Emergency Plan, Revision 31
ML043640038
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 12/20/2004
From: Luckey P
Dominion Nuclear Connecticut
To:
Document Control Desk, NRC/FSME
References
EP-04-001, MP-04-084, FOIA/PA-2015-0025
Download: ML043640038 (177)


Text

PASSPORT DOCUMENT To  : DOCUMENT CONTROL DESK Facility  : MP Department : 806 TRANSMITTAL Address  : OFFICE OF NRC U.S. NUC REG COMM WASHINGTON DC 20555 Page: 1 From  : NDS CONT DOCUMENTS Date/Time  : 12/20/04 12:48 Trans No.  : 000068402 Tr ansmittal Group Id: 05920-1 Total Items: 00001 Item Facility Type Sub Document Number/ Title Sheet Revision Doc Date Copy # Media Copies

  • 0001 MP PROC EP MP-26-EPI-EPMP 031 99 P 01 EMERGENCY PLAN MILLSTONE POWER STATION Please check the appropriate response and return form to NDS Bldg 475/3 Millstone Power Station or Fax to 860-440-2057.

All documents received.

Documents noted above not received (identify those not received).

I no longer require distribution of these documents.

Date: Signature

-7

DOCUMENT TRANSMITTAL FORM TO: Distribution FROM: Patricia A. Luckey6V i DOCUMENT: Millstone Station Emergency Plan CHANGE NO: Revision 31 TRANSMITTAL NO: EP-04-001 AUTHORIZATION: SORC No. MP-OQ' -Ol-i EFFECTIVE DATE: tq-z3l Please review the changes from the previous revision. Then replace the appropriate Emergency Plan pages below and enter the change number on the " Record of Changes Form."

INSERT REVISION DATE REMOVE Cover Sheet December 2004 Cover Sheet and Table of Contents i through x Section 1 December 2004 1-1 through 1-7 Section 2 December 2004 2-1 Section 3 December 2004 3-1 Section 4 December 2004 4-1 through 4-5 Section 5 December 2004 5-1 through 5-20 Section 6 December 2004 6-1 through 6-18 Section 7 December 2004 7-1 through 7-15 Section 8 December 2004 8-1 through 8-8 Section 9 December 2004 9-1 through 9-4 Appendix A December 2004 A-i through A-i1 Appendix B December 2004 B-1 through B-21 Appendix C December 2004 C-1 through C-6 1 of 2

Appendix D December 2004 D-1 rough D-5 Appendix E December 2004 E-1 through E-2 Appendix F December 2004 F-i thrgh F-4 Appendix G December 2004 G-1 through G-9 Appendix H December 2004 H-1 through H-9 Appendix I December 2004 I-1 through I-8 Appendix J December 2004 J-1 through J-3 Appendix K December 2004 K-I through K-2 2of2

( (

MILLSTONE STATION EMERGENCY PLAN MAJOR CHANGES FROM PREVIOUS REVISION REVISION 30 UPDATED TO REVISION 31 Change No. Correspondence No. Correspondence Section No. Description of Change Sender/Receiver/ Subject Affected Date Revision 31 None NA Section 1.1 Added ISFSI structure sentence, "Millstone also has an Independent Spent Fuel Storage Installation (ISFSI), which is located east of the facility within the Protected Area."

Revision 31 None NA Section 5 Changed Manager Operational Support Center from Unit Specific to Non-Specific. This is an administrative correction from a previous E-Plan change.

Revision 31 None NA Table 5-1 Changed OSC Assistant from Unit Specific to Non-Specific.

Revision 31 None NA Section 6.1 Under Meteorological conditions, changed (if applicable) to (if available).

Revision 31 None NA Section 8 Changed responsibility for conducting Fire Drills from Manager, Training to Manager, Operations.

Revision 31 None NA Section 8.4 Deleted description of Information Center and added description of Educational Outreach Program.

Revision 31 None NA Appendix A Added definition for "Confinement Boundary" and "ISFSr'. Added "ISFSrI to the Abbreviations and Acronyms list.

Revision 31 None NA Appendix B Reviewed Letters of Agreement. Updated agreement B-14, Town of Waterford Fire Service, added B-21, CYAPCO Page 1 of 2 Rev. 0

( MILLSTONE STATION EMERGENCY PLAN MAJOR CHANGES FROM PREVIOUS REVISION REVISION 30 UPDATED TO REVISION 31 Revision 31 None NA Figure C-5 Added the ISFSI to the."Map of Millstone Evacuation Routes".

Revision 31 None NA Appendix I, Changed Unit 2 EAL TU2 #7 to include, page 4 of 8 "or a loaded ISFSI Confinement

____ ___Boundary'. ____ ____

Revision 31 None NA Appendix I, Changed Unit 2 EAL GUI to include, page 4 of 8 "Fire Affecting a Loaded ISFSI Confinement Boundary NOT extinguished Within 15 Minutes of Notification."

Page 2 of 2 Rev. 0

EMERGENCY PLAN MILLSTONE POWER STATION UNIT 1 DSAR - SECTION 6.3 UNIT 2 FSAR - APPENDIX 12A UNIT 3 FSAR - SECTION 13.3 REVISION 31 Millstone Emergency Plan Revision 31 December, 2004

TABLE OF CONTENTS Section Page List of Appendices .............................................. viii List of Tables ................................................ ix List of Figures .............................................. x

1. Concept of Emergency Operations ............................................... 1-1 1.1. Description of the Millstone Emergency Planning Zones .............................................. 1-1 1.2. Interrelationships of State/Local/Licensee Emergency Plans............................................ 1-2 1.3. Actions.............................................................................................................................. 1-2 1.4. Assistance.......................................................................................................................... 1-3 1.5. Public Notification .............................................. 1-3 1.6. Public Information Program .............................................. 1-3
2. Applicability and Supporting Plans ............................................... 2-1
3. Section Intentionally Blank (Reserved) .............................................. 3-1
4. Classification System............................................................................................................. 4-1
5. Emergency Response Organization .............................................. 5-1 5.1. On-Shift Positions ............................................... 5-3 5.1.1 Shift Manager ............................................... 5-3 5.1.2 Shift Technical Advisor ............................................... 5-4 5.1.3 Manager Of Control Room Operations ............................................... 5-4 5.1.4 Emergency Communicator .............................................. 5-4 5.1.5 On-Shift Operators .............................................. 5-4 5.1.6 Health Physics Technicians .............................................. 5-4 5.1.7 Chemistry Technicians ............................................... 5-4 5.1.8 Security Shift Supervisor and Security Personnel .............................................. 5-4 5.1.9 Station Duty Officer .............................................. 5-5 5.1.10 Fire Brigade / EMT ............................................... 5-5 Millstone Emergency Plan Revision 31 December, 2004

TABLE OF CONTENTS Section Page 5.2. Minimum Staffing Positions .............................................. 5-5 5.2.1 Director of Station Emergency Operations ............................................. 5-5 5.2.2 Assistant Director, Technical Support .............................................. 5-5 5.2.3 Manager of Technical Support Center ............................................. 5-6 5.2.4 Manager of Operational Support Center ............................................. 5-6 5.2.5 Assistant Director, Emergency Operations Facility ............................................. 5-6 5.2.6 Manager of Radiological Consequence Assessment .............................................. 5-7 5.2.7 Manager of Radiological Dose Assessment .......................................... 5-7 5.2.8 Manager of Communications .......................................... 5-7 5.2.9 Radiological Monitoring Team (RMT #2, NAP, SAP) .......................................... 5-7 5.2.10 Radiological Monitoring Team (RMT #3, #4, #5) .......................................... 5-7 5.2.11 EOF HP Technician .......................................... 5-8 5.2.12 EOF Emergency Communicator .......................................... 5-8 5.2.13 OSC-Assistant Radiation Protection Supervisor .......................................... 5-8 5.2.14 Public Information Technical Advisor .......................................... 5-8 5.2.15 Chief Technical Spokesperson .......................................... 5-8 5.2.16 Nuclear News Manager .......................................... 5-8 5.2.17 Manager of Resources .......................................... 5-9 5.2.18 Technical Support Center-Reactor Engineer .......................................... 5-9 5.2.19 Technical Information Coordinator .......................................... 5-9 5.2.20 Technical Support Center - Electrical Engineer .......................................... 5-9 5.2.21 Technical Support Center - Mechanical Engineer .......................................... 5-9 5.2.22 Mechanic, Electrician, I&C Technician .......................................... 5-9 ii Millstone Emergency Plan Revision 31 December, 2004

TABLE OF CONTENTS Section Page 5.3. Full Staffing Positions ........................................... 5-9 5.3.1 Control Room Data Coordinator .......................................... 5-9 5.3.2 Technical Assistant .......................................... 5-10 5.3.3 Meteorological Assistant .......................................... 5-10 5.3.4 Technical Support Center- Shift Manager ........................................... 5-10 5.3.5 Operational Support Center (OSC) Assistant ...................... .................... 5-10 5.3.6 CBETS Operator .......................................... 5-10 5.3.7 Radiological Assessment Engineer .................................... ......  ; 5-10 5.3.8 Radiological Communicators ........................................... 5-10 5.3.9 Assistant Manager, Radiological Dose Assessment .......................................... 5-11 5.3.10 Field Team Data Coordinator .......................................... 5-11 5.3.11 Manager of Security .......................................... 5-11 5.3.12 Accident Management Team .......................................... 5-11 5.3.13 Regulatory Liaison ........................................... 5-11 5.3.14 Media Center Liaison ........................................... 5-11 5.3.1 5.Rumor Control Liaison .......................................... 5-11 5.3.16 Technical Briefer .......................................... 5-11 5.3.17 Radiological Briefer .......................................... 5-12 5.4. Other Organizations Providing Assistance .......................................... 5-12 5.4.1 State / Local Assistance ........................................... 5-12 5.4.2 Private Agency Assistance .......................................... 5-12 5.4.3 Federal Assistance .......................................... 5-12 iii Millstone Emergency Plan Revision 31 December, 2004

TABLE OF CONTENTS Section Parc

6. Emergency Measures ...................................................... 6-1 6.1. Notification and Activation of Emergency Organizations ................................................ 6-1 6.2. Assessment Actions ...................................................... 6-3 6.2.1 Initial Assessment ...................................................... 6-3 6.2.2 Protective Action Recommendations ...................................................... 6-4 6.2.3 Dose Assessment ...................................................... 6-5 6.2.4 Release Rate and Dose Estimate Methodology ...................................................... 6-7 6.2.5 Secondary Dose Assessment ...................................................... 6-10 6.3. Corrective Actions .............. 6-10 6.3.1 Fire Fighting........................................................................................................... 6-11 6.3.2 Damage Control, Repair and Decontamination ..................................................... 6-11 6.4. Protective Actions .................................................... 6-11 6.4.1 On-site Protective Actions .................................................... 6-11 6.4.2 Use of On-site Protective Equipment and Supplies ............................................... 6-14 6.4.3 Contamination Control Measures .................................................... 6-14 6.4.4 Personnel Radiation Dose Determination .................................................... 6-15 6.5. Aid to Affected Personnel ..................................................... 6-15 6.5.1 Exposure Control Guidelines ..................................................... 6-15 6.5.2 Emergency Exposure Control Guidelines for Off-Site Personnel ............. ............ 6-16 6.5.3 Decontamination .................................................... 6-16 6.5.4 First Aid .................................................... 6-17 6.5.5 Medical Transportation .................................................... 6-17 6.5.6 Medical Treatment .................................................... 6-17 iv Millstone Emergency Plan Revision 31 December, 2004

TABLE OF CONTENTS Section Page 6.6. Public Information ......................................... 6-17

7. Emergency Facilities and Equipment .......................................... 7-1 7.1. Control Room .......................................... 7-1 7.1.1. Normal Operations .......................................... 7-2 7.1.2. Alert and Notification .......................................... 7-2 7.1.3. Communications .......................................... 7-2 7.2. Emergency Operations Facility .......................................... 7-3 7.2.1. Function.................................................................................................................. 7-3 7.2.2. Location .......................................... 7-3 7.2.3. Structure and Habitability .......................................... 7-3 7.2.4. Layout .......................................... 7-4 7.2.5. Communications..................................................................................................... 74 7.2.6. Power Supplies .......................................... 7-4 7.2.7. Technical Data and Data Systems .......................................... 7-4 7.2.8. Records Availability and Management .......................................... 7-4 7.3. Technical Support Center/Operational Support Center .......................................... 7-4 7.3.1. Function.................................................................................................................. 7-4 7.3.2. Location ........................................... 7-5 7.3.3. Structure and Habitability ........................................... 7-5 7.3.4. Layout..................................................................................................................... 7-6 7.3.5. Communications..................................................................................................... 7-6 7.3.6. Power Supplies ........................................... 7-6 7.3.7. Technical Data and Data Systems ........................................... 7-6 7.3.8. Records Availability .......................................... 7-6 v Millstone Emergency Plan Revision 31 December, 2004

TABLE OF CONTENTS Section Patc 7.4. Operational Support Center (OSC) and OSC Assembly Area .......................................... 7-7 7.4.1. Function ............................................... 7-7 7.4.2. Location and Size ............................................... 7-7 7.4.3. Structure and Habitability ............................................... 7-7 7.4.4. Communications..................................................................................................... 7-7 7.4.5. Emergency Equipment ............................................... 7-7 7.5. Emergency Equipment ............................................... 7-8 7.5.1. Emergency Response Data System ............................................... 7-8 7.6. Security Posts ............................................... 7-8 7.7. Joint Media Center ............................................... 7-9 7.8. Alternate Location ............................................... 7-9 7.9. Communication Systems ............................................... 7-9 7.10. Assessment Facilities ............................................... 7-10 7.11. First Aid and Medical Facilities ............................................... 7-10 7.12. Damage Control Equipment ............................................... 7-10 7.13. Meteorological Data Acquisition ............................................... 7-10

8. Maintaining Emergency Preparedness ............................................... 8-1
8. 1. Training ............................................................................................................................. .......................

8-1 8.1.1 SERO Training ............................................... 8-1 8.1.2 Off-Site Emergency Response Training .................. ............................. 8-2 8.1.3 Additional Emergency Preparedness Training ............................................... 8-2 8.2. Tests, Drills, and Exercises .................... . 8-3 8.2.1 Off-Site and On-Site Testing of the Notification, Communication, and Alerting Systems ............. 8-3 vi Millstone Emergency Plan Revision 31 December, 2004

TABLE OF CONTENTS Section Pace 8.2.2 Additional Tests, Drills, and Exercises .............................................. 8-4 8.3. Administration of Station Emergency Plan and Procedures ............................................. 8-7 8.4. Public Information Programs .............................................. 8-7 8.5. Media Information Program .............................................. 8-8

9. Recovery .............................................. 9-1 9.1. Recovery Phase .............................................. 9-1 9.2. Recovery Organization .............................................. 9-1 9.2.1 Senior Vice President - Nuclear Operations ....................... ....................... 9-1 9.2.2 Director of Recovery Operations .............................................. 9-1 9.2.3 Manager of Technical Support .............................................. 9-1 9.2.4 Manager of Plant Operations .............................................. 9-2 9.2.5 Manager of Radiation Control/Radwaste .............................................. 9-2 9.2.6 Manager of Engineering Systems .............................................. 9-2 9.2.7 Advisory Support .............................................. 9-3 9.2.8 Public Information Technical Advisor .............................................. 9-3 9.2.9 Regulatory Affairs and Compliance Department .............................................. 9-3 9.2.10 Millstone Representative in the State EOC .......................... .................... 9-3 vii Millstone Emergency Plan Revision 31 December, 2004

TABLE OF CONTENTS Section Page LIST OF APPENDICES Appendix A - Definitions, Abbreviations and Acronyms ............................................... A-I Appendix B - Letters of Agreement ............................................... B-I Appendix C -Maps of Plume and Ingestion Exposure EPZ, Locations of On-Site And Off-Site Radiological Monitoring Stations, Station Evacuation Routes ............................................... C-I Appendix D - Supporting Procedures List ................................................ D-1 Appendix E - Millstone Emergency Equipment ................ ............................... E-1 Appendix F - Diagrams and Arrangement of Emergency Facilities ....................................... F-I Appendix G - Cross-Reference To NUREG-0654 Criteria ................................................. G-1 Appendix H - Radiological Assessment Equipment and Facilities ........................................ H-I Appendix I - Emergency Action Level Scheme ................................................ ;1-1 Appendix J - Evacuation Time Estimate: Plume Exposure Pathway ...................................... J-1 Appendix K- SERO Personnel Training Summary ............................................... K-I Viii Millstone Emergency Plan Revision 31 December, 2004

TABLE OF CONTENTS Section Page LIST OF TABLES 1-1 Off-Site Host Community and Reception Centers .................................... 1-4 2-1 Supporting Plans and Sources .......................... 2-1 4-1 Unusual Event - Licensee Actions ..................................... 4-2 4-2 Alert - Licensee Actions .................................... 4-3 4-3 Site Area Emergency - Licensee Actions .................................... 4-4 4-4 General Emergency - Licensee Actions .................................... 4-5 5-1 Station Emergency Response Organization .................................... 5-13 6-1 Emergency Exposure Limits .................................... 6-18 7-1 Locations of Emergency Response Centers .................................... 7-12 H-I On-Site Assessment Equipment and Facilities .................................... H-2 H-2 Off-Site Assessment Equipment and Facilities ...................................... H-9 J-1 Millstone Evacuation Time Estimate Summary .................................... J-2 ix Millstone Emergency Plan Revision 31 December, 2004

TABLE OF CONTENTS Section PaRe LIST OF FIGURES 1-1 Emergency Response Organizations Responsibilities ........................................................... 1-5 1-2 Responsibilities of State and Local Agencies For The Various Incident Classifications ...... 1-6 1-3 Licensee Emergency Response Facility Responsibilities ...................................................... 1-7 5-1 Organization and Location of Station Emergency Management Personnel ........... ............. 5-18 7-1 a Notification of Emergency Response Organizations ......................................................... 7-13 7-lb NRC Emergency Notification System and Health Physics Network ............. ................... 7-14 7-1 c Lines of Communications Between Emergency Response Centers Millstone Station ...... 7-15 9-1 Recovery Organization ................................................................ 9-4 C-1 Map of Millstone Emergency Planning Zone, Host Communities and Evacuation Routes.C-2 C-2 Locations of On-Site and Off-Site Radiological Monitoring Stations .................................. C-3 C-3 Map of Millstone 10 Mile Emergency Planning Zone ......................................................... C-4 C-4 Map of Millstone 50 Mile Emergency Planning Zone ......................................................... C-5 C-5 Map of Millstone Station Evacuation Routes ................................................................ C-6 E-l Millstone Emergency Equipment Summary ................................................... ............. E-2 F-1 Diagram of TSC / OSC Layout ................................................................ F-2 F-2 Diagram of Emergency Operations Facility ................................................................ F-3 F-3 Diagram of OSC Assembly Area Layout ................................... ............................. F-4 x Millstone Emergency Plan Revision 31 December, 2004

1. Concept of Emergency Operations 1.1. Description of the Millstone Emergency Planning Zones The Millstone Power Station is located on Long Island Sound within the Town of Waterford, Connecticut. Millstone has three nuclear power plants: Unit 1, a boiling water reactor, which is permanently shutdown and defueled' and being decommissioned; and Units 2 and 3 which are pressurized water reactors.

Millstone also has an Independent Spent Fuel Storage Installation (ISFSI), which is located east of the facility within the Protected Area. Millstone has an approximate 10-mile Emergency Planning Zone (EPZ) for the plume exposure pathway and an approximate 50-mile planning zone for the Ingestion Exposure Pathway (IPZ). Millstone Station occupies approximately 500 acres and is located 3.2 miles west-southwest of New London and 40 miles southeast of Hartford.

Local communities within the Millstone plume exposure pathway EPZ include East Lyme, Fishers Island (NY), Groton City, Groton Town, Ledyard, Lyme, Montville, New London, Old Lyme, and Waterford. The Plum Island Animal Disease Center, while physically located within 10 miles of Millstone, is a non-residential federal facility. There are two states within the plume exposure pathway EPZ, Connecticut and New York. The states within the IPZ are Connecticut, Rhode Island, and New York (see Appendix C). Although a small portion of Massachusetts is within the 50-mile radius of Millstone, this area has intentionally been omitted from the Emergency Plan due to the distance from the site and the insignificant amount of land area involved. The Federal Emergency Management Agency (FEMA) has agreed that Massachusetts shall be excluded from the Millstone approximate 50-mile IPZ.

The Millstone Plume EPZ is primarily a residential area, with some urban sections. Peak population totals, including year round residents, seasonal residents, and transients are approximately 206,000 (based on 2000 census data).

Appendix J provides a population distribution within the approximate 10-mile EPZ.

The Millstone approximate 10-mile EPZ contains three major industrial facilities:

Dow Chemical Corporation (Ledyard), Pfizer Corporation and Electric Boat Division of General Dynamics Corporation (Groton); an air transportation facility (Groton/New London Airport); four military installations: U.S. Naval Submarine Base (Groton), U.S. Coast Guard Academy (New London), Connecticut National Guard Camp and Stone's Ranch Military Reservation (East Lyme); and the State of Connecticut maintained York Correctional Institute (East Lyme).

In accordance with IOCFR50.82(a)(1)(i) and 10CFR50.82(a)(1)(ii), Millstone Unit I submitted certification to the NRC that as of July 1, 1998, power operations had permanently ceased and fuel had been permanently removed from the reactor vessel.

1-1 Millstone Emergency Plan Revision 31 December, 2004

1.2. Interrelationships of State/Local/Licensee Emergency Plans The objective of the Millstone Power Station Emergency Plan is to delineate assessment and protective actions to be taken to minimize the consequences of an incident to the health and safety of the public. Separate plans exist for the licensee, state and local communities within the plume exposure pathway EPZ and the host communities (Table 1-1) to which populations will evacuate. The plans encompass emergency preparedness actions taken by the licensee, the State (all applicable agencies) and the affected local communities. These plans are linked together by a broad overall concept of operations through mutual planning and common notification and assessment procedures. Various federal agencies including the Nuclear Regulatory Commission (NRC), Federal Emergency Management Agency (FEMA), Department of Energy (DOE), and Environmental Protection Agency (EPA) also respond to an emergency in accordance with established federal plans. The licensee will maintain contact with the NRC, the Connecticut Department of Environmental Protection (DEP), and the Connecticut Office of Emergency Management (OEM). The OEM is responsible for coordinating emergency activities with state and federal agencies and notification of adjoining state governments.

Figure 1-1 illustrates general responsibilities of state, local and licensee emergency organizations. Implementing procedures have been developed to ensure planning effectiveness.

The licensee, state, and local emergency plans include responsibilities and functions and identify resources for each organization. Local radiological emergency response procedures are reviewed and approved by appropriate government officials. State and local emergency preparedness programs include training and periodic drills or exercises.

1.3. Actions Figure 1-1 outlines responsibilities and actions of the licensee, state, and local communities. Figure 1-2 outlines actions and responsibilities of state and local agencies. Figure 1-3 outlines actions and responsibilities associated with each emergency response facility. The actions escalate through each successive emergency classification.

The licensee response to an incident includes: assessment of plant conditions, incident classification, notification of state and local officials, mitigation of plant system degradation, and assessment of accident consequences. The licensee will classify the incident in accordance with federal guidelines and the State of Connecticut Nuclear Incident Classification Scheme. The licensee will notify designated Connecticut and New York state and local officials and licensee personnel, as appropriate, within 15 minutes of an incident classification. In Connecticut, the state agencies notified are the OEM, the State Police and the DEP, as well as officials in the local EPZ communities. In New York, this notification is provided to Suffolk County and Fishers Island, while a courtesy notification is provided to the State of New York. NRC notification by the licensee is completed via telephone.

1-2 Millstone Emergency Plan Revision 31 December, 2004

After initial classification, the licensee ensures that plant conditions are evaluated and updated information or event reclassification is completed as necessary.

1.4. Assistance State agencies will mobilize resources as necessary to support local communities in protective action implementation. The Director of OEM is authorized to request assistance from federal agencies as necessary.

The licensee emergency response facilities provide office space for federal agency responders.

1.5. Public Notification Public protective actions will be implemented by use of the Public Alerting System and the Emergency Alert System (EAS). The Public Alerting System consists of approximately 160 electronic sirens at various locations within the Plume EPZ. Procedures for providing prompt notification and information to the public are contained within the State Radiological Emergency Response Plan (RERP). Local agencies will initiate responses to implement and support the protective actions. In the event evacuation is necessary, reception centers that are greater than 15 miles from the station have been designated (Table 1-1).

1.6. Public Information Program A public information program has been developed to inform EPZ populations of actions to be taken during an emergency. This program, as described in Section 8.0, has been developed for the media and general population and provides general radiological and emergency response information.

1-3 Millstone Emergency Plan Revision 31 December, 2004

Table 1-1 Off-Site Host Community and Reception Centers Local Communitv Host Community-Reccption Facility East Lyme New Haven - Southern Connecticut State University Moore Fieldhouse Fishers Island, New York Windham - Windham High School Groton, City of Norwich - Kelly Middle School Groton, Town Norwich - Kelly Middle School Ledyard Storrs - University of Connecticut Fieldhouse Lyme New Haven - Southern Connecticut State University Moore Fieldhouse Montville East Hartford - East Hartford High School New London Windham - Windham High School Old Lyme New Haven - Southern Connecticut State University Moore Fieldhouse Waterford East Hartford - East Hartford High School 1-4 Millstone Emergency Plan Revision 31 December, 2004

Fig~ure 1-1 Emergency Response Organizations Rcsponsibilities A. Licensee Responsibilities I. Classification of event.

2. Activation of on-site TSC, OSC and EOF within 60 minutes of ALERT or higher level incident notification
3. Notification of licensee, State of Connecticut, State of New York (Suffolk County) and EPZ commnunities.
4. On-site mitigation actions.
5. On-site corrective actions.
6. Protective Action recommendations to the State of Connecticut, as required.
7. Off-site radiological monitoring.
8. Assist State of Connecticut environmental sampling program.

B. State of Connecticut Responsibilities I. Activation of State EOC and Joint Media Center at SITE AREA EMERGENCY or higher level incident notification (standby at ALERT).

2. Notification of host communities.
3. Notification of Rhode Island and New York (50-mile EPZ states).
4. Protective action decision making after declaration of State of Emergency by the Governor.
5. Activation of Emergency Alert System (standby at ALERT, activate at SITE AREA EMERGENCY or higher level incident notification).
6. Off-site radiological monitoring team deployment and environmental sample collection.
7. Implementation of the Traffic Management Plan for affected areas, as required.

C. 10-Mile EPZ Communities I. Activation of EOCs at SITE AREA EMERGENCY and higher level incident notification (standby at ALERT).

2. Protective action decision making prior to declaration of State of Emergency by Governor.
3. Activation of the Public Alert System (sirens) at SITE AREA EMERGENCY and higher level incident notification in coordination with Emergency Alert System activation.
4. Implementation of protective actions.

D. Host Communities

1. Standby at SITE AREA EMERGENCY (as directed)
2. At the direction of the State OEM, activate reception center and shelter areas at GENERAL EMERGENCY incident.

E. 50-mile IPZ States

1. Activate EOCs at SITE AREA EMERGENCY (Standby at ALERT) level.
2. Monitor food pathways.
3. Implement ingestion pathway protective actions.

1-5 Millstone Emergency Plan Revision 31 December, 2004

( (

Figure 1-2 Responsibilities of State and Local Agencies For The Various Incident Classifications UNUSUAL EVENT

  • ALERT **
  • All agencies acknowledge SITE AREA EMERGENCY ** All agencies Standby GENERAL EMERGENCY II I l rI I Department of Office of Governor Environmental Emergency Local Chief State Police Protection Management Executives Direct actions of all State Conduct Independent Disseminate emergency data Execute and direct Serve as backup agencies. assessment of the incident to local, State and Federal emergency protective communications link and/or respond with agencies. actions within their between the site and Coordinate media releases. assistance. jurisdiction. State EOC.

