ML052170308
ML052170308 | |
Person / Time | |
---|---|
Site: | Three Mile Island |
Issue date: | 08/04/2005 |
From: | Federal Emergency Management Agency |
To: | NRC/FSME |
Shared Package | |
ML052170301 | List: |
References | |
Download: ML052170308 (141) | |
Text
Three Mile Island Nuclear Generation Station -
May 3-4, 2005 Final Report - Radiological Emergency Preparedness Program August 4, 2005 FEMA Region III
Final Exercise Report Three Mile Island Nuclear Generation Station Licensee: Exelon Nuclear Exercise Date: May 3-4, 2005 Report Date: August 4, 2005 U.S. DEPARTMENT OF HOMELAND SECURITY FEDERAL EMERGENCY MANAGEMENT AGENCY REGION III One Independence Mall, 6th Floor, 615 Chestnut Street Philadelphia, Pennsylvania 19106-4404
Table of Contents I. EXECUTIVE
SUMMARY
.......................................................................................... iv II. INTRODUCTION .........................................................................................................1 III. EXERCISE OVERVIEW..............................................................................................3 A. Plume Emergency Planning Zone Description..........................................................3 B. Exercise Participants................................................................................................5 C. Exercise Timeline ..................................................................................................11 IV. EXERCISE EVALUATION AND RESULTS ...........................................................14 A. Summary Results of Exercise Evaluation ...............................................................14 B. Status of Jurisdictions Evaluated............................................................................21 1.0 Commonwealth Of Pennsylvania................................................................23 1.1 State Emergency Operations Center (SEOC) ..............................................23 1.2 Joint Public Information Center..................................................................24 1.3 Commonwealth Emergency News Information Center (CENIC) ................24 1.4 Accident Assessment Center (SEOC/BRP).................................................24 1.5 Accident Assessment Center EOF - Coatesville .........................................25 1.6 State Field Monitoring Team A ..................................................................25 1.7 State Field Monitoring Team B ..................................................................25 1.8 State Traffic/Access Control Points ............................................................26 2.0 Risk Jurisdictions .......................................................................................26 2.1 Cumberland County ...................................................................................26 2.1.1 Cumberland County Emergency Operations Center....................................26 2.1.2 Monitoring/Decontamination Reception and Mass Care Center -
Shippensberg University.............................................................................27 2.1.3 Emergency Worker Monitoring/Decontamination Center - West Shore Borough FS #13 .........................................................................................28 2.1.4 Lower Allen Township Emergency Operations Center ...............................28 2.1.4.1 Route Alerting (Hearing Impaired) - Lower Allen Township .....................28 2.2 Dauphin County .........................................................................................29 2.2.1 Dauphin County Emergency Operations Center..........................................29 2.2.2 Reception Center - Williams Valley HS.....................................................32 2.2.3 Monitoring/Decontamination and Mass Care Center - Halifax HS .............32 2.2.4 Emergency Worker Monitoring/Decontamination Center - Harrisburg Area Community College ...................................................................................33 2.2.5 Harrisburg City Emergency Operations Center ...........................................34 i
2.2.6 Paxtang Borough Emergency Operations Center ........................................34 2.2.6.1 Route Alerting (Hearing Impaired) - Paxtang Borough ..............................36 2.3 Lancaster County .......................................................................................36 2.3.1 Lancaster County Emergency Operations Center ........................................36 2.3.2 Reception Center - Park City Mall .............................................................37 2.3.3 Monitoring/Decontamination and Mass Care Center - Hempfield HS ........37 2.3.4 Emergency Worker Monitoring/Decontamination Center - Marietta FD ....37 2.3.5 Conoy Township Emergency Operations Center.........................................38 2.3.5.1 Route Alerting (Hearing Impaired) - Conoy Township...............................39 2.4 Lebanon County.........................................................................................39 2.4.1 Lebanon County Emergency Operations Center .........................................39 2.4.2 Reception Center - Lebanon County Career and Tech Center.....................42 2.4.3 Monitoring/Decontamination and Mass Center - Northern Lebanon HS.....42 2.4.4 Monitoring /Decontamination Center - Annville Union Hose FD...............43 2.4.5 South Londonderry Township Emergency Operations Center.....................43 2.4.5.1 Route Alerting - South Londonderry Township..........................................44 2.5 York County...............................................................................................44 2.5.1 York County Emergency Operations Center ...............................................44 2.5.2 Monitoring/Decontamination Reception and Mass Care Center - Southern School Complex .........................................................................................45 2.5.3 Emergency Worker Monitoring/Decontamination Center - Monahan FD ...46 2.5.4 Dover Township Emergency Operations Center .........................................46 2.5.5 Manchester Township ................................................................................47 2.5.5.1 Route Alerting (Hearing Impaired) - Manchester Township.......................47 2.5.6 Lewisbury Borough/Newberry Township EOC ..........................................47 2.5.7 Northeast Area Emergency Operations Center (Mt. Wolf & Manchester Borough /East Manchester Township) ........................................................48 3.0 Support Jurisdictions ..................................................................................48 3.1 Adams County............................................................................................48 3.1.1 Adams County Emergency Operations Center ............................................48 3.1.2 Monitoring/Decontamination Reception and Mass Care Center - Gettysburg MS .............................................................................................................49 3.2 Franklin County .........................................................................................50 3.2.1 Franklin County Emergency Operations Center..........................................50 3.2.2 Reception Center - Scotland School...........................................................50 3.2.3 Monitoring/Decontamination and Mass Care Center - Chambersburg MS..51 3.3 Schuylkill County.......................................................................................52 3.3.1 Schuylkill County Emergency Operations Center .......................................52 3.3.2 Reception Center - Blue Mountain HS .......................................................52 3.3.3 Monitoring/Decontamination and Mass Care Center - Pottsville MS..........53 4.0 School Districts ..........................................................................................53 4.1 Cumberland County School Districts..........................................................53 4.1.1 West Shore SD - Red Mill ES ....................................................................53 ii
4.2 Dauphin County School Districts................................................................53 4.2.1 Central Dauphin SD - Central Dauphin East HS ........................................53 4.2.2 Derry Township SD - Hershey ES .............................................................54 4.2.3 Harrisburg SD - Harrisburg HS..................................................................54 4.2.4 Lower Dauphin SD - Lower Dauphin HS...................................................55 4.2.5 Middletown Area SD - Middletown HS .....................................................55 4.2.6 Milton Hershey SD - Milton Hershey School.............................................55 4.2.7 Steelton-Highspire SD - Steelton-Highspire ES .........................................56 4.3 Lancaster County School Districts..............................................................56 4.3.1 Donegal SD - Maytown ES........................................................................56 4.3.2 Elizabethtown Area SD - East High Street ES............................................56 4.4 Lebanon County School Districts ...............................................................57 4.4.1 Palmyra Area SD - Palmyra HS .................................................................57 4.5 York County School Districts.....................................................................57 4.5.1 Central York SD.........................................................................................57 4.5.1.1 Central York SD - Hayshire ES .................................................................57 4.5.1.2 Central York SD - Roundtown ES .............................................................57 4.5.2 Northeastern SD.........................................................................................58 4.5.2.1 Northeastern SD - Northeastern MS...........................................................58 4.5.2.2 Northeastern SD - Spring Forge Intermediate.............................................58 4.5.3 Dover Area SD - Dover Intermediate.........................................................58 4.5.4 Eastern SD - Kreutz Creek ES ...................................................................59 APPENDIX 1. ACRONYMS AND ABBREVIATIONS..................................................60 APPENDIX 2. EXERCISE EVALUATORS AND TEAM LEADERS ..........................62 APPENDIX 3. EXERCISE EVALUATION AREA CRITERIA AND EXTENT-OF-PLAY AGREEMENTS ............................................................................67 APPENDIX 4. EXERCISE SCENARIO........................................................................110 APPENDIX 5. PLANNING ISSUES ..............................................................................112 APPENDIX 6. ADDITIONAL PRIOR ISSUES ............................................................122 iii
I. EXECUTIVE
SUMMARY
On May 3 and 4, 2005, the U.S. Department of Homeland Security, Federal Emergency Management Agency (FEMA), Region III, conducted an exercise in the plume exposure pathway emergency planning zone (EPZ) around the Three Mile Island Nuclear Generating Station (TMI). The purpose of the exercise was to assess the level of State and local preparedness in responding to a radiological emergency. This exercise was held in accordance with FEMA's policies and guidance concerning the exercise of State and local radiological emergency response plans (RERP) and procedures.
The most recent previous exercise at this site was conducted on April 22 and 23, 2003.
FEMA wishes to acknowledge the efforts of the many individuals who participated in this exercise, including: the Commonwealth of Pennsylvania, five risk counties (Cumberland, Dauphin, Lancaster, Lebanon, and York) and nine risk municipalities in the risk counties. The risk municipality for Cumberland County included Lower Allen Township. The risk municipalities for Dauphin County included Harrisburg City and Paxtang Borough. The risk municipality for Lancaster County included Conoy Township. The risk municipality for Lebanon County included South Londonderry Township. The risk municipalities for York County included Dover Township, Manchester Township, Lewisbury Borough/Newberry Township, and the Northeast Area (Mt. Wolf & Manchester Borough /East Manchester Township). Three supporting counties, Adams County, Franklin County, and Schuylkill County, also participated.
The following out-of-sequence evaluation activities were conducted during the exercise week.
On the morning of May 3, 2005, FEMA evaluated fifteen school districts in the risk counties.
On the morning of May 4, 2005, FEMA evaluated the State Police from all five-risk county troop locations for Traffic/Access control activities in Pennsylvania. In the evening on May 4, 2005, FEMA conducted out-of-sequence evaluations of Monitoring/Decontamination/Mass Care/Reception Center and Emergency Worker Monitoring and Decontamination facilities at the five risk counties and three support counties.
Evaluations were conducted in the evening on May 3, 2005, of the Emergency Operations Centers (EOCs) in the five risk counties, three support counties, and the Commonwealth of Pennsylvania; the EOCs of nine Risk County Municipalities were also evaluated in the evening of May 3, 2005.
An item of special interest during this exercise was the notification of day care centers located in the 10-mile EPZ of Three Mile Island. Municipalities in the Commonwealth of Pennsylvania are the responsible offsite response organizations for notifying day care centers located in their geographical/political boundaries in the event of an incident occurring at TMI. The municipal plans and procedures require that day care centers be notified of an incident at TMI at the Alert, Site Area and General Emergency and/or when Protective Action Decisions are announced.
There were nine municipalities evaluated during this exercise. The jurisdictions were Lower Allen Township, Harrisburg City, Paxtang Borough, Conoy Township, South Londonderry iv
Township, Dover Township, Manchester Township, Lewisbury Borough/Newberry Township and Northeast Area (Mt. Wolf and Manchester Borough/E. Manchester Township). The evaluators at these locations were instructed to observe the simulated notifications at the nine municipalities. Each municipality had a Notification and Resource Manual that lists the names, address, point of contact and phone number of the day care centers located in their portion of the EPZ. In every case, the municipalities simulated notification of the day care centers in a timely manner pursuant to their codified plans and procedures.
Protecting the public health and safety is the full-time job of some of the exercise participants and an additional assigned responsibility for others. Still others have willingly sought this responsibility by volunteering to provide vital emergency services to their communities.
Cooperation and teamwork of all the participants were evident during this exercise.
This report contains the final evaluation of the biennial exercise and evaluations of the out-of-sequence activities conducted on May 3 and 4, 2005.
The State and local organizations, except where noted in this report, demonstrated knowledge of their emergency response plans and procedures and adequately implemented them. Zero Deficiencies, seven Areas Requiring Corrective Action (ARCAs), and seven planning issues were identified during this exercise; five of the ARCAs were successfully redemonstrated. In addition, seven prior ARCAs and six prior planning issues were evaluated during the exercise; all but two prior planning issues were successfully resolved. Seven prior ARCAs and one prior planning issue, not scheduled for demonstration during this exercise, remain outstanding.
v
II. INTRODUCTION On December 7, 1979, the President directed FEMA to assume the lead responsibility for all offsite nuclear planning and response. FEMAs activities are conducted pursuant to 44 Code of Federal Regulations (CFR) Parts 350, 351, and 352. These regulations are a key element in the Radiological Emergency Preparedness (REP) Program that was established following the Three Mile Island Nuclear Station accident in March 1979.
FEMA Rule 44 CFR 350 establishes the policies and procedures for FEMAs initial and continued approval of tribal, State, and local governments radiological emergency planning and preparedness for commercial nuclear power plants. This approval is contingent, in part, on State and local government participation in joint exercises with licensees.
FEMAs responsibilities in radiological emergency planning for fixed nuclear facilities include the following:
- Taking the lead in offsite emergency planning and in the review and evaluation of RERPs and procedures developed by State and local governments;
- Determining whether such plans and procedures can be implemented on the basis of observation and evaluation of exercises of the plans and procedures conducted by State and local governments;
- Responding to requests by the U.S. Nuclear Regulatory Commission (NRC) pursuant to the Memorandum of Understanding between the NRC and FEMA dated June 17, 1993 (44 CFR Part 354, Appendix A, September 14, 1993); and
- Coordinating the activities of the following Federal agencies with responsibilities in the radiological emergency planning process:
- U.S. Department of Commerce,
- U.S. Nuclear Regulatory Commission,
- U.S. Environmental Protection Agency,
- U.S. Department of Energy,
- U.S. Department of Health and Human Services,
- U.S. Department of Transportation,
- U.S. Department of Agriculture,
- U.S. Department of the Interior, and
- U.S. Food and Drug Administration.
Representatives of these agencies serve on the FEMA Region III Regional Assistance Committee (RAC), which is chaired by FEMA.
1
The Commonwealth of Pennsylvania and local jurisdictions submitted their RERPs for the Three Mile Island Nuclear Generating Station to FEMA Region III and were granted formal approval of the RERPs on August 24, 1998, under 44 CFR 350.
FEMA Region III evaluated a plume REP exercise on May 3, 2005, and an out-of-sequence demonstration on May 4, 2005, to assess the capabilities of State and local emergency preparedness organizations in implementing their RERPs and procedures to protect the public health and safety during a radiological emergency involving the Three Mile Island Nuclear Generating Station. The purpose of this exercise report is to present the exercise results and findings on the performance of the offsite response organizations (OROs) during a simulated radiological emergency.
The findings presented in this report are based on the evaluations of the Federal evaluator team, with final determinations made by the FEMA Region III RAC Chairperson, and approved by the Regional Director.
The criteria utilized in the FEMA evaluation process are contained in:
- NUREG-0654/FEMA-REP-1, Rev.1, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants, November 1980;
- FEMA Radiological Emergency Preparedness (REP) Program Manual, August 2002;
- 67 Federal Register (FR) 20580, FEMA Radiological Emergency Preparedness:
Exercise Evaluation Methodology, April 25, 2002; and
- 66 FR 47546, FEMA Radiological Emergency Preparedness: Alert and Notification, September 12, 2001.
Section III of this report, entitled Exercise Overview, presents basic information and data relevant to the exercise. This section of the report contains a description of the plume pathway EPZ, a listing of all participating jurisdictions and functional entities that were evaluated, and a tabular presentation of the time of actual occurrence of key exercise events and activities.
Section IV of this report, entitled Exercise Evaluation and Results, presents detailed information on the demonstration of applicable exercise evaluation areas at each jurisdiction or functional entity evaluated in a jurisdiction-based, issues-only format. This section also contains: (1) descriptions of all Deficiencies and ARCAs assessed during this exercise, recommended corrective actions, and the State and local governments schedule of corrective actions for each identified exercise issue, and (2) descriptions of unresolved ARCAs assessed during previous exercises and the status of the OROs efforts to resolve them.
2
III. EXERCISE OVERVIEW This section contains data and basic information relevant to the May 3, 2005 and May 4, 2005, exercise and out-of-sequence (OOS) demonstrations to test the offsite emergency response capabilities in the area surrounding the Three Mile Island Nuclear Generating Station. This section of the exercise report includes a description of the plume pathway EPZ, a listing of all participating jurisdictions and functional entities that were evaluated, and a tabular presentation of the actual time of occurrence of key exercise events and activities.
A. Plume Emergency Planning Zone Description The TMI Nuclear Power Station (40° 9' 12" N/76° 43' 25" W) is a nuclear power plant operated by the Exelon Nuclear. The site consists of two pressurized water-type units. Unit One is an 819-megawatt (MW) reactor, and Unit Two is a 906-MW reactor. Unit 1 received its license in June 1974 and began commercial operation in September 1974. Unit 2 began commercial operation in February 1978; it was damaged in March 1979 and has been shut down and placed in a monitored storage mode.
The minimum exclusion distance specified for the TMI plant is 2,000 feet. Included within the 2,000-foot radius are a portion of Three Mile Island, a portion of Shelly Island, and a portion of the Susquehanna River. Exelon Nuclear and GPU Nuclear Corporation own all the land within the exclusion area.
The TMI plant is located in south-central Pennsylvania in Londonderry Township, Dauphin County. The site is part of an 814-acre tract consisting of several adjacent islands in the Susquehanna River. The power plant is located on Three Mile Island, which is one of the largest islands of the group. The site is at an elevation of 300 feet above mean sea level (msl), relatively flat, and wooded on the periphery and the southern portion. Of the 470 acres that make up the island, the plant occupies approximately 200 acres in the northern portion.
Soils on the island are of the Duncannon-Chavies-Tioga Association, which comprises deposits of alluvial sand, silt, and clay. Underlying bedrock is red sandstone and shale.
The normal pool elevation of the Susquehanna River in this area is 277 feet above msl. Hills on both sides of the river in this vicinity rise to elevations of over 500 feet. The plant grade is 300 feet above msl.
An access bridge for plant personnel connects State Route 441 with the north end of the island.
A wooden bridge connects the southern portion of the island with State Route 441. Conrail lines are located on both sides of the river; the closest is a one-track line adjacent and parallel to Route 441 on the east shore.
The area within 10 miles of the TMI Nuclear Power Station is located in south-central Pennsylvania, and includes portions of Cumberland, Dauphin, Lancaster, Lebanon, and York 3
counties. The site is surrounded mostly by farmland within a 10-mile radius. The nearest community is Goldsboro Borough, on the west shore of the Susquehanna River, 1 mile from the plant. The nearest major population center with more than 25,000 people is Harrisburg (population 53,624), which lies just over 10 miles to the north.
Twenty-three industrial firms are located within a 5-mile radius; they employ approximately 2,400 people. The Harrisburg International Airport is located 2 miles northwest of the TMI plant. An NRC estimate of aircraft risk to TMI Units One and Two indicates an acceptably low risk for either unit, provided fewer than 2,400 operations per year are by aircraft in excess of 200,000 pounds. The NRC requires Exelon to continue periodic monitoring and reporting of airport usage and will reevaluate the adequacy of plant protection if aircraft traffic is reliably projected to exceed 2,400 operations per year. The major railroads operating in the EPZ include Amtrak, Blue Mountain and Ridge, Chessie System, Conrail, and the Maryland and Pennsylvania Railroad.
The climate of the five-county risk EPZ is mild and humid. Weather is variable because the prevailing westerly winds bring both high- and low-pressure systems through the area every few days. Average annual precipitation for the southern portion of the county is about 38 inches, and the average annual temperature is 52 degrees F.
On the basis of the 2000 census, the total population of the 10-mile EPZ is 201,800. There are 97 sirens used to provide coverage of the plume exposure pathway EPZ. The county in which it is located operates each siren system.
The 10-mile EPZ for Three Mile Island Nuclear Generating Station covers the following jurisdictions which participated in the May 3 and 4, 2005 REP Exercise:
Cumberland County Lower Allen Township Dauphin County Harrisburg City Paxtang Borough Lancaster County Conoy Township Lebanon County South Londonderry Township York County Dover Township Manchester Township Lewisbury Borough/Newberry Township Northeast Area (Mt. Wolf & Manchester Borough/East Manchester Township) 4
B. Exercise Participants The following agencies, organizations, and units of government participated in the Three Mile Island Nuclear Generating Station out-of-sequence demonstrations and REP exercise held on May 3 and 4, 2005.
Commonwealth of Pennsylvania Exelon Nuclear Pennsylvania Bureau of Radiation Protection Pennsylvania Department of Agriculture Pennsylvania Department of Conservation/Natural Resources Pennsylvania Department of Corrections Pennsylvania Department of Education Pennsylvania Department of Environmental Protection Pennsylvania Department of General Services Pennsylvania Department of Health Pennsylvania Department of Labor Press Secretary Office Pennsylvania Department of License and Inspection Pennsylvania Department of Military Affairs Pennsylvania Department of Public Welfare Pennsylvania Department of State Press Secretary Office Pennsylvania Department of Transportation Pennsylvania Emergency Management Agency Pennsylvania Fish and Boat Commission Pennsylvania Game Commission Pennsylvania Governor's Office Pennsylvania Public Utility Commission Pennsylvania Secretary for Public Information Pennsylvania State Police Pennsylvania Turnpike Commission U. S. Nuclear Regulatory Commission Risk Jurisdictions Cumberland County Cumberland County 9-1-1 Communications Center Cumberland County Board of Commissioners Cumberland County Department of Public Safety Cumberland County HazMat Team Cumberland County Mass Casualty and Animal Response Teams Cumberland County Mental Health Cumberland County Office of Emergency Preparedness Cumberland County Prison Cumberland County Public Information Team Cumberland County Sheriffs Department 5
Cumberland County Transportation Department Pennsylvania Army National Guard Pennsylvania Department of Transportation Pennsylvania State Emergency Management Agency Pennsylvania State Police State Agriculture Extension U.S. Department of Agriculture New Cumberland Borough Council New Cumberland Fire Department, Company 10 New Cumberland Borough Emergency Management Coordinator New Cumberland Police West Shore Borough Fire Company 13 Stations 1 & 2 Carlisle Army War College Shippensberg University Lower Allen Township Lower Allen Township Administrative Services Lower Allen Township Codes Department Lower Allen Township Emergency Medical Service Lower Allen Township Highway Department Lower Allen Township Police Department Lower Allen Township Public Safety Lower Allen Township Public Works Lower Allen Township Volunteer Fire Department Dauphin County Dauphin County Area Agency on Aging Dauphin County Board of Commissioners Dauphin County Communications Department Dauphin County Emergency Communications Center Dauphin County Emergency Management Agency (EMA)
Dauphin County EMA Hazardous Materials/Special Operations Dauphin County HazMat Team Dauphin County Mental Health Department Dauphin County Security Department Pennsylvania County Commissioners Association Pennsylvania Emergency Management Agency Pennsylvania State Police Pennsylvania State University Cooperative Extension Office Williams Town Emergency Management Agency Campbelltown Fire Company Liberty Hose Company Fire-Police Station 24 City of Harrisburg 6
Paxtang Borough Paxtang Borough Department of Public Works Paxtang Borough Emergency Management Agency Paxtang Borough Fire Company #1, Company 40 Paxtang Borough Office of Emergency Management Paxtang Borough Police Department Lancaster County Lancaster County Board of Commissioners Lancaster County Communications Center Lancaster County Emergency Management Agency Lancaster County Engineers Office Lancaster County Fire Services Lancaster County Geographic Information Systems Lancaster County Medical Services Lancaster County Public Works Lancaster County Sheriffs Office Pennsylvania Department of Transportation Pennsylvania Emergency Management Agency Pennsylvania State Police Bainbridge Volunteer Fire Department Hempfield Volunteer Fire and HazMat Departments Conoy Township Conoy Township Board of Supervisors Conoy Township Emergency Management Agency Conoy Township Emergency Medical Services Lebanon County Lebanon County Auxiliary Patrol (4)
Lebanon County Bilingual Liaison Lebanon County Career and Technical Center (2)
Lebanon County Commissioners Office Lebanon County Conservation District Lebanon County Department of Agriculture Lebanon County Emergency Management Agency Lebanon County Emergency Medical Services Lebanon County Fire Department (HazMat)
Lebanon County HazMat Team Lebanon County Mental Health/Mental Retardation Program Lebanon County Public Works Lebanon County School Services Lebanon Sheriffs Office Pennsylvania Emergency Management Agency Pennsylvania State Police 7
South Londonderry Township South Londonderry Emergency Medical Services South Londonderry Fire Department South Londonderry Township Emergency Management Agency South Londonderry Township Police Department South Londonderry Township Supervisors Office York County York County 911 Communication Center York County Commissioners Office York County Department of Public Works York County Emergency Ambulance and Rescue Service York County Emergency Medical Services York County Fire and Rescue Services York County HazMat Response Team York County Intermediate Unit York County Office of Emergency Management York County Planning Commission York County Public Information York County Public Works York County Radiological Officer York County Sheriffs Department York County Transportation Authority Federal Emergency Management Agency Pennsylvania Army National Guard Pennsylvania Department of Transportation Pennsylvania Emergency Management Agency Pennsylvania State Police Pennsylvania State University - Agricultural Extension Service Glen Rock Hose and Ladder Company Monaghan Township Volunteer Fire Company Northern York County Regional Police Dover Township Dover Township Emergency Medical Services Dover Township Volunteer Fire Department Lewisbury Borough/Newberry Township Manchester Township Manchester Township Emergency Management Agency Manchester Township Fire, EMS, Police and Public Works Northeast Area (Mt. Wolf and Manchester Borough/East Manchester Township) 8
Support Counties Adams County Adams County Commissioners Office Adams County Department of Emergency Services Adams County Emergency Response Team Adams County Radiological Officer Adams County Solicitors Office Gettysburg Emergency Medical Services Gettysburg Fire Department Gettysburg Police Department Pennsylvania Emergency Management Agency Franklin County Local Emergency Commissioners Office Franklin County Department of Emergency Services Franklin County Emergency Management Agency Franklin County Sheriffs Department Green Township Emergency Management Department Pennsylvania Emergency Management Agency Scotland School for Veterans Children Schuylkill County Schuylkill County Board of Health Schuylkill County Emergency Management Agency Schuylkill County Emergency Medical Services Schuylkill County Fire and Rescue Services Schuylkill County Public Works Schuylkill County Radiological Response Team Schuylkill County Sheriffs Department Pottsville Sheriffs Department Pennsylvania Department of Transportation Pennsylvania Department of Correction Pennsylvania Emergency Management Agency Pennsylvania State Police U.S. Department of Agriculture-Extension Service Schools Cumberland County West Shore School District Red Mill Elementary School 9
Dauphin County Central Dauphin School District Central Dauphin East High School Derry Township School District Hershey Elementary School Harrisburg School District Harrisburg High School Lower Dauphin School District Lower Dauphin High School Middletown Area School District Middletown High School Milton Hershey School District Milton Hershey School Steelton-Highspire School District Steelton-Highspire Elementary School Lancaster County Donegal School District Maytown Elementary School Elizabethtown Area School District East High Street Elementary School Lebanon County Palmyra Area School District Palmyra Area High School York County Central York School District Hayshire Elementary School Roundtown Elementary School Northeastern School District Northeastern Middle School Spring Forge Intermediate School Dover Area School District Dover Intermediate School Eastern York School District Kreutz Creek Elementary School Private/Volunteer Organizations The following private and volunteer organizations participated in the Three Mile Island Nuclear Generating Station exercise at many different locations throughout the area. We thank them and all those who volunteer their services to State, county, and municipal governments during emergencies.
