E-Mail from Allen Hiser to NRR Re Vhp Nozzle Status Report Update
ML022400792
Person / Time
Site: Millstone, Davis Besse, Diablo Canyon, Cook  Pacific Gas & Electric icon.png
Issue date: 01/24/2002
From: Allen Hiser
Office of Nuclear Reactor Regulation
To: Harrison J, Albert Lee, Sands S, Stang J, Jacob Zimmerman
Office of Nuclear Reactor Regulation
References
FOIA/PA-2002-0229
Download: ML022400792 (2)


Text

Page 1

  • Eacb Zimmerman - Re: VHP Nozzle Status Report Update ,

From: Allen Hiser To: Andrea Lee; Jacob Zimmerman; John Harrison; John Stang; Stephen Sands Date: Thu, Jan 24, 2002 3:19 PM

Subject:

Re: VHP Nozzle Status Report Update Jake, For my sanity, I have prepared a table that summarizes the status of close-out letters for those plants that are outstanding inthe previous status report. The table, in the attached file, lists the action item holding up issuance of the close-out letter, which is either EMCB, the licensee, or DLPM (not sure about the status of the Diablo Canyon letter).

Use this or not, at your discretion.

Allen

>>> Jacob Zimmerman 01/24/02 01:17PM >>>

Please send me you updated information by COB today. I plan to issue tomorrow's update by noon tomorrow. Attached is last week's status report.

John H. - Brief summary of today's Millstone 2 meeting.

Stephen S. - Brief summary of yesterday's Davis-Besse meeting.

John Stang - Status of D.C. Cook's inspections (i.e., plan to start when?, etc..)

Allen Hiser - Any updates to closeout letters and status of EMCB reviews.

Thanks, Jake CC: Beth Wetzel g /9

1-Jacob Zimmerman - Close-out Status.wod ,Page 1

-Jacob Zimmerman - Close-out Status.wpd Page 1 BULLETIN 2001-01 CLOSE-OUT LETTER STATUS (1/23/2001)

PLANT NAME ACTION ITEM CLOSEOUT LETTER DATE ANO-1 EMCB - Use of leakage for follow-up monitoring ??

Crystal River 3 EMCB - Issue letter Davis-Besse EMCB - Provide basis paragraph Diablo Canyon 1 DLPM Diablo Canyon 2 Ginna EMCB - Approach is acceptable ??

Indian Point 2 EMCB - Issue letter Indian Point 3 Millstone 2 Licensee - meeting with licensee 1/24 North Anna 1 Licensee - Qualified visual analysis North Anna 2 Oconee 1 EMCB - Use of leakage for follow-up monitoring ??

Oconee 2 Oconee 3 Palo Verde 1 Licensee - clarification on scope/extent of inspection Palo Verde 2 Palo Verde 3 Point Beach 1 Licensee - submit report to staff 30-days ahead of tha incniz-rfinn Point Beach 2 Surry 1 Licensee - Qualified visual analysis Surry 2