- Eacb Zimmerman - Re: VHP Nozzle Status Report Update Page 1 Allen Hiser Andrea Lee; Jacob Zimmerman; John Harrison; John Stang; Stephen Sands Thu, Jan 24, 2002 3:19 PM Re: VHP Nozzle Status Report Update
- Jake, For my sanity, I have prepared a table that summarizes the status of close-out letters for those plants that are outstanding inthe previous status report. The table, in the attached file, lists the action item holding up issuance of the close-out letter, which is either EMCB, the licensee, or DLPM (not sure about the status of the Diablo Canyon letter).
Use this or not, at your discretion.
Allen
>>> Jacob Zimmerman 01/24/02 01:17PM >>>
Please send me you updated information by COB today. I plan to issue tomorrow's update by noon tomorrow. Attached is last week's status report.
John H. - Brief summary of today's Millstone 2 meeting.
Stephen S. - Brief summary of yesterday's Davis-Besse meeting.
John Stang - Status of D.C. Cook's inspections (i.e., plan to start when?, etc..)
Allen Hiser - Any updates to closeout letters and status of EMCB reviews.
- Thanks, Jake CC:
Beth Wetzel From:
To:
Date:
Subject:
g / 9
-Jacob Zimmerman - Close-out Status.wpd Page 1 BULLETIN 2001-01 CLOSE-OUT LETTER STATUS (1/23/2001)
PLANT NAME ACTION ITEM CLOSEOUT LETTER DATE ANO-1 EMCB - Use of leakage for follow-up monitoring ??
Crystal River 3 EMCB - Issue letter Davis-Besse EMCB - Provide basis paragraph Diablo Canyon 1 DLPM Diablo Canyon 2 Ginna EMCB - Approach is acceptable ??
Indian Point 2 EMCB - Issue letter Indian Point 3 Millstone 2 Licensee - meeting with licensee 1/24 North Anna 1 Licensee - Qualified visual analysis North Anna 2 Oconee 1 EMCB - Use of leakage for follow-up monitoring ??
Oconee 2 Oconee 3 Palo Verde 1 Licensee - clarification on scope/extent of inspection Palo Verde 2 Palo Verde 3 Point Beach 1 Licensee - submit report to staff 30-days ahead of tha incniz-rfinn Point Beach 2 Surry 1 Licensee - Qualified visual analysis Surry 2
,Page 1 1 -Jacob Zimmerman - Close-out Status.wod