MONTHYEARML23342A1162024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 IR 05000219/20230022023-11-0909 November 2023 EA-23-076 Oyster Creek Nuclear Generating Station - Notice of Violation and Proposed Imposition of Civil Penalty - $43,750 - NRC Inspection Report No. 05000219/2023002 ML23286A1552023-10-13013 October 2023 Defueled Safety Analysis Report (DSAR) ML23249A1212023-09-0606 September 2023 NRC Inspection Report 05000219/2023002, Apparent Violation (EA-23-076) ML23242A1162023-08-30030 August 2023 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Report January 1, 2021 Through December 31, 2022 ML23214A2472023-08-22022 August 2023 NRC Inspection Report 05000219/2023002 IR 05000219/20230012023-05-31031 May 2023 NRC Inspection Report No. 05000219/2023001 IR 07200015/20234012023-05-16016 May 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2023401 ML23114A0912023-04-24024 April 2023 Annual Radioactive Effluent Release Report for 2022 ML23114A0872023-04-24024 April 2023 Annual Radioactive Environmental Operating Report for 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000219/20220022023-02-0909 February 2023 NRC Inspection Report No. 05000219/2022002 ML23031A3012023-02-0808 February 2023 Discontinuation of Radiological Effluent Monitoring Location in the Sewerage System ML23033A5052023-02-0202 February 2023 First Use Notification of NRC Approved Cask RT-100 ML23025A0112023-01-24024 January 2023 LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G ML22347A2732022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22297A1432022-12-15015 December 2022 Part 20 App G Exemption Letter L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 IR 07200015/20224012022-12-0606 December 2022 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2022401 (Letter & Enclosure 1) ML22280A0762022-11-0202 November 2022 Us NRC Analysis of Holtec Decommissioning Internationals Funding Status Report for Oyster Creek, Indian Point and Pilgrim Nuclear Power Station ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22286A1402022-10-13013 October 2022 NRC Confirmatory Order EA-21-041 IR 05000219/20220012022-08-11011 August 2022 NRC Inspection Report 05000219/2022001 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22214A1732022-08-0202 August 2022 Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E ML22207B8382022-07-26026 July 2022 NRC Confirmatory Order EA-21-041 ML22130A6882022-05-10010 May 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G L-22-026, Occupational Radiation Exposure Data Report - 20212022-04-29029 April 2022 Occupational Radiation Exposure Data Report - 2021 ML22118A6122022-04-28028 April 2022 Annual Radioactive Environmental Operating Report for 2021 ML22118A5822022-04-28028 April 2022 Annual Radioactive Effluent Release Report for 2021 ML22091A1062022-04-0101 April 2022 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. ML22069A3762022-03-10010 March 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML22032A0582022-03-0808 March 2022 EA-21-139; EA-150: Oyster Creek Nuclear Generating Station - NRC Investigation Report Nos.. 1-2021-002 & 1-2021-014 ML22060A2202022-03-0202 March 2022 NRC Office of Investigations Case No. 1-2021-009 ML22049B2452022-02-19019 February 2022 Late Low Level Radwaste Shipment Report Pursuant to 10 CFR 20 Appendix G IR 05000219/20214022022-01-26026 January 2022 EA-21-041: Confirmatory Order Related to Oyster Greek Nuclear Generating Station - NRC Investigation Report I-2020-007; NRC Inspection Report Nos. 05000219/2021402 & 07200015/2021401 ML22025A3422022-01-25025 January 2022 and Big Rock Point - Changes to Site Organization ML22025A2182022-01-25025 January 2022 Late LLRW Shipments Investigation Report Pursuant to 10 CFR 20, Appendix G ML22021B5512022-01-21021 January 2022 Compensatory Measures Not Implemented Per Site'S Physical Security Plan Due to Multiplexer (Mux) Power Supply Failure L-21-134, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations2021-12-17017 December 2021 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations ML21349A5192021-12-15015 December 2021 Commitment Change Summary Report ML21285A1912021-11-30030 November 2021 Nrc'S Analysis of Holtec Decommissioning International'S Decommissioning