10
Amateur Radio Emergency Services (ARES)
American Red Cross (ARC)
Civil Air Patrol Radio Amateur Civil Emergency Services (RACES)
United Way C. Exercise Timeline Table 1, on the following page, presents the times at which key events and activities occurred during the Three Mile Island Nuclear Generating Station May 3, 2005 exercise. Also included are times notifications were made to the participating jurisdictions/functional entities.
11
TABLE 1. EXERCISE TIMELINE Date and Site: May 3, 2005, Three Mile Island Nuclear Generating Station Time That Notification Was Received or Action Was Taken Emergency Classification Time Utility ENC Lower Dauphin Paxtang Lancaster Level or Event Declared PA State JPIC Coatesville Cumberland Allen Twp. County Harrisburg Boro. County Conoy EOC EOF Harrisburg EOF County EOC EOC EOC City EOC EOC EOC Twp Unusual Event 1730 1736 N/A N/A 1740 1806 1742 N/A 1734 Alert 1814 1814 N/A 1813 1821 1826 1818 1823 1822 1814 1823 Site Area Emergency 2027 2033 2029 2029 2033 2045 2033 2051 2044 2033 2033 General Emergency 2102 2107 2103 2107 2111 2125 2111 2132 2128 2111 2120 Simulated Radiation Release Started 2130 2017 1900 2140 2140 1848 2217 2050 2120 Simulated Radiation Release Terminated N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Facility Declared Operational 1815 1921 1845 1906 1851 1840 1850 1845 1845 Governor's Declaration of State of Emergency 2100 2100 2117 2214 N/A 2127 2140 Local Declaration of State of Emergency N/A N/A N/A N/A 2050 2052 1923 N/A 2040 N/A N/A Exercise Terminated N/A 2248 2247 2232 2232 2247 2217 2200 2248 2248 Precautionary Actions:
Restrict airspace 2040 2040 2117 N/A 2127 2040 Restrict rail traffic 2058 2058 2117 N/A 2127 2050 Restrict water traffic 2100 2100 2117 N/A 2100 Shelter livestock, place on stored feed 2100 2117 2111 N/A 2150 1st A&N Decision (State [made]; local [received])
Tune radio/TV to EAS station 2059 N/A 2023 2025 Shelter: _____________________________________ 2015 2135 2015 Evacuate 360° to 10 miles 2219 N/A N/A 1st Siren Activation 2025 2032 2025 2128 2116 2025 1st EAS 2028 2nd A&N Decision (State [made]; local [received])
Shelter:_____________________________________ 2130 2131 2130 2132 2142 2130 2142 2142/
Evacuate 360° to 10 miles 2130 2131 2130 2130 2142 2153 2nd Siren Activation 2140 2140 2144 2132 2144 2140 2nd EAS Message 2143 3rd A&N Decision (State [made]; local [received]
Shelter: ____________________________________ N/A Evacuate 360° to 10 miles N/A 3rd Siren Activation N/A 3rd EAS Message KI Administration Decision: Emergency Workers advised to take KI Received at location 2130 2130 2128 2129 2126 2132 2134 2139 2145 Action taken at location 2128 2130 2142 2155 KI Administration Decision: Emergency Workers advised NOT to N/A take KI 12
TABLE 1. EXERCISE TIMELINE Date and Site: May 3, 2005, Three Mile Island Nuclear Generating Station Time That Notification Was Received or Action Was Taken Emergency Classification Time Utility Lewisbury Lebanon South York Northeast Adams Franklin Schuylkill Level or Even Declared Dover Manchester Boro/
County Londonderry County Area County County County Twp. EOC Twp. EOC Newberry Twp EOC Twp. EOC EOC EOC EOC EOC EOC EOC Unusual Event 1730 1736 1735 N/A N/A N/A N/A N/A N/A N/A Alert 1814 1826 1833 1817 1825 1827 1827 1827 1848 1841 1845 Site Area Emergency 2027 2033 2044 2033 2033 2043 2043 2043 2037 2058 2040 General Emergency 2102 2111 2215 2111 2121 2121 2121 2121 2118 2103 2119 Simulated Radiation Release Started 2033 2044 1848 2043 2043 2043 2043 1930 1922 Simulated Radiation Release Terminated N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Facility Declared Operational 1920 1903 1827 1850 1855 1850 1856 1920 1915 1846 Governor's Declaration of State of Emergency 2122 2215 2130 2137 2137 2137 2137 2120 2122 2119 Local Declaration of State of Emergency 2199 N/A N/A N/A N/A N/A N/A N/A N/A N/A Exercise Terminated 2247 2310 2226 2235 2235 2235 2235 2225 2243 2146 Precautionary Actions:
Restrict airspace 2040 2137 2122 2122 2119 Restrict rail traffic 2058 2137 Restrict water traffic 2100 2137 Shelter livestock, place on stored feed 2106 2137 2131 2136 2136 2136 2136 1st A&N Decision (State [made]; local [received])
Tune radio/TV to EAS station 2022 2044 2032 2038 2038 2038 2030 N/A N/A N/A Shelter: _____________________________________
Evacuate 360° to 10 miles 1st Siren Activation 2030 2028 1st EAS 2nd A&N Decision (State [made]; local [received]) 2130 2138 2136 2136 2147 2147 2147 2147 2150 2145 Shelter: ____________________________________ 2130 2136 Evacuate 360° to 10 miles 2140 2nd Siren Activation 2143 2140 nd 2 EAS Message 2443 3rd A&N Decision (State [made]; local [received]
Shelter: ___________________________________
Evacuate 360° to 10 miles 3rd Siren Activation 3rd EAS Message KI Administration Decision: Emergency Workers advised to take KI Received at location 2126 2144 2131 2154 2154 2154 2154 Action taken at location 2154 2158 2158 2158 2158 KI Administration Decision: Emergency Workers advised NOT to take KI 13
IV. EXERCISE EVALUATION AND RESULTS Contained in this section are the results and findings of the evaluation of all jurisdictions and locations that participated in the May 3-4, 2005, REP exercise to test the offsite emergency response capabilities of State and local governments in the 10-mile EPZ surrounding the Three Mile Island Nuclear Generating Station.
Each jurisdiction and functional entity was evaluated on the basis of its demonstration of the exercise evaluation area criteria contained in the FEMA REP Exercise Evaluation Methodology.
Detailed information on the exercise evaluation area criteria and the extent-of-play agreement used in this exercise is found in Appendix 3 of this report.
A. Summary Results of Exercise Evaluation The matrix presented in Table 2, on the following pages, provides the status of the exercise evaluation area criteria from the FEMA REP Exercise Evaluation Methodology that were scheduled for demonstration during this exercise by all participating jurisdictions and functional entities. Exercise evaluation area criteria are listed by number (reference Section IV, Appendix 3, Exercise Evaluation Area Criteria and Extent-of-Play Agreement) and the demonstration status of the criteria is indicated by the use of the following letters:
M Met (No Deficiency or ARCAs assessed and no unresolved ARCAs from prior exercises)
D Deficiency assessed A ARCA(s) assessed A1 ARCA(s) assessed, but successfully redemonstrated R Resolved ARCA(s) from prior exercise(s)
U Unresolved ARCA(s) from prior exercises 14
TABLE 2.
SUMMARY
RESULTS OF THE 2005 EXERCISE EVALUATION Date and Site: May 3 and 4, 2005; Three Mile Island Nuclear Generating Station EMERGENCY FIELD SUPPORT OFFSITE RESPONSE EMERGENCY PROTECTIVE ACTION PROTECTIVE ACTION NOTIFICATION MEASUREMENT OPERATION/
ORGANZATION OPERATIONS DECISION-MAKING IMPLEMENTATION & PUBLIC AND ANALYSIS FACILITIES MANAGEMENT INFORMATION Criteria 1.a.1 1.b.1 1.c.1 1.d.1 1.e.1 2.a.1 2.b.1 2.b.2 2.c.1 2.d.1 2.e.1 3.a.1 3.b.1 3.c.1 3.c.2 3.d.1 3.d.2 3.e.1 3.e.2 3.f.1 4.a.1 4.a.2 4.a.3 4.b.1 4.c.1 5.a.1 5.a.2 5.a.3 5.b.1 6.a.1 6.b.1 6.c.1 6.d.1 1.0 COMMONWEALTH OF PENNSYLVANIA 1.1 State EOC (SEOC) M M A1 M M M M M M M M 1.2 Joint Information Center M M M (JIC) 1.3 Commonwealth Emergency News M M Information Center (CENIC) 1.4 Accident Assessment M M M M M M Center (SEOC/BRP) 1.5 Accident Assessment M M Center EOF- Coatesville 1.6 State Field Monitoring M M M M M M Team A 1.7 State Field Monitoring M M M M M M Team B 1.8 State Traffic/Access M M M M M M Control Points*
2.0 Risk Jurisdictions 2.1 Cumberland County 2.1.1 Cumberland County EOC M M M M M M M M M M M M M 2.1.2 Mon./ Decon. Reception and Mass Care Center - M A1 M M M M Shippensberg University*
2.1.3 EW Mon./ Decon. Center
- West Shore Borough FS M M M M M M
- 13*
- Conducted on May 4, 2005 as an Out-of-sequence Demonstration 15 A - ARCA(s) Assessed A1 - ARCA(s) assessed, but successfully redemonstrated D - Deficiency assessed M - Met (No Deficiency or ARCA(s) assessed) R- Resolved ARCA(s) from prior Exercise R1- Resolved ARCA from Peach Bottom Exercise U - Unresolved ARCA(s) from prior exercise(s) Blank - Not scheduled for demonstration
TABLE 2.
SUMMARY
RESULTS OF THE 2005 EXERCISE EVALUATION Date and Site: May 3 and 4, 2005; Three Mile Island Nuclear Generating Station EMERGENCY FIELD SUPPORT OFFSITE RESPONSE EMERGENCY PROTECTIVE ACTION PROTECTIVE ACTION NOTIFICATION MEASUREMENT OPERATION/
ORGANZATION OPERATIONS DECISION-MAKING IMPLEMENTATION & PUBLIC AND ANALYSIS FACILITIES MANAGEMENT INFORMATION Criteria 1.a.1 1.b.1 1.c.1 1.d.1 1.e.1 2.a.1 2.b.1 2.b.2 2.c.1 2.d.1 2.e.1 3.a.1 3.b.1 3.c.1 3.c.2 3.d.1 3.d.2 3.e.1 3.e.2 3.f.1 4.a.1 4.a.2 4.a.3 4.b.1 4.c.1 5.a.1 5.a.2 5.a.3 5.b.1 6.a.1 6.b.1 6.c.1 6.d.1 2.1.4 Lower Allen TWP EOC M M M M M M M M M M M M M 2.1.4.1 Route Alerting (Hearing Impaired) - Lower Allen M M M M M M TWP 2.2 Dauphin County A1, 1 M, 2.2.1 Dauphin County EOC M M A M M M M M M M M A R 2.2.2 Reception Center -
M M M M M Williams Valley HS*
2.2.3 Mon./ Decon. & Mass Care Center - Halifax M M M M M HS*
2.2.4 EW Mon./Decon Center -
Harrisburg Area M M M M M M Community College*
2.2.5 Harrisburg City EOC M M M M M M M M M M M M M 2.2.6 Paxtang Borough EOC M M M M M M M M M M M M M 2.2.6.1Route Alerting (Hearing Impaired) - Paxtang M M M M M M Borough 2.3 Lancaster County 2.3.1 Lancaster County EOC M M M M M M M M M M M M M M 2.3.2 Reception Center - Park M M M M M City Mall*
- Conducted on May 4, 2005 as an Out-of-sequence Demonstration 16 A - ARCA(s) Assessed A1 - ARCA(s) assessed, but successfully redemonstrated D - Deficiency assessed M - Met (No Deficiency or ARCA(s) assessed) R- Resolved ARCA(s) from prior Exercise R1- Resolved ARCA from Peach Bottom Exercise U - Unresolved ARCA(s) from prior exercise(s) Blank - Not scheduled for demonstration
TABLE 2.
SUMMARY
RESULTS OF THE 2005 EXERCISE EVALUATION Date and Site: May 3 and 4, 2005; Three Mile Island Nuclear Generating Station EMERGENCY FIELD SUPPORT OFFSITE RESPONSE EMERGENCY PROTECTIVE ACTION PROTECTIVE ACTION NOTIFICATION MEASUREMENT OPERATION/
ORGANZATION OPERATIONS DECISION-MAKING IMPLEMENTATION & PUBLIC AND ANALYSIS FACILITIES MANAGEMENT INFORMATION Criteria 1.a.1 1.b.1 1.c.1 1.d.1 1.e.1 2.a.1 2.b.1 2.b.2 2.c.1 2.d.1 2.e.1 3.a.1 3.b.1 3.c.1 3.c.2 3.d.1 3.d.2 3.e.1 3.e.2 3.f.1 4.a.1 4.a.2 4.a.3 4.b.1 4.c.1 5.a.1 5.a.2 5.a.3 5.b.1 6.a.1 6.b.1 6.c.1 6.d.1 2.3.3 Mon./ Decon. & Mass Care Center - Hempfield M M M M M M HS*
2.3.4 EW Mon./ Decon. Center M M M M M M
- Marietta FD*
2.3.5 Conoy TWP EOC M M M M M M M M M M M M A1 2.3.5.1 Route Alerting (Hearing M M M M M M Impaired) - Conoy TWP 2.4 Lebanon County 2.4.1 Lebanon County EOC M M A M M M M M M M M M M 2.4.2 Reception Center -
Lebanon County Career M M M M M and Tech Center*
2.4.3 Mon./Decon.& Mass Care Center - Northern M M M M M M Lebanon HS*
2.4.4 Mon./ Decon. Center -
Annville Union Hose M M M M M M FD*
2.4.5 South Londonderry TWP M M M M M M M M M M M M M EOC 2.4.5.1 Route Alerting - South M M M M M M Londonderry Twp 2.5 York County 2.5.1 York County EOC M M M M M M M M M M M M A 2.5.2 Mon./ Decon. Reception M M M M R1 M
& Mass Care Center*
- Conducted on May 4, 2005 as an Out-of-sequence Demonstration 17 A - ARCA(s) Assessed A1 - ARCA(s) assessed, but successfully redemonstrated D - Deficiency assessed M - Met (No Deficiency or ARCA(s) assessed) R- Resolved ARCA(s) from prior Exercise R1- Resolved ARCA from Peach Bottom Exercise U - Unresolved ARCA(s) from prior exercise(s) Blank - Not scheduled for demonstration
TABLE 2.
SUMMARY
RESULTS OF THE 2005 EXERCISE EVALUATION Date and Site: May 3 and 4, 2005; Three Mile Island Nuclear Generating Station EMERGENCY FIELD SUPPORT OFFSITE RESPONSE EMERGENCY PROTECTIVE ACTION PROTECTIVE ACTION NOTIFICATION MEASUREMENT OPERATION/
ORGANZATION OPERATIONS DECISION-MAKING IMPLEMENTATION & PUBLIC AND ANALYSIS FACILITIES MANAGEMENT INFORMATION Criteria 1.a.1 1.b.1 1.c.1 1.d.1 1.e.1 2.a.1 2.b.1 2.b.2 2.c.1 2.d.1 2.e.1 3.a.1 3.b.1 3.c.1 3.c.2 3.d.1 3.d.2 3.e.1 3.e.2 3.f.1 4.a.1 4.a.2 4.a.3 4.b.1 4.c.1 5.a.1 5.a.2 5.a.3 5.b.1 6.a.1 6.b.1 6.c.1 6.d.1 2.5.3 EW Mon./ Decon. Center M M M M M M Monahan FD*
2.5.4 Dover TWP EOC M M M M M M M M M M M M M 2.5.5 Manchester TWP M M M M M M M M M M M M M 2.5.5.1 Route Alerting (Hearing Impaired) - Manchester M M M M M M TWP 2.5.6 Lewisbury Borough/
M M M M M M M M M M M M M Newberry TWP EOC 2.5.7 Northeast Area EOC (Mt. Wolf & Manchester M M M M M M M M M M M M M Boro. /E. Manchester TWP) 3.0 Support Jurisdictions 3.1 Adams County 3.1.1 Emergency Operations M M M M M M Center 3.1.2 Mon./ Decon. Reception
& Mass Care Center - M M M M R R Gettysburg MS*
3.2 Franklin County 3.2 Emergency Operations M M M M M M Center 3.2.2 Reception Center -
M M M M R M Scotland School*
- Conducted on May 4, 2005 as an Out-of-sequence Demonstration 18 A - ARCA(s) Assessed A1 - ARCA(s) assessed, but successfully redemonstrated D - Deficiency assessed M - Met (No Deficiency or ARCA(s) assessed) R- Resolved ARCA(s) from prior Exercise R1- Resolved ARCA from Peach Bottom Exercise U - Unresolved ARCA(s) from prior exercise(s) Blank - Not scheduled for demonstration
TABLE 2.
SUMMARY
RESULTS OF THE 2005 EXERCISE EVALUATION Date and Site: May 3 and 4, 2005; Three Mile Island Nuclear Generating Station EMERGENCY FIELD SUPPORT OFFSITE RESPONSE EMERGENCY PROTECTIVE ACTION PROTECTIVE ACTION NOTIFICATION MEASUREMENT OPERATION/
ORGANZATION OPERATIONS DECISION-MAKING IMPLEMENTATION & PUBLIC AND ANALYSIS FACILITIES MANAGEMENT INFORMATION Criteria 1.a.1 1.b.1 1.c.1 1.d.1 1.e.1 2.a.1 2.b.1 2.b.2 2.c.1 2.d.1 2.e.1 3.a.1 3.b.1 3.c.1 3.c.2 3.d.1 3.d.2 3.e.1 3.e.2 3.f.1 4.a.1 4.a.2 4.a.3 4.b.1 4.c.1 5.a.1 5.a.2 5.a.3 5.b.1 6.a.1 6.b.1 6.c.1 6.d.1 3.2.3 Mon./ Decon. & Mass Care Center - M M M M M M Chambersburg MS*
3.3 Schuylkill County 3.3.1 Emergency Operations M M M M M M M Center 3.3.2 Reception Center - Blue M M M M M M Mountain HS*
3.3.3 Mon./ Decon. & Mass Care Center - Pottsville M M M M M M MS*
4.0 School Districts 4.1 Cumberland County School Districts 4.1.1 West Shore SD - Red M
Mill ES 4.2 Dauphin County School Districts 4.2.1 Central Dauphin SD -
M Central Dauphin East HS 4.2.2 Derry TWP SD - Hershey M
ES 4.2.3 Harrisburg SD - M, Harrisburg HS R 4.2.4 Lower Dauphin SD -
M Lower Dauphin HS 4.2.5 Middletown Area SD -
M Middletown HS 4.2.6 Milton Hershey SD -
M Milton Hershey School
- Conducted on May 4, 2005 as an Out-of-sequence Demonstration 19 A - ARCA(s) Assessed A1 - ARCA(s) assessed, but successfully redemonstrated D - Deficiency assessed M - Met (No Deficiency or ARCA(s) assessed) R- Resolved ARCA(s) from prior Exercise R1- Resolved ARCA from Peach Bottom Exercise U - Unresolved ARCA(s) from prior exercise(s) Blank - Not scheduled for demonstration
TABLE 2.
SUMMARY
RESULTS OF THE 2005 EXERCISE EVALUATION Date and Site: May 3 and 4, 2005; Three Mile Island Nuclear Generating Station EMERGENCY FIELD SUPPORT OFFSITE RESPONSE EMERGENCY PROTECTIVE ACTION PROTECTIVE ACTION NOTIFICATION MEASUREMENT OPERATION/
ORGANZATION OPERATIONS DECISION-MAKING IMPLEMENTATION & PUBLIC AND ANALYSIS FACILITIES MANAGEMENT INFORMATION Criteria 1.a.1 1.b.1 1.c.1 1.d.1 1.e.1 2.a.1 2.b.1 2.b.2 2.c.1 2.d.1 2.e.1 3.a.1 3.b.1 3.c.1 3.c.2 3.d.1 3.d.2 3.e.1 3.e.2 3.f.1 4.a.1 4.a.2 4.a.3 4.b.1 4.c.1 5.a.1 5.a.2 5.a.3 5.b.1 6.a.1 6.b.1 6.c.1 6.d.1 4.2.7 Steelton-Highspire SD -
M Steelton-Highspire ES 4.3 Lancaster County School Districts 4.3.1 Donegal SD - Maytown M
ES 4.3.2 Elizabethtown Area SD -
M East High Street ES 4.4 Lebanon County School Districts 4.4.1 Palmyra Area SD -
M Palmyra HS 4.5 York County School Districts 4.5.1.1 Central York SD -
M Hayshire ES 4.5.1.2 Central York SD -
M Roundtown ES 4.5.2.1 Northeastern SD -
M Northeastern MS 4.5.2.2 Northeastern SD -
Spring Forge M Intermediate 4.5.3 Dover Area SD - Dover M
Intermediate 4.5.4 Eastern SD - Kreutz M
Creek ES
- Conducted on May 4, 2005 as an Out-of-sequence Demonstration 20 A - ARCA(s) Assessed A1 - ARCA(s) assessed, but successfully redemonstrated D - Deficiency assessed M - Met (No Deficiency or ARCA(s) assessed) R- Resolved ARCA(s) from prior Exercise R1- Resolved ARCA from Peach Bottom Exercise U - Unresolved ARCA(s) from prior exercise(s) Blank - Not scheduled for demonstration
B. Status of Jurisdictions Evaluated This subsection provides information on the evaluation of each participating jurisdiction and functional entity in a jurisdiction-based, issues-only format. Presented below is a definition of the terms used in this subsection relative to criteria demonstration status.
- Met - Listing of the demonstrated exercise evaluation area criteria under which no Deficiencies or ARCAs were assessed during this exercise and under which no ARCAs assessed during prior exercises remain unresolved.
- Deficiency - Listing of the demonstrated exercise evaluation area criteria under which one or more Deficiencies were assessed during this exercise. Included is a description of each Deficiency and recommended corrective actions.
- Area Requiring Corrective Actions - Listing of the demonstrated exercise evaluation area criteria under which one or more ARCAs were assessed during the current exercise. Included is a description of the ARCAs assessed during this exercise and the recommended corrective actions to be demonstrated before or during the next biennial exercise.
- Not Demonstrated - Listing of the exercise evaluation area criteria, which were not scheduled to be demonstrated during this exercise and the reason they were not demonstrated.
- Prior ARCAs - Resolved - Descriptions of ARCAs assessed during previous exercises that were resolved in this exercise and the corrective actions demonstrated.
- Prior ARCAs - Unresolved - Descriptions of ARCAs assessed during prior exercises that were not resolved in this exercise. Included is the reason the ARCAs remain unresolved and recommended corrective actions to be demonstrated before or during the next biennial exercise.
The following are definitions of the two types of exercise issues that are discussed in this report.
- A Deficiency is defined in the Radiological Emergency Preparedness Program Manual as ...an observed or identified inadequacy of organizational performance in an exercise that could cause a finding that offsite emergency preparedness is not adequate to provide reasonable assurance that appropriate protective measures can be taken in the event of a radiological emergency to protect the health and safety of the public living in the vicinity of a nuclear power plant.
- An Area Requiring Corrective action is defined as ...an observed or identified inadequacy of organizational performance in an exercise that is not considered, by itself, to adversely impact public health and safety.
21
- A Plan Issue is defined as an observed or identified inadequacy in the OROs emergency plan or implementing procedures, rather than in the OROs performance.
Plan issues are not considered to be exercise issues.
FEMA has developed a standardized system for numbering exercise issues (Deficiencies and ARCAs). This system is used to achieve consistency in numbering exercise issues among FEMA Regions and site-specific exercise reports within each Region. It is also used to expedite tracking of exercise issues on a nationwide basis.
