level Scheme2018-06-15015 June 2018 License Amendment Request to Change the Implementation Date for License Amendments to Upgrade Emergency Action Level Scheme CNL-17-010, Submittal of Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (SQN-TS-17-06)2018-03-16016 March 2018 Submittal of Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (SQN-TS-17-06) CNL-17-150, Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise the Updated Final Safety Analysis Report (SQN-TS-17-04)2018-03-0909 March 2018 Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise the Updated Final Safety Analysis Report (SQN-TS-17-04) CNL-18-021, Supplement to Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plants, Units 1 and 2 License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 2.4, QPTR, and TS 3.3.1, 'Reactor Trip System (RTS)2018-02-0808 February 2018 Supplement to Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plants, Units 1 and 2 License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 2.4, QPTR, and TS 3.3.1, 'Reactor Trip System (RTS) .. NL-18-021, Supplement to Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plants, Units 1 and 2 License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 2.4, Qptr, and TS 3.3.1, 'Reactor Trip System (RTS) .2018-02-0808 February 2018 Supplement to Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plants, Units 1 and 2 License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 2.4, Qptr, and TS 3.3.1, 'Reactor Trip System (RTS) .. NL-17-034, Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System2017-11-17017 November 2017 Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System. CNL-17-034, Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power Syste2017-11-17017 November 2017 Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System. CNL-17-008, License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 3.2.4, QPTR, and TS 3.3.1, Reactor Trip System (RTS) Instrumentation, Condition D (SQN-TS-17-02 and WBN-TS-17-014)2017-08-0707 August 2017 License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 3.2.4, QPTR, and TS 3.3.1, Reactor Trip System (RTS) Instrumentation, Condition D (SQN-TS-17-02 and WBN-TS-17-014) NL-17-008, Sequoyah and Watts Bar - License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 3.2.4, Qptr, and TS 3.3.1, Reactor Trip System (RTS) Instrumentation, Condition D (SQN-TS-17-02 and WBN-TS-17-014)2017-08-0707 August 2017 Sequoyah and Watts Bar - License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 3.2.4, Qptr, and TS 3.3.1, Reactor Trip System (RTS) Instrumentation, Condition D (SQN-TS-17-02 and WBN-TS-17-014) CNL-16-051, Proposed Technical Specification Change to Revise the Note Modifying SR 3.8.1.17 of TS 3.8.1 AC Sources - Operating (TS-SQN-16-04)2017-03-13013 March 2017 Proposed Technical Specification Change to Revise the Note Modifying SR 3.8.1.17 of TS 3.8.1 AC Sources - Operating (TS-SQN-16-04) CNL-16-121, Supplemental Information Regarding Proposed Technical Specification Change to Extend the Allowed Completion Time to Restore Essential Raw Cooling Water System Train to Operable Status from 72 Hours to 7 Days2016-07-22022 July 2016 Supplemental Information Regarding Proposed Technical Specification Change to Extend the Allowed Completion Time to Restore Essential Raw Cooling Water System Train to Operable Status from 72 Hours to 7 Days CNL-16-001, Application to Modify Sequoyah Nuclear Plant, Units 1 and 2 Technical Specifications Regarding Diesel Generator Steady State Frequency (SQN-TS-14-02)2016-05-26026 May 2016 Application to Modify Sequoyah Nuclear Plant, Units 1 and 2 Technical Specifications Regarding Diesel Generator Steady State Frequency (SQN-TS-14-02) CNL-16-018, License Amendment Request (SQN-TS-16-03) to Change the Completion Date of Cyber Security Plan Implementation Milestone 82016-05-16016 May 2016 License Amendment Request (SQN-TS-16-03) to Change the Completion Date of Cyber Security Plan Implementation Milestone 8 CNL-15-178, License Renewal Application - Clarifications (TAC Nos. MF0481 and MF0482)2015-08-28028 August 2015 License Renewal Application - Clarifications (TAC Nos. MF0481 and MF0482) CNL-15-164, Second Annual Update, License Renewal Application2015-08-14014 August 2015 Second Annual Update, License Renewal Application CNL-14-075, Redacted Version of License Amendment Request (SQN-TS-14-01) to Change the Completion Date of Cyber Security Plan Implementation Milestone 82014-05-27027 May 2014 Redacted Version of License Amendment Request (SQN-TS-14-01) to Change the Completion Date of Cyber Security Plan Implementation Milestone 8 ML13329A7172013-11-22022 November 2013 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) 2024-08-28