Funding Status Report for Oyster Creek Nuclear Generating Station and Pilgrim Nuclear Power Station, Docket Nos 50-219 and 50-293 IR 05000219/20210032021-11-16016 November 2021 NRC Inspection Report No. 05000219/2021003 L-21-118, Changes to Signature Authority & Addressee for Holtec Decommissioning International, LLC Correspondence Re to Oyster Creek Nuclear Generating Station, Pilgrim Nuclear Power Station, Indian Point Nuclear Generating Units 1, 2, 3, & Palisades2021-11-0909 November 2021 Changes to Signature Authority & Addressee for Holtec Decommissioning International, LLC Correspondence Re to Oyster Creek Nuclear Generating Station, Pilgrim Nuclear Power Station, Indian Point Nuclear Generating Units 1, 2, 3, & Palisades IR 05000219/20214042021-08-26026 August 2021 NRC Independent Spent Fuel Storage Security Inspection Report No. 07200015/2021402 and Security Decommissioning Inspection Report 05000219/2021404 - (Public) 2024-01-09
[Table view] Category:Report
MONTHYEARML23286A1552023-10-13013 October 2023 Defueled Safety Analysis Report (DSAR) ML23025A0112023-01-24024 January 2023 LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G ML22130A6882022-05-10010 May 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML21036A1692021-01-29029 January 2021 ISFSI Only Security Plan, Training Qualification Plan, Safeguards Contingency Plan Supplemental Information ML20153A2282020-05-29029 May 2020 Biological Opinion for Oyster Creek Shutdown and Decommissioning ML19214A0452019-08-0202 August 2019 NRC to NMFS, Revised Proposed Action for Oyster Creek Endangered Species Act Section 7 Consultation ML19029B3332019-01-29029 January 2019 Security Inspection Plan for Oyster Creek Station - 2019 RA-18-084, Secondary Containment Capability Test2018-09-14014 September 2018 Secondary Containment Capability Test ML18033B7442018-02-21021 February 2018 Staff Assessment of the Response to 10 CFR 50.54(F) Information Request Flood-Causing Mechanism Reevaluation RA-17-032, Submittal of Biennial 10 CFR 50.59 and 1 O CFR 72.48 Change Summary Reports - January 1, 2015 Through December 31, 20162017-05-16016 May 2017 Submittal of Biennial 10 CFR 50.59 and 1 O CFR 72.48 Change Summary Reports - January 1, 2015 Through December 31, 2016 ML15350A3532016-02-17017 February 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near Term Task Force... RA-15-042, Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Reports - January 1, 2013 Through December 31, 20142015-05-26026 May 2015 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Reports - January 1, 2013 Through December 31, 2014 ML15093A2842015-02-23023 February 2015 Enclosure 2: Flood Hazard Reevaluation Report for Oyster Creek Nuclear Generating Station, Rev. 1 RA-14-078, Secondary Containment Capability Test2014-10-24024 October 2014 Secondary Containment Capability Test RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 RA-14-068, Sea Turtle Incidental Take Report 2014-32014-08-0101 August 2014 Sea Turtle Incidental Take Report 2014-3 ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML14065A2322014-06-16016 June 2014 Staff Assessment of Response to Enclosure 4 of the March 12, 2012, 10 CFR 50.54(F) Information Request - Flooding Walkdowns ML14030A5132014-02-19019 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14038A1112014-02-11011 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Oyster Creek Nuclear Generating Station, TAC No.: MF0824 NEI 99-04, Oyster Creek Nuclear Generating Station, Commitment Change Summary Report - 20122013-12-23023 December 2013 Oyster Creek Nuclear Generating Station, Commitment Change Summary Report - 2012 RA-13-127, Commitment Change Summary Report - 20122013-12-23023 December 2013 Commitment Change Summary Report - 2012 RA-13-088, Sea Turtle Incidental Take Report 2013-52013-09-0909 September 2013 Sea Turtle Incidental Take Report 2013-5 RA-13-074, Sea Turtle Incidental Take Reports 2013-1 and 2013-22013-08-0909 August 2013 Sea Turtle Incidental Take Reports 2013-1 and 2013-2 ML15093A2832013-07-0303 July 2013 Enclosure 1: Local Intense Precipitation Evaluation Report for Oyster Creek, Rev. 6 RS-12-177, E Plan for Future Seismic Walkdown of Inaccessible Equipment2013-04-26026 April 2013 E Plan for