April 9, 2007 Mr. Terry J. Garrett Vice President Engineering Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION REGARDING THE ENVIRONMENTAL REVIEW FOR WOLF CREEK GENERATING STATION LICENSE RENEWAL (TAC NO. MD3182)

Dear Mr. Garrett:

On September 27, 2006, Wolf Creek Nuclear Operating Company submitted an application for license renewal of the Wolf Creek Generating Station (WCGS), Unit 1. As part of the environmental review for license renewal, the U.S. Nuclear Regulatory Commission (NRC) staff conducted an environmental site audit at the WCGS during the week of March 16, 2007. In advance of the audit, NRC staff submitted (by letter dated February 21, 2007) a list of information that would facilitate the staffs review during the environmental site audit. We appreciate the efforts of your staff to make the requested information available during the audit.

During the staffs review of the information, and based on discussions with your staff, we have identified areas where additional information is needed to complete our review. Enclosed is a compilation of three lists of documents that are being requested. The first list includes references that are identified in the Environmental Report. The second list (Master List) includes references that provide responses to questions that were asked during the site audit.

The numbering system for Environmental Report references and the Master List were provided by your staff and remain unchanged.

The third list is composed of additional information that was identified during the site audit. The numbering system for this list was created by NRC staff and was discussed with your staff during the audit. Please note that items A1, A2, A3, A4, A8, A9, A10, A11, A12, A13, A14, A15 and A16 from this third list were obtained by NRC staff during the audit, left behind, and may be returned to us separate from the official response to these requests for additional information (RAIs).

T. Garrett We request that you provide your response to these RAIs no later than 30 days after the issuance of this letter in order to support the license renewal environmental review schedule.

If you have any questions, please contact me by telephone at (301) 415-3874 or by e-mail at cjj@nrc.gov.

Sincerely,

/RA/

Christian Jacobs, Environmental Project Manager Environmental Branch B Division of License Renewal Office of Nuclear Reactor Regulation Docket No.: 50-482

Enclosure:

As stated cc w/encl: See next page

T. Garret We request that you provide your response to these RAIs no later than 30 days after the issuance of this letter in order to support the license renewal environmental review schedule.

If you have any questions, please contact me by telephone at (301) 415-3874 or by e-mail at cjj@nrc.gov.

Sincerely,

/RA/

Christian Jacobs, Environmental Project Manager Environmental Branch B Division of License Renewal Office of Nuclear Reactor Regulation Docket No.: 50-482

Enclosure:

As stated cc w/encl: See next page Distribution: w/encl. See next page Adams Accession No.: ML070851188 OFFICE LA:DLR GS:DLR:REBB PM:DLR:REBB BC:DLR:REBB NAME S. Figueroa A. Williamson C. Jacobs R. Franovich DATE 04/ 4 /07 04/ 4 /07 04/ 9 /07 04/ 8 /07 OFFICIAL RECORD COPY

Environmental Report - References Casper, H. (Coffey County Zoning Department). 2005. Personal communication with E. N. Hill (Tetra Tech NUS, 1

Inc.). Land Use Information. Coffey County Zoning Department, Coffey County, Kansas. May 31.

EA (EA Engineering, Science, and Technology, Inc.). 1988. Wolf Creek Generating Station Operational Phase 2 Environmental Monitoring Program, Final Report. Prepared for Wolf Creek Nuclear Operating Corporation by EA Engineering, Science, and Technology, Inc., Great Plains Regional Office.

Hotaling, J. (Coffey County Economic Development). 2005. Personal communication with E. N. Hill (Tetra Tech 3

NUS, Inc.). Land Use Information. Coffey County Economic Development, Coffey County, Kansas. June 1.

4 No longer requested Kelsey, K. (Kansas Department of Health and Environment, Enforcement and Regulation 5 Development, Public Water Supply Section). 2005. Water supply data for the City of Emporia Water Supply Facility. April 21, 2005. Personal communication with E. N. Hill (Tetra Tech NUS, Inc.).

6-7 No longer requested - NRC documents Peterson, P. (Kansas Department of Transportation District 4). 2005. Electronic mail to E.N. Hill (Tetra Tech NUS).

8 Level of Service Request for Coffey County. May 27.

Sowder, Jack. City of Burlington Water Superintendent. 2005. Water supply data for the City of Burlington Water 9

Supply Facility. May 5, 2005. Personal communication with E. N. Hill (Tetra Tech NUS, Inc.).

State of Kansas. 2004. Kansas Water Plan. Neosho Basin Section. Kansas Water Office.

10 Topeka, Kansas. November 18.

11 No longer requested - Available on License Renewal CD Haines, D. E. 2000. Biological control of gizzard shad impingement at a nuclear power plant. Environmental 12 Science & Policy 3: S275-S281.

Hagan, R. C. 1992. Letter to USFWS regarding 1992 fish and wildlife sampling activities and renewal of WCNOCs 13 Neosho madtom sub-permit 91-27. R.C. Hagan, WCNOC, Burlington, Kansas. December 22.

Maynard, O.L. 1990a. Letter to Kansas Dept. of Wildlife and Parks with 1989 Conditional Wildlife Permit Activities 14 Report. O.L. Maynard, WCNOC, Burlington, Kansas. January 19.

Maynard, O.L. 1990b. Letter to Kansas Dept. of Wildlife and Parks with information on 1988 and 1989 Neosho 15 madtom sampling. O.L. Maynard, WCNOC, Burlington, Kansas. January 23.

Obermeyer, Brian K. 2000. Recovery Plan for Four Freshwater Mussels in Southeast Kansas: Neosho Mucket, 16 Ouachita Kidneyshell, Rabbitsfoot, Western Fanshell. Kansas Department of Wildlife & Parks, Pratt, Kansas.

November.

Rhodes, F. T. 1991. Letter to Kansas Dept. of Wildlife and Parks with 1990 Conditional Wildlife Permit Activities 17 Report and 1991 Renewal Application. F. T. Rhodes, WCNOC, Burlington, Kansas. January 15.

18 Rhodes, F. T. 1992. Letter to Kansas Dept. of Wildlife and Parks with 1991 Conditional Wildlife Permit Activities.

19 Provided under a separate request (Master List #12)

WCNOC (Wolf Creek Nuclear Operating Corporation). 2005. Circulating/Service Water 20 Treatment Chemicals and Limits, Form APF 07A-002-01, Rev. 0, submitted in email from R. L. Logsdon (WCNOC) to S. Connor (Tetra Tech NUS) April 5.

The 12/13/74 letter cited in Section 4.1 of the ER (WCGS, 1980) from KDHE to the Kansas Gas and Electric 21 Company regarding 316(a) exemptions.

WCNOC (Wolf Creek Nuclear Operating Corporation). 1987. Naegleria fowleri Test Results, LI 87-0627, 22 interoffice correspondence from Gregg Wedd to Distribution, October 16.