[Table view] Category:Technical Specifications
MONTHYEARCNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements ML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML22348A0052023-01-25025 January 2023 Issuance of Amendment Nos. 326, 349, and 309; 363 and 35; 159 and 67 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22349A6472023-01-20020 January 2023 Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules ML22276A1612022-10-24024 October 2022 Issuance of Amendment Nos. 359, 353, 155, & 63 Regarding Adoption of TSTF Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22259A2042022-09-29029 September 2022 Correction to Amendment Nos. 358 and 352 Regarding Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B CNL-22-030, Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03)2022-07-27027 July 2022 Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) ML21084A1902021-05-0404 May 2021 Issuance of Amendment Nos. 355 and 348 Regarding Revision to Technical Specification Table 3.3.3-1, Post Accident Monitoring Instrumentation ML21021A3492021-03-0303 March 2021 Issuance of Amendment Nos. 354 and 347 Regarding Revision to Technical Specification 4.2.2, Control Rod Assemblies ML20282A3452020-11-19019 November 2020 Issuance of Amendment Nos. 313, 336, 296, 350, 344, 138, and 44 Revise Emergency Plan On-Shift Emergency Medical Technician & Onsite Ambulance Requirements ML19319C8312019-11-21021 November 2019 Issuance of Exigent Amendment No. 348 to Operate One Cycle with One Control Rod Removed ML18277A1102019-08-27027 August 2019 Units, 1 & 2 Issuance of Amendment Nos. 309, 332, 292, 345, 339, 128, and 31 Regarding Unbalanced Voltage Protection CNL-16-178, Response to Request for Additional Information (RAI) Regarding Application to Modify Technical Specifications Regarding Diesel Generator Steady State Frequency (SQN-TS-14-02)2016-12-23023 December 2016 Response to Request for Additional Information (RAI) Regarding Application to Modify Technical Specifications Regarding Diesel Generator Steady State Frequency (SQN-TS-14-02) CNL-16-086, Response to Request for Additional Information Technical Specifications 3.7.8 Change - Essential Raw Cooling Water System2016-05-31031 May 2016 Response to Request for Additional Information Technical Specifications 3.7.8 Change - Essential Raw Cooling Water System ML15320A2182015-11-30030 November 2015 Issuance of Amendments to Revise Technical Specification for Containment Leakage Rate Program ML15310A0422015-11-0404 November 2015 License Amendment Nos. 334 and 327, Improved Technical Specifications, Implementation CNL-15-218, Application to Revise Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program, (SQN-TS-14-03) (TAC Nos. MF5366 and MF5367), Supplement to Response to Request for Additional Information2015-10-23023 October 2015 Application to Revise Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program, (SQN-TS-14-03) (TAC Nos. MF5366 and MF5367), Supplement to Response to Request for Additional Information ML15238B4602015-09-30030 September 2015 Issuance of Amendments for the Conversion to the Improved Technical Specifications with Beyond Scope Issues CNL-15-163, Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Proposed License Conditions2015-08-0505 August 2015 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Proposed License Conditions NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 4 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 4 of 9 ML15205A4132015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 8 of 9 ML15205A4122015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 7 of 9 ML15205A4112015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 6 of 9 ML15205A4092015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 5 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 8 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 8 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 7 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 7 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 6 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 6 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 5 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 5 of 9 ML15205A4062015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 2 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 3 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 3 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 2 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 2 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 1 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 