Future Seismic Walkdown of Inaccessible Equipment ML13120A1862013-04-0909 April 2013 Enclosure 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic Updated Transmittal # 1 for the Oyster Creek Generating Station Correspondence No. RS- ML13098A2092013-04-0505 April 2013 2.206 Petition by New Jersey Environmental Federation (Et.Al.) for Oyster Creek Nuclear Generating Station Exelon Generation Company, LLC IR 05000272/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000456/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee ML13008A2192013-01-31031 January 2013 U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000454/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000461/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000237/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000373/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000289/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000254/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000277/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000219/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000352/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee ML12355A1422012-12-31031 December 2012 2012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 1 of 2 RS-12-217, 2012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 2 of 22012-12-31031 December 2012 2012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 2 of 2 RS-12-217, 2012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 1 of 22012-12-31031 December 2012 2012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 1 of 2 RA-12-117, Company, Llc'S 180-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2012-11-19019 November 2012 Company, Llc'S 180-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML12359A0082012-11-0606 November 2012 Rev. 1 to Report 12Q0108.80-R-001,Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Oyster Creek Generating Station Unit 1. Part 1 of 4 ML12359A0062012-11-0606 November 2012 Rev. 1 to Report 12Q0108.80-R-001,Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Oyster Creek Generating Station Unit 1. Part 3 of 4 ML12359A0052012-11-0606 November 2012 Rev. 1 to Report 12Q0108.80-R-001,Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Oyster Creek Generating Station Unit 1. Part 2 of 4 RS-13-065, Core Spray/Auto Depress'N System Relay Logic Panel2012-10-10010 October 2012 Core Spray/Auto Depress'N System Relay Logic Panel RA-13-022, D Area Walk-By Checklists (Awcs)2012-10-10010 October 2012 D Area Walk-By Checklists (Awcs) ML12178A2152012-08-0202 August 2012 Closeout of Bulletin 2011-01 Migrating Strategies. 2023-10-13
[Table view] Category:Technical
MONTHYEARML23286A1552023-10-13013 October 2023 Defueled Safety Analysis Report (DSAR) ML21036A1692021-01-29029 January 2021 ISFSI Only Security Plan, Training Qualification Plan, Safeguards Contingency Plan Supplemental Information ML20153A2282020-05-29029 May 2020 Biological Opinion for Oyster Creek Shutdown and Decommissioning ML19214A0452019-08-0202 August 2019 NRC to NMFS, Revised Proposed Action for Oyster Creek Endangered Species Act Section 7 Consultation RA-18-084, Secondary Containment Capability Test2018-09-14014 September 2018 Secondary Containment Capability Test ML15093A2842015-02-23023 February 2015 Enclosure 2: Flood Hazard Reevaluation Report for Oyster Creek Nuclear Generating Station, Rev. 1 RA-14-078, Secondary Containment Capability Test2014-10-24024 October 2014 Secondary Containment Capability Test RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML14030A5132014-02-19019 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14038A1112014-02-11011 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Oyster Creek Nuclear Generating Station, TAC No.: MF0824 ML15093A2832013-07-0303 July 2013 Enclosure 1: Local Intense Precipitation Evaluation Report for Oyster Creek, Rev. 6 RS-12-177, E Plan for Future Seismic Walkdown of Inaccessible Equipment2013-04-26026 April 2013 E Plan for Future Seismic Walkdown of Inaccessible Equipment ML13120A1862013-04-0909 April 2013 Enclosure 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic Updated Transmittal # 1 for the Oyster Creek Generating Station Correspondence