Frequency 1.4 1.4 Frequency DESCRIPTION criteria. SR 3.0.4 restrictions would not apply if both the (continued) following conditions are satisfied:
- a. The Surveillance is not required to be performed; and
- b. The Surveillance is not required to be met or, even if required to be met, is not known to be failed.
EXAMPLES The following examples illustrate the various ways that Frequencies are specified.
In these examples, the Applicability of the LCO (LCO not shown) is MODES 1, 2, and 3. The examples do not reflect the potential application of LCO 3.0.4.b.
I EXAMPLE 1.4-1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY Perform CHANNEL CHECK.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Example 1.4-1 contains the type of SR most often encountered in the Technical Specifications (TS). The Frequency specifies an interval (12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />) during which the associated Surveillance must be performed at least one time.
Performance of the Surveillance initiates the subsequent interval. Although the Frequency is stated as 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, an extension of the time interval to 1.25 times the interval specified in the Frequency is allowed by SR 3.0.2 for operational, flexibility.
The measurement of this interval continues at all times, even when the SR is not required to be met per SR 3.0.1 (such as when the equipment is inoperable, a variable is outside specified limits, or the unit is outside the Applicability of the LCO).
If the interval specified by SR 3.0.2 is exceeded while the unit is in a MODE or other specified condition in the Applicability of the LCO, and the performance of the Surveillance is not otherwise modified (refer to Examples 1.4-3 and 1.4-4), then SR 3.0.3 becomes applicable.
(continued) g PBAPS UNIT 2 1.4 -2 Amendment No. 252
LCO Applicability 3.0 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY LCO 3.0.1 LCOs shall be met during the MODES or other specified conditions in the Applicability, except as provided in LCO 3.0.2 and LCO 3.0.7.
LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5 and LCO 3.0.6.
If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required, unless otherwise stated.
LCO 3.0.3 When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS, the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable. Action shall be initiated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the unit, as applicable, in:
- a.
MODE 2 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />;
- b.
MODE 3 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />;-and
- c.
MODE 4 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />.
Exceptions to this Specification are stated in the individual Specifications.
Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.
LCO 3.0.3 is only applicable in MODES 1, 2, and 3.
LCO 3.0.4 When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made:
- a.
When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time;
- b.
After performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of (continued)
PBAPS UNIT 2 3.0-1 Amendment No. 0+9, 252
LCO Applicability 3.0 3.0 LCO APPLICABILITY LCO 3.0.4 (continued) entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate; exceptions to this Specification are stated in the individual Specifications, or
- c.
When an allowance is stated in the individual value, parameter, or other Specification.
This Specification shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.
LCO 3.0.5 Equipment removed from service or declared inoperable to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate its OPERABILITY or the OPERABILITY of other equipment.
This is an exception to LCO 3.0.2 for the system returned to service under administrative control to perform the testing required to demonstrate OPERABILITY.
LCO 3.0.6 When a supported system LCO is not met solely due to a support system LCO not being met, the Conditions and Required Actions associated with this supported system are not required to be entered.
Only the support system LCO ACTIONS-are required to be entered.
This is an exception to LCO 3.0.2 for the supported system.
In this event, additional evaluations and limitations may be required in accordance with Specification 5.5.11, "Safety Function Determination Program (SFDP)."
If a loss of safety function is determined to exist by this program, the appropriate Conditions and Required Actions of the LCO in which the loss of safety function exists are required to be entered.
When a support system's Required Action directs a supported system to be declared inoperable or directs entry into Conditions and Required Actions for a supported system, the applicable Conditions and Required Actions shall be entered in accordance with LCO 3.0.2.
(continued)
PBAPS UNIT 2 3.0-2 Amendment No. 22g, 252
SR Applicability 3.0 3.0 SR APPLICABILITY (continued)
SR 3.0.4 Entry into a MODE or other specified condition in the Applicability of an LCO shall only be made when the LCO's Surveillances have been met within their specified Frequency, except as provided by SR 3.0.3.
