MONTHYEARCPSES-201001000, Operator Licensing Examination Data, Form 5362010-07-28028 July 2010 Operator Licensing Examination Data, Form 536 CPSES-200901377, Operator Licensing Examination Data2009-09-29029 September 2009 Operator Licensing Examination Data CPSES-200701127, Response to Request for Additional Information Related to License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times.2007-11-15015 November 2007 Response to Request for Additional Information Related to License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times. CPSES-200701495, Withdrawal of License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits2007-10-22022 October 2007 Withdrawal of License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits CPSES-200701530, Additional Information in Connection with the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments2007-10-0909 October 2007 Additional Information in Connection with the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments CPSES-200701496, Information Required by Order Approving the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments2007-10-0202 October 2007 Information Required by Order Approving the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments CPSES-200701351, Transmittal of First-Half 2007 Fitness-for-Duty Program Performance Data2007-08-29029 August 2007 Transmittal of First-Half 2007 Fitness-for-Duty Program Performance Data CPSES-200701076, Revision to the Operating License and Technical Specifications 1.0, Use and Application and 3.7.17, Spent Fuel Assembly Storage to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt2007-08-28028 August 2007 Revision to the Operating License and Technical Specifications 1.0, Use and Application and 3.7.17, Spent Fuel Assembly Storage to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt CPSES-200701302, Relief Request B-4 to the Unit 2 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date - August 03, 2004, Second Interval)2007-08-22022 August 2007 Relief Request B-4 to the Unit 2 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date - August 03, 2004, Second Interval) CPSES-200701324, Supplement to License Amendment Request (LAR) 07-003 Revision to Technical Specification 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, and 5.6.5 B, Core Operating Limits2007-08-16016 August 2007 Supplement to License Amendment Request (LAR) 07-003 Revision to Technical Specification 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, and 5.6.5 B, Core Operating Limits CPSES-200701323, License Amendment Request 07-006, Revision to Technical Specification 3.1.4, Rod Group Alignment Limits, Table 3.3.1-1, Reactor Trip System Instrumentation, Table 3.3.2-1, Engineered Safety Feature Actuation System..2007-08-16016 August 2007 License Amendment Request 07-006, Revision to Technical Specification 3.1.4, Rod Group Alignment Limits, Table 3.3.1-1, Reactor Trip System Instrumentation, Table 3.3.2-1, Engineered Safety Feature Actuation System.. CPSES-200701279, Mitigation of Alloy 82/182 Pressurizer Butt Welds in 20082007-08-0303 August 2007 Mitigation of Alloy 82/182 Pressurizer Butt Welds in 2008 CPSES-200701284, (Cpses), Operator Licensing Examination Data2007-08-0202 August 2007 (Cpses), Operator Licensing Examination Data CPSES-200701238, Submittal of the CPSES Units 1 and 2 Large and Small Break LOCA Analyses2007-07-31031 July 2007 Submittal of the CPSES Units 1 and 2 Large and Small Break LOCA Analyses CPSES-200701178, Supplement to Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change (TAC Nos. MD5289 and MD5280), Enclosures 1, 4, 5, 6 & 72007-07-20020 July 2007 Supplement to Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change (TAC Nos. MD5289 and MD5280), Enclosures 1, 4, 5, 6 & 7 CPSES-200701126, Response to Request for Additional Information to License Amendment Request (LAR) 06-007 Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits2007-07-18018 July 2007 Response to Request for Additional Information to License Amendment Request (LAR) 06-007 Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits CPSES-200701174, Submittal of Twelfth Refueling Outage (1RF12) Inservice Inspection Summary Report (1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - 08/03/2000, Second Interval)2007-07-17017 July 2007 Submittal of Twelfth Refueling Outage (1RF12) Inservice Inspection Summary Report (1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - 08/03/2000, Second Interval) CPSES-200701065, Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.2007-06-21021 June 2007 Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients. CPSES-200700951, (Cpses), Unit 1, Pressurizer Weld Overlay 60 Day Report and Update for Unit 1 Reactor Pressure Vessel Head Replacement Regarding Revised Order EA-03-0092007-06-19019 June 2007 (Cpses), Unit 1, Pressurizer Weld Overlay 60 Day Report and Update for Unit 1 Reactor Pressure Vessel Head Replacement Regarding Revised Order EA-03-009 CPSES-200701059, Submittal of Startup Report, Cycle 132007-06-13013 June 2007 Submittal of Startup Report, Cycle 13 CPSES-200700738, License Amendment Request (LAR) 07-001 Revision to Technical Requirements Surveillance 13.3.33.2 Frequency for the Turbine Stop and Control Valves2007-05-22022 May 2007 License Amendment Request (LAR) 07-001 Revision to Technical Requirements Surveillance 13.3.33.2 Frequency for the Turbine Stop and Control Valves CPSES-200700915, Supplemental Response to Request for Information on Generic Letter 2003-01, Control Room Habitability2007-05-0707 May 2007 Supplemental Response to Request for Information on Generic Letter 2003-01, Control Room Habitability CPSES-200700871, Transmittal of Year 2006 Radioactive Effluent Release Report2007-04-30030 April 2007 Transmittal of Year 2006 Radioactive Effluent Release Report CPSES-200700859, Submittal of the Annual Non-Radiological Environmental Operating Report for 20062007-04-27027 April 2007 Submittal of the Annual Non-Radiological Environmental Operating Report for 2006 CPSES-200700517, Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change2007-04-18018 April 2007 Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change CPSES-200700719, Nuclear Liability Insurance2007-04-10010 April 2007 Nuclear Liability Insurance CPSES-200700605, License Amendment Request (LAR) 07-003, Revision to Technical Specifications 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, & 5.6.5b, Core Operating Limits Report2007-04-10010 April 2007 License Amendment Request (LAR) 07-003, Revision to Technical Specifications 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, & 5.6.5b, Core Operating Limits Report CPSES-200700708, Evaluation of Pressurizer Weld Overlay Confirmatory Analyses2007-04-0505 April 2007 Evaluation of Pressurizer Weld Overlay Confirmatory Analyses CPSES-200700691, Core Operating Limits Report, Cycle 132007-04-0404 April 2007 Core Operating Limits Report, Cycle 13 CPSES-200700663, Transmittal of the Annual Radiological Environmental Operating Report for 20062007-03-30030 March 2007 Transmittal of the Annual Radiological Environmental Operating Report for 2006 CPSES-200700607, Property Damage Insurance2007-03-29029 March 2007 Property Damage Insurance CPSES-200700606, Decommissioning Report2007-03-29029 March 2007 Decommissioning Report CPSES-200700573, Request to Withdraw Relief Request A-72007-03-22022 March 2007 Request to Withdraw Relief Request A-7 CPSES-200700571, Supplement to License Amendment Request (LAR) 05-06; Revision to Technical Specification 5.6.5 Revise Listing of LOCA and Non-LOCA Analysis Methodologies (TAC Nos. MD0185/0186)2007-03-19019 March 2007 Supplement to License Amendment Request (LAR) 05-06; Revision to Technical Specification 5.6.5 Revise Listing of LOCA and Non-LOCA Analysis Methodologies (TAC Nos. MD0185/0186) CPSES-200700515, Day Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.2007-03-0909 March 2007 Day Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients. CPSES-200700454, Transmittal of Second-Half 2006 Fitness-For-Duty Program Performance Data2007-02-28028 February 2007 Transmittal of Second-Half 2006 Fitness-For-Duty Program Performance Data CPSES-200700451, Annual Operating Report for 20062007-02-28028 February 2007 Annual Operating Report for 2006 CPSES-200700422, Response to Request for Additional Information Related to Txu Power'S Request for Review of Previously Submitted Topical Reports2007-02-22022 February 2007 