Maintain communications Declare a State of with towns and respective Public Alert (siren) Provide traffic and Recommend public Emergency as necessary protective actions, as OEM Area offices. system activation. access control.

and assume overall necessary.

command of state and local Coordinate services, Further duties as defined Assist local police in emergency response Deploy radiological materials support and in RERP. evacuation of residents activities. monitoring teams to affected manpower to the towns. in affected area.

areas, as necessary, for Activate State EAS, as radiation measurements.

necessary.

Provide radiation monitoring support to the towns.

NOTE: In case of RADIOACTIVE MATERIALS INCIDENT OR GENERAL INTEREST EVENT only the Notify and record the actions Department of Environmental Protection will be of other State agencies.

notified per the State RERP. Activate host communities.

l -6 Millstone Emergency Plan Revision 31 December, 2004

Fiigure 1-3 Licensee Emergency Response Facility Responsibilities (ALERT or higher event classifications)

Control Room

  • Initial incident classification 2
  • Implement mitigation actions Implement corrective actions
  • Declare incident classification changes, as necessary
  • Perform radiopager notifications, develop and transmit incident reports 2 On-Shift Dose assessment Initial NRC notification (may be done from EOF)

Emergency Operations Facility (EOF)

  • Overall Command and Control
  • Declare incident classification changes (Director of Station Emergency Operations)
  • Communications with NRC, State EOC, DEP and local communities Notify state and local officials (radiopager notifications and incident reports)

Provide protective action recommendations (PARs) to State DEP

  • Direct off-site radiological monitoring teams and dose assessment activities Co-located Technical Support Center/Operational Support Center (TSC/OSC)

. Provide engineering and accident management support to Control Room and emergency response staff

  • Provide input on incident classification changes to Director of Station Emergency Operations Prioritize TSC/OSC assessment and repair activities in coordination with Control Room Direct on-site mitigation actions Direct on-site corrective actions
  • Direct on-site protective actions Operational Support Center Assembly Area (OSC AA)

Assemble and brief/debrief emergency teams

  • Coordinate emergency team activities with the TSC/OSC and Control Room 2 Incident classifications of UNUSUAL EVENT require classification, radiopager notification and completion of incident report only.

1-7 Millstone Emergency Plan Revision 31 December, 2004

2. Applicability and Supporting Plans This Plan applies to the Millstone Station Emergency Response Organization in the event of an incident at the Millstone Power Station. This Plan is in agreement with the affected state and local community plans. The supporting plans and their sources are listed in Table 2-1.

Tablc-2-1 Supporting Plans and Sources Plan Source I . State of Connecticut Radiological Emergency State of Connecticut Office of Emergency Management, Response Plan State Armory Hartford, Connecticut

2. State Agency Procedures State of Connecticut Office of Emergency Management, State Armory Hartford, Connecticut
3. New York State Radiological Emergency New York State Disaster Preparedness Commission Preparedness Plan Albany, New York
4. State of Rhode Island Ingestion Exposure Rhode Island Emergency Management Agency Cranston, Pathway Emergency Response Plan RI
5. Local Community Procedures: Local Community Emergency Management Agencies
  • Town of East Lyme
  • City of Groton
  • Town of Groton
  • Hamlet of Fishers Island (NY)
  • Town of Ledyard
  • Town of Lyme
  • Town of Montville
  • City of New London
  • Town of Old Lyme
  • Town of Waterford
6. Host Community Procedures: I lost Community Emergency Management Agencies
  • Town of East Hartford
  • UCONN I Storrs
  • City of New Haven
  • City of Norwich
  • Town of Windham
7. Lawrence and Memorial Hospital Master Lawrence and Memorial Hospital New London, Emergency Preparedness Manual, Section 11, Part Connecticut K, Radiation Accident Plan
8. Treating and Decontaminating Middlesex Hospital Middletown, Connecticut Injured/Radioactively Contaminated Patients at Middlesex Hospital-
9. Manual of Protective Action Guides and EPA400-R-92-001 U.S. Environmental Protection Agency Protective Actions for Nuclear Incidents 2-1 Millstone Emergency Plan Revision 31 December, 2004
3. Section Intentionally Left Blank (Reserved) 3-1 Millstone Emergency Plan Revision 31 December, 2004
4. Classification System
4. Classification System An UNUSUAL EVENT, ALERT, SITE AREA EMERGENCY or GENERAL EMERGENCY is declared as required by the emergency assessment procedure. Each emergency classification has one or more corresponding state posture codes. Within each classification is a description of the conditions and parameter values which are applicable to classifying the incident. This classification approach is consistent with the NUMARC or NEI methods.

The State RERP requires that incidents be assigned a state posture code at the time of classification. The state plan also defines non-emergency "General Interest Events" and "Radioactive Materials Incidents," which require reporting. This scheme has been adopted by the state agencies and the local communities in the Millstone EPZ. Certain federal classifications and their corresponding posture codes include an associated public protection action recommendation. The station will report the incident classification and a state posture code during an event to local and state authorities.

The emergency classification description, posture codes, discussion, and corresponding licensee actions are also given in Table 4-1 (UNUSUAL EVENT), Table 4-2 (ALERT), Table 4-3 (SITE AREA EMERGENCY) and Table 4-4 (GENERAL EMERGENCY).

The nuclear incident classification description and associated posture code scheme is defined in the State RERP and described in emergency procedures.

Incident classifications are driven by unit specific Emergency Action Level (EAL) tables.

Example EAL tables are provided in Appendix 1.The examples do not include specific setpoints for each classification category. Complete EAL tables are provided in Emergency Plan Implementing Procedure MP-26-EPI-FAP06, "Classification and PARs." The emergency classification and action level scheme meet I OCFR50.47(b)(4) requirements.

An analysis of the potential radiological impact of an accident at Unit I in the permanently defueled condition has been conducted. Based on this analysis, any potential release is not expected to exceed the EPA PAG exposure levels beyond the exclusion area boundary. For this reason, only the UNUSUAL EVENT or ALERT classifications apply at this unit.

4-1 Millstone Emergency Plan Revision 31 December, 2004

Table 4-1 Unusual Event - Licensee Actions Class Description NOTIFICATION OF UNUSUAL EVENT (State Posture Code: DELTA-TWO [if radiation release) or DELTA-ONE): Events are in process or have occurred which indicate a potential degradation of the level of safety of the plant. No releases of radioactive material requiring off-site response or monitoring are expected unless further degradation of safety systems occurs.

Actions

1. Assessment of conditions and initiation of actual corrective responses, as appropriate.
2. Notification of the appropriate Connecticut and New York state agencies and local communities (responsible local officials) within the plume exposure EPZ.
3. Notification of the appropriate licensee personnel and NRC.
4. Augmentation of on-shift resources, as appropriate.
5. Periodic event status updates are provided to off-site authorities.
6. Reassessment of conditions and a revised event classification, as appropriate.
7. A close-out report is provided with verbal summary to off-site authorities, followed by a written summary to the NRC as required by 10 CFR 50.73, as appropriate.

4-2 Millstone Emergency Plan Revision 31 December, 2004

Table 4-2 Alert - Licensee Actions Class Description ALERT (State Posture Code: CHARLIE-ONE): Events are in process or have occurred which involve an actual or potential substantial degradation of the level of safety of the plant. Any releases are expected to be limited to small fractions of the EPA Protective Action Guideline exposure levels.

Actions

1. Assessment of conditions and initiation of actual corrective responses, as necessary.
2. Precautionary dismissal of nonessential station personnel.
3. Notification of the appropriate Connecticut and New York state agencies and local communities (responsible local officials) within the plume exposure EPZ.
4. Activation of the Station Emergency Response Organization (SERO) and appropriate emergency response facilities (ERFs)
5. Establish communications with the State EOC in Hartford, if activated.
6. Notification of the NRC.
7. Deployment of on-site and off-sitc radiological monitoring teams (RMTs).
8. Periodic event status updates arc provided to off-site authorities.
9. Periodic meteorological data summaries and dose assessments are developed and provided to off-site authorities.
10. Reassessment of conditions and a revised event classification, as appropriate.
11. An event report by verbal summary is provided to off-site authorities followed by a written summary to the NRC as required by 10 CFR 50.73, as appropriate.

4-3 Millstone Emergency Plan Revision 31 December, 2004

Table 4-3 Site Area Emergency - Licensee Actions Class Description SITE AREA EMERGENCY (State Posture Code: CHARLIE-TWVO): Events are in process or have occurred which involve actual or likely major failures of plant functions needed for protection of the public. Any releases are not expected to result in exposure levels which exceed EPA Protective Action Guideline exposure levels except near the site boundary.

Actions

1. Assessment of conditions and initiation of corrective responses, as necessary.
2. Evacuation of nonessential personnel at the station.
3. Implement accountability of station personnel, as required.
4. Notification of the appropriate Connecticut and New York state agencies and local communities (responsible local official) within the plume exposure EPZ.
5. Activation of the Station Emergency Response Organization (SERO) and ERFs.
6. Establish communications with the State EOC in Hartford, when activated.

I-

7. Notification of the NRC.
8. Deployment of on-site and off-site RMTs.
9. Periodic event status updates are provided to off-site authorities.
10. Periodic meteorological data summaries and dose assessments are developed and provided to off-site authorities.
11. Reassessment of conditions and revised event classification, if appropriate.
12. An event report by verbal summary is provided to off-site authorities followed by a written summary to the NRC as required by 10 CFR 50.73, as appropriate.

4-4 Millstone Emergency Plan Revision 31 December, 2004

Table 44 General Emergency - Licensee Actions Class Description GENERAL EMERGENCY (State Posture Code: ALPHA [significant radiation release] or BRAVO): Events are in process or have occurred which involve actual or imminent substantial core degradation or melting with potential for loss of containment integrity. Releases can be reasonably expected to exceed EPA Protective Action Guideline exposure levels off-site for more than the immediate site area.

Actions

1. Assessment of conditions and initiation of corrective responses, as necessary.
2. Evacuation of nonessential personnel at the station.
3. Implement accountability of station personnel, as required.
4. Notification of the appropriate Connecticut and New York state agencies and local communities (responsible local official) within the plume exposure EPZ.
5. Activation of the Station Emergency Response Organization (SERO) and appropriate ERFs.
6. Establish communications with the State EOC in Hartford, when activated.
7. Notification of the NRC.
8. Deployment of on-site and off-site RMTs.
9. Periodic event status updates are provided to off-site authorities.
10. Periodic meteorological data summaries and dose assessments are developed and provided to off-site authorities.
11. Provide protective action recommendations to the State EOC.
12. An event report by verbal summary is provided to off-site authorities followed by a written summary to the NRC as required by 10 CFR 50.73, as appropriate.

4-5 Millstone Emergency Plan Revision 31 December, 2004

5- Emergency Response Organization This section describes the Station Emergency Response Organization (SERO). The SERO (Figure 5-1) replaces and prevails over the normal station organization. Information regarding the structure of the normal operating organization is presented in Section 1.0 of the Quality Assurance Program (QAP) Topical Report and is incorporated in this document by reference.

Personnel are assigned to the SERO based on their normal job qualifications and other specialized training. Personnel assigned receive Emergency Plan training based on their specific emergency functions. The Nuclear Training Department maintains a Training Procedure Description that specifies required training for each SERO function.

The SERO consists of on-shift staff, minimum staffing, and full staffing. The minimum SERO staffing necessary to activate the ERFs consists of the on-shift and minimum staffing positions identified in Table 5-1. The DSEO has the discretion to relieve the CR-DSEO and authorize ERF activation with less than minimum staffing when the necessary functional areas are filled. The specified positions are in accordance with NUREG-0654, Planning Standard B, Table B-1. The SERO personnel identified as full staffing are additional personnel beyond the required minimum, used to enhance the emergency response. The full staffing emergency positions will report as soon as possible after acknowledging notification with a goal of filling these positions within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. The SERO is activated upon declaration of an ALERT, SITE AREA EMERGENCY or GENERAL EMERGENCY. The on-shift SERO personnel are then supplemented by minimum and full staffing, reporting as indicated on Table 5-1. Additional personnel resources, outside the SERO staff, may be activated, as needed.

The SERO is described in Table 5-1 and Figure 5-1. Table 5-1 illustrates the relationship between emergency and normal positions, describes major tasks, functional areas, emergency locations, and indicates the emergency position type (i.e. on-shift, minimum staffing, or full staffing). The normal on-shift staff complement applies to operating modes. During shutdown, refueling or permanently defueled condition, the on-shift staff may be reduced to the minimum shift staff composition delineated in the administrative controls section of the unit Technical Specifications.

Procedures detailing responsibilities for the various SERO staff positions are listed in Appendix D, as applicable.

This section also includes brief descriptions of the state, local and other organizations that would provide assistance upon request.

Appendix B contains copies of letters of agreement from these organizations.

The on-shift/on-site positions are part of the normal station organization, which includes:

  • Shift Manager/Certified Fuel Handler (CFH)

Shift Technical Advisor (Unit 2 and Unit 3)

Work Control Senior Reactor Operator (SRO) 5-I Millstone Emergency Plan Revision 31 December, 2004

Unit Supervisor (Unit 2 and Unit 3)

Control Operators (Unit 2 and Unit 3)

. Plant Equipment Operators (Unit 2 and Unit 3)

Health Physics Technicians (same as Radiation Protection Technicians)

Chemistry Technician Security Shift Supervisor and Security Personnel Station Duty Officer

  • Fire Brigade / EMT The minimum staffing management positions include the following:

Director of Station Emergency Operations Assistant Director, Emergency Operations Facility Assistant Director, Technical Support (Unit 2, 3)

Manager of Technical Support Center Manager of Radiological Consequence Assessment Manager of Radiological Dose Assessment

  • Manager of Communications (Unit 2, 3)

Manager of Operational Support Center (2 Positions)

  • Chief Technical Spokesperson
  • Nuclear News Manager
  • Manager of Resources
  • PublicInformation Technical Advisor 5-2 Millstone Emergency Plan Revision 31 December, 2004

The Millstone SERO positions are described below:

5.1. On-Shift Positions 5.1.1. Shift Manager (SM) 3 The Shift Manager initially assumes command of the SERO as the Control Room DSEO (CRDSEO) following UNUSUAL EVENT or higher classification. In this position, the Shift Manager has the authority and responsibilities of the DSEO. Due to the numerous responsibilities assigned the Shift Manager at the onset of an emergency, actions shall be prioritized as follows:

(I) ensure safe operation of the plant, (2) ensure immediate notification requirements are met, (3) obtain operational and radiological assessment of the emergency, and (4) perform additional emergency actions as directed by procedures as time and conditions permit.

An SRO shall assume the responsibilities of the SM if the SM should become incapacitated or otherwise unable to fulfill the responsibilities of CRDSEO. If this is required, some delay in completing the prioritized actions is expected. However, assistance is available from the Station Duty Officer and the unit STA. After being relieved by another qualified DSEO, the Shift Manager becomes the Manager of Control Room Operations (MCRO). The following CRDSEO responsibilities cannot be delegated:

  • Event classification 4
  • Initiation of station emergency response
  • Authorization of mitigation and repair activities.
  • Command and control of station emergency response.
  • Approval of off-site Protective Action Recommendations.
  • Approval of on-site evacuation.
  • Authorization of emergency exposures.
  • Authorization of off-site notifications.

For a Unit I event, the Unit 2 SM/CFI1 functions as the CRDSEO.

3 For Unit 2, the SM is also a qualified Certified Fuel Handler (SM/CFIII).

4 The Unit 2 CR DSEO will also classify events specific to Unit 1.

5-3 Millstone Emergency Plan Revision 31 December, 2004

5.1.2. Shift Technical Advisor (STA)

The STA is responsible for the analysis of operational data5 .

5.1.3. Manager Of Control Room Operations (MCRO)

The Manager of Control Room Operations responsibilities include control room operations, interface with ADTS concerning plant status and changing conditions and recommendations for classification changes and corrective actions. The Unit 3 MCRO is also responsible for determining entry conditions into the Severe Accident Management Control Room Initial Response Guidelines and implementation of the Severe Accident Management Guidelines as required.

For a Unit I event, the Unit 2 CRDSEO becomes the MCRO.

5.1.4. Emergency Communicator The Emergency Communicator is responsible for conducting emergency notifications and activating ERDS.

5.1.5. On-shift Operators For an operating unit, the on-shift Unit Supervisor (US), Control Operators (CO) and Plant Equipment Operators (PEO) perform plant related functions in accordance with unit and Station procedures, and as directed by the SM/MCRO. The PEOs provide basic on-shift mechanical and electrical maintenance functions, in addition to Radwaste-opcrations. 6 5.1.6. Health Physics Technicians (HP)

The Health Physics Technicians provide initial in-plant and on-site radiological support actions as RMT #1.

5.1.7. Chemistry Technician The Chemistry Technician provides on-shift dose assessment, chemistry support and is available to assist control room personnel in other actions as directed.

5.1.8. Security Shift Supervisor and Security Personnel The Security Shift Supervisor performs security related functions in accordance with unit and Station procedures, and as directed by the SM/MCRO. The Security Shift Supervisor is assisted by security personnel in providing site access control and accountability.

5 This position is not required for a permanently defueled unit.

6 For a permanently defueled unit, an on-shift Unit 2 operator (licensed or non-licensed) performs these functions.

54 Millstone Emergency Plan Revision 31 December, 2004

5.1.9. Station Duty Officer (SDO)

The Station Duty Officer or available SRO notifies the NRC, assists with communications, precautionary dismissal, and evacuation or assembly of station personnel.

5.1.10. Fire Brigade / EMT The Fire Brigade provides immediate response to a fire on-site. EMT qualified personnel assigned to the Fire Brigade provide emergency medical services for on-site personnel injuries.

5.2. Minimum Staffing Positions 5.2.1. Director of Station Emergency Operations (DSEO)

After relieving the CRDSEO, the EOF DSEO assumes overall command and control of the SERO and the licensee emergency response. The DSEO is responsible for classification, notification, release of information to off-site authorities and the public, recommending protective actions to the State of Connecticut, and approval of personnel appointed to fill SERO vacancies during an emergency. The DSEO will ensure that additional SERO staff positions, as determined necessary to effectively respond to the specific emergency, will be staffed within 90 minutes of facility activation. The DSEO will turn over the responsibility to approve news releases to the Chief Technical Spokesperson (CTS) when he is available at the State EOC. The following DSEO responsibilities cannot be delegated:

  • Command and control of station emergency response, including coordination of response by off-site agencies.
  • Event classification.
  • Approval of off-site Protective Action Recommendations.

Authorization of emergency exposures greater than 25 rem TEDE for lifesaving activities.

Authorization of off-site notifications.

  • Requests for federal assistance to support station response.

5.2.2. Assistant Director, Technical Support (ADTS)

The ADTS reports to the DSEO. The ADTS is responsible for providing command and control of the SERO technical, operational, assessment and repair staff. The MCRO, MRCA, MOSC, MTSC, and MOS report to the ADTS.

The ADTS primary responsibilities include:

Ensuring actions are taken to mitigate degradation of plant systems.

5-5 Millstone Emergency Plan Revision 31 December, 2004

Recommending changes in classification to the DSEO.

Approving accident management strategies and ensuring accident management plan is implemented.

  • Ordering station assembly, evacuation, or sheltering.
  • Approving on-site personal protective action decisions (PPADs)

Approving emergency exposure upgrades to 25 Rem TEDE for on-site staff and technical, operational support and security personnel.

  • Approving the issue of Potassium Iodide (KI) to emergency personnel assigned to the ADTS, at the recommendation of the MRCA.

5.2.3. Manager of Technical Support Center (MTSC)

The MTSC reports to the ADTS. The MTSC analyzes operating data and provides technical support to the ADTS, MCRO, and the MOSC. The TSC Engineering staff and Accident Management Team report to the MTSC and provide accident assessment functions. The MTSC is assisted by a mechanical engineer, reactor engineer, and an electrical engineer.

5.2.4. Manager of Operational Support Center (MOSC)

The MOSC reports to the ADTS. The MOSC assembles, briefs, equips, deploys, and coordinates Emergency Assessment, Repair, and Search/Rescue Teams. The MOSC assumes control of the Operational Support Center. Personnel assigned to assist in performing these functions report to the MOSC. The MOSC is assisted by OSC assistants, maintenance specialists, and other staff.

5.2.5. Assistant Director, Emergency Operations Facility (ADEOF)

The ADEOF reports to the DSEO in the EOF. The ADEOF is responsible for providing command and control of the offsite radiological assessment and radiological support activities. The MRDA, MOC, MOR, PITA, and Emergency Communicator report to the ADEOF. The ADEOF is also responsible for:

  • Providing recommendations for classification changes based on offsite radiological conditions.
  • Approving Potassium Iodide (KI) issue to emergency personnel assigned to the ADEOF.
  • Developing, recommending and updating off-site PARs to the DSEO.

Off-site radiological dose assessment.

Providing logistics support (personnel) from external response agencies.

Managing the collection and communication of event data and news releases.

5-6 Millstone Emergency Plan Revision 31 December, 2004

  • Assuming responsibilities of DSEO, in the event the DSEO becomes incapacitated or otherwise unable to perform the assigned duties.
  • Approving emergency exposure upgrades up to 25 Rem TEDE for SERO personnel who perform actions off-site.
  • Authorizing contaminated personnel to leave the station.

5.2.6. Manager of Radiological Consequence Assessment (MRCA)

The MRCA reports to the ADTS. The MRCA coordinates health physics activities including on-site radiological assessment, personnel exposure control, recommendations on the issuance of KI to on-site SERO personnel, and radiation protection programs. Personnel assigned to assist in on-site radiological assessment functions include the ARPs and Radiological Communication.

5.2.7. Manager of Radiological Dose Assessment (MRDA)

The MRDA reports to the ADEOF. The MRDA coordinates off-site radiological monitoring, environmental sampling, and dose assessment, and provides recommendations for exposure upgrades and KI issuance to offsite SERO responders. The personnel assigned to assist in performing these functions are the Assistant Managers of Radiological Dose Assessment (AMRDAs), Radiological Assessment Engineers (RAEs),

Field Team Data Coordinator (FTDC), and the Meteorological Assistant.

5.2.8. Manager of Communications (MOC)

The MOC reports to the ADEOF. The MOC provides information concerning the operation and status of the plant and radiological conditions to the NRC Headquarters Emergency Operations Center, Bethesda, MD and the NRC Region I Emergency Response Center as requested.

5.2;9. Radiological Monitoring Team (RMT #2-NAP and SAP)

HP Technicians serve as RMT # 2 and provide radiological surveys, HP coverage, and monitoring and decontamination activities associated with site evacuation. The RMT #2 reports to the MRCA.

5.2.10. Radiological Monitoring Team (RMT #3-#4-#5)

RMTs # 3, #4, and #5 are each composed of a driver and monitor and provide offsite radiological surveys in the event of a release. The EOF RMTs will also collect environmental samples as directed by the MRDA.

The offsite RMTs report to the MRDA.

5-7 Millstone Emergency Plan Revision 31 December, 2004

5.2.11. EOF HP Technician The EOF HP Technician provides HP functions for the EOF and supervises operation of the EOF decontamination facility and count-room.

The EOF HP Teclmician reports to the MRDA.

5.2.12. EOF Emergency Communicator The EOF Emergency Communicator performs notifications of licensee, federal, state and local officials. The EOF Emergency Communicator reports to the ADEOF.

5.2.13. OSC - Assistant Radiation Protection Supervisor (ARPS)

The ARPS reports to the MRCA. The ARPS provides radiological controls for the TSC/OSC and OSC Assembly Area. The ARPS also provides radiological support for emergency teams dispatched from the OSC AA.

5.2.14. Public Information Technical Advisor (PITA)

The PITA reports to the ADEOF. The PITA gathers emergency-related information and transmits it to the Nuclear News Manager and public information staff at the Joint Media Center. The PITA is also responsible for rumor control activities at the site and will issue news releases until the State EOC is staffed by an NNM and CTS.

5.2.15. Chief Technical Spokesperson (CTS)

The CTS reports to the DSEO and acts as the company spokesperson at the State EOC and Joint Media Center, providing face-to-face communications with state officials and representing the licensee at news conferences. The CTS may also provide background information concerning licensee PARs provided to the State DEP. The CTS will relieve the DSEO of the responsibility to approve news releases.

5.2.16. Nuclear News Manager (NNM)

The NNM reports to the CTS and supervises all public information activities. The position of NNM is activated upon declaration of an UNUSUAL EVENT or higher incident classification for purposes of public information releases. The NNM issues news releases from the State EOC.

5-8 Millstone Emergency Plan Revision 31 December, 2004

5.2.17. Manager of Resources (MOR)

The MOR reports to the ADEOF. The MOR fills SERO vacancies and provides 24 hour/day planning for manpower, transportation, food, quarters, equipment and supplies at the site. He/she serves as the coordinator for corporate support.

5.2.18. Technical Support Center-Reactor Engineer The Technical Support Center-Reactor Engineer (TSCRE) reports to the MTSC and provides expertise in reactivity transients, reactivity management and shutdown margin calculations. The TSC-RE assists the AMT with thermal hydraulic calculations as necessary.

5.2.19. Technical Information Coordinator (TIC)

The TIC reports to the DSEO and is responsible for collecting and entering information and key plant parameter data onto the Critical Parameters status board. The TIC obtains this set of key plant parameters from the Off-Site Facilities Information System (OFIS). This system provides information to the EOF, TSC and the State EOC.

5.2.20. Technical Support Center - Electrical Engineer The TSC Electrical Engineer (TSCEE) reports to the MTSC. The TSC Electrical Engineer is responsible for providing the MTSC with electrical engineering and general support.

5.2.21. Technical Support Center - Mechanical Engineer The TSC Mechanical Engineer (TSCME) reports to the MTSC. The TSC Mechanical Engineer is responsible for providing the MTSC with mechanical engineering and general support.

5.2.22. Mechanic, Electrician, I&C Technician The mechanic, electrician, and I&C technician report to the Manager, OSC and are responsible for assessment, repair, and corrective actions.

5.3. Full Staffing Positions 5.3.1. Control Room Data Coordinator (CRDC)

The CRDC reports to the MCRO and is responsible for communicating plant data and control room activities to the TSC and EOF.

5-9 Millstone Emergency Plan Revision 31 December, 2004

5.3.2. Technical Assistant (TA)

The TA reports to the CTS and provides the CTS with technical information as required.

5.3.3. Meteorological Assistant The Meteorological Assistant reports to the MRDA and provides meteorological data interpretation, calculations and long term meteorological information to support dose assessment activities.

5.3.4. Technical Support Center- Shift Manager (TSC-SM)

The SRO assigned to the Technical Support Center assists with communications with the control room and provides technical expertise in accident assessment activities. The TSC-SM monitors Emergency Operating Procedure (EOP) progress and assists the ADTS in monitoring plant conditions for possible classification changes.

The Unit 2 TSC-CFH assists with communications to the Unit 2 control room and provides expertise on Unit I-related activities.

5.3.5. Operational Support Center (OSC) Assistant The OSC Assistant reports to the Manager, OSC, and provides operational support by coordinating on-site activities and personnel.

5.3.6. CBETS Operator The CBETS Operator provides computer based exposure tracking information and assists the MRCA with the administrative activities for exposure upgrades and KI issuance. The CBETS Operator reports to the MRCA.

5.3.7. Radiological Assessment Engineer (RAE) {two positions)

The RAE reports to the MRDA and assists the radiological assessment team in dose calculations.

