July 13, 2004 Mr. Christopher M. Crane, President and Chief Nuclear Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
OYSTER CREEK NUCLEAR GENERATING STATION, AND THREE MILE ISLAND NUCLEAR STATION, UNIT 1 RE: AMENDMENTS TO DELETE A LICENSE CONDITION REGARDING THE LONG RANGE PLANNING PROGRAM (TAC NOS. MC2311 AND MC2336)
Dear Mr. Crane:
The Commission has issued the enclosed Amendment Nos. 244 and 250 to Facility Operating License Nos. DPR-16 and DPR-50 for Oyster Creek Nuclear Generating Station (OCNGS), and Three Mile Island Nuclear Station, Unit 1 (TMI-1), in response to your application dated March 8, 2004.
The amendments delete the License Condition entitled Long Range Planning Program from the OCNGS and TMI-1 Operating Licenses. In addition, for TMI-1, the amendment relocates a requirement (regarding surveillance of the depth of water in the spent fuel pool) from the Long Range Planning Program to the Technical Specifications.
A copy of the related safety evaluation is also enclosed. Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
/RA/
Peter S. Tam, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-219 and 50-289
Enclosures:
- 1. Amendment No. 244 to DPR-16
- 2. Amendment No. 250 to DPR-50
- 3. Safety Evaluation cc w/encls: See next page
July 13, 2004 Mr. Christopher M. Crane, President and Chief Nuclear Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
OYSTER CREEK NUCLEAR GENERATING STATION, AND THREE MILE ISLAND NUCLEAR STATION, UNIT 1 RE: AMENDMENTS TO DELETE A LICENSE CONDITION REGARDING THE LONG RANGE PLANNING PROGRAM (TAC NOS. MC2311 AND MC2336)
Dear Mr. Crane:
The Commission has issued the enclosed Amendment Nos. 244 and 250 to Facility Operating License Nos. DPR-16 and DPR-50 for Oyster Creek Nuclear Generating Station (OCNGS), and Three Mile Island Nuclear Station, Unit 1 (TMI-1), in response to your application dated March 8, 2004.
The amendments delete the License Condition entitled Long Range Planning Program from the OCNGS and TMI-1 Operating Licenses. In addition, for TMI-1, the amendment relocates a requirement (regarding surveillance of the depth of water in the spent fuel pool) from the Long Range Planning Program to the Technical Specifications.
A copy of the related safety evaluation is also enclosed. Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
\\RA\\
Peter S. Tam, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-219 and 50-289
Enclosures:
- 1. Amendment No. 244 to DPR-16
- 2. Amendment No. 250 to DPR-50
- 3. Safety Evaluation cc w/encls: See next page DISTRIBUTION PUBLIC PDI-1 R/F RLaufer DSkay PTam GHill(2)
SLittle RDennig OGC ACRS CBixler, RGN-1 ACCESSION NO.: ML041560041 OFFICE PDI-1\\PM PDI-1\\LA PDI-1\\PM OGC PDI-1\\SC NAME PTam SLittle DSkay SLewis RLaufer DATE 6/29/04 6/28/04 7/6/04 7/2/04 7/6/04 No technical branch is known to have an interest in the subject license condition. The original amendments which imposed the subject license condition on the plants listed only the project managers as reviewers. Hence, no technical branch was requested to concur on this package.
OFFICIAL RECORD COPY
AMERGEN ENERGY COMPANY, LLC DOCKET NO. 50-219 OYSTER CREEK NUCLEAR GENERATING STATION AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 244 License No. DPR-16 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by AmerGen Energy Company, LLC, et al., (the licensee), dated March 8, 2004, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by deleting license conditions 2.C.(6), Long Range Planning Program.
3.
This license amendment is effective as of the date of issuance, and shall be implemented within 30 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
\\RA\\
Richard J. Laufer, Chief, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Operating License Date of Issuance: July 13, 2004
ATTACHMENT TO LICENSE AMENDMENT NO. 244 FACILITY OPERATING LICENSE NO. DPR-16 DOCKET NO. 50-219 Replace the following page of the Operating License with the attached revised page. The revised page is identified by amendment number and contains a marginal line indicating the area of change.