1 of 9 ML15205A4142015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 9 of 9 ML15205A4082015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 4 of 9 ML15205A4072015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 3 of 9 CNL-15-156, Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 1 of 92015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 1 of 9 ML13330A9242013-11-22022 November 2013 Enclosure 2 - Volume 12 - Improved Technical Specifications Conversion, ITS Section 3.7, Plant Systems ML13329A7922013-11-22022 November 2013 Enclosure 2 - Volume 2 - Improved Technical Specifications Conversion, Generic Determination of Significant Hazards Consideration and Environmental Assessment ML13329A7182013-11-22022 November 2013 Enclosure 1 - Improved Technical Specifications (ITS) Submittal, Enclosure 3 - Licensee Identified Changes That May Require a Formal Technical Branch Review Through Enclosure 10 ML13330A9282013-11-22022 November 2013 Enclosure 2 - Volume 9 - Improved Technical Specifications Conversion, ITS Section 3.4, Reactor Coolant System (Rcs), Revision 0 ML13329A7902013-11-22022 November 2013 Enclosure 2 - Volume 3 - Improved Technical Specifications Conversion, ITS Chapter 1.0, Use and Application, Revision 0 ML13330A9312013-11-22022 November 2013 Enclosure 2 - Volume 11 - Improved Technical Specifications Conversion, ITS Section 3.6, Containment Systems ML13330A9532013-11-22022 November 2013 Enclosure 4, Attachments 3, 4 and 5, Reactor Trip System (RTS) and Engineered Safety Fatures Actuation System (ESFAS) Instrumentation Completion Times, Bypass Times, and Surveillance Test Interval Extensions Based On.. ML13330A9302013-11-22022 November 2013 Enclosure 2 - Volume 14 - Improved Technical Specifications Conversion, ITS Section 3.9 Refueling Operations ML13330A9292013-11-22022 November 2013 Enclosure 2 - Volume 10 - Improved Technical Specifications Conversion, ITS Section 3.5, Emergency Core Cooling Systems (Eccs), Revision 0 ML13330A9252013-11-22022 November 2013 Enclosure 2 - Volume 15 - Improved Technical Specifications Conversion, ITS Chapter 4.0, Design Features, Revision 0 ML13330A9272013-11-22022 November 2013 Enclosure 2 - Volume 13 - Improved Technical Specifications Conversion, ITS Section 3.8, Electrical Power Systems ML13330A9222013-11-22022 November 2013 Enclosure 2 - Volume 16 - Improved Technical Specifications Conversion, ITS Chapter 5.0 Administrative Controls, Revision 0 ML13329A9162013-11-22022 November 2013 Sequoyah, Units 1 and 2, Enclosure 2 - Volume 6 - Improved Technical Specifications Conversion, ITS Section 3.3 Instrumentation, Revision 0 2024-04-01
[Table view] |
Text
Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2000 April 5, 2007 TVA-SQN-TS-07-03 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Gentlemen:
In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT (SQN) - UNITS 1 AND 2 - TECHNICAL SPECIFICATIONS (TS) CHANGE 07-03 "REVISION OF CHANNEL FUNCTIONAL TEST SURVEILLANCE FREQUENCY FOR REACTOR TRIP SYSTEM (RTS) TURBINE TRIP" Pursuant to 10 CFR 50.90, Tennessee Valley Authority (TVA) is submitting a request for a TS change (TS-07-03) to Licenses DPR-77 and DPR-79 for SQN Units 1 and 2. The proposed TS change will revise the surveillance frequency for the turbine trip functions of the reactor trip system instrumentation. The current frequency is prior to each reactor startup and the proposed change will revise this to be prior to exceeding the Permissive P-9 interlock whenever the unit has been in hot standby. The proposed change is consistent with NRC approved Technical Specification Task Force Traveler TSTF-311 as incorporated into the latest revision of Standard TSs (NUREG-1431, Revision 3).
TVA has determined that there are no significant hazards considerations associated with the proposed change and that the TS change qualifies for categorical exclusion from environmental review pursuant to the provisions of 10 CFR 51.22(c) (9).
P)l p0 Printed on recycled paper
U.S. Nuclear Regulatory Commission Page 2 April 5, 2007 Additionally, in accordance with 10 CFR 50.91(b) (1), TVA is sending a copy of this letter and enclosures to the Tennessee State Department of Public-Health.
There is no specific need date for this proposed change.
Therefore, TVA requests routine processing of this TS change and that the implementation of the revised TS be within 45 days of NRC approval.
There are no commitments contained in this submittal.
If you have any questions about this change, please contact me at 843-7170.
I declare under penalty of perjury that the foregoing is true and correct. Executed on this 5th day of April, 2007.
