Long Range Planning Program Annual Update of Integrated Schedule, ABC Projects Listing - March 2003
ML030920070
Person / Time
Site: Oyster Creek
Issue date: 03/25/2003
From: Harkness E
AmerGen Energy Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2130-03-20068
Download: ML030920070 (9)


Text

AmerGen Energy Company, LLC AmerGen An Exelon/BTitish Energy Company SM Oyster Creek US Route 9 South PO Box 388 License Condition 2.C.(6)

Forked River, NJ 08731-0388 March 25, 2003 2130-03-20068 United States Nuclear Regulatory Commission Document Control Desk Washington DC 20555

Subject:

Oyster Creek Generating Station Docket 50-219 Long Range Planning Program (LRPP)

Annual Update of Integrated Schedule "ABC" Projects Listing - March 2003 Pursuant to condition 2.C.(6) of Operating License DPR-16, AmerGen Energy Company, LLC, has implemented the Long Range Planning Program for the Oyster Creek Generating Station. As required by Section V.A of the Plan, the following attachments are submitted to provide the annual project list update:

1. Attachment A contains a new list of Category A, B and C projects, annotated by an asterisk (*) to identify new projects. Completed projects have been removed from the list.
2. Attachment B contains a summary of Category A, B, and C projects which have been completed, deleted, deferred, or changed in scope. Category A and B projects which have had schedule changes are provided with explanations, as appropriate.

Category A projects reflect regulatory requirements with implementation dates mandated by rule, order, or license condition. They may not be changed without prior approval of the NRC.

Category B projects address other regulatory requirements and require notification of the NRC with time for NRC review prior to the scheduled implementation date. Category C projects are non-regulatory and do not require prior NRC approval or notification.

4 L)

. _ _ A_ _ _. . _._ .: . .

t.

2130-03-20068 Page 2 Pursuant to the LRPP for Oyster Creek, if you do not respond to this submittal within 15 days of receipt, it will be assumed that you are in agreement with the actual Category B changes attached.

If you have any questions concerning the update or require more information, please contact Mr. John Rogers, of my staff, at 609.971.4893.

Very truly yo rs, Ernest J. Harkness, P.E.

Vice President, Oyster Creek Attachments cc: Administrator Region I NRC Senior Project Manager, Oyster Creek NRC Senior Resident Inspector, Oyster Creek

ABC Classifications a) Meet NRC Requirements (NRR) - Activities that: a) Must be carried out to fulfill specific NRC requirements; b) have been committed to the NRC by the company; or c) are such that if not accomplished would result in an NRC noncompliance even though the specific activity is not required by the NRC.

b) Meet Environmental Requirements (ERR) - Activities that: a) are specifically required by environmental regulatory agencies (State & Federal); b) have been committed to environmental agencies by the Company; or c) are such that if not accomplished would result in regulatory non-compliance even though the specific activity is not required by an environmental regulatory agency.

c) Meet other Requirements (ORR) - Activities not covered by the NRC or environmental requirements but that are required by local, state, or federal ordinances, codes, court order or lawsuit settlement, or other guidance to which the Company is committed, or if not accomplished, would result in a violation of that ordinance, code, guidance, court order, etc.

d) Increase Safety Margins (ISM) - Activities that, if implemented, will improve nuclear plant or personnel safety, but are neither required by regulatory compliance nor required by safety regulations, codes or guidance.

e) Decrease Environmental Effects (E) - Activities that, if implemented, will result in an improved environmental quality but are neither required for regulatory compliance nor required by environmental regulations, codes, or guidance.

f) Improve Radiological Conditions (RAD) - Activities that, if implemented, will result in improved radiological conditions, lower man-rem exposure rates, or radwaste control/reduction, but are neither required for regulatory compliance not required by radiological regulations, codes, or guidance.

g) Maintain Reliability/Capability (MRC) - Activities that, if implemented, will maintain power production at existing levels by preventing deterioration of plant systems or equipment. Includes activities in response to national codes and standards, insurance policies, equipment vendor specifications or nuclear industrial high unavailability data without which the plant could not operate prudently.

h) Improve Reliability/Capability (REL) - Activities that, if implemented, will increase the power generation by improving availability or capacity factor to maximize energy output.