Remove Insert 4
4 The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
(4)
The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: Oyster Creek Nuclear Generating Station Physical Security Plan, with revisions submitted through July 6, 1988; Oyster Creek Nuclear Generating Station Training and Qualification Plan, with revisions submitted through June 24, 1986; and Oyster Creek Nuclear Generating Station Safeguards Contingency Plan, with revisions submitted through June 24, 1986. Changes made in accordance with 10 CFR 73.55 shall be implemented in accordance with the schedule set forth therein.
(5)
Inspections of core spray spargers, piping and associated components will be performed in accordance with BWRVIP-18, BWR Core Spray Internals Inspection and Flaw Evaluation Guidelines, as approved by NRC staffs Final Safety Evaluation Report date December 2, 1999.
(6)
Long Range Planning Program - Deleted
(7)
Reactor Vessel Integrated Surveillance Program AmerGen Energy Company, LLC, is authorized to revise the Updated Final Safety Analysis Report (UFSAR) to allow implementation of the Boiling Water Reactor Vessel and Internals Project reactor pressure vessel Integrated Surveillance Program as the basis for demonstrating compliance with the requirements of Appendix H to Title 10 of the Code of Federal Regulations Part 50, Reactor Vessel Material Surveillance Program Requirements, as set forth in the licensees application dated December 20, 2002, and as supplemented on May 30, September 10, and November 3, 2003.
Amendment No. 173, 217, 242, 244
AMERGEN ENERGY COMPANY, LLC DOCKET NO. 50-289 THREE MILE ISLAND NUCLEAR STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 250 License No. DPR-50 1.
The Nuclear Regulatory Commission (the Commission or NRC) has found that:
A.
The application for amendment by AmerGen Energy Company, LLC (the licensee), dated March 8, 2004, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by deleting License Conditions 2.c.(9), Long Range Planning Program, and by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.c.(2) of Facility Operating License No. DPR-50 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 250, are hereby incorporated in the license. The AmerGen Energy Company, LLC, shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance, and shall be implemented within 30 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
\\RA\\
Richard J. Laufer, Chief, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Operating License and Technical Specifications Date of Issuance: July 13, 2004
ATTACHMENT TO LICENSE AMENDMENT NO. 250 FACILITY OPERATING LICENSE NO. DPR-50 DOCKET NO. 50-289 Replace the following page of the Operating License with the attached revised page. The revised page is identified by amendment number and contains a marginal line indicating the area of change.
Remove Insert 7
7 Replace the following page of Appendix A, Technical Specifications, with the attached revised page. The revised page is identified by amendment number and contains a marginal line indicating the area of change.
Remove Insert 3-45 3-45 5.
The licensee shall provide routine reporting of the long-term corrosion lead tests test results on a quarterly basis as well as more timely notification if adverse corrosion test results are discovered.
(9)
Long Range Planning Program - Deleted
Sale and License Transfer Conditions (10)
Deleted (11)
Deleted (12)
Deleted (13)
Deleted Amendment No. 192, 207, 218, 228, 249, 250
3.8.8 If any of the above specified limiting conditions for fuel loading and refueling are not met, movement of fuel into the reactor core shall cease; action shall be initiated to correct the conditions so that the specified limits are met, and no operations which may increase the reactivity of the core shall be made.
3.8.9 The reactor building purge isolation valves, and associated radiation monitors which initiate purge isolation, shall be tested and verified to be operable no more than 7 days prior to initial fuel movement in the reactor building.
3.8.10 Irradiated fuel shall not be removed from the reactor until the unit has been subcritical for at least 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
3.8.11 During the handling of irradiated fuel in the Reactor Building at least 23 feet of water shall be maintained above the level of the reactor pressure vessel flange, as determined by a shiftly
check and a daily verification. If the water level is less than 23 feet above the reactor pressure
vessel flange, place the fuel assembly(s) being handled into a safe position, then cease fuel handling until the water level has been restored to 23 feet or greater above the reactor pressure vessel flange.