Sincerely, Glenn W. Morris Manager, Site Licensing and Industry Affairs
Enclosures:
- 1. TVA Evaluation of the Proposed Changes
- 2. Proposed Technical Specifications Changes (mark-up) cc (Enclosures):
Mr. Brendan T. Moroney, Senior Project Manager U.S. Nuclear Regulatory Commission Mail Stop 08G-9a One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2739 Mr. Lawrence E. Nanney, Director Division of Radiological Health Third Floor L&C Annex 401 Church Street Nashville, Tennessee 37243-1532
ENCLOSURE 1 TENNESSEE VALLEY AUTHORITY (TVA)
SEQUOYAH NUCLEAR PLANT (SQN)
UNITS 1 AND 2 TVA Evaluation of the Proposed Changes
1.0 DESCRIPTION
This letter is a request to amend Operating Licenses DPR-77 and DPR-79 for SQN Units 1 and 2. The proposed changes would revise Functional Units 18.A and 18.B of TS Table 4.3-1, "Reactor Trip System Instrumentation Surveillance Requirements." The Channel Functional Test (CFT) column of this table would be revised to delete the "S/U" frequency and replace this with a reference to Notation (12). This notation would require that the CFT be performed prior to exceeding the P-9 interlock whenever the unit has been in hot standby. The current "S/U" frequency requires the surveillance to be performed prior to reactor startup, which is well before the P-9 interlock is disabled.
The proposed revision will eliminate the gap between the required surveillance performance and the applicability for the function. Previous amendments to the SQN TSs revised the applicability from Mode 1 to operation above the P-9 interlock. These efforts did not identify the potential confusion between the surveillance frequency and the applicability. The proposed change will couple the surveillance frequency and applicability to provide more consistent requirements for this function. The proposed change is consistent with NRC approved Technical Specification Task Force Traveler TSTF-311 as incorporated into the latest revision of Standard TSs (NUREG-1431, Revision 3).
2.0 PROPOSED CHANGE
The proposed change will delete the CFT surveillance frequency of "S/U" from Functional Units 18.A and 18.B of TS Table 4.3-1. This requirement will be replaced with "(12)"
indicating that table Notation (12) applies to these CFT requirements. Notation (12) will be added to Table 4.3-1 and will read, "Prior to exceeding the P-9 interlock whenever the unit has been in HOT STANDBY."
In summary, the surveillance frequency for the turbine trip functions of the reactor trip system instrumentation requirements will be revised to be consistent with the mode applicability for these functions.
E1-I
3.0 BACKGROUND
The proposed change affects the reactor trip system instrumentation that is initiated by the turbine trip functions. The turbine trip reactor trip is actuated by two out of three logic from low autostop oil pressure signals or by all closed signals from the turbine steam stop valves. A turbine trip causes a direct reactor trip above the P-9 setpoint.
The reactor trip on turbine trip is an anticipatory trip input signal to the reactor protection system. This trip is anticipatory in that it is not assumed to occur in any of the Chapter 15 accident analysis. Condition II faults associated with turbine trips are discussed in Chapter 15.2.7 of the Updated Final Safety Analysis Report (UFSAR). This trip meets all of the requirements of IEEE 279-1971 including separation, redundancy, single failure, and testability.
Seismic location, qualification, or mounting of the sensors is not practical because of their location in the nonseismic Turbine Building.
When the turbine is tripped, turbine auto stop oil pressure drops, and the pressure is sensed by three pressure sensors.
A digital output is provided from each sensor when the oil pressure drops below a preset value. These three outputs are transmitted to two redundant two out of three logic matrixes, either of which trips the reactor if above the P-9 setpoint.
The auto stop oil pressure signal also dumps the autostop emergency trip fluid, closing all of the turbine steam stop valves. When all stop valves are closed, a reactor trip signal will be initiated if the reactor is above the P-9 setpoint. This trip signal is generated by redundant (two each) limit switches on the stop valves. Reactor trips initiated by a turbine trip event are discussed in Chapter 7.2.1.1.2 of the UFSAR.
