Text

Serial No.04-258 Docket Nos. 50-245 50-336 50-423 Enclosure 1 2003 Radioactive Effluent Release Report. Volume I Millstone Power Station Units 1, 2 and 3 Dominion Nuclear Connecticut, Inc. (DNC)

Millstone Power Station 2003 Radioactive Effluent Release Report Volume I Dominion Nuclear Connecticut, Inc.

MILLSTONE UNIT LICENSE DOCKET W--

3l-m)N" 1 2

DPR-21 DPR-65 50.245 50.336 3 NPF-49 50.423 C- CI 1

Table of Contents Volume I List of Tables References Introduction Operating History 1.0 Doses 1.1 Dose Calculations 1.2 Dose Results 2.0 Radioactivity 2.1 Airborne Effluents 2.2 Liquid Effluents 2.3 Solid Waste 3.0 REMODCM Changes 4.0 Inoperable Effluent Monitors > 30 days 5.0 Errata Volume II 2003 REMODCM Revision 24-01

List of Tables Table 1-1 Off-Site Dose Summary from Airbome Effluents - Units 1.2,3 Table 1-2 Off-Site Dose Summary from Liquid Effluents - Units 1,2,3 Table 1-3 Off-Site Dose Comparison to Umits - Units 1,2,3 Table 1-4 Off-Site Dose Comparison - Units 1,2,3 Table 2.1-Al Unit I Airborne Effluents - Release Summary Table 2.1-A2 Unit I Airborne Effluents - Elevated Continuous Table 2.1-A3 Unit 1 Airborne Effluents - Ground Continuous - Balance of Plant Vent

& Spent Fuel Pool Island Vent Table 2.1-LI Unit I Liquid Effluents - Release Summary Table 2.1-L2 Unit I Liquid Effluents - Batch Table 2.2-Al Unit 2 Airborne Effluents - Release Summary Table 2.2-A2 Unit 2 Airborne Effluents - Mixed Continuous - Aux Bldg Vent, SGBD Tank Vent

& Spent Fuel Pool Evaporation Table 2.2-A3 Unit 2 Airborne Effluents - Mixed Batch - Containment Purges Table 2.2-A4 Unit 2 Airborne Effluents - Elevated Batch - WGDT Table 2.2-A5 Unit 2 Airborne Effluents - Ground Batch - Containment Equipment Hatch Table 2.2-A6 Unit 2 Airborne Effluents - Ground Batch - RWST Vent Table 2.2-A7 Unit 2 Airborne Effluents - Elevated Continuous - Containment Vents Table 2.2-LI Unit 2 Uquid Effluents - Release Summary - Quarry Table 2.2-L2 Unit 2 Liquid Effluents - Continuous - SGBD Table 2.2-L3 Unit 2 Liquid Effluents - Batch - LWS Table 2.2-L4 Unit 2 Uquid Effluents - Release Summary - Yard Drain DSN 006 Table 2.2-L5 Unit 2 Liquid Effluents - Continuous - Turbine Building Sump Table 2.3-Al Unit 3 Airborne Effluents - Release Summary Table 2.3-A2 Unit 3 Airborne Effluents - Mixed Continuous - Vent & Spent Fuel Pool Evaporation Table 2.3-A3 Unit 3 Airborne Effluents - Ground Continuous - ESF Building Ventilation Table 2.3-A4 Unit 3 Airborne Effluents - Mixed Batch - Containment Drawdowns Table 2.3-A5 Unit 3 Airborne Effluents - Mixed Batch - Containment Purges Table 2.3-A6 Unit 3 Airborne Effluents - Elevated Continuous - GWS & Containment Vents Table 2.3-L1 Unit 3 Liquid Effluents - Release Summary - Quarry Table 2.3-L2 Unit 3 Liquid Effluents - Continuous - SGBD, SW & TK2 Table 2.3-L3 Unit 3 Uquid Effluents - Batch - LWS Table 2.3-L4 Unit 3 Uquid Effluents - Batch - CPF Waste Neutralization Sumps & Hotwell Discharge Table 2.3-L5 Unit 3 Uquid Effluents - Release Summary - Yard Drain DSN 006 Table 2.3-L6 Unit 3 Liquid Effluents - Continuous - Turbine Building Sump Table 2.3-L7 Unit 3 Uquid Effluents - Continuous - WTT Berm Water Table 2.1-S Unit I Solid Waste & Irradiated Component Shipments Table 2.2-S Unit 2 Solid Waste & Irradiated Component Shipments Table 2.3-S Unit 3 Solid Waste & Irradiated Component Shipments

References

1. NUREG-0597 User Guide to GASPAR Code, KF Eckerman, FJ Congel, AK Roecklien, WJ Pasciak, Division of Site Safety and Environmental Analysis, Office of Nuclear Reactor Regulation, US Nuclear Regulatory Commission, Washington, DC 20555, manuscript completed January 1980, published June 1980.
2. Intentionally left blank
3. NRC Regulatory Guide 1.109 Calculation of Annual Doses to Man from Routine Releases of Reactor Effluents for the Purpose of Evaluating Compliance with 10 CFR Part 50.

Appendix I, Revision 1, October 1977.

4. Intentionally left blank
5. NRC Regulatory Guide 1.111 Methods for Estimating Atmospheric Transport and Dispersion of Gaseous Effluents in Routine Releases from Light-Water-Cooled Reactors, Revision 1, July 1977.
6. NUREG/CR-1276, ORNLUNUREGITDMC-1 User's Manual for LADTAP II - A Computer Program for Calculating Radiation Exposure to Man from Routine Release of Nuclear Reactor Liquid Effluents, DB Simpson, BL McGill, prepared by Oak Ridge National Laboratory, Oak Ridge, TN 37830, for Office of Administration, US Nuclear Regulatory Commission, manuscript completed 17 March 1980.
7. 10 CFR Energy, Part 50 Domestic Licensing of Production and Utilization Facilities, Appendix I Numerical Guides for Design Objectives and Limiting Conditions for Operation to Meet the Criterion "As Low As Reasonably Achievable" for Radioactive Material In Light-Water-Cooled Nuclear Power Reactor Effluents.
8. 40 CFR Environmental Protection Agency, Part 190 Environmental Radiation Protection Standard for Nuclear Power Operation.
9. Memo No. MPWS-03-006, Solid Waste and Irradiated Component Shipments March 11, 2003.
10. DOSLIQ-Dose Excel Code for Liquid EffluentsSoftware Document File, Rev 1, February 2002
11. DOSAIR-Dose Excel Code for Airborne Effluents,Software Document File, Rev 0, February, 2002
12. GASPAR Il -Technical Reference and User Guide (NUREG/CR-4653), March 1987.

Introduction This report, for the period of January through December of 2003, is being submitted by Dominion Nuclear Connecticut, Inc. for Millstone Power Station's Units 1, 2, and 3, in accordance with 10CFR50.36a, the REMODCM, and the Station's Technical Specifications. A combined report, written in the US NRC Regulatory Guide 1.21 format, is submitted for all three units.

Volume I contains radiological and volumetric information on airborne and liquid effluents and shipments of solid waste & irradiated components, calculated offsite radiological doses, all changes to the REMODCM, information on effluent monitors inoperable for more than 30 consecutive days, and any corrections to previous reports. Volume II contains a full copy of each of the complete revisions to the REMODCM effective during the calendar year.

Operating History The operating history of the Millstone Units during this reporting period was as follows:

The annual capacity factor for Unit 1 was 0.0%. Unit 1 was shut down November 11, 1995 with a cessation of operation declared in July 1998.

The annual capacity factor for Unit 2 was 80.00% based on Design Electrical Rating (DER). Unit 2 was shut down due to a reactor trip on March 7th, and then on October 11 th for 2R1 5 refueling and maintenance.

MP2 - CYCLES 15 & 16 POWER HISTORY YEAR 2003 Note: Data at 3 hou IrIntervals 11c 10C iS_

9C -

80 7C __

__RIN COTO VAV TES___TI____G -

IY* 3I DOW POE __G TO REOV P_FRO SE3C TO PUM MOO_ _

COUPLING 0 __

- 5C

-- 1l_-

_l_

4C -

3C IN N0

2. AUTOMATIC RXTRIP (317/03)WHILE PERFORMING -RPS MATRIX LOGIC AND TRIP PATH RELAY TEST'-

0 N 0' I*-_O N 0_O- O--NO-N0 -i_

0000000000000000000000000000000* _ _

2C S. DOWN POWER TO 95% TO FACILITATE A CND WATERBOX INSPECTION FOR PUMP PARTS . __

6. DOWN POWER TO 8ACKFLUSH E, C. & 0 WATERBOXES AND REPAIR TUBE LEAKS IN C' CONDENSER IC 7. DOWN POWER TO BACKFLUSH B, C, & 0 WATEREOXES 1- _

BSHUTDOWN FOR 2R15 (10/1 1)

C M co V Cl) Cn C.) M. C' C') M' C') C' C) C) ') C) C' M' M' en M ' C' C' C' C') C' M ' C' M ' C' C') C' ' ' C) C)

C C ) C')

0000 a C)0 0 0 0 0 0 >0 - - - - - -

09 -

5

- N _~

The annual capacity factor for Unit 3 was 98.8% based on Design Electrical Rating (DER). On December 23, 2002, Unit 3 was temporarily shut down due to a main generator ground fault, and returned to full power in early January 2003. Except for a short-term down power to 87% in August due to Northeast grid instability and a short-term down power to 75% to backflush of the condensers, Unit 3 ran close to 100%

power.

MP3 - CYCLE 9 POWER HISTORY YEAR 2003 Note: Data at 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> Intervals 110 100 90 80 70 -

°60 50_

0-! - rz 11 -  :- " 11 11 - - g rt - - - -m - f g 1 1 v§ ig g9 e4 rre e n ra r9 n IZ; oR Oi~~i 0 0M 00 i,O O oi ; N g o 00 2z g 0 N Io N~~0.N0 z g .N Q Qz Q - -

N C(O.5

1.0 Doses This report provides a summary of the 2003 off-site radiation doses for releases of radioactive materials in airborne and liquid effluents from Millstone Units 1, 2, and 3. This includes the annual maximum dose (mrem) to any real member of the public as well the maximum gamma and beta air doses.

To provide perspective, these doses are compared with the regulatory limits and with the annual average dose a member of the public could receive from natural background and other sources.

1.1 Dose Calculations The off-site dose to humans from radioactive airborne and liquid effluents have been calculated using measured radioactive effluent data, measured meteorological data, and dose computer models DOSAIR and DOSLIQ, which were developed by Millstone. The methodology and input parameters for DOSAIR are those used In GASPAR II (Reference 12) and NRC Regulatory Guide 1.109 (Reference 3). The methodology and input parameters for DOSLIQ are those used in LADTAP II (Reference 6) and NRC Regulatory Guide 1.109 (Reference 3). The calculated doses generally tend to be conservative due to the conservative model assumptions. More realistic estimates of the off-site dose can be obtained by analysis of environmental monitoring data. A comparison of doses estimated by each of the above methods is presented in the Annual Radiological Environmental Operating Report.

1.1.1 Maximum Individual Dose The doses are based upon exposure to the airborne and liquid effluents over a one year period and an associated dose commitment over a 50-year period from initial exposure due to inhalation and ingestion, taking into account radioactive decay and biological elimination of the radioactive materials.

Maximum Individual dose is defined as the dose to the individual within the 50 mile population who would receive the maximum dose from releases of airborne and liquid effluents.

Although the location of the maximum individual may vary each quarterly period, the annual dose is the sum of these quarterly doses. This conservatively assumes that the individual is at the location of maximum dose each quarter.

The dose calculations are based upon these three types of input: radioactive source term, site-specific data, and generic factors. The radioactive source terms (Curies) are characterized in the Radioactivity section of this report. The site specific data includes:

meteorological data (e.g. wind speed, direction, stability, etc.) to calculate the transport and dispersion of airborne effluents, and dilution factors for liquid effluents. The generic factors include the average annual consumption rates (for inhalation of air and ingestion of fruits, vegetables, leafy vegetables, grains, milk, poultry, meat, fish, and shellfish) and occupancy factors (for air submersion and ground Irradiation, shoreline activity, swimming, boating, etc.).

All these inputs are used in the appropriate dose models to calculate the maximum individual dose from radioactive airborne and liquid effluents.

1.1.1.1 Airborne Effluents Maximum individual doses due to the release of noble gases, radioiodines, and particulates were calculated using the computer code DOSAIR (Reference 11). This

is equivalent to the NRC code, GASPAR II, which uses a semi-infinite cloud model to implement the NRC Regulatory Guide 1.109 (Reference 3) dose models.

The values of average relative effluent concentration (X/Q) and average relative deposition (DIQ) used in the DOSAIR code were generated using EDAN 3, a meteorological computer code which implements the assumptions cited in NRC Regulatory Guide 1.111 (Reference 5), Section C. The annual summary of hourly meteorological data (in 15-minute increments), which Includes wind speed, direction, atmospheric stability, and joint frequency distribution, is not provided in the report but can be retrieved from computer storage.

Millstone Stack (375 ft) releases are normally considered elevated with Pasquill stability classes determined based upon the temperature gradient between the 33 ft and 374 ft meteorological tower levels, however, the doses were conservatively calculated using mixed mode 142 ft meteorology since DOSAIR may underestimate the plume exposure for elevated releases from the Millstone Stack prior to touchdown. All three units had the ability to discharge effluents to the Millstone Stack, however, in March 2001, Unit 1 was separated from releasing to the stack and modifications were made to add two new release points, the Spent Fuel Pool Island Vent (SFPI) and the Balance of Plant Vent (BOP).

Unit 1 Spent Fuel Pool Island Vent (73 ft) and the Balance of Plant Vent (80 ft) releases are considered ground level and DOSAIR was used to calculate doses using 33 ft meteorology. Continuous ventilation of the spent fuel pool island and evaporation from the spent fuel pool water (H-3) release to the Spent Fuel Pool Island Vent. Continuous ventilation from other Unit 1 buildings and airborne releases from the reactor building evaporator are discharged to the BOP Vent.

Each of these doses were summed to determine the total Unit 1 airborne effluent dose.

Unit 2 Vent (159 ft) releases are considered mixed mode (partially elevated and partially ground) releases; and, Pasquill stability classes are determined based upon the temperature gradient between the 33 ft and 142 ft meteorological tower levels.

DOSAIR was used to calculate doses for Unit 2 mixed mode continuous releases (Auxiliary Building Ventilation and the Steam Generator Blowdown Tank flashed gases) and mixed mode batch releases (Containment Purge) through the Unit 2 Vent, and elevated batch releases (Waste Gas Decay Tanks and Containment Vents) through the Millstone Stack. The doses for these elevated batches were conservatively calculated using mixed mode 142 ft meteorology. Each of these doses were summed to determine the total Unit 2 airborne effluent dose. The Containment Equipment Hatch and the RWST Tank Vent releases are considered ground level and DOSAIR was used to calculate doses using 33 ft meteorology.

Unit 3 (142.5 ft) Vent releases are considered mixed mode (partially elevated and partially ground) releases; and, Pasquill stability classes are determined based upon the temperature gradient between the 33 ft and 142 ft meteorological tower levels.

DOSAIR was used to calculate doses for Unit 3 mixed mode continuous releases through the Unit 3 Vent (Auxiliary Building Ventilation), mixed mode batch releases (Containment Purge) through the Unit 3 Vent, and "initial" Containment Drawdown through the roof of the Auxiliary Building. Gaseous waste and containment drawdowns are released through the Unit 3 SLCRS system to the Millstone Stack (375 ft). The doses for these elevated releases were conservatively calculated using mixed mode 142 ft meteorology. In addition, the Engineered Safety Features Building (ESF) Vent releases are considered ground level and doses are calculated using 33 ft meteorology Each of these doses were summed to determine the total Unit 3 airborne effluent dose.

1.1.1.2 Liquid Effluents Maximum individual doses from the release of radioactive liquid effluents were calculated using the DOSLIQ program (Reference 10). This program uses the dose models and parameters cited In NRC Regulatory Guide 1.109 with site specific inputs to produce results similar to the LADTAP II code, (Reference 6).

1.1.2 Gamma and Beta Air Doses Maximum gamma and beta air doses from the release of noble gases are calculated using DOSAIR.

1.2 Dose Results 1.2.1 Airborne Effluents For the dose to the maximum individual, DOSAIR calculates the dose to the whole body, GI-tract, bone, liver, kidney, thyroid, lung, and skin from each of the following pathways: direct exposure from the plume and from ground deposition, inhalation, and ingestion of vegetation, cow and goat milk, and meat. The values presented are a total from all pathways; however, only the whole body, skin, thyroid and maximum organ (other than thyroid) doses are presented.

For the plume and inhalation pathways, the maximum individual dose is calculated at the off-site location of the highest decayed X/Q where a potential for dose exists.

For ground deposition, the maximum individual dose is calculated at both the off-site maximum land location of the highest X/Q and highest D/Q where a potential for dose exists.

For the vegetation pathway, the maximum individual dose is calculated at the vegetable garden of the highest D/Q except for the case when only tritium is released in which the maximum individual dose Is calculated at the vegetable garden with the highest X/.Q For the vegetation pathway, the calculated dose is included in the maximum individual's dose only at locations and times where these pathways actually exist.

For the meat, cow's milk, and goat's milk pathways, the calculated dose is included in the maximum individual's dose only at locations and times where these pathways actually exist.

To determine compliance with IOCFR50, Appendix I (Reference 7), the maximum individual whole body and organ doses include all applicable external pathways (i.e. plume and ground exposure) as well as the Internal pathways (inhalation and ingestion).

The air dose includes only the dose from noble gases in the plume.

The off-site doses from airborne effluents are presented in Table 1-1. These are the calculated maximum off-site doses.

1.2.2 Liquid Effluents The DOSLIQ code performs calculations for the following pathways: fish, shellfish, shoreline activity, swimming, and boating. Doses are calculated for the whole body, skin, thyroid, and maximum organ (GI-LLI, bone, liver, kidney, and lung).

The off-site doses from liquid effluents are presented in Table 1-2. These are the calculated maximum off-site doses.

1.2.3 Analysis of Results In the first quarter of 2003, Unit 2 shutdown due to a reactor trip and subsequent issues with the charging system. The noble gas and iodine activity concentration in the primary coolant was higher than normal due to the existence of small fuel pin leakage. This resulted in higher than normal releases. In addition, Unit 2 was shutdown in October for 2R15 refueling and maintenance. The leaking fuel pins were identified and moved from the reactor to the fuel storage pool. Although offsite doses were higher than normal during these two periods of time, the doses are well below the permissible levels in the REMODCM and the applicable sections of 10CFR50. The quarterly doses are presented in Tables 1-1 and 1-2.

Table 1-3 provides a quantitative dose comparison with limits specified in the REMODCM.

The data indicates that the total whole body and organ doses to the maximum offsite individual from Millstone Station including all sources of the fuel cycle are well within the limits of 40CFRI90 (Reference 8). On-site radioactive waste storage during this year was within storage criteria and the maximum dose to a member of the public was approximately 0.034 mrem/yr. The doses from airborne and liquid effluents were added to the estimated dose from on-site radioactive waste storage to show compliance with 40CFR1 90.

The Offsite Dose Comparison, Table 1-4, provides a perspective on the maximum offsite individual dose received from Millstone Station with the natural background radiation dose received by the average Connecticut resident. The total effective dose to the maximum individual received from Millstone Station is small in comparison to the dose received from natural background radiation.