Enclosure

Wedd, Gregg, R., Summer 1985, Observations on Neosho River Larval Fish In Coffey County, Kansas, Vol XXXIV, 23 No. 1, Emporia State Research Studies 24 Haine, 2/16/06, 2005 Fishery Monitoring Report and 2006 Plan, Wolf Creek Lake.

25a KGE, November 14,1974, Letter from Koester to KDHE.

25b KGE, June 16, 1986, Letter from Koester to NRC, Annual Environmental Operating Report, Revision 1 55a EA, 1981. WCGS Construction Environmental Monitoring Program, April 1980 - January 1981, EA Report 9107.

EA, 1982. WCGS Construction Environmental Monitoring Program, February 1981 - January 1982, EA Report 55b KGE11.

Nalco Environmental Sciences,1976. Final Report of Preconstruction Environmental Monitoring Program WCGS, 55c March 1975 - February 1976.

Nalco Environmental Sciences,1977. Final Report of Preconstruction Environmental Monitoring Program WCGS, 55d March 1976 - February 1977.

Nalco Environmental Sciences,1978. Final Report of Preconstruction Environmental Monitoring Program WCGS, 55e March 1977 - February 1978.

Nalco Environmental Sciences,1979. Final Report of Preconstruction Environmental Monitoring Program WCGS, 55f March 1978 - February 1979.

Nalco Environmental Sciences,1980. Final Report of Preconstruction Environmental Monitoring Program WCGS, 55g March 1979 - February 1980.

State of Kansas, 1977b and State of Kansas, 1977c as presented in Enclosure 1 to WM 06-0046 (November 17, 57 2006). (Water Appropriation [file #s 20,275 and 14,626])

58 USACE 2002 as cited in Enclosure 1 to WM 06-0046 (November 17, 2006). (JRR Conservation Pool) 59a WCNOC, April 1997, Annual Environmental Operating Report.

EA (Engineering, Science and Technology), Nov 14, 1985, Assessment of Cold Shock Potential for Six Target 59b Species from the Wolf Creek Cooling Lake.

59c WCNOC, Mar 1993, Aquatic Monitoring 1992 Reports and 1993 Plans 59d WCNOC, Feb 12, 1987, Evaluation of the Environmental Effects of Higher than Postulated Condenser Delta Ts 61 KGE, March19, 1982, Letter from Koester to NRC, Makeup Screenhouse Impingement Monitoring Report NRC (U.S. Nuclear Regulatory Commission). 1975. Final Environmental Statement related to construction of Wolf 62a Creek Generating Station, Unit 1, NUREG-175/096, Office of Nuclear Reactor Regulation, Washington, DC.

WCGS (Wolf Creek Generating Station). 1980. Wolf Creek Generating Station Unit No. 1, Environmental Report, 62b Operating License Stage - Volume 1.

WCNOC (Wolf Creek Nuclear Operating Corporation). 1988. Wolf Creek Generating Station 1987-1988 62c Operational Wildlife Monitoring Report. Environmental Management Section, Burlington, Kansas, November.

WCNOC (Wolf Creek Nuclear Operating Corporation). 2005a. Wolf Creek Generating Station, Annual 62d Environmental Operating Report 2004. Environmental Management Organization, Burlington, Kansas, April.

Wenke, T.L. and M. E. Eberle. 1991. Neosho Madtom Recovery Plan. Prepared by Natural Science Research 100 Associates for Region 6 U.S. Fish and Wildlife Service, Denver.

101 Duplicate request. See A-60.

Master List for Audit Needs Aerial photographs of the site dating back to before and during site preparation and plant construction. WCNOC, undated, 1972 Coffey County Preconstruction Imagery; WCNOC, undated, 1979 Coffey County Preconstruction 1

Imagery; WCNOC, undated, 1991 Coffey County Preconstruction Imagery; WCNOC, 1/29/07, Coffey County Kansas, Source: National Aerial Imagery Project, Farm Service Agency, Summer 2006 Other photographs of the site dating to before and during site preparation and plant construction. WCGS, undated, 2

From Prairie to Protons: A Pictorial history of the construction of Wolf Creek Generating Station.

Available water or sediment quality data for John Redmond Reservoir (JRR), Coffey County Lake (CCL), and 3 Neosho River. Raw data tables - chemistry data for John Redmond Reservoir, Wolf Creek Lake, Neosho River Station Downstream of Wolf Creek, Neosho River Upstream of JRR. Data source identification required.

Available information regarding local, state, or federal management measures for the JRR, CCL, and the Neosho 4 River. This may include fisheries management, watershed management, flow regulation, etc. Jirak, L., undated, Progress and Management Report 2005, John Redmond Reservoir; Any available documentation regarding minimum flows in the Neosho River.

Kansas Dept of Agriculture, Division of Water Resources, 1/25/07, Minimum Desirable Stream flows, 5

http://www.accesskansas.org/kda/dwr/OTS/mds.htm; Kansas Water Appropriation Act, Statutes KSA 82A-701 through 82A-737, and KSA 42-313,42-314 as amended 2004 Available records regarding the operation of the intake screens at either the Neosho River or CCL screen houses as well as information on the ongoing and periodic maintenance that occurs on the screens. Huynh, D.T., 1/26/07, Email to C.M. Medenciy, Question #31 & 32 for NRC License Renewal Audit; WCNOC, 2/1/07, CWSH and MUSH 6

Traveling Screens Preventive Maintenance Activity; WCNOC WO#06-290030-000 and #06-285439-000; PM Work Instructions for CWSH Traveling Screen Cleaning Inspection, and Lubrication and Oil Sampling of Gear Reducers; WP: 126386 Task:1, Rev 0, Work Package Task, PM for 1SW001FA Available information on invasive or nuisance species observed in the facilitys intake, JRR, CCL, or the Neosho River and available information on WCNOC efforts to address this issue. Scherich, K.L., 1/25/07, Email to C.M.

Medenciy, Item 33 response; undated and unreferenced text entitled "Invasive or Nuisance Species in the vicinity of WCGS - Audit; Haines, 3/22/06, Zebra Mussel (Dreissena polymorpha) Monitoring near Wolf Creek Generating 7

Station, 2005 Report and 2006 Plans: WCNOC, 06/06, Microfouling, Asiatic Clam and Zebra Mussel Control Program for WCGS, WCEM 05-012; State of Kansas, 4/26/05, Kansas Aquatic Nuisance Species Management Plan; Goeckler, J., Nov 30, 2006, Report to the Aquatic Nuisance Species Task Force on Kansas ANS management for federal Fiscal Year 2006 Documentation regarding the WCNOC or Coffey County Sheriffs office management of the CCL access program.