The identifying number for Deficiencies and ARCAs includes the following elements, with each element separated by a hyphen (-).
- Plant Site Identifier - A two-digit number corresponding to the Utility Billable Plant Site Codes.
- Exercise Year - The last two digits of the year the exercise was conducted.
- Evaluation Area Criterion - A letter and number corresponding to the criteria in the FEMA Interim Radiological Emergency Preparedness Program Manual.
- Issue Classification Identifier - (D = Deficiency, A = ARCA). Only Deficiencies and ARCAs are included in exercise reports.
- Exercise Issue Identification Number - A separate two digit indexing number assigned to each issue identified in the exercise.
22
1.0 Commonwealth Of Pennsylvania 1.1 State Emergency Operations Center (SEOC)
- a. MET: 1.a.1 2.a.1 3.b.1 5.a.1 6.c.1 1.b.1 3.d.1 1.d.1 3.d.2 1.e.1
- b. DEFICIENCY: None C. AREAS REQUIRING CORRECTIVE ACTION: 1.c.1 Issue No.: 64-05-1.c.1-A-01 Condition: The command staff at the State Emergency Operations Center (SEOC) did not coordinate with the command staff at the risk counties of Cumberland, Dauphin, Lancaster, Lebanon, and York the two activations of the public alert sirens and the content of the Emergency Alert System (EAS) messages.
Possible Cause: The Command Staff at the SEOC did not take into consideration the required coordination, as specified in State and County plans, prior to activating the alert and notification system.
Reference:
NUREG-0654, A.1.d; A.2.a,b; Commonwealth of Pennsylvania Emergency Operations Plan, Annex E, Appendix 3, p. E-3-1.
Effect: Inadequate coordination of the alert and notification sequence could result in public confusion and inadequate implementation of county procedures, e.g. prompt protective actions for the general public and route alerting of special populations.
Recommendation: The SEOC staff should coordinate public alert and notification with all risk counties in accordance with State and County plans.
Corrective Action Demonstrated: All risk counties were contacted prior to the activation of the 2nd alert and notification (A&N).
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 23
1.2 Joint Public Information Center
- a. MET: 1.b.1 5.b.1 1.d.1
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 1.3 Commonwealth Emergency News Information Center (CENIC)
- a. MET: 5.a.1 5.b.1
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 1.4 Accident Assessment Center (SEOC/BRP)
- a. MET: 1.a.1 2.a.1 4.a.2 1.c.1 2.b.1 1.d.1
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 24
1.5 Accident Assessment Center EOF - Coatesville
- a. MET: 1.d.1 1.e.1
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 1.6 State Field Monitoring Team A
- a. MET: 1.d.1 3.a.1 4.a.1 1.e.1 3.b.1 4.a.3
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 1.7 State Field Monitoring Team B
- a. MET: 1.d.1 3.a.1 4.a.1 1.e.1 3.b.1 4.a.3
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 25
1.8 State Traffic/Access Control Points
- a. MET: 1.d.1 2.a.1 3.a.1 1.e.1 3.b.1 3.d.1
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 2.0 Risk Jurisdictions 2.1 Cumberland County 2.1.1 Cumberland County Emergency Operations Center
- a. MET: 1.a.1 2.a.1 3.a.1 5.a.1 1.b.1 2.c.1 3.b.1 5.b.1 1.c.1 3.c.1 1.d.1 3.c.2 1.e.1
- b. DEFICIENCY: None C. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 26
2.1.2 Monitoring/Decontamination Reception and Mass Care Center -
Shippensberg University
- a. MET: 1.b.1 3.a.1 6.a.1 3.b.1 6.c.1
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: 1.e.1 Issue No.: 64-05-1.e.1-A-02 Condition: Documentation of the current calibration of the ADM-300A Serial Number 892085 survey instrument was not available at the time the instrument was prepared for use. This instrument is used to monitor contaminated evacuees. There was a calibration expiration date of 3/8/02 listed on the instrument. It was shown that the APTEC-NRC calibration fixture Model GCF-200(V2) could be calibrated without being sent back to the manufacturer.
However, there was no documentation that this calibration had been performed using the calibration fixture.
Possible Cause: Only an operability check is mentioned in the procedures for monitoring. The operator is not reminded of the requirement for the instrument to have a current calibration when used.
Reference:
NUREG-0654, H.7, 10; J.10.a,b,e; J.11; K.3.a Effect: While the instruments passed the operability check, an uncalibrated instrument may not provide accurate results.
Recommendation: Modify the procedure to include a check of the calibration date of the instruments being used. Provide a procedure for the performance of the instrument calibration. Schedule the performance annually or as required by the manufacturer and maintain documentation of these calibrations with the instrument.
Corrective Action Demonstrated: The Supervisor described the calibration process and showed the sources used for the calibration, thus simulating the calibration of the instrument.
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 27
2.1.3 Emergency Worker Monitoring/Decontamination Center - West Shore Borough FS #13
- a. MET: 1.b.1 3.a.1 6.a.1 1.e.1 3.b.1 6.b.1
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 2.1.4 Lower Allen Township Emergency Operations Center
- a. MET: 1.a.1 2.a.1 3.a.1 5.a.1 1.b.1 2.c.1 3.b1 1.c.1 3.c.1 1.d.1 3.d.1 1.e.1 3.d.2
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 2.1.4.1 Route Alerting (Hearing Impaired) - Lower Allen Township
- a. MET: 1.d.1 3.a.1 5.a.1 1.e.1 3.b.1 3.c.1
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None 28
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 2.2 Dauphin County 2.2.1 Dauphin County Emergency Operations Center
- a. MET: 1.a.1 2.a.1 3.a.1 5.a.1 1.b.1 2.c.1 3.b.1 5.b.1 1.e.1 3.c.1 3.c.2
- b. DEFICIENCY: None C. AREAS REQUIRING CORRECTIVE ACTION: 1.c.1, 1.d.1 Issue No.: 64-05-1.c.1-A-03 Condition: The Dauphin County Emergency Operations Center (EOC) failed to promptly provide the Paxtang Borough EOC with information about the initial alert and notification decision and the need to initiate Route Alerting. At 2025, the Dauphin County 911 Communications Center Supervisor received a message from the Pennsylvania Emergency Management Agency (PEMA)
EOC instructing risk counties to simulate the activation of the sirens at 2025 and indicating that PEMA would issue the appropriate Emergency Alert System (EAS) message at 2028. However, this information was not received at the Paxtang Borough EOC until 2116 via facsimile.
Possible Cause: The significant delay that occurred in the process of handling a critical message from the moment the message was received to the moment the information was effectively provided to the Paxtang Borough EOC appears to have resulted from a failure to verify that critical information had been effectively received by the risk municipalities. The Dauphin County EOC Planning Section Coordinators checklist includes the item Verify Route Alerting Conducted as part of the items subject to verification during a Site Area Emergency (SAE) Emergency Classification Level (ECL), but does not include such an item under the Alert ECL section. However, the PEMA EOC made the initial alert and notification decision during the Alert ECL.
Reference:
NUREG-0654, II-E.1; Dauphin County Radiological Emergency Response Plan, Basic Plan, Section 6.D (5).
29
Effect: The failure on the part of the Dauphin County EOC to provide adequate warning to the Paxtang Borough EOC prevented them from conducting backup route alerting in a timely manner.
Recommendation: Dauphin County Emergency Management Agency (EMA) should revise its procedures to ensure that the timeliness of conveying critical information to the municipalities is verified promptly so that corrective actions can be implemented, if necessary.
Corrective Action Demonstrated: During the 2nd alert and notification (A&N) sequence, the Dauphin County EOC provided the information to the Paxtang Borough EOC to initiate route alerting in a timely manner.
Issue No.: 64-05-1.d.1-A-04 Condition: The dedicated telephone line that connects the Pennsylvania Emergency Management Agency (PEMA) Emergency Operations Center (EOC), the utility, and the EOCs in all risk counties did not ring at the Dauphin County EOC at approximately 2130, when PEMA engaged all jurisdictions in a conference call to coordinate the activation of the alert and notification (A&N) system (i.e., activation of sirens and broadcast of Emergency Alert System (EAS) messages) to implement the evacuation order issued by the Governor.
The PEMA EOC was able to contact the Dauphin County Emergency Management Agency (EMA) by reaching its 911 Communications Center Supervisor and conveying the information concerning the time established for activation of the sirens.
Possible Cause: The wiring for the dedicated telephone line that connects the PEMA EOC, the utility, and the EOCs in all risk counties failed in the Dauphin County EOC when the call came in for the conference call that started at approximately 2130.
Reference:
NUREG-0654, II.F.1.d; Dauphin County Radiological Emergency Response Plan, Basic Plan, Section 5.D (Concept of Operations).
Effect: A failure of the dedicated telephone line affects Dauphin County EMAs ability to effectively engage in coordination with PEMA, the utility, and other risk jurisdictions regarding implementation of protective actions.
Recommendation: The Dauphin County EMA should coordinate with PEMA and the utility to verify what type of equipment malfunction occurred in the dedicated telephone line in Dauphin County during the exercise. Once the exact source of the malfunction is identified, it should be corrected and tested.
30
Corrective Action Demonstrated: On May 5, 2005, the Dauphin County EMA Deputy Director explained that a wiring defect was detected on the dedicated telephone line. That same day, the wiring for that line was replaced, and the line was successfully tested.
Issue No.: 64-05-5.b.1-A-05 Condition: The press release regarding the Health Departments recommendation for administration of potassium iodide (KI) issued by the Dauphin County Emergency Operations Center (EOC) Public Information Officer (PIO) with a time of 2023 only made reference to emergency workers and special populations and did not address the fact that the recommendation covered the general public as well.
Possible Cause: The template for the press release regarding the Health Departments recommendation for administration of KI used by the PIO is apparently outdated and corresponds to a time when the general public was not issued KI.
Reference:
NUREG-0654, II.G.1.c; Dauphin County Radiological Emergency Response Plan, Basic Plan, Section 6.D (27).
Effect: The general public could be confused as a result of the inconsistency between the messages issued by the Pennsylvania Emergency Management Agency (PEMA) and the Dauphin County regarding the Health Departments recommendation for administration of KI. PEMAs press release made reference to the fact that the recommendation was applicable to the general public, while that reference was omitted from the press released prepared by the Dauphin County EOC PIO.
Recommendation: The Dauphin County EMA should revise the template used for notification to the public of the Health Departments recommendation for administration of KI to ensure that it makes reference to the general public.
The training of the Dauphin County EOC PIO should address this revised template.
Schedule for Corrective Action: The referenced press release at 2023 only applied to special populations and emergency workers. At 2126 the Dauphin County PIO did send out a press release declaring a General Emergency and advising the general public to take KI (see enclosed press releases.) We do not, as a rule, make a decision on KI for the general public until after General Emergency is declared. The General Emergency was not declared by the utility until 2102. The 2030 2023 press release cited above was released before any decision had been made or considered by the State concerning KI for the general public. The utility had not even provided a recommendation by 2030 2023. This ARCA should be deleted.
31
FEMA Response: Concur. This ARCA is deleted.
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: 5.b.1 Issue No.: 64-03-5.b.1-A-04
Description:
A News Release, issued at 5:34 PM, provided contradictory and misleading information regarding whether an Alert or a Site Area Emergency (SAE) Emergency Classification Level (ECL) had been declared. (NUREG-0654, E.5,7; G.3.a; G.4.c)
Corrective Action Demonstrated: All the press releases generated by the Dauphin County Emergency Operations Center (EOC) Public Information Officer (PIO) contained the correct ECL, as appropriate.
- f. PRIOR ARCAs - UNRESOLVED: None 2.2.2 Reception Center - Williams Valley HS
- a. MET: 1.b.1 3.a.1 6.a.1 1.e.1 3.b.1
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 2.2.3 Monitoring/Decontamination and Mass Care Center - Halifax HS
- a. MET: 1.e.1 3.a.1 6.a.1 3.b.1 6.c.1
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None 32
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 2.2.4 Emergency Worker Monitoring/Decontamination Center - Harrisburg Area Community College
- a. MET: 1.b.1 3.a.1 6.a.1 1.e.1 3.b.1 6.b.1
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None Issue No.: 64-05-1.b.1-A-06 Condition: The present facility layout has not been adequately designed to control contamination of emergency workers (EWs) and their vehicles at the Radiological Monitoring and Decontamination Station, North Hall, Harrisburg Area Community College, Harrisburg, PA. The facility layout does not contain a flow layout for EW vehicle monitoring and decontamination, and the shower room walls do not completely touch the floors in the shower rooms, resulting in potentially contaminated run-off water spreading around the entire shower room floor. Additionally, the entrance and egress corridor from the shower room is not wide enough to permit two persons to pass.
Possible Cause: The facility is inadequate as a decontamination facility.
Reference:
NUREG-0654, H.3 Effect: The lack of a facility layout caused delays in processing EW vehicles for monitoring and decontamination of the vehicle and possible cross-contamination in the shower rooms (male and female) of emergency workers.
Recommendations: The ERT, Dauphin County, and Exelon Nuclear should re-examine this facility for its intended purpose.
Schedule for Corrective Action: This same facility and layout has been used consistently since 1999. In the 1999, 2001, and 2003 biennial exercises there was not a single issue noted by the evaluators. Nevertheless, procedures will be developed to resolve the remote possibility of contamination in the showers and a flow chart lay-out will be created for EW vehicles. Recommend that this issue be changed from an ARCA to a planning issue. It at most was an observed or identified inadequacy in the OROs emergency plan or 33
implementing procedures, rather than in the OROs performance, which is exactly how a planning issue is defined.
FEMA Response: Concur. This ARCA is now reclassified as a planning issue.
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 2.2.5 Harrisburg City Emergency Operations Center
- a. MET: 1.a.1 2.a.1 3.a.1 5.a.1 1.b.1 2.c.1 3.b.1 1.c.1 3.c.1 1.d.1 3.d.1 1.e.1 3.d.2
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 2.2.6 Paxtang Borough Emergency Operations Center
- a. MET: 1.a.1 2.a.1 3.a.1 5.a.1 1.b.1 2.c.1 3.b.1 1.c.1 3.c.1 1.d.1 3.d.1 1.e.1 3.d.2
- b. DEFICIENCY: None 34
- c. AREAS REQUIRING CORRECTIVE ACTION: None Issue No.: 64-05-5.a.1-A-07 Condition: During the second alert and notification (A&N) sequence, the Paxtang Borough EOC activated their own fire siren (2145) as a public alerting method one minute after the Dauphin County siren activation (2144). This activity is not in accordance with the Paxtang Borough plans and procedures.
Possible Cause: During the first A&N sequence, the Paxtang Borough EOC did not receive notification from the Dauphin County Emergency Management Agency (EMA) of the siren activation for 51 minutes. The Paxtang Borough Emergency Management Coordinator (EMC) believed that the sounding of the borough siren would ensure that the public would be promptly notified of an impending Emergency Alert System (EAS) message.
Reference:
NUREG-0654, E.5,6,7 Effect: The Paxtang Boroughs fire siren sounding may cause public confusion.
Recommendation: The Paxtang EOC should not activate their fire siren during an A&N sequence unless requested to do so by the Dauphin County EMA, or, include the Paxtang Borough siren activation in conjunction with the Dauphin County siren activation in the Paxtang Borough and County plans and procedures.
Schedule for Corrective Action: The sounding of the Paxtang Borough fire siren during the second A&N sequence was a direct result of the communication problems between the SEOC and Dauphin County during the first A&N sequence. Even though it was not in his plan, the borough coordinator, in the interest of public safety, made a conscious decision to sound his fire sirens as a back-up or alternative in the event there would have been another delay. As such it could be argued that he exhibited commendable decision making and command and control. Regardless, this borough siren sounding would not have had a deleterious effect on public safety or caused public confusion. Regardless of which sirens sound the result is the same -
residents tune into their local stations for emergency information. To say that a municipal siren sounding during an event at a nuclear power plant is a detriment implies the sirens should not be blown for a fire or any other emergency during this period. That, of course, would be a totally unworkable rule. The real problem here was at the State and county level and that has already been addressed in this report. Nothing is to be gained by second guessing the actions of a local coordinator who made a real-time decision to do what he felt was best for his citizens. The goal of the exercise was to prove mission accomplishment. That was done. There is no need to make a plan 35
change. This was an immediate action to mitigate a perceived problem - the very essence of emergency management. Recommend this ARCA be deleted.
FEMA Response: Concur. This ARCA is deleted.
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 2.2.6.1 Route Alerting (Hearing Impaired) - Paxtang Borough
- a. MET: 1.d.1 3.a.1 5.a.1 1.e.1 3.b.1 3.c.1
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 2.3 Lancaster County 2.3.1 Lancaster County Emergency Operations Center
- a. MET: 1.a.1 2.a.1 3.a.1 5.a.1 6.a.1 1.b.1 2.c.1 3.b.1 5.b.1 1.c.1 3.c.1 1.d.1 3.c.2 1.e.1
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None 36
- f. PRIOR ARCAs - UNRESOLVED: None 2.3.2 Reception Center - Park City Mall
- a. MET: 1.b.1 3.a.1 6.a.1 1.e.1 3.b.1
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 2.3.3 Monitoring/Decontamination and Mass Care Center - Hempfield HS
- a. MET: 1.b.1 3.a.1 6.a.1 1.e.1 3.b.1 6.c.1
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 2.3.4 Emergency Worker Monitoring/Decontamination Center - Marietta FD
- a. MET: 1.b.1 3.a.1 6.a.1 1.e.1 3.b.1 6.b.1
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None 37
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 2.3.5 Conoy Township Emergency Operations Center
- a. MET: 1.a.1 2.a.1 3.a.1 1.b.1 2.c.1 3.b.1 1.c.1 3.c.1 1.d.1 3.d.1 1.e.1 3.d.2
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: 5.a.1 Issue No.: 64-05-5.a.1-A-08 Condition: The Conoy Township Emergency Operations Center (EOC) failed to deploy their Primary Route Alerting Teams in response to the first Alert and Notification (A&N) sequence.
At 2033, Conoy Township was notified of an Alert Condition at the Three Mile Island Nuclear Site. That notification included a report that sirens were being activated at 2025. Prompt alert and notification of the public required the Conoy County EOC to deploy Primary Route Alerting Teams to notify the public of the Alert Emergency Classification Level (ECL) and to listen for additional Emergency Alert System (EAS) messages. The Primary Route alerting personnel had received their radiological briefing in the EOC and were ready for deployment but were never dispatched.
Possible Cause: Lack of familiarity with the Conoy Township Emergency Operations Plan (EOP).
Reference:
Conoy Township Emergency Operations Plan, page B-2, paragraph B.3.1, if sirens are activated, commence route alerting Effect: During the first A&N sequence, members of the public were not adequately notified of the emergency situation and the need to monitor the EAS. This is particularly true for special needs populations (hearing impaired, etc.) who may be dependent on route alerting for initial notification.
Recommendation: Review the Conoy Township EOP and ensure check lists are updated to reflect timely dispatch of Route Alerting Teams upon siren activation. Conduct training with the EOC staff to ensure they understand there 38
is no need to wait for the Lancaster County EOC to direct dispatch of Route Alerting Teams after sirens have sounded.
Corrective Action Demonstrated: At the second A&N sequence at 2102, upon notification of a General Emergency (GE), the Primary Route Alerting Teams were correctly dispatched and successfully demonstrated their activities associated with primary alerting and notification of the public in a complete and timely manner.
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 2.3.5.1 Route Alerting (Hearing Impaired) - Conoy Township
- a. MET: 1.d.1 3.a.1 5.a.1 1.e.1 3.b.1 3.c.1
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 2.4 Lebanon County 2.4.1 Lebanon County Emergency Operations Center
- a. MET: 1.a.1 2.a.1 3.a.1 5.a.1 1.b.1 2.c.1 3.b.1 5.b.1 1.d.1 3.c.1 1.e.1 3.c.2
- b. DEFICIENCY: None 39
- c. AREAS REQUIRING CORRECTIVE ACTION: 1.c.1 Issue No.: 64-05-1.c.1-A-09 Condition: Briefings to the Emergency Operations Center (EOC) staff by the Emergency Management Coordinator (EMC) did not provide detailed briefings and did not encourage staff participation in the exchange of information pertaining to their activities. Emergency information posted to the EOC status board contained incorrect information and was not recorded in a timely manner.
Event log entries were not checked for spelling or context (i.e. evacuation of non-essential personnel at Three Mile Island (TMI) was entered as Partial Evacuation of TMI non-residential). Entries into the log were delayed by up to one hour. For example, the 2040 Federal Aviation Administration (FAA) restrictions were entered at 2150. The restriction on rail services at 2050 was entered at 2150.
Possible Cause: The EMC did not properly assign responsibilities to his staff as specified in the plan.
Reference:
NUREG-0654, A.1.d; A.2a,b Effect: Staff was unaware of certain activities being conducted by the State, which may have influenced their response efforts.
Recommendation: The EMC should delegate authority to the EOC staff and prioritize managing the county response.
Schedule for Corrective Action: Agreed. This was an entirely new staff involved in their first nuclear power plant exercise. Improvement will continue to grow through experience and training.
Issue No.: 64-05-3.c.2-A-10 Condition: During the out-of-sequence (OOS) school demonstration on May 3, 2005, no notifications had been received at the Palmyra School District Office as of 1000 from the Lebanon County Emergency Operations Center (EOC) dispatch center. After calling the EOC district office, it was learned that the EOC was not aware that its participation during OOS school demonstrations was required. After being made aware of this need, the EOC provided the exercise messages, including those prior to 1000. Although all messages were received, messages for the Alert and Site Area Emergency (SAE) were received at a time significantly later than that in the exercise timeline and created some confusion during the demonstration.
40
Possible Cause: Lack of coordination and detailed procedures for the school services EOC liaison to contact the Palmyra School District Office during an emergency event.
Reference:
NUREG-0654, J.10.c,d,g; Lebanon County Plan, Appendix 14, Annex E, School Services.
Effect: School officials may not be able to implement protective actions for students to prevent them from returning into the 10-mile EPZ during an event.
Recommendation: EOC procedures for the school services outlining their specific roles during an emergency should be fully demonstrated in accordance with the plans and procedures.
Schedule for Corrective Action: The simple fact of this issue is that the county was unaware that they had to forward messages to the school district office. This is as much a fault of the exercise developers as it was a new county EMA staff. Obviously the county is well aware that in the future they are to forward all messages during school exercises. It is hard to see what benefit is gained by even bothering to make this an issue or call it an ARCA.
The problem was corrected on the spot during the exercise and there is simply no training or other corrective actions that can take place that will further improve anyones understanding. Furthermore, as evidenced by the lack of any issues for Palmyra School District, the lateness of the first few messages had no detrimental effect on the districts mission accomplishment. Recommend this ARCA be deleted.
FEMA Response: Concur. This ARCA is deleted.
Issue No.: 64-05-5.b.1-A-11 Condition: The Reception Center identified in the 2005 Verizon telephone directory (Yellow Pages) emergency information insert is not the Reception Center identified in the county plan or in the Pennsylvania Emergency Management Agency (PEMA) Emergency Alert System (EAS) message.
Possible Cause: There was no review of the phone directory insert prior to publication.
Reference:
NUREG-0654, E.5, 7; G.3.a; G.4.c; Lebanon County Plan, Reception Center identified in Appendix 12, p. E-12-5, Appendix 4, p. E-9.
Effect: The public was being instructed to refer to the telephone directory throughout the event. When PEMA issued the EAS message recommending evacuation, they identified the correct center. This variance in facilities may have caused confusion among the public.
41
Recommendation: Update telephone book.
Schedule for Corrective Action: Again, this was an observed or identified inadequacy in the OROs emergency plan or implementing procedures, rather than in the OROs performance, which is exactly how a planning issue is defined. Additionally, the utility, not the county, writes the telephone directory emergency procedures. This is most definitely not an ORO performance issue.
If it is then there is no such thing as a planning issue. The telephone directories will be fixed when the next version is published. This issue should be reclassified as a planning issue.
FEMA Response: Concur. This ARCA has been reclassified as a planning issue.
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 2.4.2 Reception Center - Lebanon County Career and Tech Center
- a. MET: 1.b.1 3.a.1 6.a.1 1.e.1 3.b.1
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 2.4.3 Monitoring/Decontamination and Mass Center - Northern Lebanon HS
- a. MET: 1.b.1 3.a.1 6.a.1 1.e.1 3.b.1 6.c.1
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None 42
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 2.4.4 Monitoring /Decontamination Center - Annville Union Hose FD
- a. MET: 1.b.1 3.a.1 6.a.1 1.e.1 3.b.1 6.b.1
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 2.4.5 South Londonderry Township Emergency Operations Center
- a. MET: 1.a.1 2.a.1 3.a.1 5.a.1 1.b.1 2.c.1 3.b.1 1.c.1 3.c.1 1.d.1 3.d.1 1.e.1 3.d.2
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 43
2.4.5.1 Route Alerting - South Londonderry Township
- a. MET: 1.d.1 3.a.1 5.a.1 1.e.1 3.b.1 3.c.1
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 2.5 York County 2.5.1 York County Emergency Operations Center
- a. MET: 1.a.1 2.a.1 3.a.1 5.a.1 1.b.1 2.c.1 3.b.1 1.c.1 3.c.1 1.d.1 3.c.2 1.e.1
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: 5.b.1 Issue No.: 64-05-5.b.1-A-12 Condition: The Public Information Officer (PIO) neglected to include the necessary information in follow-on messages, such as evacuation instructions, evacuation routes, reception center locations, what to take when evacuating, information concerning pets, public inquiry telephone number, etc. Information regarding the Governors order advising recommendation of evacuation was also inaccurate.