Table 1-1 2003 Off-Site Dose Commitments from Airborne Effluents Millstone Units 1, 2, 3 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter Annual Total Max Air (mrad) (mrad) (mrad) (mrad) (mrad)

Beta O.OOE+00 O.OOE+00 O.OOE+00 0.00E+00 O.OOE+00 Gamma O.OOE+00 O.OOE+00 O.OOE+00 O.OOE+00 0.00+00 Max Individual (mrem) (mrem) (mrem) (mrem) (mrem)

Whole Body 1.51 E-04 3.17E-04 7.42E-04 4.24E-04 1.63E-03 Skin 1.66E-04 3.21 E-04 7.48E-04 4.63E-04 1.70E-03 Thyroid 1.51E-04 3.03E-04 7.19E-04 4.23E-04 1.60E-03 Max organ+ 1.52E-04 4.02E-04 8.73E-04 4.25E-04 1.85E-03 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter Annual Total Max Air (mrad) (mrad) (mrad) (mrad) (mrad)

Beta 2.61 E-02 5.98E-03 1.31 E-02 2.25E-02 6.77E-02 Gamma 8.17E-03 2.10E-03 5.89E-03 6.22E-03 2.24E-02 Max Individual (mrem) (mrem) (mrem) (mrem) (mrem)

Whole Body 5.80E-03 1.48E-03 3.84E-03 4.75E-03 1.59E-02 Skin 1.71 E-02 4.07E-03 1.03E-02 1.48E-02 4.63E-02 Thyroid 1.95E-02 2.08E-02 3.122-02 3.68E-02 1.08E-01 Max organ+ 6.07E-03 1.54E-03 3.96E-03 5.01 E-03 1.66E-02 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter Annual Total Max Air (mrad) (mrad) (mrad) (mrad) (mrad)

Beta 2.30E-05 2.98E-05 8.55E-07 6.31 E-06 5.99E-05 Gamma 4.97E-05 4.19E-05 1.27E-06 1.52E-05 1.08E-04 Max Individual (mrem) (mrem) (mrem) (mrem) (mrem)

Whole Body 1.81E-03 2.12E-03 4.11 E-03 7.75E-04 8.82E-03 Skin 1.84E-03 2.13E-03 4.11 E-03 7.85E-04 8.87E-03 Thyroid 1.81 E-03 2.12E-03 4.11 E-03 7.75E-04 8.82E-03 Max organ+ 1.82E-03 2.12E-03 4.11 E-03 7.75E-04 8.822-03

" Maximum of the following organs (not including thyroid): Bone, GI-LLI, Kidney, Liver, Lung

Table 1-2 2003 Off-Site Dose Commitments from Liquid Effluents Millstone Units 1, 2, 3 T T F 1st Quarter. ,1 2nd Quarter 3rd Quarter 4th Quarter Annual Annual Total Total Quarter.

let(mrem) Quarter 2nd(mrem) 4. 3rd Quarter 4. 4th Quarter 1 Max Individual (imre) (mrem) (mrem)

.Whole Body O.OOE+00 O.OOE+00 O.OOE+00 O.OOE+00 O.OOE+00 Thyroid O.OOE+00 O.OOE+00 O.OOE+00 O.OOE+00 O.OOE+00

.Max Organ :. O.OOE+00 O.OOE+00 O.OOE+00 O.OOE+00 O.OOE+00 I:.1st Quarter 2nd Quarter, 3rd Quarter 4th Quarter Annual Total Max In'dividual- (mrem) (mrem) (mrem) (mrem) (mrem)

Whole Body 5.88E-05 3.43E-03 5.63E-04 4.75E-04 4.52E-03 Thyroid . 6.71 E-05 1.23E-03 2.26E-04 2.02E-04 1.72E-03 Max Organ 1.07E-04 4.47E-03 2.04E-03 6.85E-03 1.35E-02

_st Quarter 2nd Quarter 3rd Quarter 4th Quarter Annual Total Max WIVdvdual. (mrem)

Whole Body Thyroid 7.74E-05 4.32E-05 (mrem) 6.99E-05 3.53E-05 (mrvem) 1.81 E-04 9.22E-05 (mrem) 5.14E-04 1.36E-04 l

I (mrem) 8.42E-04 3.07E-04 Max Organ 2.65E-04 2.83E-04 6.90E-04 2.49E-03 3.73E-03

Table 1-3 2003 Off-Site Dose Comparison to Limits Millstone Units 1, 2, 3 Airborne Effluents Max Individual Dose vs REMODCM Limits Whole Body Thyroid Max Organ" Skin Beta Air Gamma Air (mrem) (mrem) (mrem) (mrem) (mrad) (mrad)

Unit 1 1.63E-03 1.60E-03 1.85E-03 1.70E-03 O.OOE+00 0.00E+00 Unit 2 1.59E-02 1.08E-01 1.66E-02 4.63E-02 6.77E-02 2.24E-02 Unit 3 8.82E-03 8.82E-03 8.82E-03 8.87E-03 5.99E-05 1.08E-04 Millstone Station 2.63E-02 1.19E-01 2.73E-02 5.69E-02 6.78E-02 2.25E-02 KlEIRAW 1st$1 I "'AS4,as~

sr gw Liquid Effluents Max Individual Dose vs REMODCM Limits Whole Body Thyroid Max Organ"*

(mrem) (mrem) (mrem)

Unit I 0.00E+00 0.00E+00 O.OOE+00 Unit 2 4.52E-03 1.72E-03 1.35E-02 Unit 3 8.42E-04 3.07E-04 3.73E-03 Millstone Station 5.36E-03 2.03E-03 1.72E-02 Millstone Station Max Individual Dose vs 40CFRI90 Limits Whole Body Thyroid Max Organ (mrem) (mrem) (mrem)

Airborne Effluents 2.63E-02 1.1 9E-01 2.73E-02 Liquid Effluents 5.36E-03 2.03E-03 1.72E-02 Radwaste Storage 3.40E-02 3.40E-02 3.40E-02 Millstone Station 0.066 0.155 0.08 r- B [;9 F E m ~ -e-~

' 10CFR50. Appendix I Guidelines Maximum of the folloing organs (not incduding Thyroid) Bone, GI-ULI. Kidney. Liver, Lung

Table 1-4 2003 Offsite Dose Comparison Millstone Units 1, 2, 3 Natural Background Radiation Dose vs. Radiation Dose from Millstone Station Average Resident Natural Background Radiation Dose

  • Cosmic 27 mrem Cosmogenic 1 mrem Terrestial (Atlantic and Gulf Coastal Plain) 16 mrem Inhaled 200 mrem In the Body .

40 mrem Effective Whole Body Dose - 284 mrem Maximum Offsite Individual Millstone Station Whole Body Dose 0.07 mrem Thyroid Dose 0.15 mrem Maximum Organ (other than Thyroid) 0.08 mrem

2.0 Radioactivity 2.1 Airborne Effluents 2.1.1 Measurement of Radioactivity 2.1.1.1 Millstone Stack The MP2 WRGM and MP3 SLCRS continuously monitor the effluent activity concentration and flow rate to the Millstone Stack. Monthly gaseous grab samples are taken and analyzed for Isotopic content. The isotopic concentrations at the release point are multiplied by the total flow to the stack to obtain the total activity released for each isotope.

The gas washing bottle method accomplishes tritium collection. The sample is counted on a liquid scintillation detector. Concentration is multiplied by volume to get the total activity released.

Charcoal cartridges and particulate filters are used to collect iodines and particulates, respectively. These filters are then analyzed for isotopic content using a gamma spectrometer. Particulate filters are also analyzed for Sr-89, Sr-90 and gross alpha.

Isotopic concentrations are multiplied by the release flow rate and sampling time to determine the total amount of activity released.

2.1.1.2 Unit I Spent Fuel Pool Island (SFPI) Vent The SFPI monitor continuously records the effluent activity concentration and flow rate. Monthly gaseous grab samples are taken and analyzed for isotopic content.

The isotopic concentrations at the release point are multiplied by the total flow to the stack to obtain the total activity released for each isotope.

The gas washing bottle method accomplishes tritium collection. The sample is counted on a liquid scintillation detector. Concentration is multiplied by volume to get the total activity released.

Particulate filters are used to collect particulates. These filters are then analyzed for isotopic content using a gamma spectrometer. Particulate filters are also analyzed for Sr-90 and gross alpha. Isotopic concentrations are multiplied by the release flow rate and sampling time to determine the total amount of activity released.

2.1.1.3 Unit I Balance of Plant (BOP) Vent The BOP monitor continuously records the effluent activity concentration and flow rate. Monthly gaseous grab samples are taken and analyzed for Isotopic content.

The isotopic concentrations at the release point are multiplied by the total flow to the stack to obtain the total activity released for each isotope.

The gas washing bottle method accomplishes tritium collection. Prior to processing each batch from the Reactor building Evaporator a sample is collected and counted on a liquid scintillation detector. Concentration is multiplied by volume to get the total activity released.

Particulate filters are used to collect particulates. These filters are then analyzed for isotopic content using a gamma spectrometer. Particulate filters are also analyzed for Sr-90 and gross alpha. Isotopic concentrations are multiplied by the release flow rate and sampling time to determine the total amount of activity released.

2.1.1.4 Unit 2 Vent Effluent volume from the Unit 2 vent is multiplied by the Isotopic concentrations as measured by gamma spectrometer HPGe analysis for gases and liquid scintillation analysis for tritium to obtain the total activity released from the vent. The gas washing bottle method accomplishes tritium collection.

Since a major source of tritium is evaporation of water from the spent fuel pool, tritium releases were also estimated based upon amount of water lost and measured concentrations of the pool water. This amount was added to the amount measured by the grab sample technique.

Charcoal cartridges and particulate filters are used to collect iodines and particulates, respectively. These filters are then analyzed for isotopic content using a gamma spectrometer. Particulate filters are also analyzed for Sr-89, Sr-90 and gross alpha.

Isotopic concentrations are multiplied by the release flow rate and sampling time to determine the total amount of activity released.

2.1.1.5 Unit 2 Containment Purges ) Vents A purge is the process of discharging air from containment to maintain temperature, humidity, pressure, concentration, etc., where air Is replaced. Purges are considered batch releases and are filtered by HEPA and normally released through the Unit 2 vent. If necessary, the purge may be filtered by charcoal In the EBFS system and discharged to the Millstone Stack.

Gaseous grab samples (Noble Gas & Tritium) are taken and are analyzed on a HPGe gamma spectrometer and liquid scintillation detector for tritium. Computed concentrations are then multiplied by the calculated purge volume to obtain the total activity released. The gas washing bottle method accomplishes tritium collection.

A vent is the process of discharging air from containment usually once per week to maintain temperature, humidity, pressure, concentration without supplying replacement air. Weekly gaseous grab samples (Noble Gas & Tritium) are taken and are analyzed on a HPGe gamma spectrometer and liquid scintillation detector for tritium. Computed concentrations are then multiplied by the calculated containment vent volume to obtain the total activity released. The gas washing bottle method accomplishes tritium collection.

2.1.1.6 Unit 2 Waste Gas Decay Tanks Waste Gases from the Gaseous Waste Processing System are held for decay in waste gas decay tanks (6) prior to discharge through the Unit I Stack. Calculated

volume discharged is multiplied by the isotopic concentrations from the analysis of grab samples to determine the total activity released.

2.1.1.7 Unit 2 Steam Generator Blowdown Tank Vent A decontamination factor (DF) across the SGBD Tank vent was determined for iodines by comparing the results of gamma spectrometry, HPGe, analysis of the Steam Generator Blowdown water and grab samples of the condensed steam exiting the vent. This DF was applied to the total iodine releases via the Steam Generator Blowdown water to calculate the iodine release out the vent. An additional factor of 0.33 was utilized to account for the fraction of blowdown water actually flashing to steam in the Steam Generator Blowdown Tank.

2.1.1.8 Unit 2 Radwaste Storage Tank (RWST) Vent A decontamination factor (DF) of 100 was applied to the total iodine transferred from the RCS to the RWST water to estimate the iodine release out the vent. All noble gases are assumed to be released through the tank vent.

2.1.1.9 Unit 2 Containment Equipment Hatch Opening Samples of air near the opening are analyzed for particulates, iodines, during refueling outages. One containment volume is assumed to be released during the period that the equipment hatch is open to estimate the release.

2.1.1.10 Unit 3 Vent and ESF Building Vent Effluent volume from the Unit 3 ventilation vent is multiplied by the isotopic concentrations as measured by gamma spectrometer HPGe analysis for gases and liquid scintillation analysis for tritium to obtain the total activity released from the vent.

The gas washing bottle method accomplishes tritium collection.

Since a major source of tritium is evaporation of water from the spent fuel pool, tritium releases were also estimated based upon amount of water lost and measured concentrations of the pool water. This amount was added to the amount measured by the grab sample technique.

The Unit 3 Engineered Safety Features (ESF) building vent collects gas streams from the ESF building ventilation system.

Total effluent volume is multiplied by isotopic concentrations from the analysis of grab samples and composites to obtain the total activity released. These samples are obtained monthly for fission gases, weekly composites of filters for iodines and particulates, monthly composites of particulate filters for gross alpha and strontium.

2.1.1.11 Unit 3 Containment Drawdown and Purge Unit 3 containment is initially drawn down prior to startup and purged typically during outages. The initial drawdown is accomplished by using the containment vacuum steam jet ejector and releases through an unmonitored vent on the roof of the

auxiliary building. The containment vacuum pump discharge, which maintains subatmospheric pressure following initial drawdown, is released through the Millstone Stack.

The purge is the process of discharging air from containment to maintain temperature, humidity, pressure, concentration, etc., where air is replaced. Purges are normally released through the Unit 3 Vent. Intermittent purges and drawdowns are considered continuous releases since they occur usually 1 or 2 times a week.

For initial drawdowns and purges, the calculated volume discharged is multiplied by isotopic concentrations from the analysis of grab samples to obtain total activity released. These are considered as batch releases.

A ground level release of radioactivity may occur during outages from the containment building through the open equipment hatch. The calculated volume discharged is multiplied by Isotopic concentrations from the analysis of grab samples to obtain total activity released.

2.1.1.12 Unit 3 Containment Equipment Hatch Opening Samples of air near the opening are analyzed for particulates, iodines, during refueling outages. One containment volume is assumed to be released during the period that the equipment hatch is open to estimate the release.

2.1.2 Estimate of Errors Estimates of errors associated with radioactivity measurements were made using the following guidelines:

Sampling/Data Collection 10% Variation in data collection Sample Line Loss 10% Deposition of some nuclides Calibration 10% Calibration to NBS standards Sample Counting 10% Error for counting statistics Flow & Level Measurements 10% Error for release volumes

2.1.3 Batch Releases - Airborne Effluents Unit 1 - None Unit 2 Ctmt Purges WGDT Ctmt Vents Number of Batches 5 15 37 Total Time (min) 2,040 5,688 5,436 Maximum Time (min) 660 590 248 Average Time (min) 408 379 147 Minimum Time (min) 240 15 52 Unit 3 Ctmt Purges Drawdowns Number of Batches 0 0 Total Time (min) 0 0 Maximum Time (min) 0 0 Average Time (min) 0 0 Minimum Time (min) 0 0 2.1.4 Abnormal Airborne Releases An abnormal airborne release of radioactivity is defined as an increase in airborne radioactive material released to the environment that was unplanned or uncontrolled due to an unanticipated event. These do not include normal routine effluent releases from anticipated operational and maintenance occurrences such as power level changes, reactor trip, opening primary system loops, degassing, letdown of reactor coolant or transferring spent resin and do not include non-routine events such as minor leakages from piping, valves, pump seals, tank vents, etc.

In2003, the following abnormal airborne releases occurred:

2.1.4.1 Unit 1 - None 2.1.4.2 Unit 2 -

On March 7, 2003 at 1439, with the plant at full power and SP 2401 D'RPS Matrix Testing" in progress, a reactor trip occurred due to a malfunction of the 'A-C" Matrix Relay Test switch. This was followed by an automatic turbine trip. All control rods inserted into the core and all electrical busses transferred properly following the trip.

Auxiliary Feed initiated automatically on low steam generator level, which is an anticipated response. Following the plant trip, normal secondary heat removal systems (condenser steam dumps, atmospheric steam dumps) did not respond as designed resulting in 6 of 16 Steam Generator (SG) Safety Relief Valves lifting. The two backup charging pumps started in response to the plant cooldown, however charging flow did not increase as expected and eventually, all charging flow was lost.

While attempting to restore charging, the operating crew identified discrepancies in charging inventory and declared an Unusual Event (UE) due to RCS leakage. Initially, the crew could not account for all of the discharge flow from the operating charging pumps. They were uncertain if there was a break somewhere inside Containment in addition to the leakage In the charging pump cubicle area and decided to conservatively declare the UE. This decision was made within the first thirty minutes of the event.

Plant conditions continued to be monitored, and it became clear to the operating crew that there were no breaks other than those already identified in the charging pump cubicle area. The Containment Sump level had increased and was pumped down soon after the trip. This was normal, as there is a great deal of condensation inside Containment following a plant trip. Eventually, charging capability was established via the alternate charging path and with suction aligned to the RWST. Once charging flow was restored, plant cooldown proceeded slowly resulting in a second Unusual Event declaration for failure to reach Mode 5 within the time required by Technical Specifications. In addition, during plant cooldown, the frequency of having to pump the Containment Sump increased, indicating a possible leak inside Containment.

Once the unit was cooled down to Mode 4, a containment entry was made and the source of RCS leakage was determined to be from the 'C' RCP vapor seal leakoff.

The plant was then maintained on the Shutdown Cooling system in mode 5.

Releases to the Unit 2 Vent from the auxiliary building were largest at the start of the incident with the charging pump releases. Several minor releases occurred via this pathway within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The Chemistry department estimated the Tritium release via the steam safeties to be 6.50E-04 Ci.

Early in the event the operating crew declared an Unusual Event (UE) due to RCS leakage. Leakage into containment was determined to be from the 'Co RCP seal leakoff. The containment was purged to the Millstone Stack via the Enclosure Building Filtration System (EBFS). The iodines from the Millstone Stack monitor were included in the Containment Purge activity table below.

This sequence of events resulted in an unplanned airborne radioactive release and is therefore considered an Nabnormal release' in accordance with Reg Guide 1.21. The Millstone Unit 2 Auxilliary Building Ventilation Vent releases during the period as well as the subsequent Containment Purge were considered to be due to this event. The amount of iodines released was higher than normal due to fuel defects.

The corrective action process identified and implemented changes in equipment and procedures to prevent recurrence.

I I I I A. Fission & Activation Gases Ar-41 Ci -

Kr-85 Ci 4.37E+00 Kr-85m Ci 9.06E-03 Xe-131 m Ci 3.34E-01 Xe-133 Ci 7.51 E+00 2.86E+01 Xe-1 33m Ci 1.78E-01 4.04E-01 Xe-135 Ci 1.16E-01 3.61 E-01 Total Activity Ci 7.81 E+00 3.41 E+01 B. lodines 1-131 Ci 1.93E-03 2.75E-05 1-133 Ci 2.36E-04 5.16E-06 Total Activity Ci 2.17E-03 3.27E-05 C. Particulates Total Activity Ci D. Gross Alpha Gross Alpha Ci E. Tritium IH-3 I Ci I 6.50E-04 I 5.64E-01 Aux Bldg Vent

SUMMARY

OF DOSES TO MAXIMUM INDIVIDUAL Case Analyzed: M2SB 103 Quarter I Maximum Air mrad) Beta: l .27E-03 Gamma: 1.14E-03 Maximum Individual (mrem)

Whole Body: 7.81 E-04 Skin: 2.06E-03 Thyroid: 1.33E-02 Maximum Organ: 8.26E-04

SUMMARY

OF DOSES TO MAXIMUM INDIVIDUAL Ctmnt Purge Case Analyzed: M2MF P103 Quarter I Maximum Air (mrad) Beta: 1.58E42 Gamma: 4.31E43 Maximum Individual (mrem)

Whole Body: 2.69E403 Skin: 9.69E43 Thyroid: 2.85E43 Maximum Organ: 2.85E43 2.1.4.3 Unit 3 - None

2.2 Liquid Effluents 2.2.1 Measurement of Radioactivity 2.2.1.1 Liquid TankslSumps There are numerous tanks & sumps that are used to discharge liquids containing radioactivity to the environs; they are:

Unit 1 None (All liquid processed by the Reactor Building Evaporator)

Unit 2 Clean Waste Monitor Tanks (2)

Aerated Waste Monitor Tank CPF Waste Neutralization Sump & Turbine Building Sump Steam Generator Bulk Unit 3 High Level Waste Test Tanks (2)

Low Level Waste Drain Tanks (2)

Boron Test Tanks CPF Waste Neutralization Sump & Turbine Building Sump Steam Generator Bulk Prior to release, a tank is re-circulated for two equivalent tank volumes, a sample is drawn and then analyzed on the HPGe gamma spectrometer and liquid scintillation detector for individual radionuclide composition. Isotopic concentrations are multiplied by the volume released to obtain the total activity released. A proportional aliquot of each discharge is retained for composite analysis for Sr-89, Sr-90, Fe-55 and gross alpha.

2.2.1.2 Unit 2 and Unit 3 Steam Generator Blowdown Steam generator blowdown water grab samples are taken and analyzed on the HPGe gamma spectrometer and liquid scintillation detector if required by the conditional action requirements of the REMODCM. Total volume of blowdown is multiplied by the isotopic concentrations (if any) to determine the total activity released via blowdown. A proportional aliquot of each discharge is retained for composite analysis for Sr-89, Sr-90, Fe-55 and gross alpha if required by the conditional action requirements of the REMODCM. Tritium is determined through liquid scintillation counting. Unit 2 is a continuous release while Unit 3 recycles blowdown except for periodic open cycle blowdown.

2.2.1.3 Unit 2 and Unit 3 Continuous Liquid Releases Grab samples are taken for continuous liquid release pathways and analyzed on the HPGe gamma spectrometer and liquid scintillation detector. Total estimated volume is multiplied by the Isotopic concentrations (if any) to determine the total activity released. A proportional aliquot of each discharge is retained for composite analysis for Sr-89, Sr-90, Fe-55 and gross alpha if required by the conditional action requirements of the REMODCM. Tritium is determined through liquid scintillation counting. Pathways for continuous liquid effluent releases include, Steam Generator

Blowdown, Service Water Effluent, and Turbine Building Sump discharge from Units 2 & 3.

2.2.2 Estimate of Errors Estimates of errors associated with radioactivity measurements were made using the following guidelines:

Sampling/Data Collection 10% Variation in data collection Calibration 10% Calibration to NBS standards Sample Counting 10% Error for counting statistics Flow & Level Measurements 10% Error for release volumes 2.2.3 Batch Releases - Liquid Effluents Unit I Unit 2 Unit 3 Number of Batches 0 67 281 Total Time (min) 0 7,306 30,448 Maximum Time (min) 0 466 211 Average Time (min) 0 109 108 Minimum Time (min) 0 12 3 Average Stream Flow Not Applicable - Ocean Site 2.2.4 Abnormal Liquid Releases An abnormal release of radioactivity is the discharge of a volume of liquid radioactive material to the environment that was unplanned or uncontrolled.