8 MOU, 5/24/96, Kansas Gas and Electric Co., Kansas City Power & Light Co., Kansas Electric Power Coop, Inc.,

WCNOC, KDWP, Coffey County; Amendment No. 1 to MOU 5/4/98 Examples of the fishery regulations developed by the KDWP for CCL.

9 See MOU under #8; Correspondence between WCNOC and KDWP regarding fishery regulations dated from 8/98 through 3/06 If available, information on any occurrences of the Topeka Shiner in the JRR, CCL, Neosho River, or any water bodies crossed by the facilitys transmission lines Text provided @ site audit, no reference; KDWP, 2000, Topeka Shiner, Notropis topeka; WCGS, ER (OLS), 6/81, 10 Figure 3.9-1, Transmission Line Routes; USGS Maps, undated, Chase County, Coffey County, Greenwood County, Lyon County, http://ga2er.usgs.gov/kswater/index.cfm; KDWP, April 2004, Recovery Plan of the Topeka shiner (Notropis topeka) in Kansas; KDWP, February 2006, Stream Monitoring and Assessment Program, Sub-Watershed Report Section 2.5 of the ER (WCGS, 1980) states that USFWS and USGS recommended that additional data be obtained on the habitat requirements of the Neosho River madtoms. Please provide any new information related to these habitat requirements. Summary text from following refs: Wildhaber, et.al., April 17, 2000, Ictalurid Populations in Relation to the Presence of a Main-Stem Reservoir in a Midwestern Warmwater Stream with Emphasis on the Threatened Neosho Madtom, Transactions of the Am Fisheries Society; Bryan, et.al., 2004, Threatened fishes of the world: Noturus placidus Taylor, 1969 (Ictaluridae), Environmental Biology of Fishes; Bryan, et.al., 6/17/05, Examining Neosho Madtom Reproductive Biology Using Ultrasound and Artificial Photothermal Cycles, North Am Journal of Aquaculture; Bryan, et.al., undated, Influence of Water Flow on Neosho madtom (Notorus placidus)

Reproductive Behavior, Am Midl. Nat. 156:305-318; Gilette, et.al., Habitat use by a Midwestern USA riverine fish assemblage: effects of season, water temperature and river discharge, Journal of Fish Biology; Gillette, et.al., 2005, 11 Spatiotemporal Patterns of Fish Assemblage Structure in a river Impounded by Low-Head Dams, Coperia: Gillette, 11/19/03, Effects of Lowhead Dams on Riffle-Dwelling Fishes and Macroinvertebrates in a Midwestern River, Transactions of the Am Fisheries Society; Tiemann, et.al., 2004, Correlations among densities of stream fishes in the upper Neosho River, with focus on the federally threatened Neosho madtom Notorus placidus, Transactions of the Kansas Academy of Science; Bulger, et.al., 2002, Breeding Behavior and Reproductive Life History of the Neosho Madtom, Noturus placidus (Teleostei: Ictaluridae), Transactions of the Kansas Academy of Science; Bulger, et.al.,

March 2002, Effects of Photo period on Behavior and Courtship of the Noesho madtom (Noturus placidus), Journal of Freshwater Ecology; Wildhaber, et.al., 2000, Natural and Anthropogenic Influences on the Distribution of the Threatened Neosho Madtom in a Midwestern Warmwater Stream, Transactions of the Am Fisheries Society; The Conservation Behaviorist 2006 Vol 4(1)

Section 2.5 of the ER (WCGS, 1980) states that USFWS and USGS recommended that flows below the John Redmond Dam be increased during critical periods for the Neosho River madtoms. Please provide any new 12 information related to this issue. Wildhaber, et.al., April 17, 2000, Ictalurid Populations in Relation to the Presence of a Main-Stream Reservoir in a Midwestern Warmwater Stream with Emphasis on the Threatened Neosho Madtom, Transactions of the Am Fisheries Society If available, information on any occurrences of the Neosho river madtom in the JRR, CCL or Neosho river.

Text provided @ site audit, no reference; WCNOC, March 2007, Biological Assessment of Potential Impact to the Neosho Madtom and Neosho Mucket Due to License Renewal of WCGS; WCGS, undated, ER for License Renewal, 13 Attachment C, Special Status Species Correspondence; US Dept of the Interior, 1/29/07, Letter from LeValley to NRC; An Assessment of the Potential Impacts on the Flow of the Neosho River, Related to the Operating License Renewal for WCGS, Unit NO. 1, undated, no reference.

If available, information on any occurrences of the Neosho mucket mussel in the JRR, CCL or Neosho river?

14 Text provided @ site audit. Data provided under #13.

Section 3.1.2 of the ER (WCGS, 1980) states that water is released to Wolf Creek infrequently. Please provide available records documenting these releases and/or information regarding the frequency of these releases.

15 Raw data tables: Coffey County Lake Spillway Discharges to Wolf Creek 4/16/97 - 03/16/06, Open CDM, Measurements-Samplepoint, Analysis, Sampledate, Wolf Creek Dec 99 - Jan 2007, 01/22/07. Data source identification required.

16 Provided under another request System operating procedures for the circulating water system traveling screens. WCNOC, 10/15/06, Startup, 17 Operation and Shutdown of The Circulating Water System; WCNOC, 11/30/05, Circulating Water Screen Wash System Drawings and a detailed description of the circulating water system/service water system/essential service water 18 system. Attachment to ET 0001, Response to Request for Additional Information. Quality of drawings provided in the document is of poor quality. Are these drawings available in 11x17color or electronically?

19 DMRs for the last 12 month period. Discharge Monitoring Reports, Jan 2006 through Dec 2006 Whole effluent toxicity testing documentation or reports conducted at the facility (and as specified in the facilities NPDES permit). Water Treatment Chemical Additives Evaluation Log, undated, no reference; WCGS NPDES 20 Discharge Monitoring Reports Nov '00, Apr '01, Jun '02, May '03, May '04, Jul '05, Jun '05, Jun '06. WCNOC, 06/06, "Microfouling .." article was removed from this group. It is provided in #7.

Item D.21 of the Facilities NPDES permit states that information required by the 316(b) Phase II regulations shall be submitted to KDHE in accordance with the dates indicated in the Phase II regulations. Please describe the steps 21 conducted to date by WCNOC to comply with this permit requirement and provide any data collected to date in support of this submission. Data provided under #30.

Current and historic flow records for the Neosho River. USGS, 2005, Water Resources Data, Kansas, Water Year 22 2004, Water-Data Report KS-04-1; USGS, 2006, Water Resources Data, Kansas, Water Year 2005, Water-Data Report KS-05-1 A statement is made in the 5th paragraph of Enclosure 2 to WM 06-0046 (November 17, 2006) that the state of Kansas has not required entrainment monitoring and will not require it for the 316(b) determination. Please provide 23 documentation from KDHE regarding this issue. Logsdon, 2/27/07, Email to Hammond and Haines, 316(b) CWSH Entrainment Exempt Letter; WCNOC, 1/24/07, Letter from K. Moles to KDHE, Entrainment Study Exemption Request Larval fish monitoring data as described in Paragraph 6 of Enclosure 2 to WM 06-0046 (November 17, 2006).