No. RS- ML12355A1422012-12-31031 December 2012 2012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 1 of 2 RS-12-217, 2012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 2 of 22012-12-31031 December 2012 2012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 2 of 2 RS-12-217, 2012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 1 of 22012-12-31031 December 2012 2012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 1 of 2 RA-12-117, Company, Llc'S 180-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2012-11-19019 November 2012 Company, Llc'S 180-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML12359A0082012-11-0606 November 2012 Rev. 1 to Report 12Q0108.80-R-001,Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Oyster Creek Generating Station Unit 1. Part 1 of 4 ML12359A0062012-11-0606 November 2012 Rev. 1 to Report 12Q0108.80-R-001,Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Oyster Creek Generating Station Unit 1. Part 3 of 4 ML12359A0052012-11-0606 November 2012 Rev. 1 to Report 12Q0108.80-R-001,Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Oyster Creek Generating Station Unit 1. Part 2 of 4 RA-13-022, D Area Walk-By Checklists (Awcs)2012-10-10010 October 2012 D Area Walk-By Checklists (Awcs) RS-13-065, Core Spray/Auto Depress'N System Relay Logic Panel2012-10-10010 October 2012 Core Spray/Auto Depress'N System Relay Logic Panel ML1016001862010-06-23023 June 2010 Final ASP Analysis - Oyster Creek ML1007004922010-02-24024 February 2010 Reportable Event Rad 1.34, Rev. 10 ML1007004932010-02-24024 February 2010 Reportable Event Rad 1.4, Rev. 10 ML1007401482010-02-24024 February 2010 Attachment 9 Micro ALARA Plan Work Sheet, Rev. 9 ML1020204192009-06-0505 June 2009 Root Cause Evaluation Report for Tritium Leak at Oyster Creek ML1020203322009-05-20020 May 2009 Gamma Spectrum Analysis ML1020203632009-05-20020 May 2009 Gamma Spectrum Analysis ML1020203642009-05-20020 May 2009 Gamma Spectrum Analysis ML1020203282009-05-0707 May 2009 Gamma Spectrum Analysis ML1020203272009-05-0707 May 2009 Gamma Spectrum Analysis ML1020203262009-05-0707 May 2009 Gamma Spectrum Analysis ML1020203252009-05-0707 May 2009 Issue Entry, Oc ML1020203292009-05-0707 May 2009 Gamma Spectrum Analysis ML1020203242009-05-0101 May 2009 AR 00914559 Report ML1007401592009-04-28028 April 2009 Report of Analysis/Certificate of Conformance, L38101 ML1020203232009-04-27027 April 2009 Gamma Spectrum Analysis ML1020004662009-04-26026 April 2009 Gamma Spectrum Analysis ML1020004622009-04-25025 April 2009 Gamma Spectrum Analysis Oyster Creek ML1020004652009-04-25025 April 2009 Gamma Spectrum Analysis ML1020004642009-04-25025 April 2009 Gamma Spectrum Analysis Oyster Creek ML1020004632009-04-25025 April 2009 Gamma Spectrum Analysis Oyster Creek ML1020004592009-04-25025 April 2009 Gamma Spectrum Analysis Oyster Creek ML1020004602009-04-25025 April 2009 Gamma Spectrum Analysis Oyster Creek ML0910407272009-04-0606 April 2009 Document No. 17693-R-001, Revision 0, NJDEP Oyster Creek Drywell Review ML1007401572009-03-24024 March 2009 Report of Analysis/Certificate of Conformance, L38010 ML1007401582009-03-24024 March 2009 Report of Analysis/Certificate of Conformance, L38009 ML1007401542009-03-22022 March 2009 Report of Analysis/Certificate of Conformance, L37854 2023-10-13
[Table view] |
Text
AmerGen Energy Company, LLC AmerGen An Exelon/BTitish Energy Company SM Oyster Creek US Route 9 South PO Box 388 License Condition 2.C.(6)
Forked River, NJ 08731-0388 March 25, 2003 2130-03-20068 United States Nuclear Regulatory Commission Document Control Desk Washington DC 20555
Subject:
Oyster Creek Generating Station Docket 50-219 Long Range Planning Program (LRPP)
Annual Update of Integrated Schedule "ABC" Projects Listing - March 2003 Pursuant to condition 2.C.(6) of Operating License DPR-16, AmerGen Energy Company, LLC, has implemented the Long Range Planning Program for the Oyster Creek Generating Station. As required by Section V.A of the Plan, the following attachments are submitted to provide the annual project list update:
- 1. Attachment A contains a new list of Category A, B and C projects, annotated by an asterisk (*) to identify new projects. Completed projects have been removed from the list.