Possible Cause: The newly assigned PIO was not supplied with the appropriate templates that the previous PIO had and the Emergency Alert System (EAS) messages that might have contained some of this information that never reached the York County EOC from the Pennsylvania Emergency Management Agency (PEMA) in written form.
Reference:
NUREG-0654, E.5, 7 44
Effect: If the necessary information for a safe and efficient evacuation and relocation of the public was broadcast, it would have caused confusion.
Recommendation: Templates contained in the plans and procedures should be updated to assure that they contain current and accurate necessary information.
These templates should then be forwarded to the PIO. As the PIO is new to this position, some additional training and guidance might also be helpful.
Schedule for Corrective Action: Agreed. York County is in the process of updating and rewriting their templates for the PIO. Additional training will be provided in their implementation and use.
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 2.5.2 Monitoring/Decontamination Reception and Mass Care Center - Southern School Complex
- a. MET: 1.b.1 3.a.1 6.a.1 1.e.1 3.b.1 6.c.1
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: 6.a.1 Issue No.: 46-04-6.a.1-A-01 (This ARCA was a result of the Peach Bottom 2004 Exercise)
Description:
Evacuees exiting the shower rooms used the same floor area which was previously used by contaminated individuals. There were no floor diagrams, which would show the clean versus contaminated evacuees traffic pattern. Clean evacuees exiting shower rooms could be contaminated again by using the same floor area as contaminated evacuees. (NUREG-0654, J.12)
Corrective Action Demonstrated: The procedures for the York County Evacuee Monitoring, Decontamination, and Mass Care facility have been changed to clearly delineate the traffic pattern for clean versus contaminated individuals. The entrance/exit area to the showers has been divided in half and 45
clearly marked with a combination of portable barriers and tape. An individual is also stationed at the exit/entrance area to assure that evacuees stay on the appropriate side of the barriers.
This new process was successfully demonstrated on May 04, 2005 as part of a TMI exercise out-of-sequence demonstration.
- f. PRIOR ARCAs - UNRESOLVED: None 2.5.3 Emergency Worker Monitoring/Decontamination Center - Monahan FD
- a. MET: 1.b.1 3.a.1 6.a.1 1.e.1 3.b.1 6.b.1
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 2.5.4 Dover Township Emergency Operations Center
- a. MET: 1.a.1 2.a.1 3.a.1 5.a.1 1.b.1 2.c.1 3.b.1 1.c.1 3.c.1 1.d.1 3.d.1 1.e.1 3.d.2
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 46
2.5.5 Manchester Township
- a. MET: 1.a.1 2.a.1 3.a.1 5.a.1 1.b.1 2.c.1 3.b.1 1.c.1 3.c.1 1.d.1 3.d.1 1.e.1 3.d.2
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 2.5.5.1 Route Alerting (Hearing Impaired) - Manchester Township
- a. MET: 1.d.1 3.a.1 5.a.1 1.e.1 3.b.1 3.c.1
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 2.5.6 Lewisbury Borough/Newberry Township EOC
- a. MET: 1.a.1 2.a.1 3.a.1 5.a.1 1.b.1 2.c.1 3.b.1 1.c.1 3.c.1 1.d.1 3.d.1 1.e.1 3.d.2
- b. DEFICIENCY: None 47
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 2.5.7 Northeast Area Emergency Operations Center (Mt. Wolf & Manchester Borough /East Manchester Township)
- a. MET: 1.a.1 2.a.1 3.a.1 5.a.1 1.b.1 2.c.1 3.b.1 1.c.1 3.c.1 1.d.1 3.d.1 1.e.1 3.d.2
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 3.0 Support Jurisdictions 3.1 Adams County 3.1.1 Adams County Emergency Operations Center
- a. MET: 1.a.1 5.b.1 1.b.1 1.c.1 1.d.1 1.e.1
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None 48
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 3.1.2 Monitoring/Decontamination Reception and Mass Care Center - Gettysburg MS
- a. MET: 1.b.1 3.a.1 6.a.1 1.e.1 3.b.1 6.c.1
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: 6.a.1, 6.c.1 Issue No.: 64-99-18-A-42 (6.a.1)
Description:
The radiological monitors at the Adams County monitoring/
decontamination/mass care center (Gettysburg Area Middle School) did not wear or simulate wearing gloves while surveying individuals and vehicles for contamination, as required by Appendix 5, page E-36, of the Adams County EOP. (NUREG-0654, J.12)
Corrective Action Demonstrated: The emergency workers wore gloves during radiological monitoring.
Issue No.: 64-03-6.a.1-A-08 (Monitoring/Decontamination, Reception, and Mass Care Center - New Oxford Middle School)
Description:
Personnel changed the alarm set point for contamination on \the Bicron portal monitor. A person is considered contaminated if there is a reading of 18,000 counts/second (cps) using the Bicron TPM-903 portal monitor. This action limit was derived from the 300 counts/minute (cpm) contamination threshold utilized for monitoring with a CDV-700 (300 cpm x 60 seconds/minute = 18000 cps). The contamination limit may be too high and should not be calculated using this method due to the differences in detector efficiency and sensitivity. (NUREG-J.10.h; J.12; K.5.a)
Commonwealth Recommendation: The same portal monitor and same HAZMAT team that would have been used at New Oxford Middle School are the same ones that were successfully evaluated at Gettysburg Middle School during the 2005 exercise. Adams County only possesses one portal monitor, so the 49
location it is set up at should not matter as long as the set point is correct and the portal monitor is properly operated.
FEMA Response: Concur. This Prior ARCA was correctly demonstrated during this 2005 exercise and is resolved.
Issue No.: 64-99-19-A-43 (6.c.1)
Description:
The ARC Manager for the Adams County mass care center, located in the Gettysburg Area Middle School, was not knowledgeable in all aspects of the requirements for this center (e.g., capacity of the center, how many evacuees to expect, and if procedures are available for exceeding the capacity of the center). (NUREG-0654, J.10.h)
Corrective Action Demonstrated: The ARC Mass Care Center manager was extremely knowledgeable about the facilities capabilities and resources.
- f. PRIOR ARCAs - UNRESOLVED: None 3.2 Franklin County 3.2.1 Franklin County Emergency Operations Center
- a. MET: 1.a.1 5.b.1 1.b.1 1.c.1 1.d.1 1.e.1
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 3.2.2 Reception Center - Scotland School
- a. MET: 1.b.1 3.a.1 6.a.1 1.e.1 3.b.1 6.c.1
- b. DEFICIENCY: None 50
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: 6.a.1 Issue No.: 64-03-6.a.1-A-09
Description:
The Reception Center was not set-up in accordance with the extent-of-play agreement and/or the Franklin County Plan, (Appendix 3 Reception Center Operations), for demonstration of the facilities capabilities.
The extent-of-play from PEMA readsSet-up of the facility will be performed the same as for an actual emergency with all route markings and contamination control measures in place including step-off pads, with the exception of long runs of plastic covered with paper which will not be demonstrated In order for this facility to become operational in accordance with the Plan and the extent-of-play agreement prior to evacuees arriving, the following steps should be performed (not all inclusive): vehicle and people traffic flow patterns should be established in order to ensure that the spread of contamination can be controlled utilizing such items as cones, stanchions, rope, tape, plastic sheeting, rolls of paper, and step-off pads etc; receptacles for contaminated waste should be available; and an area to separate contaminated from non-contaminated individuals should be established; and evacuee processing should be controlled when each individual is moving from one stop-point to another. (NUREG-0654, J.10.h; J.12; K.5.a)
Corrective Action Demonstrated: The reception center set-up and operation was demonstrated in an outstanding manner in accordance with established guidelines. Vehicle and personnel traffic flow patterns were clearly established and effectively demonstrated utilizing signs, cones, stanchions, and tape.
Receptacles for contaminated waste were available, and contaminated personnel were kept separated from other evacuees. The staff was well trained and performed outstandingly.
- f. PRIOR ARCAs - UNRESOLVED: None 3.2.3 Monitoring/Decontamination and Mass Care Center - Chambersburg MS
- a. MET: 1.b.1 3.a.1 6.a.1 1.e.1 3.b.1 6.c.1
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None 51
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 3.3 Schuylkill County 3.3.1 Schuylkill County Emergency Operations Center
- a. MET: 1.a.1 5.a.1 6.a.1 1.b.1 1.c.1 1.d.1 1.e.1
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 3.3.2 Reception Center - Blue Mountain HS
- a. MET: 1.b.1 3.a.1 6.a.1 1.e.1 3.b.1 6.c.1
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 52
3.3.3 Monitoring/Decontamination and Mass Care Center - Pottsville MS
- a. MET: 1.b.1 3.a.1 6.a.1 1.e.1 3.b.1 6.c.1
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 4.0 School Districts 4.1 Cumberland County School Districts 4.1.1 West Shore SD - Red Mill ES
- a. MET: 3.c.2
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 4.2 Dauphin County School Districts 4.2.1 Central Dauphin SD - Central Dauphin East HS
- a. MET: 3.c.2
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None 53
- e. PRIOR ARCAs - RESOLVED: None
- a. MET: 3.c.2
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 4.2.3 Harrisburg SD - Harrisburg HS
- a. MET: 3.c.2
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: 3.c.2 Issue No.: 64-03-3.c.2-A Harrisburg School District - Foose Elementary School
Description:
Parents of children attending schools in the Harrisburg School District have not been informed of the plan or provided information as to where to pick up their children if they are sheltered or evacuated. (NUREG-0654 J.10.c, d, g)
Commonwealth Recommendation: This ARCA was successfully demonstrated during the 2005 exercise and should be deleted. The letter to parents was mailed in September 2004 at the beginning of the school year from the school district office which was evaluated during the out-of-sequence demonstration. The letter is displayed as Appendix 4, page 4-1 of the Harrisburg School District Emergency Evacuation Plan dated February 2005. A copy of this was provided to FEMA.
54
The fact that Foose Elementary School was not evaluated during this exercise does not mean this ARCA cannot be deleted. Foose Elementary School was not responsible for the issue. The school district was and they successfully proved they had remedied the problem during this exercise.
FEMA Response: Concur. This Prior ARCA is deemed corrected.
- f. PRIOR ARCAs - UNRESOLVED: None 4.2.4 Lower Dauphin SD - Lower Dauphin HS
- a. MET: 3.c.2
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 4.2.5 Middletown Area SD - Middletown HS
- a. MET: 3.c.2
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 4.2.6 Milton Hershey SD - Milton Hershey School
- a. MET: 3.c.2
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None 55
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- a. MET: 3.c.2
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 4.3 Lancaster County School Districts 4.3.1 Donegal SD - Maytown ES
- a. MET: 3.c.2
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- a. MET: 3.c.2
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None 56
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 4.4 Lebanon County School Districts 4.4.1 Palmyra Area SD - Palmyra HS
- a. MET: None
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 4.5 York County School Districts 4.5.1 Central York SD 4.5.1.1 Central York SD - Hayshire ES
- a. MET: 3.c.2
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- a. MET: 3.c.2 57
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- a. MET: 3.c.2
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 4.5.2.2 Northeastern SD - Spring Forge Intermediate
- a. MET: 3.c.2
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 4.5.3 Dover Area SD - Dover Intermediate
- a. MET: 3.c.2 58
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- a. MET: 3.c.2
- b. DEFICIENCY: None
- c. AREAS REQUIRING CORRECTIVE ACTION: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ARCAs - RESOLVED: None
- f. PRIOR ARCAs - UNRESOLVED: None 59
APPENDIX 1. ACRONYMS AND ABBREVIATIONS The following is a list of the acronyms and abbreviations used in this report.
A&N Alert and Notification AAC Accident Assessment Center ACP Access Control Point ALARA As Low As Reasonably Achievable ARC American Red Cross ARCA Area Requiring Corrective Action ARES Amateur Radio Emergency Service ATL Alternate Team Leader BRP Bureau of Radiation Protection CENIC Commonwealth Emergency News Information Center CFR Code of Federal Regulations cpm Counts per Minute cps Counts per Second Decon. Decontamination DRD Direct-Reading Dosimeter EAS Emergency Alert System ECL Emergency Classification Level EMA Emergency Management Agency EMC Emergency Management Coordinator EMS Emergency Medical Service(s)
EMT Emergency Medical Technician ENC Emergency News Center EOC Emergency Operations Center EOF Emergency Operations Facility EOP Emergency Operating Plan ES Elementary School EPLO Emergency Preparedness Liaison Officer EPZ Emergency Planning Zone ERT Emergency Response Team EW Emergency Worker FAA Federal Aviation Administration FEMA Federal Emergency Management Agency FR Federal Register FRERP Federal Radiological Emergency Response Plan GE General Emergency 60
HazMat Hazardous Materials HS High School ICF ICF Consulting JPIC Joint Public Information Center KI Potassium iodide Mon. Monitoring mR/h milliroentgen(s) per hour MS Middle School msl Mean sea level MW Megawatt NLT No Later Than NRC U.S. Nuclear Regulatory Commission NUREG-0654 NUREG-0654/FEMA-REP-1, Rev. 1, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants, November 1980 OOS Out-of-sequence ORO Offsite Response Organization PAD Protective Action Decision PAG Protective Action Guidelines PAR Protective Action Recommendation PEMA Pennsylvania Emergency Management Agency PIO Public Information Officer PRD Permanent Record Dosimeter PSP Pennsylvania State Police RAC Regional Assistance Committee RACES Radio Amateur Civil Emergency Service RadOff Radiological Officer REP Radiological Emergency Preparedness RERP Radiological Emergency Response Plan RO Radiological Officer SAE Site Area Emergency SD School District SEOC State Emergency Operations Center SOP Standard Operating Procedure(s)
TCP Traffic Control Point 61
TL Team Leader TMI Three Mile Island TSC Technical Support Center TWP Township USDA United States Department of Agriculture 62
APPENDIX 2. EXERCISE EVALUATORS AND TEAM LEADERS The following is a list of the personnel who evaluated the Three Mile Island (TMI) Nuclear Power Station Out-of-Sequence activities on May 3 & 4, and exercise on May 3, 2005.
Evaluator Team Leaders are indicated by the letters "(TL)" after the organization name. The organization each evaluator represents is indicated by the following abbreviations:
FEMA Federal Emergency Management Agency NRC U.S. Nuclear Regulatory Commission ICF ICF Consulting Position Name Organization RAC Chairperson Darrell Hammons FEMA Project Officer Al Henryson FEMA ICF Coordinator Roger B. Kowieski ICF I. BIENNIAL PLUME EXERCISE - May 3, 2005 Evaluation Site Evaluator Organization Commonwealth of Pennsylvania State Emergency Operations Center Angela Hough FEMA (TL)
Bob Duggleby ICF Bill Wark ICF Joint Public Information Anita Kellogg ICF Emergency News Center (EOF Coatesville) Ken Lott ICF Accident Assessment Center (State EOC/BRP) Harry Harrison ICF (Tech TL)
Accident Assessment Center (EOF Coatesville) Bob Bores NRC State Field Air Monitoring Team A Lyle Slagle ICF State Field Air Monitoring Team B Bill Neidermeyer ICF State Traffic/Access Control Points* Mack Lake ICF Stephen Mc Grail ICF Risk Jurisdictions Cumberland County Cumberland County EOC Chris Thompson FAA (TL)
Roy Smith ICF Jim Lightner ICF Mon./Decon., Reception & Mass Care Center Rowena Argall ICF (Shippensberg University)*
- Evaluated out-of-sequence on May 4, 2005. 63
Evaluation Site Evaluator Organization Emergency Worker Mon./Decon. Center (West Art Ball ICF Shore Borough FS #13)*
Lower Allen Township EOC Glenn Kinnear ICF Route Alerting (Hearing Impaired) (Lower Bart Freeman FEMA Allen Township)
Dauphin County Dauphin County EOC John Price FEMA (TL)
Alejandro Fernandez ICF Bill Vocke ICF Reception Center (Williams Valley HS)* John Flynn ICF Mon./Decon. & Mass Care Center (Halifax Hollis Berry ICF HS)*
Emergency Worker Mon./Decon. Center Lynn Mariano ICF (Harrisburg Area Community College)*
Harrisburg City EOC Mike Meshenberg ICF Paxtang Borough EOC Paul Neid ICF Route Alerting (Hearing Impaired) (Paxtang Landton Malone FEMA Borough)
Lancaster County Lancaster County EOC Kevin Keyes FEMA (TL)
Bob Rospenda ICF Steve Lowery ICF Reception Center (Park City Mall)* Bud Iannazzo ICF Mon./Decon. & Mass Care Center (Hempfield David Schweller ICF HS)*
Emergency Worker Mon./Decon. Center Bart W. Ray ICF Marietta FD*
Conoy Township EOC Patrick Twiss FEMA Route Alerting Team (Hearing Impaired)
Richard Smith ICF (Conoy Township)
Lebanon County Lebanon County EOC Pat Tenorio FEMA (TL)
Frank Bold ICF Jon Christiansen ICF Reception Center (Lebanon County Career &
Jim Willison ICF Tech Center)*
Mon./Decon. & Mass Care Center (Northern Dave Stuenkel ICF Lebanon HS)*
Emergency Worker Mon./Decon. Center Stan Maingi ICF (Annville Union Hose FD)*
South Londonderry Township EOC David Duncan ICF Route Alerting (South Londonderry Township) Laurel Ryan FEMA
- Evaluated out-of-sequence on May 4, 2005. 64
Evaluation Site Evaluator Organization York County York County EOC Ken Wierman FEMA (TL)
Nancy Johnson ICF Gary Goldberg ICF Mon./Decon., Reception & Mass Care Center Patrick Taylor ICF (Southern School Complex)*
Emergency Worker Mon./Decon. Center Daryl Thome ICF (Monahan FD)*
Dover Township EOC Wendy Swygert ICF David Goldbloom-Manchester Township EOC ICF Helzner Route Alerting (Hearing Impaired)
Tom Blosser FEMA (Manchester Township)
Lewisbury Borough/Newberry TWP EOC Bob Linck FEMA Northeast Area EOC (Mount Wolf and Tom McCance ICF Manchester Borough/E. Manchester TWP)
Support Jurisdictions Adams County ICF (TL - All Adams County EOC Harold Spedding Support Counties)
Mon./Decon., Reception & Mass Care Center Ed Wojnas ICF (Gettysburg MS)*
Franklin County Franklin County EOC Bob Black ICF Reception Center (Scotland School)* Larry Visniesky ICF Mon./Decon., & Mass Care Center Neil Gaeta ICF (Chambersburg MS)*
Schuylkill County Schuylkill County EOC Sam Nelson ICF Reception Center (Blue Mountain HS)* Bob Fernandez ICF Mon./Decon., & Mass Care Center (Pottsville Marynette Herndon ICF MS)*
II. Schools Evaluations (Out-of-Sequence) - May 3, 2005 Evaluation Site Evaluator Organization All Schools Roger Kowieski ICF (TL)
Cumberland County West Shore School District Rowena Argall ICF
- Evaluated out-of-sequence on May 4, 2005. 65
Evaluation Site Evaluator Organization Dauphin County Central Dauphin School District Hollis Berry ICF Derry Township School District Bob Fernandez ICF Harrisburg School District Ed Wojnas ICF Lower Dauphin School District Art Ball ICF Middletown Area School District Neil Gaeta ICF Milton Hershey School District Marynette Herndon ICF Steelton-Highspire School William Ulicny ICF Lancaster County Donegal School District David Schweller ICF Elizabethtown Area School District Bart W. Ray ICF Lebanon County Palmyra Area School District Dave Stuenkel ICF York County Central York School District Patrick Taylor ICF Daryl Thome ICF Northeastern School District Bud Iannazzo ICF Larry Visniesky ICF Dover School District Jim Willison ICF Eastern School District Peter Lejeune ICF
- Evaluated out-of-sequence on May 4, 2005. 66
APPENDIX 3. EXERCISE EVALUATION AREA CRITERIA AND EXTENT-OF-PLAY AGREEMENTS This appendix contains the extent-of-play agreements (EOPs) approved by FEMA Region III for the exercise activities and out-of-sequence demonstrations related to the 10-mile emergency planning zone (EPZ) surrounding the Three Mile Island (TMI) Nuclear Generating Station. The exercise was conducted in the evening on May 3, 2005. Out-of-sequence demonstrations were conducted in the morning on May 3, 2005, in the morning on May 4, 2005, and in the evening on May 4, 2005. The EOPs are arranged according to the exercise evaluation area criteria.
The exercise evaluation area criteria, contained in the Radiological Emergency Preparedness Exercise New Methodology represent a functional translation of the planning standards and evaluation criteria of NUREG-0654/FEMA-REP-1, Rev. 1, Criteria for the Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants, November 1980.
Because the exercise evaluation area criteria are intended for use at all nuclear power plant sites, and because of variations among off-site plans and procedures, an extent-of-play agreement is prepared by the State and approved by FEMA to provide evaluators with guidance on expected actual demonstration of the evaluation area criteria.
A. Exercise Evaluation Area Criteria Listed below are the specific radiological emergency preparedness evaluation area criteria scheduled for demonstration during this exercise.
EVALUATION AREA 1: EMERGENCY OPERATIONS MANAGEMENT Sub-element 1.a - Mobilization Criterion 1.a.1: OROs use effective procedures to alert, notify, and mobilize emergency personnel and activate facilities in a timely manner. (NUREG-0654, A.4; D.3, 4; E.1, 2; H.4)
Sub-element 1.b - Facilities Criterion 1.b.1: Facilities are sufficient to support the emergency response. (NUREG-0654, H.3) 67
Sub-element 1.c - Direction and Control Criterion 1.c.1: Key personnel with leadership roles for the ORO provide direction and control to that part of the overall response effort for which they are responsible. (NUREG-0654, A.1.d; A.2.a, b)
Sub-element 1.d - Communications Equipment Criterion 1.d.1: At least two communication systems are available, at least one operates properly, and communication links are established and maintained with appropriate locations.
Communications capabilities are managed in support of emergency operations. (NUREG-0654, F.1, 2)
Sub-element 1.e - Equipment and Supplies to Support Operations Criterion 1.e.1: Equipment, maps, displays, dosimetry, potassium iodide (KI), and other supplies are sufficient to support emergency operations. (NUREG-0654, H.7, 10; J.10.a, b, e; J.11; K.3.a)
EVALUATION AREA 2: PROTECTIVE ACTION DECISION-MAKING Sub-element 2.a - Emergency Worker Exposure Control Criterion 2.a.1: OROs use a decision-making process, considering relevant factors and appropriate coordination, to ensure that an exposure control system, including the use of KI, is in place for emergency workers including provisions to authorize radiation exposure in excess of administrative limits or protective action guides. (NUREG-0654, J.10.e, f; K.4)
Sub-element 2.b - Radiological Assessment and Protective Action Recommendations and Decisions for the Plume Phase of the Emergency Criterion 2.b.1: Appropriate protective action recommendations are based on available information on plant conditions, field monitoring data, and licensee and ORO dose projections, as well as knowledge of onsite and offsite environmental conditions. (NUREG-0654, I.8, 10; Supplement 3)
Sub-element 2.c - Protective Action Decisions Consideration for the Protection of Special Populations Criterion 2.c.1: Protective action decisions are made, as appropriate, for special population groups. (NUREG-0654, J.9, J.10.d, e) 68
EVALUATION AREA 3: PROTECTIVE ACTION IMPLEMENTATION Sub-element 3.a - Implementation of Emergency Worker Exposure Control Criterion 3.a.1: The OROs issue appropriate dosimetry and procedures, and manage radiological exposure to emergency workers in accordance with the plans and procedures.
Emergency workers periodically and at the end of each mission read their dosimeters and record the readings on the appropriate exposure record or chart. (NUREG-0654, K.3.a, b)
Sub-element 3.b - Implementation of KI Decision Criterion 3.b.1: KI and appropriate instructions are available should a decision to recommend use of KI be made. Appropriate recordkeeping of the administration of KI for emergency workers and institutionalized individuals (not the general public) is maintained. (NUREG-0654, J.10.e)
Sub-element 3.c - Implementation of Protective Actions for Special Populations Criterion 3.c.1: Protective action decisions are implemented for special populations other than schools within areas subject to protective actions. (NUREG-0654, J.10.c, d, g)
Criterion 3.c.2: OROs/School officials decide upon and implement protective actions for schools. (NUREG-0654, J.10.c, d, g)
Sub-element 3.d - Implementation of Traffic and Access Control Criterion 3.d.1: Appropriate traffic and access control is established. Accurate instructions are provided to traffic and access control personnel. (NUREG-0654, J.10.g, j)
Criterion 3.d.2: Impediments to evacuation are identified and resolved.
(NUREG-0654, J.10.k)
EVALUATION AREA 4: FIELD MEASUREMENT AND ANALYSIS Sub-element 4.a - Plume Phase Field Measurements and Analyses Criterion 4.a.1: The field teams are equipped to perform field measurements of direct radiation exposure (cloud and ground shine) and to sample airborne radioiodine and particulates. (NUREG-0654, H.10; I.7, 8, 9)
Criterion 4.a.2: Field teams are managed to obtain sufficient information to help characterize the release and to control radiation exposure. (NUREG-0654, I.8, 11; J.10.a; H.12)
Criterion 4.a.3: Ambient radiation measurements are made and recorded at appropriate locations, and radioiodine and particulate samples are collected. Teams will move to an appropriate low background location to determine whether any significant (as specified in the 69
plan and/or procedures) amount of radioactivity has been collected on the sampling media.