24 Eichman and Triplett, 2/7/07, Generalized Larval Fish Densities in the Cooling Water Intake Water of WCGS If available, information on the location of the spawning areas for the various fish species in CCL.

Text provided @ site audit, no reference; WCNOC, Nov 1992, 1991 Operational Fishery Monitoring Report; 25 WCNOC, Feb 1988, 1997 Fisherires Monitoring Report. Provided documents don't directly address the question.

If spawning locations are known, please provide. Otherwise we have to infer from species descriptions. Prefer defined spawning areas.

Bathymetric map of CCL. Sargent & Lundy, 7/9/82, Drawing No. S-1, General Arrangement, WCGS Unit 1. Only 26 need the one map identified by yellow sticky tab. DO NOT NEED the other maps provided during the site audit.

Available information regarding the initial stocking of CCL and subsequent stocking efforts.

27 Text with summary of stocking activities from 1984 - 2001 provided @ audit; Kansas Gas and Electric Company, Sep 1984, 1983 Preoperational Fishery Monitoring Report Available information regarding the initial stocking of CCL and subsequent stocking efforts.

28 Text provided @ audit, no reference; DKWP, February 2006, Stream Monitoring and Assessment Program Sub-Watershed Report. Fish population data provided but it is not trend data.

As discussed in Enclosure 1 to WM 06-0046 (November 17, 2006), please provide any information available regarding WCNOCs stakeholder participation in the WRAPS. Text provided @ site audit, no reference; Kansas Natural Resources Sub-Cabinet, undated, Watershed Restoration and Protection Strategy - WRAPS, www.kswraps.org; Wilson, R. W., 12/4/06, Email to distribution, agenda for Neosho WRAPS meeting on Dec 5; KDHE, Dec 15, 2005, Coffey County Regional Watershed Restoration and Protection Strategy; Kansas Water Plan, 29 Basin Planning and Implementation Process, August 2003 Draft with Neosho Basin Section; Undated and unreferenced text related to the Kansas Water Plan; KDWP raw data, undated, Neosho River fish community, water chemistry, and freshwater mussel community, http://www.kdwp.state.ks.us/news/other_services?stream_assessment_and_monitoring_program/sub_watershed_repor t State of Kansas, 2004. Kansas Water Plan, Neosho Basin Section, Kansas Water Office, Topeka, Kansas, November 18 provided in ER Refs #10.

Additional details regarding the detailed assessment of impingement currently being prepared by WCNOC staff (as cited in Enclosure 3 to WM 06-0046, November 17, 2006). Additional data provided in #29. Logsdon and Haines, 30 undated, Draft Comprehensive Demonstration Study, Wolf Creek Cooling Impoundment, Clean Water Act 316(b) -

Cooling Water Intake Structures, WCGS.

A mention is made in Section 2.2 of the ER (WCGS, 1990) of possible cold shock impacts to gizzard shad. If there have been any incidents of cold shock to gizzard shad or other fish, please provide supporting data.

31 Text provided @ site audit, no reference; KGE 4/8/86, Environmental Noncompliance Report No. 86-08; WCNOC, Environmental Noncompliance Report No. 88-6 and No. 89-2; WCNOC EPP Design or Operational Change Evaluation No. 94-02, No. 96-05, and No. 2004-02 32 Request eliminated - provided in Enclosure 5 to ET 07-0001 Section 2.5 of the ER (WCGS, 1980) describes the Topeka shiner, Neosho madtom, and Neosho mucket mussel.

Please have available any records of these species being collected in impingement and entrainment sampling. Text 33 provided @ site audit, no reference; KGE, undated, Makeup Screenhouse Impingement Monitoring Report, November 1980 - October 1981.

34 Request eliminated - resolved issue 35 Request eliminated - provided in Enclosure 5 to ET 07-0001 36 Request eliminated - provided in Enclosure 5 to ET 07-0001 37 Request eliminated - provided in Enclosure 5 to ET 07-0001 A description, including volumes and chemical and radiological characteristics, of all solid, liquid, aqueous, and gaseous waste streams generated by the facility. Include information on whether waste streams are disposed at off-site locations, or released to land, air, or water bodies on-site. Text and data tables provided @ site audit, no reference; 38 WCNOC, 6/24/05, Waste Minimization Plan, WCEM-04-010;WCNOC, 2004, WCGS Annual Radioactive Effluent Release Report - Report 27; WCNOC, 2005, WCGS Annual Radioactive Effluent Release Report - Report 28; WCNOC, 2006, WCGS Annual Radioactive Effluent Release Report - Report 29 Residential locations, by city and county, of full-time WCGS employees.

39 Raw data provided @ site audit. Data source identification required.

Approximate on-site land area used by major structures and facilities, in square feet.

40 Data provided in #41 Information on plant noise and what can be heard at the site boundaries.

41 Text provided @ site audit. Data source identification required.

Records of public water usage by WCGS (e.g., water bills from City of Burlington 42 Table: WCNOC Water Consumption Report Feb 06 - Jan 07. Coffey County Rural Water District #3, New Strawn.

Federal lands and Native American lands in the area.

43 Map for Kansas from nationalatlas.gov Information regarding the source of the water Public Wholesale District 12 and the City of Burlington distribute as potable water. Public Wholesale Water Supply District Status, Capacity Development Program, Public Water Supply 44 Section, KDEH; Water Statistics, Water/Wastewater Department, Capital Improvement Projects/Utilities, http://skyways.lib.ks.us/kansas/towns/Burlington/capital.html WCNOC policies and procedures concerning the identification and documentation of cultural resources in advance of 45 ground surface disturbing activities Data provided in #46 Examples of the implementation of these policies and procedures during past ground surface disturbing activities.

WCNOC, 8/4/06, EPP Plant Design or Operational Change Evaluation and form; WCNOC, 2/27/04, Letter from K.

Moles to A. Brooks, KDEH: WCNOC, 7/8/03, Letter from K. Moles to A. Brooks, KDEH; Dept of the Army, 2/9/96, 46 Letter from R. Lenning to W. Wood, WCNOC; WCNOC, 8/7/06, Resource Management and Ecological Monitoring Programs; Dept of the Army, 9/11/97, Letter from D. Hoover to B. Loveless, WCNOC; WCNOC, 3/20/06, Regulatory Evaluations (Other than 10CFR50.59).