When an LCO is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with LCO 3.0.4.
This provision shall not prevent entry into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.
PBAPS UNIT 2 3.0- 5 Amendment No. 2E), 252
PAM Instrumentation 3.3.3.1 3.3 INSTRUMENTATION 3.3.3.1 Post Accident Monitoring (PAM) Instrumentation LCO 3.3.3.1 APPLICABILITY:
The PAM instrumentation for each Function in Table 3.3.3.1-1 shall be OPERABLE.
MODES 1 and 2.
ACTIONS
NOTE------------------------------------
Separate Condition entry is allowed for each Function.
I CONDITION REQUIRED ACTION COMPLETION TIME A. One or more Functions A.1 Restore required 30 days with one required channel to OPERABLE channel inoperable.
status.
B. Required Action and B.1 Initiate action in Immediately associated Completion accordance with Time of Condition A Specification 5.6.6.
not met.
C. One or more Functions C.1 Restore one required 7 days with two required channel to OPERABLE channels inoperable.
status.
(continued)
PBAPS UNIT 2 3.3 -24 Amendment No. AI9, 252
Remote Shutdown System 3.3.3.2 3.3 INSTRUMENTATION 3.3.3.2 Remote Shutdown System LCO 3.3.3.2 APPLICABILITY:
The Remote Shutdown System Functions shall be OPERABLE.
MODES 1 and 2.
ACTIONS
NOTE------------------------------------
Separate Condition entry is allowed for each Function.
I CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Restore required 30 days Functions inoperable.
Function to OPERABLE status.
B. Required Action and B.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.
SURVEILLANCE REQUIREMENTS SURVEILLANCE REQUIREMENTS FREQUENCY SR 3.3.3.2.1 Verify each required control circuit and 24 months transfer switch is capable of performing the intended function.
(continued)
PBAPS UNIT 2 3.3-27 Amendment No. 210, 252
RCS Leakage Detection Instrumentation 3.4.5 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.5 RCS Leakage Detection Instrumentation LCO 3.4.5 The following RCS leakage detection instrumentation shall be OPERABLE:
- a.
Drywell sump monitoring system; and
- b.
One channel of primary containment atmospheric gaseous monitoring system.
APPLICABILITY:
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Drywell sump A.1 Restore drywell sump 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> monitoring system monitoring system to inoperable.
OPERABLE status.
B. Required primary B.1 Analyze grab samples Once per containment of primary 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> atmospheric monitoring containment system inoperable.
atmosphere.
AEi2 B.2 Restore required 30 days primary containment atmospheric monitoring system to OPERABLE status.
(continued)
PBAPS UNIT 2 3.4-12 Amendment No. 19, 252
RCS Specific Activity 3.4.6 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.6 RCS Specific Activity LCO 3.4.6 APPLICABILITY:
The specific activity of the reactor coolant shall be limited to DOSE EQUIVALENT I-131 specific activity
- 0.2 pCi/gm.
MODE 1, MODES 2 and 3 with any main steam line not isolated.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME
NOTE------------
A. Reactor coolant LCO 3.0.4.c is applicable.
specific activity
> 0.2 pCi/gm and s 4.0 pCi/gm DOSE EQUIVALENT I-131.
A.1 Determine DOSE Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> EQUIVALENT I-131.
AND A.2 Restore DOSE 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> EQUIVALENT 1-131 to within limits.
B. Required Action and B.1 Determine DOSE Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> associated Completion EQUIVALENT I-131.
Time of Condition A not met.
AND OR B.2.1 Isolate all main 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> steam lines.
Reactor coolant specific activity QR
> 4.0 pCi/gm DOSE EQUIVALENT I-131.
(continued)
I PBAPS UNIT 2 3.4 -14 Amendment No. 2+0, 252
RHR Shutdown Cooling System-Hot Shutdown 3.-4.7 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.7 Residual Heat Removal (RHR) Shutdown Cooling System-Hot Shutdown LCO 3.4.7 Two RHR shutdown cooling subsystems shall be OPERABLE, and, with no recirculation pump in operation, at least one RHR shutdown cooling subsystem shall be in operation.