(NUREG-0654, I.9)
EVALUATION AREA 5: EMERGENCY NOTIFICATION AND PUBLIC INFORMATION Sub-element 5.a - Activation of the Prompt Alert and Notification System Criterion 5.a.1: Activities associated with primary alerting and notification of the public are completed in a timely manner following the initial decision by authorized offsite emergency officials to notify the public of an emergency situation. The initial instructional message to the public must include as a minimum the elements required by current FEMA REP guidance. (10 CFR Part 50, Appendix E.IV.D; NUREG-0654, E.5, 6, 7)
Sub-element 5.b - Emergency Information and Instructions for the Public and the Media Criterion 5.b.1: OROs provide accurate emergency information and instructions to the public and the news media in a timely manner. (NUREG-0654, E.5, 7; G.3.a, G.4.c)
EVALUATION AREA 6: SUPPORT OPERATION/FACILITIES Sub-element 6.a - Monitoring and Decontamination of Evacuees and Emergency Workers and Registration of Evacuees Criterion 6.a.1: The reception center/emergency worker facility has appropriate space, adequate resources, and trained personnel to provide monitoring, decontamination, and registration of evacuees and/or emergency workers. (NUREG-0654, J.10.h; J.12; K.5.a)
Sub-element 6.b - Monitoring and Decontamination of Emergency Worker Equipment Criterion 6.b.1: The facility/ORO has adequate procedures and resources for the accomplishment of monitoring and decontamination of emergency worker equipment, including vehicles. (NUREG-0654, K.5.b)
Sub-element 6.c - Temporary Care of Evacuees Criterion 6.c.1: Managers of congregate care facilities demonstrate that the centers have resources to provide services and accommodations consistent with American Red Cross planning guidelines. (Found in MASS CARE - Preparedness Operations, ARC 3031) Managers demonstrate the procedures to assure that evacuees have been monitored for contamination and have been decontaminated as appropriate before entering congregate care facilities. (NUREG-0654, J.10.h, J.12) 70
B. Extent-of-Play Agreement The extent-of-play agreement which follows was developed by the Commonwealth of Pennsylvania and submitted to FEMA Region III for approval. The agreement includes any significant modification or change in the level of demonstration of each exercise evaluation area criterion listed in Subsection A of this appendix. The extent-of-play agreement was approved by FEMA Region III on April 27, 2005.
THREE MILE ISLAND NUCLEAR GENERATING STATION 2005 RADIOLOGICAL EMERGENCY PREPAREDNESS EXERCISE METHOD OF OPERATION
- 1. Three Mile Island Nuclear Generating Station The facility normally uses off-watch section personnel to participate in the exercise. The plant's simulated events, radiation readings, and emergency classifications will trigger offsite exercise actions.
- 2. Bureau of Radiation Protection (BRP)
Personnel will be present at the State EOC, the nuclear facility EOF, and field locations; all areas will be evaluated.
- 3. PEMA Operations at State EOC PEMA Bureau of Operations and Training staff, augmented by designated PEMA personnel from the Fire Commissioner's Office, the Bureaus of Administration, Technical Services, Plans, plus Emergency Preparedness Liaison Officers (EPLOs) with accompanying response team members from designated State departments/agencies, including representatives from the USDA State Emergency Board, will comprise initial operations at the State EOC.
- 4. Counties Designated to Participate The five risk counties (Cumberland, Dauphin, Lancaster, Lebanon, and York), in coordination with PEMA, will demonstrate the capability to implement emergency response operations to include sheltering and/or evacuation. County government will provide direction and coordination to risk municipalities. Adams, Franklin, and Schuylkill Counties will participate in their assigned support roles.
- 5. PEMA Liaison Officers Liaison officers will be present at the participating risk county EOCs, the TMI Emergency Operations Facility (EOF), and the Emergency News Center (ENC) to provide assistance, 71
guidance, and support. These liaison officers will participate as players in the exercise and will be at their assigned location NLT 5:30 p.m. on May 3, 2005.
- 6. Controllers The utility will provide controllers at the monitoring/decontamination stations and monitoring/decontamination centers.
- 7. PEMA Observers PEMA staff, qualified county emergency management personnel, and/or nuclear power plant personnel will be assigned if required to key locations for the purpose of observing, noting response actions and conditions, and recording observations for future use. Observers will not take an active part in the proceedings, but will interact with staff members to the extent necessary to fulfill their observer responsibilities. Coaching of players by observers is not permitted except to provide training to participants awaiting a redemonstration. (Refer to paragraph 12)
- 8. FEMA Evaluators Federal evaluators will be present at the State, risk and support county EOCs, risk municipal EOCs, and at appropriate field locations to evaluate player response to the actual and simulated events in the exercise scenario. FEMA will evaluate one-third of the risk municipalities in Dauphin, Lancaster and York Counties plus one municipality each in Cumberland and Lebanon Counties.
- 9. Demonstration Windows The demonstration windows are those periods of time designated in the exercise during which specified demonstrations will be accomplished out-of-sequence. The purpose of the windows is to provide for more effective demonstrations as well as permitting the release of volunteers from the exercise play at a reasonable hour. There will be four out-of-sequence demonstrations during the exercise.
The out-of-sequence MS-1 hospital demonstration will be evaluated at the Good Samaritan Hospital in Lebanon on March 30, 2005.
The window for school demonstrations will be conducted out-of-sequence from 9:00 - 11:00 a.m. on May 3, 2005.
The demonstration for reception centers, mass care centers, monitoring/decontamination centers and stations will be conducted out-of-sequence from 7:00 - 9:30 p.m. on May 4, 2005.
The out-of-sequence demonstration Pennsylvania State Police traffic control/access control points will be from 9:00 - 11:00 a.m. on May 4, 2005.
72
County and municipal EOC operations will be conducted on the evening of May 3, 2005.
All demonstrations will commence promptly and, barring any complications, not continue past the end of the windows. (Refer to extent of Play Demonstration Tables)
- 10. Stand-down All jurisdictions will request approval on a jurisdiction by jurisdiction basis prior to stand-down.
- a. Upon completion of all requirements and after having informed the FEMA evaluator that all evaluation areas have been demonstrated and/or completed, the risk municipality EOCs may request approval from their county EOC to terminate the exercise.
- b. Support counties may likewise request approval to terminate the exercise upon completion of all evaluated objectives from the State EOC.
- c. The risk county EOCs will remain operational until the exercise is officially terminated by the State.
- 11. General Concepts An emergency plan is drafted to address the generally expected conditions of an emergency.
Not everything in the emergency plan may be applicable for a given scenario. The main purpose of an emergency plan is to assemble sufficient expertise and officials so as to properly react to the events as they occur. The responders should not be so tied to a plan that they cannot take actions that are more protective of the public. Therefore, if, by not following the plan, the responders protect the public equally as well as provided in the plan, it should be noted for possible modification of the plan, but not classified as a negative incident.
Furthermore, if, by following the plan there is a failure to protect the public health and safety, it should be noted so that the plan can be modified and the appropriate negative assessment applied.
- 12. Redemonstrations During the out-of-sequence demonstrations or the plume phase demonstrations any activity that is not satisfactorily demonstrated may be redemonstrated by the participants during the exercise provided it does not negatively interfere with the exercise. Refresher training can be provided by the players, observers, and/or controllers. Evaluators are not permitted to provide refresher training. Redemonstrations will be negotiated between the players, observers, controllers, and evaluators with prior approval from the RAC Chair. It is permissible to extend the evaluation time to accommodate the redemonstration. Activities corrected from a redemonstration will be so noted.
73
Three Mile Island Nuclear Generating Station 2005 Radiological Emergency Preparedness Exercise EXTENT OF PLAY AGREEMENT EVALUATION AREA 1 Emergency Operations Management Sub-element 1.a - Mobilization INTENT This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) should have the capability to alert, notify, and mobilize emergency personnel and to activate and staff emergency facilities.
Criterion 1.a.1: OROs use effective procedures to alert, notify, and mobilize emergency personnel and activate facilities in a timely manner. (NUREG-0654, A.4; D.3, 4; E.1, 2; H.4)
EXTENT OF PLAY Responsible OROs should demonstrate the capability to receive notification of an emergency situation from the licensee, verify the notification, and contact, alert, and mobilize key emergency personnel in a timely manner. Responsible OROs should demonstrate the activation of facilities for immediate use by mobilized personnel when they arrive to begin emergency operations. Activation of facilities should be completed in accordance with the plan and/or procedures. Pre-positioning of emergency personnel appropriate, in accordance with the extent of play agreement, at those facilities located beyond a normal commuting distance from the individuals duty location or residence. Further, pre-positioning of staff for out-of-sequence demonstrations is appropriate in accordance with the extent of play agreement.
All activities must be based on the OROs plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
PEMA Negotiated Extent of Play:
State agencies, risk and support counties, and risk municipalities will demonstrate call-outs.
All out-of-sequence players and equipment will be pre-positioned.
Sub-element 1.b - Facilities INTENT This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) have facilities to support the emergency response.
74
Criterion 1.b.1: Facilities are sufficient to support the emergency response. (NUREG-0654, H.3)
EXTENT OF PLAY Facilities will only be specifically evaluated for this criterion if they are new or have substantial changes in structure or mission. Responsible OROs should demonstrate the availability of facilities that support the accomplishment of emergency operations. Some of the areas to be considered are: adequate space, furnishings, lighting, restrooms, ventilation, backup power and/or alternate facility (if required to support operations.)
Facilities must be set up based on the OROs plans and procedures and demonstrated as they would be used in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
PEMA Negotiated Extent of Play:
One-third of ORO facilities will be evaluated during this exercise.
Sub-element 1.c - Direction and Control INTENT This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) have the capability to control their overall response to an emergency.
Criterion 1.c.1: Key personnel with leadership roles for the ORO provide direction and control to that part of the overall response effort for which they are responsible.
(NUREG-0654, A.1.d; A.2.a, b)
EXTENT OF PLAY Leadership personnel should demonstrate the ability to carry out essential functions of the response effort, for example: keeping the staff informed through periodic briefings and/or other means, coordinating with other appropriate OROs, and ensuring completion of requirements and requests.
All activities associated with direction and control must be performed based on the OROs plans and procedures and completed as they would be in an actual emergency, unless otherwise noted above or indicated in the extent of play agreement.
PEMA Negotiated Extent of Play: None Sub-element 1.d - Communications Equipment INTENT This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) should establish reliable primary and backup communication systems to 75
ensure communications with key emergency personnel at locations such as the following:
appropriate contiguous governments within the emergency planning zone (EPZ), Federal emergency response organizations, the licensee and its facilities, emergency operations centers (EOC), and field teams.
Criterion 1.d.1: At least two communication systems are available, at least one operates properly, and communication links are established and maintained with appropriate locations. Communications capabilities are managed in support of emergency operations. (NUREG-0654, F.1, 2)
EXTENT OF PLAY OROs will demonstrate that a primary and at least one backup system are fully functional at the beginning of an exercise. If a communications system or systems are not functional, but exercise performance is not affected, no exercise issue will be assessed. Communications equipment and procedures for facilities and field units should be used as needed for the transmission and receipt of exercise messages. All facilities and field teams should have the capability to access at least one communication system that is independent of the commercial telephone system. Responsible OROs should demonstrate the capability to manage the communication systems and ensure that all message traffic is handled without delays that might disrupt the conduct of emergency operations. OROs should ensure that a coordinated communication link for fixed and mobile medical support facilities exists. The specific communications capabilities of OROs should be commensurate with that specified in the response plan and/or procedures. Exercise scenarios could require the failure of a communications system and the use of an alternate system, as negotiated in the extent of play agreement.
All activities associated with the management of communications capabilities must be demonstrated based on the OROs plans and procedures and completed as they would be in an actual emergency, unless otherwise noted above or in the extent of play agreement.
PEMA Negotiated Extent of Play: None Sub-element 1.e - Equipment and Supplies to Support Operations INTENT This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) have emergency equipment and supplies adequate to support the emergency response.
Criterion 1.e.1: Equipment, maps, displays, dosimetry, potassium iodide (KI), and other supplies are sufficient to support emergency operations. (NUREG-0654, H.7, 10; J.10.a, b, e; J.11; K.3.a) 76
EXTENT OF PLAY Equipment within the facility (facilities) should be sufficient and consistent with the role assigned to that facility in the OROs plans and/or procedures in support of emergency operations. Use of maps and displays is encouraged.
All instruments should be inspected, inventoried, and operationally checked before each use.
Instruments should be calibrated in accordance with the manufacturers recommendations.
Unmodified CDV-700 series instruments and other instruments without a manufacturers recommendation should be calibrated annually. Modified CDV-700 instruments should be calibrated in accordance with the recommendation of the modification manufacturer. A label indicating such calibration should be on each instrument, or calibrated frequency can be verified by other means. Additionally, instruments being used to measure activity should have a range of reading sticker affixed to the side of the instrument. The above considerations should be included in 4.a.1 for field team equipment; 4.c.1 for radiological laboratory equipment (does not apply to analytical equipment; reception center and emergency worker facilities equipment under 6.a.1; and ambulance and medical facilities equipment under 6.d.1.
Sufficient quantities of appropriate direct-reading and permanent record dosimetry and dosimeter chargers should be available for issuance to all categories of emergency workers that could be deployed from that facility. Appropriate direct-reading dosimetry should allow individual(s) to read the administrative reporting limits and maximum exposure limits contained in the OROs plans and procedures.
Dosimetry should be inspected for electrical leakage at least annually and replaced, if necessary. CDV-138s, due to their documented history of electrical leakage problems, should be inspected for electrical leakage at least quarterly and replaced if necessary. This leakage testing will be verified during the exercise, through documentation submitted in the Annual Letter of Certification, and/or through a staff assistance visit.
Responsible OROs should demonstrate the capability to maintain inventories of KI sufficient for use by emergency workers, as indicated on rosters; institutionalized individuals, as indicated in capacity lists for facilities; and, where stipulated by the plan and/or procedures, members of the general public (including transients) within the plume pathway EPZ.
Quantities of dosimetry and KI available and storage locations(s) will be confirmed by physical inspection at storage location(s) or through documentation of current inventory submitted during the exercise, provided in the Annual Letter of Certification submission, and/or verified during a Staff Assistance Visit. Available supplies of KI should be within the expiration date indicated on KI bottles or blister packs. As an alternative, the ORO may produce a letter from a certified private or State laboratory indicating that the KI supply remains potent, in accordance with U.S. Pharmacopoeia standards.
At locations where traffic and access control personnel are deployed, appropriate equipment (for example, vehicles, barriers, traffic cones and signs, etc.) should be available or their availability described.
77
All activities must be based on the OROs plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
PEMA Negotiated Extent of Play:
In Pennsylvania CDV-700s are calibrated every 4-years.
Leakage testing verification and KI extension letters will be available to the evaluator upon request.
78
EVALUATION AREA 2 Protective Action Decision Making Sub-element 2.a - Emergency Worker Exposure Control INTENT This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) have the capability to assess and control the radiation exposure received by emergency workers and have a decision chain in place, as specified in the OROs plans and procedures, to authorize emergency worker exposure limits to be exceeded for specific missions.
Radiation exposure limits for emergency workers are the recommended accumulated dose limits or exposure rates emergency workers may be permitted to incur during an emergency.
These limits include any pre-established administrative reporting limits (that take into consideration Total Effective Dose Equivalent or organ-specific limits) identified in the OROs plans and procedures.
Criterion 2.a.1: OROs use a decision-making process, considering relevant factors and appropriate coordination, to insure that an exposure control system, including the use of KI, is in place for emergency workers including provisions to authorize radiation exposure in excess of administrative limits or protective action guides. (NUREG-0654, J.10.e, f; K.4)
EXTENT OF PLAY OROs authorized to send emergency workers into the plume exposure pathway EPZ should demonstrate a capability to meet the criterion based on their emergency plans and procedures.
Responsible OROs should demonstrate the capability to make decisions concerning the authorization of exposure levels in excess of pre-authorized levels and to the number of emergency workers receiving radiation dose above pre-authorized levels.
As appropriate, OROs should demonstrate the capability to make decisions on the distribution and administration of KI as a protective measure, based on the OROs plan and/or procedures or projected thyroid dose compared with the established Protective Action Guides (PAGs) for KI administration.
All activities must be based on the OROs plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
PEMA Negotiated Extent of Play: None 79
Sub-element 2.b - Radiological Assessment and Protective Action Recommendations and Decisions for the Plume Phase of the Emergency INTENT This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) have the capability to use all available data to independently project integrated dose and compare the estimated dose savings with the protective action guides.
OROs have the capability to choose, among a range of protective actions, those most appropriate in a given emergency situation. OROs base these choices on PAGs from the OROs plans and procedures or EPA 400-R-92-001 and other criteria, such as, plant conditions, licensee protective action recommendations, coordination of protective action decisions with other political jurisdictions (for example, other affected OROs), availability of appropriate in-place shelter, weather conditions, and situations that create higher than normal risk from evacuation.
Criterion 2.b.1: Appropriate protective action recommendations are based on available information on plant conditions, field monitoring data, and licensee and ORO dose projections, as well as knowledge of onsite and offsite environmental conditions.
(NUREG-0654, I.8, 10 and Supplement 3)
EXTENT OF PLAY During the initial stage of the emergency response, following notification of plant conditions that may warrant offsite protective actions, the ORO should demonstrate the capability to use appropriate means, described in the plan and/or procedures, to develop protective action recommendations (PARs) for decision-makers based on available information and recommendations from the licensee and field monitoring data, if available.
When the licensee provides release and meteorological data, the ORO also considers these data. The ORO should demonstrate a reliable capability to independently validate dose projections. The types of calculations to be demonstrated depend on the data available and the need for assessments to support the PARs appropriate to the scenario. In all cases, calculation of projected dose should be demonstrated. Projected doses should be related to quantities and units of the PAGs to which they will be compared. PARs should be promptly transmitted to decision-makers in a prearranged format.
Differences greater than a factor of 10 between projected doses by the licensee and the ORO should be discussed with the licensee with respect to the input data and assumptions used, the use of different models, or other possible reasons. Resolution of these differences should be incorporated into the PAR if timely and appropriate. The ORO should demonstrate the capability to use any additional data to refine projected doses and exposure rates and revise the associated PARs.
All activities must be based on the OROs plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
80
PEMA Negotiated Extent of Play: None Criterion 2.b.2: A decision-making process involving consideration of appropriate factors and necessary coordination is used to make protective action decisions (PAD) for the general public (including the recommendation for the use of KI, if ORO policy).
(NUREG-0654, J.9; J.10.f, m)
EXTENT OF PLAY OROs should have the capability to make both initial and subsequent PADs. They should demonstrate the capability to make initial PADs in a timely manner appropriate to the situation, based on notification from the licensee, assessment of plant status and releases, and PARs from the utility and ORO staff.
The dose assessment personnel may provide additional PARs based on the subsequent dose projections, field monitoring data, or information on plant conditions. The decision-makers should demonstrate the capability to change protective actions as appropriate based on these projections.
If the ORO has determined that KI will be used as a protective measure for the general public under off-site plans, then the ORO should demonstrate the capability to make decisions on the distribution and administration of KI as a protective measure for the general public to supplement shelter and evacuation. This decision should be based on the OROs plan and/or procedures or projected thyroid dose compared with the established PAG for KI administration. The KI decision-making process should involve close coordination with appropriate assessment and decision-making staff.
If more than one ORO is involved in decision-making, OROs should communicate and coordinate PADs with affected OROs. OROs should demonstrate the capability to communicate the contents of decisions to the affected jurisdictions.
All decision-making activities by ORO personnel must be performed based on the OROs plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
PEMA Negotiated Extent of Play: None Sub-element 2.c - Protective Action Decisions for the Protection of Special Populations INTENT This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) should have the capability to determine protective action recommendations, including evacuation, sheltering and use of potassium iodide (KI), if applicable, for special population groups (for example, hospitals, nursing homes, correctional facilities, schools, licensed day care centers, mobility impaired individuals, and transportation 81
dependent individuals). Focus is on those special population groups that are (or potentially will be) affected by a radiological release from a nuclear power plant.
Criterion 2.c.1: Protective action decisions are made, as appropriate, for special population groups. (NUREG-0654, J.9, J.10.d, e)
EXTENT OF PLAY Usually, it is appropriate to implement evacuation in areas where doses are projected to exceed the lower end of the range of PAGs, except for situations where there is a high-risk environment or where high-risk groups (e.g., the immobile or infirm) are involved. In these cases, examples of factors that should be considered are weather conditions, shelter availability, availability of transportation assets, risk of evacuation vs. risk from the avoided dose, and precautionary school evacuations. In situations were an institutionalized population cannot be evacuated, the administration of KI should be considered by the OROs.
Applicable OROs should demonstrate the capability to alert and notify all public school systems/districts of emergency conditions that are expected to or may necessitate protective actions for students. Contacts with public school systems/districts must be actual.
In accordance with plans and/or procedures, OROs and/or officials of pubic school systems/districts should demonstrate the capability to make prompt decisions on protective actions for students. Officials should demonstrate that the decision making process for protective actions considers (that is, either accepts automatically or gives heavy weight to) protective action recommendations made by ORO personnel, the ECL at which these recommendations are received, preplanned strategies for protective actions for that ECL, and the location of students at the time (for example, whether the students are still at home, en route to the school, or at the school).
All decision-making activities associated with protective actions, including consideration of available resources, for special population groups must be based on the OROs plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
PEMA Negotiated Extent of Play: None Sub-element 2.d - Radiological Assessment and Decision-Making for the Ingestion Exposure Pathway This sub-element will not be evaluated during this exercise.
Sub-element 2.e - Radiological Assessment and Decision-Making Concerning Relocation, Re-entry, and Return This sub-element will not be evaluated during this exercise.
82
EVALUATION AREA 3 Protective Action Implementation Sub-element 3.a - Implementation of Emergency Worker Exposure Control INTENT This sub-element derives from NUREG-0654, which provides that OROs should have the capability to provide for the following: distribution, use, collection, and processing of direct-reading dosimetry and permanent record dosimetry; the reading of direct-reading dosimetry by emergency workers at appropriate frequencies; maintaining a radiation dose record for each emergency worker; and establishing a decision chain or authorization procedure for emergency workers to incur radiation exposures in excess of protective action guides, always applying the ALARA (As Low As is Reasonably Achievable) principle as appropriate.
Criterion 3.a.1: The OROs issue appropriate dosimetry and procedures, and manage radiological exposure to emergency workers in accordance with the plans and procedures. Emergency workers periodically and at the end of each mission read their dosimeters and record the readings on the appropriate exposure record or chart.
(NUREG-0654, K.3.a, b)
EXTENT OF PLAY OROs should demonstrate the capability to provide appropriate direct-reading and permanent record dosimetry, dosimeter chargers, and instructions on the use of dosimetry to emergency workers. For evaluation purposes, appropriate direct-reading dosimetry is defined as dosimetry that allows individual(s) to read the administrative reporting limits (that are pre-established at a level low enough to consider subsequent calculation of Total Effective Dose Equivalent) and maximum exposure limits (for those emergency workers involved in life saving activities) contained in the OROs plans and procedures.
Each emergency worker should have the basic knowledge of radiation exposure limits as specified in the ORO's plan and/or procedures. Procedures to monitor and record dosimeter readings and to manage radiological exposure control should be demonstrated.
During a plume phase exercise, emergency workers should demonstrate the procedures to be followed when administrative exposure limits and turn-back values are reached. The emergency worker should report accumulated exposures during the exercise as indicated in the plans and procedures. OROs should demonstrate the actions described in the plan and/or procedures by determining whether to replace the worker, to authorize the worker to incur additional exposures or to take other actions. If scenario events do not require emergency workers to seek authorizations for additional exposure, evaluators should interview at least two emergency workers, to determine their knowledge of whom to contact in the event authorization is needed and at what exposure levels. Emergency workers may use any available resources (for example, written procedures and/or co-workers) in providing responses.
83
Although it is desirable for all emergency workers to each have a direct-reading dosimeter, there may be situations where team members will be in close proximity to each other during the entire mission and adequate control of exposure can be effected for all members of the team by one dosimeter worn by the team leader. Emergency workers who are assigned to low exposure rate areas, for example, at reception centers, counting laboratories, emergency operations centers, and communications centers, may have individual direct-reading dosimeters or they may be monitored by dosimeters strategically placed in the work area. It should be noted that, even in these situations, each team member must still have their own permanent record dosimetry. Individuals without specific radiological response missions, such as farmers for animal care, essential utility service personnel, or other members of the public who must re-enter an evacuated area following or during the plume passage, should be limited to the lowest radiological exposure commensurate with completing their missions.
All activities must be based on the OROs plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
PEMA Negotiated Extent of Play:
Radiological briefings will be provided to address exposure limits and procedures to replace those approaching limits and how permission to exceed limits is obtained from the municipality and county. Emergency workers will also be briefed on when to take KI and on whose authority. Distribution of KI will be simulated. The completion of a KI report form will be demonstrated.
OROs should also demonstrate the use of all dosimetry forms to emergency workers.
At any time, players may ask other players or supervisors to clarify radiological information.
In Pennsylvania, emergency workers outside of the EPZ do not have turnback values.
Emergency workers who are assigned to low exposure rate areas, e.g., at reception centers, counting laboratories, emergency operations centers, and communications centers, may have individual direct-reading dosimeters or they may be monitored by dosimeters strategically placed in the work area. In Pennsylvania this will be accomplished through the use of an area kit.
