Site-Specific Worksheets for Use in the NRC SDP
ML013120536
Person / Time
Site: Oyster Creek
Issue date: 01/30/2002
From: Pastis H
NRC/NRR/DLPM/LPD1
To: Kingsley O
Exelon Generation Co, Exelon Nuclear
Pastis H, NRR/DLPM, 415-1261
Shared Package
ML013120589 List:
References
TAC MA6544
Download: ML013120536 (5)


Text

January 30, 2002 Mr. Oliver D. Kingsley, President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

OYSTER CREEK NUCLEAR GENERATING STATION - SITE-SPECIFIC WORKSHEETS FOR USE IN THE NUCLEAR REGULATORY COMMISSIONS SIGNIFICANCE DETERMINATION PROCESS (TAC NO. MA6544)

Dear Mr. Kingsley:

Enclosed please find the Risk-Informed Inspection Notebook which incorporates the updated Significance Determination Process (SDP) Phase 2 Worksheets that inspectors will be using to characterize and risk-inform inspection findings. This document is one of the key implementation tools of the reactor safety SDP in the reactor oversight process.

The 1999 Pilot Plant review effort clearly indicated that significant site-specific design and risk information was not captured in the Phase 2 Worksheets forwarded to you last spring.

Subsequently, a site visit was conducted by the Nuclear Regulatory Commission (NRC) to verify and update plant equipment configuration data and to collect site-specific risk information from your staff. The enclosed document reflects the results of this visit.

The enclosed Phase 2 Worksheets have incorporated much of the information we obtained during our site visits. The staff encourages further licensee comments where it is identified that the Worksheets give inaccurately low significance determinations. Any comments should be provided to the Document Control Desk, with a copy to the Chief, Probabilistic Safety Assessment Branch, Office of Nuclear Reactor Regulation. We will continue to assess SDP accuracy and update the document based on continuing experience.

O. Kingsley While the enclosed Phase 2 Worksheets have been verified by our staff to include the site-specific data, we will continue to assess its accuracy throughout implementation and update the document based on comments by our inspectors and your staff.

If you have any questions, you may reach me at (301) 415-1261.

Sincerely,

/RA/

Helen N. Pastis, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-219

Enclosure:

As stated cc w/o encl: See next page

O. Kingsley While the enclosed Phase 2 Worksheets have been verified by our staff to include the site-specific data, we will continue to assess its accuracy throughout implementation and update the document based on comments by our inspectors and your staff.

If you have any questions, you may reach me at (301) 415-1261.

Sincerely,

/RA/

Helen N. Pastis, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-219

Enclosure:

As stated cc w/o encl: See next page DISTRIBUTION:

PUBLIC PD I-1 R/F JMunday SLittle HPastis MSykes ACRS OGC JRogge

Enclosure:

ML013120607 Package: ML013120589 ACCESSION NOs: Letter: ML013120536 OFFICE PDI-1/PM PDI-1/LA PDI-1/(A)SC NAME HPastis:cn SLittle JMunday DATE 1/29/02 1/28/02 1/30/02 OFFICIAL RECORD COPY

Oyster Creek Nuclear Generating Station cc:

John Skolds Kent Tosch, Chief Chief Operating Officer New Jersey Department of Exelon Generation Company, LLC Environmental Protection 4300 Winfield Road Bureau of Nuclear Engineering Warrenville, IL 60555 CN 415 Trenton, NJ 08625 William Bohkle Senior Vice President Nuclear Services Michael P. Gallagher Exelon Generation Company, LLC Director - Licensing 4300 Winfield Road Exelon Generation Company, LLC Warrenville, IL 60555 Correspondence Control Desk P.O. Box 160 John B. Cotton Kennett Square, PA 19348 Senior Vice President - Operations Support Exelon Generation Company, LLC Ernest J. Harkness 4300 Winfield Road Plant Manager Warrenville, IL 60555 Oyster Creek Nuclear Generating Station AmerGen Energy Company, LLC Joseph J. Hagan P.O. Box 388 Senior Vice President - Forked River, NJ 08731 Mid Atlantic Regional Operating Group Exelon Generation Company, LLC Kevin P. Gallen, Esquire 200 Exelon Way, Suite 305 Morgan, Lewis & Bockius LLP Kennett Square, PA 19348 1800 M Street, NW Washington, DC 20036-5869 Jeffrey A. Benjamin Vice President - Manager Regulatory Assurance Licensing and Regulatory Affairs Oyster Creek Nuclear Generating Station Exelon Generation Company, LLC AmerGen Energy Company, LLC 4300 Winfield Road P.O. Box 388 Warrenville, IL 60555 Forked River, NJ 08731 Ron J. DeGregorio Edward J. Cullen, Jr., Esquire Vice President Vice President, General Counsel and Oyster Creek Nuclear Generating Station Secretary AmerGen Energy Company, LLC Exelon Generation Company, LLC P.O. Box 388 300 Exelon Way Forked River, NJ 08731 Kennett Square, PA 19348 H. J. Miller J. Rogge, Region I Regional Administrator, Region I U. S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission 475 Allendale Road 475 Allendale Road King of Prussia, PA 19406-1415 King of Prussia, PA 19406-1415 Mayor Lacey Township 818 West Lacey Road Forked River, NJ 08731 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 445 Forked River, NJ 08731