Response to Request for Additional Information Related to Txu Power'S Request for Review of Previously Submitted Topical Reports CPSES-200700414, Transmittal of Inservice Inspection Program Plan, Revision 5 (Unit 1: ASME Code Section XI 1998 Edition, 1999 and 2000 Addenda, Interval Start Date - 08/13/200, Second Interval)2007-02-22022 February 2007 Transmittal of Inservice Inspection Program Plan, Revision 5 (Unit 1: ASME Code Section XI 1998 Edition, 1999 and 2000 Addenda, Interval Start Date - 08/13/200, Second Interval) CPSES-200700391, Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds2007-02-20020 February 2007 Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds CPSES-200700346, Guarantees of Payment of Deferred Premiums, Submits Form 10-Q for the Period Ending September 30, 20062007-02-0808 February 2007 Guarantees of Payment of Deferred Premiums, Submits Form 10-Q for the Period Ending September 30, 2006 CPSES-200700229, Comanche, Response to Request for Additional Information, Relief Request B-6 for the Unit 1 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date..2007-02-0202 February 2007 Comanche, Response to Request for Additional Information, Relief Request B-6 for the Unit 1 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date.. CPSES-200700169, Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds2007-01-30030 January 2007 Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds CPSES-200700147, Response to Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power2007-01-29029 January 2007 Response to Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power CPSES-200700127, Submittal of Unit 2 Ninth Refueling Outage (2RF09) Inservice Inspection (ISI) Summary Report (Unit 2: 1998 Edition of ASME Code Section XI, Through 2000 Addenda, Interval Start Date - August 3, 2004, Second Interval)2007-01-24024 January 2007 Submittal of Unit 2 Ninth Refueling Outage (2RF09) Inservice Inspection (ISI) Summary Report (Unit 2: 1998 Edition of ASME Code Section XI, Through 2000 Addenda, Interval Start Date - August 3, 2004, Second Interval) CPSES-200700146, License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits2007-01-18018 January 2007 License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits CPSES-200700130, License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Diesel Generators2007-01-18018 January 2007 License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Diesel Generators CPSES-200700099, Annual Report of Changes in Peak Cladding Temperature2007-01-10010 January 2007 Annual Report of Changes in Peak Cladding Temperature CPSES-200602339, License Amendment Request (LAR) 06-010, Revision to Technical Specification 5.5.16, Containment Leakage Rate Testing Program.2006-12-19019 December 2006 License Amendment Request (LAR) 06-010, Revision to Technical Specification 5.5.16, Containment Leakage Rate Testing Program. CPSES-200602340, License Amendment Request (LAR) 06-012, Revision to Technical Specification 3.7.5, Auxiliary Feedwater System, TS 3.8.1, AC Sources - Operating, & TS 3.8.9, Distribution Systems - Operating.2006-12-19019 December 2006 License Amendment Request (LAR) 06-012, Revision to Technical Specification 3.7.5, Auxiliary Feedwater System, TS 3.8.1, AC Sources - Operating, & TS 3.8.9, Distribution Systems - Operating. 2010-07-28
[Table view] |
Text
hAxu A
I J
I I
Power I
TXU Power Comanche Peak Steam Electric Station Mike Blevins Senior Vice President &
Chief Nuclear Officer I
PO.Box 1002 (EO1)
/
Glen Rose. TX 76043 Tel: 254 897 S209 Ref: #10CFR50.90 Fax 254 897 6652 mike.blevinsbtxucom CPSES-200502462 Log # TXX-05201 November 22, 2005 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 /
SUBJECT:
COMANCHE PEAK STEAM ELE CTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50446 RESPONSE TO FOLLOW-UP REQUEST FOR INFORMATION RE: LICENSE AMENDMENT REQUEST (LAR) 02-07 FOR REVISION TO TECHNICAL SPECIFICATION (TS) 3.8.1 SURVEILLANCE REQUIREMENT MODE RESTRICTION NOTES REF: 1. TXU Power letter, logged TXX-04143, from Mike Blevins to the U.S. Nuclear Regulatory Commission, dated October 6, 2004.
- 2. TXU Power letter, logged TXX-05179, from Mike Blevins to the U.S. Nuclear Regulatory Commission, dated September 16, 2005.