Bases Detailed written procedures will be available for use by refueling personnel. These procedures, the above specifications, and the design of the fuel handling equipment as described in Section 9.7 of the UFSAR incorporating built-in interlocks and safety features, provide assurance that no incident could occur during the refueling operations that would result in a hazard to public health and safety. If no change is being made in core geometry, one flux monitor is sufficient. This permits maintenance on the instrumentation. Continuous monitoring of radiation levels and neutron flux provides immediate indication of an unsafe condition. The decay heat removal pump is used to maintain a uniform boron concentration. The shutdown margin indicated in Specification 3.8.4 will keep the core subcritical, even with all control rods withdrawn from the core (Reference 1). The boron concentration will be sufficient to maintain the core keff 0.99 if all the control rods were removed from the core, however only a few control rods will be removed at any one time during fuel shuffling and replacement. The keff with all rods in the core and with refueling boron concentration is approximately 0.9. Specification 3.8.5 allows the control room operator to inform the reactor building personnel of any impending unsafe condition detected from the main control board indicators during fuel movement.
Per Specification 3.8.6 and 3.8.7, the personnel and emergency air lock doors, and penetrations may be open during movement of irradiated fuel in the containment provided a minimum of one door in each of the air locks, and penetrations are capable of being closed in the event of a fuel handling accident, and the plant is in REFUELING SHUTDOWN or REFUELING OPERATION with at least 23 feet of water above the fuel seated within the reactor pressure vessel. The minimum water level specified is the basis for the accident analysis assumption of a decontamination factor of 200 for the release to the containment atmosphere from the postulated damaged fuel rods located on top of the fuel core seated in the reactor vessel. Should a fuel handling accident occur inside containment, a minimum of one door in each personnel and emergency air lock, and the open penetrations will be closed following an evacuation of containment. Administrative controls will be in place to assure closure of at least one door in each air lock, as well as other open containment penetrations, following a containment evacuation.
Provisions for equivalent isolation methods in Technical Specification 3.8.7 include use of a material (e.g. temporary sealant) that can provide a temporary, atmospheric pressure ventilation barrier for other containment penetrations during fuel movements.
3-45 Amendment No. 157, 178, 236, 245, 250
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMERGEN ENERGY COMPANY, LLC AMENDMENT NO. 244 TO FACILITY OPERATING LICENSE NO. DPR-16 OYSTER CREEK NUCLEAR GENERATING STATION, DOCKET NO. 50-219 AMENDMENT NO. 250 TO FACILITY OPERATING LICENSE NO. DPR-50 THREE MILE ISLAND NUCLEAR STATION, UNIT 1, DOCKET NO. 50-289
1.0 INTRODUCTION
By application dated March 8, 2004 (Accession No. ML040780583), AmerGen Energy Company, LLC (the licensee), applied to the Nuclear Regulatory Commission (NRC) for amendments to the operating licenses of Oyster Creek Nuclear Generating Station (OCNGS),
and Three Mile Island Nuclear Station, Unit No. 1 (TMI-1). The proposed amendments would delete the License Condition entitled Long Range Planning Program from the OCNGS and TMI-1 operating licenses. In addition, for TMI-1, the amendment would relocate a requirement (regarding surveillance of the depth of water in the spent fuel pool) from the Long Range Planning Program to the Technical Specifications (TSs).
The NRC staff published its No Significant Hazards Consideration analysis on April 13, 2004 (69 FR 19564).
2.0 REGULATORY EVALUATION
The Plan for the Long Range Planning Program for the Oyster Creek Nuclear Generating Station and the Plan for the Long Range Planning Program for the Three Mile Island Nuclear Station - Unit 1 were added as a condition of the license via Facility Operating License Amendment Nos. 122 (Accession No. ML011160514) and 140 (Accession No. ML0037672840) for OCNGS and TMI-1, respectively. The plans were developed to enable the licensee to effectively manage implementation of significant changes to the plant which were required or proposed by the NRC, as well as other measures to enhance plant safety and reliability, which had been identified by the licensee or other agencies. The original plan for OCNGS contained a list of over 50 major projects, and that for TMI-1, 300 major projects. The licensee stated that these major projects have been completed or resolved.
As stated in the safety evaluations (SEs) associated with Amendment Nos. 122 (for OCNGS) and 140 (for TMI-1), the original objectives of the plans were (1) to optimize the allocation of licensee and NRC resources to those projects necessary to assure safe, reliable, and economic plant operation, and (2) to achieve appropriate balance and prioritization among all proposed projects based on their relative value and effect regardless of source. The plans characterize individual projects as Category A, B, or C. Category A projects reflect regulatory requirements with implementation dates mandated by rule, order, or license condition; they may not be changed without prior approval of the NRC. Category B projects address other regulatory requirements; they require notification of the NRC with time for NRC review prior to the scheduled implementation date. Category C projects are non-regulatory and do not require prior NRC approval or notification. The plans describe how the program functions, mechanisms for changing the program and updating it, the interactions and responsibilities of the NRC and licensee under the program, and its resultant assessments and schedules.