- 2. Attachment B contains a summary of Category A, B, and C projects which have been completed, deleted, deferred, or changed in scope. Category A and B projects which have had schedule changes are provided with explanations, as appropriate.
Category A projects reflect regulatory requirements with implementation dates mandated by rule, order, or license condition. They may not be changed without prior approval of the NRC.
Category B projects address other regulatory requirements and require notification of the NRC with time for NRC review prior to the scheduled implementation date. Category C projects are non-regulatory and do not require prior NRC approval or notification.
4 L)
. _ _ A_ _ _. . _._ .: . .
t.
2130-03-20068 Page 2 Pursuant to the LRPP for Oyster Creek, if you do not respond to this submittal within 15 days of receipt, it will be assumed that you are in agreement with the actual Category B changes attached.
If you have any questions concerning the update or require more information, please contact Mr. John Rogers, of my staff, at 609.971.4893.
Very truly yo rs, Ernest J. Harkness, P.E.
Vice President, Oyster Creek Attachments cc: Administrator Region I NRC Senior Project Manager, Oyster Creek NRC Senior Resident Inspector, Oyster Creek
ABC Classifications a) Meet NRC Requirements (NRR) - Activities that: a) Must be carried out to fulfill specific NRC requirements; b) have been committed to the NRC by the company; or c) are such that if not accomplished would result in an NRC noncompliance even though the specific activity is not required by the NRC.
b) Meet Environmental Requirements (ERR) - Activities that: a) are specifically required by environmental regulatory agencies (State & Federal); b) have been committed to environmental agencies by the Company; or c) are such that if not accomplished would result in regulatory non-compliance even though the specific activity is not required by an environmental regulatory agency.
c) Meet other Requirements (ORR) - Activities not covered by the NRC or environmental requirements but that are required by local, state, or federal ordinances, codes, court order or lawsuit settlement, or other guidance to which the Company is committed, or if not accomplished, would result in a violation of that ordinance, code, guidance, court order, etc.
d) Increase Safety Margins (ISM) - Activities that, if implemented, will improve nuclear plant or personnel safety, but are neither required by regulatory compliance nor required by safety regulations, codes or guidance.
e) Decrease Environmental Effects (E) - Activities that, if implemented, will result in an improved environmental quality but are neither required for regulatory compliance nor required by environmental regulations, codes, or guidance.
f) Improve Radiological Conditions (RAD) - Activities that, if implemented, will result in improved radiological conditions, lower man-rem exposure rates, or radwaste control/reduction, but are neither required for regulatory compliance not required by radiological regulations, codes, or guidance.
g) Maintain Reliability/Capability (MRC) - Activities that, if implemented, will maintain power production at existing levels by preventing deterioration of plant systems or equipment. Includes activities in response to national codes and standards, insurance policies, equipment vendor specifications or nuclear industrial high unavailability data without which the plant could not operate prudently.
h) Improve Reliability/Capability (REL) - Activities that, if implemented, will increase the power generation by improving availability or capacity factor to maximize energy output.