NOTES---------------------------
- 1.
Both required RHR shutdown cooling subsystems and recirculation pumps may be removed from operation for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period.
- 2.
One required RHR shutdown cooling subsystem may be inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for performance of Surveillances.
APPLICABILITY:
MODE 3, with reactor steam dome pressure less than the RHR shutdown cooling isolation pressure.
ACTIONS
NOTE------------------------------------
Separate Condition entry is allowed for each RHR shutdown cooling subsystem.
I CONDITION REQUIRED ACTION COMPLETION TIME A. One or two required A.1 Initiate action to Immediately RHR shutdown cooling restore required RHR subsystems inoperable.
shutdown cooling subsystem(s) to OPERABLE status.
AND (continued)
PBAPS UNIT 2 3.4-16 Amendment No. a9, 252
ECCS-Operating 3.5.1 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.1 ECCS-Operating LCO 3.5.1 APPLICABILITY:
Each ECCS injection/spray subsystem and the Automatic Depressurization System (ADS) function of five safety/relief valves shall be OPERABLE.
MODE 1, MODES 2 and 3, except high pressure coolant injection (HPCI) is not required to be OPERABLE with reactor steam dome pressure
- 100 psig.
ACTIONS
NOTE------------------------------------
LCO 3.0.4.b is not applicable to HPCI.
CONDITION REQUIRED ACTION COMPLETION TIME A. One low pressure ECCS A.1 Restore low pressure 7 days injection/spray ECCS injection/spray subsystem inoperable.
subsystem(s) to OPERABLE status.
DR One low pressure coolant injection (LPCI) pump in each subsystem inoperable.
B. Required Action and B.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A AND not met.
B.2 Be in MODE 4.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (continued)
PBAPS UNIT 2
- 3. 5-1 Amendment No. HO, 252
RCIC System 3.5.3 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.3 RCIC System LCO 3.5.3 APPLICABILITY:
The RCIC System shall be OPERABLE.
MODE 1, MODES 2 and 3 with reactor steam dome pressure > 150 psig.
ACTIONS
NOTE------------------------- ----------
LCO 3.0.4.b is not applicable to RCIC.
CONDITION REQUIRED ACTION COMPLETION TIME A. RCIC System A.1 Verify by Immediately inoperable.
administrative means High Pressure Coolant Injection System is OPERABLE.
A.2 Restore RCIC System 14 days to OPERABLE status.
B. Required Action and B.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.
AND B.2 Reduce reactor steam 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> dome pressure to
- 150 psig.
PBAPS UNIT 2 3.5-12 Amendment No. aO, 252
CAD System 3.6.3.1 3.6 CONTAINMENT SYSTEMS 3.6.3.1 Containment Atmospheric Dilution (CAD) System LCO 3.6.3.1 APPLICABILITY:
Two CAD subsystems shall be OPERABLE.
MODES 1 and 2.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or both CAD A.1 Restore CAD 30 days subsystems inoperable.
subsystem(s) to OPERABLE status.
B. Required Action and B.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.
I PBAPS UNIT 2 3.6-31 Amendment No. -21, 252
AC Sources-Operating 3.8.1 ACTIONS
NOTE------------------------------------
LCO 3.0.4.b is not applicable to DGs.
CONDITION REQUIRED ACTION COMPLETION TIME A. One offsite circuit A.1 Perform SR 3.8.1.1 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable.
for OPERABLE offsite circuits.
AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter A.2 Declare required 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from feature(s) with no discovery of no offsite power offsite power to available inoperable one 4 kV when the redundant emergency bus required feature(s) concurrent with are inoperable.
inoperability of redundant required feature(s)
ANU A.3 Restore offsite 7 days circuit to OPERABLE status.
AND 14 days from discovery of failure to meet LCO 3.8.1.a or b (continued)
PBAPS UNIT 2 3.8-2 Amendment No. 21e, 252
Frequency 1.4 1.4 Frequency DESCRIPTION criteria.