Site-specific hydrogeological information, including: groundwater depth(s) at site; aquifer(s) present at site; location, elevation, construction, and historical analyses on current and past monitoring wells (including B-12, C-10, C-49, J-1, J-2, G-2, and F-1); details of the current monitoring and analytical program; flow direction information (direction, rate, fate); and comprehensive local production information (locations, construction information, history of analysis, pump rates, use). AP 07B-004, Offsite Dose Calculation Manual (Radiological Environmental Monitoring Program), Rev 12, Attachment A, Figure 5.3, Waterborne Pathway Sampling Locations; WCGS, 1982, ER(OLS),

47 Sections 2.4 and 2.5.6.2; Section 2.4.12.2 - 2.4.14 of unreferenced text; Wolf Creek Updated Safety Analysis Report, Rev 0, Figure 2.4-1, -2, -5, -6; WCGS Unit No. 1 Environmental Report (OLS), Figures 2.4-1, -6, -14, -17, -

19. Submittal is not sufficient to answer questions but submittal is all available data. The actual data do not exist.

Documentation of any environment releases, including any evaluations of the incident with respect to the nature, extent, and impact of the release. Text provided @ audit, summary of Reportable Releases of Oil and Hazardous 48 Substances, undated, no reference. Requested NPDES monitoring data. According to applicant, these are not NPDES releases.

Locations, volumes, and existing chemical and radiological analytical data on drinking water intakes for Burlington, Neosho Falls, Iola, and any other intakes on the Neosho River between John Redmond Reservoir and Iola. Kelsey, 49 K., 4/21/05, personal communication log; Sowder, J, 5/5/05, personal communication log; WCNOC, April 15, 2006, 2005 Annual Radiological Environmental Operating Report Correspondence, reports, and any other information related to any past restrictions on water withdrawal, if any have occurred. If none have occurred, a statement that these restrictions have never been implemented.

50 State of Kansas, 12/19/72 and 2/21/68, Certificates of Appropriation for Beneficial Use of Water; Correspondence (4 letters) between State of Kansas and Western Resources dated 1992 - 1998 regarding billing/water meters; Correspondence (3 letters) between KDEH and WCNOC (K. Moles) dated 1/23/07, 1/24/07, 3/8/08 More detailed data regarding the groundwater quality study performed from 1973-87. Provide the locations of the wells included in the study, their depths, production rates, and water uses. Discuss any regulatory involvement, including the regulatory program of which the study was a part, which agency(ies) reviewed and approved work plans 51 and conclusions, the chemical and radiological parameters that were measured, the periodicity of the sampling, and the standards to which results were compared. Provide the rationale for ceasing the program only two years into operations, including any regulatory concurrence in this action.

EA, 1988. Operational Phase Environmental Monitoring Program Final Report.

A map showing the locations of all groundwater monitoring or production wells in the local area, including their depths, rates of production, and use of water, if known. Section 2.9.1 states that 80% of water use in the basin is from 52 surface sources - describe the source, location, and use of the other 20%. Map and Coffey County water well data from Kansas Geological Survey web site http://www.kgs.ku.edu/kgs.html More detailed meteorological data, including historic rainfall data, to provide additional information for the evaluation of water use conflicts n Section 2.10 of the ER (WCGS, 1980). Include average rainfall, seasonal variations, and information on extreme conditions. Please provide the average peak and low-flow values for the 53 Neosho River. Also provide information on seasonal variability, if it exists.

USACE, 1/96 - 12/06, Monthly Lake Report, John Redmond Lake, from http://www.swt-wc.usace.army.mil/JOHNcharts.html Clarification of the relationship between the WCNOC contract with the Kansas Water Resources Board, versus the Certificate of Appropriation discussed in ER Section 4.1. It appears that the contract has controls based on 54 available supply within the reservoir, while certificate has controls based on the flow rate in the river. Please verify if this is correct. Also identify if a different agency implements the controls in either case, or if this is a single agency.

Text provided @ site audit. Data source identification required.

Historical information on how the water withdrawal controls have been implemented in the past. If there have never been any incidents where low water levels in the reservoir or low flow in the river have resulted in water withdrawal restrictions, then state this. If there have been incidents where the rights of any user (WCGS or any other user) have 55 been restricted, provide information on the cause of the incident, length of duration, restrictions placed on which users, and any other relevant information.

State of Kansas, 2/21/07 and 11/8/06, Letters from K. Tietsort to WCNOC, Minimum Desirable Stream Flows.

Please provide actual historical data on water withdrawal volumes from the Neosho River.

Summary table of water pumped from Neosho River. Data from Annual Environmental Operating Reports, 1985-56 2005. Summary table references 20 years . Reviewers request copies the Environmental Operating Reports for 2001, 2002, 2003, 2005, and 2006 (if 2006 is available). Report for 2004 is provided in ER References #62.

Groundwater levels were predicted to rise 45.8 feet within 100 feet of the site 50 years after the filling of Coffey County Lake. The height of the groundwater table was predicted to rise 0.4 feet, 2 miles from the site after the lake 57 was filled. Please provide the elevation of the water table before the lake was filled and the current water table elevation. Data provided in #58 The groundwater flow direction was noted to be generally SW from WCGS to the Neosho River. Are there any localized groundwater flow directions to Wolf Creek (below Coffey County Lake)?

58 WCGS, undated, Environmental Report for License Renewal, Section 2.3, 4.6; page 2-11 from an undated, untitled report; WCGS, 9/13/74, ER, pages 2.5 2.5.-4; pages 5-3 and 5-4 from an undated, untitled report; KSG, 1/17/07, Ground-Water Levels in Kansas, A Briefing to the Kansas Legislature.

Regarding water use conflicts at Wolf Creek, although the ER Section 4.1 indicates no surface water use conflicts, our Generic Environmental Impact Statement (GEIS) for license renewal says (Section 4.4.2.1, p. 4-52): Two nuclear power plants, the Braidwood Station and Wolf Creek Generating Station, have already experienced water-use conflicts. Furthermore, the GEIS on p. 4-53 (left column, first full para) uses Wolf Creek Generating Station as an example of potential water use conflicts. Water use conflicts at Wolf Creek are also cited in section 4.4.3, p. 4-57, 59 left column. Although there seems to be a discrepancy, perhaps all water use conflicts have been solved. If so, Wolf Creek should provide this information.

Text provided @ site audit summarizing info from WCNOC, 1990; Rhodes, F.T., 6/25/90, personal communication log, H. L. Spiker; Spiker, H, 6/4/90, personal communication log, B. Loveless; WCNOC, undated, An Assessment of the Potential Impacts on the Flow of the Neosho River An assessment of the impact of population increases attributable to the proposed project on the public water supply, 60 as per 10 CFR 51.53(c)(3)(ii)(I).

Text provided @ site audit referencing the ER.

Identify the source of the potable water purchased by WCGS (i.e., where do City of Burlington and Public Wholesale District 12 obtain their potable water?).

