MONTHYEARML0335602182003-12-16016 December 2003 Submittal of Application for Order and Conforming Administrative Amendments for License Transfer Project stage: Request ML0400801202004-01-15015 January 2004 Notice of Consideration of Approval of Transfer of Facility Operating License and Conforming Amendment, and Opportunity for a Hearing Project stage: Other ML0402102022004-02-0505 February 2004 R. E. Ginna Nuclear Power Plant, Withholding from Public Disclosure, Confidential Addendum Which Contains Sensitive Financial Information Concerning Projected Revenues & Operating Expenses of Constellation Generation Group, LLC Project stage: Other ML0406308552004-02-27027 February 2004 R. E. Ginna Nuclear Power Plant, Supplemental Information to Support Application for Order and Conforming Administrative Amendments for License Transfer Project stage: Request ML0409301942004-03-26026 March 2004 R. E. Ginna - Supplemental Information to the 12/16/03 License Transfer Application Project stage: Request ML0408209962004-04-14014 April 2004 R. E. Ginna Nuclear Power Plant, Request for Withholding Information, Rochester Gas and Electric Corporation and Constellation Generation Group, LLC Project stage: Withholding Request Acceptance ML0412800872004-04-30030 April 2004 R. E. Ginna Nuclear Power Plant, License Transfer Supplement Project stage: Request ML0412804172004-04-30030 April 2004 Supplemental Information to Support the Application for Order and Conforming Administrative Amendments for License Transfer Project stage: Request ML0413305402004-05-28028 May 2004 FRN: General Notice R.E. Ginna Nuclear Power Plant- Order Approving Transfer of License from Rochester Gas and Electric Corporation to R.E. Ginna Nuclear Power Plant, LLC and Approving Conforming Amendments Project stage: Other ML0415603252004-06-0404 June 2004 R. E. Ginna, Order Modifying May 28, 2004, Order Approving Transfer of License from Rochester Gas and Electric Corporation (Rg&E) to R. E. Ginna Nuclear Power Plant, LLC (Ginna LLC) and Approving Conforming Amendment Project stage: Other ML0416702392004-06-10010 June 2004 R. E. Ginna, Amendment No. 12 to Indemnity Agreement No. B-38 Project stage: Other ML0416002482004-06-10010 June 2004 R. E. Ginna, Amendment, Issuance of Conforming Amendment Re Transfer of License Project stage: Approval 2004-03-26
[Table View] |
Similar Documents at Ginna |
---|
Category:Letter
MONTHYEARIR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of B Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report IR 05000244/20234012023-08-15015 August 2023 LLC - Material Control and Accounting Program Inspection Report 05000244/2023401 (Cover Letter Only) IR 05000244/20230022023-08-0303 August 2023 LLC - Integrated Inspection Report 05000244/2023002 ML23191A0592023-07-21021 July 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 155 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 IR 05000244/20234022023-07-19019 July 2023 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2023402 (Cover Letter Only) RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML23135A0412023-05-15015 May 2023 2022 Annual Radioactive Effluent Release Report and 2022 Annual Radiological Environmental Operating Report ML23121A0482023-05-0101 May 2023 R. E. Ginna Nuclear Power Plant Core Operating Limits Report Cycle 44, Revision 0 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI IR 05000244/20230012023-04-26026 April 2023 LLC - Integrated Inspection Report 05000244/2023001 ML23100A0302023-04-10010 April 2023 2023 10 CFR 50.46 Annual Report ML23114A1152023-03-29029 March 2023 Electronic Reporting of Exposure Data for 2022 RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23075A0872023-03-15015 March 2023 R. E. Ginna Nuclear Power Plant - Project Manager Assignment ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000244/20220062023-03-0101 March 2023 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2022006) ML22364A0242023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 ML23060A1622023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant, Supplemental Information - Proposed Alternatives Related to the Steam Generators RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 ML23005A1762023-02-23023 