In 2003, the following abnormal liquid releases occurred:

2.2.4.1 Unit 1 - None 2.2.4.2 Unit 2 On April 22, 20 totes were staged in the Unit 2 Turbine Building access area in preparation for temporarily storing TB sump water while the sump was isolated for the replacement of the charcoal in the treatment beds. Mistakenly, "low dose" totes were requested from Waste Services, instead of 'H-3 only contaminated" totes. When Waste Services issues "low dose" totes, they expect the water stored in these totes to be returned for treatment.

On April 23'during the day, seven totes filled; and, from 20:00 April 23 to 05:00 April 24, they were drained, untreated by Waste Services, into the TB floor trough near the tote staging area through the TB sump charcoal treatment beds into Yard Drain DSNO06 and then into the Niantic Bay.

From 07:00 April 24 to 06:00 April 25 during the weekly sampling of Yard Drain DSNO06, radioactive contamination other than tritium was discovered.

For further details refer to:

(1) RER-03-001 Gamma Contamination in Storm Drain System and Cs-137 Contamination in Unit 2 Turbine Building East Sump, Rev 0, April 28, 2003; (2) RP-03-02 MP2 Turbine Building Sump Contamination, Rev 0, Approved May 30, 2003.

The following source term and dose consequences were determined:

Co-60 5.40E-05 Ci Cs-1 37 2.42E-04 Ci Whole Body 3.16E-03 mrem Thyroid 1.10E-03 mrem Maximum Organ 4.14E-03 mrem 2.2.4.3 Unit 3 - None

Table 2.1-Al Millstone Unit 1 Airborne Effluents Release Summary I Units l 1st Qtr l 2nd Qtr l 3rd Qtr I 4th Qr I Total l A. Fission & Activation Gases

1. Total Activity Ci NOD NOD NOD j N/D N/D Released No Activity Detected
2. Average Period uC~sec ____

Release Rate B. Iodine-131

1. Total Activity Ci N/D N/D I N/D N/D N/D Released No Activity Detected
2. Average Period uCi/sec _ _ _

Release Rate C. Particulates

1. Total Activity Ci 2.81 E-06 2.53E-06 2.26E-06 6.98E-06 1.46E-05 Released . .
2. Average Period uCilsec 3.61 E-07 3.22E-07 2.85E-07 8.79E-07 4.63E-07 Release Rate D. Gross Alpha
1. Total Activity Ci N/D NID l N/D N/D N/D Released I I No Activity Detected NOD = Not Detected

Table 2.1-A2 Millstone Unit 1 Airborne Effluents Elevated Continuous

< After 1Q-2001, Unit 1 ventilation releases were seperated from elevated Millstone Stack >

Nclides Released I Units I 1st Qtr l 2nd Qtr l 3rd Qtr l 4th Qtr l Total A. Fission & Activation Gases I ci I - I - I - I - I -

lTotal Activity I Ci I - I - I - I N/D B. lodines11-131 l Ci l -

lTotal Activity _ Ci - - - N/D C. Particulates11-131 l Ci l - I - - j ITotal Activity I Ci I - - - N/D D. Gross Alpha lGross Alpha Ci I - - - - N/D E. Tritium lH-3 Ci j - - j N/D N/D = Not Detected

Table 2.1-A3 Millstone Unit 1 Airborne Effluents Ground Continuous - Balance of Plant Vent & Spent Fuel Pool Island Vent Nuclides Released I Units l 1st Qtr I 2nd Qtr l 3rd Qtr 4th Qtr I Total A. Fission & Activation Gases I ci I - I - - I -

ITotal Activity I Ci - - - - ND B. lodines11-131 Ci I -

lTotal Activity I Ci - - N/D C. Particulates 1-131 Ci Co-58 Ci 2.41 E-07 2.41 E-07 Cs-137 Ci 2.81 E-06 2.29E-06 2.26E-06 6.98E-06 1.43E-05 Total Activity Ci 2.81 E-06 2.53E-06 2.26E-06 6.98E-06 1.46E-05 D. Gross Alpha Gross Alpha Ci - - I - l NID E. Tritium H-3 I Ci 2.19E-01 1.90E-01 3.71 E-01 8.44E-01 1.62E+OOl N/D = Not Detected

Table 2.1-L1 Millstone Unit I Liquid Effluents Release Summary (Quany Release Point)

<< No Liquid Discharges>>

I Units I 1st Qtr I 2nd Qtr I 3rd Qtr I 4th Qtr I Total A. Fission and Activation Products

1. Total Activity Ci N/D l N/D N/D N/D l N/D Released No Activity Detected
2. Average Period uCi/ml _ l _ l Diluted Activity llll B. Tritium
1. Total Activity Cl N/D N/D N/D N/D N/D Released No Activity Detected
2. Average Period uCVml _ l _

Diluted Activity l l__

C. Dissolved and Entrained Gases

1. Total Activity Ci NID l N/D l NID N/D N/D Released C_ No Activity Detected
2. Average Period uCl/ml _ _ _ _

Diluted Activity D. Gross Alpha

1. Total Activity Ci N/D N/D l N/D N/D N/D Released I No Activity Detected E. Volume
1. Released Waste Liters Volume
2. Dilution Volume Uters l During Releases
3. Dilution Volume Uters _ _ _ _

During Period .

N/D = Not Detected

Table 2.1-L2 Millstone Unit I Liquid Effluents Batch (Quary Release Polnt)

<<a No Liquid Discharges>>

Nuclides l Released IUnitsI 1st Qtr I 2nd Qtr 3rd Qtr 4th Qtr Total A. Fission &Activation Products I Ci I- - I - I - - I lTotal Activity I Ci Il -  :

-  : N/D B. Tritium H-3 Ci - ] - - - N/D C. Dissolved & Entrained Gases lTotal ActivityI Ci - l l l lI l D. Gross Alpha IGross Alpha I Ci I - - l N/D N/D = Not Detected

Table 2.2-Al Millstone Unit No. 2 Airborne Effluents - Release Summary I Units I 1st Qtr I 2nd Qtr I 3rd Qtr I 4th Qtr l Total A. Fission & Activation Gases

1. Total Activity Ci 7.64E+01 1.75E+01 3.15E+01 1.85E+02 3.11 E+02 Released
2. Average Period uC/sec 9.82E+00 2.22E+00 3.96E+00 2.33E+01 9.85E+OO Release Rate B. Iodine-131
1. Total Activity Ci 2.24E-03 5.89E-04 4.09E-04 9.1 OE-03 1.23E-02 Released
2. Average Period uCisec 2.89E-04 7.49E-05 5.14E-05 1.14E-03 3.91 E-04 Release Rate C. Particulates
1. Total Activity Ci 5.32E-07 4.46E-07 2.37E-07 1.30E-04 1.31 E-04 Released
2. Average Period uCi/sec 6.85E-08 5.67E-08 2.98E-08 1.63E-05 4.15E-06 Release Rate D. Gross Alpha
1. Total Activity Ci N/D N/D l N/D l ND NOD 1 Released I I No Activity Detected E. Tritium N/D = Not Detected

Table 2.2-A2 Millstone Unit No. 2 Airborne Effluents - Mixed Continuous - Aux Bldg Vent & SGBD Tank Vent

& Spent Fuel Pool Evaporation Nuclides I Released I Units 1st Qtr 2nd Qtr I 3rd Qtr I 4th Qtr I Total I A. Fission & Activation Gases Ar-41 Ci 6.17E-01 6.17E-01 Kr-85 Ci 1.97E+00 1.97E+00 Kr-85m Ci 9.06E-03 1.34E-01 1.80E-02 1.61E-01 Xe-131 m Ci Xe-133 Ci 3.56E+01 1.51 E+01 2.55E+01 4.85E+01 1.25E+02 Xe-133m Ci 1.78E-01 5.01 E-01 6.79E-01 Xe-135 Ci 1.86E+00 6.39E-01 1.08E+00 1.19E+00 4.77E+O0 Total Activity Ci 3.77E+01 1.58E+01 2.93E+01 5.02E+01 1.33E+02 B. lodines 1-131 Ci 2.22E 5.88E-04 4.08E-04 4.22E-03 7.43E-03 1-132 Ci 9.60E-05 2.96E-05 1.70E-04 7.25E-05 3.68E-04 1-133 Ci 4.93E-04 8.19E-04 7.72E-04 9.82E-04 3.07E-03 1-135 Ci 2.1 OE-04 4.64E-04 j 4.98E-04 2.46E-04 1.42E-03

,Total Activity Ci 3.01 E-03 1.90E-03 1.85E-03 5.52E-03 1.23E-02 C. Particulates 1-131 Ci ---

Co-58 Ci - 2.14E-06 2.14E-06 Co-60 Ci -

Mn-54 Ci -

Ba-140 Ci -

Cs-137 Ci 5.32E-07 4.46E-07 2.08E-07 8.1OE-07 2.OOE-06 Total Activity Ci 5.32E-07 j 4.46E-07 j 2.08E-07 j 2.95E-06 4.13E-06

0. Gross Alpha Gross Alpha Ci I - - l N/D E. Tritium IH-3 I Ci I 4.79E+00 3.53E-01 4.11 E-01 1.92E+00 7.48E+00O N/D = Not Detected

Table 2.2-A3 Millstone Unit No. 2 Airborne Effluents - Mixed Batch - Containment Purges Nuclides I Released I Units 1st Qtr 2nd Qtr I 3rd Otr I 4th Qtr I Total I A. Fission & Activation Gases Ar-41 Ci 2.29E-03 2.29E-03 Kr-85 Ci 4.37E+00 - 3.92E+00 8.29E+00 Kr-85m Ci - - 7.37E-03 7.37E-03 Xe-1 31 m Ci 3.34E-01 - - 3.60E-01 6.94E-01 Xe-1 33 Ci 2.86E+01 - - 2.75E+01 5.61 E+01 Xe-1 33m Ci 4.04E-01 - - 5.02E-01 9.05E-01 Xe-135 Ci 3.61 E-01 - - 1.16E+00 1.52E+00 Xe-1 35m Ci - - 2.73E-03 2.73E-03 Total Activity Ci 3.41 E+01 3.34E+01 6.75E+01 B. lodines

  • 1-131 Ci 2.75E-05 - - j l 2.75E-05 1-132 1-133 Total Activity Ci Ci Ci l

5.1 6E-06 3.27E-05 l

j T

I l

j I

j 5.16E-06 l 3.27E-05 C. Particulates 1-131 17 c l Br-82 ____

Cs-1 37 Ci _ - - _ _ _

Total Activity Ci I - - - - N/D D. Gross Alpha IGross Alpha Ci I - I N/D E. Tritium IH-3 Ci I 5.64E-01 - - 5.60E-02 6.20E-01

  • lodines attributed to containment purge via Millstone Stack N/D = Not Detected

Table 2.2-A4 Millstone Unit No. 2 Airborne Effluents - Elevated Batch - WGDT Nuclides g 11 I Released I Units 1st Qtr -l 2nd Qtr l 3rd Qtr I 4th Qtr I Total I A. Fission & Activation Gases Ar-41 Ci - - - j Kr-85 Ci 2.78E-03 1.23E+00 1.52E+00 6.12E+00 8.88E+oo Kr-85m Ci - - -

Kr-87 Ci - - --

Kr-88 Ci - - -

Xe-131 m Ci - - - 4.36E-02 4.36E-02 Xe-133 Ci - 1.i1IE-01 1.11 E-01 Xe-133m Ci Xe-I 35 Ci 5.87E-05 5.87E-05 Xe-1 35m Ci Total Activity Ci 2.78E-03 1.23E+00 1.52E+00 1 6.28E+00 5.87E-05 B. lodines 1-131 Ci l Total Activity Ci l/D I - I - NID C. Particulates 1-131 l Ci l - - I NI Total Activity Ci - - - N/D D. Gross Alpha lGross Alpha Ci I - I N/D E. Tritium lH-3 Ci I 6.92E-07 I 2.34E-04 2.79E-04 I 1.14E-03 I 1.66E-03 N/D = Not Detected

Table 2.2-A5 Millstone Unit No. 2 Airborne Effluents - Elevated - Containment Vents/Site Stack Nuclides I Released I Units 1st Qtr 2nd Qtr I 3rd Qtr 4th Qtr Total I A. Fission & Activation Gases Ar-41 Ci 1.82E-02 2.05E-02 2.37E-02 1.06E-02 7.30E-02 Kr-85 Ci 5.36E-01 1.33E-01 3.51 E-01 4.07E-02 1.06E+OO Kr-85m Ci 2.83E-05 1.39E-02 1.91 E-04 5.89E-05 1.41 E-02 Xe-131 m Ci 5.94E-03 5.20E-04 5.63E-03 1.21 E-02 Xe-133 Ci 3.76E+00 2.89E-01 2.83E-01 8.68E+01 9.11 E+01 Xe-133m Ci 1.77E-03 2.75E-03 1.1 OE+OO 1.1 OE+OO Xe-135 Ci 2.95E-01 3.37E-03 4.34E-03 1.64E-01 4.68E-01 Total Activity ] Ci 4.62E+00 4.62E-01 6.70E-01 8.81 E+01 9.39E+01 B. lodines

  • 1-131 Ci 8.43E-07 4.19E-07 2.25E-05 2.38E-05 1-133 Ci 7.32E-06 7.32E-06 1-135 Ci 1.48E-06 1.48E-06 Total Activity I Ci 8.43E-07 4.19E-07 J 3.13E-05 3.25E-05 C. Particulates 1-131 Ci Co-58 Ci 1.1OE-04 1.1 OE-04 Co-60 Ci 5.25E-07 5.25E-07 Cs-1 34 Ci 8.79E-06 8.79E-06 Cs-136 Ci 1.64E-06 1.64E-06 Cs-137 Ci 2.88E-08 5.61 E-06 5.64E-06 Sb-124 Ci  ; 3.12E-07 3.12E-07 Total Activity Ci - 2.88E-08 1 1.27E-04 1.27E-04 D. Gross Alpha Gross Alpha Ci I - i I - N/D E. Tritium IH-3 Ci I 2.85E-01 4.25E-01 1.35E-01 2.49E-01 1.09E+OO
  • Prior to charcoal filtration
    • 1st Qtr iodines shown in containment purge via stack in Table 2.2-A3 N/D = Not Detected

Table 2.2-A6 Millstone Unit No. 2 Airborne Effluents - Ground Batch - Containment Equipment Hatch Nuclides Released Units 1st Qtr I 2ndQtr I 3rd Qtr I 4thQtr I Total I A. Fission & Activation Gases Ar-41 Ci Kr-85 Ci Kr-85m Ci----

Kr-87 Ci -

Kr-88 Ci----

Xe-131 m Cl _ _ - -

Xe-1 33 Ci 3.07E-01 3.07E-01 Xe-1 33m Ci Xe-1 35 Ci 7.53E-03 7.53E-03 Xe-1 35m Ci Total Activity Ci - I 3.15E-01 7.53E-03 B. lodines 1-131 lCi 6.94E-07 l6.94E-07 1-133 Ci I 9.22E-07 1 9.22E-07 Total Activity Ci I - 1.62E-06 l 1.62E-06 C. Particulates 1-131 Ci Co-58 Ci 9.99E-09 1.52E-08 Cs-I 37 Ci 9.97E-09 9.97E-09 Total Activity [ Ci - 2.OOE-08 2.52E-08 D. Gross Alpha lGross Alpha I Ci - - - - T NID E. Tritium H-3 Ci - - - l NID N/D = Not Detected

Table 2.2-A7 Millstone Unit No. 2 Airborne Effluents - Ground Batch - RWST Vent Nuclides I I Released I Units 1st Qtr -l 2nd Qtr I 3rd Qtr I 4th Qtr l Total A. Fission & Activation Gases Ar-41 Ci Kr-85 Ci Kr-85m Ci Xe-131 m Ci 1.33E-01 1.33E-01 Xe-133 Ci 6.41 E+00 6.41 E+00 Xe-133m Ci 1.39E-01 1.39E-01 Xe-135 Ci 1.70E-01 1.70E-01 Total Activity Ci - i 6.85E+00 6.85E+00 B. lodines 1-131 Ci 4.86E-03 4.86E-03 1-132 Ci - 1.27E-03 1.27E-03 1-133 Ci 7.37E-04 7.37E-04 Total Activity Ci 6.87E-03 6.87E-03 C. Particulates 1-131 Ci----

Co-58 Ci Co-60 Ci Cs-134 Ci Cs-136 Ci Cs-137 Ci Sb-1 24 Ci Total Activity I Ci I-I-N/D D. Gross Alpha lGross Alpha I Ci I - - - N/D E. Tritium H-3 Ci I - 9.98E-01 I 9.98E-01 N/D = Not Detected

Table 2.2-L1 Millstone Unit 2 Liquid Effluents Release Summary (Quarry Release Point)

I Units l 1st Qtr I 2nd Qtr I 3rd Qtr I 4th Qtr I Total A. Fission and Activation Products

1. Total Activity Ci 2.88E-03 2.46E-02 5.71 E-02 4.50E-02 1.30E-01 Released
2. Average Period uCi/mj 1.16E-11 9.66E-11 1.99E-1 0 2.49E-10 1.33E-1 0 Diluted Activity B. Tritium
1. Total Activity Ci 1.21 E+02 1.89E+02 2.05E+02 1.1OE+02 6.24E+02 Released m
2. Average Period uCi/ml 4.85E-07 7.42E-07 7.14E-07 6.08E-07 6.43E-07 Diluted Activity _ ___

C. Dissolved and Entrained Gases

1. Total Activity Ci 1.53E-01 2.62E-01 7.05E-01 8.43E+00 9.55E+0O Released
2. Average Period uCi/mi 6.15E-10 1.03E-09 2.46E-09 4.67E-08 9.84E-09 Diluted Activity D. Gross Alpha 7 Total Activity Released I Ci I

N/D N/D N/D No Activity Detected N/D 7 N/D E. Volume

1. Released Waste Liters 2.90E+07 3.50E+05 8.04E+05 9.47E+05 3.11 E+07 Volume"')
2. Dilution Volume Liters 1.28E+09 1.82E+09 3.50E+09 4.11 E+09 1.07E+1 0 During Releases(2) _ _ _ _
3. Dilution Volume Liters 2.49E+1 1 2.55E+1 T2.87E+11 T 1.80E+1 1 9.70E+1 l During Period-Notes:

(1) Includes Batch and Continuous Released Waste Volumes (2)Includes only Batch Dilution Volumes During Releases: Dilution Volumes can not be accurately determined for Continuous releases NID = Not Detected

Table 2.2-L2 Millstone Unit 2 Liquid Effluents Continuous - SGBD, SW, RBCCW (Quarry Release Point)

Nuclides Released I Units 1st Qtr l 2nd Qtr I 3rd Qtr 4th Qtr Total A. Fission & Activation Products Cs-34 Ci .39E-06 1.39E-06 Cs-1l37 Ci 4.31 E-06 4.31 E-06 Total Activity Ci 5.70E-06 5.70E-06 B. Tritium H-3 Ci l 1.62E-01 3.26E-04 2.49E-05 5.70E-03 1.68E-01 C. Dissolved& Entrained Gases Z 1 ciI - I - I - I - - I ITotal Activity - ND D. Gross Alpha lGross Alpha I Ci - - - - N/D N/D = Not Detected

Table 2.2-L3 Millstone Unit 2 Liquid Effluents Batch - LWS, Milstone Stack Sump (Quarry Release Point)

Nuclides _

Released I Units l 1st Qtr l 2nd Qtr I 3rd Qtr l 4th Qtr l Total A. Fission & Activation Products Ag-11Om Ci I1.39E-06 3.82E-04 1.23E-03 1.61 E-03 Ba-140 Ci 3.41 E-04 3.41 E-04 Ba-1 42 Ci 5.27E-04 5.27E-04 Co-57 Ci 6.95E-06 1.82E-06 5.41 E-05 6.94E-05 1.32E-04 Co-58 Ci 3.76E-04 6.81 E-03 3.88E-03 5.54E-03 1.66E-02 Co-60 Ci 5.19E-04 2.91 E-04 1.55E-02 8.26E-03 2.46E-02 Cr-51 Ci 1.1 3E-03 1.1 3E-03 Cs-134 Ci 8.20E-05 7.24E-03 1.05E-02 1.40E-03 1.92E-02 Cs-1 37 Ci 9.35E-05 5.52E-03 8.85E-03 1.23E-03 1.57E-02 Fe-55 Ci 5.97E-04 6.37E-04 6.21 E-03 1.89E-02 2.63E-02 Fe-59 Ci 1.63E-05 8.43E-06 6.52E-04 6.76E-04 1-131 Ci 1.91 E-04 3.04E-04 2.19E-06 6.66E-04 9.72E-04 1-132 Ci 6.74E-05 6.74E-05 La-1 40 Ci 5.58E-06 5.50E-04 5.56E-04 Mn-54 Ci 2.76E-06 6.01 E-05 2.62E-04 6.94E-04 1.02E-03 Mo-99 Ci 2.56E-05 2.56E-05 Nb-95 Cl 2.55E-06 5.90E-04 5.93E-04 Nb-97 Ci 2.97E-06 2.97E-06 Np-239 Ci - - 1.78E-05 1.78E-05 Ru-103 Ci - - - 8.61 E-06 8.61 E-06 Ru-105 Ci - - - 1.09E-05 1.09E-05 Sb-122 Ci - - - 2.33E-05 2.33E-05 Sb-1 24 Ci - 5-.29E-05 5.29E-05 Sb-1 25 Ci 9.93E-04 3.63E-03 1.09E-02 2.90E-03 1.84E-02 Sn-1 13 Ci 2.05E-04 2.05E-04 Sn-117m Ci 1.26E-05 1.26E-05 Sr-89 Ci 7.81 E-05 1.32E-05 1.26E-04 2.18E-04 Sr-90 Ci 1.16E-06 1.16E-06 Sr-92 Ci 1-.89E-05 1.89E-05 Tc-99m Ci - 2.83E-05 2.83E-05 Te-132 Ci - 5.53E-05 5.53E-05 Zr-95 Ci - 2.22E-04 2.22E-04 Total Activity Ci 2.88E-03 2.46E-02 5.71 E-02 4.50E-02 1.30E-01 B. Tritium H-3 Ci 1.20E+02 1.89E+02 2.05E+02 1.1OE+02 6.24E+02

