Clarification of Decommissioning Funding Status Information
ML032810281
Person / Time
Site: Harris, Brunswick, Robinson  Duke Energy icon.png
Issue date: 09/26/2003
From: Holt J
Progress Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PE&RAS-03-105
Download: ML032810281 (6)


Text

rA e- -- - 1s IU UrK DU.-I/t)(1) g Progress Energy PO Box 1551 411 Fayeteville Street Mall Raleigh NC 27602 Serial: PE&RAS-03-105 September 26, 2003 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 / LICENSE NO. DPR-23 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324 / LICENSE NOS. DPR-71 AND DPR-62 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400 / LICENSE NO. NPF-63 CLARIFICATION OF DECOMMISSIONING FUNDING STATUS INFORMATION

REFERENCE:

Letter PE&RAS-03-017 from Progress Energy Carolinas, Inc. to NRC, "Biennial Decommissioning Funding Status Report and Notification of Change in Decommissioning Funding Method," dated March 28, 2003.

Ladies and Gentlemen:

In the referenced letter, Progress Energy Carolinas, Inc. (PEC) submitted, pursuant to 10 CFR 50.75(f)(1), the biennial status report for funding the decommissioning of each reactor owned, or partially owned, by PEC. As required, the report provided the amount of decommissioning funds estimated to be required, fund balances, projected annual contributions, and assumptions about escalation and earnings rates. However, consistent with previous reports, this information was not broken out by jurisdiction to correlate with the applicable real rate of return. PEC is providing this detail in response to a verbal request for clarification by an NRC Staff member.

This document contains no new regulatory commitment.

Please contact me at (919) 546-6901 if you need additional information concerning this report.

Sicyly, es W. Holt er - Performance Evaluation & Regulatory Affairs HAS fr )

woolf

United States Nuclear Regulatory Commission PE&RAS-03-105 Page 2 Attachments:

  • Attachment 1,Financial Assurance Mechanism Details, H. B. Robinson Steam Electric Plant, Unit No. 2
  • Attachment 2, Financial Assurance Mechanism Details, Brunswick Steam Electric Plant, Unit No. I
  • Attachment 3, Financial Assurance Mechanism Details, Brunswick Steam Electric Plant, Unit No. 2
  • Attachment 4, Financial Assurance Mechanism Details, Shearon Harris Nuclear Power Plant, Unit No. 1 c: L. A. Reyes, Regional Administrator - Region II USNRC Resident Inspector - BSEP, Unit Nos. 1 and 2 USNRC Resident Inspector - HBRSEP, Unit No. 2 USNRC Resident Inspector - SHNPP, Unit No. I1 R. William Borchardt, (Acting) Director - Nuclear Reactor Regulation B. L. Mozafari, NRR Project Manager - BSEP, Unit Nos. I and 2 C. P. Patel, NRR Project Manager - SHNPP, Unit No. 1; HBRSEP, Unit No. 2 M. A Dusaniwskyj, OWFN 12D1, NRR/DRIP/REXB J. A. Sanford - North Carolina Utilities Commission

United States Nuclear Regulatory Commission PE&RAS-03-105 Page 3 Attachment 1 Financial Assurance Mechanism Details H. B. Robinson Steam Electric Plant, Unit No. 2 Docket No. 50-261 / License No. DPR-23

  • Amount of decommissioning funds estimated to be required pursuant to 10 CFR 50.75(b) and (c)

$320 million at expiration of current license, July 31, 2010

$208 million estimated to be required from North Carolina

$112 million estimated to be required from All Others

  • Amount of decommissioning funds accumulated as of December 31, 2002

$117,409,857

$74,577,037 accumulated from North Carolina

$42,832,820 accumulated from All Others

  • Schedule of the annual amounts remaining to be collected NRC Required Minimum: $20.74 million

$13.13 million required annually from North Carolina

$7.61 million required annually from All Others Allowed by North Carolina Utilities $9,436,965 Commission and Public Service $7,720,987 to be collected annually from North Carolina Commission of South Carolina: $1,715,978 to be collected annually from South Carolina Under wholesale contracts: $1,517,276 (contribution is not credited in future years)

  • Assumptions used regarding rates of escalation in decommissioning costs, rates of earnings on decommissioning funds, and rates of other factors used in funding projections Rate of escalation in decommissioning costs = 0%

- Rate of earnings on decommissioning funds = 3.25% (North Carolina) 2% (All Other Contributions)

The above assumptions result in an associated real rate of return of 3.25% and 2% for North Carolina and All Other Contributions, respectively. For wholesale contracts, the resultant assumed real rate of return of 2% is only applicable to funds accumulated from previous contributions associated with those contracts.