Interlock P-9 blocks a reactor trip following a turbine trip below 50 percent power. The block action (absence of the P-9 interlock signal) occurs when three out of four neutron flux power range signals are below the setpoint. Thus, below the P-9 setpoint, the reactor will not be directly tripped by a turbine trip, but instead the reactor control system and the steam dump system will automatically control the reactor to zero power conditions. These interlock functions are described in Chapter 7.2.1.1.3 of the UFSAR.
When the SQN units were licensed for power operation, the surveillance frequency for the turbine trip functions was prior to reactor startup or S/U. This requirement was associated with a Mode 1 applicability for these functions.
This crafting of the TSs left a small window of time during E1-2
typical startups between the point when the surveillance was required to be performed and when the functions had to be operable. This is not typical for most TS requirements and creates difficulty when trying to apply the general rules of the TSs found in TS Sections 3.0 and 4.0.
TVA requested and received approval from NRC to revise the turbine trip function applicability from Mode 1 to above the P-9 interlock in Amendments 304 and 294 for Units 1 and 2, respectively. The basis of this change is that the turbine trip instrumentation cannot perform any function until the P-9 interlock of 50 percent reactor power is exceeded and the trip function is enabled. Therefore, a function does not need to be operable until it can perform its intended function. This change actually amplified the concern described above by increasing the duration between the surveillance performance requirement and the applicability.
TVA is pursuing this TS change to eliminate this gap which creates confusion regarding the need to perform the surveillance before reactor startup even though the function is not required to be operable until 50 percent reactor power. Vogtle Nuclear Power Plant identified this disconnect during their conversion to the standard TSs. As a result of this discovery and NRC's approval of their conversion, TSTF-311 was proposed for NUREG-1431 and approved generically by NRC. Incorporation of TSTF-311, as contained in the proposed revision, into the SQN TSs will eliminate the potential misapplication of the surveillance requirements and the associated confusion. The proposed surveillance frequency does not alter the current provision that takes credit for a surveillance performance within the previous 31 days. In this case, the surveillance does not have to be performed prior to the P-9 interlock based on a recent performance of the surveillance.
4.0 TECHNICAL ANALYSIS
The proposed- change to the surveillance frequency of the turbine trip functions for the reactor trip system instrumentation provides a more appropriate requirement.
These trip functions are only enabled by design when the reactor power is above the P-9 interlock that is set at 50 percent thermal power. A requirement to verify that a function is operable through testing when the design keeps such a feature from performing the required action is not necessary. The proposed revision to change the turbine trip function surveillance frequency before the reactor is above the P-9 interlock achieves the appropriate requirement to have an operable trip function when the system is capable of initiating the required reactor trip signal. The turbine trips are not credited as the primary actuation of a reactor trip for any SQN postulated event. They are provided to E1-3
enhance the overall reliability of the reactor protection system. This proposed change is consistent with the latest version of the standard TSs (NUREG-1431, Revision 3) and the NRC approved TSTF-311. The incorporation of this revision into the SQN TSs will not adversely affect the ability of the reactor trip system to generate the required trip signal for turbine trip events.
5.0 REGULATORY SAFETY ANALYSIS This letter is a request to amend Operating Licenses DPR-77 and DPR-79 for SQN Units 1 and 2. The proposed changes would revise Functional Units 18.A and 18.B of TS Table 4.3-1, "Reactor Trip System Instrumentation Surveillance Requirements." The Channel Functional Test (CFT) column of this table would be revised to delete the "S/U" frequency and replace this with a reference to Notation (12). This notation would require that the CFT be performed prior to exceeding the P-9 interlock whenever the unit has been in hot standby. The current "S/U" frequency requires the surveillance to be performed prior to reactor startup, which is well before the P-9 interlock is disabled.
The proposed revision will eliminate the gap between the required surveillance performance and the applicability for the function. Previous amendments to the SQN TSs revised the applicability from Mode 1 to operation above the P-9 interlock. These efforts did not identify the potential confusion between the surveillance frequency and the applicability. The proposed change will couple the surveillance frequency and applicability to provide more consistent requirements for this function. The proposed change is consistent with NRC approved Technical Specification Task Force Traveler TSTF-311 as incorporated into the latest revision of Standard TSs (NUREG-1431, Revision 3).