Clarify discussions regarding site boundaries, land ownership, and land use within Section 2.4 and Figure 2-3 of the ER (WCGS, 1980). Clarify the difference between Site Boundary and the Plant Site on the map, with respect to whether these are a land ownership distinction, a physical fencing distinction, or some other regulatory or access 61 distinction. Please clarify whether or not the referenced agricultural production areas are within the Site Boundary as shown on Figure 2-3. Identify any areas fenced to restrict human access and any areas fenced that may restrict wildlife access. Text provided @ site audit. No reference. Aerial photograph provided in #1.

Additional data on the avian collision studies that were ceased in 1986. Section 2.4 of the ER (WCGS, 1980) states that sufficient data had been collected by 1986. Provide any documentation of regulatory involvement and concurrence in this determination of sufficiency. Text provided @ site audit; WCNOC, 4/29/97, Letter from C.

Warren to NRC; Table of mean number of selected avian species using Coffey County Lake, 1982-1998, no 62 reference; WCNOC, 11/88, 1987-1988 Operational Wildlife Monitoring Report; WCNOC, 10/96, 1995-1996 Operational Wildlife Monitoring Report; Avian Protection Plan Attachment, Review of Bird Collision Data on Transmission Facilities at WCGS with emphasis on the LSP, undated; WCNOC, 4/26/06, Letter from K. Moles to NRC Clarify the scope requirements for the various transmission lines. According to ER Section 3.1, some lines were pre-existing, while some were newly constructed for this plant, but all would be retained after WCGS is decommissioned.

Since all are to be used during the re-licensing period, and all are to be retained following this period, it is not clear why some are within scope, and some are not.

Details on the power transmission system, including information on the design of the towers, the number and 63 configuration of the lines on the towers within each right-of-way (ROW).

Some data are provided under #65. Need schematic of tower design for 345kV T-lines and 69 kV T-lines Details regarding the maintenance procedures used in the transmission line ROWs, including mechanical, chemical, 64 and biological control methods for vegetation management. Westar Energy, Inc., undated, Transmission Line Vegetation Management Program. Need this information from Kansas Electric Power Coop for Sharp T-Line.

More detailed maps/aerial photos of the transmission line ROWs showing topographic features, major habitats/vegetation communities, land uses, wetlands, and floodplains, and the location of the Sharpe Generating Station. Kansas Gas and Electric Company, Select Plan & Profile Drawings for La Cygne - Benton, 245 kV Line, 65 KD-7388 (1973/74); Wolf Creek - Rose Hill 345 kV Line, KD-7568 (1975/1981); and Route Map for Wolf Creek-Rose Hill 345 kV Line, KB-7607 (1975). If the aerials in #66 are available , don't need these maps.

Please provide information on the locations of transmission line ROWs crossings with parks, wildlife refuges, or wildlife management areas, or any major lakes (in addition to CCL), ponds, or streams? If so, please provide 66 information on these crossings and their locations. WCGS, 1980. Environmental Report, Section 2.4. Aerial maps from Westar Energy, Inc. are NOT to be made available to the public. IF these are available don't need the maps provided in #65.

Any available studies or other information about the issues raised in the letter from the US Fish and Wildlife Service (November 14, 2005) regarding terrestrial threatened and endangered species.

For example:

-- Any assessments of the transmission lines for conformity with Suggested Practices for Raptor Protection on Power Lines (Raptor Research Foundation 1996)? Please provide any such assessments and details of transmission line construction relevant to raptor protection. Also provide a copy of Suggested Practices, 67 if available.

-- Any special ROW maintenance procedures used to reduce the potential for impacts to Meads milkweed or animals with federal or state listing status.

Text provided @ site audit, no reference; WCNOC, August 2006, Avian Protection Plan at Wolf Creek Generating Station, with emphasis of potential impacts to the Bald Eagle from License Renewal at Wolf Creek Generating Station; Lyon-Coffey Electric Coop, undated and unsigned, Policy for Prevention of Wildlife Contacts; Westar Energy, Inc., 5/18/04, Environmental Services Policies and Procedures, Avian Protection Plan, Policies 3.01-3.03 Any available maps and aerial photographs of the WCGS plant site and the area within and adjoining the larger site boundary (which encompasses Coffey County Lake) showing topographic features, major habitats/vegetation 68 communities, land uses, wetlands, and floodplains. Provided under #1. E-copy of color aerial photo showing site boundary, Owner Controlled Area, Protected Area Boundary, Exclusionary Boundary. Plot date January 29, 2007. Photography date Summer 2006; Floodplain with site boundaries defined; Community type map.

Any available information identifying natural communities and dominant species of plants and animals that utilize terrestrial habitats of the site and the transmission line ROWs, as well as semiaquatic species such as waterfowl that 69 use Lime Sludge Pond and Coffey County Lake. Attachment to ET 07-0001, Select pages, undated, no reference.

Need information on "animals that utilize terrestrial habitats of the site and the transmission line ROWs, as well as semiaquatic species such as waterfowl that use Lime Sludge Pond and Coffey County Lake."

Would additional transmission infrastructure be necessary if purchased power replaced Wolf Creeks capacity, i.e., do existing transmission lines have sufficient capacity to support purchased or imported power? Would any new utility 70 rights-of-way (ROW) be necessary? Would existing ROW need to be expanded or otherwise modified? Would existing ROW be retired and return to other uses? What are the impacts of these actions?

Text provided @ site audit. No reference. Provide source of response.

Can construction begin on a new facility at the Wolf Creek site while WCGS is in operation? Can a new plant be constructed that would use Wolf Creeks cooling system prior to the retirement of WCGS? Can a new plant be 70 constructed on previously-disturbed areas of the site prior to retirement of WCGS? If not, what are the impacts of building a new, alternative plant on a Greenfield site or of constructing and operating a new cooling system? Text provided @ site audit. No reference.

What is the current attainment status (Clean Air Act) of the region within which WCGS is situated?

70 Text provided @ site audit. No reference. Provide source of response.

PM2.5 is a Clean Air Act criteria pollutant. Please provide any available information on how much PM2.5 would be 70 emitted using the coal, oil or gas alternatives to license renewal. Text provided @ site audit. No reference. Provide source of response.

What is the heat rate for Wolf Creek? How would the differential levels of heat rejection from the sited appropriate alternative energy sources affect the heating of Coffey County Lake? Would you be aware of any significant effects 70 to water quality or ecology should the thermal output to the lake change in conjunction with alternative energy sources? Text provided @ site audit. No reference. Provide source of response.

Provide the annual average capacity factor for WCGS for the ten year period ending in 2006. Please indicate those 70 years during which refueling outages occurred. Raw data table, Refuel Outage Dates, provided @ site audit. No reference. Provide source of response.

Provide the gross and net electrical output of WCGS based on summer and winter conditions.

70 Raw data tables [Capacity Factor (Design), Gross Generation MWH, Net Generation MWH) provided @ site audit.

No reference. Provide source of response.