5.3.8. Radiological Communicators {two positions)

The Radiological Communicators report to the MRCA and provide communications for on-site radiological activities. One RadCom is located in the TSC/OSC and the other is in the EOF.

5-10 Millstone Emergency Plan Revision 31 December, 2004

5.3.9. Assistant Manager, Radiological Dose Assessment (AMRDA) {two positions)

The AMRDAs report to the MRDA and assist in performance of radiological monitoring, environmental sampling, and dose assessment.

5.3.10. Field Team Data Coordinator (FTDC)

The FTDC reports to the MRDA and provides communications and information from field teams to the EOF. The FTDC also briefs and deploys field monitoring and environmental sampling teams.

5.3.11. Manager of Security (MOS)

The Manager of Security reports to the ADTS and is responsible for maintaining accountability and site security.

5.3.12. Accident Management Team (AMT)

An Accident Management Team consisting of an AMT-Leader and an AMT Thermal-Hydraulic Engineer report to the MTSC and assist the Technical Support Center in developing accident response strategies. The AMT is also responsible for evaluating conditions and implementing Severe Accident Management Guidelines. During severe accident management implementation, the AMT reports to the ADTS.

5.3.13. Regulatory Liaison (RL)

The RL reports to the ADEOF and is responsible for accommodating the NRC Site Team dispatched to the station, arranging site access for the NRC Team, providing adequate dosimetry, and responding to questions and comments.

5.3.14. Media Center Liaison The Media Center Liaison reports to the NNM and is responsible for assisting with media response.

5.3.15. Rumor Control Liaison The Rumor Control Liaison reports to the NNM and is responsible for coordinating with the State Public Information Officer (PlO) to oversee joint rumor and inquiry control activities.

5.3.16. Technical Briefer The Technical Briefer reports to the Media Center Liaison and is responsible for providing technical, plant specific information to the media during official news briefings.

5-1I Millstone Emergency Plan Revision 31 December, 2004

5.3.17. Radiological Briefer The Radiological Briefer reports to the Media Center Liaison and is responsible for providing technical radiological information to the media during official news briefings.

5.4. Other Organizations Providing Assistance 5.4.1. State / Local Assistance During an emergency, assistance from state or local agencies may be required. The State RERP defines responsibilities of the state and local agencies. Details of provided assistance are contained in Letters of Agreement (Appendix B) with the agencies and the State RERP. These letters are updated annually or as necessary to reaffirm agreed-upon assistance and to verify appropriate communications channels.

5.4.2. Private Agency Assistance Assistance of private agencies may also be required during an accident.

Details of the type of services expected are contained in letters of agreement. The letters are updated annually or as necessary to reaffirm agreed-upon assistance and to verify appropriate communications channels. Appendix B contains a listing of operational letters of agreement.

5.4.3. Federal Assistance Request for off-site federal assistance vill be made through the State OEM. The federal agencies contacted can inform the State OEM of their response times.

The licensee does not anticipate need for additional federal support in responding to an accident.

The licensee maintains work centers for both FEMA and the NRC at the Station EOF. Work space is also maintained for NRC personnel in the TSC. Dedicated federal telephone communications and access to licensee communications equipment are provided in this area.

5-12 Millstone Emergency Plan Revision 31 December, 2004

Figure 5-1 Organization and Location of Station Emergency Management Personnel (page 1 of 3)

Senior SERO Management Structure

.3 I0 0 6 S g Public Information SERO Structure I

ATech Assistant l Rum Cont Liaison MC Liaison Tech Briefer Rad Briefer l U Indicates positions necessary for facility activation.

Indicates fully augmented organization positions.

5-18 Millstone Emergency Plan Revision 31 December, 2004

C C Figure 5-1 Organization and Location of Station Emergency Management Personnel (page 2 of 3)

Onsite SERO Structure JADTS qTSC-SMICFH l I

I I

I HM-Ti -I !JaitAsiIt 1A Rsid rnmm --- I Lii t4PId-ft-Nnowl

-ICRDC ..

-Itgnm tlmmml MOSC . .

Fm ,Maint Assist

,~~~~~~~~ . . .. .. _.

. . ;es_

-FAKFF-Lead I qI&C Assist (2) CBETS .

A T Thenro

-  ; _ .  ! ' L'.' t tL' (2)--jM-  :,  ;:,-

-lElectrical Eng I

-4Mechanical Eng I.

O3SCAsse Se mbly *e Z Indicates on shift positions.

  • Indicates positions necessary for facility activation.

Fa Indicates fully augmented organization positions.

5-19 Millstone Emergency Plan Revision 31 December, 2004

( ( C Figure 5-1 Organization and Location of Station Emergency Management Personnel (page 3 of 3)

Offsite SERO Structure

- I.

=3- Ie WMCl .I1 I I l

Station EP Rep

]

L Reg Liaison -

]

I-

  • Indicates positions necessary for facility activation.

a Indicates fully augmented organization positions.

5-20. Millstone Emergency Plan Revision 31 December, 2004

6- Emergency Measures

6. Emergency Measures Emergency measures begin with the identification and classification of an emergency and the activation of the appropriate emergency organizations. Emergency measures include assessment actions, corrective actions, and recommendation of protective actions. The Emergency Action Levels (EALs) have predetermined values or conditions which, when met or exceeded, require declaration of an emergency classification, notification of the licensee emergency response organization, state and local officials, and corrective and/or protective actions. A general outline is presented as follows:

6.1. Notification and Activation of Emergency Organizations The authority and responsibility for initially classifying and declaring emergencies, initiating notification to emergency organization personnel, state and local officials, the NRC and initiating immediate actions necessary to limit the consequences of the emergency reside with the Shift Manager (SM), who is on site 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day.

The SM initially assumes command and control of the SERO as the Control Room Director of Station Emergency Operations (CRDSEO). The SM will function as CRDSEO until relieved by the EOF DSEO, a shift relief occurs, or the event is terminated. After relief by the EOF DSEO, the SM assumes responsibility as Manager of Control Room Operations (MCRO). For a Unit 1 event, the Unit 2 SM functions as the CRDSEO. After a turnover with the EOF DSEO and ADTS, the Unit 2 SM assumes MCRO responsibilities.

KJ The CRDSEO / DSEO is responsible for ensuring that timely and appropriate notifications are made.

SERO responsibilities may be transferred during a normal shift rotation when a qualified relief reports on site and is fully briefed on current and past conditions.

For emergencies that are not unit-specific, the Unit 3 Shift Manager assumes the position of DSEO until relieved, or the event is terminated.

The SERO is activated by a combination of public address (PA) system announcement, Station emergency alarm actuation and pager message. The PA announcement can include the incident location, emergency classification and personnel information.

Initially, the emergency organization consists of normal on-shift personnel. Notification of the emergency organization and state and local officials is by the Emergency Notification and Response System (ENRS) which is initiated by Control Room personnel.

If a failure of either system should occur, notifications will be made using commercial telephone lines. The Connecticut State Police will assist with backup notifications to state and local officials, as necessary.

6-1 Millstone Emergency Plan Revision 31 December, 2004

Following the declaration of a "State of Emergency" by the Governor, OEM may direct the DSEO to discontinue use of the ENRS for further state and local notifications and directly communicate with the State EOC for classification changes or event updates. The State OEM will then assume responsibilities for notification of the local communities.

The State EOC will coordinate activation of the Public Alerting System sirens with the local governm ents, as needed. The ENRS consists of computer based systems. When activated, a pager tone alert and a message are transmitted to the pagers. The ENRS system is used for notification of emergency events and decreases the time necessary to notify off-site officials. The radiopager message satisfies the 15-minute notification' requirement for state and local officials. The state and local officials call a dedicated telephone number which records the time the call was completed and provides more detailed incident information. A goal of 15 minutes has been established for completing the initial SERO notification sequence.

Radiopager messages include the following information:

  • Station and unit identification
  • Event classification (including State Posture Code)

The initial or reclassification messages are received by off-site officials calling the dedicated telephone numbers provided to each responder. The information above is repeated and additional information is provided as follows:

  • Date and time of event classification
  • Name and Title of communicator
  • Verbal summary of incident details (major and minor EAL headings)
  • Current release information
  • Meteorological conditions (if available)
  • Classification change, update, termination Message updates which are provided as plant status and conditions change include forecast meteorological conditions, plant status, any offsite services requested, and whether or not access to the site has been restricted.

Details concerning release type, quantities and actual or projected dose rates will be developed, as appropriate, and provided to responsible officials, when requested.

6-2 Millstone Emergency Plan Revision 31 December, 2004

The ENRS provides initial event notification to the emergency organizations. When emergency facilities are activated, various communications systems are used. These systems allow transmission of detailed technical information of the event in progress as well as direct voice communications between facilities and decision makers. Detailed radiological information will be relayed to the DEP at the State EOC for analysis and decision making.'

A representative from the State DEP responds to the EOF and provides a liaison with the EOF and State EOC staff.

The Chief Technical Spokesperson, Technical Assistant, and Nuclear News Manager respond to the State EOC. They are supported by the Rumor Control Liaison, Media Center Liaison, Technical Briefer, and Radiological Briefer.

Work space and communications for federal agencies and the Town of Waterford are located in the EOF. The TSC provides a work area and limited communications for the NRC.

The State of Connecticut EOC in Hartford uses various communication systems to provide information to the OEM Area Coordinators and the local community EOCs. The systems are used to transmit technical, radiological, administrative and resource data between the local community EOCs and the State EOC. Radio, telephone, and FAX devices are used to provide continuous contact with the affected areas. The State EOC coordinates the Public Alerting System siren activation to immediately precede Emergency Alert System (EAS) broadcast messages.

The primary notification (radiopager and dedicated telephone lines) contacts and the continuing lines of communication between on-site emergency response facilities and off-site emergency response centers are indicated in Figures 7-1 a through 7-lc.

6.2. Assessment Actions 6.2.1. Initial Assessment Event classification is based on EALs. The EAL tables provide an incident classification based on instrument readings available in the control room or other observations. The NRC incident classification and corresponding state posture codes are transmitted to state and local officials via the ENRS.

On-Shift dose calculations are conducted, when appropriate, and used to validate the incident classification and any PAR if applicable.

The Shift Technical Advisor (STA) provides independent assessment of emergency actions. When activated, the TSC assumes a more expanded role and responsibility beyond that of the STA.

6-3 Millstone Emergency Plan Revision 31 December, 2004

Additional technical services and support are obtained as necessary from a combination of station personnel, corporate personnel, and off-site assistance companies/agencies. The State DEP does an independent assessment of plant conditions and off-site dose assessment.

6.2.2. Protective Action Recommendations (PARs)

The State RERP includes procedures for use by state and local community officials for public protective actions in the plume exposure pathway. Public PARs requiring evacuation are to be initiated only for GENERAL EMERGENCY events.

PARs beyond those associated with the event classification are developed using dose assessment or plant conditions in accordance with "NUREG-0654, Supplement 3" guidance for severe reactor accidents. The licensee will provide a PAR to state and local authorities.

If PARs are warranted from the Control Room before activation of the station response organization, the state posture code will automatically initiate actions out to 5 miles. If actions are necessary beyond 5 miles, the appropriate PARs will be transmitted directly to the State DEP Duty Officer. Following activation

  • ofthe station response organizations, PARs are developed and issued directly to the State EOC. The provided PAR will be revised if changing conditions warrant.

When authorized, protective actions are implemented by state and local officials using the Public Alerting System sirens in conjunction with the EAS. The Governor of Connecticut is responsible for public protective action decisions after a state of emergency is declared. Before a state of emergency declaration, local chief executives are authorized to take the public protective actions associated with the GENERAL EMERGENCY posture codes.

When emergency response facilities are activated, the State DEP will collect and process information to independently verify and recommend changes, if necessary, to the licensee provided PARs.

64 Millstone Emergency Plan Revision 31 December, 2004

6.2.3. Dose Assessment Radiological assessments by the SERO include determination of radiation exposure rates by both analytic and direct measurement methods. Direct measurements are performed by RMTs deployed to field monitoring locations.

The analytic methods use computerized dose calculation models. Projected dose estimates are calculated for different downwind directions and distances. The results may require reclassification of the emergency. Further assessments are performed as required and updates are provided to off-site authorities. On-site radiation protection activities are coordinated by the MRCA. Off-site RMT activities are coordinated by the FTDC under the direction of the MRDA. Field data and projected dose information is transmitted to the State DEP, as necessary.

The emergency plan procedures contain methods for relating the various measured parameters to dose rates for the accident conditions.

Dose assessment is performed by licensee personnel assigned to the control room or EOF who perform the calculations. Information from dispatched field monitoring teams and plant conditions are then used to verify incident classification.

a. Use of Station Monitors The station has an extensive system for monitoring radioactive materials released to the environment. As a general requirement, the various process monitors are capable of initiating appropriate alarms and/or actuating control equipment to provide containment of radioactive materials if pre-established limits are reached.

High range containment monitors have been installed in the Unit 2 and Unit 3 containments to be used to determine containment atmosphere curie inventory. Procedures have been established for converting these monitor readings into potential dose assessment data.

For Unit 2 and Unit 3, high-range radiation monitors have been installed at the potential effluent points to determine effluent release rates if existing normal range stack monitors should go off-scale or become inoperative during an emergency. These high-range monitors cover the entire postulated range of releases and exceed the values specified for a GENERAL EMERGENCY. These systems allow for monitoring releases during emergency conditions. Procedures have been established for converting these monitor readings into release rates. RMT surveys are taken to verify release rates.

6-5 Millstone Emergency Plan Revision 31 December, 2004

Unit 1 gaseous effluent releases are continuously monitored for radioactive gases by a Spent Fuel Pool Island (SFPI) radiation monitoring system. Gaseous effluent is sampled for radioactive particulates by a continuous sampling system which collects samples for periodic analysis.

The site has a permanent meteorological installation that records wind speed, direction, and temperature differences continuously in the Unit 2 and Unit 3 Control Rooms and at 15-minute intervals via a computer system.

b. Use of Emergencv Action Levels (EALs)

Unit 2 and Unit 3 EALs contain effluent monitor radiation levels which correspond to predetermined dose assessments and appropriate emergency classification levels.

Unit 1 EALs contain effluent monitor release limits established in the Radiation Effluent Monitoring Manual.

c. Dose Estimates for Radioactive Releases Upon determination of an emergency or potential emergency condition that is anticipated to have off-site consequences, off-site doses are estimated. The critical exposure pathways for short-term emergency actions are the external dose due to noble gases and the internal thyroid dose due to inhalation of radioactive iodine. In these cases, estimated release rates are combined with meteorological dispersion estimates in order to predict off-site doses. Station emergency plan procedures include a method to calculate the distances at which the Environmental Protection Agency protective action guide (PAG) limits may occur.

When the station EOF is activated and radiological dose assessment personnel have arrived, estimates of off-site doses based on more sophisticated techniques and by analysis of actual RMT data can be provided.

6-6 Millstone Emergency Plan Revision 31 December, 2004

6.2.4. Release Rate and Dose Estimate Methodology

a. Noble Gas Release Rate Estimates Gaseous effluent readings for Unit 2 and Unit 3 are obtained and converted to release rates by multiplying the readings by an appropriate factor. If the monitors are off-scale, the high-range radiation monitors are used to determine release rates. The high-range radiation monitor readings are converted to a release rate using a predetermined factor.

Grab sample results, if available, may be more accurate than gross monitor readings. Release rates based on actual samples, if available, will be used in lieu of monitor based calculations.

If no release estimates based on fixed monitors are available, the release rate will be estimated using field monitoring results.

Unit 1 noble gas release estimates for accidental releases out the SFPI vent will use an area monitor and conversion factors to determine the quantity of Kr-85 being released.

b. Radioactive Iodine Release Rate Estimates If radioactive iodine grab sample results are available, they may be used to calculate the total iodine release rate. If grab samples are not available, the total noble gas release rate is multiplied by a predetermined iodine-to-noble gas ratio (depending on the plant conditions) to obtain the iodine release rate.
c. Core Damage Estimates Core damage estimations serve several roles within the Millstone Emergency Preparedness Program. For planning purposes, core damage considerations are used as the bases for several of the Emergency Action Level (EAL) initiating conditions and as the threshold for the declaration of a General Emergency (the definition of a General Emergency specifies conditions which involve 'substantial' core degradation or melting as one of the bases for classification). From an implementation perspective, core damage estimations provide a means of realistically differentiating between the four core states (no damage, clad damage, overheat, and melt) to:
  • Evaluate the status of the fuel barriers and how their status relates to the risks and possible consequences of the accident.
  • Determine the potential quality (type) and/or quantity (%) of source term available for release in support of projected offsite doses and protective action recommendations.
  • Provide information which quantifies the severity of an accident in terms that can be readily understood and visualized.

6-7 Millstone Emergency Plan Revision 31 December, 2004

  • Support the determination of radiological protection actions that should be considered for long term recovery activities.

The assessment methodologies used by Millstone Station are intended to provide a rapid best estimate of core damage which, when evaluated together, help to develop an overall picture of the extent of core damage.

The methods used to estimate the amount or type of core damage occurring under accident conditions include the following:

  • Core Uncovers Time: An indirect method used to indicate the type of core damage (clad failure or fuel melt). Applicable for all types of accidents. Provides a relatively accurate estimate of the core state early in the event. Valid any time following an accident.
  • Core Temperatures: An indirect method used to indicate the type of core damage. Applicable for all types of accidents. Does not provide numerical estimations but is useful as a yes/no indicator or as confirmation of other methods. Valid any time following an accident.
  • Containment and Main Steam Line Radiation Levels: An indirect method used to determine the amount of core damage. Applicable to LOCA type accidents. Based upon an end-of-life source term and static nuclide ratio assumptions yielding a limited accuracy. Valid any time following an accident.

. Containment Hydrogen Concentration: An indirect method used to establish the type of core damage. Applicable to LOCA type accidents where all the hydrogen generated by the metal-water reaction is released into containment. Valid any time following an accident.

  • Sample Analysis - Isotopic Ratio Comparison: A direct method used to establish the type of core damage. Compares expected isotopic ratios with a sample to determine a general core state. Applicable under all types of accidents. Valid any time following an accident.
  • Sample Analysis - Presence of Abnormal Isotopes: A direct method used to indicate a degree of fuel melt by the presence of unusually high concentrations of the less volatile fission products. Applicable under all types of accidents. Valid any time following an accident.
  • Sample Analysis - Concentration Evaluation: A direct method which yields the most accurate numerical estimations. Applicable for all types of accidents. Requires the sampled system(s) be in a steady state which usually prevents its use until the plant is in a stable condition.

6-8 Millstone Emergency Plan Revision 31 December, 2004

d. Meteorological Data Input to the meteorological section of the procedures includes effective release height, temperature differential, wind speed, and wind direction based on actual or projected readings.

Meteorological data, acquisition and flow are described in Section 7.13.

e. Total Effective Dose Equivalent (TEDE)

The calculated TEDE contributions will include plume external exposure, ground external exposure and inhalation exposure. TEDE doses are calculated for various downwind distances using computerized methods.

f. Committed Dose Eguivalent (CDE)-Thvroid The radioactive iodine release rate and meteorological data are used in computerized methods to obtain the projected maximum off-site CDE thyroid dose at various downwind distances.
g. Verification When appropriate, dose rates are verified by on-site and off-site RMTs which have been deployed with portable emergency radiological instrumentation and communication equipment.

h.. RMT Mobilization and Monitorinz

1. Notification/Coordination Methods - When notified by radiopager and/or the station evacuation alarm, the RMT members report to the EOF, Control Room, North Access Point (NAP), South Access Point (SAP), or other areas as assigned.

The teams are then dispatched by the appropriate SERO managers.

2. Composition - Each of the off-site RMTs consists of two persons, at least one is a health physics technician. The on-site RMTs are health physics technicians.
3. Transportation - Three dedicated company vehicles are used for transporting off-site RMTs.
4. Monitoring and Equipment - A general list of radiological monitoring kit equipment is included in Appendix E. Complete inventories are provided in station procedures. The kits are provided with appropriate radiological monitoring equipment to measure radioiodine concentrations in air as low as 10- iCi/cc.

6-9 Millstone Emergency Plan Revision 31 December, 2004

Environmental Thermoluminescent Dosimeters (TLDs) and air particulate samples, air sample cartridges, goat milk, cow milk, soil, vegetation, and water are collected by Environmental Services (ES), Health Physics personnel, or HP REMP Tech.

5. Deployment Time- The off-site RMTs can be deployed in approximately one hour. The on-site RMTs can be deployed immediately after equipment checks.
6. RMT Communication- The RMTs report information via radio communications or telephone.
i. Off-site Monitoring by DEP The State DEP dispatches off-site monitoring teams of state personnel.
j. Plume Monitoring Over Water Millstone Environmental Lab vessels may be used to provide transportation for plume monitoring over water. RMT personnel will be assigned to perform over water monitoring as necessary.

6.2.5. Secondary Dose Assessment Long-term off-site radiological dose assessment (secondary assessment) is provided by the State DEP. The State DEP is assisted, as necessary, by Millstone and other agencies. After the assessment has been completed, the State DEP recommends protective actions to the Governor for approval.

6.3. Corrective Actions Corrective actions are implemented by the use of detailed station procedures. These procedures prioritize actions to prevent or mitigate the consequences of an accident.

The instrumentation, control systems monitors, and radiation monitoring systems provide indications of the safe and orderly operation of the unit. These systems provide the operator with the information and controls needed to start up, operate at power, and shut down the plant. They further provide the means to cope with an abnormal operating condition should it occur. Control of plant systems and information displays are centralized in the control room. This instrumentation provides the basis for initiation of corrective actions.

The following additional corrective actions are implemented during emergency situations as necessary.

6-10 Millstone Emergency Plan Revision 31 December, 2004

6.3.1. Fire Fighting Procedures for responding to fire emergency situations are in place. Firefighting strategies for plant areas are available for use by responding personnel. The Shift Fire Brigade Captain, with assistance from the operations Fire Brigade Technical Advisor, is in charge of extinguishing the fire.

Applicable health physics, security, and safeguards procedures apply. If outside assistance is needed, the Waterford Fire Department is called.

6.3.2. Damage Control, Repair and Decontamination Station personnel normally provide decontamination, repair and damage control services. For ALERT, SITE AREA EMERGENCY and GENERAL EMERGENCY operations, the support of specialized outside contractors is obtained, as required. Decontamination of personnel and equipment is conducted in accordance with approved procedures.

6.4. Protective Actions Protective actions are taken when an incident has occurred, or may occur, that could result in concentrations of airborne radioactivity or radiation levels that exceed normal limits for a specific area or areas and cannot be readily controlled, or personnel safety from other causes is threatened. Emergency procedures provide guidance for protective actions, such as evacuation, assembly or sheltering.

6.4.1. On-site Protective Actions Persons in the owner-controlled area of the site, but outside the protected area, are considered members of the general public. Persons within the protected area are either station personnel, contractor personnel, or visitors. If the protected area has been evacuated, Security will inspect locations outside the protected area to ensure all personnel have evacuated.

The radiological protective actions specified in this section and in Emergency Plan Procedures are augmented by the normal health physics procedures and are used during an emergency unless different actions are identified and authorized by the ADTS. The MRCA establishes radiological control areas (RCAs) in response to the incident. Access to the RCA is controlled by the emergency team briefing process unless immediate access is authorized by the ADTS to facilitate emergency repairs.

a. Notification The actuation of radiation monitoring alarms, the station emergency alarm, fire alarms, and public address announcements alerts personnel to hazardous conditions and response actions.

6-11 Millstone Emergency Plan Revision 31 December, 2004

b. Security and Site Access Control If station access has been restricted, traffic is diverted through a security checkpoint in the EOF parking lot. Site access roads will be manned and barricaded as necessary. Station access controls will be supported by the Waterford Police department and the Connecticut State Police, as necessary.

Personnel accessing the protected area must be authorized by the ADTS.

Station security procedures provide detailed guidance for responding to an emergency.

c. Precautionary Dismissal of Non-Essential Personnel A precautionary dismissal of non-SERO personnel occurs at the Alert level declaration and can be initiated from the Control Room or TSC.

The CR DSEO or ADTS can elect NOT to conduct the precautionary dismissal if the nature of the event warrants such judgement.

A precautionary dismissal directs all non-essential Millstone employees, contractors, and visitors to leave the site.

d. Evacuation A site evacuation is initiated at the SITE AREA EMERGENCY or GENERAL EMERGENCY classification levels. Site evacuation may be called for at the ALERT level classification depending on the environmental conditions at the time of the event. All non-essential personnel are instructed to leave the Owner Controlled Area. Personnel can be evacuated in about 30 minutes. Evacuation may be suspended or, deferred during certain situations (e.g., Security-related, toxic gas), until the threat is resolved. Evacuation will be implemented as quickly as possible thereafter, given the specific situation.

Evacuation can involve the movement of large numbers of personnel out of the Protected Area through the turnstiles at the NAP or SAP. An evacuation alarm actuator is located in the Unit 2 and Unit 3 control rooms. A public alert system is in place in the protected area to communicate evacuation messages in the event of a station emergency.

Evacuation may warrant station egress control by Security. Following discussion with the Connecticut State Police and the Waterford Police Departments, Security will provide specific instructions to exiting personnel as requested by off-site authorities. As part of evacuation, station personnel may be directed to a specific location for monitoring and decontamination.

6-12 Millstone Emergency Plan Revision 31 December, 2004

Other situations which involve the evacuation of personnel from occupied localized areas onsite must be controlled on a case-by-case basis.

e. Local Area Evacuation Local area evacuation is an evacuation of a building, area, unit, or multi-units for the immediate protection of station personnel from a hazard with limited exposure potential. It is a standard response immediately taken by control room personnel upon acknowledging the hazard.
f. Sheltering Sheltering is a short-term action taken in specific situations where there is insufficient time available to conduct an evacuation due to the hazard being short lived or threatening the safety of the evacuating population.

If a release or hazard is projected to occur within 30-60 minutes, sheltering in place with subsequent staggered movement of personnel may be considered.

g. Assembly Assembly occurs upon declaration of an ALERT or higher emergency classification level. Minimum staffing and full staffing SERO positions report to their emergency response facilities (control room, EOF, TSC/OSC, OSC AA). SERO personnel assigned to the State EOC (SEOC) report to Hartford. Non-essential personnel are not involved in assembly activities. The Assembly Areas are used to retain SERO personnel who may be needed in the near term to support the event.
h. Accountability Accountability is conducted at a SITE AREA or GENERAL EMERGENCY and may be conducted at the Alert level following SERO activation and the completion of the precautionary dismissal.

Accountability is the process of verifying the location of personnel who are inside the Protected Area. That is, any unaccounted for person that has keyed into the Protected Area (NAP/SAP) and is not keyed into a vital area, the TSC/OSC, or the OSC Assembly Area (cafeteria) will be identified as missing. Accountability is required to be completed within 45 minutes of its initiation (the names of any missing persons identified to the DSEO or ADTS and announced over the PA).

If precautionary dismissal or evacuation could endanger plant personnel, these actions may be deferred until the condition has been resolved.

When conditions warrant, dismissal, evacuation and accountability wvill be performed, as appropriate.

6-13 Millstone Emergency Plan Revision 31 December, 2004

i. Personnel Monitoring All personnel within the Protected Area are monitored for radioactive contamination before leaving the Owner-Controlled Area. Portal monitors and RMTs will be used for monitoring personnel. An off-site monitoring location will be established if radiological conditions on site prohibit adequate monitoring.

Each ERF has radiation detection equipment.

The MRCA will establish decontamination areas as necessary.

Decontamination facilities are available at the EOF and other areas within the station. The Haddam Neck Plant may be used for monitoring and decontamination if conditions prohibit on- site monitoring.

