ML063460194

From kanterella
Jump to navigation Jump to search
Revision to the 2002 Annual Radioactive Effluent Release Report
ML063460194
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 12/01/2006
From: Jim Costedio
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
JAFP-06-0166
Download: ML063460194 (5)


Text

Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

James A. Fitzpatrick NPP

'Entergy P.O. Box 110 Lycoming, NY 13093 Tel 315 342 3840 December 1, 2006 JAFP-06-0166 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 License No. DPR-59 Revision to the 2002 Annual Radioactive Effluent Release Report

Reference:

Entergy Nuclear Operations, Inc. letter to USNRC (JAFP-03-0056), 2002 Annual Radioactive Effluent Release Report, dated April 23, 2003.

Dear Sir or Madam:

Attached is a revision to the Annual Radioactive Effluent Release Report for the period of January 1, 2002 through December 31, 2002. The report is submitted in accordance with the requirements of the James A. FitzPatrick Nuclear Power Plant Offsite Dose Calculation Manual, Part 1, Section 6.2, Radioactive Effluent Release Report. As a result of a recent telephone conference with the NRC Staff, two errors were discovered in the numbers submitted in the 2002 report. The attachment to this letter provides the corrected pages.

If you have any questions concerning the attached information, please contact Crystal Boucher, Chemistry Superintendent, at (315) 349-6748.

There are no commitments contained in this letter.

Very truly yours, Regulatory Compliance Manager JC/TP/jbh Attachment 1: Revision to the 2002 Annual Radioactive Effluent Release Report Cc: NRC Region I NRC Resident Inspector D. Sherman (ANI Library) P. Merges (NYSDEC)

T. Kurtz (NMPC) J. Boska, Project Manager, NRR

JAFP-06-0166 Attachment 1 Revision to the 2002 Annual Radioactive Effluent Release Report

REVISION

SUMMARY

TABLE 1A GASEOUS EFFLUENTS--SUMMATION OF ALL RELEASES C. PARTICULATES Quarter 1 Reported: Amended:

4. Gross alpha radioactivity 3.79E-07 Ci 3.83E-07 Ci TABLE 1B
3. Particulates Quarter 4 Reported: Amended:

Strontium-90 6.61 E-04 Ci 6.61 E-08 Ci

ENTERGY NUCLEAR OPERATIONS, INC.

JAMES A. FITZPATRICK NUCLEAR POWER PLANT EFFLUENT AND WASTE DISPOSAL ANNUAL REPORT JANUARY 2002-DECEMBER 2002 TABLE 1A GASEOUS EFFLUENTS--SUMMATION OF ALL RELEASES EST TOTAL UNIT OTR 1 OTR 2 OTR 3 QTR4 ERROR %

A. FISSION AND ACTIVATION GASES

1. Total Release Ci 4.72E+00 7.94E+00 8.63E+01 8.53E+00  :*2.50E+01l
2. Average release rate for period gCi/sec 6.01 E-01 1.01 E+00 1.08E+01 1.07E+00
3. Tech. Spec. Limit B. IODINE-131
1. Total Iodine-131 Ci 4.35E-05 5.17E-05 7.31E-05 1.14E-04 <2.50E+01
2. Average release rate for period jgCi/sec 5.53E-06 6.57E-06 9.16E-06 1.44E-05
3. Tech. Spec. Limit C. PARTICULATES
1. Particulates with half-lives

>8 days Ci 1.06E-05 3.62E-06 2.68E-05 1.26E-04 <3.60E+01

2. Average release rate for period pCi/sec 1.35E-06 4.62E-07 3.37E-06 1.59E-05
3. Tech. Spec. Limit
4. Gross alpha radioactivity Ci 3.83E-07 3.06E-07 6.69E-07 4.19E-07 _<2.50E+01 D. TRITIUM
1. Total Release Ci 8.48E+00 6.04E+00 6.49E+00 2.79E+00 <_2.50E+01
2. Average release rate for period jgCi/sec 1.08E+00 7.68E-01 8.16E-01 3.50E-01
3. Tech. Spec. Limit
  • E. PERCENT OF TECHNICAL SPECIFICATION LIMITS FISSION AND ACTIVATION GASES
1. Quarterly gamma air dose limit 2.91 E-03 4.54E-03 4.23E-02 5.02E-03
2. Quarterly beta air dose limit 1.36E-04 2.52E-04 3.32E-03 3.28E-04
3. Yearly gamma air dose limit 1.45E-03 2.27E-03 2.11 E-02 2.51 E-03
4. Yearly beta air dose limit 6.80E-05 1.26E-04 1.66E-03 1.64E-04
5. Whole body dose rate limit 1.86E-04 2.36E-03 9.80E-03 2.18E-03
6. Skin dose rate limit 3.78E-05 5.07E-04 2.12E-03 4.64E-04 HALOGENS, TRITIUM AND PARTICULATES WITH HALF-LIVES >8 DAYS
7. Quarterly dose limit (organ)  % 1.21 E-02 1.05E-02 1.63E-02 2.35E-02
8. Yearly dose limit (organ)  % 6.03E-03 5.27E-03 8.17E-03 1.17E-02
9. Organ dose rate limit  % 1.71 E-05 1.37E-05 1.35E-05 2.27E-05 6

ENTERGY NUCLEAR OPERATIONS, INC.

JAMES A. FITZPATRICK NUCLEAR POWER PLANT EFFLUENT AND WASTE DISPOSAL ANNUAL REPORT JANUARY 2002-DECEMBER 2002 TABLE 1B GASEOUS EFFLUENTS--ELEVATED RELEASE CONTINUOUS MODE NUCLIDES RELEASED UNIT OUARTER 1 OUARTER 2 OUARTER3 OUARTER4

1. Fission Gases Argon-41 Ci 4.26E+00 4.73E+00 1.03E+01 2.31 E+00 Krypton-85m Ci 4.60E-01 8.OOE-01 6.72E+00 6.12E-01 Krypton-87 Ci 3.50E-01 1.53E+01 9.64E-01 Krypton-88 Ci 3.64E-01 1.82E+01 1.13E+00 Xenon-1 33 Ci 1.96E-01 3.29E+00 2.63E-01 Xenon-1 35 Ci 3.30E-01 2.57E+01 6.35E-01 Ci 4.72E+00-- 1.78E+00 3.60E-01 Xenon-1 35m 2.96E-01 Xenon-1 37 Ci 1.61 E-01 Xenon-1 38 Ci 8.78E-01 4.84E+00 2.26E+00 TOTAL Ci 7.94E+00 8.63E+01 8.53E+00
2. Iodines Iodine-131 Ci ------------ 2.13E-05 8.95E-05 Ci ------------ 2.47E-06 2.29E-06 8.66E-04 Iodine-133 Iodine-135 Ci ------------ 9.52E-04 TOTAL Ci 2.38E-05 1.57E-05 1.91iE-03
3. Particulates Manganese-54 Ci 7.76E-07 8.84E-08 1.64E-06 Ci 4.22E-07 3.05E-08 1.61 E-07 Cobalt-60 Arsenic-76 Ci 1.63E-06 Strontium-89 Ci 4.67E-07 7.16E-07 1.27E-06 4.14E-07 Strontium-90 Ci 1.56E-08 6.87E-08 1.19E-07 6.61 E-08 Cerium-144 Ci 3.1 OE-08 3.47E-07 TOTAL Ci 4.83E-07 1.98E-06 1.54E-06 4.26E-06
4. Tritium Hydrogen-3 Ci 5.54E-01 7.05E-01 1.20E+00 6.58E-01 Note: There were no batch releases for this report period.

7