2130-03-20XXX ABC Classifications Page 2 i) Improve Operational Effectiveness (IOE) - Activities that, if implemented, will improve staff efficiency or provide a direct economic payback in terms of reduced operating/maintenance costs.

j) Improve Personnel Facilities (FAC) - Activities that, if implemented, will improve working conditions and the usefulness of personnel facilities.

k) Provide Contingency/Blanket (CUI) - Activities that, if implemented, will provide management flexibility to respond in a timely manner to emergent work requirements or the ongoing requirements to procure, replace or repair minor items essential to support routine operations.

1) Improves Heat Rate Performance (HRP) - Activities that, if implemented, will increase power production by enhancing the heat rate efficiency.

m) General Working Conditions (GWC) - Activities, tools and equipment that if implemented will improve working conditions, but will not demonstrate a direct economic payback.

MARCH 2003 INTEGRATED SCHEDULE ANNUAL UPDATE 2130-03-20068 PROJECT LISTING ATTACHMENT A OYSTER CREEK PROJECT LISTING NRC INTEGRATED SCHEDULE Legend:

  • New Projects CATEGORY 'A' PROJECTS CYCLE / CLASS-OBS DESCRIPTION YEARS IFICATION 0 NONE Page 1 of 4

MARCH 2003 INTEGRATED SCHEDULE ANNUAL UPDATE 2130-03-20068 PROJECT LISTING ATTACHMENT A OYSTER CREEK PROJECT LISTING NRC INTEGRATED SCHEDULE Legend:

New Projects CATEGORY 'B' PROJECTS 065 OBSDECRPTONCYCLE DESCRIPTION YEARS / CLASS-IFICATION 1 OUTAGE ISI & RCS AUG IGSCC INSPECTIONS 1R20 NRR INSPECT VARIOUS COMPONENTS TO SECTION Xi REQUIREMENTS & INSPECT PIPING WELDS (MANUAL) PER NUREG 0313 REV.2 2 RX. VESSEL INTERNAL INSPECTION 1R20 NRR VISUAL INSPECTION OF SELECTED INTERNAL COMPONENTS AND SURFACES AS REQUIRED BY ASME CODES

  • 3 CRD STUB TUBE PERMANENT REPAIR 1R20 NRR EVALUATE THE NEED TO UPGRADE THE EXISTING NON-CODE REPAIR TO MEET ASME Xi
  • 4 GENERATOR / EXCITER INSPECTION AND OVERHAUL 1R20 ORR PERFORM MAINTENANCE REQUIRED BY ANI Page 2 of 4

MARCH 2003 INTEGRATED SCHEDULE ANNUAL UPDATE 2130-03-20068

- PROJECT LISTING ATTACHMENT A OYSTER CREEK PROJECT LISTING NRC INTEGRATED SCHEDULE Legend.

New Projects CATEGORY 'C' PROJECTS CYCLE / CLASS-OBS DESCRIPTION YEARS IFICATION 5 INTERIM SPENT FUEL STORAGE INSTALLATION 2003/04/05 IOE PROCUREMENT AND ADDITIONS TO THE SPENT FUEL STORAGE INSTALLATION 6 SIMULATOR COMPUTER REPLACEMENT 19 IOE SIMULATOR COMPUTER REPLACEMENT 7 CRD HCU REBUILD 1R20 MRC PERFORM CORRECTIVE MAINTENANCE ON CRD HCU'S 8 REACTOR DISASSEMBLY/ REASSEMBLY 1R20 MRC TASKS ASSOCIATED WITH REACTOR DISASSEMBLY AND REASSEMBLY PLUS SUPPORTING ACTIVITIES 9 PIPE WALL THINNING 1R20 ISM REMOVE INSULATION PREP SURFACES AND PERFORM UT ON SELECTED PIPING SYSTEMS POSSIBLE REPLACEMENT OF FITTINGS / PIPING 10 TURBINE GENERATOR OVERHAUL 1R20 MRC INSPECT TURBINE AND TURBINE RELATED COMPONENTS FOR NML REQUIREMENTS AND MANUFACTURER RELATED ISSUES 11 VALVE REPLACEMENT 1R20 REL REPLACE SELECTED VALVES IDENTIFIED AS HAVING DEFICIENCIES Page 3 of 4