Table 2.2-13 (Cont)

Millstone Unit 2 Liquid Effluents Batch - LWS, Milstone Stack Sump (QuarryRelease Point)

Nuclides Released I Units r 1st Qtr I 2nd Qtr 3rd Qtr 4th Qtr Total C. Dissolved & Entrained Gases Kr-85 Ci 5.92E-02 l 2.41 E-01 3.94E-01 9.47E-01 1.64E+00 Xe-131 m Ci 3.89E-03 3.09E-03 1.46E-02 1.23E-01 1.45E-01 Xe-133 Ci 8.98E-02 1.83E-02 2.96E-01 7.31 E+00 7.72E+00 Xe-133m Ci 1.45E-04 4.34E-04 4.47E-02 4.53E-02 Xe-135 Ci 2.09E-04 6.61 E-04 8.70E-04 Total Activity Ci 1.53E-01 2.62E-01 7.05E-01 8.43E+00 9.55E+00 D. Gross Alpha

[Gross Alpha Ci - - l N/D D

N/D = Not Detected

Table 2.2-L4 Millstone Unit 2 Liquid Effluents Release Summary (Yard Drain DSN 006 Release Point)

I Units I 1st Qtr l 2nd Qtr I 3rd Qtr I 4th Qtr I Total I A. Fission and Activation Products

1. Total Activty Ci N/D 2.42E-04 N/D N/D 2.42E-04 Released
2. Average Period uCi/ml _ 1.08E-08 2.70E-09 Diluted Activity B. Tritium
1. Total Activity Ci 1.41 E-02 4.32E-03 1.34E-04 1.83E-02 3.69E-02 Released
2. Average Period uCi/mi 6.40E-07 1.93E-07 5.93E-09 8.11 E-07 4.12E-07 Diluted Activity C. Dissolved and Entrained Gases
1. Total Activity Ci N/D N/D N/D 1 N/D l N/D Released _ No Activity Detected
2. Average Period luCilml l - l _

Diluted Activity D. Gross Alpha

1. Total Activity Ci N/D N/D N/D N/D N/D Released E. Volume
1. Released Waste Liters 2.27E+06 7.42E+05 6.18E+04 1.71 E+06 4.79E+06 Volume (3_
2. Dilution Volume Liters _ _

4 During Releases t _4 .

3. Dilution Volume Liters 1.98E+07 2.16E+07 2.25E+07 2.09E+07 8.47E+07 During Period _

Notes:

(3) Includes only Continuous Released Waste Volumes

'4)Dlluton Volumes can not be accurately determined for Continuous releases N/D = Not Detected

Table 2.2-L5 Millstone Unit 2 Liquid Effluents Continuous - Turbine Building Sump (Yard Draln DSN 006 Release Point)

Nuclides Released I Units I 1st Qtr 2nd Qtr I 3rd Qtr 4th Qtr Total A. Fission & Activation Products Co-60 Ci - *5 40E-05 5.40E-05 Cs-137 Ci - j *2.42E-04 - - 2.42E-04 Total Activity Ci 2.42E-04 2.42E-04 B. Tritium JH-3 Ci l 1.41 E-02 l 4.32E-03 I 1.34E-04 I 1.83E-02 I 3.69E-02 C. Dissolved & Entrained Gases II Cil I - I - I - I - I Total Activity I Ci - - - - ND D. Gross Alpha IGross Alpha ICi I -- NOD

  • Abnormal Release (4/23/03-4/25/03)

N/D = Not Detected

Table 2.3-Al Millstone Unit No. 3 Airborne Effluents - Release Summary l Units 1st Qtr tr I 3rd Qtr I 4th Qtr I Total I A. Fission & Activation Gases

1. Total Activity Cl 6.20E-02 2.82E-02 2.49E-03 2.86E-02 1.21 E-01 Released
2. Average Period uCisec 7.98E-03 3.59E-03 3.14E-04 3.60E-03 3.85E-03 Release Rate B. Iodine-131
1. Total Activity Ci NOD NOD l NOD N/D j N/D Released No Activity Detected
2. Average Period uCi/sec Release Rate C. Particulates
1. Total Activity Ci 3.74E-07 N/D 9.43E-06 5.27E-05 6.25E-05 Released _
2. Average Period uCi/sec 4.81 E-08 1.1 9E-06 6.63E-06 1.98E-06 Release Rate D. Gross Alpha
1. Total Activity Ci NID O NID jND N/D NID Released I No Activity Detected E. Tritium N/D = Not Detected

Table 2.3-A2 Millstone Unit No. 3 Airborne Effluents - Mixed Continuous - Normal Ventilation &

Spent Fuel Pool Evaporation Nuclides 1k Released Units I1st Qtr l2nd Qtr 3rd Qtr 4th Qtr Total A. Fission & Activation Gases Xe-131 m Ci Xe-133 Ci Xe-135 Ci Total Activity Ci - N/D B. lodines 1-131 l C 1-133 Ci Total Activity Ci _ _ NID C. Particulates 1-131 Ci _

Co-58 Ci -

Co-60 Ci -

Cr-51 Ci Mn-54 Ci Br-82 Ci 4.16E-05 4.16E-05 Ru-1 06 Ci Sr-89 Ci Sr-90 Ci Total Activity I Ci l - - [ 4.16E-05 l 4.16E-05 D. Gross Alpha IGross Alpha I Ci - - - - N/D E. Tritium IH-3 Ci 1.87E+01 1.17E+01 1.32E+01 1.09E+01 5.45E+01 l N/D = Not Detected

Table 2.3-A3 Millstone Unit No. 3 Airborne Effluents - Ground Continuous - ESF Building Ventilation Nuclides Released I Units 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr T A. Fission & Activation Gases jKr-87 I Ci I - I 8.72E-03 8.72E-03 ITotal Activity ICi I 8.72E-03 I - 8.72E-03 B. lodines 1-131 Ci 1-133 Ci Total Activity Ci NID C. Particulates 1-131 Ci Co-58 Ci Cr-51 Ci -

Hf-181 Ci Mn-54 Ci Sr-89 Ci ----

Sr-90 Ci Total Activity Ci l - l l l D. Gross Alpha lGross Alpha I Ci I - - l l N/D E. Tritium I H-3 I Ci I - - - l NID N/D = Not Detected

Table 2.3-A4 Millstone Unit No. 3 Airborne Effluents - Mixed Batch - Containment Drawdowns

<< No Activity Detected >>

Nuclides Released I Units 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr Total A. Fission & Activation Gases Xe-131m Ci - - - - -

Total Activity I Ci I - - - - NID B. lodines 1-131 _____I _____

1-133 CiY~ .

Total Activity Ci - N/D JCi 1 1 C. Particulates11-131 Nb-97 jCi --

_ _  : . -Nl Total Activity Cl - - D D. Gross Alpha lGross Alpha I Ci I - - - - l NID E. Tritium H-3 I Ci l l N/D N/D = Not Detected

Table 2.3-A5 Millstone Unit No. 3 Airborne Effluents - Mixed Batch - Containment Purges

<< No ActivityDetected >>

Nuclides Released Units 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr Total A. Fission & Activation Gases Xe-133 l Ci -

Xe-135 j Ci I - _

Total Activity Ci l - __N/D -

B. lodines 1-131 l Ci l - j - l - j -

i-133 T ci I - 1 Total Activity Ci Al - r_-I__T-_ N/D C. Particulates 1-131 Ci l -

i-133 Ci l -- -- -

TotalActivity C' l - _ - I N/D I D. Gross Alpha Gross Alpha Ci - - - - N/D NO E. Tritium H-3 Ci - - - I l N/D N/D = Not Detected

Table 2.3-A6 Millstone Unit No. 3 Airborne Effluents - Elevated Continuous - Gaseous Waste System

& Containment Vents Nuclides I Released I Units 1st Qtr I 2nd Qtr I 3rd Qtr I 4th Qtr I Total I A. Fission & Activation Gases Ar-41 Ci 1.09E-02 1.63E-02 5.43E-04 1.87E-02 4.64E-02 Kr-85m Ci 3.53E-03 3.51 E-05 3.57E-03 Kr-87 Ci 5.18E-03 5.18E-03 Kr-88 Ci 6.89E-03 6.89E-03 Xe-133 Ci 4.33E-03 2.34E-03 1.80E-03 7.53E-03 1.60E-02 Xe-1 35 Ci 2.80E-03 8.81 E-04 1.49E-04 2.40E-03 6.23E-03 Xe-1 35m Ci 2.OOE-02 2.OOE-02 Xe-1 38 Ci 8.40E-03 8.40E-03 Total Activity I Ci 6.20E-02 1.95E-02 2.49E-03 2.86E-02 1.1 3E-01 B.

1-131 lodines; 1-133 l Ci Ci l

l

- l -

1 l - l Total Activity I i - - l - _N/D C. Particulates 1-131 Ci Co-58 Ci 1.74E-07 1.74E-07 Co-60 Ci 1.43E-07 2.79E-07 4.22E-07 Cr-51 Ci Cs-137 Ci Mn-54 Ci 5.68E-08 5.68E-08 Nb-95 Ci Ru-106 Ci Zr-95 Ci Br-82 Ci 9.43E-06 1.08E-05 2.02E-05 Total Activity Ci 3.74E-07 I 9.43E-06 l 1.11 E-05 2.09E-05 D. Gross Alpha Gross Alpha I Cl I - - N/D E. Tritium IH-3 I Ci 6.60E-01 2.43E+00 7.49E-01 1.27E+00 5.11 E+Ol N/D = Not Detected

Table 2.3-L1 Millstone Unit 3 Liquid Effluents Release Summary (Quarry Release Point)

I Unitsl 1st Qtr I 2nd Qtr I 3rd Qtr i 4th Qtr I Total A. Fission and Activation Products

1. Total Activity Ci 6.56E-03 4.73E-03 1.39E-02 3.46E-02 5.99E-02 Released
2. Average Period uCi/mi 1.51 E-1 1 1.01 E-1 I 2.96E-1 1 7.35E-1 1 3.25E-1 1 Diluted Activity B. Tritium
1. Total Activity Ci 9.37E+01 7.34E+01 2.22E+02 2.65E+02 6.54E+02 Released
2. Average Period uCUml 2.15E-07 1.57E-07 4.71 E-07 5.62E-07 3.55E-07

.Diluted Activity C. Dissolved and Entrained Gases

1. Total Activity Ci N/D 1.68E-05 1.29E-05 6.08E-06 3.58E-05 Released
2. Average Period uCilml _ 3.60E-14 2.74E-14 1.29E-14 1.94E-14 Diluted Activity D. Gross Alpha
1. Total Activity lC N/D N/D l ND N/D Released E. Volume
1. Released Waste Liters 5.03E+06 5.54E+06 1.1 3E+07 1.19E+07 3.38E+07 Volume__)
2. Dilution Volume Liters 9.40E+09 2.66E+10 9.73E+09 7.43E+09 5.32E+10 During Releases_2_
3. Dilution Volume Liters 4.36E+11 4.66E+11 4.71 E+11 4.71 E+11 1.84E+1 2 During Period Notes:

(1) Includes Batch and Continuous Released Waste Volumes (2) Includes only Batch Dilution Volumes During Releases; Dilution Volumes can not be accurately determined for Continuous releases N/D = Not Detected

Table 2.3-L2 Millstone Unit 3 Liquid Effluents Continuous - SGBD, SW, TK2 (Quarty Release Point)

Nuclides Released l Units I 1st Qtr l 2nd Qtr l 3rd Qtr l 4th Qtr l Total A. Fission & Activation Products iI ci I - I I 1 - I -

lTotalActivity I Ci II T N/D B. Tritium H-3 I Ci I 1.14E-01 I 2.13E-01 2.47E-01 2.06E-01 7.80E-01l C. Dissolved & Entrained Gases I ci I I I - I lTotalActivity iI - N/D D. Gross Alpha lGross Alpha I Ci - - - N/D i N/D = Not Detected

Table 2.3-L3 Millstone Unit 3 Liquid Effluents Batch - LWS (Quarry Release Point)

Nuclides Released I Units i 1st Qtr I 2nd Qtr I 3rd Qtr I 4th Qtr l Total A. Fission &Activation Products As-76 Ci 1.08E-05 1.08E-05 Ba-I 40 Ci 2.50E-04 2.50E-04 Co-57 Cl 5.70E-06 5.70E-06 Co-58 Ci 2.81 E-04 3.60E-05 3.52E-04 8.21 E-05 7.52E-04 Co-60 Ci 8.53E-04 5.51 E-05 1.59E-03 4.40E-03 6.91 E-03 Cs-1 37 Ci 2.88E-04 4.90E-04 1.44E-04 9.22E-04 Fe-55 Ci 3.25E-03 3.62E-03 9.14E-03 2.88E-02 4.49E-02 Mn-54 Ci 1.51 E-04 3.48E-04 5.13E-04 1.01 E-03 Nb-95 Ci 3.31 E-05 2.08E-05 5.39E-05 Nb-97 Ci 7.71 E-05 7.71 E-05 Sb-125 Cl 2.03E-03 6.76E-04 1.73E-03 5.63E-04 4.99E-03 Sr-91 Ci 5.11 E-06 5.11 E-06 Zr-95 Ci 2.1 OE-05 2.1 OE-05 Total Activity Ci 6.56E-03 4.73E-03 I 1.39E-02 3.46E-02 5.99E-02 B. Tritium H-3 9.36E+01 I 7.32E+01 2.22E+02 2.64E+02 I 6.53E+02 C. Dissolved & Entrained Gases IXe-135 I Ci I - I 1.68E-05 I 1.29E-05 i 6.08E-06 3.58E-05 lTotal Activity I Ci I - 1.68E-05 I 1.29E-05 I 6.08E-06 I 3.58E-05 D. Gross Alpha IGross Alpha I Ci - - - - N/D NID = Not Detected

Table 2.3-L4 Millstone Unit 3 Liquid Effluents Batch - CPF Waste NeutralizationSumps, Hotwell, SIG Bulk (Quarry Release Point)

Nclides*

Released Units I 1st Qtr I 2nd Qtr l 3rd Qtr l 4th Qtr T Total A. Fission & Activation Products Ic I II - I -I lTotal Activity Ci N/D B. Tritium IH-3 Cil 1.19E-02 2.20E-02 3.17E-02 2.15E-02 8.70E-02 C. Dissolved & Entrained Gases II ci I I -

Total Activity i - l N/D D. Gross Alpha lGross Alpha I Ci - - - - NID N/D = Not Detected

Table 2.3-L5 Millstone Unit 3 Liquid Effluents Release Summary (Yard Drain DSN 006 Release Point)

__ 1_

I Units 1st Qtr 2nd Qtr I 3rd Qtr 4th Qtr I Total A. Fission and Activation Products

1. Total Activity Ci NID N/D N/D N/D l N/D Released No Activity Detected
2. Average Period uCilml _ _ _ l _ _

Diluted Activity B. Tritium

1. Total Activity Ci 2.06E-02 4.07E-02 5.01 E-02 3.73E-02 1.49E-01 Released ____
2. Average Period uCi/mi 9.33E-07 1.82E-06 2.22E-06 1.65E-06 1.66E-06 Diluted Activity C. Dissolved and Entrained Gases
1. Total Activity C N/D NND N/D l N/D N/D Released No Activity Detected
2. Average Period uCl/ml _

Diluted Activity D. Gross Alpha

1. Total Activity Ci N/D N/D N/D N/D NID Released E. Volume
1. Released Waste Liters 4.75E+05 4.87E+05 1.74E+06 1.69E+06 4.39E+06 Volumet3) _
2. Dilution Volume Liters _ _ _ _

During Releasest4) _ _ _

3. Dilution Volume Liters 2.16E+07 2.18E+07 2.08E+07 2.09E+07 8.51 E+07 During Period Notes:

(3)Includes only Continuous Released Waste Volumes Daution Volumes can not be accurately determined for Continuous releases Dl)

N/D = Not Detected

Table 2.3-L6 Millstone Unit 3 Liquid Effluents Continuous - Turbine Building Sump (Yard Drain DSN 006 Release Point)

Nuclides Released I Units l 1st Qtr I 2nd Qtr l 3rd Qtr l 4th Qtr l Total l A. Fission &Activation Products I ci I - - I - - I Total Act ivity Ci l N/D B. Tritium lHI3 Z Ci 2.04E-02 3.95E-02 4.64E-02 3.45E-02 1.41 E-01 C. Dissolved & Entrained Gases I ci- I - I lTotalActivity i - N/D D. Gross Alpha Gross Alpha Ci - - - - N/D N/D = Not Detected

Table 2.3-L7 Millstone Unit 3 Liquid Effluents Continuous- WTTBerm Water (Yard Drain DSN 006 Release Point)

I Nuclides IReleased I Units 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr Total A. Fission & Activation Products I IciI - I - I - - I -

ITotal Activity I Ci I - - I N/D B. Tritium lH-3 Ci I 2.16E-04 1.18E-03 3.71E-03 2.75E-03 7.86E-03 C. Dissolved & Entrained Gases I ICi - I - I - -- I lTotal Activity I Ci i - - - N/D D. Gross Alpha lGross Alpha Ci - - - NID NID = Not Detected

2.3 Solid Waste Solid waste shipment radioactivity summaries for each unit are given in the following tables:

Table 2.1-S Unit 1 Solid Waste and Irradiated Component Shipments Table 2.2-S Unit 2 Solid Waste and Irradiated Component Shipments Table 2.3-S Unit 3 Solid Waste and Irradiated Component Shipments The principal radionuclides in these tables were from shipping manifests.

Solidification Agent(s):

No solidification on site for 2003 Containers routinely used for radioactive waste shipment include:

55-gal Steel Drum DOT 17-H container 7.5 ft3 Steel Boxes 45 ft3 87 ft3 95 ft3 122 ft3 Steel Container 202.1 ft3 Steel "Sea Van" 1280 ft3 Polyethylene High Integrity Containers 120.3 ft3 132.4 ft3 173.4 ft3 202.1 ft3

Table 2.1-S Solid Waste and Irradiated Component Shipments Millstone Unit I January 1, 2003 through December 31, 2003 A. SOLID WASTE SHIPPED OFFSITE FOR BURIAL OR DISPOSAL (Not irradiated fuel)

1. Type of Waste
a. Spent resins, Filter sludges, Evaporator bottoms, etc.
c. Irradiated components, Control rods, etc.
d. Other - (Grease, Oil, Oily waste)
d. Other - (Water)
d. Other - (Mixed Waste)

From Millstone Nuclear Power Station to Diversified Scientific jServices. Kingston. TN for Incineration. Fuel Blending. etc.

From Millstone Nuclear Power Station to Peffna-Fix of Florida, Inc.. 2.4681 E-01 IGalnesville. FL for Stabrilzation. Fuel Blending. etc. IXVCi V.1 1.4832E-03 1 25% 1 Dominion Nuclear Connecticut Millstone Power Station Page 1 of 27 Unit 1 Section

2. Estimate of major nuclide composition (by type of waste)
b. Dry compressible waste, Contaminated equipment, etc.

From Millstone Nuclear Power Station to Duratek Inc.. Kingston, TN for Super-Compaction. Incineration. etc.

IRtidibirfiahl iddfl 3'V'PWbf4TbtW'xe'IIV-TVQ--1C`

dr,dnvL,: II l

H-3 3.99 2.7978E-03 C-14 <0.01 2.3340E-06 Cr-51 Mn-54 Fe-55 39.88 2.7948E-02 Fe-59 Co-57 Co-58 Co-60 15.87 1.1122E-02 Ni-59=

Ni-63 2.38 1.6689E-03 Zn-65 Sr-89 Sr-90 2.01 1.4059E-03 Nb-94 Zr-95 Nb-95 Tc-99 Ru-103 Ru-106 Ag-108m Ag-110m Sn-113 . -

Sb-1 24 Sb-1 25 1-125 1-129 Cs-1 34 Cs-137 35.82 2.5101 E-02 Ba-140 . -

Ce-141 Ce-1 44 <0.01 4.1400E-06 Gd-153 U-235 U-238 Pu-238 1.0680E-06 Pu-239 <0.01 5.61 OOE-07 Pu-241 0.04 2.8270E-05 Am-241 <0.01 1.9140E-06 Cm-242 Cm-243 Cm-244 <0.01 9.9700E-07

-gCURIES (TA ILyr+! 7.0083E-02 Dominion Nuclear Connecticut Millstone Power Station Page 2 of 27 Unit 1 Section
2. Estimate of major nuclide composition (by type of waste)
b. Dry compressible waste, Contaminated equipment, etc.

