ML062210184
| ML062210184 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 01/30/2004 |
| From: | Barber G NRC Region 1 |
| To: | Meyer G NRC Region 1 |
| References | |
| FOIA/PA-2005-0194 | |
| Download: ML062210184 (1) | |
Text
0 11nn.leyer - Salem Unit 2 raN OV - Unauthorized FWP -team Admission Valve Operation Page 1I From:
Scott Barber To:
Glenn Meyer Date:
1/30/04 8:56AM a
ei
Subject:
Salem Unit 2 Draft NOV - Unauthorized FWP Steam Admission Valve peration Appende th ised draft NOV. The basic premise of the original draft was preserved in that the actions ol r v dversely Impacted the command and control responsibilities of the operating shift. A CFR reference was added to emphasize that consent of the operator at the controls must first be obtained before operating certain plant equipment. Thanks to Dan Holody and Karl Farrar for their help with this issue.
This draft NOV will provide a baseline discussed outside NRC.
reference o and should not be V
/
CC:
A. Randolph Blough; Daniel Holody; Daniel Orr-, David Vito; Eileen Neff;, Ernest Wilson; George Malone; Jeffrey Teator, Karl Farrar; Leanne Harrison; Sharon Johnson Information in this record was deleted in accordance with the jeedom of Information Act, exemptions FOI-A-