Transportation to an off-site facility will be provided, as necessary.

Monitoring and decontamination procedures are detailed in the Radiation Protection Manual (RPM).

Documentation of personnel contamination surveys will be maintained.

Any person suspected or known to have ingested radioactive material will receive bioassay examinations as specified by the RPM.

6.4.2. Use of On-site Protective Equipment and Supplies Protective equipment and supplies are used to minimize external and internal radiological exposure and contamination of personnel entering the station.

Detailed procedures on the use of protective equipment and supplies are referenced in Appendix D.

6.4.3. Contamination Control Measures

a. Detailed guidance for controlling radioactive contamination of personnel and equipment is provided in the RPM.
b. During accident conditions, the MRCA may approve conditional release of items from the RCA, in excess of RPM release limits. Special controls for release of this equipment will be instituted.
c. Personnel are advised not to consume on-site drinking water and food supplies during an accident, until sampling and analysis are completed.
d. For areas outside the station protected area, RMTs will be used to identify radiation control areas and security will be used to control access. Public access areas of the site will be controlled to off-site radiological criteria.
e. Radiological waste material will be controlled, stored and shipped in accordance with the RPM.

6-14 Millstone Emergency Plan Revision 31 December, 2004

f. Off-site surface contamination and other radiological control criteria are detailed in the state and local RERP.

6.4.4. Personnel Radiation Dose Determination Health Physics (HP) coverage is provided 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day to support normal Station operations. During accident conditions, HP technicians may accompany emergency workers, as needed, during RCA entries.

Emergency dosimetry (i.e. self-reading Pocket Ion Chamber dosimeters (PICs) or alarming dosimeters) and permanent recording dosimeters (TLDs) are used by the initial SERO responders, as necessary. Additional dosimetry is distributed by HP personnel and is issued to individuals, including off-site individuals arriving at the EOF.

TLDs are available from and analyzed by the Dosimetry Laboratory. The individual integrated dose records are maintained by the HP Department.

Exposure information is recorded from self-reading dosimeters and provides personnel exposure tracking until TLD results become available. The TLD results will be used as a permanent exposure record.

Permanent dosimetry will usually be read when it is determined that the emergency workers have received an exposure near their administrative limit or if an overexposure is suspected. All other dosimetry is read on a schedule established by the MRCA.

6.5. Aid to Affected Personnel Provisions are made to assist personnel who are injured and/or have received high radiation exposures. EMT qualified personnel, assigned to the Fire Brigade, provide on-site emergency medical services. First aid and decontamination facilities are available on-site and off-site. The following subsections describe measures to be used to provide necessary assistance.

6.5.1. Exposure Control Guidelines In the event of an ALERT, SITE AREA EMERGENCY or GENERAL EMERGENCY, emergency worker exposure limits are automatically increased in accordance with EPA 400. This limit remains in effect until mission-specific limit upgrades are required and authorized by the appropriate emergency manager (refer to Table 6-1). The use of radioprotective Potassium Iodide will be evaluated for administration to on-site and off-site SERO personnel in accordance with emergency procedures. Exposures are commensurate with the significance of the objective and are held to the lowest levels that the emergency permits. In all situations, every reasonable effort is made to minimize exposure to emergency personnel.

6-15 Millstone Emergency Plan Revision 31 December, 2004

Planned actions are carefully examined by weighing the risks and consequences of potential exposure and injury against the probability of success and the benefits to be gained from these actions.

Emergency worker exposure limits and KI issuance for State and local agency responders (i.e., National Guard, police) onsite are controlled by the State of CT or applicable agency.

6.5.2. Emergency Exposure Control Guidelines for Off-Site Personnel If off-site emergency personnel are required during a nuclear incident to support combating fires, provide emergency first aid, or transport injured and/or contaminated injured to off-site medical treatment facilities, exposure limits as specified in Table 6-1 are applied. Appropriate dosimetry will be issued to all off-site responders in accordance with the RPM.

Off-site medical facility staff personnel performing medical treatment on injured and/or contaminated injured persons shall control exposure in accordance with facility emergency procedures. Medical staff shall be issued appropriate dosimetry (i.e., TLD and pocket dosimeter).

All dosimetry will be evaluated to determine and document the actual exposure received responding to the emergency.

For security-related events, offsite emergency responders such as the National Guard and State Police will report to the site with their own dosimetry. Dosimetry will be processed by a State contractor. Exposures received will be reported to the individuals and the station, as requested. Exposure control will be through the State of CT or local agency.

6.5.3. Decontamination Radiological decontamination of personnel, supplies and equipment and waste disposal is conducted in accordance with the RPM, under direction of HP personnel.

Unit 2 and Unit 3 have decontamination facilities which may be used to decontaminate emergency response personnel.

The EOF is the principal decontamination facility during emergencies. A shower with holding tank and supplies for personnel decontamination are provided. If on-site areas are not usable because of inclement weather or continuing releases, the Haddam Neck Plant with similar facilities may be used.

6-16 Millstone Emergency Plan Revision 31 December, 2004

6.5.4. First Aid EMT qualified personnel are available to assist ill or injured personnel on-site 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day. If necessary, a physician may be requested to provide medical assistance on-site.

6.5.5. Medical Transportation Injured or radioactively contaminated injured personnel requiring hospitalization are transported using local community ambulance services. The ambulance may be requested via dedicated or commercial telephone. The ambulance crews are trained to respond to radiological incidents. Personnel qualified in radiation protection are directed to report to the receiving hospital or accompany the injured, contaminated patients to the hospital. If necessary, the receiving hospital will be provided details of patients being transported. Station procedures provide detailed instructions for personnel responding to personnel injuries or contamination.

6.5.6. Medical Treatment Arrangements for the primary care of injured, or radioactively contaminated injured personnel are made with the Lawrence and Memorial Hospital in New London and Middlesex Hospital in Middletown. Communications will be by commercial telephone lines. The hospital staff is trained annually and the facility is equipped to treat contaminated injured patients. Contaminated wounds are treated and decontaminated as necessary by the hospital staff.

6.6. Public Information The public information emergency response personnel consist of the Public Information Technical Advisor (PITA), the Nuclear News Manager (NNM), the Chief Technical Spokesperson (CTS) and supporting staff. The PITA reports to the ADEOF at the Station EOF. The PITA gathers and transmits accident information to the NNM at the State EOC. The NNM reports to the Chief Technical Spokesperson and manages public information activities at the EOF and Joint Media Center. The Chief Technical Spokesperson represents the licensee in communications with state and media officials.

6-17 Millstone Emergency Plan Revision 31 December, 2004

Table 6-1 Emergency Exposure Limits Cateorv TEDE Annual Part 20 5.0 Rem(')

Mission to protect valuable property 1 0.0 Rem(2)

Mission to save a life or prevent/mitigate a severe accident 25.0 Rem(3 )

Voluntary mission to save a life or prevent/mitigate a severe accident >25.0 Rem(4 )

NOTES:

(1) Automatic exposure up to 5 Rem is allowed in a declared emergency. Members of the SERO responding to on-site emergency response facilities are designated emergency workers subject to NRC 10 CFR 50.47(b).1 1 radiation exposure controls which are the EPA guidelines for on-site emergency workers.

(2) In accordance with EPA 400, emergency workers can be authorized for an exposure up to 10 Rem TEDE for operations necessary to protect valuable property.

(3) Depending on station radiological conditions, authorized emergency workers may receive exposures up to a job/mission-specific designated limit, not to exceed 25 Rem TEDE.

(4) Exposures above 25 Rem may be received for life saving activities on a volunteer basis and with full awareness of the risk involved.

  • It is recognized by NRC and EPA that an accident involving significant radiation exposure is a low probability occurrence. An exposure level below 25 Rem is not considered to be life-threatening and will occur once in a lifetime. ALARA principles will be applied when possible.
  • Dose received during an emergency is administratively tracked/controlled in accordance with 10 CFR 20 requirements following termination of the event.
  • Total Effective Dose Equivalent is defined as part of the station health physics program.

6-18 Millstone Emergency Plan Revision 31 December, 2004

7- Emergency Facilities and Equipment This section identifies, describes, and gives the locations of emergency operation centers, support centers, communication systems, and first aid and medical facilities. Diagrams of the station emergency response facilities (ERFs) are provided in Appendix F. Locations of the on-site emergency response facilities (ERFs) are indicated in Table 7-1. The various facilities and equipment are controlled and surveilled, using MP-26-EPA-FAP05, "Emergency Planning Facility Manual," and MP-26-EPA-FAPOI, "Management Program for Maintaining Emergency Preparedness." These documents provide detailed lists of equipment and schedules for conduct of facility/equipment surveillance. Equipment inspection and inventories are conducted quarterly or after known or suspected use of equipment occurs in accordance with this procedure.

Operational checks of emergency equipment are completed at specified intervals and during activation of the emergency response organization.

7.1. Control Room The Control Room is the primary facility where conditions of the plant are monitored, controlled and corrective actions are taken to mitigate any abnormal conditions. The Unit I Central Monitoring Station (CMS) houses a Programmable Logic Controller (PLC), two control stations in "monitor mode" only (they can .be reconfigured to the control mode), and an alarm printer. No control functions are available in the "monitor mode." The Unit 2 control room contains one control station (SM's work station) and two monitors which provide all control and monitoring functions remotely. Both locations provide indications and alarms for Unit 1.

The Control Room provides the main communications link between the Station and the other ERFs concerning system problems as well as long-term and short-term corrective actions. The Control Room is the primary operations center during events classified as UNUSUAL EVENT, and prior to the activation of the other ERFs for ALERT, SITE AREA EMERGENCY, and GENERAL EMERGENCY classifications. The SM/CRDSEO can initiate and coordinate appropriate procedures from the Control Room until additional assistance is available.

Emergency lighting, power, ventilation systems, and shielding enable operators to remain in the Control Room to ensure the station can be maintained in a safe condition. In addition, the operators are able to evaluate station conditions and relay pertinent information and data to appropriate emergency facilities, personnel, and agencies during all emergencies. To ensure that operating shift and other personnel can remain self-sufficient, portable radiation monitors, respiratory equipment, portable lighting, and alternate communication systems are maintained in the Control Room.

The Unit 2 and Unit 3 control rooms use the Off-site Facilities Information System (OFIS) as the primary data communications link to the ERFs. In addition, the Unit 2 and Unit 3 Control Rooms have Safety Parameter Display System (SPDS) terminals.

7-1 Millstone Emergency Plan Revision 31 December, 2004

The Unit 2 control room contains one SM's work station and two monitors which provide indications and alarms for various parameters applicable to Unit l's decommissioned condition, including the Spent Fuel Pool Island.

7.1.1. Normal Operations The Control Room is the on-site location from which the nuclear power plant is operated. For Unit 2 and Unit 3, the control room contains the instrumentation, controls, and displays, as applicable to the unit, for:

  • Balance of Plant and Nuclear Steam Supply systems
  • Electrical.systems
  • Safety systems (including engineered safety features), and a Accident monitoring systems The Unit 2 control room is the on-site location from which the defueled plant is monitored and controlled. It contains instrumentation or displays for the Spent, Fuel Pool, Balance of Plant, and Accident Monitoring Systems. If the Unit 2 control station console should become inoperable, the Unit I CMS may be used for control and monitoring.

7.1.2. Alert and Notification The Unit 2 and Unit 3 control rooms are equipped with an ENRS terminal from which personnel transmit radiopager messages. State and local emergency response personnel call in and acknowledge radiopager notification. They can receive a voice-recorded summary report describing the nature of the incident and the plant status.

7.1.3. Communications In addition to regular direct-dial telephone lines and on-site extensions, the Unit 2 and Unit 3 Control Rooms are equipped with reliable emergency communication systems (dedicated telephone lines and radios) necessary to alert station and other essential licensee, state, and local community personnel and maintain communications with the station ERFs throughout an emergency. The Unit 2 and Unit 3 Control Rooms, the TSC, and the EOF have a dedicated telephone system to communicate with the NRC.

7-2 Millstone Emergency Plan Revision 31 December, 2004

7.2. Emergency Operations Facility 7.2.1. Function The EOF serves as a near-site support facility for the management of the overall site emergency response, the coordination of radiological and environmental assessments, and determination of recommended public protective actions. It is the primary on-site communication center and contains appropriate communication links to on-site data sources and off-site organizations.

Emergency radiological monitoring and decontamination equipment and supplies, protective clothing, and respiratory protective devices are also, located in the EOF. In addition, the EOF contains a facility for limited analyses of radiological data.

The EOF is activated during events classified as ALERT, SITE AREA EMERGENCY, or GENERAL EMERGENCY and is the primary interface between the SERO and off-site agencies.

If an event occurs which prohibits staffing the EOF (i.e., Security threat),

designated locations are available for EOF SERO response. Full activation may not be possible until the threat conditions have been resolved.

7.2.2. Location The EOF is located approximately one (I) mile north of the station protected area on the west side of the access road, approximately 800 feet inside the site boundary (refer to Appendix F, Figure F-2).

7.2.3. Structure and Habitability The EOF is designed for continuous operation during an emergency. It is a rectangular, one-level above-ground, structure having 2-foot thick steel reinforced concrete walls and ceiling. It provides approximately 7,000 ft2 of working space and has a protection factor greater than 500 from a semi-infinite noble gas cloud airborne source and a protection factor of 133 for Iodine 131.

The heating, ventilation, and air conditioning (HVAC) system is rated at 2,000 CFM and is located inside the EOF. Operating in the filtered recirculation mode, the system provides a habitable environment for the designed occupancy of 250 people.

The EOF has manually activated airtight doors, decontamination facilities and a dedicated emergency diesel to provide backup AC power.

7-3 Millstone Emergency Plan Revision 31 December, 2004

7.2.4. Layout The EOF functional areas are indicated in Appendix F, Figure F-2.

7.2.5. Communications The EOF is the primary communications center at the station during an emergency. The EOF is provided with communications to the control rooms, TSC/OSC, State EOC, Joint Media Center, and NRC.

An ENRS terminal is available as well as radios, dedicated telephones, normal telephones and facsimile machines.

7.2.6. Power Supplies Normal power is provided to the EOF from the station power grid.

Emergency power is provided automatically by an emergency diesel generator, capable of meeting all EOF power requirements.

7.2.7. Technical Data and Data Systems The EOF receives plant operational data via the Offsite Facility Information System (OFIS) and direct voice communications with other ERFs. Facsimile machines provide hardcopy communications between ERFs.

7.2.8. Records Availability and Management An administratively controlled library of station and plant specific drawings and procedures is maintained in the EOF. This information is stored at the EOF in hard copy or electronic form.

7.3. Technical Support Center/Operational Support Center 7.3.1. Function The TSC provides technical support to plant operations personnel in the Control Room, OSC (co-located with the TSC) and EOF during an emergency. The TSC is activated within 60 minutes of notification of an ALERT or higher event.

74 Millstone Emergency Plan Revision 31 December, 2004

TSC personnel are under the direction of the ADTS. The MTSC will use communication networks, data system networks, and available documents

  • toanalyze the plant behavior throughout the incident. TSC personnel will also research, collect, and interpret plant parameter data, perform detailed calculations, trend data, determine probable consequences of proposed plant corrective actions and provide engineering recommendations to mitigate plant system degradation. The MTSC communicates with the MCRO to evaluate plant conditions, and recommends corrective action via the ADTS.

If an event occurs which prohibits staffing the TSC (i.e., Security threat),

designated locations are available for TSC SERO response. Full TSC activation may not be possible until the threat conditions have been resolved.

The ADTS, located in the TSC, provides guidance and direction to the control room operating personnel. The MTSC coordinates with the MOSC to brief emergency repair teams.

The NRC dispatches representatives to the TSC to monitor plant conditions and station emergency technical support activities, and to maintain communications with the NRC Director of Site Operations.

7.3.2. Location The TSC is located inside the protected area, adjacent to the west side of the Unit 3 control building.

7.3.3. Structure and Habitability The TSC/OSC is a 2000-ft2 below-ground facility with one-foot thick (minimum) exterior walls and ceiling. It was designed and built in accordance with the Connecticut State Building Code. It is able to withstand the most adverse conditions reasonably expected during the design life of the station.

A dose consequence study for the TSC/OSC revealed that the calculated 30-day integrated doses to personnel in the TSC/OSC following a design basis accident at any of the three units are within I OCFR5O Appendix A, General Design Criteria 19 guidelines and the NRC Standard Review Plan for Control Room Habitability:

Limit Thyroid 30 Rem Whole body gamma 5 Rem Beta skin dose 30 Rem 7-5 Millstone Emergency Plan Revision 31 December, 2004

The HVAC system is rated for 2,000 CFM and located in the TSC/OSC penthouse, which is above ground level. The facility receives an isolation' signal initiating HVAC operation from the Unit 3 control building isolation (CBI) signal. This system is designed to maintain habitability for facility occupants.

7.3.4. Layout Work centers exist to enable OSC and TSC personnel to monitor plant data on the OFIS, SPDS terminals, and provide technical assistance. The critical safety functions may be continuously monitored on provided SPDS displays.

The NRC work area provides a space for the NRC to establish local area network communications and monitor OSC and TSC activities. NRC dedicated telephone system connections are provided in addition to site telephone access.

7.3.5. Communications The OSC and TSC are provided with reliable communications to the control rooms and EOF. A facsimile machine is provided for hard copy data transmission.

7.3.6. Power Supplies The TSC/OSC is powered from the Unit 3 normal power bus. The Security system emergency diesel generator provides reliable backup power to meet all TSC requirements.

7.3.7. Technical Data and Data Systems The TSC will initially receive plant operational data via the Unit 2 or Unit 3 SPDS and/or OFIS system and telephone communications between the TSC and the control room. OFIS automatically records plant system variables and provides history, data trending and graphic print capability to the ERFs.

7.3.8. Records Availability An administratively controlled library of station and plant specific drawings and procedures is maintained in the TSC. This information is stored in hard copy or electronic form.

7-6 Millstone Emergency Plan Revision 31 December, 2004

7.4. Operational Support Center (OSC) and OSC Assembly Area 7.4. 1. Function The OSC is a protected area facility, co-located within the same structure as the TSC. Emergency response personnel will assemble in the OSC during an emergency to provide support to the affected control room.

The OSC Assembly Area provides a staging area for emergency teams being dispatched during accident conditions, as well as space for additional SERO personnel outside the TSC/OSC.

7.4.2. Location and Size The OSC is located within the TSC/OSC facility adjacent to the west side of the Unit 3 control building. The OSC is approximately 23 feet by 26 feet.

The OSC Assembly Area accommodates support personnel not located in the TSC/OSC facility.

The OSC Assembly Area is located in the William Ellis Technical Support Center (B475), Conference Room C-I 02, which is approximately 50 yards west of the TSC/OSC (see Figure F-3).

7.4.3. Structure and Habitability The OSC has the same habitability as the TSC.

The OSC Assembly Area has no specific habitability criteria.

7.4.4. Communications The MOSC will maintain communications with the OSC Assembly Area using normal or dedicated telephones in the OSC. The MOSC will directly communicate with the ADTS.

7.4.5. Emergency Equipment In order to support the OSC function, the following emergency equipment is located in OSC storage locations:

  • Radiation Monitoring Team Kit
  • Portable Radios
  • Protective Clothing
  • Respiratory Protection 7-7 Millstone Emergency Plan Revision 31 December, 2004

Access to additional HP and maintenance equipment is readily available to obtain specific materials required to perform OSC functions.

The OSC AA contains the following equipment:

  • Dosimetry issue equipment
  • Portable radios
  • Hotlines and fax machines 7.5. Emergency Equipment Emergency equipment is stored at various on-site locations, including the control rooms, TSC/OSC, access points and the EOF.

For a representative list of emergency equipment, see Appendix E. Emergency equipment is maintained in accordance with station procedures including MP-26-EPA-FAPO1 and MP-26-EPA-FAP05.

7.5.1. Emergency Response Data System (ERDS)

The ERDS, established in accordance with regulatory guidance, is provided via electronic data transfer. An ERDS link is initiated within an hour of an ALERT or higher emergency classification. An ERDS link is not provided for Unit 1.

7.6. Security Posts The security posts that are established and used during an emergency are addressed in general terms to avoid disclosing safeguards information. More specific information is contained in the proprietary Security Plan and procedures.

The Station Security Department primary objectives during an emergency are to maintain adequate station security, facilitate the precautionary dismissal and evacuation of the protected area and outlying areas, and assist with emergency communications, as necessary.

Either the Central or Secondary Alarm Station will become the Security Command Console if an emergency occurs and will function as an on-site emergency communications center during the first 60 minutes while'the SERO is being activated. Security computer keycard reader units are used to perform accountability for the protected area.

7-8 Millstone Emergency Plan Revision 31 December, 2004

7.7. Joint Media Center The Joint Media Center is located within the State EOC in Hartford, Connecticut.

The Joint Media Center is activated by the State OEM as the principal media contact point for the utility, the state and local communities during a SITE AREA EMERGENCY, GENERAL EMERGENCY, or other incidents that may generate high media interest. State and licensee plans do not include use of the Station EOF for a media center; however limited space is available for media briefings or conferences at the facility.

7.8. Alternate Location An alternate location is designated for off-site officials who are unable to reach the EOF due to radiological or environmental conditions near the EOF. The Alternate Location is physically located at the State EOC (Armory) in Hartford, Connecticut. The Alternate Location-has communications capability with the site emergency response facilities (i.e., EOF, TSC, control room, etc.). There is enough space to accommodate off-site officials requiring access to site emergency managers.

7.9. Communication Systems The communication links between emergency response centers and off-site agencies are shown in Figures 7-la through 7-1 c. These systems provide reliable communications and consist of a combination of the station PA system, emergency alarm, intraplant telephones, computer terminals, dedicated hotlines, commercial and utility (tie-line) telephones, facsimile machines, and two-way radios including utility, State Police, Waterford Police, and ISO New England radio communications. In addition, the Station has NRC dedicated telephone system lines installed in the Unit 2 and Unit 3 control rooms, EOF and TSC.

Two-way radio communications are used to maintain communication between the EOF and RMTs. Police and utility radio communication are used by the Control Room in the event of the failure of the telephone system for off-site communications. Backup power is maintained for selected communication links in the protected area and the EOF.

Ambulances are equipped with radios and can communicate with the hospital.

Normal communication between the station and off-site medical facilities will be over commercial telephone. There are also hotline telephones between the Central Alarm Station and TSC/OSC to the State Police, Waterford Police / Waterford Emergency Communications Center.

The states of New York and Rhode Island are within the 50-mile ingestion pathway EPZ and are contacted through the Connecticut OEM and State Police as described in the State RERP. Fishers Island and Plum Island, New York, are within the plume exposure EPZ and are notified of emergency events via ENRS radiopager.

7-9 Millstone Emergency Plan Revision 31 December, 2004

7.10. Assessment Facilities Appropriate on-site and off-site monitoring instruments and laboratory facilities needed to analyze an accident are available 24-hours per day and are listed in Appendix H, Tables H-1 and H-2. The MRDA and MRCA will coordinate the collection of sample media by the Radiological Monitoring Teams (RMTs). The RMTs will return samples to the EOF for analysis when directed. Appendix B provides letters of agreement with private laboratory facilities specified in Table H-2. Post-accident environmental samples are collected by responsible state agencies and analyzed by the State Health Department laboratory. The licensee will assist the State of Connecticut in the collection of environmental samples under direction and control of the Department of Environmental Protection, as requested.

7.11. First Aid and Medical Facilities 24-hour per day first aid services are provided by EMT qualified personnel. First aid supplies and equipment are stored in various locations throughout the station.

The Site Medical Facility is also available during selected hours, which may provide equipment and personnel to assist in medical emergencies.

7.12. Damage Control Equipment Damage control equipment consisting of fire hydrants, fire hose stations, fire extinguishers, and portable lanterns are provided throughout the station for fire fighting. Self-contained breathing apparatus is located strategically throughout the station for fire fighting and entry into airborne radioactivity or toxic gas areas.

Selected equipment spare parts are stored in the warehouse for emergency repairs.

Tools and equipment required for equipment maintenance are available in the maintenance shops.

7.13. Meteorological Data Acquisition The Millstone site has a primary meteorological installation consisting of a 450-foot instrumented tower, a climate-controlled shelter, and a computerized data acquisition system. Wind speed and direction are measured at four different levels: 33, 142, 374, and 447 feet. Vertical temperature difference is measured at 142, 374, and 447 foot levels: the vertical interval in all three cases is measured from a baseline height of 33 feet. The critical parameters of wind speed, wind direction, and a measure of atmospheric stability are continuously available in the Unit 2 and Unit 3 Control Rooms and at the base of the meteorological tower.

Other non-critical meteorological parameters are also measured.

The site has a backup meteorological monitoring system located near the training facility. The system consists of a 10-meter instrumented mast, a climate-controlled shelter, and a backup computerized data acquisition system. Additional information may be obtained from a weather service organization, listed in Appendix B.

7-10 Millstone Emergency Plan Revision 31 December, 2004

The primary source of meteorological data used by the meteorological team is the EDAN system, an electronic data acquisition network. If EDAN is inoperative, the critical data may be obtained over the telephone from operators reading Unit 3 Plant Process Computer data. If the primary meteorological tower instruments are not operating properly, the backup meteorological installation located near the training building may be used. If both on-site systems are inoperative, arrangements have been made to obtain information from the assisting weather service organization.

7-11 Millstone Emergency Plan Revision 31 December, 2004

able 7-1 Locations Of Emei rgency Response Centers On-site Location

1. Control Room Unit 2 and 3 Control Room
2. OSC Assembly Area (OSC AA) Cafeteria, Bldg 475
3. Technical Support Center/Operational Adjacent to and below Unit 3 Control Bldg.

Support Center (TSC/OSC)

Off-site Location

1. Emergency Operations Facility Just off the Site Access Road
2. Assembly Area Simulator Foyer in the Training Building
3. Joint Media Center Connecticut State Armory (Hartford)
4. State Emergency Operations Center Connecticut State Armory (Hartford)
5. Local Community Emergency Operations Refer to the Local Community Radiological Centers Emergency Response Procedures
6. Alternate Location State EOC (Armory) Hartford, Connecticut 7-12 Millstone Emergency Plan Revision 31 December, 2004

( (

Figure 7-la Notification of Emergency Response Organizations ON-SITE STATE & LOCAL COMMUNITY RESPONSE CENTERS EMERGENCY RESPONSE CENTERS T

T CONTIGUOUS T CONTROL ROOM STATES OEM UNITS 2 AND 3 (RI) (NY)

RP T

]

T STATE DEP RP L EOF RP RP I STATE POLICE TROOP E AND F

_I T T STATE DEPT OF PUBLIC I- SAFElY COMM CENTER TSC/OSC/OSC AA Legend:

RP T__ Commercial Telephone Unes RP T

STATE OEM T _ RP_ Radio Pager STATION ON-CALL T AFFECTED COMMUNITY RESPONSIBLE OFFICIAL EMERGENCY East Lyme Montville RESPONSE RP ORGANIZATION Fishers Island (NY) New London RP GrotonCity Old Lyme Groton Town Plum Island (NY)

Ledyard Waterford Lyme 7-13 Millstone Emergency Plan Revision 31 December, 2004

( (

Figure 7-lb NRC Emergency Notification System (ENS) And Health Physics Network (HPN) Millstone Station I

ON-SITE EMERGENCY FEDERAL GOVERNMENT RESPONSE CENTERS I EMERGENCY RESPONSE CENTERS I

Control Room Units 2 and 3 *- F l Dedicated lines are bridged between NRC and Utility facilitie I

NRC NRC 0( E I 1% Emergency ** E -* Region 1

. Emergency Operations Emergency Operations Facility '* -

  • H - r' -I Center --

- H - - Response

- .1*-

Center

.4 .

