January 30, 2002 Mr. Oliver D. Kingsley, President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
OYSTER CREEK NUCLEAR GENERATING STATION - SITE-SPECIFIC WORKSHEETS FOR USE IN THE NUCLEAR REGULATORY COMMISSIONS SIGNIFICANCE DETERMINATION PROCESS (TAC NO. MA6544)
Dear Mr. Kingsley:
Enclosed please find the Risk-Informed Inspection Notebook which incorporates the updated Significance Determination Process (SDP) Phase 2 Worksheets that inspectors will be using to characterize and risk-inform inspection findings. This document is one of the key implementation tools of the reactor safety SDP in the reactor oversight process.
The 1999 Pilot Plant review effort clearly indicated that significant site-specific design and risk information was not captured in the Phase 2 Worksheets forwarded to you last spring.
Subsequently, a site visit was conducted by the Nuclear Regulatory Commission (NRC) to verify and update plant equipment configuration data and to collect site-specific risk information from your staff. The enclosed document reflects the results of this visit.
The enclosed Phase 2 Worksheets have incorporated much of the information we obtained during our site visits. The staff encourages further licensee comments where it is identified that the Worksheets give inaccurately low significance determinations. Any comments should be provided to the Document Control Desk, with a copy to the Chief, Probabilistic Safety Assessment Branch, Office of Nuclear Reactor Regulation. We will continue to assess SDP accuracy and update the document based on continuing experience.
O. Kingsley While the enclosed Phase 2 Worksheets have been verified by our staff to include the site-specific data, we will continue to assess its accuracy throughout implementation and update the document based on comments by our inspectors and your staff.
If you have any questions, you may reach me at (301) 415-1261.
Sincerely,
/RA/
Helen N. Pastis, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-219
Enclosure:
As stated cc w/o encl: See next page
O. Kingsley While the enclosed Phase 2 Worksheets have been verified by our staff to include the site-specific data, we will continue to assess its accuracy throughout implementation and update the document based on comments by our inspectors and your staff.
If you have any questions, you may reach me at (301) 415-1261.
Sincerely,
/RA/
Helen N. Pastis, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-219
Enclosure:
As stated cc w/o encl: See next page DISTRIBUTION:
PUBLIC PD I-1 R/F JMunday SLittle HPastis MSykes ACRS OGC JRogge
Enclosure:
ML013120607 Package: ML013120589 ACCESSION NOs: Letter: ML013120536 OFFICE PDI-1/PM PDI-1/LA PDI-1/(A)SC NAME HPastis:cn SLittle JMunday DATE 1/29/02 1/28/02 1/30/02 OFFICIAL RECORD COPY
Oyster Creek Nuclear Generating Station cc:
John Skolds Chief Operating Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 William Bohkle Senior Vice President Nuclear Services Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 John B. Cotton Senior Vice President - Operations Support Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Joseph J. Hagan Senior Vice President -
Mid Atlantic Regional Operating Group Exelon Generation Company, LLC 200 Exelon Way, Suite 305 Kennett Square, PA 19348 Jeffrey A. Benjamin Vice President -
Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Ron J. DeGregorio Vice President Oyster Creek Nuclear Generating Station AmerGen Energy Company, LLC P.O. Box 388 Forked River, NJ 08731 H. J. Miller Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mayor Lacey Township 818 West Lacey Road Forked River, NJ 08731 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 445 Forked River, NJ 08731 Kent Tosch, Chief New Jersey Department of Environmental Protection Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 Michael P. Gallagher Director - Licensing Exelon Generation Company, LLC Correspondence Control Desk P.O. Box 160 Kennett Square, PA 19348 Ernest J. Harkness Plant Manager Oyster Creek Nuclear Generating Station AmerGen Energy Company, LLC P.O. Box 388 Forked River, NJ 08731 Kevin P. Gallen, Esquire Morgan, Lewis & Bockius LLP 1800 M Street, NW Washington, DC 20036-5869 Manager Regulatory Assurance Oyster Creek Nuclear Generating Station AmerGen Energy Company, LLC P.O. Box 388 Forked River, NJ 08731 Edward J. Cullen, Jr., Esquire Vice President, General Counsel and Secretary Exelon Generation Company, LLC 300 Exelon Way Kennett Square, PA 19348 J. Rogge, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415