5.1 No Significant Hazards Consideration TVA has evaluated whether or not a significant hazards consideration is involved with the proposed amendments by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of Amendment," as discussed below:
- 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No.
The proposed changes revise the surveillance frequency for reactor trip functions from a turbine trip event. These changes do not alter E1-4
these functions physically or how they are maintained. Delaying the performance of the surveillance up to the P-9 interlock will continue to ensure operability of the function before the plant is in a condition that would benefit from the associated actuation. The incorporation of a surveillance frequency that is consistent with the applicability for the function eliminates potential misapplication of the TS requirements.
The frequency changes support turbine trip operability during plant startup and is consistent with their ability to perform the reactor trip functions.
Since these changes will not affect the ability of these trips to perform the initiation of reactor trips when appropriate, the offsite dose consequences for an accident will not be impacted.
Equally, the potential to cause an accident is not affected because no plant system or component has been altered by the proposed changes. Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No.
The proposed changes only affect the surveillance frequency requirement for the turbine trip functions. This does not affect any physical features of the plant or the manner in which these functions are utilized. The proposed surveillance frequency will require the functions to be verified operable before the turbine trip functions are applicable and able to perform their trip functions. Delaying the performance of the surveillance up to the P-9 interlock will continue to ensure operability of the function before the plant is in a condition that would benefit from the associated actuation. Therefore, the proposed change does not create the possibility of a new or different kind of accident from any previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No.
E1-5
The proposed changes do not alter any plant setpoints or functions that are assumed to actuate in the event of postulated accidents. In fact, the proposed changes do not alter any plant feature and only alters the requirements for when the function must be verified to be operable through surveillance testing. The proposed changes ensure the functionality of the turbine trips when assumed in the analysis for accident mitigation. Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Based on the above, TVA concludes that the proposed amendment(s) present no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and accordingly, a finding of "no significant hazards consideration" is justified.
5.2 Applicable Regulatory Requirements/Criteria Section 182a of the Atomic Energy Act requires applicants for nuclear power plant operating licenses to include TSs as part of the license. The Commission's regulatory requirements related to the content of the TS are contained in Title 10, Code of Federal Regulations (10 CFR), Section 50.36. The TS requirements in 10 CFR 50.36 include the following categories: (1) safety limits, limiting safety systems settings and control settings, (2) limiting conditions for operation (LCO), (3) surveillance requirements (SRs), (4) design features, and (5) administrative controls. The requirements for the initiation of a reactor trip resulting from a turbine trip are included in the TS in accordance with 10 CFR 50.36(c) (2),
"Limiting Conditions for Operation."
As stated in 10 CFR 50.59(c) (1) (i), a licensee is required to submit a license amendment pursuant to 10 CFR 50.90 if a change to the TS is required.
Furthermore, the requirements of 10 CFR 50.59 necessitate that the U.S. Nuclear Regulatory Commission (NRC) approve the TS changes before the changes are implemented. TVA's submittal meets the requirements of 10 CFR 50.59(c) (1) (i) and 10 CFR 50.90.
NUREG-1431, Revision 3, "Standard Technical Specifications Westinghouse Plants," provides generic recommendations for requirements associated with the operation of Westinghouse Electric Company designed nuclear power plants. NUREG-1431 contains specifications for the generation of reactor trips as a result of a trip of the turbine. The proposed changes E1-6
support these functions by implementing appropriate surveillance frequency requirements that are more consistent with the function applicability and the logic design of these trip functions. The proposed changes are consistent with NUREG-1431 recommendations to the degree that the SQN design is compatible with these requirements. The proposed change is consistent with and meets the intent of NUREG-1431.
General Design Criterions (GDC) 20 through 29, "Protection and Reactivity Control Systems," of Appendix A, "General Design Criteria," to 10 CFR Part 50, provides the expectations for protection systems associated with reactor operation. The proposed changes do not alter the ability for the reactor trip functions to actuate on a valid turbine trip signal.
The proposed surveillance frequency is consistent with the function applicability requirements and the SQN design and analysis for the turbine trip safety function and ensures operability verifications before entering required plant conditions. Therefore, the recommendations of these GDCs continue to be met with the proposed changes.