- 3. TAC MC 4912 and 4913 on SR Mode Restrictions Gentlemen:
This letter is in response to your request for additional information regarding License Amendment Request 02-07 submitted by Reference 1, and our first round of RAI responses which were provided in Reference 2.
The NRC staff questions which were received from Mr. Mohan Thadani in an email to Dennis Buschbaurn on November 1, 2005, are included in Attachment 1 to this letter and are followed by TXU Power's response.
Also, as requested by Mr. Thadani, a copy of recently approved Revision 4 to CPSES Station Administrative Procedure STA-629, "Switchyard Control," is currently available for your information.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
TXX-05201 Page 2 of 2 This letter contains no new licensing basis commitments regarding CPSES Units 1 and 2. Should you have any questions, please contact Mr. M. J. Riggs at (254) 897-5218.
I state under penalty of perjury that the foregoing is true and correct.
Executed on November 22, 2005.
Sincerely, TXU Generation Company LP By: TXU Generation Management Company LLC Its General Partner Mike Blevins By: 4 i )97
/Ired W. Madden Director, Regulatory Affairs MJR Attachment c - B. S. Mallett, Region IV M. C. Thadani, NRR Resident Inspectors, CPSES
Attachment 1 to TXX-05201 Page 1 of 3 FOLLOW-UP RESPONSE TO NOVEMBER 1, 2005 RAI ON LAR 02-07 SURVEILLANCE REQUIREMENT MODE RESTRICTIONS Re: TAC NOs. MC4912 and 4913 The following CPSES responses are provided in response to NRC staff questions received from Mr. Mohan Thadani in an email to Dennis Buschbaum on November 1, 2005.
Ouestion No. 1 The licensee's procedures on "Switchyard Control" Revision 4 is still in draft form. It is the new revision that addresses communication protocol with grid operator. The procedure has stated no expectations on how soon grid problems should be notified (page 49). The words used are "when possible.", "if possible," etc.,
We would like to see the final version of STA-629 procedure.
Response
Revision 4 to CPSES Station Administrative Procedure STA-629, "Switchyard Control," has been approved by the Station Operations Review Committee (SORC) and became effective on November 1, 2005. The current revised and approved version of this procedure is available for your review and information.
Station Administrative Procedure STA-629 is part of the Generation Interconnect Agreement for CPSES and defines responsibilities for the design, maintenance, document control, operation, and grid related notifications that are needed to control the various aspects of the CPSES switchyards, and to establish the necessary interfaces between CPSES and the transmission grid system operators. Revision 4 of this procedure enhances and clarifies this interface by adding new guidance that provides for the timely exchange of necessary and pertinent information. This guidance has been summarized and is added to the procedure in the form of Attachments 8.F, "Communications Protocol," and Attachment 8.G, "CPSES-TGM/GRT Communications Levels," and is also supported by Attachment 8.H, "CPSES Offsite Power System Performance Characteristics," and Attachment 8.1, "CPSES Generator and Transformer Performance Characteristics."
Where terms and phrases such as "as soon as practical" and "if possible" have been incorporated into the attachments providing communications guidance, they are utilized primarily where believed needed to acknowledge that certain situations and events may require immediate actions and may appropriately be followed by the making of timely notifications. This usage is consistent with similar guidance which is provided in the CPSES STA-202 Procedure Writer's Guide for the use of the term "should," which is used to indicate firm CPSES management expectations. Deviation is a departure from the norm and requires supervisory concurrence.
Attachment 1 to TXX-05201 Page 3 of 3 Ouestion No. 2 Surveillance Requirement 3.8.1.19 and 3.8.1.11 have the following actions to be verified.
Please indicate what part of the following could be done at mode 1 or 2? Recognize that DG starts to supply a dead bus.
- a. De-energization of emergency buses;
- b. Load shedding from emergency buses;
- c. DG auto-starts from standby condition and:
- 1. energizes permanently connected loads in 10 seconds,
- 2. energizes auto-connected shutdown loads through automatic load sequencer,
- 3. maintains steady state voltage > 6480 V and S 7150 V,
- 4. maintains steady state frequency > 58.8 Hz and < 61.2 Hiz, and
- 5. supplies permanently connected and auto-connected shutdown loads for > 5 minutes.
