ML061320094

From kanterella
Jump to navigation Jump to search
E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC, Status Report for Jan 31
ML061320094
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 01/31/2006
From: Mcmullin K
Entergy Nuclear Operations
To: Boska J, Brian Holian, David Lew
NRC/FSME
References
FOIA/PA-2006-0140
Download: ML061320094 (7)


Text

'Page 1'l Ijofi-n Wh-ife, ---

John-White~ -IIPEC PE

-- sttuu's- rreor C s-ta--t, fo J,,a-n-.-3-1 6-6-orf-fo-r Jan 3 Pae-From: "McMullin, Kathy" <KMcMull@entergy.com>

To: " (Popopeektaol.com)" <Popopeek~aol.com>, " Baranski, James"

<james.baranski@semo.state.ny.us>, " Eddy, Paul" <paul-eddy@ dps.state.ny.us>, "Greeley, Dan"

<greeleyd@co.rockland.ny.us>, " Gross, Steve - Orange PlO" <sgross©co.orange.ny.us>," Meyer, Sue-Rockland Alt. POIO" <Meyers@©co.rockland.ny.us>, " Sutton, Tony" <awsl @ westchestergov.com>,

Adam Stiebeling <abspcbes@bestweb.net>, "Albanese, Raymond" <rlal @westchestergov.com>, Alfredo Vidal <avidal@thevidalgroup.com>, "Anthony Sutton (awsl @weschestergov.com)"

<awsl @weschestergov.com>, "Baker Nancy (bakerna ©co.rockland.ny.us)"

<bakerna@co.rockland.ny.us>, "Barry, Terrence" <TBarry@ entergy.com>, "Benjamin, Liz"

<BenjamiL@ co.rockland.ny.us>, "Bentley, Robyn" <rbentle ©entergy.com>, "Bergmann Ken (ken.beirgmann @semo.state.ny.us)" <ken.bergmann ©semo.state.ny.us>, Bernie McGarry

<mcgany© senate.state.ny.us>, "Blizard, Andrea" <ablizar@ entergy.com>, "Bob Outhouse (rjO4 westchestergov.com)"

" <rjO4 ©westchestergov.com>, "Bob Outhouse (rjo4 ©westchestergov.cc m.)"

<rjo4 @westchestergov.com>, "Bordewich Jean (jean-bordewich ©schumer.senate.gov)"

<jeanbordewich @schumer.senate.gov>, "Bordewich Jean (schumer@ valstar.net)"

<schumer~valstar.net>, "Boska John apbl @nrc.gov)" <jpbl @nrc.gov>, "Bowman, Greg"

<GBowrn9O@cc--exsO3.prod.entergy.com>, Brian Holian <bjm@©nrc.gov>, "Brian Holian (beh@nrc.gc'v)"

<beh ©rirc.gov>, "Bridges Jeff (JBridges ©troopers.state.ny.us)" <JBridges @troopers.state.ny.us>, Chief Tubbs <ChiefBTubbs ©aol.com>, Chris Schwarz <cschwar@?entergy.com>, "Comiotes, Jim"

<JComiot@ entergy.com>, "Conroy, Pat" <PConroy@ entergy.com>, "Cooper Linda (lindac ©yorktownny.org)" <lindac ©yorktownny.org>, "Cox, Mark R" <mcox90 ©entergy.com>, "Crawl ord Garnesha (Gcrawford @urbanomics.com)" <Gcrawford ©urbanomics.com>, "Curran, Nick"

<Nick.curran@©mail.house.gov>, "Dacimo, Fred" <FDacimo@entergy.com>, David Brand

<DavidF1Brand ©hotmail.com>, David Greene <dgreene ©urbanomics.com>, David Weinraub

<DWeinraub ©bmwlobby.com>, "DeGasperis, Edward" <edegasp @entergy.com>, "Dirocco, Anthony'

<ADirocc@ entergy.com>, "Don Maurer (Donald.Maurer@semo.state.ny.us)"

<Donalcl.Maurer@ semo.state.ny.us>, "Dowling, Adele" <amd2@westchestergov.com>, "Drew Barney (Barney.Drew@©lafarge-na.com)" <Barney.Drew©lafarge-na.com>, "Elisa Gwilliam (elisagvy illiam@msn.com)" <elisagwilliam @ msn.com>, "Fay, Deborah" <DFayl @ entergy.com>, Feathers

<jdf ©ffcwc-law.com>, "Feeney Andrew (Andrew.Feeney© semo.state.ny.us)"