2130-03-20XXX ABC Classifications Page 2 i) Improve Operational Effectiveness (IOE) - Activities that, if implemented, will improve staff efficiency or provide a direct economic payback in terms of reduced operating/maintenance costs.
j) Improve Personnel Facilities (FAC) - Activities that, if implemented, will improve working conditions and the usefulness of personnel facilities.
k) Provide Contingency/Blanket (CUI) - Activities that, if implemented, will provide management flexibility to respond in a timely manner to emergent work requirements or the ongoing requirements to procure, replace or repair minor items essential to support routine operations.
- 1) Improves Heat Rate Performance (HRP) - Activities that, if implemented, will increase power production by enhancing the heat rate efficiency.
m) General Working Conditions (GWC) - Activities, tools and equipment that if implemented will improve working conditions, but will not demonstrate a direct economic payback.
MARCH 2003 INTEGRATED SCHEDULE ANNUAL UPDATE 2130-03-20068 PROJECT LISTING ATTACHMENT A OYSTER CREEK PROJECT LISTING NRC INTEGRATED SCHEDULE Legend:
- New Projects CATEGORY 'A' PROJECTS CYCLE / CLASS-OBS DESCRIPTION YEARS IFICATION 0 NONE Page 1 of 4
MARCH 2003 INTEGRATED SCHEDULE ANNUAL UPDATE 2130-03-20068 PROJECT LISTING ATTACHMENT A OYSTER CREEK PROJECT LISTING NRC INTEGRATED SCHEDULE Legend:
New Projects CATEGORY 'B' PROJECTS 065 OBSDECRPTONCYCLE DESCRIPTION YEARS / CLASS-IFICATION 1 OUTAGE ISI & RCS AUG IGSCC INSPECTIONS 1R20 NRR INSPECT VARIOUS COMPONENTS TO SECTION Xi REQUIREMENTS & INSPECT PIPING WELDS (MANUAL) PER NUREG 0313 REV.2 2 RX. VESSEL INTERNAL INSPECTION 1R20 NRR VISUAL INSPECTION OF SELECTED INTERNAL COMPONENTS AND SURFACES AS REQUIRED BY ASME CODES
- 3 CRD STUB TUBE PERMANENT REPAIR 1R20 NRR EVALUATE THE NEED TO UPGRADE THE EXISTING NON-CODE REPAIR TO MEET ASME Xi
- 4 GENERATOR / EXCITER INSPECTION AND OVERHAUL 1R20 ORR PERFORM MAINTENANCE REQUIRED BY ANI Page 2 of 4
MARCH 2003 INTEGRATED SCHEDULE ANNUAL UPDATE 2130-03-20068
- PROJECT LISTING ATTACHMENT A OYSTER CREEK PROJECT LISTING NRC INTEGRATED SCHEDULE Legend.
New Projects CATEGORY 'C' PROJECTS CYCLE / CLASS-OBS DESCRIPTION YEARS IFICATION 5 INTERIM SPENT FUEL STORAGE INSTALLATION 2003/04/05 IOE PROCUREMENT AND ADDITIONS TO THE SPENT FUEL STORAGE INSTALLATION 6 SIMULATOR COMPUTER REPLACEMENT 19 IOE SIMULATOR COMPUTER REPLACEMENT 7 CRD HCU REBUILD 1R20 MRC PERFORM CORRECTIVE MAINTENANCE ON CRD HCU'S 8 REACTOR DISASSEMBLY/ REASSEMBLY 1R20 MRC TASKS ASSOCIATED WITH REACTOR DISASSEMBLY AND REASSEMBLY PLUS SUPPORTING ACTIVITIES 9 PIPE WALL THINNING 1R20 ISM REMOVE INSULATION PREP SURFACES AND PERFORM UT ON SELECTED PIPING SYSTEMS POSSIBLE REPLACEMENT OF FITTINGS / PIPING 10 TURBINE GENERATOR OVERHAUL 1R20 MRC INSPECT TURBINE AND TURBINE RELATED COMPONENTS FOR NML REQUIREMENTS AND MANUFACTURER RELATED ISSUES 11 VALVE REPLACEMENT 1R20 REL REPLACE SELECTED VALVES IDENTIFIED AS HAVING DEFICIENCIES Page 3 of 4