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 153 Revise Technical Specifications (TS) for the Spent Fuel Pool Charcoal System and Two (2) TS Administrative Changes ML23005A1222023-02-22022 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No 152 Adopt TSTF-315-Revise Technical Specification 3.1.8, Physics Tests Exceptions - Mode 2 RS-23-040, Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators2023-02-21021 February 2023 Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators ML22287A0692023-02-0808 February 2023 R. E. Ginna Station - Forward Fit Analysis (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23031A2992023-02-0707 February 2023 R. E. Ginna Nuclear Power Plant - Withdrawal of an Amendment Request ML23010A0112023-02-0101 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Inservice Testing of Refueling Water Storage Tank Outlet Value RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 IR 05000244/20223012023-01-20020 January 2023 Initial Operator Licensing Examination Report 05000244/2022301 IR 05000244/20220122023-01-12012 January 2023 LLC - Design Basis Assurance Inspection (Teams) Inspection Report 05000244/2022012 ML22362A0382022-12-28028 December 2022 R. E. Ginna Nuclear Power Plant - Letter to Withdraw Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML22348A2062022-12-14014 December 2022 Re. Ginna Nuclear Power Plant - Annual Commitment Change Notification RS-22-123, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator2022-12-0707 December 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator 2024-02-05
[Table view] |
Text
Robert C. Mecredy R OW Always at YourService Vice President Nuclear Operations March 26, 2004 Mr. Robert L. Clark Office of Nuclear Regulatory Regulation U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001
Subject:
License Transfer Application R. E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Clark:
The purpose of this letter is to supplement our December 16, 2003 "Application for Order and Conforming Administrative Amendments for License Transfer", particularly with respect to Exhibit 12 of that submittal, the "Interconnection Agreement between Constellation Generation Group, LLC and Rochester Gas and Electric Corporation".
The supplementary information, as well as the questions discussed via telecon on March 3, 2004, is provided in Attachment 1.
Very truly yours, Robert C. Mecredy Attachment 1
-OD An equal opportunity employer 89 East Avenue I Rochester, NY 14649 tel (585) 546-2700 www.rge.com i oO q d An Energy East Company
cc:
Kenneth Kolaczyk, Sr. Resideni Inspector R.E. Ginna Nuclear Power Plant U.S. Nuclear Regulatory Commission 1503 Lake Road Ontario,NY 14519 Hubert J. Miller Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Daniel F. Stenger Ballard Spahr Andrews & Ingersoll, LLP 601 13' Street, N.W., Suite 1000 South Washington, DC 20005 Mr. James M. Petro Counsel for Constellation Energy Group 750 East Pratt Street, 5th Floor Legal Department Baltimore, MD 21201 James R. Curtiss Counsel for Constellation Energy Group at Winston & Strawn 1400 L Street, N.W.
Washington, DC 20005 Samuel Behrends, IV Counsel for Rochester Gas and Electric Corporation at LeBoeuf, Lamb, Greene and MacRae 1875 Connecticut Avenue, N.W.
Washington, DC 20009 Robert L. Clark (Mail Stop 0-8-C2)
Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852
Attachment 1
- 1) The license transfer application is stated to be based on Section 184 of the Atomic Energy Act of 1954, 10 CFR 50.80 and 50.90. Confirm that after the transfer of Ginna Nuclear Power Plant ownership to Ginna LLC which will result in the Rochester Gas and Electric Corporation owning and operating most of the high voltage switchyard, all the requirements of electric power systems to GDC 17 of Appendix A of 10 CFR 50 and loss of all alternating current power to 10 CFR 50.63 will be met consistent with the licensing basis.
RG&E is committed both to General Design Criteron 17 and 10 CFR 50.63. A description of our conformance is provided in UFSAR section 3.1.2.2.8 and Technical Specification B3.8.1, "AC Sources, Applicable Safety Analyses" for GDC 17, and in UFSAR section 8.1.4.4 for Station Blackout. Conformance with these requirements will be maintained following license transfer from RG&E to Ginna LLC.