I I I Technical Support I Center I

I I I

- H - - - I-j Legend:

NRC EOF *

- E- ENS - Emergency Notification Command Post *'_ - E System, dedicated hotlines.

I - - H- - HPN - Health Physics Network normal long distance.

NRC Resident's *- E .

Office I

( ( (7 Figure 7-1c Lines of Communications Between Emergency Response Centers Millstone Station On-Site Emergency Response Centers State and Local Community Emergency Response Centers Legend:

-T. Commercial < 0 Dedicated Telephone Telephone

- R; Radio (U2/3 only)

O FAX Machine - - Data Line Information Line to Dominion Energy 7-15 Millstone Emergency Plan Revision 31 December, 2004

8- Maintaining Emergency Preparedness K> Station management is responsible for the staffing of the SERO and approval of station emergency plan procedures.

The Manager, Emergency Preparedness is responsible for the following:

  • Maintenance and readiness of the on-site emergency response facilities and equipment.
  • Maintenance and development of the Station Emergency Plan and implementing procedures (Appendix D).
  • Training off-site emergency response personnel.
  • Providing input to SERO training.
  • Assisting station management to ensure effective emergency plan implementation.
  • Collecting and reviewing additional EP-related information such as severe accident management research, and NRC regulations and industry research, for incorporation into the EP Program.

The Manager, Emergency Preparedness is assisted by the EPD staff. Appropriate EPD staff training is ensured by attendance at NRC/FEMA seminars/meetings, academic institutions, industry conferences/meetings, on-the-job training, and supervised work assignments.

Administration and management of emergency preparedness programs is detailed in MP-26-MMM, "Radiological Emergency Preparedness." In addition, MP-26-EPA-FAPOI, "Management Program for Maintaining Emergency Preparedness," outlines responsibilities for Station personnel and Departments in maintaining emergency preparedness.

The Manager, Nuclear Training, is responsible for scheduling, coordinating, and conducting SERO training using Nuclear Training Department personnel. The Manager, Nuclear Training, will obtain assistance as necessary from discipline managers in the conduct of discipline-specific training. In addition, the Manager, Nuclear Training, is responsible for supporting chemistry drills and health physics drills. The Manager, Operations is responsible for conducting required fire drills.

8.1. Training 8.1.1. SERO Training The goal of the Emergency Plan Training Program is to provide SERO personnel with the additional skills and knowledge necessary for them to effectively respond to an emergency at the station. The SERO Training Program provides both initial and requalification training on an annual, calendar year basis.

8-1 Millstone Emergency Plan Revision 31 December, 2004

Appendix K provides a summary listing of training topics for SERO personnel.

Section 5, Table 5-1 lists the topics for personnel by SERO position. Detailed training lesson plans and administrative requirements for SERO personnel are contained in NTP 7.212 and MP-26-EPA-FAPOl.

8.1.2. Off-Site Emergency Response Training Training for local off-site emergency response personnel, such as local fire, police, mutual aid responders and emergency management officials is offered.

annually. Training for off-site agencies consists of radiation protection, emergency classification, notification, emergency plan overview and general plant access information. Local ambulance and hospital emergency room staff are trained annually in plant access and the medical treatment of contaminated, injured patients.

State personnel, representing agencies at the State EOC, are trained in specific procedures through participation in periodic drills. In addition, responsible state agencies are trained in emergency classification. Field monitoring and sampling team personnel are trained annually in radiation protection, monitoring and ingestion sampling procedures.

Host community emergency organizations are trained in radiation monitoring and protection, activation and operation of evacuee reception centers.

8.1.3. Additional Emergency Preparedness Training

a. Plant Access Training (PAT)

Employees obtaining unescorted access to the station for the first time receive general instruction on the Emergency Plan as part of their plant access training. This includes a review of the purpose of emergency planning, the emergency classification system, and the precautionary dismissal, and evacuation. This information is reviewed annually as part of the employee's Plant Access Training Program. Company and contractor personnel obtaining unescorted access to the station receive general instruction on the Emergency Plan as part of their plant access training.

b. Fire Brigade Training The Fire Brigade is composed of dedicated station firefighting personnel.

Initial and annual refresher training is provided to Firefighter Technicians and Brigade Captains in accordance with training department procedures.

Station EMTs receive certification and training through the State of Connecticut, Office of Emergency Medical Services.

8-2 Millstone Emergency Plan Revision 31 December, 2004

8.2. Tests, Drills, and Exercises Drills and exercises are conducted to ensure that the participants are familiar with their emergency duties and responsibilities; to verify the adequacy of and methods used in station emergency plan procedures and other emergency procedures; and to verify emergency equipment function.

Drills are conducted for SERO personnel at intervals throughout the year. The drills may be combined with classroom refresher training for each SERO position. Drills may be conducted as an evaluated event or a training drill, where controllers provide immediate correction of erroneous performance. Guidance for the conduct of drills and exercises is provided in regulatory guides published by NRC and FEMA. Detailed methodology for the structure, administration and conduct of drills is contained in MP-26-EPA-FAP03, "Drill and Exercise Manual.' Drill comments are also tracked and dispositioned using the station Corrective Action process.

8.2.1. Off-Site and On-Site Testing of the Notification, Communication, and Alerting Systems

a. Communication Tests Communications tests shall include an aspect of understanding message content as well as testing the equipment.
  • The site emergency alarms and emergency responder notification systems tests are conducted monthly.
  • Communications with specific state and local officials within the plume exposure pathway EPZ are tested at least monthly.
  • Telephone numbers in emergency plan procedures are reviewed quarterly and corrected as necessary.
  • The NRC dedicated telephone systems are tested monthly.
  • Communications capability between the RMTs and emergency centers are tested quarterly and during drills or exercises.
  • Communications with federal emergency response organizations and states within the ingestion pathway EPZ are tested quarterly by the State OEM.
  • The ERDS system for Unit-2 and Unit-3 is tested quarterly.

8-3 Millstone Emergency Plan Revision 31 December, 2004

b. Off-site Public Alerting System Testing The testing of the Public Alerting System (sirens) and communications is detailed in the State and local RERPs. Silent and growl tests are conducted quarterly, and a full-load test of the Public Alerting System is conducted annually. This test may take place during the full or partial-participation exercise. Records on siren availability are kept by the Emergency Preparedness Department and summaries are forwarded to the State OEM on an annual basis.

8.2.2. Additional Tests, Drills, and Exercises The schedule for conducting drills and exercises is as follows:

a. Fire Drills Fire drills will be conducted in accordance with the unit technical requirements manuals. The Station Fire Marshall is responsible for the review and approval of all fire drill scenarios, in advance of their use.

The Station Fire Marshall shall evaluate and take appropriate actions for observed fire drill discrepancies. The Station Fire Marshall shall also review and disposition, as necessary, comments from fire drill critiques.

b. Medical Emergency Drills The Manager, Emergency Preparedness is responsible for conducting annual medical drills. Arrangements for training and drills are made through the Lawrence and Memorial Hospital or Middlesex Hospital Emergency Departments, as applicable. A medical exercise, involving simulated contaminated and injured worker(s), local ambulance service personnel, station security, health physics and hospital emergency staff is conducted annually.
c. Radiological Monitoring Drills Environmental radiological monitoring drills (on-site and off-site) are conducted annually and can be conducted as part of the annual exercise.

These drills include collecting and analyzing environmental samples.

Communications and record-keeping procedures are also checked during these drills.

d. Health Physics Drills Health physics drills are conducted semi-annually and involve response to and analyses of simulated elevated airborne and liquid samples and direct radiation measurements.

8-4 Millstone Emergency Plan Revision 31 December, 2004

c. Emergency Plan Training Drills The Emergency Preparedness Department is responsible for scheduling two emergency plan training drills annually for Unit 2 and Unit 3, and one for Unit 1. These drills generally include functional areas identified in Table 5-1. (These include the annual rehearsal and exercise.) The Emergency Preparedness Department wvill also conduct drills involving severe accident management implementation at intervals established by the 6-year schedule.
f. Exercises Emergency Preparedness exercises are conducted in accordance with 10 CFR 50.47(b) and 10 CFR 50 Appendix E requirements.

The Emergency Preparedness Department is responsible for coordinating exercises to test station, state(s), and local emergency plans. Station procedures ensure 6 year exercise cycle objectives are met.

Millstone Power Station shall exercise the emergency plan annually.

Millstone Power Station shall exercise the emergency plan with off-site authorities (state and local government) every two (2) years, with full or partial-participation by state and local governments within the plume exposure pathway EPZ. The level of participation shall be as follows:

  • The State of Connecticut shall at least partially participate in each off-site exercise at Millstone Power Station.
  • The State of Connecticut shall fully participate in at least one off-site exercise every two (2) years.
  • Partial participation by a local government is acceptable, with FEMA approval, when the local government is fully participating in a biennial exercise at another site, or a combination of the following enable demonstration of all exercise objectives:

I) FEMA credits actual incident response for required objectives.

2) The local government cannot demonstrate exercise objectives due to conflicting schedules and required objectives can be demonstrated out-of-sequence with the main exercise.

8-5 Millstone Emergency Plan Revision 31 December, 2004

3) Compensatory measures can be demonstrated by another entity.
  • The states of Rhode Island, Connecticut and New York, which are responsible for emergency responses within the 50 mile ingestion exposure pathway EPZ, shall exercise their plans and preparedness related to ingestion exposure pathway measures at least once every six (6) years.
  • The licensee shall enable any state or local government located within the plume exposure pathway EPZ to participate in an annual exercise when requested by such state or local governments.
  • The licensee shall make provisions to conduct an off-hours exercise between the hours of 6:00 p.m. and 4:00 a.m. every six years.

Remedial exercises will be required if the plan is not satisfactorily tested during the biennial exercise, such that NRC, in consultation with FEMA, cannot find reasonable assurance that adequate protective measures can be taken in the event of a radiological emergency. The extent of state and local participation in remedial exercises must be sufficient to show that appropriate corrective measures have been taken regarding planning elements not properly demonstrated during the previous exercise.

g. Post-Exercise Critique An in-house, post-exercise critique will be conducted.

An off-site post-exercise critique will be scheduled at the conclusion of each exercise by FEMA to allow official observers and evaluators from federal agencies and state and local communities to evaluate the performance of the various emergency response organizations. The critique will be chaired by the Chairperson of the Regional Assistance Committee. Additionally, the critique is open to the public and news media.

Exercise evaluators will discuss emergency response observations during the critique. The exercise observations and comments shall be compiled into a formal exercise evaluation report by the Emergency Preparedness Department.

The Emergency Preparedness Department is responsible for tracking corrective actions for exercise critique comments.

The Emergency Preparedness Department will evaluate comments, assign responsibilities and track the resolution process. Station management will ensure corrective actions are completed as necessary.

8-6 Millstone Emergency Plan Revision 31 December, 2004

8.3. Administration of Station Emergency Plan and Procedures The Station Emergency Plan contains elements of planning that involve assistance and coordination of governmental agencies and intra-company groups.

In order to achieve and maintain the most efficient course of emergency action, liaison is continuously maintained with state and local agencies responsible for public safety.

The Station Emergency Plan and letters of agreement are reviewed on an annual basis and updated as appropriate. Changes to the Emergency Preparedness Program are evaluated in accordance with MP-26-EPA-FAP02 for 10 CFR 50.54(q) prior to implementation. Changes to the Station Emergency Plan and implementing procedures are undertaken in accordance with station administrative procedures and subject to evaluation under 10 CFR 50.54(q).

10CFR50.54(t) reviews of the Emergency Preparedness Program are performed annually by the licensee oversight group or an industry peer evaluation team.

The reviews include the Emergency Plan, implementing procedures and practices, training, readiness testing, equipment, an evaluation of the adequacy of interfaces with state and local government and the conduct of drills and exercises. The reviewer completes a written report that details the items reviewed and corrective actions to be taken. The report is sent to the Manager, Emergency Preparedness and to corporate and station management. The Manager, Emergency Preparedness is responsible for evaluating and correcting report findings.

Documentation of report findings and corrective actions shall be maintained for a period of no less than five years. Applicable portions of the report will also be made available to federal, state, and local organizations. The Chairperson of the Management Safety Review Committee (MSRC) receives the report. Unresolved findings from the review are identified to the oversight group management in writing. Review items are not closed until final corrective actions are taken.

8.4. Public Information Programs Specific emergency instructions for residents and the transient population are distributed annually within the plume EPZ via the primary telephone directory serving each EPZ community. The telephone directories are distributed to residences, government offices, commercial establishments and other locations with telephones, and are available to the transient populations within the EPZ.

The telephone book information includes detailed instructions to follow in an emergency, a description of the Public Alerting System, a list of applicable Emergency Alert system stations, sheltering and evacuation checklists, host communities and reception centers, emergency assistance (special needs) registration instructions, and a map of evacuation routes. Contact points for additional information concerning nuclear power, radiation and emergency planning are also provided.

General information about radiation is distributed within the Plume EPZ on a periodic basis.

8-7 Millstone Emergency Plan Revision 31 December, 2004

The State of Connecticut OEM is provided with information for posting or distribution, as appropriate, at selected public areas within the EPZ.

Other on-going elements of the Public Information program include:

1) Educational Outreach Programs. These programs are conducted out of the Nuclear Training Center. The Outreach Program provides public informational and educational activities throughout the EPZ.
2) The Nuclear Speaker's Bureau, comprising a variety of company employees from many disciplines and operational functions, provides information on nuclear power to numerous institutions, civic and professional groups, and other organizations.

8.5. Media Information Program A media information program is offered annually to acquaint the news media with emergency plans, information concerning radiation, and points of contact for release of public information in an emergency.

A media manual, developed to meet the needs of the news media, contains plant specific information and general information concerning emergency planning, nuclear power and radiation. The manual is distributed to the local media and is available for issue at the Joint Media Center at the time of an emergency.

8-8 Millstone Emergency Plan Revision 31 December, 2004

9. Recovery 9.1. Recovery Phase The Organization for Recovery Operations (ORO) is activated by the DSEO.

The recovery phase occurs after the plant is brought to a long-term stable state.

When this occurs the emergency organization will no longer be required to take corrective or mitigating actions to respond to the accident.

If the unit is damaged and the recovery actions require extensive resources and/or will last from months to years, the ORO will replace the SERO. If normal resources are adequate to recover the plant to normal operations, the emergency organization is disbanded and a Director of Recovery Operations will be designated to convene an event review meeting and investigate the cause.

Recovery actions are described in emergency plan procedures.

9.2. Recovery Organization The ORO is illustrated in Figure 9-1.

9.2.1. The Site Vice President - Millstone is responsible for coordinating the station recovery operations.

9.2.2. The Director of Recovery Operations (DRO) is responsible for overall direction of recovery operations and reports to the Site Vice President -

Millstone.

The Director of Recovery Operations (DRO), as well as those managers reporting directly to him, are chosen by station management. They possess competent managerial skills and are experienced in their areas of responsibility.

9.2.3. Manager of Technical Support is responsible for the following:

  • Providing necessary technical support services.
  • Analyzing core parameters and other technical information.
  • Performing reactor systems analysis.
  • Providing a central. facility for collecting, retaining, and retrieving data.
  • Providing post accident data analysis timeline for the accident.
  • Developing recovery procedures.
  • Developing and approving proposed modifications to procedures, systems and equipment.

9-1 Millstone Emergency Plan Revision 31 December, 2004

  • Determining recovery activities needed to be documented in accordance with the Quality Assurance (QA) program.

9.2.4. Manager of Plant Operations is responsible for the following:

  • Supervising and maintaining a station support staff during the recovery operation.
  • Maintaining an effective station security program.
  • Implementing maintenance and repair operations with station staff.
  • Coordinating Site Operations Review Committee activities as necessary.

9.2.5. Manager of Radiation Control/Radwaste is responsible for the following:

  • Assisting the State DEP as necessary in off-site recovery phase sampling, survey measurements and data analysis to determine re-entry and recovery actions for off-site areas.
  • Developing and performing evaluations of health physics equipment and procedures for recovery operations.
  • Performing special dosimetry evaluations or providing specialized dosimeters.
  • Developing plans and procedures to sample, process, and control liquid, gaseous, and solid radioactive waste, and coordinating waste disposal activities.
  • Maintaining an ALARA program.
  • Developing decontamination plans.
  • Assisting the State DEP in determining total integrated population doses by using various inputs.

9.2.6. Manager of Engineering Systems is responsible for the following:

  • Providing required engineering support services.
  • Interface and consultation with engineering and technical experts, as needed.
  • Acquisition and coordination of manpower and equipment to support repair activities.
  • Acquisition of housing, office, and construction equipment to support recovery operations.
  • Arranging for the purchase of legal and insurance assistance.
  • Providing general administrative support.
  • Scheduling and expediting recovery operations.

9-2 Millstone Emergency Plan Revision 31 December, 2004

  • Assisting the DRO in planning activities.
  • Coordination of recovery staff meetings.
  • Tabulating, expediting and closing out commitment lists in support of recovery operations.
  • Establishing cost control procedures.

9.2.7. Advisory support staffpersonnel provide support to the DRO in various areas.

9.2.8. The Public Information Technical Advisor provides liaison with the media.

9.2.9. The Licensing Department interfaces with the NRC and other regulatory agencies on licensing issues.

9.2.10. The Millstone Representative in the state EOC and Joint Media Center provides advisory support to state and local communities.

9-3 Millstone Emergency Plan Revision 31 December, 2004

( ( (

Figure 9-1 Recovery Organization Site Vice President - Millstone Director of Advisory Recovery Support Operations I I I II I I I Manager, Manager, Manager, Public Millstone Station Technical Plant Radiation Information Representatives in Support Operations Control and Technical the State EOC and Radwaste Advisor Joint Media Center

  • System Analysis 'Affected unit staff 'Waste Treatment 'INPO -Provide periodic 'Millstone Liaison

-Core Physics plus other station Design 'Engineering news releases as with the State EOC

-Data Reductions staff as applicable 'ALARA Evaluations necessary and official media

'Vendors (Post-Accident 'Support the Joint spokesperson.

'Waste Disposal A/E Analysis Data) Media Center 'Support State

-Personnel Exposure 'NSSS Operations at the response to FEMA

, . I Evaluations 'Resources State EOC questions.

l Licensing I -Specialized 'Construction 'Support local Dosimetry responses to

'Purchasing

'NRC/State 'Field Survey and questions and licensing Environmental 'Legal evaluate needs.

Sample Teams 'Insurance

'Off-site and On-site 'Project Management surveys, sampling for 'Schedules recovery/reentry 'Cost Control decision making 9-4 Millstone Emergency Plan Revision 31 December, 2004

Appendix A APPENDIX A DEFINITIONS, ABBREVIATIONS AND ACRONYMS A-1 Millstone Emergency Plan Revision 31 December, 2004

Appendix A This section provides definitions of commonly used terms that are applicable to this Emergency Plan.

DEFINITIONS Absorbed Dose The quantity of energy imparted from ionizing radiation per unit mass of tissue.

Alternate Location A designated facility (State EOC [Armory]) where off-site officials can communicate with company officials if access to the EOF is impaired.

Actions Assessment Actions Those actions taken during or after an incident to obtain and process information that is necessary to make decisions to implement specific emergency measures.

Corrective Actions Those emergency measures taken to improve or terminate an emergency situation.

Emergency Actions Actions taken as a result of reaching an Emergency Action Level.

Protective Actions An action taken to avoid or reduce a projected dose.

Recovery Actions Actions taken after an emergency to restore the station to pre-emergency condition and decide on re-entry of the public affected areas.

Airborne Radioactivity Any radioactive material dispersed in the air in the form of dusts, vapors, gases, etc.

Area Clean Area An area free of contamination or with levels of contamination below the specified limits.

A-2 Millstone Emergency Plan Revision 31 December, 2004

Appendix A Owner Controlled Area The area within the site boundary including the protected area.

Protected Area The area within the Millstone Power Station security fence.

Radiological Control Area (RCA)

An area of the Station where dosimetry is required.

Background Radiation Radiation arising from material other than the one directly under consideration such as from cosmic rays, the ground, the air, building materials, etc.

Barrier One of the three fission product barriers: fuel clad, RCS pressure boundary and containment.

Barrier Based EALs A table of symptoms defining the loss or potential loss of a barrier, e.g., the Barrier Reference Table. A combination of barrier losses defines an emergency classification level.

Central Monitoring Station (CMS)

The Unit 1 facility from which indications and alarms are monitored and control functions performed, if necessary.

Certified Fuel Handler A non-licensed operator who has qualified in accordance with an approved fuel handler training program.

Condition (also called initiating condition)

A description of a nuclear power plant event where either the potential exists for a radiological emergency, or such an emergency has occurred; e.g., loss of both batteries for greater than 15 minutes is a condition with a category of events titled Loss of Power.

Confinement Boundary The sealed dry cask storage canister that provides the spent fuel cladding protection. The barrier between areas containing radioactive substances and the environment.

A-3 Millstone Emergency Plan Revision 31 December, 2004

Appendix A Contamination (Radioactive)

The deposition of radioactive material in any place where it is unwanted (e.g., on persons, products or equipment).

Control Room The Control Room is the primary location where conditions of the unit are monitored, controlled and where corrective actions are directed to mitigate any emergency.

Curie The unit of radioactivity which is equivalent to 3.7 x 1010 disintegrations per second; millicurie (mCi) = one-thousandth curie; microcurie (lpCi) = one-millionth curie; picocurie (pCi) = one-millionth microcurie.

Decontamination The reduction or removal of contaminating radioactive material from a person, area or object by cleaning or washing.

Dosimeter A device that records radiation exposure.

Emergency Any abnormal condition that could affect the health and safety of people or safe operation of equipment.

Emergency Action Levels (EALs)

Thresholds for initiating emergency actions such as designating a particular class of emergency, initiating a notification procedure, or initiating a particular protective action.

Emergency Classification System A system that arranges abnormal conditions in order of severity. They are listed as follows in order of increasing severity.

  • UNUSUAL EVENT (State Posture Code, DELTA ONE/DELTA TWO)
  • ALERT (State Posture Code, CHARLIE-ONE)
  • SITE AREA EMERGENCY (State Posture Code, CHARLIE-TWO)
  • GENERAL EMERGENCY (State Posture Code, BRAVO/ALPHA)

A-4 Millstone Emergency Plan Revision 31 December, 2004

Appendix A Emergency Operations Facility (EOF)

A facility located on the site access road from Which station activities related to an emergency K> will be carried out and from which information will be provided to the corporate, federal, state officials and local community chief executive officers.

Emergency Planning Zone (EPZ)

An area surrounding the Millstone Power Station for which planning is conducted to ensure that prompt and effective actions can be taken to protect the public in the event of an accident. For the plume exposure pathway, the EPZ has a corresponding radius of about 10 miles; and for the ingestion exposure pathway, the EPZ has a corresponding radius of about 50 miles.

Emergency Medical Technician (EMT)

Personnel assigned to the Fire Brigade which maintain EMT certification with the State of Connecticut.

Event Based EAL A listing of symptoms and conditions under generic event categories.

Event Categorv A generic group of plant conditions; e.g., loss of power, equipment failure, radiation hazard, security threat, etc.

Exposure Pathway Plume Exposure Pathway The pathway by which exposure to a radioactive plume and subsequent deposition of radioactive material could result in external exposure and by which inhalation of the radioactive plume could result in internal exposure.

Ingestion Exposure Pathway The pathway by which deposited radioactive materials could be ingested from contaminated water or food, such as milk or fresh vegetables which would cause internal exposure.

Full Staffini SERO positions which are beyond the required minimum staffing. Full staffing positions, as a goal, will be staffed within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> of SERO activation. Personnel assigned to fill these positions are drawn from a pool of qualified individuals.

A-5 Millstone Emergency Plan Revision 31 December, 2004

Appendix A Incident An unexpected occurrence that could lead to an emergency.

Independent Spent Fuel Storage Installation (ISFSI)

A complex designed and constructed for the interim storage of Millstone Power Station spent nuclear fuel.

Joint Media Center The Joint Media Center is the principal contact point between the media and Millstone Station, state, and local community representatives. It is a facility where informational releases are made to the public and media and press conferences are held.

Minimum Staffing Personnel assigned to fulfill a specific SERO position and who report to the station in accordance with Table 5-1.

On-Shift Personnel assigned to duties as part of a normal shift complement.

Off-site K. The area outside the owner controlled area of the Millstone Power Station.

On-site The area inside the owner controlled area of the Millstone Power Station.

Operational Support Center (OSC)

A center co-located with the TSC where operational support of the emergency is provided.

OSC Assembly Area An emergency repair team staging area supporting OSC activities.

Precautionary Dismissal A dismissal of non-essential personnel at the Alert level which directs all non-essential Millstone employees, contractors, and visitors to leave the site.

A-6 Millstone Emergency Plan Revision 31 December, 2004

Appendix A Procedures Emergency Operating Procedures (EOP)

Procedures which provide specific actions to mitigate the consequences of and terminate an emergency situation.

Emergency Plan Implementing Procedures (EPIs)

Procedures which implement the Station Emergency Plan. These procedures specify the emergency organization and actions that would be required of station and other on-site personnel during an emergency.

Supplemental Procedures Station operating, health physics, radiological control, administrative, security and training procedures.

Proiected Dose The estimated potential dose that-could be received by affected individuals if no protective actions are taken.

Protective Action Guides (PAGs)

Projected absorbed dose to individuals in the general population which warrants protective action.

Radiation (ionizing)

The emission and propagation of energy through a medium in the form of electromagnetic waves or particles which impart their energy to the medium through the creation of electrically charged ion pairs directly or indirectly in its passage through the medium.

Radioactivity The property possessed by certain unstable radionuclides of spontaneously emitting charged particles, gamma photons or X-rays.

Radiopager System The system used by Millstone Power Station for prompt notification of emergency response personnel.

Shift Manager's Work Station The Unit 2 control room location from which indications and alarms for Unit I are monitored and control functions are performed.

A-7 Millstone Emergency Plan Revision 31 December, 2004

Appendix A Station Emergency Response Organization The organization responsible for station operations under emergency conditions.

State The State of Connecticut.

Site Evacuation The orderly withdrawal of personnel from the owner controlled area except designated resource and SERO personnel.

State Plan The State of Connecticut Emergency Operations Plan? Annex V, Fixed Nuclear Facilities Radiological Emergency Response Plan.

Station Evacuation The orderly withdrawal of all personnel from the protected area, except designated resource and SERO personnel.

Symptom A predetermined site and unit specific parameter observable in the Control Room (or reported to the Control Room) that is the threshold for a plant "condition" that places the plant in a given emergency classification. A symptom can be an instrument reading, equipment status indicator, a measurable parameter (on-site or off-site), a discrete observable event, or the results of analyses.

Technical Support Center (TSC)

A center located where technical support personnel monitor station conditions and provide data interpretation.

