MONTHYEARML0311103792003-04-0909 April 2003 Ninth Refueling Outage Steam Generator Tube Inspection Report Project stage: Request ML0322002542003-07-29029 July 2003 Ninth Refueling Outage Steam Generation Tube Inspection Report, Additional Information Pertaining to Steam Generator Secondary Side Inspections Project stage: Other ML0327900182003-10-28028 October 2003 Letter, Evaluation of Steam Generator Tube Inspection Report, Ninth Refueling Outage, April 2002 Project stage: Other 2003-04-09
[Table View] |
|
---|
Category:Letter
MONTHYEARML24225A1112024-08-13013 August 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, “Revise Risk Informed Completion Time (RICT) Program” Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000456/20240022024-08-0808 August 2024 Integrated Inspection Report 05000456/2024002 and 05000457/2024002 ML24172A1252024-07-26026 July 2024 Environmental Assessment and Finding of No Significant Impact Related to a Requested Increase in Ultimate Heat Sink Temperature (EPID L-2024-LLA-0075) - Transmittal Letter ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) 05000456/LER-2024-001, Submittal of LER 2024-001-00 for Braidwood Station, Unit 1, Trip on Low Steam Generator Level Due to Failure to Verify Isolation Valves Were Open2024-07-0303 July 2024 Submittal of LER 2024-001-00 for Braidwood Station, Unit 1, Trip on Low Steam Generator Level Due to Failure to Verify Isolation Valves Were Open ML24163A3922024-06-25025 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, & Opportunity for a Hearing (EPID L-2024-LLA-0075)- Letter RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24164A2132024-06-13013 June 2024 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Braidwood Nuclear Plant RS-24-057, License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink2024-06-0404 June 2024 License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink IR 05000456/20240102024-05-31031 May 2024 License Renewal Phase 1 Report 05000456/2024010 RS-24-044, License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed2024-05-28028 May 2024 License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed RS-24-043, Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications2024-05-24024 May 2024 Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report ML24136A2452024-05-15015 May 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000457/2024004 ML24136A0132024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report ML24128A1212024-05-0707 May 2024 Response to Braidwood and Dresden FOF Dates Change Request (2025) ML24122A6522024-05-0101 May 2024 Submittal of 2023 Annual Radioactive Effluent Release Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000456/20243012024-04-29029 April 2024 NRC Initial License Examination Report 05000456/2024301; 05000457/2024301 RS-24-026, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR)2024-04-25025 April 2024 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML24116A0052024-04-25025 April 2024 Transmittal of Braidwood Station, Unit 1, Core Operating Limits Report, Braidwood Unit 1 Cycle 25 IR 05000456/20240012024-04-24024 April 2024 Integrated Inspection Report 05000456/2024001 and 05000457/2024001 ML24113A1272024-04-22022 April 2024 Audit Plan in Support of Review of LAR Revision of TS 3.7.15, 3.7.16, and 4.3.1 (EPID: L-2023-LLA-0136) (Non-Proprietary) IR 05000457/20240902024-04-19019 April 2024 Final Significance Determination for 2b Auxiliary Feedwater Pump Diesel Engine Fuel Oil Dilution Issue - NRC Inspection Report 05000457/2024090 IR 05000456/20230042024-02-0202 February 2024 Integrated Inspection Report 05000456/2023004 and 05000457/2023004 ML24025C7242024-01-29029 January 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000456/2024002; 05000457/2024002 IR 05000457/20230112024-01-25025 January 2024 2B Auxiliary Feedwater Pump Diesel Fuel Oil Dilution Report 05000457/2023011 and Preliminary Greater than Green Finding and Apparent Violation ML24018A0362024-01-17017 January 2024 Paragon Energy Solutions, Defect with Detroit Diesel/Mtu Fuel Injectors P/N R5229660 Cat Id 0001390618 RS-24-004, Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-01-11011 January 2024 Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators ML23348A2162023-12-15015 December 2023 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0030 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000456/20200232023-12-15015 December 2023 Baseline Security Inspection Document; 05000456/2023/402; 05000457/2023/402 ML23277A0032023-12-11011 December 2023 Issuance of Amendments Regarding Adoption of TSTF-370 ML23339A0452023-12-0505 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000546/2024010 ML23313A1552023-12-0101 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23331A8922023-11-22022 November 2023 Supplement - Braidwood Security Rule Exemption Request ISFSI Docket No. Reference 05000457/LER-2023-001, Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case2023-11-17017 November 2023 Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case ML23321A0442023-11-17017 November 2023 Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline RS-23-118, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums RS-23-114, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2023-11-0101 November 2023 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds IR 05000456/20234012023-10-18018 October 2023 Security Baseline Inspection Report 05000456/2023401 and 05000457/2023401 IR 05000456/20230102023-10-18018 October 2023 Functional Engineering Inspection Commercial Grade Dedication Report 05000456/2023010 and 05000457/2023010 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.2023-09-29029 September 2023 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. ML23226A0062023-09-19019 September 2023 Review of License Renewal Commitment Number 10 Submittal ML23180A1692023-09-11011 September 2023 Calvert Cliff Units 1 & 2, and R.E. Ginna Plant - Withdrawal of Proposed Alternatives to American Society of Mechanical Engineers (ASME) Requirements (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) 2024-08-09
[Table view] |
Text
October 28, 2003 Mr. John L. Skolds, President Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
EVALUATION OF STEAM GENERATOR TUBE INSPECTION REPORT BRAIDWOOD STATION, UNIT 2, NINTH REFUELING OUTAGE, APRIL 2002 (TAC NO. MB8476)
Dear Mr. Skolds:
By letters dated May 10, 2002 (ML021480394) and April 9, 2003 (ML031110379), Exelon Generation Company, the licensee for Braidwood Station, submitted reports from the steam generator (SG) inspections performed in Unit 2 during the ninth refueling outage in April 2002.