SR 3.0.4 restrictions would not apply if both the (continued) following conditions are satisfied:
- a.
The Surveillance is not required to be performed; and
- b.
The Surveillance is not required to be met or, even if required to be met, is not known to be failed.
EXAMPLES The following examples illustrate the various ways that Frequencies are specified.
In these examples, the Applicability of the LCO (LCO not shown) is MODES 1, 2, and 3. The examples do not reflect the potential application of LCO 3.0.4.b.
EXAMPLE 1.4-1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY Perform CHANNEL-CHECK.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Example 1.4-1 contains the type of SR most often encountered in the Technical Specifications (TS).
The Frequency specifies an interval (12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />) during which the associated Surveillance must be performed at least one time.
Performance of the Surveillance initiates the subsequent interval.
Although the Frequency is stated as 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, an extension of the time interval to 1.25 times the interval specified in the Frequency is allowed by SR 3.0.2 for operational flexibility.
The measurement of this interval continues at all times, even when the SR is not required to be met per SR 3.0.1 (such as when the equipment is inoperable, a variable is outside specified limits, or the unit is outside the Applicability of the LCO).
If the interval specified by SR 3.0.2 is exceeded while the unit is in a MODE or other specified condition in the Applicability of the LCO, and the performance of the Surveillance is not otherwise modified (refer to Examples 1.4-3 and 1.4-4), then SR 3.0.3 becomes applicable.
(continued)
PBAPS UN IT 3 1.4-2 Amendment No. P14, 255
LCO Applicability 3.0 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY LCO 3.0.1 LCOs shall be met during the MODES or other specified conditions in the Applicability, except as provided in LCO 3.0.2 and LCO 3.0.7.
LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5 and LCO 3.0.6.
If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required, unless otherwise stated.
LCO 3.0.3 When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS, the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable.
Action shall be initiated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the unit, as applicable, in:
- a.
MODE 2 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />;
- b.
MODE 3 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />; and
- c.
MODE 4 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />.
Exceptions to this Specification are stated in the individual Specifications.
Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.
LCO 3.0.3 is only applicable in MODES 1, 2, and 3.
LCO 3.0.4 When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made:
- a.
When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time;
- b.
After performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of (continued)
PBAPS UNIT 3 3.0-1 Amendment No. 2I4, 255
LCO Applicability 3.0 3.0 LCO APPLICABILITY LCO 3.0.4 (continued) entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate; exceptions to this Specification are stated in the individual Specifications, or
- c.
When an allowance is stated in the individual value, parameter, or other Specification.
This Specification shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.
LCO 3.0.5 Equipment removed from service or declared inoperable to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate its OPERABILITY or the OPERABILITY of other equipment.
This is an exception to LCO 3.0.2 for the system returned to service under administrative control to perform the testing required to demonstrate OPERABILITY.
LCO 3.0.6 When a supported system LCO is not met solely due to a support system LCO not being met, the Conditions and Required Actions associated with this supported system are not required to be entered.
Only the support system LCO ACTIONS are required to be entered.
This is an exception to LCO 3.0.2 for the supported system.
In this event, additional evaluations and limitations may be required in accordance with Specification 5.5.11, "Safety Function Determination Program (SFDP)."
If a loss of safety function is determined to exist by this program, the appropriate Conditions and Required Actions of the LCO in which the loss of safety function exists are required to be entered.
When a support system's Required Action directs a supported system to be declared inoperable or directs entry into Conditions and Required Actions for a supported system, the applicable Conditions and Required Actions shall be entered in accordance with LCO 3.0.2.
(continued)
PBAPS UNIT 3 3.0 -2 Amendment No. 2i4, 255
SR Applicability 3.0 3.0 SR APPLICABILITY (continued)
SR 3.0.4 Entry into a MODE or other specified condition in the Applicability of an LCO shall only be made when the LCO's Surveillances have been met within their specified Frequency, except as provided by SR 3.0.3.
When an LCO is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with LCO 3.0.4.