A-8 Millstone Emergency Plan Revision 31 December, 2004

Appendix A ABBREVIATIONS AND ACRONYMS ALARA - As Low As Reasonably Achievable ARMS - Area Radiation Monitoring System BWR - Boiling Water Reactor CC or CM3 - Cubic Centimeter CEDE - Committed Effective Dose Equivalent CFH - Certified Fuel Handler CDE - Committed Dose Equivalent CFR - Code of Federal Regulations Ci - Curie (Unit of Radioactivity)

  • CMS - Central Monitoring Station CONVEX - Connecticut Valley Exchange CPM - Counts per minute CR - Control Room CT - Connecticut CTS - Chief Technical Spokesperson DEP - Department of Environmental Protection DHS - Department of Health Services (formerly DHEW)

DSEO - Director of Station Emergency Operations DOE - U.S. Department of Energy DOT - Department of Transportation dpn/ I00 cm2 - Disintegrations per minute per 100 square centimeter area EAL - Emergency Action Level EAS - Emergency Alert System ECCS - Emergency Core Cooling System EDAN - Environmental Data Acquisition Network ENRS - Emergency Notification and Response System ENS - NRC Emergency Notification System telephone EOC Emergency Operations Center (State, local, or Site)

EOP - Emergency Operating Procedure EOF - Emergency Operations Facility EPA - Environmental Protection Agency EPA - Emergency Plan Administrative Procedure EPC - Emergency Planning Coordinator EPI - Emergency Plan Implementing Procedure EPZ - Emergency Planning Zone ETS - Environmental Technical Specification FDA - Food and Drug Administration FEMA - Federal Emergency Management Agency A-9 Millstone Emergency Plan Revision 31 December, 2004

Appendix A GM - Geiger-Mueller detector gpd - Gallons per day gpm - Gallon per minute HP - Health Physics HPN - NRC Health Physics Network Telephone I - Iodine INPO - Institute of Nuclear Power Operations IPZ - Ingestion Pathway Zone ISFSI - Independent Spent Fuel Storage Installation KI - Potassium Iodide LCO Limiting condition for operation LOCA - Loss of coolant accident MA - Massachusetts MAX - Maximum Met - Meteorological MPC - Maximum permissible concentration MPS - Millstone Power Station mRem/hr - 1/1 000 Rem per hour MSRC - Management Safety Review Committee NAP - North Access Point NFSA - Nuclear Fuel and Safety Analysis (formerly RES)

NRC - U.S. Nuclear Regulatory Commission NNM - Nuclear News Manager NY - New York OEM - Office of Emergency Management OFIS - Off-site Facilities Information System ORO - Organization for Recovery Operations OSC - Operational Support Center PA - Public address system PAG - Protective Action Guide PEO - Plant Equipment Operator PF - Protection factor P10 - Public Information Officer PITA - Public Information Technical Advisor PWR - Pressurized water reactor Q - Release rate QA - Quality Assurance A-10 Millstone Emergency Plan Revision 31 December, 2004

Appendix A R - Roentgen. A unit of radiation exposure rad - Unit of radiation dose RCA - Radiological Control Area RCP - Reactor Coolant Pump RCS - Reactor Coolant System REM - Unit of radiation dose RERP - Radiological Emergency Response Plan RHR Residual Heat Removal RI - Rhode Island RMS - Radiation Monitoring System RMT - Radiological Monitoring Team RO - Reactor Operator RP - Radio Pager RWP - Radiation Work Permit SCBA - Self-contained breathing apparatus SDO - Station Duty Officer SEOC - State Emergency Operations Center SIS - Safety injection system SORC - Site Operations Review Committee SRO - Senior Reactor Operator SM - Shift Manager STA - Shift Technical Advisor State - State of Connecticut TEDE - Total Effective Dose Equivalent TLD - Thermoluminescent dosimeter TSC - Technical Support Center US - Unit Supervisor USCG - US Coast Guard u - Wind speed

[Lci - Microcuries X (chi) Concentration X/Q - Relative Concentration A-lI Millstone Emergency Plan Revision 31 December, 2004

Appendix B APPENDIX B LETTERS OF AGREEMENT

/

B-I Millstone Emergency Plan Revision 31 December, 2004

Appendix B Page Organization Original Date Agreement of Agreement Review Date B-3 Amtrak 11/3/95 12/04 B4 Electric Boat Division of General Dynamics 12/5/96 12/04 B-5 Institute of Nuclear Power Operations 1/23/98 12/04 B-6 Laidlaw Transit, Inc. 1116/95 12/04 B-7 Lawrence & Memorial Hospital 10/27/95 12/04 B-8 Middlesex Hospital 11/18/97 12/04 B-9 Nichols Bus Service, Inc. 11/10/95 12/04 B-10 Shipman's Fire Equipment Company, Inc. 11/20/96 12/04 B-ll State of Connecticut, Department of Public 3/9/98 12/04 Safety-Division of State Police B-12 Teledyne Brown Engineering 11/21/97 12/04 B-13 Town of Waterford Ambulance Service 12/11/97 12/04 B-14 Town of Waterford Fire Service 12/10/97 12/04 B-15 Town of Waterford Police Department 3/2/96 12/04 B-1 6 Weather Service International 11/30/99 12/04 B-17 Framatome ANP (formerly Duke Engineering) 10/29/02 12/04 B-18 Norwich Fire Department 5/7/96 12/04 B-19 Salem Volunteer Fire Department 5/6/96 12/04 B-20 Department of Energy 12/97 12/04 B-21 Connecticut Yankee Atomic Power Company 11/22/04 12/04 Note: The letters of agreement are reviewed annually and verified to be current. Only letters with significant changes require reissue.

B-2 Millstone Emergency Plan Revision 31 December, 2004

Appendix B

,. I N^TIONAL NARROA^D FAS56N.41 CORFPAO TN. SO-th StliN. 9"10%, MA 021 10 November 7,2001 Mr. William R Matthews Vice President & Sr. Nuclear Executive Dominion Nuclear Connecticut PO Box 128 Waterford. CT 06385

Dear Mr. Matthews:

This letter is to confirm that the National Railroad Passenger Corporation will, when requested. res ond In the event of an emergency at the Millstone Power Station on Long Island Sound. In the following areas:

Implementation Criteria/Authoities Resronsibilities It is our understanding that. in th event of an emergency, the nuclear facility Director of Site Emergency Operations may request our assistance. Assistance should be requested by calling the Chief Train Dispatcher ofthe Boston Division at (617)345-7543 or 7569 or(500)243-1255. Indicate the nature of the incident, the location. and the type ofassistance required.

Measures to be Provided/Limits of Actions Our commitment for assistance is to direct train traffic away from any areas that may be affected by the cnIergeuicy.

Information Fxchance/Point of Contact at Site Verification coniillunicalions to the nuclar facility will be by telephole to thc Director of Site Emergency Operations. The telephone number is unlisted. Information exclhange can be provided by using the samie telephone number.

Trainilt and Drills Plase notify us of your plant drills In the event we wish to observe your emergency response actions and meet yoturenscrgrencyopcratiois personnel. Pleasecoordiiate bycoutactin y nllyofr O aent(617) 345-7400.

This letter of agreement shall remain in efect until cancellation by either party. provided on ninety (90) days prior written notice, and shall be reviewed and certified as needed.

Sincerely.

Steven Icman General Manager New England Divlilon cc: Paul A. Blasioli, Emergency Planning Services Department - Millstone B-3 Millstone Emergency Plan Revision 31 December, 2004

Appendix B Enclosure (1) to 438-37497 Page 1 of 2 Ii LETTER OF AGREEMENT BETWEEN ELECTRIC BOAT CORPORATION AND DOMINION NUCLEAR CONNECTICUT RADIOLOGICAL ASSISTANCE It is understood that the Electric Boat Corporation will, upon request, respond with personnel and equipment Inthe event of an emergency at the Millstone Power Station In accordance with the following:

1. In the event of a radiological emergency, the Director of the Site Emergency Organization may request personnel and equipment to assist in performing emergency radiological surveys. Assistance should be requested by celling:

Director of Radiological Services Telephone: 43343139 (during normal business hours)

2. If after normal business hours, or no answer, call In order.

RAD CON Office: 433-5019 or433-5392 Shipyard Secuwrty 433-5530 or 433-5531 NOTE: If shipyard Security Is contacted, request that RAD CON Management be notified.

It Is understood that the Electric Boat Corporation's commitment for assistance includes providing trained radiological control personnel and equipment for the purpose of performing emergency radiation, contamination, and airborne radioactivity measurements. Personnel responding to (he facility's request for assistance will report to the Manager of Resources who will be located in the Emergency Operations Facility (EOF).

I B4 Millstone Emergency Plan Revision 31 December, 2004

Appendix 1 Enclosure (1) to 438437497 Page 2 of 2 It Is understood that should the Electric Boat shipyard be affected by a radioactive rolease from another faclity, Electric Boat resources wil be used, as the first priorty, to protect the shipyard and Its personnel; support will be provided to Millstone Station as available.

It Is understood that Ineach case where assistance Is provided under this Agreement, all radiological waste from the emergency will remain the responsibility of the affected facility.

It Is understood that verification of communications will be by telephone to:

Manager of Resources - 442-5139 Director Station Emergency Organization - 443-2216 Information exchange can be provided by using the same telephone number.

It Isunderstood that Millstone Station will train representatives of Electric Boat Corporation's Radiological Training Section annually on the use of Station equipment and procedures. These Radiological Training Section Individuals, Inturn, will train selected Electric Boat Corporation personnel on this equipment and procedures. It Is understood that this training will be performed annually and the Electric Boat Corporation will be given advance notification of plant drills or additional training that would be advantageous to both organizations.

This Letter of Agreemont shall remain in effect until cancellation by either party, provided on ninety-(90) days prior written notice, and shall be reviewed and certified as needed.

Dominion Nuclear Connecticut Electric Boat Corporation By:  ; .f ItJ LjL Name: J. Alan Price M.Toner

Title:

She Vice-Presidont President Date: 0 V\a - _ _

Appendix B Instute of . Suee 100 INPO NuclearPower Opraons 700 GaWeia Parway. SE Atnta, GA 30339M5957 770-644-8000 FAX 770-644-W9 November 18, 2002

Dear Sirs and Mesdames:

This letter certifies that the plant emergency assistance agreement between INPO and its member utilities remains in effect. In the event of an emergency at your utility. INPO will assist you in acquiring the help of other organizations in the industry. as described In Section I of the Emergency Resources Manual. INPO 86-032. ifrequested. INPO will provide the following assistance:

  • Facilitate technical information flow from the affected utility to the nuclear industry.
  • Locate replacement equipment and personnel with technical expertise.
  • Obtain technical information and industry experience regarding plant component and systems.
  • Provide an INPO liaison to facilitate interface.

This agreement will remain in effect until terminated in writing. Should you have questions, please call me at (770) 644-8304.

Sincerely.

David J. Moss Manager Radiological Protection Department DJM/ms 13-5 Millstone Emergency Plan Revision 31 December, 2004

Appendix B LAIDLAW TRANSIT, NC.

We cary The Nation'sFuture December 10, 2001 Mr. William Matthews Vice President & Senior Nuclear Executive Millstone Power Station P0 Box 158 Waterford, CT 06385

Dear Sir:

This letter will confirm that Laidlaw Transit, Inc., 80 Tower Ave., Groton, CT will, when requested, respond in the event of an emergency at the Millstone Nuclear Power Station. Per my discussions with Mr. Steve Mazzola of your staff, our response will be limited to' providing available school buses for transporting personnel from the Millstone site, with volunteer workers from our branches in the area.

Please be advised, that our first priority for the vehicles will be to respond to the immediate needs of our school districts in the area, with whom we have contractual arrangements. We anticipate that in the event of an emergency involving the evacuation of the schools or communities, our fleet assets would be primarily involved in those duties, and would not be immediately available to assist the Millstone facility. However, when our duties there were concluded, we would gladly make our equipment available for your use, along with any of our employees who may volunteer to help.

It is important for your organization to note that most of our school bus drivers are part time employees, who are not available on a twenty-four-hour/seven day per week basis. This limits our ability to commit a definite quantity of vehicles or personnel to your needs. However, rest assured that we would respond with whatever assets and personnel we can make available. in the interest of public safety.

Coordination of the use of our vehicles should be requested by contacting our branch location in Groton, at 860-448-0677.

Sincerely.

Gibson General Manager B-6 Millstone Emergency Plan Revision 31 December, 2004

Appendix B William T. Christopher LAWRENCE President &

&MEMORIAL m Chief Executive Officer H OS PITA L _

November 5, 2001 Mr. William R. Matthews Vice President & Sr. Nuclear Executive Dominion Nuclear Connecticut P.O. Box 128 Waterford. CT 06385

Dear Mr. Matthews:

This letter is to confirm that Lawrence and Memorial Hospital will respond in the event of a radiological emergency at Millstone Power Station.

Implementation CriterialAuthorities. Responsibilities It is our understanding that in the event of an emergency, the nuclear facility may request medical assistance. The Hospital Emergency Department is to be contacted by calling 442.0711 extension 2261 and requesting to speak to the Emergency Room Charge Nurse to activate our Radiation Accident Plan.

Mcasures to bc Provided/Limits of Action Our commitment for medical assistance includes patients who might be injured as a result of an industrial or radiation accident and who arc in need of medical treatment at Lawrence and Mcmorial Hospital. -

This letter of agreement shall remain in ceffcct until cancellation by either party, provided on ninety (90) days prior written notice, and shall be reviewcd and certified as needed.

Sincerely yours, I /

William T. Christopher President/CEO A

cc: Paul A. Blasioli, Emergency Planning Service. Millstone Station 365 Montauk Avenue

  • New London, Connecticut 06320 (860) 442-0711, Ext. 2221 Fa.x: (860) 444-3741 - E-mail wchristophetmhosp.chime.org B Millstone Emergency Plan Revision 31 December, 2004

Appendix B I.. .

A&MIDDLESEX I IOSPitAL ADMINISTRATnON November 6,2001 Mr. William R. Matthews Vice President & Sr. Nuclear Executive Dominion Nuclear Connecticut P.O. Box 128 Waterford, Cl 06385

Dear Mr. Matthews:

This letter represents a continuance of the Letter of Agreement between Millstone Power Station and Middlesex Hospital.

Middlesex is ready to receive and administer treatment to accident victims sent to us by Millstone Power Station. We will provide backup and support for Lawrence and Memorial Hospital, acting as the secondary medical treatment facility for the Millstone Station. Any expenses incurred as a result of providing these services will be the responsibility of Millstone Power Station.

In case of an emergency situation, we would follow the plan for "Decontamination and Treatment of the Radioactively Contaminated Patient at Middlesex Hospital." currently in effect between our institution and the facility mentioned above.

i1you have any questions concerning our arrangements for contaminated patients, please contact me.

Sincerely,

  • ;:$w . ..-

Harry Evert Vice President, Administration IIE/rdo c: Paul A. Basioli. Emergency Planning Services. Millstone Station 28C escent Staee Middletown, Connecakut 06457-3650 tel 860 344-6000 A member orthe Middles" Health Sstuem fax 860346-5485 h'S B-8 Millstone Emergency Plan Revision 31 December, 2004

Appendix B 5-NoYcmnber') 2001 Mr. Williant R. Matthews Vice President & Sr. Nkuckar rxwLutivc Dotninion Nufcar Connecticut 1'.0. Box 128 Watecrr,C'l 06385 Dcar Mr. Matthcws:

Ibis letter i4 to confirm that Nichols Du$ Service, Inc. ivill. when requested. rcspond in the event of an emergency at the Millstone Power Station in the followint arc3s:

Imnletneitation Critqi fAuthoritiet. Responsibilities It is our undcr31Xndinc thzi in the event of an emc:gency, the Director of Sire Emcrgency Operations may requcot services 10 assist in the cmergency responte effort. As3i6tance should be requested by calling 860-267-4574.

Mearures to he Providcilimnits of Action Our commitment for assistancc is supplying mass transpollation in the event of an emetgeency nt the Millstone Power Station.

IfoIrmation LxchUrce Point of Contact at Sitc Verilication communications to thc Nuclear Facility will b by bIlephone to the Director of Sitc Emergency ODerations. 1he telephonc number is unliStcd.

Very trutly yours,

&2&U Clharics B.Nichol Prcsident cc: Paul A. Blasioll, Emergency Planning Service, Millstone Station B-9 IVISLUCn 1.M016vaL;4 I N-a A-Revision 31 December, 2004

Appendix B SHIPMAN'S FIRE EOUIPMENT CO., INC.

172 Cross Road-DP. . Box 257 Waterford. Connecticut 06385-0257 (860) 442-0678 Fax (860) 444-7395 November 7, 2001 Mr. William R. Matthews Vice President & Sr. Nuclear Executive Dominion Nuclear Connecticut Millstone Station P.O. Box 128 Waterford, Cl 06385

Dear Mr. Matthews:

This letter is to confirm that Shipman's Fire Equipment Co., will, when requested, respond in the event of an emergency at the Millstone Power Station, in the following areas:

Imrplementation Criteria/Authorities. Responsibilities It is our understanding that, in the event of an emergency, the nuclear facility Director of Site Emergency Operations may request services to assist in the emergency effort. Assistance should be requested by calling 860-267-4574.

Measures to be Provided/Limits of Actions Our commitment for assistance is supplying breathing air in the event of an emergency at Millstone Power Station.

Inrormation Exchange/Point orContact at Site Verification communications to the nuclear facility will be by telephone to the Director of Site Emergency Operations. 'Ihe telephone number is unlisted. Information exchange can be provided by using the same telephone number.

Trainine and Drills Since our assistance is limited to providing equipment and service, we feel that we do not need to participate in your training and drills. However, we would appreciate being invited to your plant drills to observe your emergency response actions, and to meet your emergency personnel.

This letter of agreement shall remain in effect until cancellation by either party, provided on ninety (90) days prior written notice, and shall be reviewed and certified as needed.

Sincrely, David E. Carson, President cc: Paul A. Blasioli, Emergency Planning Services Department, Millstone FIRE & SAFETY EQUIPMENT *
  • WWW.SHIPMANS.COM A d B-I0 Millstone Emergency Plan Revision 31 December, 2004

Appendix B I','

STATE OF CONNECTICUT U22 _--j DEPARTMENT OF PUBLIC SAFETY OFFICE OF THE COMMISSIONER November 7,2001 ArthurL Spada Commissioner Mr. William R. Matthews Vice President and Senior Nuclear Executive Dominion Nuclear Connecticut Millstone Station Post Office Box 128 Waterford, Connecticut 06385

Dear Mr. Matthews:

This letter is to confirm that personnel and equipment from the Department of Public Safety will, when requested, respond in the event of an emergency at the Millstone Power Station.

This response is in accordance with the State of Connecticut Radiological Emergency Response Plan; ALS:eah Cc: IPaul A. Blasioli. Emergency Services Department, Millstone I I I Cotiy Club Road P.O. Box 2794 Middlctown, CT 06457-9294 An Equal Oppoftnily Employer

  • Revision 31 December, 2004

App~endix B I

I Dember 5,2Q02 o PboEM: S 5MO19 Mr. J. Alan Pricc Site Vice President Millstone Power Station Dominion Nuclear CT POBox 128 RopeVerry Road Waford, CT 06385

REFERENCE:

Your request for emergency services pla=L Dtar Mr. Price, I am replying to the request to updatc our 'etter of Agreenent" to provide assistance in the event of an mergnicy.

We have 23 Gmma detectors and 34 Gross alphA/beta proportional counters which arm used for gros aphabeta, 1-131 and Sr 89/90 couating. During an accident we could d cate a large portion of these detectorr to provide fst turaround analyss.

Tbe accompanying Table I lists the types of anlyses; number of each analysis which can be parfoned on a one-day, two-day or three day basis; sample medium; and detection sensitivity.

We could be contacted at any time in the event of an emergency. The listed persons and telcpbone numbers can be called in the order listed:

Teledyne Brown Engineciing (865) 690-6819 leith jeter (865)220-0820 Marty Webb (865)376-3710 Rebecca Charles (865) 482-3061 This agreement letter shall remain in efrect until cancellation by either party.

provided on ninety (90) days prior written notice, and shall be reviewed and certified IIS needt If you need additional information please contact me at the above number.

Sincerelyyours.

}Ceitb Ictc Operations Manager Enclosure cc: Paul BlasiolU B-12 Millstone Emergency Plan Revision 31 December, 2004

Appendix B WATERFORD AMBULANCE SERVICE October 22,2002 Mr. J Alan Price Site Vice President Miltone Power Station Dombinon Nuclear CT P.O. BMi12J Waterford, CT 0435 Desr Mr. Price, Thbi letter Istn eoitlrua that the Waterfard Ambulanee Service wKil when called upon respond It the event of emergencIes at Ihe Millstone Power Stalion Complex In the following Oreas.

IMPIJMENTATION CRITFRIA I AITHORITI FS, Rr.PONSIMlLlTIS.

I Isoer Understanding that Is thl event ofan emnergency, the minlstone shift Manager/ Direetutr of Station Emergency Operations will request ambulance service t assht In the cmergency optrations.

Axlstance should be requested by calling tihe Weaerford Emergency Commsunications Center (911),

or lby other means provIked.

MEASURFS TO BE PROVIDED I UNIMIT OF ACTIONS Osur comnitmnt Isto provide Emergency Medical Service to personnel who might he Injured et the Milltone Power Station Complex.

INF"ORMATION F.XCIIANGE/POINTOF CONTACT ATS.CFNE Verification otcomumualcatsin to the site may be by telephone to the Millstone Control Roon or Emergency Operations Facility.

TRAINING and DRILLS We would appreciate notieslon nf the plant drtith or additional traininr. which you mlght fel would be adviatasg to us.

Timothy DI.Sullivan President Ce Paul Blasloll, Lmergency Planning Service Department

-P.O. BoX 137

  • 19 Rope Ferry Rload
  • Waterford - Connoctict
  • 560.443-6302 . fax
  • 860-442-2661 K>

- ~ TmPrtYPnr.V Plan B5-13 IVAIISOLVIAW s96 -^ '--

Revision 31 December, 2004

Appendix B FIFTEEN ROPE FERRY ROAD WATERFORD. CT 0638S-2886 November29, 2004 Mr. J. Alan Price Site Vice President - Millstone Station Dominion Nuclear Connecticut Rope Feny Road Waterford, Connecticut 06385

Dear Mr. Price:

This letter is to coanfirm that personnel and equipment from the Waterford Fire Service will. when requested, respond in the event of an emergency at the Millstone Power Station In the following areas:

Implementation Criteria/Audiorides, Responsities I It is our understanding that, inthe event of an emergency, the Millstone Shift Manager/Director of Emergency Opertions may request personnel and equipment to handle the emergency. Assistance should be requested by calling the Waterford Emergency Communications Center (911), or by other means that may be provided Measures to be Pr~vided/Limnhs of Actions Our commitment for assistanceis to respond to the best of our ability with personnel and equipment In the event of a fire emergency or rescue at the Millstone Power Station Complex and attempt to control the situation with the resources that may be available.

Information Exchange/Point of Contact Verification of communications to the nuclear facility will be by telephone to the Control Room or Director of Site Emergency Operations/Designee.

Trmining andDrills We would appreciate advanced notification of the plant drills or additional training, which you feel would be advantageou to us. This notification should also include any additional security requirements that ae being implemented at the Millstone nuclear facility.

This letter of agreement shall remain in effect until cancellation by either party, provided on niney (90) days prior written notice, and shall be reviewed and certified as needed.

VCIM r- %arson I -

Chairman, Board of Fire Commissioners Cc: Patti Luckey, Manager, Emergency Preparedness Department, Millstone B-14 Millstone Emergency Plan Revision 31 December, 2004

Appendix B WAThFORD POUCE DEPARTMENT 4

. 41 AVERYIANE WATERFORD, cr 0638S-2819 1hurray J. Pendleton (860) 442-9451 TEL cheo~iefoPoie 4860) 442-2SS7 TAX October 31, 2002 Mr. Alan J. Pricc, Site Vice-President Millstone Power Station DominionNuclar Connecticut P.O. Box 128 Wasedord, Connecticut 06385 DeM Mr. Price:

This letter is to conrm that personnel from the Waterford Police Department shall servc as the pritary Law Eaforcement Agency which when requested, will respond to the Milstone Power Station.

In the event ofan emergency, the billstone Power Station Director of Emergency Operations may requen peronnel And equipment from the Waterford Police Department by requesing such assistance utilizing the established Hot Lines within the Waterford Communications Dispatch Center.

Tec Waterford Police Departwent's commitment for assistance to provide persornel and equipment may include, but not limited to, tsafle control, security or taical aistance 'Informnetion rquesting assistance will be vcrified by the Waterford Police Department utilizing a call back vedcastion method, which shall be conducted by the rniing Executive Officer on duty. In addition, the Waterford Police Department shall be the initial saging ara for all incidents involving outside law enforcement agencks.

The Waterford Police Deprtment shall be notified of all notewocthy related plant dils or additional training that would be advantageous to Law Enforcement.

This rcsponse is in accordance with the criteria as set forth in the Federal Regulations, 10 CFR. Pan 73.55, "Requirements for Physical Protection of License Activities hi Nuclear Pover Reators Against Radolongical Sabotagc.

Sicrely, efof oce

.B-15 Millstone Emergency Plan Revision 31 December, 2004

Appendix B WsF WEAnHER sERmcs WrOMTONAL October21, 2002 Mr.I. Alan Price Site Vie President

-- Millstone Power Station DominionNuclear CT PO Box 128 Waterford,Cr 06385 Dear Mr. Price.

This letter is to confrm that WSI Corporation will. when requested, respond with meteorological support in the event of an emergency at Millstone Power Station.

Telephone consultations will be available 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day, 7 days a week. with WSI meteorologists as needed. In accordance with WSI Agreement #2365, the service includes the following

  • WSI wnll provide MSillstone site-specific forecasts as needed during Incidents, Alerts, and Emergencies at Millstone Power Station. Ibe forecasts will be delivered via phone to Millstone Power Station as requestd.
  • WSI will provide meteorological support for drills and exercises at Millstone Power Station.

WSI will also provide meteorological support for hurricanes, severe weather, and other significant weather events potentially effecting Millstone Power Station.

WS1 will paticipate in periodic weather forecast simulations with the Millstone Environmental Staf The direct WSI Forecast Operations number is (978) 670S5053. Simply ask for the Senior Duty Meteorologist We look forward to continuing our work with the Dominion Nuclear Coecdcut's Operations staff. If you have any questions, or need any additional information, feel free to contact me at (978) 670-5105.

KiGO. Bosse S Director, Energy Services WSI Corporation Cc. Paul Blasioli, Manager Emergency Preparedness, Millstone Power Station John Leavitt, Environnental Services, Millstone Power Station 4FedenlSWM l krla,Ma P~heM O1= M I TA9767040 l F.79670S100

    • TOTL PA .n2 -

B-16 Millstone Emergency Plan Revision 31 December, 2004

Appendix B A

FRAMATOME ANP An AREVA and Siemens Company FRAtMTOME AP DEWS October29,2002 EL 185/02 Mr. J. Alan Price, Site Vice President Milltone Power Station Dominion Nuclear CT P.O. Box 128 W&Ateord, CT 06385

Dear Mr. Prie:

This letter constues a renewal of fte Framaome ANP DE&S Environmental Laboratory commiment to pwovde emergency radloanalyse" of enrvronmontal samples to assist your organization In Mhe event of an emergency situaion or an ernergency response drill. Pleaso note that Dominion Nuclear Connecticut would be responsbie. on a time and material basis, for the radwaste disposal oosts of accident sample materials.

I am the contact point and can be reached at (50) 898-9970, Extesion 252;L This Letter of Agreme shall remain In effect until cancelaiton by elther party, provWed on ninety (90) days prior written notice, and shall be reviewed and certiled as needed.

Shcerey, Melvin W. Gmyrek Laboratory Director 49 MwGlmn rcc Paul A. Blasioli Emergency Planning Services Millstone Station

-FRAMATObe NPlXE&S EMrMt MENTAL LAORATORY: 29 Rue.t DtV,,W"1bo , M01581-313 Pon.: 50188-97O F= 508 98t6 WWWaivrM e-m1p noAM B-17 Millstone Emergency Plan Revision 31 December, 2004

Appendix B

& OIL of City of Norwich fire Dept James E Walsh 10 North Thamcs EUel (6ireChief Norvich. ConnodbsL 06360 (860) 8926080 t%4144, 61,, Ftv "I November 9, 2001 Mr. William R. Matthews Vice President & Sr. Nuclear Executive Dominion Nuclear Connecticut P0O.Box 128 Waterford, CT 06385

Dear Mr. Matthews:

This letter is to confirm that the Norwich Fire Department will, to the best of its ability, during a station emergency, fill breathing bottles brought to the Norwich Fire Department by Dominion Nuclear Connecticut upon telephone request by its Emergency Response Operations.