There are several NRC Regulatory Guides associated with instrumentation and control systems for nuclear facilities. These guides deal primarily with the design, setpoint development, and testing of these systems. The proposed changes do not alter these types of features for the reactor trip functions that are generated by turbine trip signals. The physical characteristics of these functions are not altered by the proposed revision of the surveillance frequency requirements. Therefore, the recommendations of applicable regulatory guides continue to be met without change.
In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
6.0 ENVIRONMENTAL CONSIDERATION
A review has determined that the proposed amendment would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or SR.
E1-7
However, the proposed amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c) (9). Therefore, pursuant to 10 CFR 50.22(b),
no environmental impact statement or environmental assessment needs to be prepared in connection with the proposed amendment.
7.0 REFERENCES
- 1. Sequoyah Nuclear Plant, Final Safety Analysis Report (as updated) Revision 18, Sections 7.2.1.1.2, 7.2.1.1.3, and 15.2.7, dated May 28, 2004
- 2. NUREG-1431, Revision 3, "Standard Technical Specifications Westinghouse Plants," dated March 2004
- 3. Technical Specification Task Force Traveler TSTF-311, Revision 0, "Revision of Surveillance Frequency for TADOT on Turbine Trip Functional Unit," approved by NRC April 21, 1999 E1-8
ENCLOSURE 2 TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT (SQN)
UNITS 1 AND 2 Proposed Technical Specification Changes (mark-up)
I. AFFECTED PAGE LIST Unit 1 3/4 3-12 3/4 3-13 Unit 2 3/4 3-12 3/4 3-13 II. MARKED PAGES See attached.
E2-1
TABLE 4.3-1 (Continued)
REACTOR TRIP SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS MODES IN CHANNEL WHICH CHANNEL CHANNEL- FUNCTIONAL. SURVEILLANCE FUNCTIONAL UNIT CHECK CALIBRATION TEST IS REQUIRED
- 15. Deleted
- 16. Undervoltage - Reactor Coolant N.A. R Q Pumps
- 17. Underfrequency - Reactor Coolant N.A. R Q Pumps
- 18. Turbine Trip 1*
A. Low Fluid Oil Pressure N.A. N.A. SMU11)(12) 1"**
B. Turbine Stop Valve Closure N.A. N.A. W4()(12)
- 19. Safety Injection Input from ESF N.A. N.A. R 1,2
- 20. Reactor Trip Breaker N.A. N.A. M(5) and 1, 2, and
- 21. Automatic Trip Logic N.A. N.A. M(5) 1, 2, and *
- 22. Reactor Trip System Interlocks A. Intermediate Range Neutron N.A. R N.A. 2, and
- Flux, P-6 B. Power Range Neutron Flux, N.A. N.A. N.A. 1 P-7 C. Power Range Neutron Flux, N.A. R N.A. 1 P-8 D. Power Range Neutron Flux, N.A. R N.A. 1,2 P-1 0 E. Turbine Impulse Chamber N.A. R N.A. 1 Pressure, P-13 F. Power Range Neutron Flux, N.A. R N.A. 1 P-9 G. Reactor Trip, P-4 N.A. N.A. R 1, 2, and*
- 23. Reactor Trip Bypass Breaker N.A. N.A. M(10)R(11) 1, 2, and
- September 2, 2005 SEQUOYAH - UNIT 1 3/4 3-12 Amendment No. 54, 63, 141, 304 E2-2
TABLE 4.3-1 (Continued)
NOTATION S With the reactor trip system breakers closed and the control rod drive system capable of rod withdrawal.
- - Above the P-9 (Power Range Neutron Flux) interlock.
(1) - If not performed in previous 31 days.
(2) - Heat balance only, above 15% of RATED THERMAL POWER. Adjust channel if absolute difference greater than 2 percent.
(3) - Compare incore to excore AXIAL FLUX DIFFERENCE above 15% of RATED THERMAL POWER. Recalibrate if the absolute difference greater than or equal to 3 percent. The frequency of this surveillance is every 31 EFPD. This surveillance is not required to be performed until 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> after thermal power is > 15% RTP.
(4) - Deleted.
(5) - Each train or logic channel shall be tested at least every 62 days on a STAGGERED TEST BASIS. The test shall independently verify the OPERABILITY of the undervoltage and automatic shunt trip circuits.