What does WCNOC view to be a realistic schedule for implementing the alternatives evaluated in detail in the ER 70 (gas, coal, nuclear)? Please provide a simplified permitting, design and construction schedule for each such alternative. To be provided by Dan Williamson/Ken Frederickson Provide the range of WCNOC employee salaries. Also, provide the range of salaries for permanent contract 70 employees at WCGS. Text provided @ site audit. No reference. Provide source of response.

Is there a gas transmission line in the immediate WCGS vicinity to support a gas fired alternative. What is the distance that a new gas line would need to be run to support gas fired operations at the WCGS site and what would be the 70 diameter of the line? Also, is there adequate capacity in the nearest gas transmission lines to support gas fired operations at the WCGS site? Text provided @ site audit. No reference. Provide source of response.

Please update the information presented in Section 7.2 of the ER to show both Generating Capacity and Generation by 70 fuel type for the years 2000 through 2006 inclusive. Text provided @ site audit. No reference. Provide source of response.

WCNOC has limited its analysis of coal fired alternatives to pulverized coal systems (ER Section 7.2.1). However, the WCGS operating license does not expire until 2025 which is 18 years off. At this point in time integrated gasification combined cycle (IGCC) systems are well under development and is likely that these and other advanced coal utilization systems will be operational by the time the WCGS license expires. Please provide updated information including a brief assessment of the state of advanced coal utilization technologies, whether such 70 technologies could be employed at the WCGS site and the potential benefits of the new technologies. In particular, the possible environmental advantages of advanced coal systems should be mentioned including reduced air emission in comparison to pulverized coals burners. The purpose of addressing advanced coal technologies would not be to consider those technologies as formal "alternatives" to license renewal but rather to generally update the information presented in the alternatives analysis. Text provided @ site audit. No reference. Provide source of response.

Most license renewal EISs contain an analysis of a combination of alternatives to replace the output of a generating 70 station should the operating license not be renewed. Please provide an analysis of at least one combination alternative that WCNOC considers feasible. Text provided @ site audit. No reference. Provide source of response.

With regard to Section 7.2.1.4, please identify the range of conservation, efficiency and load management programs 70 being conducted in Kansas. This should list each program, identify its sponsor and goals, and provide information relative to the success of the effort. Text provided @ site audit. No reference. Provide source of response.

ER Section 7.2.1.3 addresses purchased power. Please provide a chart showing Kansas power imports for the last ten 70 years. Also, identify transmission line constraints, if any, to importing power into the state.

Text provided @ site audit. No reference. Provide source of response.

Additional Information Needs Identified During Audit A1 Allen, George. February 6, 1990. Memorandum, Scans of blood samples from Clinton Reservoir nestling bald eagles. Hard copy provided by M. McNulty during site audit, 3/13/07.

A2 USFWS, 2006. Number of Eaglets Fledged from Bald Eagle Nests in Kansas, 1989-2006 Hard copy provided by M. McNulty during site audit, 3/13/07.

A3 USFWS, 2006. Eagle Nesting Results, Eagle Banded Returns. Hard copy provided by M. McNulty during site audit, 3/13/07.

A4 USFWS, March 1991. Metal Levels in Blood From Fledgling Bald Eagles of Clinton Reservoir in Kansas Hard copy provided by M. McNulty during site audit, 3/13/07.

A5 WCGS, 2006. 2006 Land Use Census Report A6 Google Map, 3/13/07. Closest Resident to WCGS, 1441 Native Road SE, Burlington, KS.

A7 WCGS, 2006. 2005 Annual Radiological Environmental Operating Report, Figure 1, Airborne Pathway Sampling Locations.

A8 Rohn, A.H., et.al., 1977. Wolf Creek Archaeology, Coffey County, Kansas. Archaeology Laboratory, Wichita State University. Tim Weston, SHPO Archaeology Rohn, Arthur H. and C. Martin Stein, undated. Assessment of Archaeological Resources Affected by the Wolf Creek A9 Power Plant, Coffey County, Kansas. Tim Weston, SHPO Archaeology Thies, Randall M., October 27, 2004. Archaeological Survey of CFBA#3, KDOT Project K-7389-01, Coffey County, Kansas, Report submitted to the Kansas Department of Transportation in accordance with the provisions of A10 the Cooperative Agreement for Highway Archeological Salvage Program.

Tim Weston, SHPO Archaeology Thies, Randall M., June 19, 2003. Archaeological Survey of KDOT Project K-7389, Coffey County, Kansas, Report A11 submitted to the Kansas Department of Transportation in accordance with the provisions of the Cooperative Agreement for Highway Arc. Tim Weston, SHPO Archaeology Brogan, William T., May 1982. Phase II and Phase III Archeological Field Investigations at Secondary Road Project A12 16-RS-583(19),Coffey County, Kansas, Archeology Department, Kansas State Historical Society.

Tim Weston, SHPO Archaeology Thies, Randall M., October 1980. Archeological Field Investigation of the Lebo Creek Bridge Project, Flint Hills A13 National Wildlife Refuge, Coffey County, Kansas, Archeology Department, Kansas State Historical Society. Tim Weston, SHPO Archaeology Thies, Randall M., October 8, 1984. The Long Creek Bridge East of Center Hill Cemetery: Results of an A14 Archeological Survey of Road Project C-2019,Coffey County, Kansas, Archeology Department, Kansas State Historical Society. Tim Weston, SHPO Archaeology A15 USGS Quad Map, New Strawn, Kansas, 1971. Tim Weston, SHPO Archaeology A16 USGS Quad Map, Burlington, Kansas, 1971. Tim Weston, SHPO Archaeology How much land is available for developing a new generating facility at the Wolf Creek Site?

A17 Section V, Onsite Groundwater Monitoring, undated, no reference WCNOC, 11/17/06, Onsite Groundwater Monitoring Program, AI 07-007 A18 Not the same as A17 Wolf Creek Environmental Report Volume I-IV A19 Some sections missing in copy provided during the audit. Specifically need sections 2.4 and 2.5.

A23 Class II Air Emission Source Operating Permit, Sep 8, 2005 A24 2002 Air Emissions Inventory for Wolf Creek Generating Station A25 WCNOC, 8/25/04, Letter to KDHE, Potential Exceedence of 58-Ton Nox Notification Threshold A26 WCNOC, 12/3/04, Letter to KDHE, WCGS Clean Air Permit Modification Request A27 WCNOC, 6/1/05, Letter to KDHE, Clean Air Permit Noncompliance A28 WCNOC, 6/16/05, Letter to KDHE, Air Emission Source Permit Compliance Plan WCGS, 1974, Environmental Report, Revised, Section 2.5, Hydrology A29 Not all figures are in the copy provided during the audit.

A30 USACE, June 2002. Draft Supplement to the Final Environmental Impact Statement, Reallocation of Water Supply Storage Project: John Redmond Lake, Kansas, Volumes 1 and II. Provided on CD.