MARCH 2003 INTEGRATED SCHEDULE ANNUAL UPDATE 2130-03-20068 PROJECT LISTING ATTACHMENT A OYSTER CREEK PROJECT LISTING NRC INTEGRATED SCHEDULE Legend:

New Projects CATEGORY 'C' PROJECTS OBSDECRPTONCYCLE DESCRIPTION YEARS / CLASS-IFICATION OBS

  • 12 NEW STARTUP AND AUXILIARY TRANSFORMERS 19 CUI PURCHASE SPARE TRANSFORMERS TO MAINTAIN POWER PRODUCTION RELIABILITY
  • 14 INSTALL GAMMA SENSITIVE MONITORS AT RCA'S 19 RAD INCREASE CONTROL OF CONTAMINATION
  • 15 MG SET ROOM HEAT REMOVAL UPGRADE 19 MRC INCREASE COOLING TO THE MG SET ROOM
  • 16 LONG TERM ESW/SW UNDERGROUND PIPE REPAIR 19 MRC RESTORE THE ORIGINAL PIPE CONFIGURATION
  • 17 4160V CABLE REPLACEMENT 19 MRC PREVENTIVE MAINTENANCE
  • 18 RADWASTE SYSTEM IMPROVEMENTS 19 IOE IMPROVE MATERIEL CONDITION AND ENHANCE OPERABILITY OF RADWASTE CONTROL ROOM
  • 19 RECIRCULATION PUMP MG SET ELECTRICAL 19 REL REFURBISHMENT INCREASE THE RELIABILITY OF THE VARIABLE SPEED RECIRCULATION PUMPS 20 CONTROL ROD BLADE REPLACEMENT 1R20 REL REPLACE CR BLADES AS SCHEDULED Page 4 of 4

JANUARY 2002 INTEGRATED SCHEDULE ANNUAL UPDATE 2130-01-20068 PROJECTS

SUMMARY

ATTACHMENT B OYSTER CREEK

SUMMARY

of CATEGORY A, B and C PROJECTS NRC INTEGRATED SCHEDULE CATEGORY "A" PROJECTS ADDITIONS: NONE COMPLETIONS: NONE DELETIONS: NONE SCHEDULE CHANGE: NONE CATEGORY "B"PROJECTS ADDITIONS (2): As noted by an

  • next to the Observtion Number in Attachment A CRD STUB TUBE REPAIR GENERATOR / EXCITER INSPECTION AND OVERHAUL COMPLETIONS (2) OUTAGE ISI AND AUGMENTED IGSCC INSPECTIONS - 1R19 RX VESSEL INTERNAL INSPECTIONS - 1Ri 9 DELETIONS: NONE SCHEDULE CHANGE: NONE CATEGORY "C' PROJECTS ADDITIONS (8): As denoted by an
  • next to the Observation Number in Attachment A NEW STARTUP AND AUX TRANSFORMER EMERGENCY LIGHTING UPGRADES INSTALL GAMMA SENSITIVE MONITORS AT RCA'S MG SET ROOM HEAT REMOVAL UPGRADE LONG TERM ESW/SW UNDERGROUND PIPE REPAIR 4160V CABLE REPLACEMENT RADWASTE SYSTEM IMPROVEMENTS RECIRC MG SET ELECTRICAL REFURBISHMENT COMPLETIONS (12): REFURBISH LP ROTOR PERMANENT DRYWELL PLATFORMS REPAIR FEEDWATER SPARGER REPAIR RECIRC MOTOR RTD'S LPRM REPLACEMENT ESW / SW CROSS TIE CRD HCU REBUILD- 1R19 REACTOR DISASSEMBLY / REASSESEMBLY - 1R19 PIPE WALL THINNING - 1R19 TURBINE GENERATOR OVERHAUL- 1R19 VALVE REPLACEMENT -1 R1 9 CONSTRUCT WORK MANAGEMENT BUILDING DELETIONS: NONE SCHEDULE CHANGE: NONE Page 1 of 1