United States Nuclear Regulatory Commission PE&RAS-03-105 Page 4 Attachment 2 Financial Assurance Mechanism Details Brunswick Steam Electric Plant, Unit No. 1 Docket No. 50-325 / License No. DPR-71

  • Amount of decommissioning funds estimated to be required pursuant to 10 CFR 50.75(b) and (c)

$418 million at expiration of current license, September 8, 2016 Progress Energy Carolinas, Inc. share (81.67%/o) = $341 million

$222 million estimated to be required from North Carolina

$119 million estimated to be required from All Others

  • Amount of decommissioning funds accumulated as of December 31, 2002

$106,845,010

$68,179,107 accumulated from North Carolina

$38,665,903 accumulated from All Others

  • Schedule of the annual amounts remaining to be collected NRC Required Minimum: $11.15 million

$6.77 million required annually from North Carolina

$4.38 million required annually from All Others Allowed by North Carolina Utilities $6,075,477 Commission and Public Service $4,934,785 to be collected annually from North Carolina Commission of South Carolina: $1,140,692 to be collected annually from South Carolina Under wholesale contracts: $1,435,370 (contribution is not credited in future years)

  • Assumptions used regarding rates of escalation in deconunissioning costs, rates of earnings on decommissioning funds, and rates of other factors used in funding projections

- Rate of escalation in decommissioning costs = 0%

Rate of earnings on decommissioning funds = 3.25% (North Carolina) 2% (All Other Contributions)

The above assumptions result in an associated real rate of return of 3.25% and 2% for North Carolina and All Other Contributions, respectively. For wholesale contracts, the resultant assumed real rate of return of 2% is only applicable to funds accumulated from previous contributions associated with those contracts.

United States Nuclear Regulatory Commission PE&RAS-03-105 Page 5 Attachment 3 Financial Assurance Mechanism Details Brunswick Steam Electric Plant, Unit No. 2 Docket No. 50-324 / License No. DPR-62

  • Amount of decommissioning funds estimated to be required pursuant to 10 CFR 50.75 Q) and (c)

$408 million at expiration of current license, December 27, 2014 Progress Energy Carolinas, Inc. share (81.67%) = $333 million

$216 million estimated to be required from North Carolina

$117 million estimated to be required from All Others

  • Amount of decommissioning funds accumulated as of December 31, 2002

$121,608,801

$78,271,496 accumulated from North Carolina

$43,337,305 accumulated from All Others

  • Schedule of the annual amounts remaining to be collected NRC Required Minimum: $11.50 million

$6.94 million required annually from North Carolina

$4.56 million required annually from All Others Allowed by North Carolina Utilities $4,455,309 Commission and Public Service $3,672,213 to be collected annually from North Carolina Commission of South Carolina: $783,096 to be collected annually from South Carolina Under wholesale contracts: $1,701,041 (contribution is not credited in fiuture years)

  • Assumptions used regarding rates of escalation in decommissioning costs, rates of earnings on decommissioning funds, and rates of other factors used in funding projections

-Rate of escalation in decommissioning costs - 0%

Rate of earnings on decommissioning funds = 3.25% (North Carolina) 2% (All Other Contributions)

The above assumptions result in an associated real rate of return of 3.25% and 2% for North Carolina and All Other Contributions, respectively. For wholesale contracts, the resultant assumed real rate of return of 2% is only applicable to funds accumulated from previous contributions associated with those contracts.

United States Nuclear Regulatory Commission PE&RAS-03-105 Page 6 Attachment 4 Financial Assurance Mechanism Details Shearon Harris Nudear Power Plant, Unit No. 1 Docket No. 50-400 / License No. NPF-63

  • Amount of decommissioning funds estimated to be required pursuant to 10 CFR 50.75(b) and (c)

$336 million at expiration of current license, October 24, 2026 Progress Energy Carolinas, Inc. share (83.83%) = $282 million

$183 million estimated to be required from North Carolina

$99 million estimated to be required from All Others

  • Amount of decommissioning funds accumulated as of December 31, 2002

$77,429,379

$50,467,087 accumulated from North Carolina

$26,962,292 accumulated from All Others

  • Schedule of the annual amounts remaining to be collected NRC Required Minimum: $3.93 million

$2.10 million required annually from North Carolina

$1.83 million required annually from All Others Allowed by North Carolina Utilities $5,216,661 Commission and Public Service $4,204,972 to be collected annually from North Carolina Commission of South Carolina: $1,011,689 to be collected annually from South Carolina Under wholesale contracts: $948,629 (contribution is not credited in future years)

  • Assumptions used regarding rates of escalation in decommissioning costs, rates of earnings on decommissioning funds, and rates of other factors used in funding projections Rate of escalation in decommissioning costs = 0%

Rate of earnings on decommissioning funds = 3.25% (North Carolina) 2% (All Other Contributions)

The above assumptions result in an associated real rate of return of 3.25% and 2% for North Carolina and All Other Contributions, respectively. For wholesale contracts, the resultant assumed real rate of return of 2% is only applicable to funds accumulated from previous contributions associated with those contracts.