From Millstone Nuclear Power Station to Duratek Inc., Oak Ridge. TN for Super-Compaction, Incineration, etc.

i RadiEWiMclide&'AI V.41total5Ž2 I .6 riesir I H-3 0.31 8.6300E-03 C-14 <0.01 2.6640E-04 Cr-51 Mn-54 Fe-55 50.61 1.4230E+00 Fe-59 __ _ __ _ _

Co-57 Co-58 Co-60 13.05 3.6705E-01 Ni-59 Ni-63 3.03 8.5200E-02 Zn-65 Sr-89 _ _

Sr-90 1.02 2.8808E-02 Nb-94 Zr-95 Nb-95 Tc-99 Ru-1 03 Ru-1 06 Ag-I 08m _

Ag-1 10 m Sn-I 13 Sb-I 24 Sb-125 1-125 _

1-129 Cs-134 Cs-I 37 31.21 8.7748E-01 Ba-140 Ce-141 _

Ce-144 0.35 9.9600E-03 Gd-153 U-235 __ _

U-238 Pu-238 0.01 3.6600E-04 Pu-239 <0.01 1.8390E-04 Pu-241 0.25 7.1 OOOE-03 Am-241 0.08 2.361 OE-03 Cm-242 <0.01 5.9600E-08 Cm-243 Cm-244 0.05 1.3770E-03

, IES.-(T, 2.8118E+00 Dominion Nuclear Connecticut Millstone Power Station Page 3 of 27 Unit 1 Section

2. Estimate of major nuclide composition (by type of waste)
c. Irradiated components, Control rods, etc.

From Millstone Nuclear Power Station to Chem-Nudear Services LLC. Bamwell, SC for Burial

r. _. , .. . .. ... _..................... .........

P'Ri:rdiddiiiblide:iiP,Wo-iof..Tdtb IL*

___Es_

_ _w____r_______________~tW w

IP-411ft".XG,

.L* U(I H-3 <0.01 1.6430E-03 C-14 0.01 3.2474E+00 Cr-51 <0.01 2.1 761 E-02 Mn-54 0.06 1.3834E+01 Fe-55 36.74 8.9944E+03 Fe-59 <0.01 2.9230E-03 Co-57 <0.01 3.9980E-03 Co-58 <0.01 7.7800E-03 Co-60 52.97 1.2967E+04 Ni-59 0.07 1.8297E+01 Ni-63 10.13 2.4808E+03 Zn-65 <0.01 9.8020E-02 Sr-89 <0.01 1.9090E-05 Sr-90 <0.01 1.0361 E-01 Nb-94 <0.01 7.3090E-02 Zr-95 <0.01 1.8620E-03 Nb-95 <0.01 5.6320E-03 Tc-99 <0.01 5.2340E-04 Ru-1 03 <0.01 2.3450E-03 Ru-106 <0.01 4.0240E-02 Ag-108m <0.01 6.5500E-03 Ag-110m <0.01 8.0122E-03 Sn-113 Sb-124 <0.01 4.5870E-03 Sb-1 25 <0.01 7.5800E-03 1-125 1-129 <0.01 4.0850E-05 Cs-1 34 <0.01 5.3600E-03 Cs-137 <0.01 3.5510E-01 Ba-140 <0.01 1.1123E-03 Ce-1 41 <0.01 8.3400E-03 Ce-144 <0.01 1.1850E-02 Gd-1 53 U-235 <0.01 2.6400E-08 U-238 <0.01 7.3900E-08 Pu-238 <0.01 6.6800E-04 Pu-239 <0.01 5.191 OE-04 Pu-241 <0.01 3.9800E-02 Am-241 <0.01 3.5950E-03 Cm-242 <0.01 1.1450E-05 Cm-243 <0.01 1.1290E-03 Cm-244 <0.01 2.1360E-03

.X ¢URIES .,,TA)!t 2.4479E+04 Dominion Nuclear Connecticut Millstone Power Station Page 4 of 27 Unit I Section

2. Estimate of major nuclide composition (by type of waste)
d. Other - (Grease, Oil, Oily waste)

From Millstone Nuclear Power Station to Duratek Inc.. Kingston, TN for Super-Compaction, Incineration, etc.

I~tad~~cldel Mg.°~t~fXilbalEt.4aRUd.16s) 11l H-3 0.01 8.5000E-08 C-14 Cr-51 Mn-54 1.61 1.1500E-05 Fe-55 51.64 3.7000E-04 Fe-59 Co-57 Co-58 1.25 8.9667E-06 Co-60 17.68 1.2667E-04 Ni-59 I Ni-63 14.19 1.0167E-04 Zn-65 Sr-89 Sr-90 0.25 1.7767E-06 Nb-94 I Zr-95 0.60 4.2667E-06 Nb-95 0.64 4.6000E-06 Tc-99 Ru-103 Ru-106 Ag-108m Ag-11 Om Sn-113 Sb-124 Sb-1 25 1-125 1-129 Cs-1 34 1.29 9.2667E-06 Cs-137 10.84 7.7667E-05 Ba-140 Ce-141 Ce-144 Gd-1 53  ;

U-235 U-238 Pu-238 Pu-239 Pu-241 Am-241 Cm-242 Cm-243 Cm-244 TA; 7.1646E-04 Dominion Nuclear Connecticut Millstone Power Station Page 5 of 27 Unit I Section

2. Estimate of major nuclide composition (by type of waste)
d. Other - (Water)

From Millstone Nuclear Power Station to Duratek Inc.. Oak Ridge, TN for Incineration lI ~fadinlllid~l

.;JO~fgoal 7-7737catls§sin1 H-3 84.50 3.2245E-02 C-14 0.25 9.3691 E-05 Cr-51 Mn-54 0.13 5.1333E-05 Fe-55 7.34 2.801 8E-03 Fe-59 Co-57 0.01 4.7433E-06 Co-58 0.01 5.4986E-06 Co-60 5.12 1.9544E-03 Ni-59 Ni-63 1.80 6.8663E-04 Zn-65_.

Sr-89 Sr-90 <0.01 2.2160E-06 Nb-94 Zr-95 Nb-95 <0.01 7.1OOOE-07 Tc-99 <0.01 3.2000E-06 Ru-103 Ru-106 Ag-108m Ag-1I1m Sn-113 Sb-1 24 Sb-125 0.02 6.7633E-06 1-125 <0.01 3.7400E-06 1-129 <0.01 6.7933E-07 Cs-1 34 0.04 1.5200E-05 Cs-1 37 0.67 2.5602E-04 Ba-140 Ce-I 41 Ce-144 <0.01 8.1160E-10 Gd-I 53 0.02 6.5700E-06 U-235 U-238 0.02 6.6000E-06 Pu-238 Pu-239 Pu-241 Am-241 0.04 1.3920E-05 Cm-242 Cm-243 Cm-244

?C UlulESX(JS TALI)*-f I 3.8158E-02 Dominion Nuclear Connecticut Millstone Power Station Page 6of27 Unit I Section

2. Estimate of major nucilde composition (by type of waste)
d. Other - (Mixed Waste)

From Millstone Nuclear Power Station to Diversified Scientific Services. Kingston, TN for Incineration. Fuel Blending. etc.

I.Radion lided iddi fXTotal iA, tiCki il H-3 99.64 1.1283E-05 C-14 Cr-51 Mn-54 <0.01 4.7667E-10 Fe-55 0.10 1.1640E-08 Fe-59 Co-57 <0.01 1.2867E-10 Co-58 0.02 2.5800E-09 Co-60 0.06 7.2407E-09 Ni-59 Ni-63 0.09 9.8733E-09 Zn-65 Sr-89 Sr-90 <0.01 1.1 853E-1 0 Nb-94 Zr-95 Nb-95 <0.01 1.3367E-1 1 Tc-99 Ru-103 Ru-106 Ag-1 08m Ag-1 IOm Sn-113 Sb-1 24 Sb-125 <0.01 3.7333E-10 1-125 _ _ _

1-129 Cs-1 34 0.03 3.7000E-09 Cs-1 37 0.05 5.1 833E-09 Ba-140 Ce-1 41 __ _ _ _ _

Ce-144 Gd-153 U-235 U-238 Pu-238 Pu-239 Pu-241 Am-241 Cm-242 Cm-243 Cm-244 CUr-;RIES(lAL):k 1.1 324E-05 Dominion Nuclear Connecticut Millstone Power Station Page 7 of 27 Unit I Section

2. Estimate of major nuclide composition (by type of waste)
d. Other - (Mixed Waste)

From Millstone Nudear Power Station to Perma-Fix of Florida, Inc., Gainesville, FL for Stabilization, Fuel Blending, etc.

Il;Rddi onucl idde.Am~/~flia s1St#Gre B.QI l H-3 0.63 9.3028E-06 C-14 0.37 5.5467E-06 Cr-51_ _ _ _ _ _

Mn-54 0.68 1.0112E-05 Fe-55 29.69 4.4034E-04 Fe-59 Co-57 Co-58 0.93 1.3844E-05 Co-60 21.10 3.1297E-04 Ni-59 Ni-63 15.97 2.3679E-04 Zn-65 Sr-89 Sr-90 0.09 1.3075E-06 Nb-94 Zr-95 0.48 7.1557E-06 Nb-95 1.04 1.5409E-05 Tc-99 Ru-1 03 Ru-1 06 _

Ag-108m Ag-1 Om Sn-1 13 Sb-124 Sb-1 25 0.41 6.0997E-06 1-125 1-129 Cs-1 34 0.48 7.1557E-06 Cs-137 28.12 4.1713E-04 Ba-140 Ce-141 Ce-144 Gd-1 53 U-235 U-238 Pu-238 Pu-239 Pu-241 Am-241 Cm-242 Cm-243 Cm-244 fIz:'GU0RlES. !(T-AL bZ~j&. 1.4832E-03 Dominion Nuclear Connecticut Millstone Power Station Page 8 of 27 Unit 1 Section

3. Solid Waste Disposition (Shipments from Millstone) itNUmIb',f2Ship mtents*j Mode ofqfans, tatioii'Nz 4 Truck (Sole Use Vehicle) IChem-Nuclear Services LLC, Barnwell, SC I Truck (Sole Use Vehicle) Diversified Scientific Services, Kingston, TN 4 Truck (Sole Use Vehicle) lDuratek Inc. - Kingston, TN 7 -Truck (Sole Use Vehicle) lDuratek Inc. - Oak Ridge, TN 2 'Truck (Sole Use Vehicle) TPerma-Fix of Florida Inc. - Gainesville FL
  • hln icalesh~w-Ure ~otadeifned' n wh~-~s0,03ah B. IRRADIATED FUEL SHIPMENTS (Disposition) mbbnf'Shipnibhtsl.1*Mode'bofjTxar-s tt - t jNo ShipmentsIn 2003 INIA IN/A Dominion Nuclear Connecticut Millstone Power Station Page 9 of 27 Unit 1 Section

Table 2.2-S Solid Waste and Irradiated Component Shipments Millstone Unit 2 January 1, 2003 through December 31, 2003 A. SOLID WASTE SHIPPED OFFSITE FOR BURIAL OR DISPOSAL (Not Irradiated fuel)

1. Type of Waste
a. Spent resins, Filter sludges, Evaporator bottoms, etc.

i Millstone Nuclear Power Station to Studsvik essIng Center LLC, Erwin, TN for Thermal Destruction

b. Dry compressible waste, Contaminated equipment, etc.

From Millstone Nuclear Power Station to Duratek Inc..

Kingston. TN for Super-Compaction, Incineration. etc.

c. Irradiated components, Control rods, etc.

No shipments during this report period - n/a

na n/a
d. Other - (Grease, Oil, Oily waste)
d. Other - (Water) d.

Dominion Nuclear Connecticut Millstone Power Station Page 10 of 27 Unit 2 Section

2. Estimate of major nuclide composition (by type of waste)
a. Spent resins, Filter sludges, Evaporator bottoms, etc.

From Millstone Nuclear Power Station to Duratek Inc.. Kingston. TN for Super-Compaction, Incineration, etc.

I 6~~

H-3 +

C-14 Cr-51 Mn-54 0.76 9.6140E-05 Fe-55 34.42 4.3390E-03 Fe-59 Co-57 Co-58 2.52 3.1780E-04 Co-60 21.52 2.7130E-03 Ni-59 Ni-63 29.54 3.7240E-03 Zn-65 Sr-89 Sr-90 Nb-94 Zr-95 Nb-95 Tc-99 Ru-103 Ru-106 Ag-1 08m Ag-110m Sn-113 Sb-1 24 Sb-125 1-125 1-129 Cs-134 3.82 4.8150E-04 Cs-I 37 7A1 9.3380E-04 Ba-140 Ce-141 Ce-144 Gd-153 U-235 U-238 Pu-238 Pu-239 Pu-241 Am-241 Cm-242 Cm-243 Cm-244 LIRIE 1.2605E-02 Dominion Nuclear Connecticut Millstone Power Station Page I1 of 27 Unit 2 Section

2. Estimate of major nuclide composition (by type of waste)
a. Spent resins, Filter sludges, Evaporator bottoms, etc.

From Millstone Nuclear Power Station to Studsvik Processing Center LLC. Erwin. TN for Thermal Destruction iIbRadi nuclide' I.__________s_ Iid'1 WOMOf o - 7T6t IIrie - I H-3 0.03 1.0529E-02 C-14 0.40 1.4141 E-01 Cr-51 Mn-54 0.91 3.2120E-01 Fe-55 10.95 3.861 OE+00 Fe-59 Co-57 Co-58 0.04 1.4405E-02 Co-60 1.90 6.6980E-01 Ni-59 _ _ _ _ _

Ni-63 2.33 8.2330E-01 Zn-65 <0.01 3.0500E-03 Sr-89 <0.01 3.4300E-05 Sr-90 0.11 3.8860E-02 Nb-94 Zr-95 Nb-95 Tc-99 Ru-103 Ru-106 _

Ag-108m Ag-110m Sn-113 Sb-124 Sb-125 1-125 1-129 <0.01 3.6370E-04 Cs-134 32.37 1.1414E+01 Cs-137 50.69 1.7875E+01 Ba-140 Ce-141 Ce-144 0.26 9.001IOE-02 Gd-1 53 _ __

U-235 U-238 Pu-238 <0.01 1.8900E-05 Pu-239 <0.01 4.311 OE-05 Pu-241 <0.01 3.1150E-03 Am-241 Cm-242 Cm-243 _

Cm-244 <0.01 2.1 0OOE-05 ifflT.P-.6U$I!ESAT( . -3.5266E+01 Dominion Nuclear Connecticut Millstone Power Station Page 12 of 27 Unit 2 Section

2. Estimate of major nuclide composition (by type of waste)
b. Dry compressible waste, Contaminated equipment, etc.

From Millstone Nuclear Power Station to Duratek Inc., Kingston, TN for Super-Compaction, Incineration, etc.

FI Mad_idn tfd_id __ftI__t AlIl -Jifit 6sr;iI i

H-3 0.58 .ti1 t6620E-03 C-14 0.10 3-.0252E-04 Cr-51 _ _ _ * -3 'i~' :

Mn-54 0.04 ;1; .0840E-04 Fe-55 29.37  ;,' '8.4720E-02 Fe-59  ; :-_______

Co-57 __ _ _ _ _ , '

Co-58 3.67 .; I'0570E402 Co-60 19.49 x 5.6198E-02 Ni-59 _______________ ,

Ni-63 24.35 :7.0238E-02 Zn-65 _ _ _ _ . .".

Sr 89: ... ;.i4 '

Sr-90 <0.01 £.-5.4450E-06 Nb-94 _ Ls Zr-95 <0.01 .' 626350E-05 Nb-95 0.02 4-. 5.0600E-05 Tc-99  ;

Ru-1 03 -

Ru-1 06 Ag-108m ___________

Ag-110m ____________ F .

Sn-113 13 . -

Sb-1 24 ; ; ; . ______

Sb-125 __________ ....

1-125 _ _____ - - ___

1-129 .r V.

Cs-134 10.00 i,-L'2.8839E-02 Cs-1 37 11.70 :s ,-.3 3754E02 Ba-140 .

Ce-141 .S; -. 7;-.

Ce-144 0.38  ;' 1.0936E-03 Gd-153 _ - L .-

U-235 __ i(  ;

U-238 ,:

Pu-238 <0.01  :;; 1.2486E-05 Pu-239 <0.01 z,9.8578E'06 Pu-241 0.27 -:r-4,7.8441 E-04 Am-241 <0.01 >-:1 18297E-05 C m -242 ___________________-.

Cm-243 l  :-_________

Cm-244 <0.01 .j' .6095E-OS

44isXCU RIE*S,(i[QoTAl '2p 2.8841 E-01 Dominion Nuclear Connecticut Millstone Power Station Page 13 of 27 Unit 2 Section
2. Estimate of major nuclide composition (by type of waste)
d. Other -(Grease, Oil, Oily waste)

From Millstone Nuclear Power Station to Duratek Inc.. Kingston. TN for Super-Compaction, Incineration, etc.

H-3 0.01 3.3115E-07 C-14 T4:

Cr-51 Mn-54 1.59 4.4452E-05 Fe-55 51.70 1.4415E-03 Fe-59 Co-57 Co-58 1.21 3.3750E-05 Co-60 17.67 4.9267E-04 Ni-59 Ni-63 14.23 3.9672E-04 Zn-65 Sr-89 _

Sr-90 0.25 6.9417E-06 Nb-94 Zr-95 0.58 1.6033E-05 Nb-95 0.60 1.6632E-05 Tc-99 Ru-I 03 Ru-I 06 Ag-1 08m Ag-1Im I .

Sn-113 Sb-124 Sb-125 _

1-125 1-129 Cs-1 34 1.29 3.6067E-05 Cs-137 10.87 3.0307E-04 Ba-140 Ce-1 41 Ce-144 Gd-153 U-235 U-238 Pu-238 Pu-239 Pu-241 Am-241 Cm-242 3 Cm-243 Cm-244 N,2,(¢.UJIES T.(3TAL 2.7882E-03 Dominion Nuclear Connecticut Millstone Power Station Page 14 of 27 Unit 2 Section

2. Estimate of major nuclide composition (by type of waste)
d. Other - (Water)

From Millstone Nuclear Power Station to Duratek Inc., Oak Ridge, TN for Incineration d2'fiR0of iTbtaIIl I G*~ ridstr¢ad l MRadi ndclidel H-3 92.64 7.9045E-02 C-14 0.11 9.3691E-05 Cr-51 Mn-54 0.09 7.3133E-05 Fe-55 3.34 2.8509E-03 Fe-59 Co-57 <0.01 4.7433E-06 Co-58 0.02 1.4649E-05 Co-60 2.33 1.9856E-03 Ni-59 NI-63 0.85 7.2853E-04 Zn-65 0.06 5.21 OOE-05 Sr-89 Sr-90 <0.01 2.2160E-06 Nb-94 Zr-95 Nb-95 <0.01 7.10OOE-07 Tc-99 <0.01 3.2000E-06 Ru-103 Ru-1 06 Ag-108m Ag-110m Sn-1 13 Sb-124 Sb-1 25 <0.01 6.7633E-06 1-125 <0.01 3.7400E-06 1-129 <0.01 6.7933E-07 Cs-1 34 0.02 1.8700E-05 Cs-137 0.48 4.1102E-04 Ba-140 Ce-I 41 Ce-144 <0.01 8.1160E-10 Gd-153 <0.01 6.5700E-06 U-235 U-238 <0.01 6.6000E-06 Pu-238 Pu-239 Pu-241 Am-241 0.02 1.3920E-05 Cm-242 Cm-243 Cm-244

, (8.5322E-02 Dominion Nuclear Connecticut Millstone Power Station Page 15 of 27 Unit 2 Section

2. Estimate of major nuclide composition (by type of waste)
d. Other - (Mixed Waste)

From Millstone Nuclear Power Station to Diversified Scientific Services. Kingston. TN for Incineration, Fuel Blending, etc. .

H-3 99.64 1.1283E-05 C-1 4 Cr-51 _;

Mn-54 <0.01 4.7667E-10 Fe-55 0.10 1.1640E-08 Fe-59 Co-57 <0.01 1.2867E-10 Co-58 0.02 2.5800E-09 Co-60 0.06 7.2407E-09 Ni-59 Ni-63 0.09 9.8733E-09 Zn-65 Sr-89 Sr-90 <0.01 1.1 853E-10 Nb-94 Zr-95 Nb-95 <0.01 1.3367E-11 Tc-99 Ru-103 Ru-106 Ag-1 08m Ag-110m Sn-113 Sb-1 24 Sb-125 <0.01 3.7333E-10 1-125 1-129 Cs-1 34 0.03 3.7000E-09 Cs-I 37 0.05 5.1833E-09 Ba-140 Ce-1 41 Ce-144 Gd-1 53 U-235 .