<Andrew.Feeney@ semo.state.ny.us>, "Feroe Peter (peter.feroe @mail.house.gov)"

<peter.feroe@ mail.house.gov>, Geri Shapiro <gerishapiro@laol.com>, "Gibbons Emily (Emily.GibbonsO mail.house.gov)" <Emily.Gibbons ©mail.house.gov>, "Giguere, Kathleen"

<KGiguor ©rentergy.com>, "Glenn Troester (grtroes©nppd.com)" <grtroes@©nppd.com>, "Gottlieb, La ry"

<LGottli @entergy.com>, "Greene, Dominick" <dgreene @co.orange.ny.us>, "Grosjean, Alain"

<AGrosjeO entergy.com>, "Guiao Frank (Frank.Guiao @lafarge-na.com)"

<Frank.Guiao @lafarge-na.com>, Harry Giannoulis <harry©theparksidegroup.com>, "Hipschman, Thomas" <thips90©entergy.com>, "Huber, John T." <jhube9O@ entergy.com>, "Inzirillo, Frank"

<finziriCaentergy.com>, Ira Promisel <ipromise©troopers.state.ny.us>, Jack Spath <jpsg@nyserda.org>,

"Jeff Tkacs (jefft@townofcortlandt.com)" <jefft~townofcortlandt.com>, "Jensen, Chris"

<jensen.@ co.rockland.ny.us>, JES <JES1 @westchestergov.com>, Jim Cunningham

<jimscuiningham @nyc.bm.com>, "Jim Seymour (jseymour© cityofpeekskill.com)"

<jseymcur@ cityofpeekskill.com>, Jim Wright <wright@senate.state.ny.us>, John Cordo

<JLC@lcwc-law.com>, "Jones, T. R." <tjones2@entergy.com>, "Kansler, Michael"

<MKansle@entergy.com>, Kathleen Wood <kathleen.wood @chamber.state.ny.us>, "Keegan Pat (Pat.keEgan @mail.house.gov)" <Pat.keegan ©mail.house.gov>, "Kerns, Matt" <MKerns @entergy.com>,

"Kopy Mike (MKopy©troopers.state.ny.us)" <MKopy© troopers.state.ny.us>, NKraus Kevin (kevin.kraus @semo.state.ny.us)" <kevin.kraus ©semo.state.ny.us>, "Leach, Don"

<DLeach ©entergy.com>, "Leibell Vincent (leibell ©senate.state.ny.us)" <leibell ©senate.state.ny.us>,

"Leon, F'ete" <Pete.Leon@mail.house.gov>, "Lew David (DCL@ nrc.gov)" <DCL@nrc.gov>

Date: 1/31/06 2:48PM Subjec1: IPEC status report for Jan. 31 Map is attached.

Jan. 31 Paoe2I

[John - JPEG status l John White - IPEC report for status report forJan. 31 Pge2 Indian Point Energy Center Daily Status Report January 31, 2006 Operational Status Indian Point Unit 2 is operating at 100% and has been online 40 days.

Indian Point Unit 3 is operating at 100% reactor power and has been on-line for 119 days.

New Joint Information Center Operational On January 30 the Joint News Center for the radiological emergency planning for the Indian Point site was transferred from the Joint News Center facility located at the White Plains airport to the Joint Informat on Center located in the Hudson Valley Transportation Management Center in Hawthorne, N.Y. The new JIC will be used for tomorrow's emergency plan drill.

The new JIC will function differently than the old JNC. This Joint Information Center functions in a virtual environment. For media briefings, the counties will participate via teleconference.

Emergency Alert System messages, press releases from the four counties, the State and Entergy will be issued via a new web site.

All EAS messages and press releases will be available on the site. Also, these messages and release will be automatically distributed to requesting media outlets and elected officials.

Tritium Investigation-Construction Continues on Phase 2 Wells As crews finish drilling the last two phase 1 monitoring wells, construction has already begun on the phase two wells. The phase 1 wells were selected to help understand ground water conditions near the IP2 spent fuel pool. The last two wells in phase 1 (MW-36 and MW-37) are located in the IP2 turbine building on the east and west side of the discharge canal. MW-36 is ready for sampling; MW-37 will be drilled this week.