Standard issue of dosimetry and potassium iodide for each category of emergency worker is as follows:
Category A: 1 PRD, 1 DRD, and 1 unit of KI Category B: 1 PRD and 1 unit of KI Category C: 1 PRD Sample kits will be pre-distributed to the municipalities for demonstration purposes. These sample kits will consist of simulated PRDs and simulated KI, and instructions.
84
Sub-element 3.b - Implementation of KI Decision INTENT This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) should have the capability to provide radioprotective drugs for emergency workers, institutionalized individuals, and, if in the plan and/or procedures, to the general public for whom immediate evacuation may not be feasible, very difficult, or significantly delayed. While it is necessary for OROs to have the capability to provide KI to emergency workers and institutionalized individuals, the provision of KI to the general public is an ORO option and is reflected in OROs plans and procedures. Provisions should include the availability of adequate quantities, storage, and means of the distribution of radioprotective drugs.
Criterion 3.b.1: KI and appropriate instructions are available should a decision to recommend use of KI be made. Appropriate record keeping of the administration of KI for emergency workers and institutionalized individuals is maintained. (NUREG-0654, J.10.e)
EXTENT OF PLAY Offsite Response Organizations (ORO) should demonstrate the capability to make KI available to emergency workers, institutionalized individuals, and, where provided for in the ORO plan and/or procedures, to members of the general public. OROs should demonstrate the capability to accomplish distribution of KI consistent with decisions made. Organizations should have the capability to develop and maintain lists of emergency workers and institutionalized individuals who have ingested KI, including documentation of the date(s) and time(s) they were instructed to ingest KI. The ingestion of KI recommended by the designated ORO health official is voluntary. For evaluation purposes, the actual ingestion of KI is not necessary. OROs should demonstrate the capability to formulate and disseminate appropriate instructions on the use of KI for those advised to take it. If a recommendation is made for the general public to take KI, appropriate information should be provided to the public by the means of notification specified in the OROs plan and/or procedures.
Emergency workers should demonstrate the basic knowledge of procedures for the use of KI whether or not the scenario drives the use of KI. This can be accomplished through an interview by the evaluator.
All activities must be based on the OROs plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
PEMA Negotiated Extent of Play:
Pennsylvania plans call for issuance of KI to the general public.
85
Evaluation of KI quantities will be verified using inventory sheets and no KI will be removed from the storage location. Boxes will not be opened. KI questions will be addressed through interviews.
Monitoring/decontamination centers and stations personnel are not issued DRDs/KI since the centers/stations are located outside the EPZ.
Sub-element 3.c - Implementation of Protective Actions for Special Populations INTENT This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) should have the capability to implement protective action decisions, including evacuation and/or sheltering, for all special populations. Focus is on those special populations that are (or potentially will be) affected by a radiological release from a nuclear power plant.
Criterion 3.c.1: Protective action decisions are implemented for special populations other than schools within areas subject to protective actions. (NUREG-0654, J.10.c, d, g)
EXTENT OF PLAY Applicable OROs should demonstrate the capability to alert and notify (for example, provide protective action recommendations and emergency information and instructions) special populations (hospitals, nursing homes, correctional facilities, mobility impaired individuals, transportation dependent, etc.). OROs should demonstrate the capability to provide for the needs of special populations in accordance with the OROs plans and procedures.
Contact with special populations and reception facilities may be actual or simulated, as agreed to in the Extent of Play. Some contacts with transportation providers should be actual, as negotiated in the extent of play. All actual and simulated contacts should be logged.
All implementing activities associated with protective actions for special populations must be based on the OROs plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
PEMA Negotiated Extent of Play:
Lists of people with special needs are maintained at the municipal EOCs. Copies of these lists will not be provided to the evaluators however; evaluators will be able to inspect these lists during the exercise.
Initial contact with special populations and reception facilities will be simulated (hospitals, nursing homes and correctional facilities). All subsequent calls will be simulated. Actual contact will be made with a transportation provider. All actual and simulated contacts should be logged.
86
Criterion 3.c.2: OROs/School officials implement protective actions for schools.
(NUREG-0654, J.10.c, d, g)
EXTENT OF PLAY Public school systems/districts shall demonstrate the ability to implement protective action decisions for students. The demonstration shall be made as follows: At least one school in each affected school system or district, as appropriate, needs to demonstrate the implementation of protective actions. The implementation of canceling the school day, dismissing early, or sheltering should be simulated by describing to evaluators the procedures that would be followed. If evacuation is the implemented protective action, all activities to coordinate and complete the evacuation of students to reception centers, congregate care centers, or host schools may actually be demonstrated or accomplished through an interview process. If accomplished through an interview process, appropriate school personnel including decision making officials (e.g., superintendent/principal, transportation director/bus dispatcher), and at least one bus driver (and the bus drivers escort, if applicable) should be available to demonstrate knowledge of their role(s) in the evacuation of school children.
Communications capabilities between school officials and the buses, if required by the plan and/or procedures, should be verified.
Officials of the school system(s) should demonstrate the capability to develop and provide timely information to OROs for use in messages to parents, the general public, and the media on the status of protective actions for schools.
The provisions of this criterion also apply to any private schools, private kindergartens and day care centers that participate in REP exercises pursuant to the OROs plans and procedures as negotiated in the Extent of Play Agreement.
All activities must be based on the OROs plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
PEMA Negotiated Extent of Play:
Evacuation of students will be conducted through an interview process.
Role of the bus driver may be conducted through an interview with school or transportation officials if a bus driver is not available. Actual demonstration of the bus route is not required and will not be demonstrated.
Risk County school plans do not require communications between the school and vehicles.
Private schools, private kindergartens, and day care centers do not participate in REP exercises. However, OROs will be prepared to show evaluators lists of these facilities that they will contact in the event of an emergency IAW plans and procedures 87
Sub-element 3.d - Implementation of Traffic and Access Control INTENT This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) have the capability to implement protective action plans, including relocation and restriction of access to evacuated/sheltered areas. This sub-element focuses on selecting, establishing, and staffing of traffic and access control points and removal of impediments to the flow of evacuation traffic.
Criterion 3.d.1: Appropriate traffic and access control is established. Accurate instructions are provided to traffic and access control personnel. (NUREG-0654, J.10.g, j)
EXTENT OF PLAY OROs should demonstrate the capability to select, establish, and staff appropriate traffic and access control points, consistent with protective action decisions (for example, evacuating, sheltering, and relocation), in a timely manner. OROs should demonstrate the capability to provide instructions to traffic and access control staff on actions to take when modifications in protective action strategies necessitate changes in evacuation patterns or in the area(s) where access is controlled.
Traffic and access control staff should demonstrate accurate knowledge of their roles and responsibilities. This capability may be demonstrated by actual deployment or by interview, in accordance with the extent of play.
In instances where OROs lack authority necessary to control access by certain types of traffic (rail, water, and air traffic), they should demonstrate the capability to contact the State or Federal agencies with authority to control access.
All activities must be based on the OROs plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
PEMA Negotiated Extent of Play:
Traffic and access control will be demonstrated by interview - no deployment. A radiological briefing will be provided.
Criterion 3.d.2: Impediments to evacuation are identified and resolved. (NUREG-0654, J.10.k)
EXTENT OF PLAY OROs should demonstrate the capability, as required by the scenario, to identify and take appropriate actions concerning impediments to evacuation. Actual dispatch of resources to deal with impediments, such as wreckers, need not be demonstrated; however, all contacts, actual or simulated, should be logged.
88
All activities must be based on the OROs plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
PEMA Negotiated Extent of Play:
Upon request municipal and county staffs will be prepared to brief the evaluator on actions to be taken should there be an impediment to evacuation on a designated route.
Sub-element 3.e - Implementation of Ingestion Pathway Decisions This sub-element will not be evaluated during this exercise.
Sub-element 3.f - Implementation of Relocation, Re-entry, and Return Decisions This sub-element will not be evaluated during this exercise.
89
EVALUATION AREA 4 Field Measurement and Analysis Sub-element 4.a - Plume Phase Field Measurements and Analyses INTENT This sub-element derives from NUREG-0654, which provides that OROs should have the capability to deploy field teams with the equipment, methods, and expertise necessary to determine the location of airborne radiation and particulate deposition on the ground from an airborne plume. In addition, NUREG-0654 indicates that OROs should have the capability to use field teams within the plume emergency planning zone to measure airborne radioiodine in the presence of noble gases and to measure radioactive particulate material in the airborne plume. In the event of an accident at a nuclear power plant, the possible release of radioactive material may pose a risk to the nearby population and environment. Although accident assessment methods are available to project the extent and magnitude of a release, these methods are subject to large uncertainties. During an accident, it is important to collect field radiological data in order to help characterize any radiological release. Adequate equipment and procedures are essential to such field measurement efforts.
Criterion 4.a.1: The field teams are equipped to perform field measurements of direct radiation exposure (cloud and ground shine) and to sample airborne radioiodine and particulates. (NUREG-0654, H.10; I.7, 8, 9)
EXTENT OF PLAY Field teams should be equipped with all instrumentation and supplies necessary to accomplish their mission. This should include instruments capable of measuring gamma exposure rates and detecting the presence of beta radiation. These instruments should be capable of measuring a range of activity and exposure, including radiological protection/exposure control of team members and detection of activity on the air sample collection media, consistent with the intended use of the instrument and the OROs plans and procedures. An appropriate radioactive check source should be used to verify proper operational response for each low range radiation measurement instrument (less than 1 R/hr) and for high range instruments when available. If a source is not available for a high range instrument, a procedure should exist to operationally test the instrument before entering an area where only a high range instrument can make useful readings.
All activities must be based on the OROs plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
PEMA Negotiated Extent of Play:
Department of Environmental protection (DEP), Bureau of Radiation Protection (BRP) field teams are equipped with the necessary instrumentation and supplies. Evaluators will meet the field teams at the Southcentral Regional Office at 4:00 PM, May 3, 2005, to observe instrumentation checks and equipment inventory verification.
90
Criterion 4.a.2: Field teams are managed to obtain sufficient information to help characterize the release and to control radiation exposure. (NUREG-0654, H.12; I.8, 11; J.10.a)
EXTENT OF PLAY Responsible Offsite Response Organizations (ORO) should demonstrate the capability to brief teams on predicted plume location and direction, travel speed, and exposure control procedures before deployment.
Field measurements are needed to help characterize the release and to support the adequacy of implemented protective actions or to be a factor in modifying protective actions. Teams should be directed to take measurements in such locations, at such times to provide information sufficient to characterize the plume and impacts.
If the responsibility to obtain peak measurements in the plume has been accepted by licensee field monitoring teams, with concurrence from OROs, there is no requirement for these measurements to be repeated by State and local monitoring teams. If the licensee teams do not obtain peak measurements in the plume, it is the OROs decision as to whether peak measurements are necessary to sufficiently characterize the plume. The sharing and coordination of plume measurement information among all field teams (licensee, federal, and ORO ) is essential. Coordination concerning transfer of samples, including a chain-of-custody form, to a radiological laboratory should be demonstrated.
OROs should use Federal resources as identified in the Federal Radiological Emergency Response Plan (FRERP), and other resources (for example, compacts, utility, etc), if available.
Evaluation of this criterion will take into consideration the level of Federal and other resources participating in the exercise.
All activities must be based on the OROs plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
PEMA Negotiated Extent of Play:
Field Team control is expected to initially be out-of-sequence with the plume timeline.
During the exercise the field teams will be directed to take measurements in locations to provide information sufficient to characterize the plume and impacts.
Criterion 4.a.3: Ambient radiation measurements are made and recorded at appropriate locations, and radioiodine and particulate samples are collected. Teams will move to an appropriate low background location to determine whether any significant (as specified in the plan and/or procedures) amount of radioactivity has been collected on the sampling media. (NUREG-0654, I.9) 91
EXTENT OF PLAY Field teams should demonstrate the capability to report measurements and field data pertaining to the measurement of airborne radioiodine and particulates and ambient radiation to the field team coordinator, dose assessment, or other appropriate authority. If samples have radioactivity significantly above background, the appropriate authority should consider the need for expedited laboratory analyses of these samples. OROs should share data in a timely manner with all appropriate OROs. All methodology, including contamination control, instrumentation, preparation of samples, and a chain-of-custody form for transfer to a laboratory, will be in accordance with the ORO plan and/or procedures.
OROs should use Federal resources as identified in the FRERP, and other resources (for example, compacts, utility, nuclear insurers, etc), if available. Evaluation of this criterion will take into consideration the level of Federal and other resources participating in the exercise.
All activities must be based on the OROs plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
PEMA Negotiated Extent of Play:
Measurements will be made by Department of Environmental Protection (DEP), Bureau of Radiation Protection (BRP), in accordance with the State Annex E, Appendix 6, and BRP Standard Implementing Procedures (IPs). Two mobile monitoring teams from BRP (Southcentral Regional Office) will demonstrate ambient radiation monitoring and radioiodine and particulate sampling. Field teams will be equipped with appropriate dosimetry and KI.
Both teams will be evaluated by FEMA. Each team will be directed to pre-determined monitoring points and perform actual radiation measurements at the first three locations and simulated measurements at the remaining locations. An actual air sample will be taken at the first pre-determined location. Teams will then take additional simulated air samples, as directed, at additional locations, if conditions are appropriate for radioiodine sampling and relay information to the Sate EOC. In place of silver zeolite cartridges, charcoal cartridges will be used for the exercise. All measurements will be forwarded to the State EOC immediately upon obtaining data. Evaluators will meet the field teams at the Southcentral Regional Office at 4:00 P.M., May 3, 2005.
Sub-element 4.b - Post Plume Phase Field Measurements and Sampling This sub-element will not be evaluated during this exercise.
Sub-element 4.c - Laboratory Operations This sub-element will not be evaluated during this exercise.
92
EVALUATION AREA 5 Emergency Notification and Public Information Sub-element 5.a - Activation of the Prompt Alert and Notification System INTENT This sub-element derives from NUREG-0654, which provides that OROs should have the capability to provide prompt instructions to the public within the plume pathway EPZ.
Specific provisions addressed in this sub-element are derived from the Nuclear Regulatory Commission (NRC) regulations (10 CFR Part 50, Appendix E.IV.D.), and FEMA-REP-10, "Guide for the Evaluation of Alert and Notification systems for Nuclear Power Plants."
Criterion 5.a.1: Activities associated with primary alerting and notification of the public are completed in a timely manner following the initial decision by authorized offsite emergency officials to notify the public of an emergency situation. The initial instructional message to the public must include as a minimum the elements required by current FEMA REP guidance. (10 CFR Part 50, Appendix E.IV.D and NUREG-0654, E.5, 6, 7)
EXTENT OF PLAY Responsible Offsite Response Organizations (ORO) should demonstrate the capability to sequentially provide an alert signal followed by an initial instructional message to populated areas (permanent resident and transient) throughout the 10-mile plume pathway EPZ.
Following the decision to activate the alert and notification system, in accordance with the OROs plan and/or procedures, completion of system activation should be accomplished in a timely manner (will not be subject to specific time requirements) for primary alerting/notification. The initial message should include the elements required by current FEMA REP guidance.
Offsite Response Organizations (OROs) with route alerting as the primary method of alerting and notifying the public should demonstrate the capability to accomplish the primary route alerting, following the decision to activate the alert and notification system, in a timely manner (will not be subject to specific time requirements) in accordance with the OROs plan and/or procedures. At least one route needs to be demonstrated and evaluated. The selected route(s) should vary from exercise to exercise. However, the most difficult route should be demonstrated at least once every six years. All alert and notification activities along the route should be simulated (that is, the message that would actually be used is read for the evaluator, but not actually broadcast) as agreed upon in the extent of play. Actual testing of the mobile public address system will be conducted at some agreed upon location. The initial message should include the elements required by current FEMA REP guidance.
For exercise purposes, timely is defined as the responsible ORO personnel/representatives demonstrate actions to disseminate the appropriate information/instructions with a sense of urgency and without undue delay. If message dissemination is to be identified as not having 93
been accomplished in a timely manner, the evaluator(s) will document a specific delay or cause as to why a message was not considered timely.
Procedures to broadcast the message should be fully demonstrated as they would in an actual emergency up to the point of transmission. Broadcast of the message(s) or test messages is not required. The alert signal activation may be simulated. However, the procedures should be demonstrated up to the point of actual activation.
The capability of the primary notification system to broadcast an instructional message on a 24-hour basis should be verified during an interview with appropriate personnel from the primary notification system.
All activities for this criterion must be based on the OROs plans and procedures and completed as they would be in an actual emergency, except as noted above or otherwise indicated in the extent of play agreement.
PEMA Negotiated Extent of Play:
All actions to broadcast stations will be simulated. Systems that use automatic sending technology may be demonstrated by interview.
One municipality per risk county will demonstrate route alerting for hearing impaired residents within their jurisdiction.
Criterion 5.a.2: [RESERVED]
Criterion 5.a.3: Activities associated with FEMA approved exception areas (where applicable) are completed within 45 minutes of the initial decision by authorized offsite emergency officials to notify the public of an emergency situation. Backup alert and notification of the public is completed within 45 minutes following the detection by the ORO of a failure of the primary alert and notification system. (NUREG-0654, E.6; Appendix 3: B.2.c)
EXTENT OF PLAY Offsite Response Organizations (ORO) with FEMA-approved exception areas (identified in the approved Alert and Notification System Design Report) 5-10 miles from the nuclear power plant should demonstrate the capability to accomplish primary alerting and notification of the exception area(s) within 45 minutes following the initial decision by authorized offsite emergency officials to notify the public of an emergency situation. The 45-minute clock will begin when the OROs make the decision to activate the alert and notification system for the first time for a specific emergency situation. The initial message should, at a minimum, include: a statement that an emergency exists at the plant and where to obtain additional information.
For exception area alerting, at least one route needs to be demonstrated and evaluated. The selected route(s) should vary from exercise to exercise. However, the most difficult route 94
should be demonstrated at least once every six years. All alert and notification activities along the route should be simulated (that is, the message that would actually be used is read for the evaluator, but not actually broadcast) as agreed upon in the extent of play. Actual testing of the mobile public address system will be conducted at some agreed-upon location.
Backup alert and notification of the public should be completed within 45 minutes following the detection by the ORO of a failure of the primary alert and notification system. Backup route alerting only needs to be demonstrated and evaluated, in accordance with the OROs plan and/or procedures and the extent of play agreement, if the exercise scenario calls for failure of any portion of the primary system(s), or if any portion of the primary system(s) actually fails to function. If demonstrated, only one route needs to be selected and demonstrated. All alert and notification activities along the route should be simulated (that is, the message that would actually be used is read for the evaluator, but not actually broadcast) as agreed upon in the extent of play. Actual testing of the mobile public address system will be conducted at some agreed-upon location.
All activities for this criterion must be based on the OROs plans and procedures and completed as they would be in an actual emergency, except as noted above or otherwise indicated in the extent of play agreement.
PEMA Negotiated Extent of Play:
There are no exception areas in the TMI EPZ.
Sub-element 5.b - Emergency Information and Instructions for the Public and the Media INTENT This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) should have the capability to disseminate to the public appropriate emergency information and instructions, including any recommended protective actions. In addition, NUREG-0654 provides that OROs should ensure that the capability exists for providing information to the media. This includes the availability of a physical location for use by the media during an emergency. NUREG-0654 also provides that a system should be available for dealing with rumors. This system will hereafter be known as the public inquiry hotline.
Criterion 5.b.1: OROs provide accurate emergency information and instructions to the public and the news media in a timely manner. (NUREG-0654, E.5, 7; G.3.a; G.4.c)
EXTENT OF PLAY Subsequent emergency information and instructions should be provided to the public and the media in a timely manner (will not be subject to specific time requirements). For exercise purposes, timely is defined as the responsible ORO personnel/representatives demonstrate actions to disseminate the appropriate information/instructions with a sense of urgency and without undue delay. If message dissemination is to be identified as not having been 95
accomplished in a timely manner, the evaluator(s) will document a specific delay or cause as to why a message was not considered timely.
The ORO should ensure that emergency information and instructions are consistent with protective action decisions made by appropriate officials. The emergency information should contain all necessary and applicable instructions (for example, evacuation instructions, evacuation routes, reception center locations, what to take when evacuating, information concerning pets, shelter-in-place instructions, information concerning protective actions for schools and special populations, public inquiry telephone number, etc.) to assist the public in carrying out protective action decisions provided to them. The ORO should also be prepared to disclose and explain the Emergency Classification Level (ECL) of the incident. At a minimum, this information must be included in media briefings and/or media releases. OROs should demonstrate the capability to use language that is clear and understandable to the public within both the plume and ingestion pathway EPZs. This includes demonstration of the capability to use familiar landmarks and boundaries to describe protective action areas.
The emergency information should be all-inclusive by including previously identified protective action areas that are still valid, as well as new areas. The OROs should demonstrate the capability to ensure that emergency information that is no longer valid is rescinded and not repeated by broadcast media. In addition, the OROs should demonstrate the capability to ensure that current emergency information is repeated at pre-established intervals in accordance with the plan and/or procedures.
OROs should demonstrate the capability to develop emergency information in a non-English language when required by the plan and/or procedures.
If ingestion pathway measures are exercised, OROs should demonstrate that a system exists for rapid dissemination of ingestion pathway information to pre-determined individuals and businesses in accordance with the OROs plan and/or procedures.
OROs should demonstrate the capability to provide timely, accurate, concise, and coordinated information to the news media for subsequent dissemination to the public. This would include demonstration of the capability to conduct timely and pertinent media briefings and distribute media releases as the situation warrants. The OROs should demonstrate the capability to respond appropriately to inquiries from the news media. All information presented in media briefings and media releases should be consistent with protective action decisions and other emergency information provided to the public. Copies of pertinent emergency information (e.g., EAS messages and media releases) and media information kits should be available for dissemination to the media.
OROs should demonstrate that an effective system is in place for dealing with calls to the public inquiry hotline. Hotline staff should demonstrate the capability to provide or obtain accurate information for callers or refer them to an appropriate information source.
Information from the hotline staff, including information that corrects false or inaccurate information when trends are noted, should be included, as appropriate, in emergency information provided to the public, media briefings, and/or media releases.
96
All activities for this criterion must be based on the OROs plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
PEMA Negotiated Extent of Play: None 97
EVALUATION AREA 6 Support Operation/Facilities Sub-element 6.a - Monitoring and Decontamination of Evacuees and Emergency Workers and Registration of Evacuees INTENT This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) have the capability to implement radiological monitoring and decontamination of evacuees and emergency workers, while minimizing contamination of the facility, and registration of evacuees at reception centers.
Criterion 6.a.1: The reception center/emergency worker facility has appropriate space, adequate resources, and trained personnel to provide monitoring, decontamination, and registration of evacuees and/or emergency workers. (NUREG-0654, J.10.h; J.12; K.5.a)
EXTENT OF PLAY Radiological monitoring, decontamination, and registration facilities for evacuees/ emergency workers should be set up and demonstrated as they would be in an actual emergency or as indicated in the extent of play agreement. This would include adequate space for evacuees vehicles. Expected demonstration should include 1/3 of the monitoring teams/portal monitors required to monitor 20% of the population allocated to the facility within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. Before using monitoring instrument(s), the monitor(s) should demonstrate the process of checking the instrument(s) for proper operation.
Staff responsible for the radiological monitoring of evacuees should demonstrate the capability to attain and sustain a monitoring productivity rate per hour needed to monitor the 20% emergency planning zone (EPZ) population planning base within about 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. This monitoring productivity rate per hour is the number of evacuees that can be monitored per hour by the total complement of monitors using an appropriate monitoring procedure. A minimum of six individuals per monitoring station should be monitored, using equipment and procedures specified in the plan and/or procedures, to allow demonstration of monitoring, decontamination, and registration capabilities. The monitoring sequences for the first six simulated evacuees per monitoring team will be timed by the evaluators in order to determine whether the twelve-hour requirement can be meet. Monitoring of emergency workers does not have to meet the twelve-hour requirement. However, appropriate monitoring procedures should be demonstrated for a minimum of two emergency workers.
Decontamination of evacuees/emergency workers may be simulated and conducted by interview. The availability of provisions for separately showering should be demonstrated or explained. The staff should demonstrate provisions for limiting the spread of contamination.
Provisions could include floor coverings, signs and appropriate means (for example, partitions, roped-off areas) to separate clean from potentially contaminated areas. Provisions should also exist to separate contaminated and uncontaminated individuals, provide changes of clothing for individuals whose clothing is contaminated, and store contaminated clothing and personal 98
belongings to prevent further contamination of evacuees or facilities. In addition, for any individual found to be contaminated, procedures should be discussed concerning the handling of potential contamination of vehicles and personal belongings.
Monitoring personnel should explain the use of action levels for determining the need for decontamination. They should also explain the procedures for referring evacuees who cannot be adequately decontaminated for assessment and follow up in accordance with the OROs plans and procedures. Contamination of the individual will be determined by controller inject and not simulated with any low-level radiation source.
The capability to register individuals upon completion of the monitoring and decontamination activities should be demonstrated. The registration activities demonstrated should include the establishment of a registration record for each individual, consisting of the individuals name, address, results of monitoring, and time of decontamination, if any, or as otherwise designated in the plan. Audio recorders, camcorders, or written records are all acceptable means for registration.
All activities associated with this criterion must be based on the OROs plans and procedures and completed, as they would be in an actual emergency, unless otherwise indicated in the extent of play agreement.