U-238 Pu-238 Pu-239 Pu-241 Am-241 Cm-242 Cm-243 Cm-244

,CU lECjE,@!TQTALz) j 1.1 324E-05 Dominion Nuclear Connecticut Millstone Power Station Page 16 of 27 Unit 2 Section

2. Estimate of major nuclide composition (by type of waste)
d. Other - (Mixed Waste)

From Millstone Nuclear Power Station to Pemia-Fix of Florida, Inc., Gainesville, FL for Stabilization, Fuel Blending, etc.

Ih(Raidionud di ddei i R.t~s<Of ot Z,l-n-Xame (Ii6sm91nI l H-3 0.51 1.0091 E-05 C-14 0.29 5.6896E-06 Cr-51 Mn-54 0.65 1.2910E-05 Fe-55 30.51 6.0222E-04 Fe-59 Co-57 Co-58 1.52 2.9991 E-05 Co-60 21.05 4.1539E-04 Ni-59 Ni-63 18.92 3.7335E-04 Zn-65 Sr-89 Sr-90 0.07 1.3075E-06 Nb-94 Zr-95 0.36 7.1557E-06 Nb-95 0.78 1.5409E-05 Tc-99 Ru-103 Ru-106 _

Ag-108m Ag-110m Sn-1 13 Sb-I 24 Sb-1 25 0.31 6.0997E-06 1-125 1-129 Cs-1 34 1.75 3.4564E-05 Cs-137 23.26 4.5898E-04 Ba-140 Ce-141 Ce-144 Gd-153  ;

U-235 U-238 Pu-238 <0.01 5.8913E-09 Pu-239 <0.01 4.6476E-09 Pu-241 0.02 3.7079E-07 Am-241 <0.01 8.6339E-09 Cm-242 Cm-243 _ ____ ___

Cm-244 <0.01 7.6124E-09 C 'AL:)j2, T0TURIES 1.9736E-03 Dominion Nuclear Connecticut Millstone Power Station Page 17 of 27 Unit 2 Section

3. Solid Waste Disposition (Shipments from Millstone)

I Numb-reofiShipn6entseMMo~de'fIUraspottatioril .Destina',tison 1 l Truck (Sole Use Vehicle) lDiversified Scientific Services, Kingston, TN I i 7 l Truck (Sole Use Vehicle) lDuratek Inc. - Kingston, TN l l 5 l Truck (Sole Use Vehicle) lDuratek Inc. - Oak Ridge, TN I 1 2 l Truck (Sole Use Vehicle) lPerma-Fix of Florida Inc. - Gainesville FL I3Truck (Sole Use Vehicle) TStudsvik Processing Center LLC - Erwin, TN hed Id s£>-r<+'Ly= ff Uv---inii.i -1xi.i tipmentsinn B. IRRADIATED FUEL SHIPMENTS (Disposition) fNuberofWShipm'ents4Moid6'ofATfanspOrtatior njI Wa-D^ st a tion INo Shipments in 2003 NIA I N/A Dominion Nuclear Connecticut Millstone Power Station Page 18 of 27 Unit 2 Section

Table 2.3-S Solid Waste and Irradiated Component Shipments Millstone Unit 3 January 1, 2003 through December 31, 2003 A. SOLID WASTE SHIPPED OFFSITE FOR BURIAL OR DISPOSAL (Not irradiated fuel)

1. Type of Waste
a. Spent resins, Filter sludges, Evaporator bottoms, etc.

i Millstone Nuclear Power Station to Duratek Inc..

ton. TN for Super-Compaction. Incineration. etc.

i Millstone Nuclear Power Staton to Studsvlk essing Center tLc, Erwin, TN for Thermal Destruction

b. Dry compressible waste, Contaminated equipment, etc.
c. Irradiated components, Control rods, etc.
d. Other - (Grease, Oil, Oily waste)
d. Other - (Water)
d. Other - (Mixed Waste)

Dominion Nuclear Connecticut Millstone Power Station Page 19 of 27 Unit 3 Section

2. Estimate of major nucilde composition (by type of waste)
a. Spent resins, Filter sludges, Evaporator bottoms, etc.

From Millstone Nuclear Power Station to Duratek Inc.. Kingston, TN for Super-Compaction, Incineration. etc.

ll ~adonslieVl8E>YOfnotatillE@iiS uries~ i.Apil H-3 1.21 6.4900E-03 C-14 0.03 1.4830E-04 Cr-51 Mn-54 2.61 1.4004E-02 Fe-55 74.74 4.0081 E-01 Fe-59 Co-57 0.06 2.9900E-04 Co-58 1.25 6.7042E-03 Co-60 10.25 5.4967E-02 Ni-59 Ni-63 8.72 4.6776E-02 Zn-65 Sr-89 Sr-90 Nb-94 Zr-95 0.16 8.3630E-04 Nb-95 0.24 1.2993E-03 Tc-99 . -

Ru-103 Ru-106 Ag-108m Ag-11 Om Sn-113 Sb-124 . -

Sb-125 0.32 1.7314E-03 1-125 1-129 Cs-1 34 Cs-137 0.22 1.1583E-03 Ba-140 Ce-1 41  ;

Ce-144 0.18 9.6400E-04 Gd-153 U-235 U-238 Pu-238 <0.01 6.6000E-07 Pu-239 <0.01 5.2900E-07 Pu-241 <0.01 5.1400E-05 Am-241 <0.01 7.7600E-07 Cm-242 <0.01 2.1080E-06 Cm-243 Cm-244 <0.01 2.7900E-06 qC3R RlSff T.A g 5.3624E-01 Dominion Nuclear Connecticut Millstone Power Station Page 20 of 27 Unit 3 Section

2. Estimate of major nuclide composition (by type of waste)
a. Spent resins, Filter sludges, Evaporator bottoms, etc.

From Millstone Nuclear Power Station to Studsvik Processing Center LLC. Erwin. TN for Thermal Destruction GR-adirdduclid6Aj'Ii,%SA. f.WfftaIl6111 1--ACCfeS6 .- IlIs H-3 0.19 4.0300E-01 C-14 0.35 7.2300E-01 Cr-51 <0.01 4.3300E-04 Mn-54 4.36 9.OIOOE+00 Fe-55 30.53 6.3100E+01 Fe-59 <0.01 1.7400E-03 Co-57 0.03 5.6900E-02 Co-58 0.26 5.4270E-01 Co-60 11.92 2.4630E+01 Ni-59 Ni-63 49.27 1.0184E+02 Zn-65 __ _

Sr-89 Sr-90 0.02 3.2700E-02 Nb-94 Zr-95 <0.01 1.8300E-02 Nb-95 <0.01 8.6900E-04 Tc-99 <0.01 1.1200E-02 Ru-103 Ru-106 Ag-108m Ag-110n Sn-113 0.02 3.1600E-02 Sb-124 Sb-125 0.81 1.6790E+00 1-125 1-129 <0.01 9.3500E-04 Cs-134 Cs-137 1.90 3.9176E+00 Ba-140 Ce-141 _ ____ ___

Ce-144 0.33 6.8500E-01 Gd-153 U-235 _

U-238 Pu-238 <0.01 7.6320E-04 Pu-239 <0.01 1.0160E-04 Pu-241 <0.01 1.8080E-02 Am-241 <0.01 3.8320E-04 Cm-242 <0.01 6.71O0E-05 Cm-243 Cm-244 <0.01 7.1870E-04 QVPJ RIES (Ti4Li)]; 2.0671 E+02 Dominion Nuclear Connecticut Millstone Power Station Page 21 of 27 Unit 3 Section

2. Estimate of major nuclide composition (by type of waste)
b. Dry compressible waste, Contaminated equipment, etc.

From Millstone Nudear Power Station to Duratek Inc.. Kingston, TN for Super-Compaction. Incineration, etc.

[§<<RadIonfidcld6TI-°1~fS~oal.~lSi~>uil l

H-3 2.87 1.1127E-03 C-14 .

Cr-51 Mn-54 4.82 1.8693E-03 Fe-55 52.69 2.0432E-02 Fe-59 Co-57 Co-58 2.97 1.1530E-03 Co-60 12.81 4.9665E-03 Ni-59 Ni-63 10.29 3.9905E-03 Zn-65 Sr-89 Sr-9o 0.01 5.4450E-06 Nb-94 Zr-95 2.27 8.7935E-04 Nb-95 2.86 1.1 079E-03 Tc-99 Ru-1 03 _

Ru-106 Ag-108m Ag-110m Sn-113 Sb-124 Sb-125 0.17 6.4600E-05 1-125 1-129 Cs-1 34 0.08 3.OOOOE-05 Cs-137 8.16 3.1645E-03 Ba-140 Ce-141 Ce-144 Gd-1 53 U-235 U-238 Pu-238 Pu-239 Pu-241 Am-241 Cm-242 Cm-243 Cm-244 W .3.8776E-02 Dominion Nuclear Connecticut Millstone Power Station Page 22 of 27 Unit 3 Section

2. Estimate of major nuclide composition (by type of waste)
d. Other - (Grease, Oil, Oily waste)

From Millstone Nuclear Power Station to Duratek Inc.. Kingston. TN for Super-Compaction, Incineration. etc.

fliRad oh tjclide'6-l w°O .6f fotal Il X5.'FC tdrIesfim I_____

H-3 0.01 3.3115E-07 C-14 Cr-51 Mn-54 1.59 4.4452E-05 Fe-55 51.70 1.4415E-03 Fe-59 Co-57 Co-58 1.21 3.3750E-05 Co-60 17.67 4.9267E-04 Ni-59 Ni-63 14.23 3.9672E-04 Zn-65 Sr-89 Sr-90 0.25 6.9417E-06 Nb-94 Zr-95 0.58 1.6033E-05 Nb-95 0.60 1.6632E-05 Tc-99 Ru-103 Ru-106 Ag-108m Ag-110m Sn-113 Sb-1 24 Sb-125 1-125 1-129 Cs-1 34 1.29 3.6067E-05 Cs-137 10.87 3.0307E-04 Ba-1 40 Ce-1 41 Ce-144 Gd-1 53 U-235 U-238 Pu-238 Pu-239 Pu-241 Am-241 Cm-242 Cm-243 _ _ _ _

Cm-244

-,-., IESJ T, 2.7882E-03 Dominion Nuclear Connecticut Millstone Power Station Page 23 of 27 Unit 3 Section

2. Estimate of major nuclide composition (by type of waste)
d. Other -(Water)

From Millstone Nuclear Power Station to Duratek Inc., Oak Ridge, TN for Incineration F. , . TalMI ..

I .,RR'diohu:llid i/b H-3 84.50 3.2245E-02 C-14 0.25 9.3691 E-05 Cr-51 Mn-54 0.13 5.1333E-05 Fe-55 7.34 2.8018E-03 Fe-59 Co-57 0.01 4.7433E-06 Co-58 0.01 5.4986E-06 Co-60 5.12 1.9544E-03 Ni-59 Ni-63 1.80 6.8663E-04 Zn-65 Sr-89 _

Sr-90 <0.01 2.2160E-06 Nb-94 Zr-95 Nb-95 <0.01 7.1000E-07 Tc-99 <0.01 3.2000E-06 Ru-I 03 Ru-1 06 Ag-1 08m =____

Ag-11 Om Sn-113 Sb-124 Sb-1 25 0.02 6.7633E-06 1-125 <0.01 3.7400E-06 1-129 <0.01 6.7933E-07 Cs-1 34 0.04 1.5200E-05 Cs-1 37 0.67 2.5602E-04 Ba-140 Ce-141 Ce-144 <0.01 8.1160E-10 Gd-153 0.02 6.5700E-06 U-235 U-238 0.02 6.6000E-06 Pu-238 Pu-239 __= -

Pu-241 Am-241 0.04 1.3920E-05 Cm-242 Cm-243 Cm-244 T>URIES.t2.(QT.7LA) Qg}5-fp: 3.8158E-02 Dominion Nuclear Connecticut Millstone Power Station Page 24 of 27 Unit 3 Section

2. Estimate of major nuclide composition (by type of waste)
d. Other- (Mixed Waste)

From Millstone Nuclear Power Station to Diversified Scientific Services, Kingston, TN for Incineration, Fuel Blending, etc.

IR!Pcad iI fCicli-d 64i#C f R taIf 1,TVAG 0 elRiI l H-3 99.64 1.1283E-05 C-14 Cr-51 Mn-54 <0.01 4.7667E-10 Fe-55 0.10 1.1640E-08 Fe-59 Co-57 <0.01 1.2867E-10 Co-58 0.02 2.5800E-09 Co-60 0.06 7.2407E-09 Ni-59 Ni-63 0.09 9.8733E-09 Zn-65 Sr-89 Sr-90 <0.01 1.1 853E-10 Nb-94 Zr-95 Nb-95 <0.01 1.3367E-11 Tc-99 Ru-103 Ru-106 Ag-108m Ag-110m Sn-113 Sb-1 24 Sb-125 <0.01 3.7333E-10 1-125 1-129 _

Cs-1 34 0.03 3.7000E-09 Cs-1 37 0.05 5.1833E-09 Ba-140 Ce-141 Ce-144 Gd-1 53 U-235 U-238 Pu-238 Pu-239 Pu-241 __ =

Am-241 Cm-242 Cm-243 Cmr-244

  • 9',A1C URi E.S, A(TiQTALJM') ,1 1.1 324E-05 Dominion Nuclear Connecticut Millstone Power Station Page 25 of 27 Unit 3 Section
2. Estimate of major nuclide composition (by type of waste)
d. Other- (Mixed Waste)

From Millstone Nudear Power Station to Perma-Fix of Florida. Inc.. Gainesville. FL for Stabilization. Fuel Blending, etc.

FIL Radidhid e,9 1?id bf i1dtal Ebri I],

,.-5l H-3 0.63 9.3028E-06 C-14 0.37 5.5467E-06 Cr-51 Mn-54 0.68 1.0112E-05 Fe-55 29.69 4.4034E-04 Fe-59 Co-57 Co-58 0.93 1.3844E-05 Co-60 21.10 3.1297E-04 Ni-59 Ni-63 15.97 2.3679E-04 Zn-65 Sr-89 Sr-90 0.09 1.3075E-06 Nb-94 Zr-95 0.48 7.1557E-06 Nb-95 1.04 1.5409E-05 Tc-99 Ru-1 03 Ru-1 06 Ag-108m Ag-1I0m Sn-1 13 Sb-1 24 Sb-1 25 0.41 6.0997E-06 1-125 1-129 Cs-134 0.48 7.1557E-06 Cs-137 28.12 4.1713E-04 Ba-140 Ce-1 41 Ce-144 Gd-153 U-235 U-238 Pu-238 . -

Pu-239 Pu-241 Am-241 Cm-242

Cm-243 Cm-244 L~*XCU lES TQTU) Wr-, .4832E-03 Dominion Nuclear Connecticut Millstone Power Station Page 26 of 27 Unit 3 Section
3. Solid Waste Disposition (Shipments from Millstone) mbrof.fShi Ormehts*1 UModTofiTl rnbtotidriia; I g#ktAhgdnt> -v -8.v f 1I I Truck (Sole Use Vehicle) IDiversified Scientific Services, Kingston, TN 1 6 l Truck (Sole Use Vehicle) lDuratek Inc. - Kingston, TN l 4 l Truck (Sole Use Vehicle) IDuratek Inc. - Oak Ridge, TN 2 l Truck (Sole Use Vehicle) Perma-Fix of Florida Inc. - Gainesville FL I 2 @Truck (Sole Use Vehicle) Studsvik Processing Center LLC - Erwin, TN I tnerntse nc etosof vta slmnstee*ade~rom -this~statibln',n2OO3s.M3 B. IRRADIATED FUEL SHIPMENTS (Disposition) flYOmberf.ShliP'ments~l >Mo'dttfzarisportatio.ni RtsWg-~D*t^-x~iietntoel-myEA

_' .. . . .. it, .

INo ShiDments in 2003 I N/A I N/A Dominion Nuclear Connecticut Millstone Power Station Page 27 of 27 Unit 3 Section

3.0 REMODCM Changes In 2003, the following changes were made to the Millstone REMODCM:

Rev Effective Date 24 September 12, 2003 24-01 October 7, 2003 (Non-intent administrative change)

The description and the bases of the change(s) for each REMODCM revision are included in Volume I of this report. In addition, a complete copy of the REMODCM revision(s) for the calendar year 2003 is provided to the Nuclear Regulatory Commission as Volume II of this report.

REMODCM Rev 24 Description of Changes and Radiological Environmental Review

Radiological Environmental Review RER-03-002 Revision 0 REMODCM Revision 24 May 6, 2003 Total Number of Pages: 20 Claude Florv Preparer o' D bate William Eakin ego r056' Date

RER-03.002 REMODCM Revision 24

1.0 DESCRIPTION

OF CHANGE List of proposed changes for REMODCM Revision 24 per Change Requests 1-02-01, I1-02-01, 111-02-01, IV-02-01, and V-02-01:

General Changes:

1. A general table of contents is being added to facilitate manual reference.
2. Changes are being made to switch from the version of 10 CFR Part 20 prior to 1994 to the present version of Part 20 when applicable to the Radiological Effluent Control Program.

Section I.A, "Introduction" Adding a link to the REMODCM Technical Information Document (MP-13-REM-REF02) for exceptions to Reg Guide 1.21. Unit 3 FSAR Table 1.8-1 will be revised to take exceptions to this regulatory guidance; it will reference the REMODCM for an explanation of exceptions.

Section I.C.1, "Liquid Effluent Sampling and Analysis Program"

1. Moving RBCCW Sump from Batch Release to Continuous Release section of Table I.C-2.
2. Adding Footnote N in Table I.C-2 and Footnote M in Table 1.C-3 to require accounting of tritium releases via the steam generator blowdown tank vent.

Section I.C.2, "Liquid Radioactive Waste Treatment"

1. In Step a.2, changing "inoperable equipment" to "processing" and, in Sub-section c, revising the wording to specify equipment as being "in or out of service" rather than "inoperable."
2. In Step a.3 deleting the word "applicable" and adding the words "with processing equipment not operating" in order to make the requirement more explicit.

Section I.D.1, "Gaseous Effluent Sampling and Analysis Program'

1. In Table I.D-2, deleting some requirements for containment purge/vent sampling and analyses:

(a) Analysis for tritium is being relaxed from prior to purge and weekly for venting to monthly.

(b) Requirements for sampling and analyses for iodine and particulates are being deleted.

2. In Table I.D-2, revising Footnote H to delete the word "continuously," add the words "and released to the environment," and modifying Condition (4) for releasing contents of waste gas decay tanks during purging/venting of a tank.
3. In Table I.D-2, revising Footnote C which requires an additional gas sample after an unexplained increase in radiation monitor reading of 50%.
4. In Tables I.D-2 and 1.D-3, revising Footnote F to:

a) Change criteria for more frequent collection and analyses of charcoal and particulate samples. The criterion of a factor of five increase of 1-13 1 in reactor coolant samples will be changed to an increase of a factor of three. A new criterion of an increase in noble gas monitor reading by a factor of three will be added.

b) Change Footnote F to require subsequent samples daily rather than "every 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />."

2

RER-03-002 REMODCM Revision 24

5. Adding Footnote J in Table I.D-2 and Footnote H in Table I.D-3 to specify that only the initial purge during outages needs to be sampled.
6. In Tables I.D-2 and I.D-3, adding a requirement for sampling at the open equipment hatch during outages.
7. In Table I.D-3, adding a requirement to obtain weekly containment air samples with weekly analysis for gaseous radioactivity and monthly analyses for tritium.
8. Revising Table I.D-3 Footnote F to specify that the more frequent charcoal and particulate sample requirement applies only to the Unit 3 Vent and not to the ESF Vent or Unit 3 releases to the Millstone Stack.

Section I.D.2, "Gaseous Radioactive Waste Treatment" I. In Step a.2, changing "inoperable equipment" to "processing" and, in Sub-section c, revising the wording to specify equipment as being "in or out of service" rather than "inoperable."

2. In Step a.3, deleting the word "continuously."
3. Revising Figure I.D-3 to:

a) Add CPF with Turbine Gland Seal Steam Condenser Exhaust, b) Add Main Condenser Air Ejector, c) Replace boxes showing Reactor Plant Gaseous Drains and Charging System with RCS Letdown and Gaseous Waste System.

Section LE, "Radiological Environmental Monitoring - Sampling and Analysis":

Adding onsite well water samples.

Section I.F.2, "Radioactive Effluent Report" The word 'time' in "meteorological conditions concurrent with the time of radioactive gaseous effluent releases" is being changed to 'quarter.'

Section II.C.5, "Monthly Dose Projections"

1. The dose projection method for Units 2 & 3 is being divided into two methods - one without significant radioactivity in the steam generators and one with significant radioactivity in the steam generators. A new Sub-section 'c' is being created to accommodate the additional method.
2. Two footnotes are being added in Sub-section 'b.' These notes were inadvertently deleted in Revision 21 to the REMODCM when Sub-section 'a' was revised. In Sub-section 'c' the asterisked note to refer to notes in Sub-section 'a' was revised to refer to the notes in Sub-section 'b.'
3. Deleting reference to note in Section lI.C.5.a.Section II.C.5.a had been deleted in a prior revision.
4. Page Il.C-6 is being repaginated.