These reports were submitted in accordance with Braidwood Station technical specifications 5.6.9.a and 5.6.9.b. After initial review, the NRC staff developed a set of questions and the requested information was submitted by the licensee in a letter dated July 29, 2003 (ML032200254). The NRCs evaluation of the inspection results is summarized below.
Braidwood Station, Unit 2 has four Model D-5 recirculating steam generators that began operation in 1988. Each steam generator contains 4,570 thermally treated Alloy 600 tubes.
Each tube has a nominal outside diameter of 0.750 inches and nominal thickness of 0.043 inches. The tubes were hydraulically expanded at both ends for the full length of the tubesheet, and they are supported by stainless steel support plates with quatrefoil-shaped holes. The U-bend portion is supported by four chromium-plated Alloy 600 anti-vibration bars (AVBs).
During the 2002 outage, the licensee performed bobbin coil inspections on 100 percent of the tubes in SG 2A. Rotating probe inspections were performed at some of the locations with bobbin coil indications. No eddy current inspections were performed in SGs 2B, 2C, or 2D. As a result of these inspections, two tubes were plugged due to wear at anti-vibration bars.
Anti-vibration bar wear was the only degradation mode reported from the inspection.
Foreign object search and retrieval (FOSAR) was performed on the secondary side in all four steam generators. The FOSAR inspections revealed a total of six objects in SGs 2B (2 objects), 2C (1 object), and 2D (3 objects), four of which were removed. The licensee found no indications of degradation associated with foreign objects. Additional details regarding these loose parts can be found in the licensees July 29, 2003 letter.
J. Skolds Based on a review of the information provided by the licensee, the NRC staff concludes that the information the licensee was required to submit according to their technical specifications was provided and that no additional follow-up is required at this time.
Sincerely,
/RA/
Mahesh Chawla, Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos.: STN 50-456 and STN 50-457 cc w/encls: See next page
J. Skolds Based on a review of the information provided by the licensee, the NRC staff concludes that the information the licensee was required to submit according to their technical specifications was provided and that no additional follow-up is required at this time.
Sincerely,
/RA/
Mahesh Chawla, Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos.: STN 50-456 and STN 50-457 cc w/encls: See next page DISTRIBUTION:
PUBLIC PD3-2 r/f WRuland PCoates AMendiola GHill (4)
MChawla AStone, RIII GMakar WBeckner MMurphy LLund OGC ACRS ADAMS Accession Number: ML032790018 OFFICE PM:LPD3-2 LA:LPD3-2 C:EMCB:DE TL:LPD3-2 SC:LPD3-2 NAME MChawla PCoates LLund* DPickett AMendiola DATE 108/03 10/8/03 9/22/03 10/8/03 10/28/03 OFFICIAL RECORD COPY
Braidwood Station Units 1 and 2 cc:
Regional Administrator, Region III Illinois Emergency Management U.S. Nuclear Regulatory Commission Agency 801 Warrenville Road Division of Disaster Assistance &
Lisle, IL 60532-4351 Preparedness 110 East Adams Street Document Control Desk - Licensing Springfield, IL 62701-1109 Exelon Generation Company, LLC 4300 Winfield Road Chairman Warrenville, IL 60555 Will County Board of Supervisors Will County Board Courthouse Ms. C. Sue Hauser, Project Manager Joliet, IL 60434 Westinghouse Electric Corporation Energy Systems Business Unit Attorney General Post Office Box 355 500 S. Second Street Pittsburgh, PA 15230 Springfield, IL 62701 Joseph Gallo George L. Edgar Gallo & Ross Morgan, Lewis and Bockius 1025 Connecticut Ave., NW, Suite 1014 1800 M Street, NW Washington, DC 20036 Washington, DC 20036-5869 Ms. Bridget Little Rorem Braidwood Station Plant Manager Appleseed Coordinator Exelon Generation Company, LLC 117 N. Linden Street 35100 S. Rt. 53, Suite 84 Essex, IL 60935 Braceville, IL 60407-9619 Howard A. Learner Site Vice President - Braidwood Environmental Law and Policy Exelon Generation Company, LLC Center of the Midwest 35100 S. Rt. 53, Suite 84 35 East Wacker Dr., Suite 1300 Chicago, IL 60601-2110 Braceville, IL 60407-9619 U.S. Nuclear Regulatory Commission Senior Vice President, Nuclear Braidwood Resident Inspectors Office Services 35100 S. Rt. 53, Suite 79 Exelon Generation Company, LLC Braceville, IL 60407 4300 Winfield Road Warrenville, IL 60555 Ms. Lorraine Creek RR 1, Box 182 Vice President - Operations Support Manteno, IL 60950 Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Chairman, Ogle County Board Post Office Box 357 Oregon, IL 61061
J. Skolds Braidwood Station Units 1 and 2 Regulatory Assurance Manager - Braidwood Exelon Generation Company, LLC 35100 S. Rt. 53, Suite 84 Braceville, IL 60407-9619 Chief Operating Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Director Licensing Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Senior Counsel, Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President - Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Manager Licensing - Braidwood and Byron Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555