Reports of updates to the plans are required to be submitted to the NRC on an annual basis.
3.0 TECHNICAL EVALUATION
3.1 Licensees Proposed Changes AmerGen requested the following specific changes:
For OCNGS, delete the contents, but not the title, of License Condition 2.C.(6), Long Range Planning Program, in its entirety, and insert the word Deleted.
For TMI-1, delete the contents, but not the title, of License Condition 2.c.(9), Long Range Planning Program, in its entirety, and insert the word Deleted. Also, revise TSs Section 3.8.11 to incorporate the last existing Category A commitment to verify the minimum water level of 23 feet above the top of the reactor vessel flange when handling irradiated fuel in the reactor building.
3.2 Evaluation of the Proposed Changes to the Operating Licenses Since inception of the plans, the number of major projects has decreased significantly as projects were being completed. Over time, many of the items in the plans were addressed by separate correspondence to the NRC, such as correspondence associated with Orders, Bulletins, etc.
Meanwhile, the licensees methods of managing these projects have changed. As a result, there is now redundancy in the tracking of these items between the AmerGen commitment control system and the plans. Specifically, AmerGen has implemented a formal commitment management process (Procedure LS-AA-110 and associated Training & Reference Material) based on the guidance contained in Nuclear Energy Institute (NEI) 99-04, Revision 0, Guidelines for Managing NRC Commitment Changes, dated July 1999. The NEI 99-04 guidelines have been endorsed by NRC in Regulatory Issue Summary 2000-17, Managing Regulatory Commitments Made By Power Reactor Licensee to the NRC Staff, dated September 21, 2000. The AmerGen commitment management process provides the administrative controls to ensure that regulatory commitments are implemented and that changes to the regulatory commitments are evaluated and, when appropriate, reported to the NRC. The Plan for OCNGS currently contains no unresolved Category A items (see letter, E. J. Harkness to NRC, dated March 25, 2003, Accession No. ML030920070). For TMI-1, only one Category A item in the Plan remains (see letter, G. H. Gellrich to NRC, dated February 6, 2004, Accession No. ML040500673), which is discussed below. The remaining Category B and C items for OCNGS and TMI-1 are appropriately identified and tracked by existing AmerGen commitment or work management tracking mechanisms.
The licensee stated that OCNGS and TMI-1 organizational changes have resulted in site work management groups that are responsible for work planning and prioritization during plant operation, as well as during refueling outages. The licensee stated that these internal processes will continue to be effectively employed to control and manage work activities at these plants.
As a result of all these developments, the licensee considers that the plans are no longer needed to achieve their original objectives. The licensees proposal to delete the subject license conditions and revise the TMI-1 TSs does not lead to changes to the physical design or operation of OCNGS and TMI-1. The licensee asserted that the additional tracking and reporting of work items via the plans represent an unnecessary administrative burden that is no longer needed and is redundant to existing procedures and practices.
3.3 Evaluation of the Proposed Changes to the TMI-1 TSs Amendment No. 236, dated October 2, 2001, revised the TS requirements for containment integrity associated with the personnel and emergency air locks during fuel movement and refueling operations. When this amendment was being processed, the licensee agreed to place the requirement to verify the minimum water level of 23 feet above the top of the reactor vessel flange in the Long Range Planning Program as a Category A item. The SE supporting this amendment states that [t]he licensee may choose to relocate that surveillance requirement to the TSs during the next operating cycle. Accordingly, in conjunction with deletion of the plan from the TMI-1 operating license, the licensee proposed to relocate this requirement to the TMI-1 TSs, Section 3.8.11 as follows (wording in italics is the proposed revision):
During the handling of irradiated fuel in the Reactor Building at least 23 feet of water shall be maintained above the level of the reactor pressure vessel flange, as determined by a shiftly check and a daily verification. If the water level is less than 23 feet above the reactor pressure vessel flange, place the fuel assembly(s) being handled into a safe position, then cease fuel handling until the water level has been restored to 23 feet or greater above the reactor pressure vessel flange.