The Emergency Planning ServicesDepartment at Millstone Station is responsible for any questions pertaining to this agreement. (Contact Tom Dembek at 440-4223)

This agreement shall remain in effect until revised, as agreed upon by both parties, or cancelled by either party with 90 days written notice.

Sincerely,

~ja 4 k/dj4<

James Walsh Fire Chief Norwich Fire Department cc: Paul A. Blasioli, Emergency Planning Services Department, Millstone I

B-18 Millstone Emergency Plan Revision 31 December, 2004

Appendix B SaLEt VOLUNTESR FMR£ Co. INC.

424 RM0TFO1RD ROGD sam CT. 06420 November 15. 2001 M. Wlilliam R. Matthews Vice President & Sr. Nuclear Executive Dominion Nuclear Connecticut P.O. Box 128 Waterford, CT 06385

Dear Mr. Matthews:

This ktter is to confirm that the Town of Salem and the Salem Volunteer Fire Department wil, to the best of its ability, during a station emergency, fill breathing bottles brought to the Salem Volunteer Fre Station by Dominion Nuclear Connecticut upon telephone request by its Emergency Response Operations.

The Ernergency Planning Services Department at Millstone Station is responsible for any questions pertaining to this agreement (Contact Tom Dembek at 440-4223) 1fhis agreement shall remain in effect until revised, as agreed upon by both parties, or cancelled by either patty with 90 days written notice.

Sincercklv Eugic Maiornno, Fire Chief Salem Volunteer Fire Department cc 'PaulA. 1lasioli, Emergency PlanningServiccs Department. Millstonc stabn & 89 59-0842 Station Foa 890a-5s-2901 B-l9 Millstone Emergency Plan Revision 31 December, 2004

Appendix B Department of Energy 13cdawn Ara Offic.

P.O. 6c000 Upton, New Ybo11973 JUN O3 20az TO: DISTRIBUTION LIST

SUBJECT:

DEPARTMENT OF ENERGYS (DOE) RADIOLOGICAL ASSISTANCE PROGRAM (RAP) MEMORANDUM OF UNDERSTANDING Ibe DOE Brookhaven Arem Office (BAO) as the Regional Coordinating Office (RCO) for DOE's Region 1, after discussion with sentatives from the U.S. Nuclear Regulaotry Commission (USNRC) and the Federal Emegency Management Agency (FEMA), has concluded that individual memorandums of understanding (MOUs) arc no longer required.

Numerous federa laws, regulations, and DOE Orders, tat ar currently in existcnce, require DOE to maintain an ever-ready response capability for coping with any nuclear/radiological incident in support of FEMA and the NRC. The elimination of the annual letters would In no way impact the assistance or support that BAO Is required to provide and has maintained over the yem BAO. as the RCO for DOE Region 1, will cary out hat assistansc required by law, regulation, and DOE Orders.

If you have any questions or would ikce furthe details, please contact me at (631) 344-7309.

Sincerely, egionA l Re on C r d aort Regiondl Responsc Coordinator PCDwcU423S1XMSjLflb~

B-20 Millstone Emergency Plan Revision 31 December, 2004

Appendix B

Emergency Preparedness I. This agreement by and between Connecticut Yankee Atomic Power Company (CYAPCO) and Dominion Nuclear Connecticut, Inc. (DNC) confirms that CYAPCO will continue to provide the emergency services stipulated in the Millstone Station Emergency Plan, section 6.4.11.i

2. DNC may use CYAPCO's Haddam Neck Plant in Haddam Neck, Connecticut to Monitor and decontaminate DNC personnel during or following an emergency at the Millstone Power Station in Waterford, Connecticut ifconditions at Millstone prohibit DNC from monitoring its personnel at Millstone.
3. Transportation of DNC personnel to CYAPCO's Haddam Neck Plant under these circumstances will be provided for by DNC
4. This agreement shall remain in effect until terminated by either party and upon the designation ofan alternate facility to perform the above-mentioned services.
  • 2>r Patricia Luckey 0 Robert Mitchell /'

Manager Unit Manager, Emergency Preparedness Department Connecticut Yankee Atomic Power Co.

Dominion Nuclear Connecticut, Inc.

eAWA g \\~ Zz-Y.

B-21 Millstone Emergency Plan Revision 31 December, 2004

Appendix C APPENDIX C MAPS OF PLUME EXPOSURE AND INGESTION EXPOSURE EPZ, LOCATIONS OF ON-SITE AND OFF-SITE RADIOLOGICAL MONITORING STATIONS, STATION EVACUATION ROUTES C-l Millstone Emergency Plan Revision 31 December, 2004

Figure C-l Map of Millstone Emergcncv Planning Zone, Host Communities and Evacuation Routes C-2 Millstone Emergency Plan Revision 31 December, 2004

Figure C-2 Locations of On-Site and Off-Site Radiological Monitoring Stations (As specified by the Radiological Effluent Monitoring and Off-Site Dose Calculation Manual)

C-3 Millstone Emergency Plan Revision 31 December, 2004

Fizure C-3 Map of Millstone 10 Mile Emergency Planning Zone I

(0-2 mi) A Waterford (A-1)

East Lye (A-2)

(2-5 mi) B East Lyme (B-I)

  • Waterford (B-2)

_ New London (B-3)

(5-10 mi) C East Lyme (C-1)

Montville (C-2)

Waterford (C-3)

D Old Lyme (D-1)

Lyme (D-2)

E Ledyard (E-1)

_ Groton City & Town (E-2)

___ _ F Fishers Island N/A Plum Island C-4 Millstone Emergency Plan Revision 31 December, 2004

Figure C-4 Map Of Millstone 50-Mile.Emergency Planning Zones C-5 Millstone Emergency Plan Revision 31 December, 2004

(3 (3 Figure C-5 Map of Millstone Station Evacuation Routes I

C-6. Millstone Emergency Plan Revision 31 December, 2004

Appendix D APPENDIX D SUPPORTING PROCEDURES LIST I

D-1 Millstone Emergency Plan Revision 31 December, 2004

Appendix D Emergency Plan Procedure Number Title Section(s)

Program Description MP-26-MMM Radiological Emergency Preparedness 8.0.

Emergency Plan Implementing Procedures (EPis)

MP-26-EPI-FAP01 CR Emergency Operations 5.1 MP-26-EPI-FAP02 TSC Activation and Operation 5.2, 5.3, 7.3 MP-26-EPI-FAP03 OSC Activation and Operation 5.2, 5.3,7.4 MP-26-EPI-FAP04 EOF Activation and Operation 5.2, 5.3, 7.2 MP-26-EPI-FAP05 State EOC Activation and Operation 5.2, 5.3 MP-26-EPI-FAP06 Classification and PARs 4, 5.2.1, 6.2, 5.2.5 MP-26-EPI-FAP07 Notification and Communications 5.1, 6.1 MP-26-EPI-FAP08 Evacuation and Assembly 6.4.1 MP-26-EPI-FAP09 Radiation Exposure Control 6.4, 6.5 MP-26-EPI-FAP10 Dose Assessment 6.2.1, 6.2.3 MP-26-EPI-FAP1 I Core Damage Assessment 6.2.4 MP-26-EPI-FAP12 Thermal Hydraulic Evaluation 5.2.18, 5.3.13 MP-26-EPI-FAP13 News Releases 5.2.14, 5.2.16 MP-26-EPI-FAP14 Recovery 9.0 MP-26-EPI-FAPI 5 Common Forms N/A Emergency Plan Administrative Procedures MP-26-EPA-FAPOI Management Program for Maintaining Emergency 7.0, 8.0 Preparedness MP-26-EPA-FAP02 Decrease In Effectiveness 10 CFR 50.54(q) Determination 8.3 MP-26-EPA-FAP03 Drill and Exercise Implementation 8.2 MP-26-EPA-FAP04 EAL Table Revision N/A MP-26-EPA-FAP05 Emergency Planning Facility Maintenance 7.0, 7.5 MP-26-EPA-FAP06 Emergency Plan Change Process N/A MP-26-EPA-FAP07 Emergency Preparedness Services Departmental Staff N/A Qualifications MP-26-EPA-FAP08 Public Alerting System Administration 8.2 MP-26-EPA-FAP09 Public Alerting System Test and Inspection Program 8.2 MP-26-EPA-FAP10 Public Alerting System Siren Test and Repair 8.2 MP-26-EPA-FAP1 1 Public Alerting System Siren Acoustical Performance Testing 8.2 D-2 Millstone Emergency Plan Revision 31 December, 2004

Appendix D Emergency Plan Procedure Number Title Section(s)

MP-26-EPA-FAP12 Public Alerting System Field Acoustical Measurement 8.2 (Community Test)

MP-26-EPA-GDLO1 Emergency Planning Performance Indicators N/A MP-26-EPA-GDLO2 Document Maintenance and Storage N/A MP-26-EPA-GDL03 Station Emergency Response Organization Qualification N/A Maintenance MP-26-EPA-GDLO4 Emergency Planning Cyclical Tasks Appendix B MP-26-EPA-GDL05 Emergency Response Data System (ERDS) Change Process NiA MP-26-EPA-GDL06 OFIS 7.1, 7.2, 7.3 MP-26-EPA-GDLO7. SERO Database and ENRS System Modifications N/A MP-26-EPA-REFOI Millstone Unit 1 Defueled Emergency Action Level (EAL) Basis N/A Document MP-26-EPA-REF02 Millstone Unit 2 Emergency Action Level (EAL) Basis N/A Document MP-26-EPA-REF03 Millstone Unit 3 Emergency Action Level (EAL) Basis N/A Document MP-26-EPA-REFO4 Off-Site Programs 8.0 MP-26-EPA-REF08B Millstone Emergency Planning Resource Book 8.2.1 Administrative Control Procedures NTP 7.205 Millstone Fire Protection and Prevention Training Program 8.1.3 Implementing Procedure Nuclear Training Procedures NTP 7.212 Emergency Plan Training Program Description 8.1.1 Radiation ProtectiontRadiation Monitoring RPM Section 2.3.4 Quality Assurance Program for Respiratory Protection Various Equipment RPM Section 2.3.5 Inspection and Inventory of Respiratory Protection Equipment Various RPM Section 2.9.1 Sample Identification and Transmittal to Contractor for 6.2.4 Analysis RPM Section 2.9.6 Biota Sampling 6.2.4 RPM Section 2.9.8 Soil Sampling 6.2.4 RPM Section 2.9.9 Terrestrial Sampling 6.2.4 RPM Section 4.8.5 Emergency Radiological Equipment Maintenance and Various Inspection REMODCM Radiological Effluent Monitoring and Off-Site Dose Calculation Figure C-2, Manual Appendix H Table H-2 D-3 Millstone Emergency Plan Revision 31 December, 2004

Appendix D Emergency Plan Procedure Number Title Section(s)

Millstone Unit-2 Severe Accident Management Guidelines (SAMG)

SAMG 4211 Phase 1 Initial Diagnosis 5.2.2, 5.1.3, 5.3.13 SAMG 4212 Phase 2 Verification of Diagnosis 5.2.2, 5.1.3, 5.3.13 SAMG 4213 Phase 3 CHLA Implementation 5.2.2, 5.1.3, 5.3.13 SAMG 4214 Phase 4 Restorative Actions 5.2.2, 5.1.3, 5.3.13 SAMG 4215 Calculational Aids 5.2.2, 5.1.3, 5.3.13 Millstone Unit-3 Severe Accident Management Guidelines (SAMG)

SACRG-1 Severe Accident CR Guideline Initial Response 5.2.2, 5.1.3, 5.3.13 SACRG-2 Severe Accident CR Guideline for Transients after TSC is 5.2.2, 5.1.3, Activated 5.3.13 SAG-I Injection Into the Steam Generators 5.2.3, 5.3.13 SAG-2 Depressurize the RCS 5.2.3, 5.3.13 SAG-3 Inject Into RCS 5.2.3, 5.3.13 SAG4 v Inject into Containment 5.2.3, 5.3.13 SAG-5 Reduce Fission Product Releases 5.2.3, 5.3.13 SAG-6 Control Containment Conditions 5.2.3, 5.3.13 SAG-7 Reduce Containment Hydrogen 5.2.3, 5.3.13 SAG-8 Flood Containment 5.2.3, 5.3.13 SCG-1 Mitigate Fission Product Release 5.2.3, 5.3.13 SCG-2 Depressurize Containment 5.2.3, 5.3.13 SCG-3 Control Hydrogen Flammability 5.2.3, 5.3.13 SCG4 Control Containment Vacuum 5.2.3, 5.313 SAEG-1 TSC Long Term Monitoring 5.2.3, 5.3.13 SAEG-2 SAMG Termination 5.2.3, 5.3.13 CA-1 RCS Injection to Recover Core 5.2.3, 5.3.13 CA-2 Injection Rate for Long-Term Decay Heat Removal 5.2.3, 5.3.13 CA-3 Hydrogen Flammability in Containment 5.2.3,5.3.13 CA4 Volumetric Release Rate from Vent 5.2.3, 5.3.13 CA-5 Containment Water Level and Volume 5.2.3, 5.3.13 CA-6 RWST Gravity Drain 5.2.3, 5.3.13 D4 Millstone Emergency Plan Revision 31 December, 2004

Appendix D Emergency Plan x Procedure Number Title Section(s)

CA-7 Hydrogen Impact when Depressurizing Containment 5.2.3, 5.3.13 DFC TSC Diagnostic Flow Chart 5.2.3, 5.3.13 SCST Severe Challenge Status Tree 5.2.3, 5.3.13 Common Operating Procedures-C-OP 200.2 Response to Security Events 6.4.1 C-OP 200.3 Response to Medical Emergencies 6.5.4, 6.5.5 C-SP 600.1 Page! Siren System Evacuation Alarm Operability Test 8.2.1 C-OP 606 Communications-Radiopaging and Callback Monthly 8.2.1 Operability Test C-SP 600.3 State Police, Waterford Police and Tri-Town Radio Test 8.2.1 C-SP 600.4 Communications-Radiopaging and ENRS Daily and Weekly 8.2.1 Operability Test Chemistry Department Procedures CP 3804K PASS RCS/RSS Sample (Unit 3) N/A CP 3804AC Liquid Waste Sample Sink (Unit 3) N/A CP 3804L PASS Containment Air Sample (Unit 3) N/A CP 3804M PASS Ventilation Samples (Unit 3) N/A CP 2804L Unit 2 Reactor Coolant and Liquid Waste PASS N/A CP 2804M Unit 2 High Range Vent Stack and Containment Air PASS N/A Sampling and Analysis D-5 Millstone Emergency Plan Revision 31 December, 2004

Appendix E APPENDIX E MILLSTONE EMERGENCY EQUIPMENT E-l Millstone Emergency Plan Revision 31 December, 2004

Appendix E

' Figure E-1 Millstone Emergency Equipment Summarye 0 Emergency Item Control TSCI NAPI Ambulance EOF Env. RMT RMT Room OSC SAP Lab Kit, Kle Radiological Monitoring Equipment: _ _ _

RM-14 Frisker (or equivalent) U3 X X _X RO-2A Survey Meter (or equivalent) X X X X DIG-5 Portable Scaler X X X ASP-1 / HP-270 (or equivalent) X X E-140 I HP-210 (or equivalent) U2 _ X X X PS-2-2 / HP-210 (or equivalent) _ X Teletector (or equivalent) X X IX Air Sampler- 110 vac X X xP)

Air Sampler- 12 vdc ___ X X() X Area Radiation Monitor X X Portable Count Rate Meter U2 x x x Cont. Air Monitor (AMS-3 or equiv.) _ X Portal Monitor (4) x Iodine Sampling Materials (5) X X X (5) X X On-Site RMT Kit (locations) X X X X (5) (5)

Off-Site RMT Kit (locations) X X (5) (5)

Emergency Dosimetry X X (5) X X (5) X X Protective Equipment I Materials 3 : _____

Respirators X X X X (5) (5) (5)

SCBA X X Fire Fac Protective Clothing X X X X X X Personnel Decontamination Material X X X Facility Rad Control / Decon Material X X Potassium lodide Tablets U2,U3 X X X X X Communications Equipment 3: _

Dedicated Telephone Lines U2. U3 X X Emergency Radios X X _X Emergency Supplies I Materials3: _

Emergency Preparedness Procedures X X X X X X RMT Vehicles _ X Tools, Lights, Office Supplies (3) X I ____T (1) On-Site RMT Kit (2) Off-Site RMT KI; Backups located at Goshen Vol. Fire Dept (3) Additional tools and equipment can be obtained from tool cribs located InU2I.J3. ERF Items maintained Inaccordance with EP procedures.

(4) Permanently Installed at this location.

(5) RMT kit resupply equipment Isstored at this location.

(6) HP materials and equipment are maintained and surveilled Inaccordance with the site Radiation Protection Manual. Detailed Inventory of other equipment Isprovided In MP-26-EPA-FAP05, EP Facility Maintenance.)

(7) 11Ov - RMT1 (U2.3 CR) TSC/OSC 12v - NAP/SAP over water E-2 Millstone Emergency Plan Revision 31 December, 2004

Appendix F APPENDIX F DIAGRAMS AND ARRANGEMENT OF EMERGENCY FACILITIES F-I Millstone Emergency Plan Revision 31 December, 2004

Figure F-1 Diagram of TSC / OSC Layout TSC Entrance from Unit 3 Not to Scale- Typical Layout F-2 Millstone Emergency Plan Revision 31 December, 2004

Figure F-2 Diagram of Emergency Operations Facility Typical Layout- Drawing not to scale F-3 Millstone Emergency Plan Revision 31 December, 2004

Figure F-3 Diagram of OSC Assembly Area Layout Building 475 Drawing not to scale-F4 Millstone Emergency Plan Revision 31 December, 2004

Appendix G APPENDIX G CROSS-REFERENCE TO NUREG-0654 CRITERIA G-l Millstone Emergency Plan Revision 31 December, 2004

Appendix G Planning Summary of Planning Standard Plan Cross Reference Standard (Section or Item)

A. ASSIGNMENT OF RESPONSIBILITY (ORGANIZATION CONTROL)

A.I .a Identify State, Local, Federal and private organizations who are 1.1, 1.2, Table 1-1, part of emergency plans. Figure 1-1, Appendix B, Table 2-1

.1.b Each organization shall specify its concept of operations and Sections 1, 5, 6, 9

_ relationship to total effort.

A.1.c Illustrate relationships by block diagram. Figures 1-2, 5-1, 7-1 a, b, c A.1.d Title of individual in charge of emergency operations. 5.2.1, Figure 5-1 A.1.e Provide for 24 hrJday emergency response and manning of Section 5.0 communications.

A.2.a Specify functions and responsibilities for major elements and key N/A- State and Local individuals by title. requirement only.

A.2.b Each plan shall contain the legal basis for such authorities. N/A- State and Local requirement only.

A.3 Include written letters of agreement. Include concept of 5.4.1, 5.4.2, Appendix B operations, emergency measures to be provided, criteria for Implementation and exchange of information.

A.4 Title of individual responsible for assuring continuity of resources. 5.2.17, 5.4.3 B. ON-SITE EMERGENCY ORGANIZATION B.1 Relationship between on-site emergency organization and normal Table 5-1 staff.

B.2 Specify title of emergency coordinator who is on-site 24-hrJday. 5.1.1, Table 5-1 B.3 Line of succession for emergency coordinator. Specify conditions 5.1.1, 5.2.1, 5.2.5 for high level officials assuming this function.

B.4 Specify functional responsibilities of emergency coordinator. 5.1.1, 5.2.1 Specify responsibilities which cannot be delegated (e.g., may not delegate the decision to notify and to recommend protective actions to authorities).

B.5 Specify title and corresponding qualifications of emergency Table 5-1 personnel. Include Table B-1, "Minimum Staffing Requirements for Nuclear Power Plant Emergencies." Specify minimum on shift and available within 30 minutes and 60 minutes following declaration of emergency.

B.6 Specify interfaces between on-site and off-site organizations. 1.2, Figures 1-1, 1-2, 1-Illustrate in block diagram. 3, 5-1 B.7 Specify corporate organization. Provide a table similar to B-1. 5.0, Table 5-1, Figure 5-1 B.7a Logistics support for emergency personnel 5.2.17 B.7b Technical support for planning, reentry, recovery Section 9 B.7c Management Interface with government authorities 6.1, Figures 7-1a, c B.7d Release of information to news media 5.2.14, 5.2.16 G-2 Millstone Emergency Plan Revision 31 December, 2004

Appendix G Planning Summary of Planning Standard Plan Cross Reference Standard (Section or Item)

B.8 Specify private organizations and contractors who would provide 5.4 assistance.

B.9 Specify services to be provided by local agencies. Include 6.3.1, 6.4.1 .b, 6.5.5, transportation and treatment of injured personnel who may be 6.5.6 contaminated.

B.9 Append letters of agreement with contractor, local, and private 7.10, Appendix B agencies which Include authorities, responsibilities, and limits of actions.

C. EMERGENCY RESPONSE SUPPORT AND RESOURCES C.1 Make arrangements with DOE for FRMAP/RAP assistance. 1.2, 1.4 C.1 .a Specify persons by title authorized to request federal assistance. 1.4, 5.4.3 C.1 .b Specify federal resources expected, including expected times of 1.4, 5.4.3 arrival at specific nuclear facility sites.

C.1.c Specify resources available to support the federal response. 1.4, 5.4.3 C.2.b Licensee may dispatch a representative to principal off-site 5.2.15, 5.2.16 governmental EOCs.

C.3 Identify radiological laboratories, capabilities, and expected 7.10, Table H-2, availability. Appendix B, Table H-1 C.4 Identify facilities, organizations, and individuals which can be Table H-2, Appendix B relied upon in an emergency D. EMERGENCY CLASSIFICATION SYSTEM D.1 Establish EAL scheme per Appendix 1. Section 4, Table 4-1, 4-2, 4-3 4-4, Appendix I D.2 Initiating conditions shall include the example conditions in Section 4, Table 4-1, 4-Appendix I and accidents in the FSAR. 2, 4-3 4-4, Appendix I E. NOTIFICATION METHODS AND PROCEDURES E.1 Establish procedures for notification of response organizations 1.3, 6.1 consistent with Appendix 1. Provide verification of messages.

E.2 Establish procedures for notifying, alerting, and mobilizing 6.1 emergency response personnel.

E.3 Initial emergency message shall include: class of emergency, 6.1 whether a release is taking place, potentially affected areas, whether protective measures may be necessary.

E.4 Provide for follow-up messages. Includes the 14 listed items. 1.3, 6.1, 6.2.1, 6.2.2 E.6 Establish administrative and physical means and the time 1.5, 6.1 required to notify public in plume EPZ per Appendix 3. Licensee will ensure means exist. Responsibility of State and Local l governments to activate the system.

E.7 Provide written messages intended for the public, consistent with 1.3, 1.5, 6.2.2, 7.7, 8.4 the operator's classification. Role of the licensee is to provide supporting information for the messages.

G-3 Millstone Emergency Plan Revision 31 December, 2004

Appendix G Planning Summary of Planning Standard Plan Cross Reference Standard I (Section or Item)

F. EMERGENCY COMMUNICATIONS F.1 Identify organizational titles and alternates for communications 1.3, 6.1, Figures 7-1 a, links. Establish primary and backup communications. b, c, 7.9, Appendix B F.1 .a Provide 24-hrJday notification and activation and 24-hr./day 5.1.4, 6.1 manning of communications links.

F.1.b Provide communications with contiguous State/Locals within the 6.1, Figure 7-1a Emergency Planning Zones.

F.1.c Provide communications with Federal Emergency Response Figure 7-1 b. 7-1c Organizations.

F.1 .d Provide communications between State and Local centers, and 1.3, 6.1, 7.2.5, Figure 7-field assessment teams. Ia, 7-1c F.1.e Provide for alerting and activating emergency personnel. 6.1 F.1.f Provide communications to NRC Headquarters, NRC Regional Figure 7-1b, 7-1c Office EOC, EOF, and RMT assembly area.

F.2 Ensure that coordinated communication links for fixed and mobile 7.9 medical support facilities exists.

F.3 Periodic testing of communications systems. 8.2.1, 8.2.1.b, 8.2.2 G. PUBLIC INFORMATION G.1 Provide periodic information at least annually to public concerning 1.6, 8.4, 8.5 public notification and protective actions in an emergency Including the special needs of the handicapped.

G.2 Information must reach population within plume EPZ and should 1.6, 8.4 include written material that would likely be available in an emergency. Updated information should be disseminated annually. Notices to refer the transient populations to the sources of local information.

G.3.a Provide point of contact and physical location for use by news 7.7 media.

G.3.b Provide space for a limited number of news media at EOF. 7.7 G.4.a Designate a spokesperson. 5.2.15 G.4.b Arrange for timely exchange of information among spokesperson. Figure 1-1, 5.2.14, 5.2.15, 5.2.16, 6.1, 6.6 G.4.c Coordinate arrangements for dealing with rumors. 5.2.14 G.5 Conduct informational programs for news media at least annually. 8.5 H. EMERGENCY FACILITIES AND EQUIPMENT H.1 Establish TSC and OSC per NUREG-0696 7.3, 7.4, Appendix E, F H.2 Establish EOF per NUREG-0696 7.2, Appendix E, F H.4 Provide for activating and staffing facilities in a timely manner. Section 5, Table 5-1, 6.1 H.5 Provide on-site monitoring systems to be used to initiate Table H-1 emergency measures per Appendix 1, including:

H.5.a Geophysical Table H-1 GA Millstone Emergency Plan Revision 31 December, 2004

Appendix G Planning Summary of Planning Standard Plan Cross Reference Standard (Section or Item)

H.5.b Radiological 6.2.3, Table H-1, Figure C-2 H.5.c Process Table H-1 H.5.d Fire Table H-1 H.6 Provide off-site monitoring equipment including:

H.6.a Geophysical Table H-2 H.6.b Radiological Figures C-2, Table H-2 H.6.c Laboratory facilities 7.10, Table H-1, H-2 H.7 Provide off-site radiological monitoring equipment. Appendix E,Table H-2 H.8 Provide meteorological Instrumentation and procedures per 7.13, Table H-1, H-2 Appendix 2. Obtain meteorological information from other sources.

H.9 Provide on-site Operational Support Center (assembly area) with 7.4, Figures F-2, F-3 adequate capacity and supplies.

H. 0 Provide for inspection, inventory and operational checking of 7.5, Appendix E, equipment at least once each calendar quarter and after each Appendix D use. Have sufficient reserves of equipment to replace that which was removed from emergency kits for calibration or repair.

Calibrate equipment per suppliers recommended intervals.

H.11 Inappendix, provide inventory of emergency kits. Appendix E H.12 Establish central point for receipt and analysis of field monitoring 6.2.3, 7.10, Table H-1, data (preferably associated with EOF) and coordination of sample H-2 media.

I. ACCIDENT ASSESSMENT 1.1 Provide EALs and corresponding emergency class. Section 4, Tables 4-1, 4-2,4-3, 4-4 and Appendix I 1.2 On-site capabilities to provide initial values and continuing N/A assessment (per NUREG-0578 and NRC letter of 10/30179) including:

Cont'd Post-accident sampling capability Appendix D Cont'd Radiation and effluent monitors Table H-1 Cont'd In-plant iodine instrumentation Table H-1 Cont'd Containment radiation monitors . Table H-1 1.3 Establish methods and techniques for determining: N/ A 1.3.a Source term (e.g., relation of containment radiation monitors and 6.2.3, Appenidix D material available for release.)