Response
By incorporating the proposed LAR changes into the Mode Restriction Notes for SR 3.8.1.1 1 and SR 3.8.1.19, the following portions of these SRs may safely be performed during Modes 1 and 2, should a need be identified to demonstrate operability of the associated equipment.
Specifically, 1) recognizing that during Modes 1 and 2 the associated emergency bus shall remain operable, i.e., energized and capable of automatically loading its associated load group, and 2) that both SR 3.8.1.11 and SR 3.8.1.19 currently allow that a simulated loss of offsite power signal, or a simulated loss of offsite power signal in conjunction with a simulated SI actuation signal, respectively, may be used to perform the individual surveillances, then 3) that portion of SR part c. which demonstrates the "DG auto-start from standby condition," and that portion of SR part c.2 which demonstrates the initiation and operation of the "automatic load sequencer" up to but not including actual loading of the bus, provide examples of the portions of these surveillances that may be safely demonstrated and verified while remaining at-power.
Overall, it is not the intent of TXU Power to perform integrated testing of SR 3.8.1.11 or SR 3.8.1.19 during Modes 1 and 2, or to cause the de-energization of major safety busses or complete load shedding, but rather to perform only portions of these SRs as is indicated in the proposed note and as amplified by the associated TS Bases. As additional examples, similar portions of these surveillances have been previously performed during at-power operation when CPSES was allowed to complete the corrective actions described in Licensee Event Report (LER) 445/97-004-06 for Comanche Peak Steam Electric Station Units 1 and 2, "Issues Discovered During the Review of Generic Letter 96-01 Associated with Technical Specification Surveillances."
In particular, the following two event descriptions illustrate the portion of these SRs which were tested in order to perform the corrective actions identified in the LER:
Attachment 1 to TXX-05201 Page 3 of 3 (LER Event 6)
On March 3, 1998, during a review of Generic Letter (GL) 96-01', "Testing of the Safety-Related Logic Circuits," it was determined that the emergency diesel generator start signals on degraded voltages of the 6.9 kV and 480 V power supplies may not have been adequately verified.
Corrective actions were identified to revise the applicable test procedures to incorporate the relays that are required to be tested An enforcement discretion was requested by on March 3, 1998, (reference TU Electric letter to NRC logged TXX-98062 dated March 3, 1998), however the enforcement discretion was subsequently determined not to be necessary. The required surveillances were performed to verify that the affected relay contacts were in the correct position and the systems were declared operable within the allowed outage time. Applicable procedures have since been revised to incorporate the Technical Specification requirements with respect to verification of the contact in the closed position.
(LER Event 7)
On March 10, 1998, during a review of Generic Letter (GL) 96-01, "Testing of the Safety-Related Logic Circuits," it was determined that portions of the testing required by then Technical Specification requirements 4.8.1.1.2 .f.4b and 6b (currently SR 3.8.1.1 Ic and SR 3.8.1.19c) had not been completely performed. Specifically, testing of the sequencer load group contacts to equipment was missing or could not be distinguished from other possible circuit actuations.
Corrective actions were identified to revise the applicable test procedures to incorporate the sequencer load group contacts that are required to be tested.
An enforcement discretion was requested for CPSES Units 1 and 2 (refer to TU Electric letter to NRC logged TXX-98074 dated March 10, 1998). Temporary test procedures were prepared to incorporate the missing testing. The testing was conducted satisfactorily within the Technical Specification allowance of the TS 4.0.3. The enforcement discretion was for sufficient duration to process a License Amendment to allow the at-power tests to be credited to the surveillance requirement (reference LAR submitted by TXX-98076 dated march 12, 1998) The testing was completed satisfactorily and later credited to the surveillances.
This LER also provides further examples, such as those included in the descriptions and corrective actions completed for Events 8 and 10, whereby other specific portions of these SRs may be demonstrated when needed, by the use of specifically prepared temporary and overlapping test procedures.