Section II.D.3, "10CFR50 Appendix I - Iodine and Particulate Doses"

1. The word 'time' in "meteorological conditions concurrent with the time of radioactive gaseous effluent releases" is being changed to 'quarter.'
2. Changing title of section to "IOCFR5O Appendix I - Iodine, Tritium, and Particulate Doses."

3

RER-03-002 REMODCM Revision 24

3. Correcting method so that Unit I releases dose calculation goes from Method I to Method 2b (bypassing Method 2a).
4. Correcting the meteorological parameter, X/Q, in Method 2a from 6.1x10 8 sec/M3 to 6.3x10 8 sec/M3 to correct a typographical error.
5. Deleting alternate meteorological parameter, D/Q, in Stack release Method 2a.
6. In Sub-section (3), "Method 2b - Millstone Stack and Unit 1 Releases", correcting reference from 'Section c(5)' to 'Section b(3).'
7. In Section II.D.3.b, deleting the two asterisk footnotes in the descriptions for parameters 13ICIV, 133Crv, Cps, and CHV.
8. In Section II.D.3.b, adding the steam generator blowdown tank vent as one of the release pathways which have to be included when determining tritium releases for dose calculations.
9. For the alternate meteorological parameter, D/Q, in Unit 2 and 3 releases Method 2a, deleting present guidance in parentheses and adding new guidance that the alternate D/Q is only for milk if the closest milk animal is no closer than in 1983 to 1987.
10. In Sub-section (3), "Method 2b - Unit 2 and Unit 3 releases," correcting 'aerated ventilation' to "ESF ventilation' in last sentence.

Section ll.D.4, "Gaseous Effluent Monthly Dose Projections"

1. Deleting Section II.D.4.b(2), "Unit 2 Projection Method - Due to Steam Generator Blowdown Tank Vent."
2. In Section II.D.4.b(3), deleting the double asterisk (**) note which states that gamma and beta air dose projections are not required for ventilation releases.

Section 1.E, "Liquid Monitor Setpoint Calculations" 3.0 Name of section is being revised because it includes requirements for discharge flow rates.

4.0 For the Unit 2 Clean and Aerated Liquid Radwaste Effluent Lines and Unit 3 Liquid Waste Monitor:

I. Determination of allowable discharge flow is being simplified.

2. The requirement to use the smaller of the two factors RI or R2 is being added.
3. Setpoint methodology is being revised to allow for use of isotopic-specific response factors.
4. For the Unit 2 monitors, Note 2 is being revised to change the alternate setpoint concentration limit used in the basis from 3 x 10-7 to I x 107 uCi/ml.
5. For the Unit 3 monitor, the assumed flow rate for a circulating water pump is being changed from 150,000 to 100,000 cfm
6. For the Unit 3 monitor, units of 'cps' in directions for determining setpoint is being deleted because this monitor reads in units of 'uCi/ml' rather than in 'cps.'

5.0 The Unit 2 RBCCW Sump is being added as a source which requires limitation on radioactivity concentrations in water being discharged to the environment.

6.0 The setpoint requirement for the Unit 3 Waste Neutralization Sump Effluent Line is being revised so that the setpoint would never exceed 2E4 uCi/mli. This does not change the affect of the requirement. It does simplify the requirement by removing confusing and ambiguous wording.

4

RER-03-002 REMODCM Revision 24 7.0 For the Unit 3 Steam Generator Blowdown radiation monitor, the assumed flow rate for a circulating water pump, used as a basis for the setpoint, is being changed from 150,000 to 100,000 cfm.

8.0 For the Unit 3 Turbine Building Floor Drains Effluent Line the setpoint is being changed from a calculated value to a value based on background reading of the radiation monitor.

Section II.F, "Gaseous Monitor Setpoints"

1. Requirements for responses to an alarm for the Unit I Spent Fuel Pool Island (SFPI)

Vent Monitor, Unit 2 Wide Range Gas and Vent Monitors, and Unit 3 SLCRS and Vent monitors are being revised.

2. For the Unit I Spent Fuel Pool Island Monitor, a note is being added to state that the required setpoint of 1.71 E-3 uCi/cc is the basis for an emergency classification in Unit I EAL Table for OA-1.
3. For the Unit 3 Engineering Safeguards Building Monitor, the setpoint is being revised from I .5x 10-5 uCi/cc to 4.7x 10-4 uCi/cc.

Section III.B, "Definitions"

4. Section designation is being changed to III.B.I to accommodate new Section III.B.2.
5. Definition for INSTRUMENT FUNCTIONAL TEST is being revised to allow, for digital instruments, the alternate test method of raising an alarm, interlock, or trip in lieu of injecting a signal to test instrument operability.

Section III.B.2, "Applicability" (NEW)

Applicability and surveillance requirements are being added with wording identical to Technical Specifications 3.0.2 and 3.0.3 to implement a change being made to Technical Specification 5.6.4 with LBDCR #1-01-02 (Letter B18560, dated 5/13/02, to the NRC).

Section III.C.1, "Radioactive Liquid Effluent Monitoring Instrumentation" Requirements for a reactor cavity water discharge radiation monitor and flow measurement device is being added.

Section III.C.2, "Radioactive Gaseous Effluent Monitoring Instrumentation" 9.0 In the first paragraph under "Controls" correcting 'Sections II.F.3 and II.F.4' to 'Section Il.F. .' This change should have been made in a prior revision.

10.0 Sampler flow monitor is being added to Balance of Plant Vent instrumentation.

11.0 Table III.C-3 footnote is being revised to:

1. Change allowable outage time from "within the time frame of the specified Action statement" to a maximum of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
2. Clarify that the exceptions for maintenance and performance of test, checks, and calibrations is applicable to both the instruments listed in the table and to any system or component which directly affects operability of the these instruments.
3. Add sampling as an activity which could place the instrument temporarily out of service.

12.0 Action C for Table 11I.C-3 is being revised from the requirement to record a default flow rate of 36,000 cfli daily to recording the flow rate every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

5

RER-03-002 REMODCM Revision 24 13.0 Action D for Table III.C-3 is being revised to specify sampling time period from Action A or Action B.

14.0 Calibration footnote #6 in Table III.C-4 for the Spent Fuel Pool Island Vent Noble Gas Activity Monitor is being revised to specify that the calibration source strength has to be determined by a detector which has been calibrated by an NIST traceable source.

Section III.D.I, "Radioactive Liquid Effluents Concentrations and Doses" For Unit 1,limits on radioactivity concentrations in liquid effluents and doses from radioactivity released in liquid effluents are being added.

Section I1I.E, "Total Radiological Dose from Station Operations" Adding the phrase "beyond the site boundary" to specify where the limit is applicable.

Section III.F, "Bases" New bases for liquid effluent concentrations and doses to support new requirements is being added. These bases are identical to bases for the same requirements for Units 2 and 3.2.

Section IV.B, "Definitions"

1. Section designation is being changed to IV.B.1 to accommodate new Section IV.B.2.
2. Definition for INSTRUMENT FUNCTIONAL TEST is being revised to allow, for digital instruments, the alternate test method of raising an alarm, interlock, or trip in lieu of injecting a signal to test instrument operability.

Section IV.B.2, "Applicability" (NEW)

Applicability and surveillance requirements are being added with wording identical to Technical Specifications 3.0.2 and 3.0.3 to implement a change being made to Technical Specification 6.20 with LBDCR #2-08-02 (Letter BI 8560, dated 5/13/02, to the NRC).

Section IV.C. 1, "Unit 2 Radioactive Liquid Effluent Monitoring Instrumentation"

3. In Tables IV.C-I and IV.C-2, requirements for the Dilution Water Flow and the Steam Generator Blowdown line flow rate measurement devices (Items #3.d and 3.e in both tables) are being deleted.
4. In Table IV.C-1, the applicability footnotes are being revised to clarify that the exceptions for maintenance, test, check, calibrations, and sampling is applicable to both the instruments listed in Tables IV.C-1 and to any system or component which directly affects operability of the these instruments.
5. In Table IV.C- 1, the specification for dectectability of gross gamma in Footnotes B, C and E is being changed to lower limits of detection specified in Table I.C-2.

Section IV.C.2, "Unit 2 Radioactive Gaseous Effluent Monitoring Instrumentation" 15.0 In Tables IV.C-3 and IV.C-4, wording is being added to specify that the requirements are only applicable to the normal range gaseous effluent monitor and that the high range monitor requirements are contained in the TRM.

16.0 In Table IV.C-3, the double asterisk (**) note is being revised:

6

RER-03-002 REMODCM Revision 24

1. To clarify that the exceptions for maintenance, test, check, calibrations, and sampling is applicable to both the instruments listed in Tables IV.C-3 and to any system or component which directly affects operability of the these instruments, and
2. To specify applicability only when air is not being released to the environment by the pathway being monitored.

17.0 In Table IV.C-4, Footnote (I) is being revised to specify that the calibration source strength has to be determined by a detector which has been calibrated by an NIST traceable source.

Section IV.D.1, "Radioactive Liquid Effluents" Wording of surveillance is revised to make it consistent with the NRC guidance in NUREG-1301.

Section IV.E, "Total Radiological Dose from Station Operations" The phrase "beyond the site boundary" is being added to specify where the limit is applicable.

Section IV.F, "Bases" In bases for Section IV.C.2 the following changes are being made:

1. Change alann/trip setpoint bases from 10CFR20 to limits specified in Section IV.D.2.a.

Limits in this section are based on annual doses from the version of I OCFR20 prior to 1994.

2. Delete discussion of explosive gas monitoring in the gaseous waste system.

Section V.B, "Definitions"

3. Section designation is being changed to V.B.I to accommodate new Section V.B.2.
4. Definition for ANALOG CHANNEL OPERATIONAL TEST is being revised to allow, for digital instruments, the alternate test method of raising an alarm, interlock, or trip in lieu of injecting a signal to test instrument operability. Delete the word "ANALOG."

Section V.B.2, "Applicability" (NEW)

Applicability and surveillance requirements are being added with wording identical to Technical Specifications 3.0.2 and 3.0.3 to implement a change being made to Technical Specification 6.15 with LBDCR #3-04-02 (Letter B 18560, dated 5/13/02, to the NRC).

Section V.C. 1, "Unit 3 Radioactive Liquid and Gaseous Effluent Monitoring Instrumentation"

5. Deleting the word "ANALOG" from "ANALOG CHANNEL OPERATIONAL TEST."

This implements the definition change as described above.

6. Deleting conditional statement on Turbine Building Floor Drains Radiation Monitor actions statement by removing the triple asterisk note.
7. Changing applicability for the Steam Generator Blowdown Monitor from "MODEs 1-5 and MODE 6 when pathway is being used" to "MODEs 1-5."
8. Adding an exception for Waste Neutralization Sump Monitor and Effluents flow rate measurement device for times when there is no detectable tritium or gamma radioactivity does not exceed 5E-7 uCi/ml in steam generators or the sump is diverted to radwaste.

7

RER-03-002 REMODCM Revision 24

9. Revising applicability footnotes to clarify that the exceptions for maintenance, test, check, calibrations, and sampling is applicable to both the instruments listed in Table V.C-1 and to any system or component which directly affects operability of the these instruments.
10. Changing specification for dectectability of gross gamma in Footnotes B and D to lower limits of detection specified in Table I.C-3.
11. Deleting requirements for the Dilution Water Flow rate measurement device (Item 2.f in both tables).
12. Deleting requirements for Regenerative Evaporator radiation monitor and flow measurements.

Section V.C.2, "Unit 3 Radioactive Gaseous Effluent Monitoring Instrumentation" 18.0 Adding wording to specify that the requirements are only applicable to the normal range gaseous effluent monitor and that the high range monitor requirements are contained in the TRM.

19.0 In Table V.C-3, changing Action D for SLCRS Noble Gas Activity Monitor (Item #2.a) to Action A.

20.0 In Table V.C-3, revising Action A to allow use of the Remote Indicating Controller (RIC) with a 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> channel check and check for alarm conditions as an alternate compensatory action to sampling.

21.0 Changing Table V.C-3 Action A for the Engineered Safeguards Building and Warehouse No. 5 Vent Noble Gas Monitors (Items 3.a and 4.a) to Action D and revising Action D to add the words "these samples are" and delete the word "gross."

22.0 Changing Table V.C-3 Action A for the Warehouse No. 5 Iodine and Particulate Samplers to Action B. Action is more appropriate for sampler compensatory actions.

23.0 In Table V.C-3, revising the single asterisk (*) note to:

1. Specify applicability only when the release path is in service. The instruments are not needed to perform their functions when air is not being released. This prevents having to classify instrumentation inoperable during ventilation outages.
2. Clarify that the exceptions for maintenance, test, check, calibrations, and sampling is applicable to both the instruments listed in Table V.C-3 and to any system or component which directly affects operability of the these instruments.

Section V.D. I, "Radioactive Liquid Effluents" Wording of surveillance is revised to make it consistent with the NRC guidance in NUREG-1301.

Section V.E, "Total Radiological Dose from Station Operations" Add the phrase "beyond the site boundary" to specify where the limit is applicable.

8

RER-03-002 REMODCM Revision 24 24.0 DISCUSSION

1. General Changes which are being made for clarification or to correct errors in the REMODCM will not be discussed.

Following changes are being made to change from version of I OCFR20 prior to 1994 to present version of IOCFR20:

a. References to I OCFR20 Table II are being changed Table 2.
b. Changing liquid effluent concentration limit to ten times the concentration limits and changing "MPC' to "Effluent Concentration.'

These changes are needed to implement LBDCRs #1-01-02, #2-08-02, and #3-04-02 (Letter B 18560, dated 5/13/02, to the NRC) which will change Millstone licensing basis from Part 20 prior to 1994 to the present version of Part 20 when applicable to the Radiological Effluent Control Program.

2. Changes to Support Discharge of Unit 1 Reactor Cavity Water A number of changes are being made to support the discharge of Unit 1 reactor cavity water to the Millstone Quarry. These changes are consistent with NRC guidance and similar to requirements for Units 2 and 3 in Sections IV.D.l and V.D.1 . They include:
  • Sampling and analysis requirements of Unit I reactor cavity water prior to discharge.

Required processing equipment for Unit I reactor cavity water.

  • Dose method requirements.
  • Limitation on radioactivity concentrations in liquid effluents and doses from radioactivity released in liquid effluents.
  • Requirements for the Reactor Cavity Water Discharge Line dilution flow rate and radiation monitor setpoint.
  • Requirements for a reactor cavity water discharge radiation monitor and flow measurement device is being added.
3. Changes Relative to Unit 2 RBCCW Sump RBCCW Sump water used to be directed to radwaste, but recent -linerepairs restored system ability to bypass radwaste. Bypass is needed to protect radwaste systems from the salt water in the sump.
  • The Unit 2 RBCCW Sump is being moved from a batch source to a continuous source in Table I.C-2. This changes the analysis frequency for gamma emitters (with 1-131 and Ce-144) from prior to each discharge to weekly and for dissolved and entrained gases from prior to each discharge to monthly. Because the sump discharge operates in an intermittent automatic mode it is more appropriate to treat it as a continuous release.

Relaxation of the analysis frequency for gamma emitters and dissolved gases is acceptable because radioactivity levels in the sump water will only change slowly in time.

  • A requirement is being added to limit radioactivity concentrations in water being discharged from the RBCCW sump to the environment. Placing limitation on RBCCW Sump water radioactivity concentrations should have been added to the REMODCM when the RBCCW 9

RER-03-002 RER-03-002 REMODCM Revision 24 Sump water sample was added to Table I.C-2 in Revision 22.

4. Accounting for Tritium Releases from Steam Generator Blowdown Tank Vents At both Units 2 and 3 a requirement is being added to account for tritium releases via the steam generator blowdown tank vent. Tritium is now routinely seen in the each plant's secondary side systems. Therefore, the blowdown vent becomes a source of tritium releases to the environment which needs to be accounted.
5. Clarification on Use of Processing Equipment
  • Wording to describe applicable processing equipment is being revised to reinforce the interpretation that the equipment should be returned to service whenever it is operable.

The wording changes include changing "inoperable equipment" to "processing" and revising the wording to specify equipment as being "in or out of service" rather than "inoperable."

  • For gaseous processing equipment, deleting the word "continuously" in Step a.3 because some of the processing equipment is designed to operate intermittently.
  • Revising Figure I.D-3 to:

I) Add CPF with Turbine Gland Seal Steam Condenser Exhaust to show this release source,

2) Add Main Condenser Air Ejector to show this release source,
3) Replace boxes showing Reactor Plant Gaseous Drains and Charging System with RCS Letdown and Gaseous Waste System. This change will more clearly identify the source and pathway of release.

These changes will make the REMODCM consistent with planned changes to PSAR Figure 11.3-2 (CR M3-98-3325).

6. Relaxation of Requirements on Unit 2 Containment Purge/Vent Sampling and Analyses The Unit 2 requirements for containment purge/vent sampling and analyses of tritium, iodine, and particulates are being relaxed. Tritium in containment would never be high enough to cause concentration or dose limits to be exceeded at the site boundary for any one purge. Weekly tritium analyses for containment venting are not needed because tritium does not vary considerably in containment. Iodine and particulates are being deleted because all containment purges/vents are released to the vent or the Millstone Stack where weekly iodine and particulate samples are collected as required by Section C in this Table I.D-2.

These changes are consistent with NRC guidance found in NUREG-1301.

7. Minor Releases from Unit 2 Waste Gas Decay Tanks Several changes are being made to Footnote H of Table I.D-2 to avoid unnecessary controls and paperwork for trivial releases of small amounts of radioactive gas already accounted for in a prior release from the Unit 2 waste gas decay tanks. These changes include deleting the word "continuously," adding the words "and released to the environment," and modifying Condition (4) for releasing contents of waste gas decay tanks during purging/venting of a tank. The word "continuously" wrongly connotes a continuous operation which is actually performed in steps. The words "released to the environment" will distinguish environmental release from tank vents within the system. Criteria will be added in Condition (4) to allow 10

RER-03-002 REMODCM Revision 24 releases without a permit.

8. Changes to Requirement for Additional Gas Samples After a 50% Increase of the Vents and Stack Radiation Monitors In Tables I.D-2 and I.D-3 for Units 2 and 3, Footnote C requires additional gas samples after an unexplained increase in radiation monitor reading of 50%. The following changes are being made:
  • The exception to not take the additional sample following a 50% increase during thermal power changes is being deleted and will be replaced with a requirement to sample 24 to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after shutdown, startup, or power change of greater than 15%. This sampling requirement is needed to ensure that the change in radionuclide mix after these power changes are measured. This change would make the requirement consistent with NRC guidance in NUREG-1301.
  • The footnote is also being revised to avoid having to take a sample if the increase of radioactivity has returned to the reading prior to the increase before a sample can be taken.

.A requirement is being added to estimate these short term releases of radioactivity.

9. Changes to Requirement for Additional Iodine and Particulates Samples After an Increase in Reactor Coolant Iodine In Tables I.D-2 and I.D-3 for Units 2 and 3, Footnote F requires additional samples after an increase of dose equivalent 1-131 in reactor coolant. The following changes are being made:
  • The criterion of a factor of five increase of I-13 1 in reactor coolant samples will be changed to an increase of a factor of three. This change would make the requirement consistent with NRC guidance in NUREG-1301
  • A new criterion of an increase in noble gas monitor reading by a factor of three will be added. This change would make the requirement consistent with NRC guidance in NUREG-1 301.
  • Change Footnote F to require subsequent samples daily rather than "every 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />" to allow more flexibility in scheduling of samples.
  • For Unit 3, revising Table I.D-3 Footnote F to specify that the more frequent charcoal and particulate sample requirement applies only to the Unit 3 Vent and not to the ESF Vent or Unit 3 releases to the Millstone Stack. Increases of radioactive iodines or particulates through the ESF Vent or to the Millstone Stack would not be expected with increase in reactor coolant 1-131. This makes the footnote consistent with the same footnote for Unit 2 in Table I.D-2.
10. Clarification on Sampling Prior to Containment Purge During an Outage Adding Footnote J in Table I.D-2 for Unit 2 and Footnote H in Table I.D-3 for Unit 3 to specify that only the initial purge during outages needs to be sampled. During outages the containment is repeatedly purged, sometimes multiple times daily. A sample before each purge is not needed. Almost all the radioactivity released from containment during an outage occurs at the initial purge. Any significant release after the initial purge during an outage will be sampled if it causes a 50% increase in the vent or stack effluent monitor (see Footnote C for each table).