This provision shall not prevent entry into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.
PBAPS UNIT 3 3.0- 5 Amendment No. 2+4, 255
PAM Instrumentation 3.3.3.1 3.3 INSTRUMENTATION 3.3.3.1 Post Accident Monitoring (PAM) Instrumentation LCO 3.3.3.1 APPLICABILITY:
The PAM instrumentation for each Function in Table 3.3.3.1-1 shall be OPERABLE.
MODES 1 and 2.
ACTIONS
NOTE-------------
Separate Condition entry is allowed for each Function.
I CONDITION REQUIRED ACTION COMPLETION TIME A. One or more Functions A.1 Restore required 30 days with one required channel to OPERABLE channel inoperable.
status.
B. Required Action and B.1 Initiate action in Immediately associated Completion accordance with Time of Condition A Specification 5.6.6.
not met.
C. One or more Functions C.1 Restore one required 7 days with two required channel to OPERABLE channels inoperable.
status.
(continued)
PBAPS UNIT 3 3.3-24 Amendment No. 1-4, 255
Remote Shutdown System 3.3.3.2 3.3 INSTRUMENTATION 3.3.3.2 Remote Shutdown System LCO 3.3.3.2 APPLICABILITY:
The Remote Shutdown System Functions shall be OPERABLE.
MODES 1 and 2.
ACTIONS
NOTE-------------
Separate Condition entry is allowed for each Function.
I CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Restore required 30 days Functions inoperable.
Function to OPERABLE status.
B. Required Action and B.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.
SURVEILLANCE REQUIREMENTS SURVEILLANCE REQUIREMENTS FREQUENCY SR 3.3.3.2.1 Verify each required control circuit and 24 months transfer switch is capable of performing the intended function.
(continued)
PBAPS UNIT 3 3.3-27 Amendment No. 214, 255
RCS Leakage Detection Instrumentation 3.4.5 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.5 RCS Leakage Detection Instrumentation LCO 3.4.5 The following RCS leakage detection instrumentation shall be OPERABLE:
- a.
Drywell sump monitoring system; and
- b.
One channel of primary containment atmospheric gaseous monitoring system.
APPLICABILITY:
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Drywell sump A.1 Restore drywell sump 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> monitoring system monitoring system to inoperable.
OPERABLE status.
B. Required primary B.1 Analyze grab samples Once per containment of primary 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> atmospheric monitoring containment system inoperable.
atmosphere.
AND B.2 Restore required 30 days primary containment atmospheric monitoring system to OPERABLE status.
(continued)
I PBAPS UNIT 3 3.4-12 Amendment No. -A:4, 255
RCS Specific Activity 3.4.6 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.6 RCS Specific Activity LCO 3.4.6 APPLICABILITY:
The specific activity of the reactor coolant shall be limited to DOSE EQUIVALENT I-131 specific activity
- 0.2 pCi/gm.
MODE 1, MODES 2 and 3 with any main steam line not isolated.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Reactor coolant
NOTE------------
specific activity LCO 3.0.4.c is applicable.
> 0.2 pCi/gm and
- 4.0 pCi/gm DOSE EQUIVALENT 1-131.
A.1 Determine DOSE Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> EQUIVALENT I-131.
AND A.2 Restore DOSE 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> EQUIVALENT I-131 to within limits.
B. Required Action and B.1 Determine DOSE Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> associated Completion EQUIVALENT 1-131.
Time of Condition A not met.
AND OR B.2.1 Isolate all main 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> steam lines.
Reactor coolant specific activity DE
> 4.0 pCi/gm DOSE EQUIVALENT I-131.
(continued)
I PBAPS UNIT 3 3.4-14 Amendment No. 2i4, 255
RHR Shutdown Cooling System-Hot Shutdown 3.4.7 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.7 Residual Heat Removal (RHR) Shutdown Cooling System-Hot Shutdown LCO 3.4.7 Two RHR shutdown cooling subsystems shall be OPERABLE, and, with no recirculation pump in operation, at least one RHR shutdown cooling subsystem shall be in operation.
