Rescheduling of Safeguards Inspection
ML041250569
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 04/30/2004
From: Creed J
Division of Reactor Safety III
To: Crane C
Exelon Generation Co
References
Download: ML041250569 (5)


Text

April 30, 2004 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC Quad Cities Nuclear Power Station 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

RESCHEDULING OF QUAD CITIES NUCLEAR POWER STATION SAFEGUARDS INSPECTION

Dear Mr. Crane:

This letter confirms rescheduling of our safeguards baseline inspection activity. The enclosure to our March 4, 2004 letter titled, Quad Cities Inspection/Activity Plan, identified a safeguards baseline inspection to be conducted May 10 - 14, 2004. This inspection has been rescheduled for May 24 - 28, 2004. The inspection will address IP 71130.01, Access Authorization, IP 71130.02, Access Control, Sections 02.01, 02.08, and 04 of IP 71130.08, Fitness-for-Duty Program, and IP 71151, Performance Indicator Verification. The change in schedule was coordinated with Mr. K. Leach of your staff.

If you have any question regarding the above changes to the safeguards inspection schedule, please contact me at (630) 829-9822.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA by Donald Funk Acting for/

James R. Creed Safeguards Program Manager Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 See Attached Distribution

April 30, 2004 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC Quad Cities Nuclear Power Station 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

RESCHEDULING OF QUAD CITIES NUCLEAR POWER STATION SAFEGUARDS INSPECTION

Dear Mr. Crane:

This letter confirms rescheduling of our safeguards baseline inspection activity. The enclosure to our March 4, 2004 letter titled, Quad Cities Inspection/Activity Plan, identified a safeguards baseline inspection to be conducted May 10 - 14, 2004. This inspection has been rescheduled for May 24 - 28, 2004. The inspection will address IP 71130.01, Access Authorization, IP 71130.02, Access Control, Sections 02.01, 02.08, and 04 of IP 71130.08, Fitness-for-Duty Program, and IP 71151, Performance Indicator Verification. The change in schedule was coordinated with Mr. K. Leach of your staff.

If you have any question regarding the above changes to the safeguards inspection schedule, please contact me at (630) 829-9857.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA by Donald Funk Acting for/

James R. Creed Safeguards Program Manager Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 See Attached Distribution DOCUMENT NAME: ML041250569.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII RIII NAME DFunk:tr MRing JCreed DATE 04/30/04 04/30/04 04/30/04 OFFICIAL RECORD COPY

C. Crane cc: Site Vice President - Quad Cities Nuclear Power Station Plant Manager - Quad Cities Nuclear Power Station Regulatory Assurance Manager - Quad Cities Nuclear Power Station Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Vice President - Law and Regulatory Affairs Mid American Energy Company Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer, State of Illinois State Liaison Officer, State of Iowa Chairman, Illinois Commerce Commission D. Tubbs, Manager of Nuclear MidAmerican Energy Company

C. Crane ADAMS Distribution:

AJM DFT LWR RidsNrrDipmIipb GEG HBC KKB DRPIII DRSIII PLB1 JRK1