A32 WCGS ER: Operating License Renewal Stage, Docket No. 50-482. All figures in a non-PDF electronic format.

A33 Transmission Line Annual Bird Mortality Report A34 Transmission Line Vegetation Management Plan A35 Schematic of Transmission Line Structures A36 Stormwater Pollution Prevention Plan A37 Most recent aquatic toxicity reports as required by NPDES Permit A39 EN-93-0056, Traveling Screen Operating Recommendations. Cited in WCNOC, 11/30/05, Circulating Water Screen Wash System A40 PIR 1996-1917, Automatic Operation of the CWSH Traveling Screens Cited in WCNOC, 11/30/05, Circulating Water Screen Wash System EN- 93-0214, Circulating Water System Operations A41 Cited in WCNOC, 10/15/06, Startup, Operation and Shutdown of The Circulating Water System A42 Environmental Protection Plan WCGS, 3/11/05, Wolf Creek Updated Safety Analysis Report (USAR). Contained in the WCGS Supplemental A43 Report Vol I A44 Petition to List, Neosho mucket (Lapsilis rafinesqueana) As a Federally Endangered Species Contained in the WCGS Supplemental Report Vol II KDWP, January 2005, Kansas County Listing of T&E and SINC. Contained in the WCGS Supplemental Report A45 Vol II USFWS, Undated, Questions and Answers about the Topeka Shiner. Contained in the WCGS Supplemental Report A48 Vol II WCNOC, 12/22/92, Letter from R.C. Hagen to USFWS, 1992 Activities and Renewal Request of Threatened A49 Neosho Madtom Subpermit. Contained in the WCGS Supplemental Report Vol II Rhodes, F.T., 1/30/92, personal communication log, 1991 Conditional Wildlife Permit Report and 1992 Renewal A50 Application. Contained in the WCGS Supplemental Report Vol II Fax from JoAnn Raaf, Coffey County Treasurer to Nicole Hill, TetraTech dated 5/18/05, Tax info for Coffey A51 County, KS. Contained in the WCGS Supplemental Report Vol III Hill, 5/31/05, personal communication log with Coffey County Planning and Zoning Office, Land Use and LOS A52 determinations for Coffey County. Contained in the WCGS Supplemental Report Vol III A53 Hill, 6/1/05, personal communication log with Coffey County Economic Development, Land Use and Tax Trends for Coffey County. Contained in the WCGS Supplemental Report Vol III Lyon County Planning Board, Feb 2001, Comprehensive Plan for Lyon County, KS A54 Contained in the WCGS Supplemental Report Vol III Connor, S.J., May 20, 2005, Calculation Package for Wolf Creek Transmission Lines Induced Current Analysis A60 Contained in the WCGS Supplemental Report Vol III Lovell, A., Sep 19, 2005, Air Emissions and Solid Waste from Coal- and Gas-Fired Alternatives for Wolf Creek A61 Generating Station. Contained in the WCGS Supplemental Report Vol III A62 1983 or 1984 Wildlife Monitoring Reports. Information on two least tern sitings A63 Environmental Assessment done as part of the 404 permit for the boat ramp Terms and Conditions of 404 permit for the boat ramp. FWS requested an exclusion zone around the bald eagle A64 habitat A65 USFWS Migratory Bird Salvage Permit A66 State of Kansas Conditional Wildlife Permit A67 Post-construction Bathymetric Map for intake/discharge areas A68 Waterfowl Disease Contingency Plan A69 Five years of reports on flow rates at seepage weir below the dam A70 Essential Service Water construction and operating parameters A71 Firing Range Management Plan A72 Resource Management Plan A73 Annual Land Management Report and Plan, 2005-2006 A74 Copy of ongoing 316(b) Determination. Including recent entrainment letter.

A75 Discharge records for outfall 004 A76 Ultimate Heat Sink details including a post-construction Bathymetric Map A77 Fisherman's Map of Coffey County Lake A78 Facility Pollution Prevention Plan (or equivalent)

A79 Applicable Waste Minimization Plan(s)

Letter to T. Garrett from C. Jacobs Dated April 9, 2007

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION REGARDING THE ENVIRONMENTAL SITE AUDIT CONDUCTED AT WOLF CREEK GENERATING STATION DURING THE WEEK OF MARCH 16, 2007 (TAC NO. MD3182)

DISTRIBUTION:

E-Mail P.T. Kuo (RidsNrrDlr)

R. Franovich (RidsNrrDlrRebb)

E. Benner(RidsNrrDlrReba)

C. Jacobs A. Stuyvenberg A. Williamson bobbie.hurley@earthtech.com V. Rodriguez J. Donohew S. Cochrum OGC (RidsOGCMailRoom)

D. Roth DLR/REBB DLR/REBA Wolf Creek Generating Station cc:

Jay Silberg, Esq. Vice President Operations/Plant Manager Pillsbury Winthrop Shaw Pittman, LLP Wolf Creek Nuclear Operating Corporation 2300 N Street, NW P.O. Box 411 Washington, DC 20037 Burlington, KS 66839 Regional Administrator, Region IV Supervisor Licensing U.S. Nuclear Regulatory Commission Wolf Creek Nuclear Operating Corporation 611 Ryan Plaza Drive, Suite 400 P.O. Box 411 Arlington, TX 76011-7005 Burlington, KS 66839 Senior Resident Inspector U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Resident Inspectors Office/Callaway Plant P.O. Box 311 8201 NRC Road Burlington, KS 66839 Steedman, MO 65077-1032 Chief Engineer, Utilities Division Mr. Terry J. Garrett Kansas Corporation Commission Vice President Engineering 1500 SW Arrowhead Road Wolf Creek Nuclear Operating Corporation Topeka, KS 66604-4027 P.O. Box 411 Burlington, KS 66839 Office of the Governor State of Kansas Kevin J. Moles, Manager Topeka, KS 66612 Regulatory Affairs Wolf Creek Nuclear Operating Corporation Attorney General P.O. Box 411 120 S.W. 10th Avenue, 2nd Floor Burlington, KS 66839 Topeka, KS 66612-1597 Lorrie I. Bell, Project Manager County Clerk Wolf Creek Nuclear Operating Corporation Coffey County Courthouse P.O. Box 411 110 South 6th Street Burlington, KS 66839 Burlington, KS 66839 Mr. James Ross Thomas A. Conley, Section Chief Nuclear Energy Institute Radiation and Asbestos Control 1776 I Street, NW, Suite 400 Kansas Department of Health Washington, DC 20006-3708 and Environment Bureau of Air and Radiation Ms. Valerie Williams, Branch Director 1000 SW Jackson, Suite 310 Coffey County Library Topeka, KS 66612-1366 Burlington Branch 410 Juniatta St.

Burlington, KS 66839