11

RER-03-002 REMODCM Revision 24

11. Sampling Releases from the Open Equipment Hatch In Table I.D-2 for Unit 2 and Table I.D-3 for Unit 3, adding a requirement for sampling at the open equipment hatch during outages. Licensing changes are pending to allow the hatch to be open for longer periods of time. The REMODCM requirement will support a commitment made to the NRC associated with the licensing change for enhanced monitoring of airborne releases.
12. Sampling Containment Vents at Unit 3 In Table I.D-3, adding a requirement to obtain weekly containment air samples with weekly analysis for gaseous radioactivity and monthly analyses for tritium. The purpose of this requirement will be to account for releases of gaseous radioactivity and tritium during containment vents which are probably not captured in the weekly grab sample required by Section B of this table. As part of this change a new Footnote I will be added to require an additional sample if the containment air monitor increases after the weekly sample. This change will implement NRC guidance found in NUREG-1 301 and will also make Unit 3 consistent with Unit 2 requirements in Table I.D-2.
13. Change to Radiological Environmental Monitoring Program (REMP)

Adding onsite well water samples. Well water samples are being added to address potential releases to the environment via groundwater. This is a response to Connecticut Yankee's experience and to some Millstone incidents and concerns including spills of contaminated water and groundwater intrusions.

14. Clarification on Meteorological Time Frame The word 'time' in "meteorological conditions concurrerfit with the time of radioactive gaseous effluent releases" is being changed to 'quarter.' This is a more accurate description of the method used to calculate dose from gaseous effluents. Dose is calculated for each quarter and the meteorological conditions used in the calculation is an average of any time within the quarter when there was a release.
15. Dose Method Simplifications
  • The dose projection method for Units 2 & 3 is being divided into two methods -

one without significant radioactivity in the steam generators and one with significant radioactivity in the steam generators. This is done to greatly simplify the dose method when there is not significant radioactivity in the steam generators which is normally the case.

  • Correcting method so that Unit I releases dose calculation goes from Method I to Method 2b (bypassing Method 2a) because the meteorological parameters in Method 2a are not applicable to Unit I releases.

Deleting alternate meteorological parameter, D/Q, in Stack release Method 2a.

There is no guidance in the REMODCM Technical Information Document as presently stated. Use of the higher D/Q will not have a major impact because, with better computer capabilities, Method 2b is not as time-consuming as before.

  • In Section I1.D.3.b, deleting the two asterisk footnotes in the descriptions for parameters I31Clv, 133CIv, Cps, and CHV. These footnotes are not needed for the implementing organization to fulfill the REMODCM requirements.

12

I RER-03-002 REMODCM Revision 24 For the alternate meteorological parameter, D/Q, in Unit 2 and 3 releases Method 2a, deleting present guidance in parentheses and adding new guidance that the alternate D/Q is only for milk if the closest milk animal is no closer than in 1983 to 1987. There is no guidance in the REMODCM Technical Information Document as presently stated and the alternate D/Q is not applicable to vegetation.

  • Deleting Section II.D.4.b(2), "Unit 2 Projection Method - Due to Steam Generator Blowdown Tank Vent." The intent of the dose projection methods in Section l1.D.4 is to estimate doses from release pathways with inoperable processing equipment as specified in Section I.D.2. There is no processing equipment specified for the blowdown tank vent in Section l.D.2; therefore, this dose projection method is not needed.
  • In Section IL.D.4.b(3), deleting the double asterisk (**) note which states that gamma and beta air dose projections are not required for ventilation releases. The purpose of the note was to explain why only maximum organ dose is projected when ventilation processing equipment is inop as specified in Section I.D.2. However this note is confusing because of it's vagueness and Section I.D.2 already states that only the doses specified in Section II.D.4 need to be determined. Therefore the note is being deleted to avoid any confusion.
16. Unit 2 Clean and Aerated Liguid Waste and Unit 3 Liguid Waste Rad Monitors
17. Determination of allowable discharge flow is being simplified by delineating steps in the process and by deleting the basis information on maximum allowable noble gas concentration. The basis information will be moved to the REMODCM Technical Information Document (MP-13-REM-REF02).
18. The requirement to use the smaller of the two factors RI or R2 is being added. This requirement was inadvertently deleted in a prior revision. However, the implementing organization continued to fulfill the requirement.
19. Setpoint methodology is being revised to allow for use of isotopic-specific response factors.
20. For the Unit 2 monitors, Note 2 is being revised to change the alternate setpoint concentration limit used in the basis from 3 x 10-7 to 1 x 10-7 uCi/ml to make it consistent with the Unit 3 value. This will cause the Unit 2 alternate setpoint to be reduced by a factor of three.
21. For the Unit 3 monitor, the assumed flow rate for a circulating water pump is being changed from 150,000 to 100,000 cfin to account for reduced flow when vacuum priming is off (see CR-02-08409). This results in a lower maximum allowable noble gas concentration and in a lower alternate radiation monitor setpoint. The maximum allowable noble gas concentration will change from 0.4 to 0.26 uCi/ml. The alternate setpoint will change from 2E-4 to 1.3E-4 uCi/ml.
22. Unit 3 Steam Generator Blowdown Rad Monitor For the Unit 3 Steam Generator Blowdown radiation monitor, the assumed flow rate for a circulating water pump, used as a basis for the setpoint, is being changed from 150,000 to 100,000 cfm to account for reduced flow when vacuum priming is off (see CR-02-08409).

This results in a lower radiation monitor setpoint, changing from 2.47E-5 to 1.7E-5 uCi/ml.

13

RER-03-002 REMODCM Revision 24

23. Unit 3 Turbine Building Floor Drains Rad Monitor For the Unit 3 Turbine Building Floor Drains Effluent Line the setpoint is being changed from a calculated value to a value based on background reading of the radiation monitor because the original basis for the setpoint was not valid. A maximum limit on the setpoint is being added. The original basis is being deleted and the basis for the maximum limit value is being added to the REMODCM Technical Information Document (MP-13-REM-REF02).
24. Changes to Requirements for Setpoints Based on Instantaneous Release Rate Limit
  • Requirements for responses to an alarm for the Unit I Spent Fuel Pool Island (SFPI)

Vent Monitor, Unit 2 Wide Range Gas and Vent Monitors, and Unit 3 SLCRS and Vent monitors are being revised. These five gaseous release points are major contributors from Millstone for dose from noble gases, particulates and radioactive iodines.

Response will be required upon reaching the alarm instead of upon approaching the alarm and the response will be directed to determining concurrent releases from the other four release points. Because each alarm is based on a fraction of the total site limit for an instantaneous dose rate limit, a response is not needed prior to reaching the alarm.

Specifying the other four release points when there is an alarm at one release point will define which release points need to be considered when determining total site dose rates.

  • For the Units 2 and 3 Vent Monitors, the option to adjust alarm setpoints at multiple release points is being deleted. These changes make the setpoint requirements consistent between the five release point radiation monitors. Adjustment of alarms would never be used because of the difficulty of implementing this option. It also was not needed as there is substantial margin between dose rate from a release which would cause an alarm at one release point and the site dose rate limits.
  • For the Unit 3 Engineering Safeguards Building Monitor, the setpoint is being revised from 1.5x10-5 uCi/cc to 4.7x10-4 uCi/cc to implement Calculation RERM-01946-R3, Rev 0. Basis of the setpoint changed from 0.16% to 1%of the site instantaneous release rate limit. The value of the setpoint changed by more that the factor of 1/0.16 because of a new methodology used to calculated the instantaneous release rate limit.
25. Unit I Spent Fuel Pool Island Monitor For the Unit I Spent Fuel Pool Island Monitor, a note is being added to state that the required setpoint of 1.7 1E-3 uCi/cc is the basis for an emergency classification in Unit I EAL Table for OA-1.
26. Definition for Instrument Functional Test The definition is being revised to allow, for digital instruments, the alternate test method of raising an alarm, interlock, or trip in lieu of injecting a signal to test instrument operability. This test method is equivalent to signal injection for digital instruments and provides an easier test method.
27. Applicability And Surveillance Requirements These requirements are being added with wording identical to Technical Specifications 3.0.2 and 3.0.3 to implement a change being made to Technical Specification 5.6.4 with LBDCR #1-01-02, #2-08-02, and #3-04-02 (LetterB18560, dated 5/13/02, to theNRC).

14

RER-03-002 REMODCM Revision 24 This addition would also be an enhancement to the REMODCM by making the general requirements the same as Tech Specs. These general requirements were applicable to the requirements of REMODCM Section III when they were in Tech Specs but were not transferred to the REMODCM when the Radiological Effluent Tech Specs (RETS) were moved to the REMODCM. The absence of the general requirements in the REMODCM did not compromise the ability to implement RETS in the REMODCM. However, restoring the general requirements to RETS in the REMODCM gives Operators the same clear interpretations of the requirements as they had when in Tech Specs.

28. Addition of Unit 1 Balance of Plant Sampler Flow Monitor Requirements Sampler flow monitor is being added to Balance of Plant Vent instrumentation. This instrumentation is important to ensure that gaseous effluent from the plant other than the Spent Fuel Pool Island is being adequately monitored for particulate radioactivity.
29. Clarifications on Gaseous Effluent Rad Monitoring Operability
  • For Unit 1, changing allowable outage time from "within the time frame of the specified Action statement" to a maximum of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The present allowed time is confusing.

The new requirement of a maximum of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is consistent with requirements for effluent monitors at Millstone Units 2 and 3.

  • Clarifying that the exceptions for maintenance and performance of test, checks, and calibrations is applicable to both the instruments listed in the table and to any system or component which directly affects operability of the these instruments.
  • For Unit 1,adding sampling as an activity which could place the instrument temporarily out of service. This allows Chemistry to sample the effluent stream without the administrative burden of declaring the instrument inoperable. This change also makes the requirement consistent with operability requirements for effluent monitors at Millstone Units 2 and 3.
  • For Units 2 and 3, specifying applicability only when air is not being released to the environment by the pathway being monitored. The instruments are not needed to perform their functions when air is not being released. This prevents having to classify instrumentation inoperable during ventilation outages.
30. Change to Action Statement for Unit l SFPI Vent Flow Action C for Table III.C-3 is being revised from the requirement to record a default flow rate of 36,000 cfrn daily to recording the flow rate every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. This makes the compensatory action consistent with similar actions at Units 2 and 3. Simple recording an assumed maximum flow does not provided any benefit.
31. Change to Action Statement for Unit I SFPI Sampler Flow Action D for Table Ill.C-3 is being revised to specify sampling time period from Action A or Action B. The current reference to just the 'Chemistry compensatory sampling time period' is too vague, particularly with the addition of the Balance of Plant vent sampler flow monitor.

15

RER-03-002 REMODCM Revision 24

32. Clarification on Use of NIST Traceable Sources for Calibrations Calibration requirement is being revised to specify that the calibration source strength has to be determined by a detector which has been calibrated by an NIST traceable source.

Radiation monitor vendors often perform primary calibration using sources traceable to the NIST rather than sources obtained directly from the NIST. This change will avoid the interpretation that the primary calibration source has to be a source direct from NIST.

Traceablity is acceptable by today's standard for radiation monitor calibrations.

33. Clarification on 4OCFR190 Dose Limit Location Adding the phrase "beyond the site boundary" to specify where the limit is applicable. This change is consistent with the EPA dose limit in 40CFRI90 and with NRC guidance in NUREG-1301 and it implements licensing change LBDCR #1-01-02, #2-08-02, and
  1. 3-04-02 (Letter B 18560, dated 5/13/02, to the NRC).
34. Deletion of Requirements on Dilution and Blowdown Flow Measurement Devices For Units 2 and 3, the requirements for the Dilution Water Flow and, for Unit 2, the Steam Generator Blowdown line flow rate measurement devices are being deleted. There are no devices which measure these flows. Flow is estimated by number of pumps running at any time and the times of pump operations. This is reflected in both the LCO and Surveillance Tables' footnotes. However, the purpose of these tables is to ensure availability of devices, not the ability to perform an action. Determining pump status is an action; for this reason an Action Statement could never be included for these two parameters. Dilution water (i.e.,

circulating water) and steam generator blowdown flow is a necessary parameter which is obtained during the course of fulfilling other REMODCM requirements. Dilution water is recorded in liquid waste discharges following the requirements specified in REMODCM Sections II.E.2 and Il.E.4. Knowledge of dilution water flow is also needed to fulfill the requirements of Section Il.E.7b. Steam Generator Blowdown samples are required by REMODCM Section I.C.1 and reporting of radioactivity released from this source are required by various REMODCM sections. Therefore, Chemistry must (and does) record blowdown flows to fulfill these requirements.

35. Change Detectability Specification from Gross Gamma to Isotopic In Table IV.C-1, the specification for dectectability of gross gamma in Footnotes B, C and E is being changed to lower limits of detection specified in Table I.C-2. The gamma analyzer is programmed to report results in radioactivity concentration per radionuclide rather than in total (gross) radioactivity. This change will facilitate implementation of the footnote requirements.
36. Non-Applicability of High Range Radiation Monitors In Tables IV.C-3 and IV.C-4, wording is being added to specify that the requirements are only applicable to the normal range gaseous effluent monitor and that the high range monitor requirements are contained in the TRM.

16

RER-03-002 REMODCM Revision 24

37. Frequency for Calculation of Liquid Effluent Doses Wording of surveillance is being revised for a frequency requirement for calculating liquid effluent doses of at least once per 31 days. This would make the requirement consistent with the NRC guidance in NUREG-1301. It would also specify that the dose determination would be a cumulative dose for the current calendar quarter and year.
38. Discussion of Explosive Gas Monitoring Deleting discussion of explosive gas monitoring in the gaseous waste system because there is no monitoring of explosive gases.
39. Unit 3 Turbine Building Sump Rad Monitor Action Statement Deleting conditional statement on action statement (remove triple asterisk note). This footnote placed an applicability condition on the Action which is in conflict with the Instrument Applicability which requires instrument operability at all times (see note #). If desired the applicability specified by the triple asterisk note should be applied to instrument applicability. However, the Action statement applicability, which is to take no action if radioactivity in sump water is less than detectable (MDA), is not appropriate. The radiation monitor should be operable at all times, even when no activity is being detected, to monitor for sudden increase of radioactivity in sump water.
40. Unit 3 Steam Generator Blowdown Rad Monitor Applicability Changing applicability from "MODEs 1-5 and MODE 6 when pathway is being used" to "MODEs 1-5." Monitoring of blowdown is not needed during Mode 6 when steam

-generator blowdown is isolated. Any discharge of generator water during this mode is preceded by a sample as required in Table I.C-3.

41. Unit 3 Waste Neutralization Sump and Effluents Flow Measurement Devices Adding an exception for flow rate measurement devices for times when there is no detectable tritium or gamma radioactivity does not exceed 5E-7 uCi/ml in steam generators or the sump is diverted to radwaste. The flow rate measurement device is needed to quantify the amount of radioactivity released in effluents.*There are two conditions when radioactivity released via this pathway does not need to be quantified: (1) If the sump water from waste neutralization is being diverted to radwaste, any radioactivity released is being recorded by the Liquid Waste Effluent Line, and (2) The only source of radioactivity to this sump is from the steam generators. Therefore radioactivity releases will not be significant enough to quantify until there is detectable tritium or gamma radioactivity greater than 5E-7 uCi/ml in the steam generators. This gamma value is the same as that used in the sampling requirements in Section I.C. 1. A threshold of detectable radioactivity is used for tritium because tritium analysis is not as sensitive as gamma analysis.
42. Unit 3 Regenerative Evaporator Rad Monitor and Flow Measurement Device Deleting requirements for Regenerative Evaporator radiation monitor and flow measurements. The evaporator is not in use and there is no expectation that it will ever be placed in service.

17

4.0 Inoperable Effluent Monitors During the period January 1 through December 31, 2003, the following effluent monitors were inoperable for more than 30 consecutive days:

4.1 Unit I The MP1 Spent Fuel Pool Island (SFPI) Vent was declared inoperable from February 23, 2003, when the monitor calibration was determined to have lapsed. The Channel Calibration SP407ST was developed and then performed on April 14, 2003, which restored the monitor to operable status.

The monitor was released to Operations in 2001 with the understanding that it would be removed from service before the Channel Calibration was required. At the time, Millstone expected to remove the fuel from the spent fuel Island within two years, which would eliminate the need for the monitor. No provision was made to periodically calibrate the monitor. The l&C department had no transfer calibration data, no test fixture, no sources, and no calibration procedure for the monitor. I&C had to procure the services of the manufacturer Canberra (who had recently purchased Aptec-NRC) to perform a transfer calibration. I&C also had to procure a test fixture and sources, and develop the calibration procedure. During the period that the monitor was determined to be inoperable Chemistry collected and analyzed samples as required by the REMODCM.

4.2 Unit 2 The MP2 Aerated Waste Radiation Monitor (RM-9116) was inoperable on March 4, 2003, when the motor failed. A priority 5 trouble report was assigned to obtain a replacement part from the warehouse. As a result, the monitor was not restored to service within 30 days.

Condition Report, CR-03-03409, was initiated on April 4, 2003, to identify that this radiation monitor was out of service for greater than thirty days. The replacement part was then obtained and the radiation monitor was repaired and returned to service on April 10, 2003.

To prevent recurrence, administrative procedure DNAP 2000 was revised to ensure inoperable REMODCM effluent radiation monitor restoration work is assigned a higher priority.

4.3 Unit 3 - None

5.0 Errata A Unit 3 outage occurred from February 2 to March 30 during the first quarter of 2001. During this outage the Vacuum Priming System (VPS) was turned off reducing flow to circulating water pumps. Total dilution flow = circulating water +

service water = 2.20E11 + 1.19E10 = 2.32E11 liters. This will be used for Unit 3 dilution flow for the first quarter. The total dilution flow for Unit 3 during the first quarter was recalculated to adjust for the flow reduction. Total dilution flow =

circulating water + service water = 2.20E1 1 + 1.1 9E1 0 = 2.32E1 1 liters. The doses from liquid effluents for Millstone 1, 2, & 3 during the 15 quarter 2001 were recalculated to be approximately 7% higher. The updated dose tables are included here as an errata to the 2001 Radiological Effluent Release Report.

I Table 1 I 2001 Off-Site Dose Commitments from Liquid Effluents Millstone Units 1, 2 and 3

_st L e nd'2d iter' t.' irLdQu'arter .  : th Quarter:2i:...

Mannivda OT (mrem) (itern) (inern) 1 0 O.OOE+00 o.OOE+00 O.OOE+00 OOOOE+00 O 0.OE00 O.OOE+00 M O i o O.OOE+O0 O.OOE+0O O.OOE+00 P uato pry . i) (person-rm (person-rm (person-rm O.OOE+0O O.OOE+00 O.OOE+00 yp.1 O.OOE+00 O.OOE+O0 O.OOE+00 rga7' 8 O1~Q4 O.OOE+00 O.OOE+0O O.OOE+O0 (mrem)

(Avgmnmildualm (mrem) (mrem) 7~WieBd ~O.OOE+00 0.OOE+00 0.OOE+O0 O.OOE+00 0.OOE+00 0.00E+00 f*akOgn 267O

  • O.OOE+00 0.OOE+00 0.OOE+00 MxIdividuI; !N6;RY5 ~NII (mnrem) (inrem) (inern)
,-Whol B1 1.06E-04 (a) 1.65E-04 (a) 1.67E-04 (a)

,,f~i9t; 7.75E-05 (a) 1.32E-04 (a) 1.28E-04 (a)

MaxOrgan i 07E-,B4ivi 1.1 4E-03 (a)(gi) 7.74E-04 (a)(gi) 1.04E-03 (a)(gi)

PopsIation (person-rem) (person-rem) (person-rem)

. 3.86E-03 5.81 E-03 1.03E-02 Tyrd 3.13E-03 4.97E-03 9.28E-03 2.67E-02 (9i) 1.43E-02 03 2.23E-02 (9i)

Avg IndivmduaIl me^ (irem) (mrem) (mrem)

Bodr 7 .1'v.Voie 1.28E-06 1.94E-06 3.44E-06 9.04E-06 1 .66E-06 3.09E-06

~.~a~gn. OE 8 .91 E-06 (g1) 4.76E-06 (gi) 7.43E-06 (gO) st.bu rrp- ,: 2nd-Quarteri;3rdQuarertb,:: Po !t rters, (mrem) (mrem) (16rem) 3E`

3R A3 9.14E-0 2.84E-04 (c 1.55E-04 (a)

.tI&!6!cE ' 0I'&dE - ' 6.04E-05 (a) 2.78E-05 (a) 9.16E-05 (a)

\Max.Oriris , ,ip 6.54E-03 (a)(9i) 1.58E-03 (c)(bo) 6.19E-04 (a)(gi)

Population p (person-rem) (person-rem) (person-rem)

.,1/hl O S/~04Ewb V ';4" 2.25E-0 1.79E-0 2.03 E-4 4.02E-03 1.24E-02 1.84E-02 3 -g Maan 2.70E-01 (gi) 544E-02 (9i) 3.88E-02 (9i) v d 7 0(rem) e (mrem)

Whl 6J ~7.50E-06 5.97E-06 6.76E-06

~ EO~~ .34E-0 1~-h/od 4.12E-0 6.12E-0

Macrgn 8.98E-05 (gI) 1.81 E-05 (gi) I.29E-05 (91 (a)=Adult, (c)=Child, (i)=lnfant, (t)=Teen (bo)=Bone; (gi)=GI-LLI, (ki)=Kidney. (Ii)=Uver, (lu)=Lung, (th)=Thyroid I

Table 3 2001 Off-Site Dose Summary from Liquid Effluents Millstone Units 1, 2 and 3 Population Dose Commitments (person-rem) 01"aWS 5G4~, k- QE4O~ iEZ04 I iLB'8O'E Max Individual Dose Commitments vs REMODCM Limits