1.3.b Magnitude of release based on plant parameters and effluent 6.2.3, Appendix D monitors.

1.4 Establish relationship between effluent monitor readings and 6.2.3, Appendix D, exposures and contamination for meteorological conditions. 6.2.4.c G-5 Millstone Emergency Plan

  • Revision 31 December, 2004

Appendix G Planning Summary of Planning Standard Plan Cross Reference Standard (Section or Item) 1.5 Acquire meteorological Information per Appendix 2. Provide 6.2.3, 6.2.4.d, 7.13 meteorological data to EOF, TSC, CR, and off-site NRC center.

Make available to the State suitable meteorological data processing interconnections.

1.6 Determine release rate/projected doses if instruments are off- 6.2.3, 6.2.4 scale or inoperable.

1.7 Field monitoring within plume EPZ. 6.2.3, 6.2.4.h 1.8 Provide for rapid assessment of radiological hazards. For field 6.2.3, 6.2.4.h, teams include: activation, notification, composition, transportation Appendix D communication, monitoring equipment and deployment times.

1.9 Have capability to detect radio-Iodine in air as low as 10-7 pCi/cc. 6.2.3, 6.2.4.h.4 1.10 Relate measured parameters to dose rates. Estimate integrated 6.2.3, 6.2.4.c, 6.2.4.e dose from dose rates and compare to PAGs.

J. PROTECTIVE RESPONSE J.1 Establish means and time to warn individuals in owner-controlled 6.4.1 areas.

J.2 Provide evacuation routes and transportation for on-site 6.4.1 individuals to off-site locations, including alternatives.

J.3 Provide radiological monitoring for people evacuated from the 6.4.1.i site.

J.4 Provide evacuation of on-site non-essential personnel in Site Area 6.4.1.d, 6.4.1.i or General Emergency. Provide decontamination capability near off-site location.

J.5 Account for all individuals on-site and ascertain names of missing 6.4.1.d, 6.4.1.h individuals within 30 minutes. Account for all individuals continuously thereafter.

J.6 Provide for individuals remaining or arriving on-site, respiratory 6.4.3, 6.4.4, 5.2.2, 5.2.5 protection, protective clothing, radioprotective drugs.

J.7 Establish a mechanism for recommending protective actions to 1.3, 6.2.1, 6.2.2, 6.2.3, statellocal authorities per EALs of Appendix I and Tables 2.1 and Figure 1-1, Table 4-4 2.2 of the EPA PAGs.

Cont'd Provide prompt notification to off-site authorities In plume EPZ as Section 4, Tables 4-1, specified In NUREG-0654, Appendix 1. 4-2, 4-3, 4-4, 6.1, Figures 7-1a, b, c J.8 Time estimates for evacuation In plume EPZ in accordance with Appendix J Appendix 4.

J.10 Plans for protective measures to include:

J.10.a Maps Appendix C J.1 0.b Population distribution Appendix J J.10.c Means for notifying population 1.5, 6.1 J.10.m Public protective strategies from plume exposure. 6.2.1 G-6 Millstone Emergency Plan Revision 31 December, 2004

Appendix G Planning Summary of Planning Standard Plan Cross Reference Standard j_ j (Section or Item)

K. RADIOLOGICAL EXPOSURE CONTROL K.1 Establish on-site exposure guidelines for:

K.1.a Removal of injured persons 6.5 K.1.b Corrective actions 6.5 K.1.c Assessment actions 6.5 K.1.d First aid 6.5 K.1.e Personnel decontamination 6.5 K.1 .f Ambulance service 6.5 K.1.g Medical treatment 6.5 K.2 Provide on-site emergency radiation protection programs. Specify 5.1, 5.2.1, 5.2.2, 5.2.5, individual (s) who can authorize exposure in excess of 10CFR20 6.4, Table 6-1 limits.

Cont'd Provide procedures for volunteers to receive radiation exposures 5.1, 5.2.1, 6.4 in lifesaving activities.

K.3.a Provide 24-hr./day dose determination 6.4 K.3.b Maintain dose records and read dosimeters at appropriate 6.4 frequencies.

K.5.a Levels for decontamination 6.4 K.5.b Establish means for radiological decontamination of personnel, 6.4.3 supplies, equipment, and waste disposal.

K.6 Provide on-site contamination control, including:

K.6.a Area access control 5.2.2, 5.2.4, 5.2.5, 6.4.1, 6.4.3 K.6.b Drinking water and food supplies 6.4.3.c K.6.c Criteria for permitting return of areas and items to normal use in 6.4.3 accordance with ANSI 13.12 K.7 Capability to decontaminate relocated on-site personnel, including 6.5.3 extra clothing and decontaminates (particularly for radio-iodine contamination).

L. MEDICAL AND PUBLIC HEALTH SUPPORT L.1 Describe hospital and medical services, Including preparations to 6.5.4, 6.5.5, 6.5.6, handle contaminated individuals. Appendix B L.2 Provide on-site first-aid capability. 6.5.4, 7.11 L.4 Arrange for transporting patients of radiological accidents to 6.5.5 medical facilities. I _I G-7 Millstone Emergency Plan Revision 31 December, 2004

Appendix G Planning Summary of Planning Standard l Plan Cross Reference Standard I__ (Section or Item)

M. RECOVERY AND REENTRY PLANNING AND POST-ACCIDENT OPERATIONS M.1 Develop general plans and procedures for recovery and means by Section 9 which decisions are made to relax protective actions.

M.2 Specify position/title, authority, and responsibility for key positions Section 9, Figure 9-1 in the recovery organization.

M.3 Means to inforrm personnel that recovery Is to be initiated and Section 9 changes in organization.

M.4 Method of periodically estimating total population exposure. 6.2.3, 9.2.5 N. EXERCISES AND DRILLS N.1.a Conduct an exercise as set forth In NRC and FEMA rules. 8.2.2.f N.1.b Include mobilization of state and local resources. Provide for 8.2.2 critique by Federal and State evaluators N.2 Conduct drills, in addition to the annual exercise, at the 8.2 frequencies indicated.

N.2.a Communication drills (Quarterly), FEMA - IP State 8.2 N.2.b Fire drills - per technical specifications 8.2 N.2.c Medical drills - annually to include contaminated individual, 8.2 ambulance, and off-site medical help. (Off-site portions may be part of annual exercise).

N.2.d Radiological monitoring - annually (include collection and analysis 8.2 of sample media).

N.2.e Health Physics - semi-annually to include simulated elevated 8.2 environmental samples; analyze actual in-plant liquid samples with elevated radiation levels.

N.3 Describe the conduct of drills and exercises. 8.2 N.4 Official observers from Federal/State/Local governments critique 8.2.2.g exercises. Hold critiques. Formal evaluation based on critiques.

N.5 Establish means and management control for Incorporating 8.2.2 observer's comments into plan and implementing corrective actions.

0. RADIOLOGICAL EMERGENCY RESPONSE TRAINING 0.1 Make provisions for training appropriate individuals. 8.1 0.1.a Provide training to off-site organizations 8.1.2 0.2 Training for on-site organization to include drills In which 8.2 individuals demonstrate abilities. On-the-spot corrections to be made and instructor to show proper performance.

0.3 First-aid teams trained in courses equivalent to Red Cross Multi- 6.5.4 Media.

0.4 Establish training programs, Including initial training and retraining. Specify scope, nature, and frequency for:

0.4.a Directors and coordinators 8.1.1 0.4.b Personnel responsible for accident assessment 8.1.1 0.4.c Radiological monitoring teams 8.1.1, 8.1.2 G-8 Millstone Emergency Plan Revision 31 December, 2004

Appendix G Planning Summary of Planning Standard Plan Cross Reference Standard (Section or Item) 0.4.d Police, security, and fire-fighting personnel 8.1.2 0.4.e On-site repair and damage control/corrective action teams 8.1.1 O.4.f First aid and rescue personnel 8.1.1, 8.1.2 0.4.g Local support services 8.1.2 0.4.h Medical support personnel 8.1.2, 8.1.3 0.4.1 Licensee's headquarters support personnel 8.1.1 0.4.j Personnel responsible for transmission of emergency information 8.1 instructions.

0.5 Provide initial and annual retraining of personnel. 8.1.1 P. RESPONSIBILITY FOR THE PLANNING EFFORT P.1 Train individuals responsible for planning effort. Section 8 P.2 Identify by title, individual with overall authority and responsibility Section 8 for radiological emergency response planning.

P.3 Designate Emergency Planning Coordinator. Section 8 P.4 Review and certify plan annually. Update plans as needed. 8.3 Incorporate changes identified by drills and exercises.

P.5 Forward plans and approved changes to responsible individuals 8.3 and organizations. Revised pages shall be dated and marked to show where changes have been made.

P.6 Each plan shall contain a detailed list of supporting plans and their Section 2, Table 2-1 source.

P.7 In appendix, list, by title, procedures required to implement the Appendix D plan, including sections of the plan to be implemented by procedures.

P.8 Include specific table of contents and index. Table of Contents Cont'd Cross reference to NUREG-0654 criteria Appendix G P.9 Conduct independent reviews at least every 12 months and 8.3 include:

Cont'd Plan, procedures, practices, training, readiness, testing, 8.3 equipment and interfaces with State and Local governments.

Cont'd Include management controls for implementation and correction 8.3 of audit findings.

Cont'd Document reports to management and Involved Federal, State 8.3 and Local organizations. Retain for 5 years.

P.10 Provide for updating telephone numbers In emergency 8.2.1.a procedures at least quarterly.

G-9 Millstone Emergency Plan Revision 31 December, 2004

Appendix H APPENDIX H RADIOLOGICAL ASSESSMENT EQUIPMENT AND FACILITIES H-1 Millstone Emergency Plan Revision 31 December, 2004

Table H-1 On-Site Assessment Equipment and Facilities Functional System Instrument Detector Individual Applicability

1. Geophysical Monitors Meteorological Tower 4 Wind speed indicators Monitor wind speed at 33', 142', 374',

and 447' elevations 4 Wind direction indicators Monitor wind direction at 33', 142',

374', and 447' elevations 3 Delta temp. sensors Monitor temp. difference between 33' and 142' 33' and 374' 33' and 447' Meteorological Mast I Wind speed indication Monitor wind speed at 33'.

1 Wind direction indicator Monitor wind direction at 33'.

Time History. Containment base slab (Unit 2) Record ground accelerations with Accelerographs respect to time Auxiliary building Intake structure Free field Peak Accelerographs Containment base slab Record peak ground accelerations Steam generator support Pressurizer support Safety injection tank support Seismic Trigger Containment base slab Activate an annunciator Response Spectrum Containment base slab Records ground accelerations Recorder

1. Radiological Monitors Unit 1 Process Monitors RM-SFPI-02 Measure gaseous activity Unit 2 Process Monitors RM8123A Containment Monitor particulate activity recirculation air particulate RM8123B Containment Monitor gaseous activity recirculation air gaseous RM8262A Containment Monitor particulate activity recirculation air particulate RM8262B Containment Monitor gaseous activity recirculation air gaseous RM8434A Radwaste ventilation Monitor particulate activity particulate RM8434B Radwaste ventilation Monitor gaseous activity gaseous H-2 Millstone Emergency Plan Revision 31 December, 2004

Table H-1 On-Site Assessment Equipment and Facilities Functional System Instrument Detector Individual Applicability Unit 2 Process Monitors RM8011 Control room ventilation Monitor gaseous activity (Cont'd) gaseous RM8145A Spent fuel pool Monitor particulate activity ventilation particulate RM8145B Spent fuel pool Monitor gaseous activity ventilation gaseous RM8997 Radwaste ventilation Monitor particulate activity particulate RM8998 Radwaste ventilation Monitor particulate activity particulate RM4299 A, B & C Main steam Measure gaseous activity line monitors RM8999 Radwaste ventilation Monitor particulate activity particulate RM8132A Unit 2 stack discharge Monitor particulate activity.

particulate RM8132B Unit 2 stack discharge Monitor gaseous activity gaseous RM8168A Unit 2 stack high Monitor high level gaseous activity range RM8168B Unit 2 stack mid range Monitor gaseous activity RM5099 Steam jet air ejector Monitor gaseous activity RM9095 Waste gas storage Monitor gaseous activity tanks discharge gaseous RM4262 Steam generator Monitor liquid activity blowdown RM6038 Reactor building closed Monitor liquid activity cooling water RM9049 Clean radwaste Monitor liquid activity discharge RM9116 Aerated radwaste Monitor liquid activity discharge RM202 & 202A Reactor letdown Monitor liquid activity gross gamma RM9327 Condensate recovery Monitor liquid activity tank 2CND-RE245 Condensate Monitor liquid activity polishing neutralizing sump RM-8169 Wide Range Gas Monitors particulate and gaseous Monitor radioactivity H-3 Millstone Emergency Plan Revision 31 December, 2004

Table H-1 On-Site Assessment Equipment and Facilities Functional System Instrument Detector Individual ADplicability Unit 3 Process Monitors 3HVR-REIO A & B Ventilation Monitors particulate and gaseous Vent radioactivity 3HVR-REI I &I 2 (A&B) Auxiliary Monitors particulate and gaseous Building (lower levels) radioactivity 3HVR-REI3, 14 & 15(A&B) Monitors particulate and gaseous Auxiliary Building (upper levels) radioactivity 3HVR-REI 6 (A&B) Charging Monitors particulate and gaseous Pump Cubicle radioactivity 3HVR-RE17 (A&B) Fuel Building Monitors particulate and gaseous activity 3HVR-REI8 (A&B) Waste Monitors particulate and gaseous Building radioactivity 3HVR-RE1 9 (A&B) SLCRS- Monitors particulate and gaseous radioactivity 3HVR-RE91 (A&B) Control Monitors particulate and gaseous Room activity 3HVQ-RE49 ESF Building Monitors particulate and gaseous radioactivity 3CMS-RE22 A&B Containment Monitors particulate and gaseous Atmosphere radioactivity 3HVZ-RE09 A&B Hydrogen Monitors particulate and gaseous Recombiner Cubicles Ventilation radioactivity 3HVC-RE1 6A&B Control Monitors gaseous radioactivity Building Inlet ventilation 3MSS-RE75, 76, 77, 78 4 Main Monitors gaseous radioactivity Steam Relief lines 3ARC-RE21 Condenser Air Monitors gaseous radioactivity Ejector 3CHS-R69 A Failed Fuel Monitors gross activity & specific (Primary Coolant) fission product activity In primary coolant liquid 3GWS-RE48 Hydrogenated Vent Monitors gaseous radioactivity 3MSS-RE79 Turbine Driven Monitors gaseous radioactivity Auxiliary Feedwater Pump Discharge 3SSR-RE08 Steam Generator Monitors liquid radioactivity Blowdown 3CCP-RE31 Reactor Plant Monitors liquid radioactivity Component Cooling 3CNA-RE47 Auxiliary Monitors liquid radioactivity Condensate 3LWS-RE70 Liquid Waste Monitors liquid radioactivity H4 Millstone Emergency Plan Revision 31 December, 2004

Table H-1 On-Site Assessment Equipment and Facilities Functional System Instrument Detector Individual Applicability Unit 3 Process Monitors 3DAS-RE50 Turbine Building Monitors liquid radioactivity (Cont'd) Drains 3LWC-RE65 Regenerant Monitors liquid radioactivity Evaporator Unit I Area Radiation RM-SFPI-01 Monitor Radiation Levels Monitors Unit 2 Area Radiation RM-7892 Drumming and Measure radiation levels Monitors decontamination area RM-7894 Engineered safeguards Measure radiation levels systems area RM-7895 Sampling area Measure radiation levels RM-7896 Radioactive waste gas Measure radiation levels processing area RM-7899 Control room Measure radiation levels RM-8139 Spent fuel pool (south Measure radiation levels wall)

RM-8142 Spent fuel pool (north Measure radiation levels wall)

RM-8156 Spent fuel pool (north Measure radiation levels wall)

RM-8157 Spent fuel pool (south Measure radiation levels wall)

RM-8240 Containment High Measure radiation levels Radiation RM-8241 Containment High Measure radiation levels Radiation 2-RMS-9813 Drumming area Measure radiation levels 2-RMS-9799A Control Room Measure radiation levels ventilation air supply 2-RMS-9799B Control Room Measure radiation levels Ventilation air supply 2-RMS-04 (not In use) CPF- Measure radiation levels solid waste 2-RMS-05 (not in use) CPF- Measure radiation levels Condensate demineralizers 2-RMS-06 (not in use) CPF- Measure radiation levels Access area 2-RMS-08 (not in use) CPF- Measure radiation levels Evaporator H-5 Millstone Emergency Plan Revision 31 December, 2004

Table 11-1 On-Site Assessment Equipment and Facilities Functional System Instrument Detector Individual Applicability Unit 3 Area Radiation 3RMS-RE01 Manipulator Crane Measure radiation levels Monitors 51'4" Containment 3RMS-RE02 Fuel Transfer Measure radiation levels Tube5i'4" Containment 3RMS-RE03 In-Core Inst. Trans. Measure radiation levels 24'6" Containment 3RMS-RE04A Containment HR Measure radiation levels Internal 51'4" Containment 3RMS-RE05A Containment HR Measure radiation levels Internal 51'4" Containment 3RMS-RE06 Decontamination Measure radiation levels Area 24'6" Fuel Bldg.

3RMS-RE07 Calibration Room Measure radiation levels 66'6" Auxiliary Bldg.

3RMS-RE08 Spent Fuel Pit/Hoist Measure radiation levels 52'4" Fuel Bldg.

3RMS-RE09 Aux. Bldg. General Measure radiation levels (A) 18'6" Aux. Bldg.

3RMS-RE10 Aux. Bldg. General Measure radiation levels (B) 4'6" Aux. Bldg.

3RMS-RE11 Aux. Bldg. General Measure radiation levels (C) 4'6" Aux. Bldg.

3RMS-REl2 Aux. Bldg. General Measure radiation levels (D) 24'6" Aux. Bldg.

3RMS-RE13 Aux. Bldg. General Measure radiation levels (E) 24'6" Aux. Bldg.

3RM-RE14 Aux. Bldg. General Measure radiation levels (F) 24'6" Aux. Bldg.

3RMS-RE1 5 Aux. Bldg. General Measure radiation levels (G) 43'6" Aux. Bldg.

3RMS-RE16 Aux. Bldg. General Measure radiation levels (H) 43'6" Aux. Bldg.

3RMS-REl 7 Waste Disp. Bldg. Measure radiation levels 3RMS-RE18 Waste Disp. Bldg. Measure radiation levels 4'6" Waste Bldg.

4RMS-RE19 Solid Waste Measure radiation levels Storage 24'6" Waste Bldg.

3RMS-RE20 Sample Room 43'6' Measure radiation levels Aux. Bldg.

3RMS-RE21 Service Bldg. Measure radiation levels Laboratory 24'6" Service Bldg.

H-6 Millstone Emergency Plan Revision 31 December, 2004

Table H-1 On-Site Assessment Equipment and Facilities Functional System Instrument Detector Individual ADplicability Unit 3 Area Radiation 3RMS-RE22 Control Room Measure radiation levels Monitors (Cont'd) Monitor 47'6" Control Bldg.

3RMS-RE24 Waste Disposal Measure radiation'levels Bldg. (C) 24'6" Waste Disp. Bldg.

3RMS-RE25 Waste Disposal* Measure radiation levels Bldg. (D) 24'6". Waste Disp Bldg.

3RMS-RE28 Fuel Bldg. Pipe Measure radiation levels Rack 11'0 Fuel Bldg.

3RMS-RE29 Spent Fuel Cask Measures radiation levels Area 52'4W Fuel Bldg.

3RMS-RE31 Fuel Transfer Tube Measures radiation levels 24'6" Containment 3RMS-RE32 Containment Air Measure radiation levels Compressor 24'6" Containment 3RMS-RE33 RHR Cubicle 'A" Measure radiation levels (Normal Range) 4'6" ESF Bldg.

3RMS-RE34 RHR Cubicle "B" Measure radiation levels (Normal Range) 4'6" ESF Bldg.

3RMS-RE35 In-Core Inst. Measure radiation levels Thimble Area 3'8" Containment 3RMS-RE36 Fuel Pool Monitor Measure radiation levels 52'4" Fuel Bldg.

3RMS-RE37 Condensate Demin. Measure radiation levels Area 14'6" Cond. Polishing Bldg.

3RMS-RE38 Regeneration Area Measure radiation levels 38'6" Cond. Polishing Bldg.

3RMS-RE41 Fuel Drop Monitor Measure radiation levels 51'4" Containment 3RMS-RE42 Fuel Drop Monitor Measure radiation levels 51'4" Containment 3RMS-RE52 Recombiner Measure radiation levels Control Room 24'6" Recombine Bldg.

2. Radiation Monitors and Gamma spectrometers Isotopic identification and 'analysis Sampling Equipment Geiger-Mueller survey Measure gamma and beta radiation instruments (0-1,000 R/hr range) dose rate Ionization chamber (0-1,000 R/hr Measure gamma and beta radiation range) dose rate Contamination survey Count samples for gross alpha and beta H-7 Millstone Emergency Plan Revision 31 December, 2004

Table H-1 On-Site Assessment Equipment and Facilities Functional System Instrument Detector Individual Applicability Radiation Monitors and Air sampling equipment Sample for airborne radionuclides Sampling Equipment (particulate, iodine, gaseous, and (Cont'd) tritium)

Neutron survey instrument Measure neutron radiation dose rate TLD Measure personnel radiation dose Direct reading pocket Ion Measure personnel gamma radiation chamber dose

3. Fire Detection Smoke detectors Detects products of combustion Rate of rise heat detector Detects quick rise of temperature Fixed heat detector Detects a set temperature
4. Facilities Chemistry laboratory Equipped for chemical and radiological analysis 9 radiation monitoring stations Measure gamma radiation dose 4 Fixed air sampling stations Sample particulates and iodines Health Physics Laboratory Equipped for radiological analyses Emergency Operations Facility Equipped for limited radiological analyses.

H-8 Millstone Emergency Plan Revision 31 December, 2004

Appendix H Table H-2 Off-Site Assessment Equipment and Facilities Functional System Instrument Detector Individual Applicability

1. Geophysical Monitors Meteorological Meteorological forecasting Provide current and forecast weather contractor for full weather for Millstone area forecast service Seismic Weston Massachusetts Record ground accelerations Observatory for Strong motion recorder
2. Radiological Monitors Environmental As specified by REMODCM Gamma radiation dose and sample Monitoring particulates and iodines
3. Laboratory Facilities Radiochemistry Teledyne Brown Engineering Equipped for chemical and laboratory Environmental Services radiological analysis Duke Engineering and Services Equipped for chemical and Environmental Laboratory radiological analysis (DESEL)

H-9 Millstone Emergency Plan Revision 31 December, 2004

Appendix I I

APPENDIX I EMERGENCY ACTION LEVEL SCHEME NOTE: The EAL scheme provides an example of how the Emergency Plan meets the standards of 50.47(b) and requirements of Appendix E. The EAL Tables in the Station Emergency Assessment procedure MP-26-EPI-FAP06 are used to classify events.

1-1 Millstone Emergency Plan Revision 31 December, 2004

Appendix J APPENDIX J EVACUATION TIME ESTIMATE PLUME EXPOSURE PATHWAY J-1 Millstone Emergency Plan Revision 31 December, 2004

Appendix J Estimates for Evacuation of the Plume Exposure EPZ The following table summarizes the results of the Evacuation Time Estimate (ETE) prepared for the Millstone Power Station in 2002, to reflect the 2000 U.S. Census and the current EPZ evacuation zones. The population estimates are based on the 2000 U.S. Census block level population and housing data.

The various population components are presented for three basic scenarios: winter day, winter night and summer weekend. The road network for evacuation planning consists of designated routes plus additional roadways needed to accurately simulate conditions during an evacuation.

Adynamic evacuation model, NetVac2, was used to generate the ETEs. The model accounts for road and intersection capacity, variable vehicle loading rates, and the geographic distribution of vehicles entering the network.

J-2 Millstone Emergency Plan Revision 31

. December, 2004

Appendix J Table J-1 Millstone Evacuation Time Estimate Summary Winter Weekday Analysis Area Resident Transient Special Facilities Total Population Zone A 21,520 3,473 6,387 31,380 Zones A and B 53,478 22,616 23,023 99,117 Zones A-E 120,048 47,753 38,273 206,074 Weather Based Evacuation Time (Minutes)

Analysis Area Fair - 100% Adverse - 100%

Zone A 300 . 420 Zones A and B 390 510 Zones A-E 391 527 Winter Weeknight Analysis Area Resident Transient Special Facilities Total Population Zone A 21,520 3,473 6,387 31,380 Zones A and B 53,478 4,872 13,792 72,142 Zones A-E 120,048 22,291 12,506 154,845 Weather Based Evacuation Time (Minutes)

Analysis Area Fair- 100% Adverse - 100%

Zone A 220 280 Zones A and B 240 320 Zones A-E 257 358 Summer Weekend Analysis Area Resident Transient Special Facilities Total Population Zone A 21,520 3,473 6,387 31,380 Zones A and B 53,871 6,183 10,468 70,521 Zones A-E 128,658 37,122 8,833 174,613 Weather Based Evacuation Time (Minutes)

Analysis Area Fair - 100% Adverse - 100%

Zone A 260 320 Zones A and B 265 327 Zones A-E 265 327 Notes:

Zones A-E refer to State of Connecticut Emergency Planning Zones for Millstone Station.

Evacuation times for zones based on Evacuation Time Estimates for Millstone Station, revised 2002.

J-3 Millstone Emergency Plan Revision 31 December, 2004

Appendix K APPENDIX K SERO PERSONNEL TRAINING

SUMMARY

K-l Millstone Emergency Plan Revision 31 December, 2004

Appendix K The following table provides a summary of training, for the qualification of SERO personnel.

Detailed lesson plans and administrative controls are maintained in NTP 7.212. In addition, EPA-FAPOI defines specific training requirements. See Reference #4 below Training Summary Table 5-1 Ref. fi Provide an overview of responsibilities and actions that occur during an 1 emergency. This includes classification system, notifications, communications, Station Emergency Response Organization, Emergency Response Facilities and equipment. This lesson may be computer based training and is used for initial and continuing training.

Provide hands-on instruction for the operation of the OFIS computer program. 2 Provide instruction on the function and operation of the Emergency Notification 3 and Response System, in addition to providing instruction on the various reports available.

Provide practical application of specific emergency duties and responsibilities as 4 well as hands-on experience with emergency equipment during the conduct of a MP training drill, facility walk-through or on-the-job training. EPA-FAPO0 Provide overview of meteorological conditions and their impact during an 5 emergency, including equipment and resources available to access this data.

Provide training on the event based EAL tables, including structure and practical 6 applications using scenarios.

Provide familiarization training on the event based EAL tables. 7 Identify NRC initiatives in the area of accident management and familiarize 8 students with types of severe accident phenomena.

Provide SERO position specific duties and responsibilities as delineated in the 9 Emergency Plan and procedures.

Explain basic principles of meteorological analysis and forecasting, including 10 interpretation and communication of data.

Provide methods for performing containment curie level estimation and for 11 assessing core uncovery projections.

Provide methods for performing radiological dose calculations. 12 Demonstrate operation of the applicable computer programs for radiological dose 13 assessments.

Provide training on process for preparing protective action recommendations to the 14 State of Connecticut.

Provide training for performance of on-shift radiological dose calculations using 15 computer programs.

K-2 Millstone Emergency Plan Revision 31 December, 2004