MARCH 2003 INTEGRATED SCHEDULE ANNUAL UPDATE 2130-03-20068 PROJECT LISTING ATTACHMENT A OYSTER CREEK PROJECT LISTING NRC INTEGRATED SCHEDULE Legend:
New Projects CATEGORY 'C' PROJECTS OBSDECRPTONCYCLE DESCRIPTION YEARS / CLASS-IFICATION OBS
- 12 NEW STARTUP AND AUXILIARY TRANSFORMERS 19 CUI PURCHASE SPARE TRANSFORMERS TO MAINTAIN POWER PRODUCTION RELIABILITY
- 14 INSTALL GAMMA SENSITIVE MONITORS AT RCA'S 19 RAD INCREASE CONTROL OF CONTAMINATION
- 15 MG SET ROOM HEAT REMOVAL UPGRADE 19 MRC INCREASE COOLING TO THE MG SET ROOM
- 16 LONG TERM ESW/SW UNDERGROUND PIPE REPAIR 19 MRC RESTORE THE ORIGINAL PIPE CONFIGURATION
- 17 4160V CABLE REPLACEMENT 19 MRC PREVENTIVE MAINTENANCE
- 18 RADWASTE SYSTEM IMPROVEMENTS 19 IOE IMPROVE MATERIEL CONDITION AND ENHANCE OPERABILITY OF RADWASTE CONTROL ROOM
- 19 RECIRCULATION PUMP MG SET ELECTRICAL 19 REL REFURBISHMENT INCREASE THE RELIABILITY OF THE VARIABLE SPEED RECIRCULATION PUMPS 20 CONTROL ROD BLADE REPLACEMENT 1R20 REL REPLACE CR BLADES AS SCHEDULED Page 4 of 4
JANUARY 2002 INTEGRATED SCHEDULE ANNUAL UPDATE 2130-01-20068 PROJECTS
SUMMARY
ATTACHMENT B OYSTER CREEK
SUMMARY
of CATEGORY A, B and C PROJECTS NRC INTEGRATED SCHEDULE CATEGORY "A" PROJECTS ADDITIONS: NONE COMPLETIONS: NONE DELETIONS: NONE SCHEDULE CHANGE: NONE CATEGORY "B"PROJECTS ADDITIONS (2): As noted by an
- next to the Observtion Number in Attachment A CRD STUB TUBE REPAIR GENERATOR / EXCITER INSPECTION AND OVERHAUL COMPLETIONS (2) OUTAGE ISI AND AUGMENTED IGSCC INSPECTIONS - 1R19 RX VESSEL INTERNAL INSPECTIONS - 1Ri 9 DELETIONS: NONE SCHEDULE CHANGE: NONE CATEGORY "C' PROJECTS ADDITIONS (8): As denoted by an
- next to the Observation Number in Attachment A NEW STARTUP AND AUX TRANSFORMER EMERGENCY LIGHTING UPGRADES INSTALL GAMMA SENSITIVE MONITORS AT RCA'S MG SET ROOM HEAT REMOVAL UPGRADE LONG TERM ESW/SW UNDERGROUND PIPE REPAIR 4160V CABLE REPLACEMENT RADWASTE SYSTEM IMPROVEMENTS RECIRC MG SET ELECTRICAL REFURBISHMENT COMPLETIONS (12): REFURBISH LP ROTOR PERMANENT DRYWELL PLATFORMS REPAIR FEEDWATER SPARGER REPAIR RECIRC MOTOR RTD'S LPRM REPLACEMENT ESW / SW CROSS TIE CRD HCU REBUILD- 1R19 REACTOR DISASSEMBLY / REASSESEMBLY - 1R19 PIPE WALL THINNING - 1R19 TURBINE GENERATOR OVERHAUL- 1R19 VALVE REPLACEMENT -1 R1 9 CONSTRUCT WORK MANAGEMENT BUILDING DELETIONS: NONE SCHEDULE CHANGE: NONE Page 1 of 1