The NRC staff determines that the proposed change (i.e., addition of the italicized phrase) is purely administrative, in that the requirement had been previously imposed, and that it is being relocated from the plan, which is to be deleted as a requirement in the TMI-1 license. This administrative change is, therefore, acceptable.
3.4 Precedent Review The licensees proposed deletion of the license condition endorsing the Long Term Planning Program from the OCNGS and TMI-1 operating licenses follows a precedence set by Amendment No. 208, dated April 3, 1995 (Accession No. ML021920035) for the Duane Arnold Energy Center, which deleted an essentially identical license condition involving the Plan for the Integrated Scheduling of Plant Modifications for the Duane Arnold Energy Center.
3.5 Summary of Review Based on the NRC staffs review of the licensees application, the NRC staff finds that proposed amendments for OCNGS and TMI-1 acceptable as set forth above.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the New Jersey and Pennsylvania State officials were notified of the proposed issuance of the amendments. The State officials had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes recordkeeping, reporting, or administrative procedures or requirements. Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(10). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above that (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: P. S. Tam Date: July 13, 2004
Oyster Creek Nuclear Generating Station cc:
Chief Operating Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Senior Vice President - Nuclear Services AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Site Vice President - Oyster Creek Generating Station AmerGen Energy Company, LLC P.O. Box 388 Forked River, NJ 08731 Vice President - Mid-Atlantic Operations AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 John E. Matthews, Esquire Morgan, Lewis, & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004 Kent Tosch, Chief New Jersey Department of Environmental Protection Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 Vice President - Licensing and Regulatory Affairs AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President - Operations Support AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 H. J. Miller Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mayor of Lacey Township 818 West Lacey Road Forked River, NJ 08731 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 445 Forked River, NJ 08731 Director - Licensing and Regulatory Affairs AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348 Manager Licensing - Oyster Creek Exelon Generation Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348 Oyster Creek Generating Station Plant Manager AmerGen Energy Company, LLC P.O. Box 388 Forked River, NJ 08731 Regulatory Assurance Manager Oyster Creek AmerGen Energy Company, LLC P.O. Box 388 Forked River, NJ 08731 Vice President, General Counsel and Secretary AmerGen Energy Company, LLC 2301 Market Street, S23-1 Philadelphia, PA 19101
Pete Eselgroth, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Correspondence Control Desk AmerGen Energy Company, LLC P.O. Box 160 Kennett Square, PA 19348
Three Mile Island Nuclear Station, Unit 1 cc:
Site Vice President - Three Mile Island Nuclear Station, Unit 1 AmerGen Energy Company, LLC P. O. Box 480 Middletown, PA 17057 Senior Vice President - Nuclear Services AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President - Operations, Mid-Atlantic AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 Vice President - Licensing and Regulatory Affairs AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Regional Administrator Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Chairman Board of County Commissioners of Dauphin County Dauphin County Courthouse Harrisburg, PA 17120 Chairman Board of Supervisors of Londonderry Township R.D. #1, Geyers Church Road Middletown, PA 17057 Senior Resident Inspector (TMI-1)
U.S. Nuclear Regulatory Commission P.O. Box 219 Middletown, PA 17057 Director - Licensing and Regulatory Affairs AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348 Rich Janati, Chief Division of Nuclear Safety Bureau of Radiation Protection Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Plant Manager - Three Mile Island Nuclear Station, Unit 1 AmerGen Energy Company, LLC P. O. Box 480 Middletown, PA 17057 Regulatory Assurance Manager - Three Mile Island Nuclear Station, Unit 1 AmerGen Energy Company, LLC P.O. Box 480 Middletown, PA 17057 Peter Eselgroth, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Michael A. Schoppman Framatome ANP Suite 705 1911 North Ft. Myer Drive Rosslyn, VA 22209 Vice President, General Counsel and Secretary AmerGen Energy Company, LLC 2301 Market Street, S23-1 Philadelphia, PA 19101 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803
Three Mile Island Nuclear Station, Unit 1 cc:
Eric Epstein TMI Alert 4100 Hillsdale Road Harrisburg, PA 17112 Correspondence Control Desk AmerGen Energy Company, LLC P.O. Box 160 Kennett Square, PA 19348 Manager Licensing - Three Mile Island Nuclear Station, Unit 1 Exelon Generation Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348 Associate General Counsel AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555