New well construction has begun on phase 2, which will help hydrologists understand ground water movement on the site. Wells in phase 2 are primarily located near Unit 1 and Unit 3. (See attached map)

[ j f_ I r .- ~ --- _ _~ _

John White - IPEC status report for Jan. 31 Page 3I Page 3 I.John White-lPECsttus report for Jan. 31 ID Location Status MW-48 Farthest south on site Well dri led, preparing to be sampled MW-40 Up gradient in IP3 parking lot Well dri led, preparing to be sampled MW-39 Between Unit 1 spent fuel building and Unit 3 Refueling Water Storage Tank Being d -illed

  • Other wells are being planned for this phase Representatives from the NRC and New York State DEC are at Indian Point today to discuss preliminary results of the hydrology investigation.

There have been no indications of tritium in off-site locations and there are no health or safety impact'; to the public or workers from tritium on site.

BM_401 54Updated Dry Cask Storage Factsheets Available Entergy has produced an updated informational brochure, available in electronic and hardcopy format that explains the details of dry cask storage. Contact Andrea Blizard at 914-271-7081 or by return email at kmcmull©entergy.com <mailto:kmcmull@entergy.com> for a copy.

Entergy Nuclear Northeast provides customized outreach education programs for schools, youth groups, and civic organizations. The topics we cover include Emergency Planning, Understanding Radiation, Nuclear Fuel and a general overview of the operations of Indian Point Energy Center. If you would like a

tJoh White- iPEC statusireport for Jan. 31 1 _Page 4{

brochure or are interested in scheduling a program, contact iPEC Communications at 914-271-7441.

If you have any questions or need clarification of the information provided, please contact Kathy McMullin, manager of communications, Indian Point Energy Center, at 914-271-7132.

[ i8 - - -

Page 1i I.---

JohJon White - TEXT.htin Wht-TEX ht Pae Map is attached.

Indian Point Energy Center Daily Status Report January 31, 2006 Operational Status Indian Point Unit 2 is operating at 100% and has been online 40 days.

Indian Point Unit 3 is operating at 100% reactor power and has been on-line for 119 days.

New Joint Information Center Operational On January 30 the Joint News Center for the radiological emergency planning for the Indian Point site was transferred from the Joint News Center facility located at the White Plains airport to the Joint Information Center located in the Hudson Valley Transportation Management Center in Hawthorne, N.Y. The new JIC will be used for tomorrow's emergency plan drill.

The new JIC will function differently than the old JNC. This Joint Information Center functions in a virtual environment. For media briefings, the counties will participate via teleconference.

Emergency Alert System messages, press releases from the four counties, the State and Entergy will be issued via a new web site.

All EAS messages and press releases will be available on the site. Also, these messages and release will be automatically distributed to requesting media outlets and elected officials.

l o0h-n W-hit-e ----TEXT.hain Page' Paae 221I

[John White TEXT.htrn i

Tritium Investigation-Construction Continues on Phase 2 Wells As crews finish drilling the last two phase 1 monitoring wells, construction has already begun on the phase two wells. The phase 1 wells were selected to help understand ground water conditions near the IP2 spent fuel pool. The last two wells in phase 1 (MW-36 and MW-37) are located in the IP2 turbine building on the east and west side of the discharge canal. MW-36 is ready for sampling; MW-37 will be drilled this week.

New well construction has begun on phase 2, which will help hydrologists understand ground water movement on the site. Wells in phase 2 are primarily located near Unit 1 and Unit 3. (See attached map)

ID Location Status MW-48 Farthest south on site Well drilled, preparing to be sampled MW-40 Up gradient in IP3 parking lot Well drilled, preparing to be sampled W-39 etween Unit 1 spent fuel building and Unit 3 eing drilled

_____Refueling Water Storage Tank____________

  • Other wells are being planned for this phase Representatives from the NRC and New York State DEC are at Indian Point today to discuss preliminary results of the hydrology investigation.

There have been no indications of tritium in off-site locations and there are no health or safety impacts to the public or workers from tritium on site.

IJ-LJ hh-n-Wh-ite-Y- ii TEXT~hti

- - Thr TE -I-- -- Page Paae 33-1 Updated Dry Cask Storage Factsheets Available Entergy has produced an updated informational brochure, available in electronic and hardcopy format that explains the details of dry cask storage. Contact Andrea Blizard at 914-271-7081 or by return email at kmcmull~entercv.com for a copy.

Entergy Nuclear Northeast provides customized outreach education programs for schools, youth groups, and civic organizations. The topics we cover include Emergency Planning, Understanding Radiation, Nuclear Fuel and a general overview of the operations of Indian Point Energy Center. If you would like a brochure or are interested in scheduling a program, contact IPEC Communications at 914-271-7441.

If you have any questions or need clarification of the information provided, please contact Kathy McMullin, manager of communications, Indian Point Energy Center, at 914 *271-7132.