- 2) The Appendix I, Substation Components, in Exhibit 12 of the submittal has been left blank. Provide information on the components to be included in this Appendix.
The NRC Maintenance, Rule 10 CFR 50.65, as implemented at Ginna Station does not include within its scope any components within Station 13A that will be owned by RG&E following the license transfer. The Maintenance Rule Scope boundary for offsite power is defined at the breakers 52/76702 and 52/75112 located onsite. The Maintenance Rule Scope boundary for the 115 KV output is defined at the output breakers/disconnect switches at Station 13A. All these components will be owned and maintained by Ginna LLC following the sale. Components at Station 13A that will be owned by Ginna LLC following the license transfer (as set forth in Appendix A to the Interconnect Agreement) will be maintained in accordance with the Ginna Station Preventative Maintenance program and will be consistent with good utility practices. Appendix I sets forth the substation components to be retained by the Transmission Owner that are covered by the NRC Maintenance Rule, per Interconnection Agreement section 10.6.2. The schedule in Appendix I correctly indicates "None", since the Transmission Owners will not retain ownership of facilities/components within the scope of the NRC Maintenance Rule.
Those components being transferred to Ginna LLC that are presently within Maintenance Rule will remain so; no changes to the Maintenance Rule scoping are being made.
- 3) Clause 9.6.3 in Exhibit 12, addresses voltage limits. Are there any procedures addressing the time period within which the transmission company has to inform the generating company about problems in the transmission systems that may require emergency measures to be initiated by the generating company?
The Interconnection Agreement, Article 13.2, states the Transmission Owner ("TO")
shall promptly notify Ginna LLC of emergency conditions on the TO interconnection or transmission system that may reasonably be expected to affect Ginna Station operations.
A 'Substation Operating Guidelines Procedure Agreement' is in development between RG&E (the Transmission Owner) and Ginna LLC. This procedure discusses the required notifications for problems in the transmission system, and requires the RGE Systems Operations Transmission Operator to notify Ginna Station 'as soon as possible' during adverse transmission system conditions. The 'as soon as possible' wording was selected, consistent with Article 13.2 of the Interconnection Agreement, to allow RG&E to respond to emergency situations immediately, with Ginna notification performed when the situation permits. There is no intent to specify a set time limit for notification.
Nevertheless, we will conform the "as soon as possible" language in the Substation Operating Guidelines Procedure Agreement to the "promptly" language of the Interconnection Agreement.
- 4) Identify whether procedures for high voltage switchyard control and maintenance have been written and implemented for "joint use facilities" and how these procedures compare with industry practices.
The term "joint use facilities" is defined in the Interconnection Agreement, Article 1. All substation 13A components shall be owned by Ginna LLC or RG&E, the Transmission Owner, in accordance with Article 10 of the Interconnection Agreement. The Transmission Owner shall maintain its facilities and components in a safe and reliable manner in accordance with Good Utility Practice and the Interconnection Agreement.
The RGE Energy System Operating Rules (ESOR) are currently in effect for high voltage switchyard control and maintenance. In accordance with the Interconnection Agreement, the ESOR shall be complied with for 'joint use facilities' (Substation 13A). The ESOR establishes the processes for control, isolation and restoration of electrical equipment and are consistent with standard industry practices.
- 5) Describe how the maintenance rule will be implemented for the high voltage switchyard following license transfer.
The components in Substation 13A impact Maintenance Rule compliance at Ginna in that the plant level performance is affected by the performance of Station 13A pipe cable, current transformers, potential transformers, breakers and disconnects, and the circuit 767 offsite power source is affected by transformer 6, its disconnect and the 767 regulator. As noted above, the existing Ginna Maintenance Rule scoping and implementation will not change as a result of the license transfer.