(6) - Neutron detectors may be excluded from CHANNEL CALIBRATION.
(7) - Below P-6 (Block of Source Range Reactor Trip) setpoint.
(8) - Deleted.
(9) - The CHANNEL FUNCTIONAL TEST shall independently verify the operability of the undervoltage and shunt trip circuits for the manual reactor trip function.
(10) Local manual shunt trip prior to placing breaker in service. Each train shall be tested at least every 62 days on a STAGGERED TEST BASIS.
(11) - Automatic and manual undervoltage trip.
STANDBY.
whenever the unit has been in HOT Q(12) Prior to exceeding the P-9 interlock September 2, 2005 SEQUOYAH - UNIT 1 3/4 3-13 Amendment No. 54, 114, 141,199, 304 E2-3
TABLE 4.3-1 (Continued)
REACTOR TRIP SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS MODES FOR CHANNEL WHICH CHANNEL CHANNEL FUNCTIONAL SURVEILLANCE FUNCTIONAL UNIT CHECK CALIBRATION TEST IS REQUIRED
- 15. Deleted
- 16. Undervoltage - Reactor Coolant N.A. R Q 1 Pumps
- 17. Underfrequency - Reactor Coolant N.A. R Q 1 Pumps
- 18. Turbine Trip A. Low Fluid Oil Pressure N.A. N.A.
1"**
B. Turbine Stop Valve Closure N.A. N.A.
- 19. Safety Injection Input from ESF N.A. N.A. R 1,2
- 20. Reactor Trip Breaker N.A. N.A. M(5) and 1, 2, and
- 21. Automatic Trip Logic N.A. N.A. M(5) 1, 2, and *
- 22. Reactor Trip System Interlocks A. Intermediate Range Neutron Flux, P-6 N.A. R N.A. 2, and
- B. Power Range Neutron Flux, N.A. N.A. N.A. 1 P-7 C. Power Range Neutron Flux, N.A. R N.A. 1 P-8 D. Power Range Neutron Flux, N.A. R N.A. 1,2 P-1 0 E. Turbine Impulse Chamber N.A. R N.A. 1 Pressure, P-13 F. Power Range Neutron Flux, N.A. R N.A. 1 P-9 G. Reactor Trip, P-4 N.A. N.A. R 1, 2, and *
- 23. Reactor Trip Bypass Breaker N.A. N.A. M(10)R(11) 1, 2, and
- September 2, 2005 SEQUOYAH - UNIT 2 3/43-12 Amendment Nos. 16, 46, 55, 132, 294 E2-4
Table 4.3-1 (Continued)
NOTATION
- Above the P-9 (Power Range Neutron Flux) interlock.
(1) - If not performed in previous 31 days.
(2) - Heat balance only, above 15% of RATED THERMAL POWER. Adjust channel if absolute difference greater than 2 percent.
(3) - Compare incore to excore AXIAL FLUX DIFFERENCE above 15% of RATED THERMAL POWER. Recalibrate if the absolute difference greater than or equal to 3 percent. The frequency of this surveillance is every 31 EFPD. This surveillance is not required to be performed until 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> after thermal power is > 15% RTP.
(4) - Deleted.
(5) - Each train or logic channel shall be tested at least every 62 days on a STAGGERED TEST BASIS. The test shall independently verify the OPERABILITY of the undervoltage and automatic shunt trip circuits.
(6) - Neutron detectors may be excluded from CHANNEL CALIBRATION.
(7) - Below P-6 (Block of Source Range Reactor Trip) setpoint.
(8) - Deleted.
(9) - The CHANNEL FUNCTIONAL TEST shall independently verify the operability of the undervoltage and shunt trip circuits for the manual reactor trip function.
(10) - Local manual shunt trip prior to placing breaker in service. Each train shall be tested at least every 62 days on a STAGGERED TEST BASIS.
(11) - Automatic and manual undervoltage trip.
(1 Priorto exceeding the P-9 interlock whenever the unit has been in HOT STANDBY.
September 2, 2005 SEQUOYAH - UNIT 2 3/4 3-13 Amendment No. 46, 104, 132, 190, 294 E2-5