PEMA Negotiated Extent of Play:
Expected demonstration should include a roster of the monitoring teams/portal monitors required to monitor 20% of the population allocated to the facility within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
Water from decontamination activities may go directly to a storm drain or other sewer or drain system or area normally designated for wastewater that has been used for bathing or washing of vehicles and or equipment.
At each reception center, a minimum of three volunteer evacuees will be processed, briefed, issued the appropriate strip map or directions, and instructed to proceed to a mass care center designated for demonstration of monitoring, decontamination, and registration. A sample of the appropriate strip maps or directions will be made available for the demonstration.
One mass care center and one monitoring/decontamination center per risk county will be demonstrated during the out-of-sequence window. All monitoring and decontamination teams will demonstrate monitoring, decontamination and registration procedures at one mass care center per county. The risk counties will provide space at designated mass care centers for operation of monitoring/decontamination centers. Schematics of these monitoring
/decontamination centers will be available to show organization within the facility and space management for monitoring and for decontamination of the evacuating public. Procedures will be demonstrated to show minimizing contamination of the facility and separation of contaminated and non-contaminated (clean) individuals.
At the evacuee monitoring/decontamination centers each team, consisting of a minimum of two persons (monitor and recorder), will monitor a minimum of six (6) volunteer evacuees or 99
one (1) volunteer evacuee six times , complete the Monitoring/Decontamination Report Form (either by demonstration or explanation), and instruct the evacuees to proceed to the mass care registration points for further processing. The teams will demonstrate: radiological monitoring of at least one vehicle and the simulated decontamination of at least two evacuees, one unable to be decontaminated based on controller inject data. Discussions concerning processing of contaminated personnel will include capabilities and written procedures for showering females separate from males A CD V-700, or other survey meter, will be issued to each team. For Portal Monitor Use refer to paragraph below. PRDs will be simulated.
At the emergency worker monitoring/decontamination stations each team, consisting of a minimum of two persons (monitor and recorder), will monitor one emergency worker, and complete the Monitoring/Decontamination Report Form (either by demonstration or explanation). Discussions concerning processing of contaminated personnel will include capabilities and written procedures for showering females separate from males. A CD V-700, or other survey meter, will be issued to each team. For Portal Monitor Use refer to next paragraph. PRDs will be simulated.
(Portal Monitor Use) Risk and Support counties may, during this exercise, utilize portal monitors to monitor simulated evacuees and emergency workers. In the instances where a portal monitor is used a draft/interim procedure/guidelines may be used, for this evaluation.
The monitoring/ decontamination team requirements will be based on the portal monitor capabilities as applicable based on the draft/interim procedure/guidelines, and manufactures recommendations.
Monitoring/decontamination centers and station personnel are not issued DRDs or KI since the centers and stations are outside the EPZ.
Radiation contamination data for the evacuees and vehicle will be provided by the controller and must be included in the scenario package. Set-up of the facility will be performed the same as for an actual emergency with all route markings and contamination control measures in place or explained. The materials will be available and explained. Positioning of a fire apparatus on-site may be simulated if otherwise required.
Sub-element 6.b - Monitoring and Decontamination of Emergency Worker Equipment INTENT This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) have the capability to implement radiological monitoring and decontamination of emergency worker equipment, including vehicles.
Criterion 6.b.1: The facility/ORO has adequate procedures and resources for the accomplishment of monitoring and decontamination of emergency worker equipment, including vehicles. (NUREG-0654, K.5.b) 100
EXTENT OF PLAY The monitoring staff should demonstrate the capability to monitor equipment, including vehicles, for contamination in accordance with the Offsite Response Organizations (ORO) plans and procedures. Specific attention should be given to equipment, including vehicles, that was in contact with individuals found to be contaminated. The monitoring staff should demonstrate the capability to make decisions on the need for decontamination of equipment, including vehicles, based on guidance levels and procedures stated in the plan and/or procedures.
The area to be used for monitoring and decontamination should be set up as it would be in an actual emergency, with all route markings, instrumentation, record keeping and contamination control measures in place. Monitoring procedures should be demonstrated for a minimum of one vehicle. It is generally not necessary to monitor the entire surface of vehicles. However, the capability to monitor areas such as radiator grills, bumpers, wheel wells, tires, and door handles should be demonstrated. Interior surfaces of vehicles that were in contact with individuals found to be contaminated should also be checked.
Decontamination capabilities, and provisions for vehicles and equipment that cannot be decontaminated, may be simulated and conducted by interview.
All activities associated with this criterion must be based on the OROs plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
PEMA Negotiated Extent of Play:
Emergency worker station personnel will consist of a minimum of one monitor and one recorder and sufficient personnel to demonstrate monitoring of at least one vehicle.
Schematics of these monitoring/decontamination stations will be available to show organization and space management within the facility. The evaluator will request that decontamination procedures be explained after the vehicle which has simulated contamination has been monitored. One CD V-700, or other survey meter, will be issued to each monitoring/decontamination team. One vehicle and/or piece of equipment will not be able to be decontaminated. Simulated radiation contamination data will be included in the scenario package, and injected by a controller. Set-up of the facility will be performed as closely as possible to that for an actual emergency with all route markings in place including step-off pads; with the exception of long runs of plastic covered with paper which will not be demonstrated, but the materials will be available and explained.
Decontamination capabilities, and provisions for vehicles and equipment that cannot be decontaminated, will be simulated and conducted by interview.
101
Sub-element 6.c - Temporary Care of Evacuees INTENT This sub-element derives from NUREG-0654, which provides that Offsite Response Organizations (ORO) demonstrate the capability to establish relocation centers in host areas.
The American Red Cross (ARC) normally provides congregate care in support of OROs under existing letters of agreement.
Criterion 6.c.1: Managers of congregate care facilities demonstrate that the centers have resources to provide services and accommodations consistent with American Red Cross planning guidelines. (Found in MASS CARE - Preparedness Operations, ARC 3031)
Managers demonstrate the procedures to assure that evacuees have been monitored for contamination and have been decontaminated as appropriate before entering congregate care facilities. (NUREG-0654, J.10.h; J.12)
EXTENT OF PLAY Under this criterion, demonstration of congregate care centers may be conducted out-of-sequence with the exercise scenario. The evaluator should conduct a walk-through of the center to determine, through observation and inquiries, that the services and accommodations are consistent with ARC 3031. In this simulation, it is not necessary to set up operations as they would be in an actual emergency. Alternatively, capabilities may be demonstrated by setting up stations for various services and providing those services to simulated evacuees.
Given the substantial differences between demonstration and simulation of this objective, exercise demonstration expectations should be clearly specified in extent-of-play agreements.
Congregate care staff should also demonstrate the capability to ensure that evacuees have been monitored for contamination, have been decontaminated as appropriate, and have been registered before entering the facility. This capability may be determined through an interview process.
If operations at the center are demonstrated, material that would be difficult or expensive to transport (for example, cots, blankets, sundries, and large-scale food supplies) need not be physically available at the facility (facilities). However, availability of such items should be verified by providing the evaluator a list of sources with locations and estimates of quantities.
All activities associated with this criterion must be based on the OROs plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement.
PEMA Negotiated Extent of Play:
Capabilities will be demonstrated through an interview process. Personnel, at a minimum, will consist of one manager and assistant for each mass care center opened.
102
Sub-element 6.d - Transportation and Treatment of Contaminated Injured Individuals This sub-element will be evaluated at the Good Samaritan Hospital in Lebanon on March 30, 2005.
103
Three Mile Island Nuclear Generating Station Extent of Play Demonstration Tables RISK DEMONSTRATION FOR EOC MOBILIZATION COUNTY FOR COUNTIES AND MUNICIPALITIES MUNICIPALITY DATE Lower Allen Township 3-May-05 Cumberland New Cumberland Borough 3-May-05 Conewago Township 3-May-05 Derry Township 3-May-05 Harrisburg City 3-May-05 Highspire Borough 3-May-05 Londonderry Township 3-May-05
- Lower Dauphin Area 3-May-05 Dauphin Lower Paxton Township 3-May-05 Lower Swatara Township 3-May-05
- Middletown/Royalton Boroughs 3-May-05 Paxtang Borough 3-May-05 Steelton Borough 3-May-05 Swatara Township 3-May-05 Conoy Township 3-May-05 East Donegal Township 3-May-05 Lancaster
- Elizabethtown Borough/West Donegal Township/ 3-May-05 Mount Joy Township Lebanon South Londonderry Township 3-May-05 Conewago Township 3-May-05 Dover Township 3-May-05 Fairview Township 3-May-05 Goldsboro Borough 3-May-05 Hellam Township 3-May-05 York *Lewisberry Borough/Newberry Township 3-May-05 Manchester Township 3-May-05
- Northeast Area 3-May-05 Springettsbury Township 3-May-05
- Warrington Township/Wellsville Borough 3-May-05 York Haven Borough 3-May-05
- Joint EOC 104
- 1. One reception center in each county.
County Reception Center Locations Quantity Cumberland Shippensberg University 1 Dauphin Williams Valley High School 1 Lancaster Park City Mall 1 Lebanon Lebanon County Career and Tech Center 1 York Southern School Complex 1 Adams Gettysburg Middle School 1 Franklin Scotland School 1 Schuylkill Blue Mountain High School 1
- 2. One mass care center and monitoring/decontamination center in each county will be evaluated.
County Mass Care Center Locations Quantity Cumberland Shippensberg University 1 Dauphin Halifax High School 1 Lancaster Hempfield High School 1 Lebanon Northern Lebanon High School 1 York Southern School Complex 1 Adams Gettysburg Middle School 1 Franklin Chambersburg Middle School 1 Schuylkill Pottsville Middle School 1 American Red Cross Chapters and POCs are as follows:
Lebanon County Chapter ARC of the Susquehanna Valley 1220 Mifflin Street 1804 N. Sixth Street, P.O. Box 5740 Lebanon, PA 17046 Harrisburg, PA 17110 Dawn Vitez (717) 273-2671 Matt Hollis (717) 234-3101 Cumberland County Chapter Adams County Chapter 1710 Ritner Highway (Combined with York County)
Carlisle, PA 17013 Sherle Davis (717) 243-5211 Schuylkill County Chapter 1402 Laurel Boulevard Franklin County Chapter Pottsville, PA 25 Penncraft Avenue March Mennig (570) 622-9550 Chambersburg, PA 17201 Janet Diller (717) 264-6214 105
York County Chapter 724 South George Street York, PA 17403 Robert Straw (717) 845-2751
- 3. Emergency worker monitoring/decontamination station for the risk county(s).
Cumberland West Shore Borough FS #13 May 4, 2005 Dauphin Harrisburg Area Community College May 4, 2005 Lancaster Marietta FD May 4, 2005 Lebanon Annville Union Hose FD May 4, 2005 York Monahan FD May 4, 2005
- 4. One hearing impaired notification or one route alerting demonstration by one municipality in each risk county.
Cumberland Lower Allen Township May 3, 2005 Dauphin Paxtang Borough May 3, 2005 Lancaster Conoy Township May 3, 2005 Lebanon South Londonderry Township May 3, 2005 York Manchester Township May 3, 2005
- 5. Risk School Districts with schools in the EPZ and those districts outside the EPZ but with students living within the EPZ will participate and will be evaluated by FEMA. These include (all schools within EPZ):
COUNTY SCHOOL DISTRICT SCHOOL Cumberland *West Shore Red Mill Elementary
- Central Dauphin Central Dauphin East HS
- Derry Township Hershey HS
- Harrisburg Harrisburg HS Dauphin *Lower Dauphin Lower Dauphin HS
- Middletown Area Middletown HS
- Milton Hershey Milton Hershey School
- Steelton-Highspire Steelton-Highspire Elementary
- Donegal Maytown Elementary School Lancaster
- Elizabethtown Area East High St. Elementary Lebanon Palmyra Area Palmyra High School 106
COUNTY SCHOOL DISTRICT SCHOOL
- Central York Hayshire Elementary and Roundtown Elementary
- Northeastern Northeastern Middle School and York Spring Forge Intermediate Dover Area Dover Intermediate
- Eastern Kreutz Creek Elem School
- 6. Traffic and Access Control Points
- a. The Pennsylvania State Police from all five risk county troop locations will be briefed at the PSP Troop H Barracks, located in Harrisburg for Cumberland, Dauphin, Lancaster, Lebanon, and York. Members attending the briefing will not actually deploy to the TCP/ACPs.
- b. The PSP briefing will be performed out-of-sequence in a demonstration window of 9:00 - 11:00 a.m. on May 4, 2005.
107
Three Mile Island Exercise Listing of Prior Issues No. ARCA NUMBER FACILITY EVALUATED NEW CRITERIA 1 64-03-1.b.1-A-02 Carlisle Regional Medical Center Set-up procedures were not followed 2 64-03-6.d.1-A-03 Carlisle Regional Medical Center Did not use step-off pads 3 64-03-5.b.1-A-04 Dauphin County EOC Incorrect ECL on press release 4 64-03-1.e.1-A-05 Mannheim Twp HS Complex CDV 700s out of calibration 5 64-03-3.a.1-A-06 Elizabethtown/West Donegal EOC Staff not briefed on dosimetry and KI 6 64-03-6.a.1-A-08 New Oxford MS Changed alarm setpoint on portal 7 64-03-6.a.1-A-09 Scotland School Set-up procedures were not followed 8 64-03-3.c.2-A-12 Harrisburg SD Parents not informed of plan 9 64-95-18-A-17 Lancaster Cty. Mon/Decon/MC Center 6.a.1 (Centerville Jr. HS)
Disposition of monitoring forms 10 64-99-05-A-20 Lancaster Cty. Mon/Decon/MC Center 3.a.1 (Mannheim Twp. MS)
Did not fill out PRD forms 11 64-99-18-A-21 Lancaster Cty. Mon/Decon/MC Center 6.a.1 (Mannheim Twp. MS)
Failed to follow checklists 12 64-99-18-A-42 Adams Cty. Rec/Mon/Decon/MC Center 6.a.1 (Gettysburg Area MS)
Rad monitors did not wear gloves 13 64-99-19-A-43 Adams Cty. Rec/Mon/Decon/MC Center 6.c.1 (Gettysburg Area MS)
Unknowledgeable MC manager 14 TMIX89-30R Juniata Cty. EOC 3.e.1 Unfamiliar with emergency PAGs 15 64-03-6.c.1- P-01 State EOC Old census data in plan 16 64-03-2.b.1/4.c.2-P- Accident Assessment Center 02 Did not trade data with licensee 17 64-03-3.a.1-P-03 Carlisle Regional Medical Center Issuing PRDs to ambulance personnel 18 64-03-6.a.1-P-04 Lancaster County EOC Old census data in plan 108
19 64-03-6.a.1-P-05 Faust Jr. HS Status as a mon./decon. center 20 64-03-6.a.1-P-06 Schuylkill County EOC Conflict of when to open mon./decon.
21 64-03-3.c.2-P-07 Harrisburg SD No verification phone number in plan 22 64-03-3.c.2-P-08 Steelton-Highspire SD Plan was missing Annex G 109
APPENDIX 4. EXERCISE SCENARIO EXELON NUCLEAR EMERGENCY PREPAREDNESS NARRATIVE
SUMMARY
THREE MILE ISLAND NUCLEAR STATION MAY 3, 2005 Initial Conditions [1700]
Unit 1 is at 100% power. Direction for on-coming shift: maintain current power level. Unit 1 had been at 100% power for the last 500 days. The following equipment is out of service:
- Sequence of Events Recorder (SER) A for card replacement.
- Make-up (MU) Pump B, MU-P-1B, for motor rewind. Motor has been removed and at vendor shop for rewind. Administrative Limiting Condition for Operation (LCO) commenced on 4/26/05 1500 and expires on 5/26/05 1500.
- Reactor Building Purge Isolation Valve, AH-V-1B, due to shorted motor. Valve has been tagged out and scheduled to be worked in work week 0530.
- Reactor Building fan, AH-E-1A, due to fan replacement. The fan is currently being rigged through the Reactor Building Personnel Hatch. A monorail is installed over the inner door and the team is rigging the load to the monorail.
Event 1 - Loss of Main Overhead Annunciators [1720]
During work on Sequence of Events Recorder A the technician damages the power supply to SER B drawer. This causes a loss of all main overhead annunciators. This will cause the declaration of an UNUSUAL EVENT per MU-6.
Event 2 - Significant Transient with Loss of Main Overhead Annunciators [1805]
A spurious turbine trip occurs - a resulting reactor trip also occurs. The reactor trip is successful with no complications. Approximately 3 minutes (1808) after the turbine trip, a loose parts alarm is received. Post-trip, an Atmospheric Dump Valve (MS-V-4B) sticks open approximately 10%. This will cause the declaration of and ALERT per MA-6.
Event 3 - Small RCS Leak with Bypass of Containment [1820]
A small leak develops on a Reactor Coolant System (RCS) Hot Leg. The leak will be approximately 20-30 gpm. The crew will see release based on mass and flow balance and increase in Reactor Building Atmospheric Monitor (RM-A P/I/G) readings. Once the leak occurs a reactor building evacuation may be called. On the exit from reactor building the load is still suspended, the crew bypasses the door interlock and opens the outer door. In the 110
process the outer door hinge is damaged causing a direct path from the reactor building to the auxiliary building. During this event the restoration of Main Overhead Annunciators will be permitted. This event has two concurrent UE classifications (MU-7 for leakage, and FU-1 on bypass of containment), and will require notification for release status change.
Event 4 - Increase in Reactor Coolant Activity [1905]
Approximately 45 minutes after the small RCS break a small loose part causes localized fuel failure. This will raise total coolant activity to approximately 600-700 µCi/ml.
Event 5 - Fuel Cladding Failure [1950]
Loose parts damage fuel cladding mechanically. The TSC will declare Fuel Damage Class 2 and escalate to a SITE AREA EMERGENCY based on FS-1. TSC should implement Site Accountability and Evacuation of Non-Essential Personnel.
Event 6 - Loss Of Makeup/High Pressure Injection [2010]
Make-up Pump, MU-P-A1, will develop an oil leak that will cause the pump to trip on low lube oil pressure. This will cause the loss of seal injection. If the operations crew lines up MU-P-1C to supply normal makeup the pump will not start.
Event 7 - Loss Of Reactor Coolant System [2055]
The RCS leak degrades to approximately 450 600 gpm. Due to the increase in leak rate, containment radiation monitors RM-G-22 and RM-G-23 will increase beyond 22 R/hr. Also depending upon the restoration of MU-P-1C this leak without HPI could result in the loss of subcooling margin. Either of these conditions result in declaring to the RCS fission product barrier lost. This will require the declaration of a GENERAL EMERGENCY and the issuance of a 0-10 mile evacuation Protective Action Recommendation.
Event 8 - Event Termination [At discretion of Lead Controller]
If objectives and demonstrations have been completed, onsite and offsite teams have been evaluated, facility lead controllers are satisfied that facility objectives and demonstration criteria have been completed, the Lead Onsite Controller will communicate with facility leads at each station and determine a termination time. The Training Drill will be terminated.
Emergency Response Facilities will be reset for actual response and post-exercise critiques will be held in all key facilities.
111
APPENDIX 5. PLANNING ISSUES This appendix contains the Planning Issues assessed and prior Planning Issues re-evaluated during the May 3 and 4, 2005, exercise at Three Mile Island Nuclear Generating Station.
Planning Issues are issues identified in an exercise or drill that do not involve participant performance, but rather involve inadequacies in the plan or procedures. Planning Issues are required to be corrected through the revision and update of the appropriate State and local RERPs and/or procedures in accordance with the following schedule:
- Within 120 days of the date of the exercise/drill when the Planning Issue is directly related to protection of the public health and safety.
- During the annual plan review and update (reported in the Annual Letter of Certification) when the Planning Issue does not directly affect the public health and safety. However, when the date for the annual plan review and update is imminent and the responsible organization does not have sufficient time to make the necessary revisions in the plans and/or procedures, the revised portion of the plans and/or procedures should be submitted in the subsequent annual plan review and update and reported in the Annual Letter of Certification.
Any requirement for additional training of responders to radiological emergencies necessitated by the revision and update of the plans and/or procedures must be completed within the timeframes described above in order for the Planning Issue to be considered resolved.
New Planning Issues 2.1.2 Shippensberg University Issue No.: 64-05-6.a.1-P-01 Condition: Only one portal monitor was planned for the initial intake at the entrance to the decontamination and monitoring facility. However, two other portal monitors were available.
Monitoring an evacuee, with the portal monitor, requires approximately 10-15 seconds per person, if uncontaminated. Therefore, the required 5,820 people would take approximately 1455 minutes or 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to go through this single portal, if everyone were uncontaminated. All three portal monitors are necessary at the initial monitoring station to meet the monitoring requirements and allow for delays caused by processing contaminated individuals.
Possible Cause: The other portal monitors were set aside to expedite survey of persons after decontamination.
112
Reference:
NUREG-0654, J.10.h; J.12; K.5.a; Cumberland County Radiological Monitoring and Decontamination Plan.
Effect: The required number of evacuees could not be processed in the 12-hour time.
Recommendation: Revise the procedures to indicate that three portal monitors be set up at the initial monitoring station and that hand held survey instruments are used in the decontamination area.
Schedule of Corrective Actions: Agreed. In the future hand-held meters will be used for decontamination operations in order to free up portal monitors for mass monitoring.
2.2.1 Dauphin County Emergency Operations Center Issue No.: 64-05-1.c.1-P-02 Condition: The Dauphin County Emergency Operations Center (EOC) staff in charge of command and control did not coordinate directly with the Pennsylvania Emergency Management Agency (PEMA) prior to the implementation of protective actions such as activation of the alert and notification (A&N) system.
Possible Cause: While the Dauphin County Radiological Emergency Preparedness Plan (RERP) calls for coordination with PEMA, the EOC staff did not follow the Concept of Operations as identified in the plan.
Reference:
NUREG-0654, II.A.2.a; Dauphin County RERP, Basic Plan, Section 5.D (Concept of Operations).
Effect: The lack of engagement of a key member of the Dauphin County EOC command and control section prior to the implementation of protective actions may result in inadequate coordination, including delays in activation of the sirens and/or delays in initiating route alerting, both of which may in turn affect the ability of the public to remain informed of protective action decisions in a timely manner.
Recommendation: The Dauphin County EMA should revise its standard operating procedures, including its General Message Flow concept of operations, to ensure that a key member of the command and control section (e.g., a County Commissioner or the Dauphin County EMA Director) is engaged in all communications on the dedicated telephone line that connects PEMA, the utility, and all risk counties so as to allow effective coordination prior to the implementation of protective actions. In addition, the dedicated telephone line unit in the EOC should be relocated from the Communications section to the Command and Control section.
Schedule for Corrective Action: We suspect that this issue is caused by confusion on the part of the evaluator over what the phrase coordinate directly with PEMA actually implies. It simply means that during the PEMA call giving instructions for PADs and 113
siren sounding times the counties have an opportunity to let PEMA know if there are any problems that would preclude them from meeting the siren sounding time or beginning evacuation. A county coordinator keeps the State updated on these things as a matter of course. This procedure gives the coordinators a few minutes grace period to get back to the State EOC with any last minute problems before the A&N sequence begins. The term coordinate has never implied that the county coordinators are expected to discuss the appropriateness of the PAD. This has nothing to do with talent or desire. The risk counties simply do not have access to the data, dose projection specialists, and software necessary to confirm the utility PAR. This is the first time this wording, which has been around for years, has ever been raised as an issue. It should not be. Recommend this issue be deleted.
FEMA Response: Do not concur with the States comments. Although a key member of the command and control section is not necessarily expected to discuss the appropriateness of the PAD or other items on the dedicated telephone line that connects PEMA, the utility, and all risk counties, it is important for a key member of the command and control staff to be immediately aware of protective action decisions so that actions required by Dauphin County are taken in the most timely manner and not inadvertently delayed by having to relay PADs from the communications section in the 911 Center to the command and control section in the EOC. Our recommendation to relocate or have an extension of the dedicated phone line with the command and control section still stands. This planning issue remains.
2.2.4 Emergency Worker Monitoring/Decontamination Center - Harrisburg Area Community College Issue No.: 64-05-1.b.1-P-03 Condition: The present facility layout has not been adequately designed to control contamination of emergency workers (EWs) and their vehicles at the Radiological Monitoring and Decontamination Station, North Hall, Harrisburg Area Community College, Harrisburg, PA. The facility layout does not contain a flow layout for EW vehicle monitoring and decontamination, and the shower room walls do not completely touch the floors in the shower rooms, resulting in potentially contaminated run-off water spreading around the entire shower room floor. Additionally, the entrance and egress corridor from the shower room is not wide enough to permit two persons to pass.
Possible Cause: The facility is inadequate as a decontamination facility.
Reference:
NUREG-0654, H.3 Effect: The lack of a facility layout caused delays in processing EW vehicles for monitoring and decontamination of the vehicle and possible cross-contamination in the shower rooms (male and female) of emergency workers.
114
Recommendations: The ERT, Dauphin County, and Exelon Nuclear should re-examine this facility for its intended purpose.
Schedule for Corrective Action: This same facility and layout has been used consistently since 1999. In the 1999, 2001, and 2003 biennial exercises there was not a single issue noted by the evaluators. Nevertheless, procedures will be developed to resolve the remote possibility of contamination in the showers and a flow chart lay-out will be created for EW vehicles. Recommend that this issue be changed from an ARCA to a planning issue. It at most was an observed or identified inadequacy in the OROs emergency plan or implementing procedures, rather than in the OROs performance, which is exactly how a planning issue is defined.