NOTES---------------------------
- 1.
Both required RHR shutdown cooling subsystems and recirculation pumps may be removed from operation for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period.
- 2.
One required RHR shutdown cooling subsystem may be inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for performance of Surveillances.
APPLICABILITY:
MODE 3, with reactor steam dome pressure less than the RHR shutdown cooling isolation pressure.
ACTIONS
NOTE-------------------------------------
Separate Condition entry is allowed for each RHR shutdown cooling subsystem.
I CONDITION REQUIRED ACTION COMPLETION TIME A. One or two required A.1 Initiate action to Immediately RHR shutdown cooling restore required RHR subsystems inoperable.
shutdown cooling subsystem(s) to OPERABLE status.
AND (continued)
PBAPS UNIT 3 3.4-16 Amendment No. -X4, 255
ECCS-Operating 3.5.1 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.1 ECCS-Operating LCO 3.5.1 APPLICABILITY:
Each ECCS injection/spray subsystem and the Automatic Depressurization System (ADS) function of five safety/relief valves shall be OPERABLE.
MODE 1, MODES 2 and 3, except high pressure coolant injection (HPCI) is not required to be OPERABLE with reactor steam dome pressure
- 150 psig and ADS valves are not required to be OPERABLE with reactor steam dome pressure s 100 psig.
ACTIONS NOTE------------------------------------
LCO 3.0.4.b is not applicable to HPCI.
CONDITION REQUIRED ACTION COMPLETION TIME A. One low pressure ECCS A.1 Restore low pressure 7 days injection/spray ECCS injection/spray subsystem inoperable.
subsystem~s) to OPERABLE status.
One low pressure coolant injection (LPCI) pump in each subsystem inoperable.
B. Required Action and B.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A AND not met.
B.2 Be in MODE 4.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (continued)
PBAPS UNIT 3 3.5-1 Amendment No. RIA, 255
RCIC System 3.5.3 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.3 RCIC System LCO 3.5.3 APPLICABILITY:
The RCIC System shall be OPERABLE.
MODE 1, MODES 2 and 3 with reactor steam dome pressure > 150 psig.
ACTIONS
NOTE------------------------------------
LCO 3.0.4.b is not applicable to RCIC.
CONDITION REQUIRED ACTION COMPLETION TIME A. RCIC System A.1 Verify by Immediately inoperable.
administrative means High Pressure Coolant Injection System is OPERABLE.
AND A.2 Restore RCIC System 14 days to OPERABLE status.
B. Required Action and B.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.
AUL B.2 Reduce reactor steam 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> dome pressure to
- 150 psig.
PBAPS UNIT 3
- 3. 5-12 Amendment No. 24, 255
CAD System 3.6.3.1 3.6 CONTAINMENT SYSTEMS 3.6.3.1 Containment Atmospheric Dilution (CAD) System LCO 3.6.3.1 APPLICABILITY:
Two CAD subsystems shall be OPERABLE.
MODES 1 and 2.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or both CAD A.1 Restore CAD 30 days subsystems inoperable.
subsystem(s) to OPERABLE status.
B. Required Action and B.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.
I PBAPS UNIT 3 3.6-31 Amendment No. gA4, 255
AC Sources-Operating 3.8.1 ACTIONS
NOTE------------------------------------
LCO 3.0.4.b is not applicable to DGs.
CONDITION REQUIRED ACTION COMPLETION TIME A. One offsite circuit A.1 Perform SR 3.8.1.1 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable.
for OPERABLE offsite circuits.
AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter AND A.2 Declare required 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from feature(s) with no discovery of no offsite power offsite power to available inoperable one 4 kV when the redundant emergency bus required feature(s) concurrent with are inoperable.
inoperability of redundant required feature(s)
AN A.3 Restore offsite 7 days circuit to OPERABLE status.
AND 14 days from discovery of failure to meet LCO 3.8.1.a or b (continued)
PBAPS UNIT 3 3.8-2 Amendment No. 214, 255