Connecticut, Inc., Millstone Power Station Units 1, 2 and 3 2003 Radioactive Effluent Release Report
ML041260120
Person / Time
Site: Millstone  
Issue date: 04/29/2004
From: Price J
Dominion Nuclear Connecticut
To:
Document Control Desk, NRC/FSME
References
04-258, RG-1.021
Download: ML041260120 (3)


Text

. Dominion-Dominion Nuclear Connecticut, Inc.

Millstone Power Station Rope Ferrn Road

'Waterford, CT 06385 APR 2 9 24 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Serial No.

MPS Lic/KD Docket Nos.04-258 RO 50-245 50-336 50-423 DPR-21 DPR-65 NPF-49 License Nos.

DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNITS 1.2 AND 3 2003 RADIOACTIVE EFFLUENT RELEASE REPORT In accordance with 10 CFR 50.36a, this letter transmits the annual Radioactive Effluent Release Report for the period January 2003 through December 2003. This report meets the provisions of Section 5.7.3 of the Millstone Unit No. 1 Permanently Defueled Technical Specifications (PDTS) and of Sections 6.9.1.6b and 6.9.1.4 of the Millstone Unit Nos. 2 and 3 Technical Specifications, respectively. transmits Volume I of the 2003 Radioactive Effluent Release Report, in accordance with Regulatory Guide 1.21.

Volume I contains information regarding airborne, liquid, and solid radioactivity released from Millstone, as well as off-site doses from airborne and liquid radioactive effluents, and a description of changes made to the Radioactive Effluent Monitoring and Off-site Dose Calculation Manual (REMODCM) during the year 2003. transmits Volume II of the report, which contains those changes made to the REMODCM throughout 2003. Volume II consists of a complete copy of the REMODCM as of December 31, 2003, which satisfies the requirements of Sections 5.6.1c of the Millstone Unit No. 1 PDTS, and of Sections 6.15c and 6.9.13c of the Millstone Unit Nos. 2 and 3 Technical Specifications, respectively.

If you should have any questions or require additional information, please contact Mr.

David W. Dodson at (860) 447-1791, extension 2346.

Very truly yours, J.

rice Sit ice President - Millstone

Serial No.04-258 2003 Radioactive Effluent Release Report Page 2 of 3

Enclosures:

2 Commitments made in this letter: None.

cc:

U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Mr. D. G. Holland Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 7E1 Rockville, MD 20852-2738 Mr. R. Prince NRC Inspector U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Mr. V. Nerses Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8C2 Rockville, MD 20852-2738 Mr. S. M. Schneider NRC Senior Resident Inspector Millstone Power Station Director Bureau of Air Management Monitoring & Radiation Division Department of Environmental Protection 79 Elm Street Hartford, CT 06106-5127

Serial No.04-258 2003 Radioactive Effluent Release Report Page 3 of 3 Mr. Robert Oliveira American Nuclear Insurers Town Center, Suite 300S 29 South Main Street West Hartford, CT 06107-2430