FEMA Response: Concur. This ARCA is now reclassified as a planning issue.
2.4.1 Lebanon County Emergency Operations Center Issue No.: 64-05-5.b.1-P-04 Condition: The Reception Center identified in the 2005 Verizon telephone directory (Yellow Pages) emergency information insert is not the Reception Center identified in the county plan or in the Pennsylvania Emergency Management Agency (PEMA)
Emergency Alert System (EAS) message.
Possible Cause: There was no review of the phone directory insert prior to publication.
Reference:
NUREG-0654, E.5, 7; G.3.a; G.4.c; Lebanon County Plan, Reception Center identified in Appendix 12, p. E-12-5, Appendix 4, p. E-9.
Effect: The public was being instructed to refer to the telephone directory throughout the event. When PEMA issued the EAS message recommending evacuation, they identified the correct center. This variance in facilities may have caused confusion among the public.
Recommendation: Update telephone book.
Schedule for Corrective Action: Again, this was an observed or identified inadequacy in the OROs emergency plan or implementing procedures, rather than in the OROs performance, which is exactly how a planning issue is defined. Additionally, the utility, not the county, writes the telephone directory emergency procedures. This is most definitely not an ORO performance issue. If it is then there is no such thing as a planning issue. The telephone directories will be fixed when the next version is published. This issue should be reclassified as a planning issue.
FEMA Response: Concur. This ARCA has been reclassified as a planning issue.
115
2.4.2 Reception Center - Lebanon County Career and Technical Center Issue No.: 64-05-6.a.1-P-05 Condition: Forms were not available for the recording of Vehicle Monitoring and Decontamination data. Vehicle monitoring and decontamination information was not recorded during the demonstration in accordance with Emergency Plan Procedures and the Extent of Play.
Possible Cause: The Lebanon County Emergency Plan Section that includes vehicle monitoring does not have a specific form for recording vehicle monitoring and decontamination activities. The plan does include forms for recording monitoring and decontamination of equipment and personal property which could have been used, but is more appropriate for non-vehicular equipment that does not have multiple locations of potential contamination.
The monitoring and recording procedure had been extensively revised in September 2004, and was being used in this exercise for the first time. The vehicle monitoring team was unfamiliar with the procedure.
Reference:
Lebanon County Emergency Plan, Appendix 13, Annex E, Radiological Exposure Control, Attachment 3 - Vehicle and Equipment Monitoring Procedure Effect: Monitoring and decontamination information was not recorded at the time of the activity and would not provide a record of property that would be needed in post-accident activities.
Recommendation: Add a specific vehicle monitoring and decontamination recording form to the procedure that includes a vehicle diagram so that multiple readings from the same vehicle can be easily recorded and provide training on the new procedure to the monitoring teams.
Schedule of Corrective Actions: Agreed. A vehicle monitoring and decontamination form will be developed and employed.
2.4.3 Monitoring/Decontamination and Mass Care Center - Northern Lebanon High School Issue No.: 64-05-6.a.1-P-06 Condition: Attachment A of Appendix 13 indicates that mass care centers for evacuees will serve as points where radiological contamination monitoring and decontamination will be conducted. (See Page E-13-11.) Additionally, Appendix 12 instructs the Mass Care Coordinator to ensure that trained monitoring/ decontamination teams have reported to each mass care center However, during the demonstration the 116
Mass Care Coordinator stated that monitoring and decontamination would be done at the reception center.
Possible Cause: It appears that Appendix 13 was not revised to incorporate changes in plans for monitoring and decontamination of evacuees at the reception center.
Reference:
Lebanon County Emergency Operations Plan, Appendix 13, Attachment 1 Effect: Inconsistencies between the plan and actual operations could create confusion as to where monitoring and decontamination teams are to be deployed.
Recommendation: Appendix 13 of the Lebanon County Emergency Operations Plan should be updated to reflect the current practice of monitoring and decontaminating evacuees at the reception center.
Schedule of Correction Actions: Agreed. The plan will be updated to reflect current practices.
2.4.4 Emergency Worker Monitoring/Decontamination Center - Annville Union Hose Fire Department Issue No.: 64-05-1.b.1-P-07 Condition: There is no diagram/schematic floor plan for the monitoring/
decontamination of the vehicles.
Possible Cause: The Monitoring/Decontamination Team Leader was not confident to set-up the floor plan of the facility for monitoring/decontamination of the vehicles.
Reference:
Lebanon County Emergency Management Plan Effect: Lack of guidance may cause a delay in activating the facility.
Recommendation: The plans and the procedures should be reviewed to incorporate schematics for all required functions. Consideration should also be given to provide warm water for the temporary shower hook-up.
Schedule of Corrective Actions: Agreed. A schematic for the center will be developed.
2.5.4 Dover Township Emergency Operations Center Issue No.: 64-05-1.a.1-P-08 Condition: The Standard Operating Procedures (SOPs) refer to the Notification and Resource Manual for lists of equipment, special facilities, and personnel addresses. The 117
information in the Notification and Resource Manual is not current. In some cases, the information in the Resource Manual does not match information provided in the SOPs.
Possible Cause: The Dover Township Resource Manual has not been updated since its creation in 1982 (per the Emergency Management Coordinator).
Reference:
NUREG-0654, A.4; D.3, 4; E.1, 2; H.4 Effect: Since the SOPs are up-to-date and the EOC personnel are very knowledge, this did not have a negative affect during the exercise.
Recommendation: The Notification and Resource Manual should be updated before the next exercise and should then be reviewed at least annually for any necessary corrections.
Schedule of Corrective Actions: Disagree. The Notification and Resource Manual was updated in March 2005, before this exercise occurred. A copy of this is provided as an enclosure to this document. Copies were also provided during the Hot Wash, and we were told the issue was cleared. To quote from the York County Training Officer, At the Hot Wash, I provided Ken Wierman Evaluation Team Leader for York County a copy of the correct manual, and he said that this cleared this issue. I had provided the EMA Coordinator a new copy of the plan and resource manual when I conducted the EOC training. Recommend this issue be deleted.
FEMA Response: Concur. The actions taken by the York County Training Officer at the Hot Wash were not communicated to the RAC Chair. This planning issue is deleted.
4.4.1 West Shore School District - Red Mill Elementary School Issue No.: 64-05-3.c.2-P-09 Condition: An inadequate number of buses were available to evacuate the entire population of students from the 10 risk schools. Bus drivers had already left the transportation facility when the initial notice of the emergency was received at 09:27am.
A telephone callout of bus drivers resulted in only 35 certified drivers being available.
Therefore, although there were 79 buses available, there were only 35 of the 64 certified drivers required to transport the entire population of students from risk schools. Thus, when the order to evacuate the impacted schools in the Emergency Planning Zone (EPZ) was issued at 10:45 a.m., all schools could not be simultaneously evacuated.
Possible Cause: Because the drivers work schedule has gaps during the school day when the drivers are not required to be at the facility, a driver shortage could occur depending on the time the emergency begins. The Plan does not address multiple bus trips to evacuate students.
118
Reference:
TMI Emergency, Radiological Emergency Response Plan (RERP), West Shore School District, Emergency Operations Plan, York County and Cumberland County Effect: There would have been a significant delay in evacuating the students.
Recommendation: Update the Plan to address the possible shortage of bus drivers.
Schedule of Corrective Actions: Disagree. In reality, the decision to have an early dismissal does not occur in a vacuum. Everyone, drivers included, are aware of an escalating crisis and are prepared to respond. Most bus drivers have other jobs that they are also committed to. There was no time standard of required availability given during this ad hoc exercise to judge these drivers performances against. The school district is obviously capable of a short notice evacuation or early dismissals due to snow and other events would never successfully occur as they often do. Any shortage of drivers for any reason would be treated as any other unmet need and reported to the county for resolution.
More importantly for future exercises nowhere in the extent of play was there a requirement or an agreement to conduct a call-out of bus drivers. These new requirements cannot simply be added during the evaluation as part of the exercise by any of the parties involved. There is no standard to judge the performance against and it accomplishes nothing but the creation of animosity and mistrust. This issue should be deleted.
FEMA Response: Concur. This planning issue is deleted.
Prior Planning Issues 1.1 State Emergency Operations Center Issue No.: 64-03-6.c.1-P-01
Description:
Population Census data contained in the Pennsylvania Emergency Operations Plan is not based on the most current census information available. The population for the Three Mile Island Emergency Planning Zone is based on the 1990 Census. (Pennsylvania Emergency Operations Plan, Annex E, Appendix 4, Attachment F, page E-4-16; NUREG-0654, J.10.h; J.12)
Reason Issue Remains Unresolved: The State needs to replace a 10-mile EPZ map containing population numbers per sector, that is still dated 1990 in the Pennsylvania Emergency Operations Plan.
119
1.4 Accident Assessment Center (State EOC/BRP)
Issue No.: 64-03-2.b.1/4.c.2-P-02
Description:
Dose projection data developed by Pennsylvania Department of Environmental Protection/Bureau of Radiation Protection (BRP) at the Accident Assessment Center (AAC) and state field monitoring team data were not sent to the licensee Emergency Operations Facility (EOF) for use by the licensee. (Data was requested from the licensee by the BRP Liaison and was then sent to the AAC.)
Differences greater than a factor of 10 between projected doses by the licensee and the BRP were not discussed (criterion 2.b.1) and the sharing and coordination of plume measurement information among all field teams (licensee and State) was not performed (criterion 4.a.2). (NUREG-0654, H.12; I-8, 10, 11; and Supplement 3; BRP-EP-6.07, Rev. 0, 03/03, Emergency Facility Operations)
Corrective Action Demonstrated: The Radiological Assessment Manager received separate dose projections from both BRP (RASCAL) and the licensee (DAPAR). The RASCAL and DAPAR dose projections were continuously verified to be within a factor of 10 of each other throughout the exercise. The comparison of plume measurement data among all field teams was also observed. The comparison of the two dose assessments and the sharing of plume data adequately resolve Prior Issue # 64-03-2.b.1/4.c.2-P-02.
2.3.1 Lancaster County Emergency Operations Center Issue No.: 64-03-6.a.1-P-04
Description:
The Lancaster County Emergency Operations Plan lists 1990 risk population data for the risk municipalities in Lancaster County. (Lancaster County Emergency Operations Plan, Annex E, Part I (TMI), Lancaster Radiological Emergency Procedures to Nuclear Power Plant Incidents, February 1993, Change 8, May 2002)
Reason Issue Remains Unresolved: The county needs to replace a 10-mile EPZ map containing population numbers per sector, that is still dated 1990 in the Lancaster County Emergency Operations Plan.
3.3.1 Schuylkill County Emergency Operations Center Issue No.: 64-03-6.a.1-P-06
Description:
Annex E, Appendix 3, Reception Center Operations, page E-3-1, contains conflicting guidance on the activation of Reception Centers when a Site Area Emergency (SAE) is declared. In this section it indicates that the Emergency Management Coordinator of Schuylkill County will activate the Reception Center when an SAE is declared. However, Annex E, paragraph 3, Concept of Operations, sub-paragraph E, Monitoring/Decontamination Center(s), sub-element 1, indicates that the Pennsylvania Emergency Management Agency (PEMA) Eastern Region will notify the 120
Schuylkill County Emergency Management Agency (EMA) when monitoring/decontamination is required. (Schuylkill County Plan; NUREG-0654, J.10.h; J.12; K.5.a)
Corrective Action Demonstrated: The plan was updated in the summer 2004. The updated plan makes clear that the Schuylkill County EMA is responsible for ensuring that the Reception Center is operational and that the PEMA Eastern Region will notify the Schuylkill County EMA when monitoring/decontamination is required.
4.2.3 Harrisburg SD - Harrisburg HS Issue No.: 64-03-3.c.2-P-07
Description:
The Harrisburg School District Emergency Evacuation Plan for TMI (Three Mile Island) requires authentication of emergency notification to be accomplished by return phone call to the Dauphin County Emergency Operations Center. No phone number is listed in the plan or is readily available to verify an emergency situation. (NUREG-0654 J.10.c, d, g)
Commonwealth Recommendation: This planning issue was successfully resolved for the 2005 exercise and should be deleted. The Harrisburg School District Emergency Evacuation Plan (which would be used for Foose Elementary School) dated February 2005 provides the Dauphin County EOC telephone number under Section V, Notification Procedures, on page 5. FEMA was provided a copy of this document. The fact that Foose Elementary School was not evaluated during this exercise does not mean this ARCA cannot be deleted. Foose Elementary School was not responsible for the issue. The school district was and they successfully proved they had remedied the problem during this exercise.
FEMA Response: Concur. This prior planning issue was adequately corrected during the 2005 exercise.
4.2.7 Steelton-Highspire School District - Steelton-Highspire Elementary School Issue No.: 64-03-3.c.2-P-08
Description:
Annex G, Nuclear Power Plant Incident Preparedness (TMI), is missing from the Steelton-Highspire School District, Dauphin County Emergency Operations Plan. (NUREG-0654 J.10.c, d, g)
Corrective Action Demonstrated: Annex G, Nuclear Power Plant Incident Preparedness (TMI), was included in the Steelton-Highspire School District, Dauphin County Emergency Operations Plan. The annex was included in copies at both the School District Administration building, and at the Steelton-Highspire Elementary School.
121
APPENDIX 6. ADDITIONAL PRIOR ISSUES This appendix contains the description and status of ARCAs and Planning Issues assessed during prior exercises at the Three Mile Island Nuclear Power Station. These were (1) assessed at jurisdictions or functional entities, which were exempted from demonstration at this exercise, or (2) for ingestion pathway objectives not scheduled for demonstration in this exercise.
Prior Issues at Functional Entities Not Scheduled To Be Demonstrated Issue No.: 64-95-18-A-17 (6.a.1) - Lancaster County Monitoring/Decontamination Center (Centerville Jr. High School)
Description:
Although the monitoring/decontamination forms were filled out properly, there was a misunderstanding about what to do with the forms afterward. There is no procedure to collect the forms and direct them to the proper destination. A procedure should be developed to direct monitoring forms to the proper location. (NUREG-0654, J.12)
Reason ARCA Unresolved: The site was not scheduled for demonstration during the 2005 exercise.
Recommendation: The site should be scheduled for demonstration during the next biennial exercise.
Issue No.: 64-99-18-A-21 (6.a.1) - Lancaster County Monitoring/Decontamination/Mass Care Center (Manheim Township Middle School)
Description:
Several significant actions listed in the "Checklist of Manager Radiological Decontamination Monitoring Center" in the Lancaster County monitoring/decontamination procedures (page 2) for a General Emergency were not demonstrated. Personnel in charge were not aware that the following checklist items were required: (a) enter into log names of all persons screened (using Decontamination Center Report Form, Enclosure 9), (b) report to the County EOC name of any person found to be contaminated to 0.5 milliRoentgens per hour (mR/h) or above, and (c) report to the County EOC, every two hours, number of individuals processed through the Center, number contaminated, number decontaminated, number referred to a medical facility, the highest reading on any particular person, and any unusual or noteworthy findings.(NUREG-0654, K.5.a; N.1.a)
Reason ARCA Unresolved: The site was not scheduled for demonstration during the 2005 exercise.
Recommendation: The site should be scheduled for demonstration during the next biennial exercise.
122
Issue No.: 64-03-1.b.1-A Newville Community EMS - Carlisle Regional Medical Center
Description:
Procedural steps, as listed in the Carlisle Regional Medical Center Safety Manual Policy and Procedures for Radiation Safety that describe the setup of contaminated patient reception, monitoring, and decontamination areas were not followed. Also the setup and use of a new decontamination tent is not identified in the procedure and the storage location for equipment and material has been changed without changing the procedure. Training had not been conducted in setting up and using the new decontamination equipment. Setup and use of this unlighted tent after dark adversely affected monitoring and decontamination activities. The tent is not insulated for use in freezing weather conditions; nor is their response during inclement weather addressed in the procedures. The Dosimetery Record Form used was different than the one attached to the procedure. (NUREG-0654, F.2; H.10; K.5.a, b; L.1, 4)
Reason ARCA Unresolved: The site was not scheduled for demonstration during the 2005 exercise.
Recommendation: Evaluate the use of new equipment and locations. Change procedures to reflect the use of new locations, forms, and equipment. Add descriptive setup drawings to procedures for all new locations and equipment. Provide hands on training in the setup and use of equipment and decontamination areas.
Issue No.: 64-03-6.d.1-A Newville Community EMS - Carlisle Regional Medical Center
Description:
Step-off pads, for emergency workers were not installed at exit points between clean and contaminated areas and a visual aid detailing exit procedures was not available. (NUREG-0654, F.2; H.10; K.5.a, b; L.1, 4)
Reason ARCA Unresolved: The site was not scheduled for demonstration during the 2005 exercise.
Recommendation: Review/Rewrite procedures to include the use of step-off pads.
Develop visual aids to allow emergency responders to follow correct exit procedures.
Issue No.: 64-03-1.e.1-A Monitoring/Decontamination and Mass Care Center -
Mannheim Township High School Complex
Description:
The CDV 700 survey meters used by the Lancaster County HazMat Team #29 personnel for monitoring of vehicles, did not have calibration stickers indicating the most recent calibration, nor was there any other evidence of calibration of these instruments at the facility. (NUREG-0654, H.7, 10; J.10.a,b,e; J.11; K.3.a) 123
Reason ARCA Unresolved: The site was not scheduled for demonstration during the 2005 exercise.
Recommendation: Only instruments with current calibrations be used for monitoring and that the calibration date and any correction factors to be applied be displayed on the instruments.
Issue No.: 64-03-3.a.1-A Elizabethtown Borough/West Donegal Emergency Operations Center
Description:
The Radiological Officer (RadOff) did not brief staff about or simulate issuance of dosimetery and potassium iodide (KI) to Emergency Operations Center (EOC) staff in accordance with the Standard Operating Procedures (SOP). The SOP requires that the RadOff brief the EOC staff at the Emergency Classification Level (ECL) Site Area Emergency and issue the dosimetery and KI at that time. Dosimetery and KI are required for the EOC staff since the EOC is located in the Emergency Planning Zone (EPZ) 10-mile radius from the Three Mile Island (TMI) nuclear plant.
(NUREG-0654, K.3.a, b)
Reason ARCA Unresolved: The site was not scheduled for demonstration during the 2005 exercise.
Recommendation: It is recommended that the Radiological Officer and the EOC staff follow their plan.
Issue No.: 64-03-6.a.1-A Monitoring/Decontamination, Reception, and Mass Care Center - New Oxford Middle School
Description:
Personnel changed the alarm setpoint for contamination on \the Bicron portal monitor. A person is considered contaminated if there is a reading of 18,000 counts/second (cps) using the Bicron TPM-903 portal monitor. This action limit was derived from the 300 counts/minute (cpm) contamination threshold utilized for monitoring with a CDV-700 (300 cpm x 60 seconds/minute = 18000 cps). The contamination limit may be too high and should not be calculated using this method due to the differences in detector efficiency and sensitivity. (NUREG-J.10.h; J.12; K.5.a)
Reason ARCA Unresolved: The site was not scheduled for demonstration during the 2005 exercise.
Recommendation: Consult with a technical representative to determine what the correct limit should be based on the CDV-300 limit. Revise the procedure to incorporate the correct limit.
Commonwealth Recommendation: This ARCA should be deleted. The same portal monitor and same HAZMAT team that would have been used at New Oxford Middle School are the same ones that were successfully evaluated at Gettysburg Middle School 124
during the 2005 exercise. Adams County only possesses one portal monitor, so the location it is set up at should not matter as long as the set point is correct and the portal monitor is properly operated.
FEMA Response: Concur. This Prior ARCA was correctly demonstrated during this 2005 exercise and is deleted.
Issue No.: 64-03-3.c.2-A Harrisburg School District - Foose Elementary School
Description:
Parents of children attending schools in the Harrisburg School District have not been informed of the plan or provided information as to where to pick up their children if they are sheltered or evacuated. (NUREG-0654 J.10.c, d, g)
Reason ARCA Unresolved: The site was not scheduled for demonstration during the 2005 exercise.
Recommendation: Send the letter to parents informing them of the actions to be taken in the event of an incident at Three Mile Island Nuclear Generating Station (Appendix 4). Revise the plan to require coordination with the Dauphin County Emergency Operations Center for information to be released to the media regarding protective actions taken for school children during this type of incident.
Commonwealth Recommendation: This ARCA was successfully demonstrated during the 2005 exercise and should be deleted. The letter to parents was mailed in September 2004 at the beginning of the school year from the school district office which was evaluated during the out-of-sequence demonstration. The letter is displayed as Appendix 4, page 4-1 of the Harrisburg School District Emergency Evacuation Plan dated February 2005. A copy of this was provided to FEMA. The fact that Foose Elementary School was not evaluated during this exercise does not mean this ARCA cannot be deleted. Foose Elementary School was not responsible for the issue. The school district was and they successfully proved they had remedied the problem during this exercise.
FEMA Response: Concur. This Prior ARCA is deemed corrected and is deleted.
Prior Issues for Ingestion Exposure Pathway Objectives Issue No.: TMIX89-3R (3.e.1) - State EOC
Description:
Communications with the participating County EOCs during the ingestion pathway phase of the exercise were complicated by the fact that no direct communications link was established between the State EOC and Juniata and Mifflin counties. Instead, the State EOC used the PEMA Area Office as a "go-between" to these counties for communications. This lack of a direct communications link may have 125
contributed to the fact that a key press release generated by PEMA did not reach Mifflin County. Communications were further complicated during the ingestion phase by use of the fax as the primary means of communication to the participating counties. The fax was enhanced by use of a programmed, automated sequential calldown of the 14 counties and two Area Offices. Despite this enhancement, fax messages were often delayed by 30 minutes at those locations near the bottom of the calldown sequence.
Given these unavoidable hard-copy message delays and the lack of a direct State communications link with two of the ingestion pathway counties, it is recommended that key messages between the State EOC and the counties transmitted primarily via fax teletype be accompanied by notice of their pending arrival by telephone calls from the State EOC. (Objective 4 (Criterion 1.d.1); NUREG-0654, F.1 and F.2)
Reason ARCA Unresolved: The communication between the State EOC and ingestion counties during the ingestion pathway phase was not scheduled for demonstration during this exercise.
Recommendation: This aspect of Objective 4 (Criterion 1.d.1) should be demonstrated during the next TMI ingestion exposure pathway exercise.
Prior Planning Issues at Functional Entities Not Scheduled To Be Demonstrated Newville Community EMS - Carlisle Regional Medical Center Issue No.: 64-03-3.a.1-P-03
Description:
Responding Emergency Medical Technicians (EMTs) from the Newville Community EMS unit #147 had not been issued a Permanent Record Dosimeter (PRD) in accordance with the extent of play. (NUREG-0654, F.2; H.10; K.5.a, b; L.1, 4)
Reason Unresolved: The site was not scheduled for demonstration during the 2005 exercise.
Recommendation: The site should be scheduled for demonstration during the next biennial exercise.
Commonwealth Recommendation: This planning issue should never have occurred.
We have been arguing this since the 2003 MS-1 evaluation out-briefing occurred. The state Radiological Emergency Response Plan, or Annex E, has never, nor currently, provides for dosimetry for transporters of contaminated or potentially contaminated individuals outside of an EPZ. This wording is taken verbatim from Appendix 5 of the referenced plan in the section defining Category C workers. We have no intention of changing this. There never was a requirement for the Newville Community EMS personnel to have Permanent Record Dosimeters or any other type of dosimetry. It should also be noted that this is the only EMS crew in the seventeen MS-1 hospitals in the state were this seems to be an issue with FEMA. We cannot correct an issue that in reality does not exist. This needs to be deleted.
126
FEMA Response: Concur. This prior planning issue is deleted.
Mass Care - Faust Jr. High School Issue No.: 64-03-6.a.1-P-05
Description:
The emergency plan for Franklin County lists Faust Junior High School as one of three monitoring/decontamination centers. However, all monitoring and decontamination would be performed at the Reception Center at Scotland School.
(NUREG-0654-J.12; Franklin County Emergency Response Plan, Appendix 4, Annex E, Attachment F)
Reason Unresolved: The site was not scheduled for demonstration during the 2005 exercise.
Recommendation: Plans regarding the monitoring and decontamination of evacuees in Franklin County should be reviewed and revised.
Harrisburg School District - Foose Elementary School Issue No.: 64-03-3.c.2-P-07
Description:
The Harrisburg School District Emergency Evacuation Plan for TMI (Three Mile Island) requires authentication of emergency notification to be accomplished by return phone call to the Dauphin County Emergency Operations Center. No phone number is listed in the plan or is readily available to verify an emergency situation. (NUREG-0654 J.10.c, d, g)
Reason Unresolved: The site was not scheduled for demonstration during the 2005 exercise.
Recommendation: The site should be scheduled for demonstration during the next biennial exercise.
Commonwealth Recommendation: This planning issue was successfully resolved for the 2005 exercise and should be deleted. The Harrisburg School District Emergency Evacuation Plan (which would be used for Foose Elementary School) dated February 2005 provides the Dauphin County EOC telephone number under Section V, Notification Procedures, on page 5. FEMA was provided a copy of this document. The fact that Foose Elementary School was not evaluated during this exercise does not mean this ARCA cannot be deleted. Foose Elementary School was not responsible for the issue. The school district was and they successfully proved they had remedied the problem during this exercise.
127
FEMA Response: Concur. This prior planning issue was adequately resolved during the 2005 exercise and is deleted.
128